HomeMy WebLinkAboutContract 55108-CO3 CSC No. 55108-CO3
FC'3 RT Wo RT H City of Fort Worth
Change Order Request
ProjectName:1 Water&Sanitary Sewer Replacement Contract 2019,WSM-B City Sec No.: 1 55108
Project No.(s): 56002-0600430/0700430-001780;30100-0200431002480 NTP N/A CityProj.No.:l 102169
Project Description:F
and Sewer Lines Replacement and Pavement Improvements
Contractor: Gra-Tex Utilities,Inc. Change Order# Date: 2/17/2022
City Project Mgr.1 Pratima Poudyal City Inspector: I Ryan Miller
Phone Number: 817-392-6149 Phone Number: 817-871-8306
Dept. Unit i Water Unit li Sewer Unit III Pavement Totals Contract Time
(Calendar days)
Original Contract Amount $3,421,054.20 $109,903.70 $1,402,515.40 $4,933,473.30 430
Extras to Date $0.00 $0.00 $0.00 $0.00 0
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $3,421,054.20 $109,903.70 $1,402,515.40 $4,933,473.30 430
Amount of Proposed Change Order $0.00 $0.00 0.01 $0.01 30
Revised Contract Amount $3,421,054.20 $109,903.70 $1,402,515.41 $4,933,473.31 460
Original Funds Available for Change Orders $102,632.80 $10,990.30 $70,126.60 $183,749.70
Remaining Funds Available for this CO $102,632.80 $10,990.30 $70;126.60 $.183,749.70
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACTCOST+25%) $6,166,841.63
„";JUSTIFICATION(REASPNS)fOR RANGE ORDER
Change Order No.3 provides for the replacement of unstable 7-inch thick non-reinforced concrete sub-base that was encountered during water
main replacement on W Drew Street.It is necessary to repair the subgrade to facilitate pavement rehabilitation.Staff concurs with the
contractor's request for additional 30 calendar days on the project for the time it took to excavate and replace/rehabilitate the subgrade.
I It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor•s,Com an ,Name: .Contractor Name Contractor Si tuts . :. Date. :.
Gra-Tex Utilities,Inc. John Crowley
Ins ecto z Date P•ro'ectManager Date"-
ZQ
201 02/18/2022
D'recio�• _ater De t ; ;. bate Con§truchori Supervisor' PW.pe't Date
Feb 21,2022
Assistaq�r3` Att4frie _ <:, _ Date Assistant..' `f�ana'er ; e: y
. _ .. Fe121,202'2 o f _
Feb 23,2022
'C+OUn-c'I AChOFt, _ Ilfed
__ r
M&C Number N/A M&C Date Approved OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
FO RT W40 RT H City of Fort Worth
Change Order Additions
Project Name Water&Sanitary Sewer Replacement Contract 2019,WSM-B City Sec No.: 55108
Project No.(s): 56002-0600430/0700430-001780;30100-020043/002480 DOE No. N/A City Proj.No.: 102169
Project Water and Sewer Lines Replacement and Pavement Improvements
Description
Contractor Gra-Tex Utilities,Inc. Change Order: Date: 2/17/2022
City Project Mgr. Pratima Poudyal City Inspector F Ryan Miller
ADDITIONS
DEPT Qty Unit Unit Cost Total
37 Crack Seal Asphalt Unit III Pavement 135.00 GA $34.65 $4,677.75
38 Concrete Sub-Grage Repair Unit III Pavement 120.00 CY $381.00 $45,720.00
24 Unclassified Excavation Unit I II Pavement 125.00 CY $25.00 $3.125.00
Unit I Water
Unit II Sewer
Unit III Pavement $53,522.75
Page 1 of 3 Additions Sub Total $53,522.75
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Water&Sanitary Sewer Replacement Contract 2019,WSM-B City Sec No.: 1 55108
Project No.(s): 56002-0600430/0700430-001780;30100-020043/002480 DOE No. N/A City Proj.No.: 102169
Project Description Water and Sewer Lines Replacement and Pavement Improvements
Contractor Gra-Tex Utilities,Inc. Change Order: [::� Date 2/17/2022
City Project Mgr. Pralima Poudyal City Inspector: I Ryan Miller
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
33 Pavement Construction Allowance Unit III Pavement 0.345308 LS $155,000.00 $53,522.74
Unit I Water
Unit II Sewer
Unit III Pavement $53,522.74
Page 2 of 3 IDeletions Sub Total $53,522.74
MIWBE Breakdown for this Change Order
MWBE Sub Type`of Service Amount for this G0
Total $0 0
Previous Change Orders
Co;#, DATE AMOUNT
Total $0 00
Page 3 of 3
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
l )
Signature
Pratima Poudyal,P.E.
Name of Employee
Project Manager
Title
ATTEST:
�7Gtl1ll���� G00�GtLG pgF00000000
Jan nette S.Goodall(Feb 24,202210:03 CST) ����O OO O
O O
L O vA
,t
P_O
Jannette Goodall V o 0=�
00 0�
City Secretary �d 00 0d
00000000 a
��SEX Asap
OFFICIAL RECORD
I
CITY SECRETARY
FT.WORTH, TX