HomeMy WebLinkAboutContract 55050-FP1 FORT WORTH. TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION City Secretary No:_55050 -FP1 Date Received:Mar 7,2022 City Project Ne: 102540 Regarding contract 55050 for HIGHLAND HILLS,MONTICELLO,AND JESSAMINE CONCRETE REHABILITATION as required by the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 11/17/2020 through M&C 20-0851 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $ 999,095.00 Amount of Approved Change Orders: $76,200.00 N91,2 Revised Contract Amount: $1,065,295.00 Total Cost Work Completed: $1,062,294.84 Less Deductions: Liquidated Damages: 0 Days @$650.00/Day Pavement Deficiencies: Total Deduction Amount: $0.00 Total Cost Work Completed: $1,065,294.84 Less Previous Payments: $1,012,030.10 Final Payment Due $ 53 264.74 L6LGL &K'Pnc tw Lauren Prieur(Mar4,202213:38 CST) Mar 4,2022 Recommended for Acceptance Date Asst. Director, TPW - Capital Delivery wj(Mar7,202209:1 ST) Mar 7,2022 Accepted Date Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT Client Department 0cgn67 2441 OAC Dana Burghdoff(Mar 7,2022 09:51 CST) Mar 7,2022 Asst. City Manager Date Comments: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX C-620 Signature Page Contractor's A L Hcation for Payment Invoice No. 18-Final To(Owner). City of Fort Worth Invoicing Period(From-To): Invoice Date: VW2-2n3l22 2232022 P.0 �,W020—����004872 From(Contractor): Remit to(NNot Automatic Deposit): Number. Makou Inc Project: 102540 Contractor's CFW Vendor No.: 7000000265 City Secretary Contract 55050 Contra Number. .Cc:2020 Highland Hills,Monticello and Jessamine Concrete Rehabilitation Name: Application For Payment Change Order Summary ArDrovod Chan eOrders 1.ORIGINAL CONTRACT PRICE......_.._........................................_.... S $989,095.00 Number Additions Deletions 2.Net change by Change Orden............................................................. S S76,200.00 1 S129,800.00 $81,000.00 3.Current Contract Price(Line lt2)................................................._..... S SI,065,295.00 2 $27,400.00 4.TOTAL COMPLETED AND STORED TO DATE 3 (Progress Estimate,Construction Allowance and Change Orders)....... S $1,065,294.84 4 S.RETAINAGE: 5 a.5.0% X Work Completed..........S 6 b. X Not Used S 7 c.Total Retains a Line 5a+Line 56 8 6.AMOUNT ELIGIBLE TO DATE(Line 4-Line 5c)............................. S SI,065,294.84 TOTALS $157,200.00 $81,000.00 7,LESS PREVIOUS PAYMENTS(Line 6 from prior Application)........5 S1,012.030.10 NEf CHANGEBY $76,200.00 S.AMOUNT DUE THIS APPLICATION................................................. S S53,264.74 CHANGE ORDERS 9.BALANCE TO FINISH,PLUS RETAINAGE (Column G an Progress Estimate+•CA+Cos+Line 5 above)..............S S0.16 Contractor's Certification 10.CONTRACT TIME: The Contractor certifies with the submittal of this document and associated Payment Request Submittal a. Days Awarded 230 on Ore City of Fort Worth Buzzsaw system that to the best of their knowledge;(1)all previous progress b, Days Added by CO 30 payments received from Owner on account of Work done under the Contract have been applied on account to discharge Contractor's legitimate obligations incurred in connection with Work covered by a Total Days 260 prior Applications for Payment;(2)tide of all Work,materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to Owner at time ofpaymeot d. Days Charged 260 free and clear of all Liens,security interests and encumbrances(except such as are covered by a Bond acceptable to Owner indemnifying Owner against any such Liens,security interest or encumbrances); a Days Remaining and(3)all Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective. Liquid Damages S650.00 x day ay�"Y&&d khawy magso d khan(Mar3,2022 14:59 CST) This document has been modified from its original form as an EJCDC document and the user did not highlight the modifications.You are encouraged to read the document carefully and consult Legal Counsel prior to its execution. MSiCIB`iOiaEZf3y"d'e�PV''mNAo1N= P'J'PP N � gS U,Qy i gp n $$'yAW �iA�f 3Ag 9A�A � r�Y � sgdds�3d83:88 c ' PQ g��Ll atiSs5-1 s155-1ss-1-1� <a Q'N � a^ _ N O GL A n Ys S '1383 Balsa Wptla8so888uWccG8S8a8cwwsg gs a j � I q 8888.5.8$9S$$,808:8$488,88 a 3 s s n a�xrap s xtzss{q�s a. 8I88.888$8ISS88098'8.89988.88138I88$8 WHO 8, HIM G c I i e &Ltp N'9 nett Rigt3 Fg� ffiax's w sssa asses .