AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No . 50217
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and
Associates, Inc. , (ENGINEER) made and entered into City Secretary
Contract No. 50217 , (the CONTRACT) which was authorized by M&C C-28545 on
the 23rd day of January, 2018 in the amount of $1,795, 070 . 00; and
WHEREAS , the CONTRACT was subsequently revised by Amendment No. 1
in the amount of $48 ,720 . 00 administratively authorized on April 6th,
2021; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Clear Fork Lift Station and Force Main; and
WHEREAS , it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE , CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $49,256. 00.
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1,893, 046. 00.
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City' s
designated Assistant City Manager.
OFFICIAL RECORD
CITY SECRETARY
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [Clear Fork Lift Station and FT. WORTH, TX
Page 1 of 2
APPROVED:
City of Fort Worth ENGINEER
Kiml,-y-Morn anr' Associates, Inc.
oaa an
Dana Burghdoff �1 �70hn Atkins, P.E
Assistant City Manager Vice President
DATE:
Mar 3,2022 DATE: 03/02/2022
APPROVAL RECOMMENDED:
1'l1!41 ti 4 /"
���=roP�ena�d :Ma,, s.a,�,
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
r
Liam Conlon
Project Manager
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
oe
Date: N/A
Douglas W. Black Form 1295 : N/A
Senior Assistant City Attorney
ATTEST: 0'C°F 000000
oo
o
nette S.Good a[[(Mar 4,202207: ST) C)o o��
° °°
Jannette S. Goodall °°° �
0000000° d
City Secretary �tt��EXpS,oaA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [Clear Fork Lift Station and Force Main]
Page 2 of 2 [CPN 100996)
VMWvcy>>>Horn
March 2, 2022
Mr. Liam Conlon
Project Manager
City of Fort Worth Water Department
200 Texas Street
Fort Worth,TX 76102
Re: Clear Fork Lift Station and Force Main
Amendment No. 2—Lift Station Value Engineering Services
KHA No. 061018214
City Project No. 100996; CSC 50217
Dear Liam:
This letter is in reference to a contract between Kimley-Horn and Associates, Inc. ("Engineer" or
"Kim ley-Horn") and the City of Fort Worth (the City)dated 01-31-2018 referred herein as the
"Contract".
The City has commenced with publicly advertising the Clear Fork Lift Station project. The City has
requested that Kimley-Horn perform value engineering services under Amendment Number 2 for the
Clear Fork Lift Station and Force Main project which are outside of the scope of services as defined in
the Contract.These services include reducing the size of the proposed Clear Fork Lift Station wetwell,
and making modifications to proposed equipment, piping, electrical, and instrumentation
improvements. Service details are further described as follows:
CONTRACT TASK 6 — LIFT STATION — CONSTRUCTION CONTRACT
DOCUMENT PREPARATION:
(Water$0, Sewer$49,256)
$27,296 Kimley-Horn
$14,560 Electrical Sub
7,40 Structural Sub
$49,256 Total
ENGINEER will complete the following additional tasks in accordance with the Original Contract:
• Remove one pump and associated discharge piping, valves, fittings, VFD, and associated
electrical and instrumentation items, interior baffle wall and sluice gates from wetwell, and
narrow wetwell dimensions accordingly.
• Remove discharge meter bypass line and valve and upstream isolation valve and
configure discharge line to allow for draining of on-site force main into wetwell.
