HomeMy WebLinkAboutContract 52102-CO1 CSC No.52102-COl Fc-'az_'1_ NAk�) -rn-i City of Fort Worth Change Order Request Project Name:1..Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No.: 1 52102 ProjectNo.(s):1 66016 0700430 5740010 CO2515 DOE No. N/A CItyProj.No.:1 02515 Project Description: Construct Parallel Relief Interceptor in Upper Big Fossil Basin and Rehabilatate existing M-347 and M-386, Contractor;1 William J.Schulz,Inc.dba Circle C Construction Co, Change Order Il C� Date: 1 1/21/2021 City Project M9r,1 Walter Norwood City Inspector: I David Johnson Phone Number: (817)392-5026 Phone Number: (817)392-8455 —F Dept. Water Sewer Totals Contract Time Calenderdays) Original Contract Amount $13,006,286.25 $13,006,286.25 456 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $13,006,286.25 $13,0062286.25 456 Amount of Proposed Change Order _ $0.00 i $0.00 180 Revised Contract Amount $13,006,286.25 $13,006,286.25 636 Original Funds Available for Change Orders $260,125.00 $260,126.00 Remaining Funds Available for this CO Additional Funding(f necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00% MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $16,257,857.81 JUSTIFICATION (REASONS)FOR CHANGE ORDER Change Order No. 1 provides for: • Additional sewer by other than open cut method in order to avoid potential damage to trees and houses in the rear of lots close to Riverside Drive and a bridge crossing Riverside Drive, • Conshield antimicrobial admixture to concrete manholes and junction structures in lieu of epoxy coating in order to expedite construction of the project. • The deletion of pay item quantities that are no longer needed on the project. Staff recommends the addition of 180 calendar days to the project for the change order. f I It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order, Contractor's Company Name Contractor Name Contractor Signature Dale W IP1rJ Schua icc a!aOrciecConswcBon Co. Teti Skelly ; Ins Odor Date Project Manager � Date t -:�l Direclur(Water Dept) Date Construction Supeivisor(Water Dept) Date an 29,2021 Assistant City Allomey Date Assistant City Mianaer Dale ebl,zozl Feb 2 2021 ,e2+anr ;m, �cm Council Action(If Required) OFFICIAL RECORD M&C Number N/A M&C Dale Approved CITY SECRETARY FT. WORTH, TX VyV, City of fort Worth - --- Change Order Additions Project Name Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No.; 52102 Project No,(s): 56016 0700430 5740010 CO2515 DOE No. N A City Proj.No.; 02515 Project Description Construct Parallel Relief Interceptor in Upper Big Fossil Basin and Rehabilatate existing M-347 and M-386. Contractor William J.Schulz,Inc.dba Circle C Construction Co, Change Order:= Date: 1/21/2021 City Project Mgr. Walter Norwood City Inspector David Johnson Aooirioivs DEPT Qt Unit Unit Cost Total 7 66"Casing By Ol er Than Open Cut Sewer 3. LF T900, 00 $245,700.00 8 48"Sewer Carrier Pipe Sewer 273.00 LF $250.00 $68,250.00 101 Conshield Antimicrobial in 5'Conshield Manhole Sewer 18.00 EA $1,800.00 $32,400.00 102 Conshleid Antimicrobial in 5'Extra Depth Conshield Manhole Sewer 223.00 VF $100.00 $22,300,00 103 Conshield Antimicrobial in 5'Tee Base Conshield Manhole Sewer 24.00 EA $4,000.00 $96,000.00 —TO-4— Conshield Antimicrobial in 5'Tee Base Drop Conshield Manhole Sewer 436.00 VF $50.00 $21,800.00 105 Conshield Antimicrobial in 5'Tee Base Extra Depth Conshield Manhole Sewer 4.00 EA $5,000,00 $20,000.00 106 Conshield Antimicrobial in 6'Manhole Sewer 1.00 EA $2,000.00 $2,000.00 107 Conshield Antimicrobial in 6'Extra Depth MH Sewer 8.00 VF $50.00 $400.00 108 Conshield Antimicrobial in Junction Structure#1 STA 0+96.55,SS LINE A) Sewer 1.00 EA $17,600.00 $17,600.00 109 Conshield Antimicrobial in Junction Structure#2(STA 3+97,77,SS LINE A) Sewer 1.00 EA $11,880.00 $11,880.00 110 Conshield Antimicrobial in Junction Structure 43(STA 1+15.00,LATERAL-1) Sewer 1.00 