���� sss IgI N s a I o O m � 1 7 { n O 2. A 7 gn 9 g A ` e y 5 C a q b p n 0 Ct. e Ei ' Liu � Q� 9 a m B m a � R o ; `c a� n n x O 3 G I 9 � ■d t� o N A W O � 0 x H 8 I a °o n O D � y a N 4 r� 2 G 1 ��y �+ 4 c G i �� l i I •I I I I i 7 ` , i 1 e c �o ' N lfl r� ' g p o 0 1 i Q s S ti j I � I A Al CD Q 3 ' o � eIIe. } C f t Q l7 pp ^ n O O rn xo C � � O N S. W tia C Cl e $ O y o IF sg I ? n a 3 tit a H � C pR Z x I I x o fl � \l � I 0 L x � "S O p p P n 0 a ti i eg o N e H c 0 y Q S o 0 w a a a rl'�; R® t 3 e °. °. QU ae n ^s M o O I 0 CD LA gc. tj z P4 z 4 9. CD I I 22 N a � N G 'c a. ^ C \t e to y a I � � O' GR' 1. 8 N b y S S i � N 4 8 a o g? g �+ g � o�n o ye o 0 ro o z ao n �Sn rt I n i o a C)CD C>0 0 CZ)0 C) C3 0(1) C)Co C,a C) CD CD Co 0 C. w (D C)CD C)C) C)C) 0 (D c) (A C) C) C) C) ? cp 6 C) CD cn C) (D C) 0 CD 0 0 C) C) CD C C) CL Fz p O� CD 0, NO I-n (D rn(D M(D m 0 oo� a 0 0 OD Co cl), Wo 0 W a, (,) 0 ID (D co @ C2;,& 0 0 Ul L11 (0 CD (0 ul 69 -4 (n -4 00 CD co (31 a lJ Ili (DO co(o 0) K) CLI co Co 0C) C) G. 0, 00 o i Go 0 0 ca CA i 0000000000w0 0o00000000wo a000000000w o 00 0 o n O p N C) CDAA O En W 0 O A J 0 0 0 0 4 a z I ww �a cnw 0 0! Ao o IF)o a LO m w O; w O' w O' ct wa. wa wco o ro (Dw! (D T; c C I CL to I N I � O "J 1 x I � � o N n N ;f N O: N O W O ts W Vl 3' o m 7 0 --h { O n i c, N p 00 C � � O O o o 00 N b ro (D d ^. z (D d 0 N A N O N W N Z O � N N 0 0 0 0 0 0 0 0 0 o w 0 0 0 0 0 0 0 0 0 0 W 0 0 0 0 0 0 0 0 0 o w 0 0 0 0 0 j 0 0 0o n O N O (n NO N I ClO O O A41. O A O O ❑ O' O : O O O _ CL z �w Nn � n ba o ooi �i Ao� i' �• m Rl fD! - ITN M(D �.. o. wos WO WO =hl a O O p �. Ul �� V �O) O O (O (D (OD 'TI Ul O I 0: I N � O N ' O S 7 ' d O x A 01 N I : N r (D fD! N O CL N O W N C. V Cl) i 3 c ir i ] b -++ O ~ (n O � p p_ p 0 A J N b o O N A N W Z N 0 K N N I ppppppppppw p p n b N N i O O n W m CD A O0 E0 C P O 7 0 z c) � b G A,° S' w o' O W n 'ti ti o O• o a c cn ;i Ul coo N O N O 'S w a x0 • —h 7 w ()I 3 N cNn m N N .•r' A A N to0 O CL N O W A N O Ll. N G. � V/ A I(D, C A 69 fA 7 iy m CD p p b rn rn � w O tj b O � a 00 c fA N: .7 O O O o A DD J N b O A f+ O N A N O N W can � N O (J W A J A it I it CSC No.55050-COI FORT WORTH, City of Fort Worth Change Order Request Project Name Highland Hills,Monticello and Jessamine St City Sec# 55050 Client Project#(s) 102540 Project The repair and reconstruction of failed sidewalks,curbs&gutter,ramps and driveways Description Contractor Makou Inc Change Order# 1 Date 51512021 City Project Mgr. Salman Shahid City Inspector F Rodney Beecham Contract Time Dept. TPW Totals CD Original Contract Amount $989,095.00 989,095.00 230 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $989,095.00 $989,095.00 230 Amount of Proposed Change Order 48,800.00 $48,800.00 0 Revised Contract Amount $1,037,895.00 $1,037,895.00 230 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $48,800.00 $48,800.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.93% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,236,368.75 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order is to add an additional$48,800.00 to the construction contract 55050 with revised contract amount of$1,037,895.00.Project has available funds required for this change order through the General Capital Project fund and does not need additional funding. To match the existing curb and gutter on the project site,the 18"gutter with 7"curb needs to be revised to 24"a gutter with 7"curb.Also,some gutters and ramps need an additional asphalt transition due to several cracking in the existing pavement. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor Name Contract Signature Date A110 000V141y Makou Inc Maqsood Khan May 11,2021 Inspector/inspection Supervisor Date Project Mana erlPro ram Manager Date Assistant Director(Dept) May Date021 Director,Contrac '_ ""'�'����"�� May 12,2021 12, TDP ( tin Department(Dept) Date :,_,,,7", May 12,2021 i , May 12,2021 Assistant City Attorney Date Assistant City Manager Date May 13,2021 May 13,2021 Council Action if required M&C Number M&C Date Approved 10/ 88/ 0014 ATTEST: Mary J.Kayser,City Secretary City of Fort Worth Change Order Additions Project Name I Highland Hills,Monticello and Jessamine St City Sec# 55050 Client Project# 1 102540 Contractorl Makou Inc PM1 Selman Shahid Inspector) Rodney Beecham Change Order Submittal# O1 Dale 51512021 ADDITIONS Unit Unit Cost Total ew oncre e ur)&24"(3ulter F ev) Asphalt Transition TPW 200.00000000 ton $187.00 e, TPW 129,800.00 Sub TotalAdditions $129,800.00 Change Order Additions Page 2 of 4 FrntrII City of Fort Worth Change Order Deletions Project Name I Highland Hills,Monticello and Jessamine St City Sec# 55050 Client Project# 102540 Contractor Makou Inc PM Selman Shahid Inspector Rodney Beecham Change Order Submittal# O1 Date 515f2021 DELETIONS Unit unit cost ola Concrete u u er -oi TPW 81,000.00 Sub Total e e ons Change Order Deletions Page 3 of 4 MISBE for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 C FORTWORTH Routing and Transmittal Slip Transportation and Public Works Department DOCUMENT TITLE: Change Order# 2 — Highland Hills, Monticello and Jessamine St M&C 21-0896 CPN: 102540 CSO # 55050 DOC# CO#2 Date: 0110512022 FM Department Initials Date Out To: Makou Inc Jan 7 2022 1. Magsood Khan (Contractor) makouinc@gmaii.com mk 2. Curtis Hollingsworth (Inspector) TPW-Signature X Jan 7,2022 3. Iretomiwa Otuyelu (PM) TPW-Signature Jan 6,2022 4. Riad Nursallah (PgM) TPW-Reviewer - Jan 9,2022 5. Lane Zarate (Sr CPO) TPW-Reviewer cZ_ Jan 13,2022 6. Lauren Prieur AD TPW-Signature 4e Jan 14,2022 7. William Johnson Director TPW-Signature Jan 14,2022 8. Doug Black (ACA) LAW-Signature — Jan 14,2022 9. Dana Burghdoff(ACM) CMO-Signature — Jan14,2022 10. Jannette Goodall CSO-Signature Jan 18,2022 DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑ Yes X No RUSH: ❑ Yes X No SAME DAY: ❑ Yes X No NEXT DAY: ❑ Yes X No ROUTING TO CSO: ❑ Yes ❑ No Action Required: ❑ As Requested ❑ Attach Signature, Initial and Notary Tabs ❑ For Your Information X Signature/Routing and or Recording ❑ Comment ❑ File Return to: Please call Iretomiwa Otuyelu at ext. for pick up when completed. Thank you. CSC No.55050-0O2 FOR__T WORTH:: City of Fort Worth Change Order Request Project Name Highland Hills,Monticello and Jessamine St City Sec# 55050 Client Project#(s) 102540 Project Description The repair and reconstruction of failed sidewalks,curbs&gutter,ramps and driveways Contracto Makou Inc Change Order# 2 Date 12/17/2021 City Project Mgr. Iretomiwa Otuyelu City Inspector Curtis Hollingsworth Dept. TPW Contract Time Totals (CD) Original Contract Amount $989,095.00 $989,095.00 230 Extras to Date $48,800.00 $48,800.00 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,037,895.00 $1,037,895.00 230 Amount of Proposed Change Order $27,400.00 $27,400.00 30 Revised Contract Amount $1,065,295.00 $1,065,295.00 260 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $27,400.00 $27,400.