Loading...
HomeMy WebLinkAboutContract 55163-CO2 CSC No.55163-CO2 FORT WORTH, City of Fort Worth `11� Change Order Request Project Name FY18-CD9 Street Repair and Recon Program City Sec# 55163 Client Project#(s) 56002-0600430/0700430-CO2445 and 200431-0O2389 Project Description This is a combined street paving improvements and water and sanitary sewer main replacements project in the Near Southside Medical District Contractor REYES GROUP LTD Change Order# 2 Date 2/22/2022 City Project Mgr. Jose Orozco City Inspector Donald Watson Dept. Water-Unit I Sewer-Unit II Paving-Unit III Contract Time Totals CD Original Contract Amount $1,928,794.00 $559,058.00 $1,843,259.50 $4,331,111.50 365 Extras to Date $0.00 $0.00 $0.00 36 Credits to Date $0.00 $0.00 $0.00 Pending Change Orders(in M&C Process) $0.00 $0.00 $0.00 Contract Cost to Date $1,928,794.00 $559,058.00 $1,843,259.50 $4,331,111.50 401 Go to ADD&DEL Tabs to Enter CO Backup $0.00 $0.00 $0.00 35 Revised Contract Amount $1,928,794.00 $559,058.00 $1,843,259.50 $4,331,111.50 436 Original Funds Available for Change Orders $57,864.00 $27,953.00 $184,326.00 $270,143.00 Remaining Funds Available for this CO $57,864.00 $27,953.00 $184,326.00 $270,143.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,413,889.38 JUSTIFICATION(REASONS)FOR CHANGE ORDE Change Order#2 will adjust the scope to include the necessary bid items for services to repair a damaged conduit and cabling that is part of Cook Children's Health system for 9th Ave that was not marked or located. It will also add days to compensate contractor for permitting delays Related to removing a power pole in the proposed pedestrian ramp and transfer service for traffic lighting. it will also include additional days for weather related delays during Construction. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. MENontractor's Company Namew rontractor Name Contract Si natu V Date ,7ai'nhChar wi Mar2,2022 Reyes GroupLtd Jaison Cherian1,11.1 IT Inspector/Inspection Supervisor Date Pro ect and Contract Compliance Manager Date Mar4,2022 _ Mar2,2022 Program Manager Date Senior Capital Pro ect Officer Date Mar4,2022 _ Mar4,2022 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date t Mar4,2022 AI&. 1- Mar 7,2022 Assistant City Attorney I Date lAssistant City Manager Date Mar 11,2022 ati7o-FG Mar 11,2022 Council Action if required) M&C Number M&C Date Approved ATTEST: q� apFFORr�oa� O o° ° Jannette Goodall,City Secretary PA►o °�Ad� Pvoo o=0 OFFICIAL RECORD ° CITY SECRETARY �'°°°°°°°°°°° d a nEx0,o , FT.WORTH, TX FORT WORTH City of Fort Worth �V-- Change Order Additions Project Name FY18-CD9 Street Repair and Recon Program City Sec# 55163 Client Project# 56002-0600430/0700430-CO2445 and 200431-CO2389 Contractor REYES GROUP LTD PM Jose A Orozco Inspector Donald Watson Change Order Submittal# F— 2 —� Date 2/22/2022 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total II- Conduit and Cabling Repair Paving-Unit III Toom000 EA Water-Unit) $0.00 Sewer-Unitll $0.00 Paving-Unit III L�S$4;,306.00 Sub Total Additions Change Order Additions Page 2 of 4 FoRYWORTH City of Fort Worth Change Order Deletions Project Name FY18-CD9 Street Repair and Recon Program City Sec# 55163 Client Project# 56002-0600430/0700430-CO2445 and 200431-CO2389 Contractor REYES GROUP LTD PM Jose A Orozco Inspector Donald Watson Change Order Submittal# O2 Date 2 22/2022 DELETIONS ITEM DESCRIPTION UEPI ty Unit Unit Cost Total III- Construction Allowance Paving-Unit III 0.04306000 LS Water-Unit) $0.00 Sewer-Unitll $0.00 Paving-Unit III $4,306.00 Sub Total Deletions Change Order Deletions Page 3 of 4 MISBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 CO2389-CNCO-CD9 — Near Southside — Construction Order # 2 Final Audit Report 2022-03-09 Created: 2022-03-02 By: Andrea Munoz(Andrea.Munoz@fortworthtexas.gov) Status: Canceled/Declined Transaction ID: CBJCHBCAABAAb4xXY5OJ4sXRv68VZxR30gjVKORRua2X "CO2389-CNCO-CD9 — Near Southside — Construction Order # 2 " History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2022-03-02-9:55:05 PM GMT-IP address:209.194.29.100 Document emailed to Jose A Orozco Qose.orozco@fortworthtexas.gov)for signature 2022-03-02-10:26:11 PM GMT Document emailed to Jaison Cherian Qcherian@reyesgroup.com) for signature 2022-03-02-10:26:11 PM GMT Document emailed to Don Watson (Donald.Watson@fortworthtexas.gov)for signature 2022-03-02-10:26:12 PM GMT Document emailed to Barbara Pryor(Barbara.Pryor@fortworthtexas.gov) for filling 2022-03-02-10:26:12 PM GMT Email viewed by Barbara Pryor(Barbara.Pryor@fortworthtexas.gov) 2022-03-02-10:39:30 PM GMT-IP address:209.194.29.100 Form filled by Barbara Pryor(Barbara.Pryor@fortworthtexas.gov) Form filling Date: 2022-03-02-10:40:55 PM GMT-Time Source:server-IP address:209.194.29.100 Email viewed by Jose A Orozco (jose.orozco@fortworthtexas.gov) 2022-03-02-10:49:02 PM GMT-IP address:209.194.29.100 Document e-signed by Jose A Orozco Qose.orozco@fortworthtexas.gov) Signature Date:2022-03-02-10:50:00 PM GMT-Time Source:server-IP address:209.194.29.100 Email viewed by Jaison Cherian Qcherian@reyesgroup.com) 2022-03-02-11:08:09 PM GMT-IP address: 104.28.50.176 FORT WORTH, Adobe Sign Document e-signed by Jaison Cherian Ocherian@reyesgroup.com) Signature Date:2022-03-02-11:20:58 PM GMT-Time Source:server-IP address:47.190.17.217 Email viewed by Don Watson (Donald.Watson@fortworthtexas.gov) 2022-03-04-6:55:15 AM GMT-IP address: 104.187.74.32 Document e-signed by Don Watson (Donald.Watson@fortworthtexas.gov) Signature Date:2022-03-04-6:58:14 AM GMT-Time Source:server-IP address: 104.187.74.32 Document emailed to Mary Hanna (Mary.Han na@fortworthtexas.gov)for signature 2022-03-04-6:58:16 AM GMT Email viewed by Mary Hanna (Mary.Hanna@fortworthtexas.gov) 2022-03-04-1:19:17 PM GMT-IP address:209.194.29.100 Document e-signed by Mary Hanna (Mary.Hanna@fortworthtexas.gov) Signature Date:2022-03-04-1:19:55 PM GMT-Time Source:server-IP address: 209.194.29.100 Document emailed to Lane Zarate (Lane.Zarate@fortworthtexas.gov) for signature 2022-03-04-1:19:57 PM GMT Email viewed by Lane Zarate (Lane.Zarate@fortworthtexas.gov) 2022-03-04-2:36:17 PM GMT-IP address:209.194.29.100 Document e-signed by Lane Zarate (Lane.Zarate@fortworthtexas.gov) Signature Date:2022-03-04-2:38:51 PM GMT-Time Source:server-IP address: 209.194.29.100 Document emailed to Lauren Prieur(Lauren.Prieur@fortworthtexas.gov) for signature 2022-03-04-2:38:53 PM GMT Email viewed by Lauren Prieur(Lauren.Prieur@fortworthtexas.gov) 2022-03-04-2:39:09 PM GMT-IP address: 108.209.194.42 Document e-signed by Lauren Prieur(Lauren.Prieur@fortworthtexas.gov) Signature Date:2022-03-04-2:43:55 PM GMT-Time Source:server-IP address: 108.209.194.42 Document emailed to WJ (William.Johnson@fortworthtexas.gov) for signature 2022-03-04-2:43:57 PM GMT Email viewed by WJ (William.Johnson@fortworthtexas.gov) 2022-03-05-6:25:03 PM GMT-IP address: 172.225.15.207 Email viewed by WJ (William.Johnson@fortworthtexas.gov) 2022-03-06-3:13:02 PM GMT-IP address: 104.28.50.136 Document e-signed by WJ (William.Johnson@fortworthtexas.gov) Signature Date:2022-03-07-2:52:53 PM GMT-Time Source:server-IP address: 209.194.29.100 FORT W❑RTH, Adobe Sign Document emailed to Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov)for approval 2022-03-07-2:52:55 PM GMT Email viewed by Priscilla Ramirez(Priscilla.Ramirez@fortworthtexas.gov) 2022-03-07-3:51:33 PM GMT-IP address:97.99.130.152 Document approved by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov) Approval Date:2022-03-07-3:51:55 PM GMT-Time Source:server-IP address:97.99.130.152 Document emailed to Douglas.Black@fortworthtexas.gov for signature 2022-03-07-3:51:57 PM GMT Email viewed by Douglas.Black@fortworthtexas.gov 2022-03-07-5:46:07 PM GMT-IP address:209.194.29.100 Document declined by Douglas.Black@fortworthtexas.gov 2022-03-09-7:31:59 PM GMT-IP address:209.194.29.100 FORT W❑RTH. Adobe Sign