HomeMy WebLinkAboutContract 54707-FP1 City Secretary 54707 -FP1 Contract No. FORTWORTH. Date Received Mar 16, 2022 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: HULEN TRACT PHASE 1 B City Project No.: 102746 Improvement Type(s): 0 Paving 0 Drainage 0 Street Lights ❑ Traffic Signals Original Contract Price: $880,907.75 Amount of Approved Change Order(s): $56,249.00 Revised Contract Amount: $937,156.75 Total Cost of Work Complete: $937,156.75 Jacob Ga> (Mar 15,202208:41 CDT) Mar 15,2022 Contractor Date Project Manager Title Conatser Construction TXLP Company Name ��t Robert Riley(Mar 15, 02209:37CDT) Mar 15 2022 Pro'ecgtLector Date PP ! y(Ma 5,202213:27CDi Mar 15,2022 Project Manager Date �G=c22�2G=�,� Mar 15 2022 J e Scarlett Morales(Mar 15,202216:32 CDT) CFA Manager Date Dam&r 4 We Mar 15 2022 Dana Burghdoff(Mar 15Dana 15,202 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: HULEN TRACT PHASE 1 B City Project No.: 102746 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 120 WD Days Charged: 185 Work Start Date: 4/28/2021 Work Complete Date: 2/16/2022 Completed number of Soil Lab Test: 266 Completed number of Water Test: 27 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name HULEN TRACT PHASE 1B Contract Limits Project Type STORM DRAIN&PAVING City Project Numbers 102746 DOE Number 2746 Estimate Number 1 Payment Number 1 For Period Ending 2/15/2022 WD City Secretary Contract Number Contract Time 129M Contract Date Days Charged to Date 185 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors CORDOVA / RILEY Thursday,March 10,2022 Page 1 of 5 City Project Numbers 102746 DOE Number 2746 Contract Name HULEN TRACT PHASE 1B Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 2/15/2022 Project Funding STORM DRAIN IMPROVEMENTS Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total --------------------------------------- 1 48"RCP(CO 31) 464 LF $155.00 $71,920.00 464 $71,920.00 2 42"RCP 201 LF $135.00 $27,135.00 201 $27,135.00 3 36"RCP 399 LF $125.00 $49,875.00 399 $49,875.00 4 36"RCP 396 LF $105.00 $41,580.00 396 $41,580.00 5 27"RCP 77 LF $80.00 $6,160.00 77 $6,160.00 6 24"RCP 45 LF $70.00 $3,150.00 45 $3,150.00 7 21"RCP 73 LF $60.00 $4,380.00 73 $4,380.00 8 10'CURB INLET 6 EA $3,200.00 $19,200.00 6 $19,200.00 9 IT CURB INLET 2 EA $4,200.00 $8,400.00 2 $8,400.00 10 4'STORM JUNCTION BOX 3 EA $5,000.00 $15,000.00 3 $15,000.00 11 T STORM JUNCTION BOX 1 EA $9,500.00 $9,500.00 1 $9,500.00 12 T STORM JUNCTION BOX 1 EA $13,500.00 $13,500.00 1 $13,500.00 13 48"SLOPING HEADWALL 1 EA $5,800.00 $5,800.00 1 $5,800.00 14 TRENCH SAFETY(CO 1) 1663 LF $1.00 $1,663.00 1663 $1,663.00 15 36"RCP CLASS III(CO 1) -216 LF $105.00 ($22,680.00) -216 ($22,680.00) 16 33"RCP CLASS III(CO 1) 216 LF $95.00 $20,520.00 216 $20,520.00 16 33"RCP CLASS III(CO 2) -216 LF $95.00 ($20,520.00) -216 ($20,520.00) 17 REMOVE 48"STORM LINE(CO 1) 49 SF $50.00 $2,450.00 49 $2,450.00 18 REMOVE&REPLACE T SIDEWALK(CO 1) 58 SF $20.00 $1,160.00 88 $1,760.00 19 REMOVE&REPLACE CONCRETE PANELS(CO 1 LS $6,000.00 $6,000.00 1 $6,000.00 1) 20 REMOVE AND REPLACE MAILBOX(CO 1) 1 LS $2,000.00 $2,000.00 1 $2,000.00 21 REMOVE&REPLACE EX.DROP INLET(CO 