Loading...
HomeMy WebLinkAboutContract 49230-A2 CSC No.49230-A2 Amendment No.2 To Maintenance Agreement (City Secretary No. 49230) This Amendment No. 2("Amendment")to that certain Maintenance Agreement(City Secretary No. 49230,June 26,2017) ("Agreement")is made by and between the City of Fort Worth("City"),a Texas home-rule municipal corporation having its principal office at 200 Texas,Fort Worth,Texas, and RIOTECH(formerly CTC Inc.),a Texas corporation,having its principal office at 9601 Camp Bowie West Boulevard,Fort Worth,Texas("RIOTECH"). On February 2,2005,the City entered into an agreement with the Fort Worth and Western Railroad Company("Railroad")for the installation and maintenance of an at-grade crossing, including warning signal devices,at Museum Way and to install and maintain warning signal devices at the West 71 Crossing. The City has contracted with RIOTECH(formerly CTC Inc.)to perform said maintenance. On October 4,2013,the City entered into a Compromise Settlement Agreement For TRV Bridges (City Secretary No. 44950)with the Railroad whereby the City agreed to install and maintain temporary railroad crossings at Henderson Street and N. Commerce Street("Temporary Crossings")to allow for construction of bridges as part of the Trinity River Vision Central City Project. On September 18,2018,the City and RIOTECH amended the Agreement to provide for maintenance at the temporary at-grade crossings at Henderson Street and N. Commerce Street(City Secretary No. 49230-A1). City now desires to amend its Agreement with RIOTECH to provide for additional scope and costs for the removal of the Temporary Crossing railroad safety/signal equipment previously installed and maintained at Henderson Street and N. Commerce Street. 1. Services to be provided by Contractor In addition to those services in the Agreement,which shall not be affected by this Amendment, RIOTECH agrees to remove the temporary at-grade crossing railroad safety/signal equipment at Henderson Street and N. Commerce Street,including highway-rail grade crossing warning systems in the same manner and with the same duties and standard of care as described in the Agreement. RIOTECH's scope of work shall be in accordance with Attachment A—Scope of Work("Scope of Work"),attached hereto and incorporated herein. 2. Payment To Contractor RIOTECH agrees to complete the Scope of Work for the Lump Sum Fee of$27,000.00,as quoted in Attachment B—Compensation,attached hereto and incorporated herein. 3. No Changes to Original This Amendment makes no changes to sections 3,4, or 5 of the Agreement,which terms shall remain in full force and effect with regard to the tasks,duties and responsibilities of the parties pursuant OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX to this Amendment. In addition to the specific,there are no changes to any general sections of the Agreement except that the Notice provision in Section 5 of Amendment 1 shall survive. 4. Term This Amendment shall be governed by the term found in Section 6 of the Agreement and the responsibilities and obligations of RIOTECH under Amendments 1 and 2 shall,necessarily,terminate when the work outlined in the Scope of Services is completed and the at grade railroad crossings on Henderson Street and N. Commerce Street are fully decommissioned. Signature Page To Follow ACCORDINGLY,the duly authorized representatives of the parties hereto have executed this Amendment,whiZshallbective as of the date subscribed by the City's City Manager or his �,�„ RIOTECH: City of Fort Worth .�..- 75aru�BuNalu�o�f Dana Burghdoff( r4,20 3:4 Danny Fregia ce President of Operations Dana Burghdoff Assistant City Manager Date: l Z Date: Mar 4,2022 ATTEST: ooq�FpRp��a Approved as to Form and Legality: .