Loading...
HomeMy WebLinkAboutContract 54021-CO1 Attest: a�FOftr °000° Tannof o S.Goodall 0 O*1-0�401° , Ja��ettes.eoodau(ma�io,zo ii:azcsr) 9� ��� CSC No.54021-CO1 Jannette Goodall aRT �RTH:.Pvog=City Secretary P� �4r,nEX 00 City Of Fort Worth Change Order Request Facility and Project Northside Community Center Renovation City Sec No. 54021 Description: Funding(FID)25002-0190450-5330201-S00051-S00001 25002- City Proj.No. 101654 No.(s)0190450-5330201-S00049-S00001 Contractor: HM&MF d/b/a Muckleroy&Falls Change Order#F—T� Date: 2123/2022 City Project Mgr.Ronnie Clements City Inspector: I Mitch Kiowski Phone Number:(817)392-8014 Phone Number: (817)392-2297 Contract Time (CD) Original Contract Amount $4,390,000.00 469 Extras to Date $0.00 0 Credits to Date $0.00 0 $0.00 0 Contract Cost to Date $4,390,000.00 469 Amount of Proposed Change Order $32,962.00 0 Revised Contract Amount $4,422,962.00 469 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $0.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.75 % MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,487,500.00 JUSTIFICATION(REASONS)FOR CHANGE ORDER The purpose of this change order is to install a monument sign at the facility.The monument sign was not part of the original scope and Neighborhood Services stated that they would pay for it.This results in an addition in the contract by$32,962.00.This results in an final contract amount of$4,422,962.00 a 0.75%increase from the original contract price of$4,390,000.00.The cost is broken up in to 2 sources. $32,000.00 will be charged to 25002-0190450-5330201-S00051-S00001 and$962.00 will be charged to 25002-0190450-5330201-S00049- S00001. It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order. HM&MF d/b/a Muckleroy&Falls Joshua Rohrer lyoshua Rohr r Feb 23,2022 Contractor's Company Name Contractor Name Contractor Signature Date N.t,16K- Feb 23,2022 Feb 23,2022 PMD Inspector Date Architecural Services Manager Date Dedcise Feb 23,2022 Mar 7,2022 PMD Superintendent Date Assistant City Attorney Date em Feb 23,2022 Mar 7,2022 o ke Mari 202211:54 C5� PMD Project Manager Date Director/Property Management Department Date Feb 23,zozz Mar 7,2022 Project Architect Date I Assistant City Manager Date M&C Number N/A M&C Date Approved I N/A Contract Compliance Manager: /f, OFFICIAL RECORD By signing I acknowledge that I am the person responsible for the monitoring and administration ofthis contract,including Brian R.Glass,AIA CITY SECRETARY ensuring all performance and reporting requirements. City Architect FT.WORTH, TX June 2018 Rev 1 Prime Contract Change Order LIM I Detailed,Grouped by Each Number MUCKLEROY LEROY FALLS Northside Community Center Project# 20643 HM&MF Ltd.,d/b/a MUCKLEROY&FALLS 1100 Northwest 18th St Tel: Fax: Fort Worth,TX 76164 Date: 1/31/2022 To Contractor: Architect's Project No: HM&MF Ltd.,d/b/a MUCKLEROY&FALLS Contract Date: 4/7/2020 3200 Riverfront Dr Contract Number: 20643-101 Suite 200 Change Order Number: 001 Fort Worth,TX 76107 The Contract is hereby revised by the following items: PCO 007-Monument Sign PCO Description Amount PCO 007 Monument Sign $32,962.00 Theoriginal Contract Value was.......................................................................................................................................... $4,390,000.00 Sum of changes by prior Prime Contract Change Orders................................................................................................... $0.00 The Contract Value prior to this Prime Contract Change Order was................................................................................... $4,390,000.00 The Contract Value will be changed by this Prime Contract Change Order in the amount of............................................. $32,962.00 The new Contract Value including this Prime Contract Change Order will be..................................................................... $4,422,962.00 The Contract duration will be changed by........................................................................................................................... 0 days The revised Substantial Completion date as of this Prime Contract Change Order is........................................................ Elements of Architecture HM&MF Ltd.,d/b/a MUCKLEROY& City of Fort Worth FALLS ARCHITECT CONTRACTOR OWNER 1201 6th Ave Suite 100 3200 Riverfront Dr 401 W 13th St Suite 200 Fort Worth,TX 76102 Fort Worth,TX 76107 Address Address Address BY Debbie Fulwiler BY Joshua Rohrer BY Ronnie Clements SIGNATURE SIGNATURE SIGNATURE DATE DATE DATE Prolog Converge Printed on: 1/31/2022 MuckleroyFallsProlog Page 1 Lr.�. I W� Change Order Request Detailed(with Breakdown of PCOs), Grouped by Each MUCKLEROY LEROY FALLS Number Northside Community Center Project# 20643 HM&MF Ltd.,d/b/a MUCKLEROY&FALLS 1100 Northwest 18th St Tel: Fax: Fort Worth,TX 76164 Change Order Request: COR 007 Date: 1/27/2022 To: Ronnie Clements From: Joshua Rohrer City of Fort Worth HIM&MF Ltd.,d/b/a MUCKLEROY&FALLS 401 W 13th St 3200 Riverfront Dr Fort Worth,TX 76102 Suite 200 Fort Worth,TX 76107 Description Category Status Monument Sign Reference Required By Days Req Amt Req Attached 2/3/2022 0 32,962 Notes PCO No Date Reference Amt Prop Days Req Category Reason Description Notes PCO 007 7/28/2021 32,962 0 Monument Sign This PCO includes costs to provide monument sign per attached drawing from Legacy Signs of Texas. PCO includes cost of Elements of Architecture sign exhibit,engineered drawings,sign construction,and painting of brick on sign. Sign includes 5 year warranty. This PCO comes at the request of the City of Fort Worth. This PCO is issued to incorporate the scope of work items as specifically detailed on the attached cost summary and supporting documents.This Proposed Change does not include any additional scope provisions not specifically included herein.If additional costs become apparent at a later date,or additional information regarding this scope of work becomes available,we reserve the right to price any additional cost and/or schedule impacts as they become known. Item No Item Description Amt Prop Reference 001 Elements of Architecture-Monument Sign Design 2,725 002 Painting-McSweeney-Monument Sign Paint 913 Prolog Converge Printed on: 1/27/2022 MuckleroyFallsProlog Page 1 Change Order Request Detailed(with Breakdown of PCOs), Grouped by Each Number 003 Exterior Signage-Legacy Signs of Texas- 25,025 Monument Sign 004 Muckleroy and Falls-Overhead at 15% 4,299 Approved By: Signature Name Date Prolog Converge Printed on: 1/27/2022 MuckleroyFallsProlog Page 2 M M O� co r i C N O� N CD N N W O O O O O N A !D LAI r � M C2 A � a0 G Ly W COD CD�_ O LU FM = LCJ ry M Rt zW ~ N Q N Co 2 - W r0 (3 V N ffCl)A NX nc >= w � F FM � LL FM - Qo z M w J 02 Z m O cm W a z H F Z W C3 w / / / / o ► �� E�� - - - /�o AN q,,.l z w gMMU as Eta g a p H $eon Ad ;4 Go 8 N r L 3lIN3AV VVNOAF Li mI vi N N O = Ln Cfl Y N N II e W J T N 000 O W r � J Q COD z ul J \—/ Y X \\ w a C1 LL W Q a y J -sue a f �` de r = d w A L w CD _= a w 'o LU O A¢A A w CD P= °u = o Tm 0 0 -- U CD cc La oa o, yLEk _ d�A }r o Ads-ALL As 1� a c O m p r.� N as 0 z 5 LU F w ~ z U3 U CO =� i fe z� a a z 20 U ao T M N QD M_ ti r co F M � G L'. - oa Z C% N CD CD co O Q7 N_ Q a m N L' M W J W �j 'r' o O a W Z Z W L7 ul }m CDa° W J o T I� 61 d E f% - c 3 a W - -o�c W Cn U - I � o Z Z Q o O C r - Z p «G L 7 «7 z - � m- 71 00 d �LLAo ' -- ------- N I IF a J m O ¢ — E mmmmmm Eli �2 ww _ w ru m mc� w m w r n ca o 0 LU a z n � Z +-a F- '^ W cn LU ' ? C= CD v♦ Vim' x M C j 20 o I� F- -0 Z r w w 66 T � fq N 0 � Q o C N L � C 1` Z LL Y �? N O z LAJ LU w Z LU IF F r O N pp U J a) O I `Q` ih Z z z _ W Q — N � z z C d U. NX LL. o o z JQ❑ y (7 W J ELEMENTS Elements of Architecture, Inc. of A3-chltccturc_ Inc. 1201 6th Avenue,Suite 100 Fort Worth,Texas 76104 Muckleroy&Falls September 11, 2021 3200 Riverfront Drive Project No: 20-1012.00 Suite 200 Invoice No: 7589 Fort Worth, TX 76107 Project 20-1012.00 MF COFW Northside CC Professional Services from August 1,2021 to August 31,2021 ------------------------------------------------------------------------------------ Phase 01 Monument Sign Professional Personnel Hours Rate Amount Christensen, Brayden 5.00 80.00 400.00 Fisher, Joseph 5.50 200.00 1,100.00 Fulwiler, Deborah 1.00 210.00 210.00 Sukala, Haley 6.50 110.00 715.00 Totals 18.00 2,425.00 Total Labor 2,425.00 Total this Phase $2,425.00 Total this Invoice $2,425.00 REC D DATE 12.23.21 $14,630.75 ELEMENTS JOB#/Po#/�20643 Elements of Architecture, Inc. COSTCODE 01 