1) 1 EA $6,500.00 $6,500.00 1 $6,500.00 22 CONNECT TO EX.48"RCP(CO 1) 1 EA $1,500.00 $1,500.00 1 $1,500.00 23 18"SETP-PD HEADWALL(CO 2) 1 EA $4,500.00 $4,500.00 1 $4,500.00 24 18"RCP,CLASS III(CO 2) 555 LF $85.00 $47,175.00 555 $47,175.00 --------------------------------------- Sub-Total of Previous Unit $325,868.00 $326,468.00 -------------------------------------- PAVING:IMPROV EMENTS Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total --------------------------------------- Thursday,March 10,2022 Page 2 of 5 City Project Numbers 102746 DOE Number 2746 Contract Name HULEN TRACT PHASE 1B Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 2/15/2022 Project Funding 1 6"CONC PVMT 11266 SY $37.00 W6,842.00 11266 $416,842.00 2 4"CONC SIDEWALK 1000 SF $3.25 $3,250.00 1000 $3,250.00 3 6"LIME TREATMENT 12043 SY $3.25 $39,139.75 12043 $39,139.75 4 HYDRATED LIME 193 TN $185.00 $35,705.00 193 $35,705.00 5 BARRIER FREE RAMP 8 EA $1,400.00 $11,200.00 8 $11,200.00 6 REMOVE END OF ROAD BARRICADE 2 EA $200.00 $400.00 2 $400.00 7 CONNECT TO EX STREET HEADER 58 LF $20.00 $1,160.00 58 $1,160.00 8 TOPSOIL III CY $18.00 $1,998.00 111 $1,998.00 9 SEEDING 1336 SY $1.50 $2,004.00 1336 $2,004.00 10 TRAFFIC CONTROL 1 MO $1,500.00 $1,500.00 1 $1,500.00 --------------------------------------- Sub-Total of Previous Unit $513,198.75 $513,198.75 STREET SIGNS Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 INSTALL ALUM SIGN GROUND MOUNT 5 EA $850.00 $4,250.00 5 $4,250.00 Sub-Total of Previous Unit $4,250.00 $4,250.00 --------------------------------------- STREET LIGHTS Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 2"CONDT PVC SCH 80 935 LF $12.00 $11,220.00 935 $11,220.00 2 FURNISH/INSTALL LED LIGHTING FIXTURE 14 EA $1,000.00 $14,000.00 14 $14,000.00 3 RDWY ILIUM FOUNDATION 14 EA $1,000.00 $14,000.00 14 $14,000.00 4 FURNISH/INSTALL RDWY ILIUM 14 EA $2,800.00 $39,200.00 14 $39,200.00 5 FURNISH/INSTALL TYPE 33B ARM 14 EA $300.00 $4,200.00 14 $4,200.00 6 NO 10 INSULATED ELEC CONDR 2805 LF $4.00 $11,220.00 2805 $11,220.00 Sub-Total of Previous Unit $93,840.00 $93,840.00 Thursday,March 10,2022 Page 3 of 5 City Project Numbers 102746 DOE Number 2746 Contract Name HULEN TRACT PHASE 113 Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 2/15/2022 Project Funding Contract Information Summary Original Contract Amount $880,907.75 Change Orders Change Order Number 1 $25,094.00 Change Order Number 2 $31,155.00 Total Contract Price $937,156.75 Total Cost of Work Completed $937,756.75 Less %Retained $0.00 Net Earned $937,156.75 Earned This Period $937,156.75 Retainage This Period $0.00 Less Liquidated Damages Days @ /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $937,156.75 Thursday,March 10,2022 Page 4 of 5 City Project Numbers 102746 DOE Number 2746 Contract Name HULEN TRACT PHASE 113 Estimate Number I Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 2/15/2022 Project Funding Project Manager NA City Secretary Contract Number Inspectors CORDOVA / RILEY Contract Date Contractor CONATSER CONSTRUCTION TxLP Contract Time 120 WD 5327 WICHITA ST Days Charged to Date 185 WD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $937,756.75 