� FWV°°°°°°°°00 pad ;a)Thette S.Goodall(Mar 4,202213• ST) 0 01 Mack(Mir 4,202213:39 CST) Jannette S. Goodall v o a 2 Y��� Douglas W. Black City Secretary '0, o° °o�c�� Sr.Assistant City Attorney ° °00000°°° a Approval Recommended. a��nEXASbA M&C: N/A Date: By:WJ(Mar3,202214: CST) William M.Johnson,Director Transportation and Public Works Department Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Tai Nguyen Tai Ngu n(Mar 3,202210:36 CST) Name of Employee Tai Nguyen Railroad Coordinator Title OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Attachment B - Compensation RIOTECH Quote Date: Monday,January 31,2022 Prepared for: Tai Nguyen Railroad Projects Coordinator City of Fort Worth tai.nsuyen@fortworthtexas.sov Description:Removal of both Henderson and Commerce crossing equipment LINE DESCRIPTION QTY UOM 1 Charge for removal of two crossings 1 EA $27,000.00 $27,000.00 2 0 EA $0.00 $0.00 3 0 EA $0.00 $0.00 4 0 EA $0.00 $0.00 5 0 EA $0.00 $0.00 6 ***THIS ESTIMATE INCLUDES THE 0 EA $0.00 $0.00 7 REMOVAL AND TEMPORARY STORAGE OF 0 EA $0.00 $0.00 8 0 EA $0.00 $0.00 9 CROSSING EQUIPMENT *** 0 EA $0.00 $0.00 10 0 EA $0.00 $0.00 11 0 EA $0.00 $0.00 12 0 EA $0.00 $0.00 15 0 EA $0.00 $0.00 TOTAL $27,000.00 Offered by: Sam Silva Note: Sales Tax not included Thank you for the opportunity to submit a proposal to you.Please reference this estimate when placing order.If you have any All amounts in U.S.Currency questions,please call or send email to me. This Estimate is valid for 90 days. 9601 Camp Bowie West Fort Worth,TX.76116 Office:(817)886-8243 Cell:(817)470-7838 RI OTECH Attachment A - Scope of Work February 16, 2022 Removal of crossing related equipment at both the Henderson St. and Commerce St. crossings, Fort Worth, TX. Construction Plan / Scope of work This scope of work covers the removal of the entirety of signal related crossing equipment (bungalow, signals, foundations, underground cable, and termination shunts) at both crossings, but DOES NOT cover any roadway (pavement, sidewalk, etc.) or track (crossing panels, ties, etc.) components. 1. Coordinate railroad flagging with the Fort Worth and Western Railroad. 2. Coordinate with RR and CDL for recalibration of any overlapping crossings. 3. Secure all internal components and remove crossing bungalow. 4. Remove all crossing related cabling and grounding to bungalow. 5. Deconstruct any elevated pad or walkway to bungalow and level to current grade. 6. Secure and remove both crossing signals. 7. Remove signal foundations and all underground cabling. 8. Deconstruct any elevated pad or walkway to signals and level to current grade. 9. Remove crossing termination shunts from track and replace track ballast at each location. 10. Deliver all removed material and equipment to pre-determined location. 11. Coordinate inspection upon completion with City and Railroad representatives for final acceptance. Please feel free to contact me with any questions you may have concerning any portion of this Scope of Work, thank you. S. "A Sam Silva Riotech 9601Bowie West Fort Worth,TX 76109 CS49230-RRAM-Temporary Crossing Removal @ Henderson St and N . Commerce St Interim Agreement Report 2022-03-04 Created: 2022-03-02 By: Andrea Munoz(Andrea.Munoz@fortworthtexas.gov) Status: Out for Filling Transaction ID: CBJCHBCAABAAmXwZKd-ncu2iAzbMKd6-Nl8BzY9U5gaw Agreement History Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature.A final audit report will be generated when the agreement is complete. "CS49230-RRAM-Temporary Crossing Removal @ Henderson St and N. Commerce St" History Document created by Andrea Munoz(Andrea.Munoz@fortworthtexas.gov) 2022-03-02-2:51:54 PM GMT-IP address:209.194.29.100 Document emailed to Ilianisse Figueroa