• Update construction contract documents to reflect changes to the following:
o Lift Station Wetwell Piping and Yard Piping
o Electrical and Instrumentation
o Site Grading and Paving
I'Mhan ey>>> o rr n Page 2
We recommend that the City increase the budget by$49,256 for these additional services.The
following tables summarize our recommended budget revisions, water and sanitary sewer design fees,
and revised contract amount:
Description Water Sewer Total
Task 1 —Project Management $0 $0 $0
Task 2—Lift Station Site Feasibility and Due Diligence $0 $0 $0
Task 3—Lift Station Property Acquisition $0 $0 $0
Task 4—Lift Station Preliminary Design $0 $0 $0
Task 5—Lift Station Final Design $0 $0 $0
Task 6—Lift Station Construction Contract Document $0 $49,256 $49,256
Preparation
Task 7—Lift Station Bid Phase Services $0 $0 $0
Task 8—Lift Station Construction Phase Services $0 $0 $0
Task 9—Lift Station Record Drawings $0 $0 $0
Task 10—Force Main Alignment Study $0 $0 $0
Task 11 —Force Main Preliminary Design $0 $0 $0
Task 12—Force Main Final Design $0 $0 $0
Task 13—Force Main Construction Contract Document $0 $0 $0
Preparation
Task 14—Force Main Bid Phase Services $0 $0 $0
Task 15—Force Main Construction Phase Services $0 $0 $0
Task 16—Force Main Record Drawings $0 $0 $0
Task 17—Permitting Services $0 $0 $0
Task 18—ROW/Easement Services $0 $0 $0
Task 19—Survey and SUE $0 $0 $0
Task 20—Additional Services $0 $0 $0
Total $0 $49,256 $49,256
• • 80100 Ft.Worth, 76102
II(iifru Ile > C horn Page 3
The following table summarizes our recommended budget revisions and shows the revised contract
amount:
Original Amendment Amendment
Contract No. 1 No. 2 Revised Contract
Task 1 $33,000 $33,000
Task 2 $83,330 $83,330
Task 3 $39,700 $39,700
Task 4 $265,230 $265,230
Task 5 $357,710 $357,710
Task 6 $40,060 $49,256 $89,316
Task 7 $43,910 $43,910
Task 8 $173,050 $173,050
Task 9 $8,900 $8,900
Task 10 $64,900 $64,900
Task 11 $178,460 $178,460
Task 12 $111,730 $111,730
Task 13 $14,500 $14,500
Task 14 $23,520 $23,520
Task 15 $91,760 $91,760
Task 16 $13,100 $13,100
Task 17 $21,700 $48,720 $70,420
Task 18 $42,570 $42,570
Task 19 $137,940 $137,940
Task 20 $50,000 $50,000
Total $1,795,070 $48,720 $49,256 $1,893,046
Project
I
RIMOMMINIMMI 8010•
lKiliI II II11ey>>> Il!orn Page 4
The following breakdown for water and sewer services is recommended:
Water Fee Sewer Fee Surve Fee y Total
Original Contract $0 $1,657,130 $137,940 $1,795,070
Amendment No. 1 $0 $48,720 $0 $48,720
Amendment No. 2 $0 $49,256 $0 $49,256
Total $0 $1,755,106 $137,940 1 $1,893,046
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES
fn R. Atkins, P.E.
Vice President
JCK/jra
Copy to: Tony Sholola, P.E,, City of Fort Worth
Attachments - Level of Effort Spreadsheet
\\klmley-horn\TX_FT MFT W_UliliU es\061010214-Clear-Fork-LS&FMIPPP W OS T_IJT P%imendmenl-No-2lAmendmenl-No.2_Clear.Fork.LS&Rd,doc
I
e e 80111 Ft.Worth, 76102
\7\
\[� �
= r
((k(() (
> 0 ® ( \
. &! « %\ ! � 00
o
\ -
»»> (
} /
m
0 0
\e §§§§& \)\\ m ��e,R w � \k
Rf m®2`m I � 23, {
/
\ 0 2 \
5 g « m
00 ° j �o
/ / m $ \
w / qf � m
2 \ 2 ± � \
z CU
� ƒ \f
» , # m > �
m ow % z �
cn, va
/ � 0 k (D
� � as
� 2 E
0 ƒ
§ §§3§§m § ` ( m
uj
# w [
m m \ /
`
=m
322
\((
)\\2
Eaein n �
\EE-Eem ,
� -
(\\) ; ; ! F m £Gmmmmk ` \
\ 7m\\\6 \ \ \\\\\m \ } )