Loading...
HomeMy WebLinkAboutContract 49485-A4 CSC No.49485-A4 AMENDMENT No. 4 TO CITY SECRETARY CONTRACT No. 49485 WHEREAS, the City of Fort Worth (CITY) and Neel-Schaffer, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 49485, (the CONTRACT) which was authorized on the 1st day of August, 2017 in the amount of $ 458,204.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No.1 in the amount of $14,980.00 administratively authorized on May 30, 2018 and Amendment No. 2 in the amount of $58,341.00 administratively authorized on December 18, 2018 and Amendment No.3 in the amount of $35,400.00 authorized on May 18th,2021 (M&C 21-0352) ; and WHEREAS, the CONTRACT involves engineering services for the following project: Churchill Road Water and Sanitary Sewer Improvements; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $31,254. 00 (Fund 56017- (Water: $12,096. 00; Sewer: $19,158. 00)) . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $598,179. 00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Prof Services Agreement Amendment Template OFFICIAL RECORD Revision Date: November 23, 2021 [Churchhill Road W/SS Page 1of2 CITY SECRETARY FT. WORTH, TX EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. APPROVED: City of Fort Worth ENGINEER Neel-Schaffer, Inc. ,Ga!'1Gt�GI�GI�l�O Dana Burghdoff(Mar 9,2022 6:18 CST) Dana Burghdoff aaies P. Amick, ��P.E. Assistant City Manager Engineering Manager Mar 9,2022 DATE: DATE: APPROVAL RECOMMENDED: Chnstonhe✓l-is✓dev a,rmpnenaae(Ma ,zozzoe.ascsri Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. a ence 'lton, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A op Date: N/A DBIa (Mar9,2Dzz ISM CST) Douglas W. Black Form 1295: N/A Senior Assistant City Attorney a pp 0°,_ �o ATTEST: a�o° °°°O d� Tannelto S.Goodall 00 o o=d J..nett,S.Good a11(M 1110,202216:21 CST) O O O y T Jannette S. Goodall 4� °°°°°°°°°°°°° p n��EXA`-oa�p City Secretary OFFICIAL RECORD CITY SECRETARY Prof Services Agreement Amendment Template FT. WORTH, TX Revision Date: November 23, 2021 [Churchhill Road W Page 2 of 2 BL NEEI--SCHAFFER Solutions you can build upon October 11,2021 Mr.Lawrence Hamilton,P.E. Sr.Professional Engineer City of Fort Worth-Water Department 311 West 10'Street Fort Worth,Texas 76102 Reference: Churchill Road Water and Sanitary Sewer Improvements Contract Amendment 4 for Additional Services,CPN 100888,CSC 49485 Dear Lawrence: Neel-Schaffer, Inc. offers additional Professional Engineering Services for this project. These additional services were requested by the City of Fort Worth to address the ongoing requests from the Tarrant Regional Water District (writing letters; marking easements; attending additional meetings; making four submittals so far; and one redesign of the 8"and 24"water lines,the 8"sewer line and the sewer services near the levee),the challenges related to the Contractor's extended schedule (failing tests, correcting the widening of Churchill Road which gives the impression of requiring retaining walls and in general the greater than normal involvement during construction). Neel-Schaffer, Inc. proposes to increase the contract amount by$31,254.00 for these additional services. All additional services will be performed in accordance with the original contract dated August 9,2017. Summary of Contract Fee Original Contract Amount $458,204.00 Amendment No. 1 $14,980.00 Amendment No.2 $58,340.00 Amendment No.3 $35,400.00 Amendment No.4 $31,254.00 Revised Contract Amount $598,178.00 If you have any questions or we may be of further service,please call me at 817/870-2422. Sincerely, NEEL-SCHAFFER,INC. James P. Amick,P.E. Engineer Manager TBPELS Firm Reg.No. F-2697 O:Vobs\14056-Churchill Road Water and Sewer\Admin\Contract\Am 4\Amendment 4 Letter.doc ARLINGTON • DALLAS • FORT WORTH • HOUSTON engineers • planners • surveyors • environmental scientists • landscape architects 515 Houston St., Ste. 751 • Fort Worth, TX 76102 • phone: 817-870-2422 • fax: 817-870-2489 • www.nool-schaffer.com