Less %Retained $0.00 Net Earned $937,156.75 Earned This Period $937,156.75 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $937,156.75 Thursday,March 10,2022 Page 5 of 5 § � 0 / Li / k 0 \ t0 " ® InG u / \§ \ / °0 ( 2 G 0 n ; o \ _ ) [ 0 A = = o E cR §/ § / $ /°\ / y © / ;\ f° § > 1-1z ra , . \ / § / \0') / ~ \ / r. § i ji } ƒ 0 G 6 rE A00 i O � \ 2 £ ƒ § 00 \ ° 1 \ \ \ k E r ƒ \ f ( ; w aI { § p a ) / U) § f ) ` � � / � k § } / § % / } / ) k \ ( ± \ � + / § ` ` § e /\ ° ° & / { \ ) / $ § e; \ } \ § / / z r ( o S 2 \ U) k G § / 3 2 / ( [ F ± EL Br S § CN \ § 0 C) 0 } � \ \ j § } ± / # E # / i # § ® } & § / G 5 k R § 0 ± \ / / S ± E 2 / \ 0 ) E o 0 0 0 4 e E 3 = b [ ( \ } N a) m O j g O o 0 o 0 0 0 m J O p 0 0 0 0 0 0C� d Q N O p 0 0 0 0 0 0 0 0 � O In � � FA V• N In W M � W i U O p o 0 0 0 0 0 0 0 0 o O � oog000000o z a � � F-- `nomwvoiN o o v oi IQ O Z jA N InN t0 N t0 z � N VI Vl V1 Q F O h U E m ' `w m o E coo r_ O Q g w z p Z w U O @ ( 111 na o E iv c Q U m Z 1- x @ LL a X O m ° cl _ _ c o° =E O _ _ _ -NCO ammo ° o " Oc°iu'�`O C:a:L -cn a @ ° m W •: UUU a� }, J K a) a) ot$ U m 1 co io ih ~ o a1 V cM M E > w O w C z W a Co � Ea� E ww N O N w w ;� J C ao LLI J m '~ \ t vJ Oo U N O ~uj m a o- a m z F N �c _jLL LLIL _j _j0 _j_jQQ J J J J J(n J J c z° -0 F" I _� b j a J O m V -oz v �v � vv � � a u; LLI U Q � N '- � ti Z z�- r o a o W w o Q $ _ a W W co a) c) c Z W N O O O o N O o 0 o o O LL N LU o C yr o_ 0000roi00000 r � r\ C _• .N m(n M Ma, D f" m t[y� y o d mrnmmm a in a N M A M M N a) M oI D) a) U i O m Q) CU M M M M O Obi Obi Obi phi phi a�i O W WCIE Mr1 m z a c) ao 'V SC m E > Z O W O o 2' t O W a O W E F � u> mvr� rom No N N Q � N = a U a m N 0 N p z O a G Z j C Q /\ m m a \C3 ( ° w t § ° a ® k k \ k0k � ci w / / j 04 . f o § § a 7 § §)k \f \ k J, § » E / w r C) f b \ \ • y h § / § ) § _ 'n w { & « / g $ § ± QG / 2 < . CD / { } ) \ k k k LU = O k) \ U ea / § � { f / § % » § § ° § § & E ° § > ) \ 2 u 6 / / j � ! \ \ k i r ou E & w f \ Q U § \ ƒ mm {� 3 # o { \ o § - \ K G G ° # § k r % \ m ) & k 7 ° It t 2 a t § ; \ J _ } ) % / x D k M ) a b j b ` V & # # i \ j § k § $ # \ / O ± & S 2 S k \ E I k ) u § am< § w / w ® § § k G ( § \ } $ 6 8 Cl) 04 / o \ oe n �o \ \ 7 \ # / \ \ / ) \ ( § m o a o = O < % \ m E ( 0 � 0 0 * m E o § k J � Cl( [ 2@§\ & LO R \§4, &R § 8 k § § 09 k a % w 2 o � ) § e § b \ z M e £ ■ & £ / ) k § � 3 $22 k ® �� o (n 2 §�� LLA §� c r R§® Aie §w , §/ _ . �( ° ® 2 . \ S) Kr / \ ) K @k ` ±!LL ƒ E§ I 9 0 ƒ k E zx . / [° ©a Cl) \ §k 0 S ) \ D \ C.)z m § $ . z CD � � 2 k � \\ § 2 } FORTWORTH. TRANSPORTATION AND PUBLIC WORKS March 10, 2022 Conatser Construction 5327 Wichita St. Fort Worth, Tx 76119 RE: Acceptance Letter Project Name: Hulen Tract Phase 16 Project Type: Developer City Project No.: 102746 To Whom It May Concern: On March 2, 2022 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on March 10, 2022. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 10, 2022, which is the date of the punch list completion and will extend of two (2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 647-2497. Sincerely, Patrick dey(Ma 5,202213:27 CDT) Patrick.Bucl<ley@fortworthtexas.gov, Project Manager Cc: Robert Riley, Inspector Ronald Cordova, Inspection Supervisor Gary Deyon, Senior Inspector VictorTornero, Program Manager Casey Stevenson, Consultant Conatser Construction, Contractor Steve Hawkins, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev.8/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX, LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: HULEN TRACT PH. 1B WATER, SANITARY SEWER, STORM DRAIN, PAVING, STREET SIGN & STREET LIGHT IMPROVEMENTS DOE#: N/A CFA PRJ#: 20-0092 CITY PROJECT #: 102746 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP -4"Z440---- Brock Huggins Subscribed and sworn to before me this 14TH day of March, 2022. KATNERINE ROSE NOTARY PUBLIC Notary Public in Tarrant County, Texas iD#133467933 °?;• +...` State of Texas ��� Comm.Exp.11-30-2025 'irwa'Yvr.� CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 0235123 PROJECT: (name, addreSS)Hulen Tract, Phase 1B Fort Worth, TX TO (Owner) HAWKINS FAMILY JOINT VENTURE AND THE CITY ARCHITECT'S PROJECT NO: CFA20-0092 OF FORT WORTH CONTRACT FOR: 7201 Hawkins View Dr.,Suite 101 Water,Sanitary Sewer,Storm Drain,Paving,Street Signs,&Street Light Improvements for Hulen Tract,Phase 1 B Fort Worth TX 76132 -J CONTRACT DATE: CONTRACTOR:CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of Ihere insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) HAWKINS FAMILY JOINT VENTURE AND THE CITY OF FORT WORTH 7201 Hawkins View Dr., Suite 101 Fort Worth TX 76132 , OWNER, as set forth in the said Surety Company's bond. IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 11th day of March,2022 BERKLEY INSURANCE COMPANY Surety Company Attest: r (Seal): ` — Signature of Authorized Representative RQ-, Mor_le_:___ Attorney-in-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No.BI-7280j-el POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna,Don E. Cornell; Sophinie Hunter; Robbi Morales;Kelly A. Westbrook; Tina McEwan;Joshua A. Saunders; or Tonie Petranek of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S.Dollars(U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds,undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WBEREOF,the Company has caused these presents to.be signed and attested by its appropriate officers and its corporate seal hereunto affixed this end day of ,tune 2020 �, Rnu�rvr Attestel Berk-y Insurance Company By B Sr:r11.l01 derzraan y Je after Executive Vice President&Secretary S rc` resident STATE OF CONNECTICUT) ) ss: COUNTY OF FAMMLD ) Sworn to before me, a Notary Public in the State of Connecticut,this end day of _ .tune 2020 by Ira S.Lederman and Jeffrey M. Hafter who are sworn to me to be the Executive Vice Presidents Secretary, and Senior Vice President, respectively,of Berkley Insurance Company_ NOTARY� �A" CONNECTIGI.IT W COMMISSION EXPIRES APFtIL 30.2024 . otary Public,State of Connecticut CERTIFICATE I,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a true,correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded aayl. N autbaritlr of tl�e Attorney-in1 Fact set forth therein, who executed the bond or undertaking to which this Power of A rrri