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 7.70% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,236,368.75 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order is to add an additional$27,400.00 to the construction contract 55050 with revised contract amount of$1,065,295.00.Project has available funds required p for this change order through the General Capital Project fund and does not need additional funding. It was found during the final stage of project that the actual quantaties of Miscellaneous utility adjustments,Driveways and SOD replacement were more than originally estimated I It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor(Name) Contract Signature Date Makou Inc Maqsood Khan Jan 7,2022 InspectorAnspection Supervisor Date Project and Contract Compliance Manager Date Jan 7,2022 Jan 6,2022 Program Manager Date Senior Capital Project Officer Date Jan 9,2022 Jan 13,2022 Assistant Director(Dept) Dale Director,Contracting Department(Dept) Date Jan 14,2022 _ Jan 14,2022 Assistant City Attorney Date Assistant City Manager Date 8 Jan 14,202281141644� Jan 14,2022 Council Action(if required) M&C Number M&C Date Approved F— ATTEST: etic 5.G-d,j(Jan 18,202209' CST( Jannette Goodall,City Secretary FORT WORTH City of Fort Worth -SIT-- Change Order Additions Project Name Highland Hills,Monticello and Jessamine St City Sec# 55050 Client Project 102540 Contractor Makou Inc PMJ Iretomiwa Oluyelu Inspector Curtis Hollingsworth Change Order Submittal# 0 Date 12I17I2021 ADDITIONS ty Unit Unit Cost I ota isce aneous Adjustments ti Nes 5 02 .0401 Remove ncrele Driveway TP 680.00000000 SF 2.25 6 3213.0401 6"Concrete Driveway TPW 680.00000000 SF $7.73 24 3217.0100 Curb Address Painting TPW 100.00000000 EA 50.00 5, 25 3292,0100 Block Sod Replacement TPW 700.00000000 SY 8.00 I TPW 27,400.00 u otal Additions $27,400.00 Change Order Additions Page 2 of 5 Poe�H City of Fort Worth Change Order Deletions Project Name Highland Hills,Monticello and Jessamine St City Sec# 55050 Client Project# 102540 Contractorl Makou Inc PMJ Iretomhva Otuyelu Inspector Cu tis Hollingswo th Change Order Submittal# 0 Date 1 211 712 0 2 1 DELETION5 ty Unit Cost lotal TPW 0.00 uTotal Deletions Change Order Deletions Page 3 of 5 MISBE for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS March 1, 2022 Makou inc. 7100 S Cooper St. STE 15 Arlington TX, 76001 RE: Acceptance Letter Project Name: Highland Hills, Monticello, and Jessamine Concrete Rehabilitation Project Type: Paving City Project No.: 102540 To Whom It May Concern: On February 2, 2022 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on March 1, 2022. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 1, 2022, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 682- 331-6747. Sincerely, Iretomiwa Otuyelu, Project Manager Cc: Curtis Hollingsworth, Inspector Mark Owen, Inspection Supervisor Edwin R. Rodriguez, Sr.,Senior Inspector Marry Hanna, P.E., Program Manager City of Fort Worth, Consultant Makou Inc., Contractor City of Fort Worth, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev.8/20/19 BOND#: 1021772 CONSENT OF SURETY OWNER TO FINAL PAYMENT ARCHITECT ❑ ❑ AIA Document G707 CONTRACTORSURETY ❑ (Instructions on reverse side) OTHER ❑ TO OWNER: ARCHITECT'S PROJECT NO.: (Nam,and add,,,,) City of Fort Worth CONTRACT FOR: PROJECT: CONTRACT DATED: November 17,2020 (Name and address) 2020 Highland hills,Monticello and Jessamine Concrete Rehabilitation Project City Project No. 102540 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (Insert name and address of Surety) Oklahoma Surety Company 1437 South Boulder,Suite 200 Tulsa,OK 74119 ,SURETY, on bond of (/usen nam and address afC'nnrrwrrnr) Makou, Inc. 6204 Parkside Dr. Arlington,TX 76001 ,CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (1—err name and uddr,ss?fO wrr) City of Fort Worth OWNER, as set forth in said Surety's bond, IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: February 17, 2022 (lusort in—icing the mmndi/ollaucd h,the mtrnerlc dare and, ,) Oklahoma Surety Company (Str,0 I",,- "I (Srbnmrnrc nfmn,nri_ed represenlunrr) Attesaac, 4& (Seal): Angie tran Brent M.Blonigan, Attorney-in-fact (Primed name and ride) CAUTION: You should sign an original AIA document that has this caution printed in red.An original