Loading...
HomeMy WebLinkAboutContract 52102-CO2 CSC No.52102-CO2("—% ]I.Cbp--r VvoIR-FI-1 City of Fort Worth Change Order Request Project Name:1 Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No.: 1 52102 Project No.(s): 56016 0700430 5740010 CO2515 DOE No, N/A City Pro).No.: 02515 Project Description Construct Parallel Relief Interceptor In Upper Big Fossil Basin and Rehabilitate Existing M-347 and M-386. Contractor: William J.Schulz,Inc,dba Circle C COnSIMGIIOn Co. Change Order 11 0 Date: 12/27I2021 City Project Mgr,J Waller Norwood City Inspector: I John Robinson Phone Number: (817)392-5026 Phone Number: (817)392-8452 Dept, Water Sewer Totals Contract Time (Calander days) Original Contract Amount $13,006,286.25 $13,006,286.25 456 Extras to Dale $0,00 $0.00 0180 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $13,006,286,25 $13,006,286.26 630 Amount of Proposed Change Order $89,305,00 $89,305.00 180 Revised Contract Amount $13,095,591.25 $13;095,691,25 816 Original Funds Available for Change Orders $260,125.00 $260,126.00 Remaining Funds Available for Ihis CO Additional Funding(it necessary) $89,306,00 $89 305.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.69% MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $16,257,857,81 JUSTIFICATIONi(Rg'ASONS)FOR CHANGEt,ORDER Change order No. 2 provides for: • Installation of sewer pipe by other than open cut method,utilizing wooden box tunnel, due to the inavailability of steel liner plate. • The deletion of pay item quantities that are no longer needed on the project. Staff recommends the addition of 180 calendar days to the project for the change order and for differing site conditions that were encountered during construction. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full(both time and money)for all costs arising out of,or incidental to,the above Change Order, Conlracloes,Qom an yNome 'C'ontro*(Name ;Conlraetbr 9gnalure NilliamISchulz,Inc.dbaOrcleCConsImgnw Teri Skelly Z/ Inspector )ale Pro'olMna or dr6-202Z r- *Supervisor Director(Water .Dale Consl ucllon*Su ervisor Watar De tl Data. 'j) . S. Jan7,2022 AssIstapI.City Attorney Dale AssistanbQll rMane er Dale Jan? zozz Jan 7 2022 Council Aollbn, If,Rd aired' OFFICIAL RECORD M&C Number N/A M&C Dale Approved CITY SECRETARY FT. WORTH, TX FORT Wo F,T14 City of Fort Worth Change Order Additions Project Name Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No.; 52102 Project No.(s): 66016 0700430 5740010 CO2515 1 DO[No. N/A City Proj,No.: 02515 Project Construct Parallel Relief Interceptor In Upper Big Fossil Basin and Rehabilitate Existing M-347 and M-386, Description Contractor William J.Schulz,Inc,dba Circle C Construction Co, Change Order:l � bale; 1212712021 City Project Mgr. Walter Norwood City Inspector John Robinson 7-1 ADDITIONS ITEM ?DEP7_ Af Unit Uitlt'Cost Total 8 48"Sewer Carrier Pipe Sewer 317.00 LF $250.00 $79,250,00 115 Wooden Box Tunnel Sewer 694.00 LF $876.00 $607,250.00 l i i t r l r. i'. L' Water Sewer $686,500.00 Page 1 of d. Additions Sub Total $6B6,500.00 � City of Fort Worth Change Order Deletions Project Name I Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No,: 52102 Project No.(s): 56016 0700430 6740010 002515 DOE No, N/A City Proj.No.: 02515 Project Description Construct Parallel Relief Interceptor in Upper Big Fossil Basin and Rehabilitate Existing M-347 and M-386. Contractor Wililam J.Schulz,Inc.dba Circle C Construction Co, Change Order: F-2 ] Date 1212712021 City Project Mgr. Walter Norwood City Inspector: John Robinson DELETIONS i7�M QESGRlRT1.0�1_ pl✓PT iQty ::"Wif:;, Uftit.Cast Totgl ' �• S * 48"Flberglass Sewer Pipe,Select backfill, Sewer 317.00 LF $435.00 $137,895.00 3 h7122 7 66"casing By Other Than Open Cut Sewer 377.00 LF $900.00 $339,300.00 85 Construction Allowance Sewer 0.60 LS $200,000.00 $120,000.00 f i i E t [ff I. I Water Sewer $597,195.00 i Page of 1 Deletions Sub Total $597,195.00 i MIWBE Breakdown for this Change Order Total Previous Change Orders coif bRfiM _ AMQUNT,. Total i i Page 1 of 1 Contract Compliance Manager By signing I aclmowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements, Signature AI¢��- llfo►�wa Name of Employee Li �` /►''�YIA'RPN` Title �FOR' ' a� °00000° 4t �.�►�°°° °0 0��d p/�o ATTEST: 0$ o=� ° ° J7ahtie-d2�f 0,74U 1 7 o ° J,��_tte S.Gnad;110=n 14 A)1 IJ21 CSi� � O °� �� ... % * ° ° *d 000000 Jannette Goodall a�ti�SEX pS,oaQ City Secretary, f { f�f f i k 1 OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX i From: Black, Doug To: Sholola.Tony Cc: Soto.Vania Elizabeth; Norwood,Walter P;Sauceda. Norma Subject: RE: Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor,CSC 52102(C01 and CO2) Date: Tuesday, March 22,2022 4:31:35 PM Ok to correct scrivener's errors. DB Douglas W Black Senior Assistant City Attorney 200 Texas Street Fort Worth,Texas 76102 817-392-7615 Direct Dou .Black e,fortworthtexas.gov City of Fort Worth Working together to build a strong community. Fop.T WORTH. RECIPIENTS -PLEASE CONTACT ME PRIOR TO FORWARDING MESSAGES DESIGNATED AS ATTORNEY-CLIENT COMMUNICATIONS. This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to which they are addressed. This communication may contain material protected by the attorney-client privilege. If you are not the intended recipient or the person responsible for delivering the e-mail to the intended recipient,be advised that you have received this e-mail in error and that any use,dissemination,forwarding,printing, or copying of this e-mail is strictly prohibited. If you have received this e-mail in error,please immediately notify Doug Black at the City of Fort Worth City Attorney's Office (817) 392-7615. From: Sholola,Tony Sent: Saturday, March 19, 2022 13:53 To: Black, Doug<Douglas.Black@fortworthtexas.gov> Cc: Soto, Vania Elizabeth <Vania.Soto@fortworthtexas.gov>; Norwood, Walter P <Walter.Norwood @fortworthtexas.gov>; Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov> Subject: Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor, CSC 52102 (C01 and CO2) Doug: For the subject project, please give Vania the okay to replace existing CO's 1 and 2 (first attachment) with updated CO 1 and CO 2 (second and third attachments).The deletion pages of the updated CO's have been revised to show the item no for 48" Fiberglass Sewer Pipe, Select backfill as 5 instead of 4 that was inadvertently listed.The deletions (from CO 1 and CO 2)were correctly made to item no. 5 and not item no. 4 as shown on the fourth attachment. Thanks