Aponte (Ilianisse.FigueroaAponte@fortworthtexas.gov)for approval 2022-03-02-2:57:21 PM GMT Email viewed by Ilianisse Figueroa Aponte(Ilianisse.FigueroaAponte@fortworthtexas.gov) 2022-03-02-3:07:08 PM GMT-IP address:209.194.29.100 Document approved by Ilianisse Figueroa Aponte (Ilianisse.FigueroaAponte@fortworthtexas.gov) Approval Date:2022-03-02-3:10:23 PM GMT-Time Source:server-IP address:209.194.29.100 Document emailed to Tai Nguyen (tai.nguyen@fortworthtexas.gov)for signature 2022-03-02-3:10:26 PM GMT Email viewed by Tai Nguyen (tai.nguyen@fortworthtexas.gov) 2022-03-03-3:17:29 PM GMT-IP address:107.77.198.131 Document e-signed by Tai Nguyen (tai.nguyen@fortworthtexas.gov) Signature Date:2022-03-03-4:36:18 PM GMT-Time Source:server-IP address:209.194.29.100 Document emailed to Kelly K Porter(kelly.porter@fortworthtexas.gov)for approval 2022-03-03-4:36:20 PM GMT FORT WORTH, :_seoev Adobe Sign Email viewed by Kelly K Porter(kelly.porter@fortworthtexas.gov) 2022-03-03-5:29:28 PM GMT-IP address:209.194.29.100 Document approved by Kelly K Porter(kelly.porter@fortworthtexas.gov) Approval Date:2022-03-03-5:29:50 PM GMT-Time Source:server-IP address:209.194.29.100 Document emailed to WJ (William.Johnson@fortworthtexas.gov)for signature 2022-03-03-5:29:52 PM GMT Email viewed by WJ (William.Johnson@fortworthtexas.gov) 2022-03-03-7:06:44 PM GMT-IP address:172.225.12.206 Document e-signed by WJ (William.Johnson@fortworthtexas.gov) Signature Date:2022-03-03-8:57:30 PM GMT-Time Source:server-IP address:209.194.29.100 Document emailed to Priscilla Ramirez(Priscilla.Ramirez@fortworthtexas.gov)for approval 2022-03-03-8:57:32 PM GMT Email viewed by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov) 2022-03-03-10:36:17 PM GMT-IP address:97.99.130.152 Document approved by Priscilla Ramirez(Priscilla.Ramirez@fortworthtexas.gov) Approval Date:2022-03-03-10:36:49 PM GMT-Time Source:server-IP address:97.99.130.152 Document emailed to DBlack(Douglas.Black@fortworthtexas.gov)for signature 2022-03-03-10:36:51 PM GMT Email viewed by DBlack(Douglas.Black@fortworthtexas.gov) 2022-03-04-7:38:55 PM GMT-IP address:209.194.29.100 c% Document e-signed by DBlack(Douglas.Black@fortworthtexas.gov) Signature Date:2022-03-04-7:39:25 PM GMT-Time Source:server-IP address:209.194.29.100 Document emailed to Dana Burghdoff(Dana.Burghdoff@fortworthtexas.gov)for signature 2022-03-04-7:39:27 PM GMT Email viewed by Dana Burghdoff(Dana.Burghdoff@fortworthtexas.gov) 2022-03-04-7:40:25 PM GMT-IP address:209.194.29.100 Document e-signed by Dana Burghdoff(Dana.Burghdoff@fortworthtexas.gov) Signature Date:2022-03-04-7:40:39 PM GMT-Time Source:server-IP address:209.194.29.100 Document emailed to Allison Tidwell (allison.tidwell@fortworthtexas.gov)for approval 2022-03-04-7:40:41 PM GMT Email viewed by Allison Tidwell (allison.tidwell@fortworthtexas.gov) 2022-03-04-7:55:18 PM GMT-IP address:47.24.14.100 FORT WORTH, :_seoev Adobe Sign Document approved by Allison Tidwell (allison.tidwell@fortworthtexas.gov) Approval Date:2022-03-04-7:55:28 PM GMT-Time Source:server-IP address:47.24.14.100 Document emailed to Jannette S. Goodall Qannette.goodall@fortworthtexas.gov)for signature 2022-03-04-7:55:30 PM GMT Email viewed by Jannette S. Goodall (Jannette.goodall@fortworthtexas.gov) 2022-03-04-7:55:49 PM GMT-IP address:209.194.29.100 Document e-signed by Jannette S. Goodall Qannette.goodall@fortworthtexas.gov) Signature Date:2022-03-04-7:56:31 PM GMT-Time Source:server-IP address:209.194.29.100 Document emailed to Vania Soto (Vania.Soto@fortworthtexas.gov)for filling 2022-03-04-7:56:33 PM GMT Email viewed by Vania Soto(Vania.Soto@fortworthtexas.gov) 2022-03-04-8:10:56 PM GMT-IP address:209.194.29.100 FORT WORTH, :'31,EREoaY IV_ Adobe Sign