assures that changes will not be obscured as may occur when documents are reproduced. See Instruction Sheet for Limited License for Reproduction of this document. AIA DOCUMENT 0707-CONSENT OF SURETY To FINAL PAYMENT.1994 EDITION-AIA Page I of 2 1994-THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVFNUF.NW.WASH- INGTON.D.C.20006.5292-WARNING:Unlicensed photocopying violates U.S.copy- G7(17-�994 right laws and will subject the violator to legal prosecution. INSTRUCTION SHEET FOR AIA DOCUMENT G707,CONSENT OF SURETY TO FINAL PAYMENT A.GENERAL INFORMATION 1.Purpose This document is intended for use as a companion to AIA Document G706,Contractor's Affidavit of Payment of Debts and Claims,on construction projects where the Contractor is required to famish a bond. By obtaining the Surety's approval of final payment to the Contractor and its agreement that final payment will not relieve the Surety of any of its obligations,the Owner may preserve its rights tinder the bond. 2.Related Documents This document may be used with most of the AIA's Owner-Contractor agreements and general conditions,such as A201 and its related family of documents.As noted above,this is a companion document to AIA Document G706. 3.Use of Current Documents Prior to using any AIA docutent,the user should consult the AIA,an AIA component chapter or a current AIA Documents List to determine the current edition of each document. 4.Limited License for Reproduction AIA Document G707 is a copyrighted work and may not be reproduced or excerpted from in substantial part without the express written permission of the AIA. The G707 document is intended to be used as a consumable-that is,the original document pur- chased by the user is intended to be consumed in the course of being used. There is no implied permission to reproduce this document,nor does membership in The American Institute of Architects confer any ffirther rights to reproduce G707. A cautionary notice is printed in red on the original of this document. This notice distinguishes an original AIA document from copies and counterfeits. To ensure accuracy and uniformity of language,purchasers should use only an original AIA document or one that has been reproduced from an original under a special limited license from the AIA. A limited license is hereby granted to retail purchasers to reproduce a maximum often copies of a completed or executed G707,but only for use in connection with a particular project. Further reproductions are prohibited without the express permission of the AIA. B.CHANGES FROM THE PREVIOUS EDITION Changes in the location of various items of information were made,without revision to the substance of the document. C.COMPLETING THE G707 FORM GENERAL: The bond form is the usual source of required information such as the contract date and the names and addresses of the Surety,Owner,Contractor and Project. ARCHITECT'S PROJECT NO.: this information is typically supplied by the Architect and entered on the form by the Contractor. CONTRACT FOR: This refers to the scope of the contract,such as"General Construction"or"Mechanical Work". D. EXECUTION OF THE DOCUMENT The G707 form requires both the Surety's seal and the signature of the Surety's authorized representative. 4194 INSTRUCTION SHEET FOR AIA DOCUMENT G707 CONSENT OF SURETY TO FINAL PAYMENT 1994 Page 2 of 2 EDITION AIAR' THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE,N.W., WASHINGTON,D.C.20006-5292 G707-1994 OKLAHOMA SURETY COMPANY 1437 South Boulder,Suite 200,Tulsa, Oklahoma 74119 • Ph: 918-587-7221 - Fax: 918-588-1296 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the Oklahoma Surety Company,a corporation organized and existing under and by virtue of the laws of the State of Ohio,does hereby nominate,constitute and appoint the person or persons named below,each individually if more than one is named,its true and lawful attorney-in-fact,for it and in its name,place and stead to execute on behalf of the said Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature thereof. Brent M.Blonigan,Raul F.Campa, Rob Dreiling,Debbie Palmer,Kara Pierce,all of RICHARDSON,TX. IN WITNESS WHEREOF,the Oklahoma Surety Company has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 20 day of September,2021. ;`o?4owroa��r Ci: =Y: SEAL oHio; OKLAHOMA SURETY COMPANY ATTEST: it L,4.