EA $7,920.00 $7,920.00 111 Conshield Antimicrobial in Junction Structure#4 STA 45+92,57,SS LINE A Sewer 1.00 EA $12,100.00 $12,100.00 112 Conshield Antimicrobial in Junction Structure#5(STA 1+13.74,LATERAL-3) Sewer 1.00 EA $8,360.00 $8,360.00 113 Conshield Antimicrobial in Junction Structure 46(STA 85+80.25,SS LINE A) Sewer 1.00 EA $14,520.00 $14,520.00 14 Conshield Antimicrobial in Junction Structure#7(STA 1+15.00,LATERAL4) Sewer 1.00 EA $13,420.00 $13,420.00 Water Sewer $594.650.00 Page 1 of i Additions Sub Total $594,650.00 174:10R-F WOa-1'11-it City of Foils UV01-11 change Order Deletions Project Name Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No.: 52102 Project No.(s): 56016 0700430 5740010 CO2515 DOE No. N/A City Proj.No.: 02515 Project Description Consfnict Parallel Relief Interceptor in Upper Big Fossil Basin and Rehabilalate existing M-347 and M-386. Contractor William J.Schulz,Inc.dba Circle C Construction Co. Change Order: ED Date 1/21/2021 City Project Mgr. Walter Norwood City Inspector; I David Johnson DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 777-40"Fiberglass Sewer Pipe,Select backfill, Sewer 273.00 LF $435.00 $118,755.00 45 Epoxy MH Liner(Warren Environmental) Sewer 843.00 VF $350.00 $309,050.00 49 Epoxy Structure Liner(Warren Environmental) Sewer 6975.00 VF $18.75 $130,781.25 85 Construction Allowance Sewer 0.18 LS $200,000.00$36,063,75 I Water Sewer $594,650.00 Page 1 of 1 Deletions Sub Total $594,650.00 _ MBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co## DATE AMOUNT I Total $0.00 E Page 1 of 1 Contract Compliance Manager BY signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. /0 Signature NO/7'Lo-Y- Alypo&o Name of Employee Title ,d4UU�� ATTEST: oo�FORr��na O00000000,00 a r U� Cti°o �O�.Id Mary J. Kayser 9 S o 0 City Secretary , ° mod T -ooa000- p i OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX From: Black, Doug To: Sholola.Tony Cc: Soto.Vania Elizabeth; Norwood,Walter P;Sauceda. Norma Subject: RE: Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor,CSC 52102(C01 and CO2) Date: Tuesday, March 22,2022 4:31:35 PM Ok to correct scrivener's errors. DB Douglas W Black Senior Assistant City Attorney 200 Texas Street Fort Worth,Texas 76102 817-392-7615 Direct Dou .Black e,fortworthtexas.gov City of Fort Worth Working together to build a strong community. Fop.T WORTH. RECIPIENTS -PLEASE CONTACT ME PRIOR TO FORWARDING MESSAGES DESIGNATED AS ATTORNEY-CLIENT COMMUNICATIONS. This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to which they are addressed. This communication may contain material protected by the attorney-client privilege. If you are not the intended recipient or the person responsible for delivering the e-mail to the intended recipient,be advised that you have received this e-mail in error and that any use,dissemination,forwarding,printing, or copying of this e-mail is strictly prohibited. If you have received this e-mail in error,please immediately notify Doug Black at the City of Fort Worth City Attorney's Office (817) 392-7615. From: Sholola,Tony Sent: Saturday, March 19, 2022 13:53 To: Black, Doug<Douglas.Black@fortworthtexas.gov> Cc: Soto, Vania Elizabeth <Vania.Soto@fortworthtexas.gov>; Norwood, Walter P <Walter.Norwood @fortworthtexas.gov>; Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov> Subject: Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor, CSC 52102 (C01 and CO2) Doug: For the subject project, please give Vania the okay to replace existing CO's 1 and 2 (first attachment) with updated CO 1 and CO 2 (second and third attachments).The deletion pages of the updated CO's have been revised to show the item no for 48" Fiberglass Sewer Pipe, Select backfill as 5 instead of 4 that was inadvertently listed.The deletions (from CO 1 and CO 2)were correctly made to item no. 5 and not item no. 4 as shown on the fourth attachment. Thanks