01110 O 1201 6th Avenue, Suite 100 of Architecture_ Inc, 1 APPROVED BYJ R APVD DATE 2/27/2MFort Worth,Texas 76104 POST BY&DATEHH 12.27.21Ku/PD DATE 94953/12.28.21 CC USED&DATE CK MAIL DATE M-12.29.21 FYI/LONF# Muckleroy& Falls December 22, 2021 3200 Riverfront Drive Project No: 20-1012.00 Suite 200 Invoice No: 7778 Fort Worth, TX 76107 Project 20-1012.00 MF COFW Northside CC Professional Services from November 1.2021 to November 30,2021 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Phase 00 Basic Services Fee Percent Billing Phase Fee Complete Earned Architectural Services 141,050.00 87.00 122,713.50 Structural Engineering 57,800.00 86.00 49,708.00 MEP Engineering 59,650.00 88.00 52,492.00 Civil Engineering 8,500.00 92.00 7,820.00 Miscellaneous 9,000.00 85.00 7,650.00 Expenses 24,000.00 85.00 20,400.00 Total Fee 300,000.00 260,783.50 Previous Fee 259,613.50 Billing Current Fee 1,170.00 Billing Total Fee 1,170.00 Total this Phase $1,170.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Phase 01 Monument Sign Professional Personnel Hours Rate Amount Fisher, Joseph 1.50 200.00 300.00 Totals 1.50 300.00 Total Labor 300.00 Total this Phase $300.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Phase 02 Add Services for PCOs Fee Percent Billing Phase Fee Complete Earned Lobby Framing PCO 01 2,750.00 100.00 2,750.00 Plan Changes at Service Area PCO 3,500.00 100.00 3,500.00 11 Hands Free to Manual PCO 12 440.00 100.00 440.00 Grade Beams/Footings PCO 4 570.00 100.00 570.00 Added Drinking fountain PCO 22 980.00 100.00 980.00 Rev 4 PCO 19, 24, 25, &27 8,505.00 100.00 8,505.00 Struct CMU Infill PCO 35 900.00 100.00 900.00 Josh Rohrer From: Charles Durham <charlie@mcsweeneycommercial.com> Sent: Tuesday, July 27, 2021 1:55 PM To: Josh Rohrer Cc: Theresa Lopez Subject: RE: Northside Monument Sign Blockfill Prep and Paint $913 Thank You Charlie Durham 817.729.9736 Charlie@mcsweeneycommercial.com From:Josh Rohrer<JRohrer@muckleroyfalls.com> Sent:Tuesday,July 27, 2021 11:11 AM To: Charles Durham <charlie@mcsweeneycommercial.com> Cc:Theresa Lopez<theresa@mcsweeneycommercial.com> Subject: Northside Monument Sign Charlie, Could you please provide a cost to paint the brick on this monument sign? Thanks, Josh Rohrer Assistant Project Manager 3200 Riverfront Drive,Suite 200, Fort Worth,Texas 76107 0 817.877.3510 1 C 254.722.7783 irohrer(@muckleroyfalls.com www.MuckleroyFalls.com MUCKLEROY & FALLS Established 1979 Q 0 0 0 i Quote Legacy Signs of Texas Date: 01/25/2022 TSCL 18933 Quote No.: 11191 10375 Alta Vista Rd. Salesperson: Bill Swift Fort Worth, TX 76244 Bill To: Ship To: HM & MF Ltd. dba Muckleroy & Northside Community Center Falls 1100 NW 18th St. 3200 Riverfront Dr., Ste. 200 FW, TX 76164 Fort Worth, TX 76107 Qty Item Description Unit Price TAX% Total 1 Permit City of Fort Worth permit acquisition $250.00 0% $250.00 acquisition 1 Permit City of Fort Worth permit at cost to be billed on $0.00 0% $0.00 final invoice (Will require Board of Adjustment approval. Fees TBD) 1 Engineering State of Texas stamped engineering $450.00 0% $450.00 1 Monument Sign Manufacture new double face aluminum $13,880.00 0% $13,880.00 monument cabinet with applied stucco finish PTM PPG 1025 Commercial White. Quote includes .5"thick CNC routed plate aluminum copy PTM Duranodic Bronze to read "NORTHSIDE COMMUNITY CENTER" and "1100 NW 18th St." stud mounted to structure with 10/24 threaded studs, washers and nuts per R4 artwork 1 Installation Installation of the monument sign. Includes $10,445.00 0% $10,445.00 core drilling the piers, dirt/debris removal, setting the steel, pouring the footing, all masonry work and sign letters placement Total $25,025.00 Watchfire 8mm The above quoted prices are based on normal working hours & conditions. Exceptions to normal include: Lack of access or obstruction to site, adverse soil conditions, unidentified wall conditions and/or mandantory after hours work schedules. ELECTRICAL: Legacy Signs of Texas cannot, by Texas State Law, provide primary electrical power for the sign. Power to the sign must be done by a licensed electrical contractor. Each sign must have: 1)A minimum of one dedicated 120v 20a circuit 2)A junction box installed within 6 feet of where the sign is to be placed 3) Line, ground and neutral wires