-( �� I Sharon Hackl,Assistant Secretary Todd Bazata,Vice President On this 20 day of September,2021 before me personally appeared Todd Bazata,to me known,being duly swom,deposes and says that s/he resides in Broken Arrow,Oklahoma,that s/he is a Vice President of Oklahoma Surety Company,the company described in and which executed the above instrument;that s/he knows the seal of the said Company;that the seal affixed to the said instrument is such corporate seal;that it was so affixed by authority of her/his office under the By-Laws of said Company,and that s/he signed his name thereto by like authority. No PuOgo Commission# 11008253 STATE OF OKLAHOMA State of Oklahoma SS J TULSA COUP N My Commission Expires: 09-08-23 COfAMI ION O11008tSf COUNTY OF TULSA Comm,to ,oa oe zass Julie Callahan,Notary Public This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Oklahoma Surety Company by unanimous written consent dated September 25,2009. RESOLVED: That the President,the Executive Vice President,the several Senior Vice Presidents and Vice Presidents or any one of them,be and hereby is authorized,from time to time,to appoint one or more Attorneys-in-Fact to execute on behalf of the Company,as surety, any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature thereof;to prescribe their respective duties and the respective limits of their authority;and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond, undertaking,contract of suretyship,or other written obligation in the nature thereof,such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though manually affixed. CERTIFICATION I,Sharon Hackl,Assistant Secretary of Oklahoma Surety Company,do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of September 25,2009 have not been revoked and are now in full force and effect. "I"SU.HErk =O.40P�OR�lF:L =Y SEAL Signed and sealed this I day of Sharon Hacki,Assistant Secretary / \ k1A MID-CONTINENT GROUP Surety Bond Seal Addendum Mid-Continent Casualty I Oklahoma Surety Oklahoma Surety Company During the COVID-19 pandemic, the use of traditional raised corporate seals has been made impractical due to government stay-at-home orders and social distancing guidelines. As a result, Oklahoma Surety Company has authorized its Attorneys-in-Fact to affix Oklahoma Surety Company's corporate seal to any bond or related instruments executed on behalf of Oklahoma Surety Company by any such Attorney-in-Fact by attaching this Addendum to said bond or related instrument. To the extent this Addendum is attached to a bond or related instrument that is executed on behalf of Oklahoma Surety Company by its Attorney-in-Fact, Oklahoma Surety Company agrees that the seal below shall be deemed affixed to said bond or related instrument to the same extent as if its raised corporate seal were physically affixed to the face of the bond or related instrument. Dated this 111 day of April, 2020 d i f" ,. SVR�T •. QaK • �' O�Q,Goa qr � Y: SEAL :A= . 0• r r • � OHIO 'rOA1111110 By. 07M 'b WZ,a)m Todd Bazata Vice President I AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared MAQSOOD KHAN, PRICIPAL Of MAKOU INC.,known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; 2020 HIGHLAND HILLS,MONTECILLO AND JESSAMINE CONCRETE REHABALITION BY AfAQSOOD KHAN PRINCIPAL Subscribed and sworn before me on this date 17 of FEB., 2022. Notary Public TARRANT, TX ROMELIA AGU-€RRE-CRUZ qP Ud Notary Public, State of Texas Comm. Expires 08-09-2022 Notary ID 729905744 I i