e,..t, cheat,is in full force and effect as of this date. der my hand and seal ofthe Company,this 11 th day of Marc 2022 W SEA1. Vincent P.Forte AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX, LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: HULEN TRACT PH. 1B WATER, SANITARY SEWER, STORM DRAIN, PAVING, STREET SIGN & STREET LIGHT IMPROVEMENTS DOE#: N/A CFA PRJ#: 20-0092 CITY PROJECT #: 102746 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP -4"Z440---- Brock Huggins Subscribed and sworn to before me this 14TH day of March, 2022. KATNERINE ROSE NOTARY PUBLIC Notary Public in Tarrant County, Texas iD#133467933 °?;• +...` State of Texas ��� Comm.Exp.11-30-2025 'irwa'Yvr.� CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 0235123 PROJECT: (name, addreSS)Hulen Tract, Phase 1B Fort Worth, TX TO (Owner) HAWKINS FAMILY JOINT VENTURE AND THE CITY ARCHITECT'S PROJECT NO: CFA20-0092 OF FORT WORTH CONTRACT FOR: 7201 Hawkins View Dr.,Suite 101 Water,Sanitary Sewer,Storm Drain,Paving,Street Signs,&Street Light Improvements for Hulen Tract,Phase 1 B Fort Worth TX 76132 -J CONTRACT DATE: CONTRACTOR:CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of Ihere insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) HAWKINS FAMILY JOINT VENTURE AND THE CITY OF FORT WORTH 7201 Hawkins View Dr., Suite 101 Fort Worth TX 76132 , OWNER, as set forth in the said Surety Company's bond. IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 11th day of March,2022 BERKLEY INSURANCE COMPANY Surety Company Attest: r (Seal): ` — Signature of Authorized Representative RQ-, Mor_le_:___ Attorney-in-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No.BI-7280j-el POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna,Don E. Cornell; Sophinie Hunter; Robbi Morales;Kelly A. Westbrook; Tina McEwan;Joshua A. Saunders; or Tonie Petranek of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S.Dollars(U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds,undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WBEREOF,the Company has caused these presents to.be signed and attested by its appropriate officers and its corporate seal hereunto affixed this end day of ,tune 2020 �, Rnu�rvr Attestel Berk-y Insurance Company By B Sr:r11.l01 derzraan y Je after Executive Vice President&Secretary S rc` resident STATE OF CONNECTICUT) ) ss: COUNTY OF FAMMLD ) Sworn to before me, a Notary Public in the State of Connecticut,this end day of _ .tune 2020 by Ira S.Lederman and Jeffrey M. Hafter who are sworn to me to be the Executive Vice Presidents Secretary, and Senior Vice President, respectively,of Berkley Insurance Company_ NOTARY� �A" CONNECTIGI.IT W COMMISSION EXPIRES APFtIL 30.2024 . otary Public,State of Connecticut CERTIFICATE I,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a true,correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded aayl. N autbaritlr of tl�e Attorney-in1 Fact set forth therein, who executed the bond or undertaking to which this Power of A rrri e,..t, cheat,is in full force and effect as of this date. der my hand and seal ofthe Company,this 11 th day of Marc 2022 W SEA1. Vincent P.Forte