HomeMy WebLinkAboutContract 52102-CO2 CSC No.52102-CO2("—%
]I.Cbp--r VvoIR-FI-1 City of Fort Worth
Change Order Request
Project Name:1 Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No.: 1 52102
Project No.(s): 56016 0700430 5740010 CO2515 DOE No, N/A City Pro).No.: 02515
Project Description Construct Parallel Relief Interceptor In Upper Big Fossil Basin and Rehabilitate Existing M-347 and M-386.
Contractor: William J.Schulz,Inc,dba Circle C COnSIMGIIOn Co. Change Order 11 0 Date: 12/27I2021
City Project Mgr,J Waller Norwood City Inspector: I John Robinson
Phone Number: (817)392-5026 Phone Number: (817)392-8452
Dept, Water Sewer Totals Contract Time
(Calander days)
Original Contract Amount $13,006,286.25 $13,006,286.25 456
Extras to Dale $0,00 $0.00 0180
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $13,006,286,25 $13,006,286.26 630
Amount of Proposed Change Order $89,305,00 $89,305.00 180
Revised Contract Amount $13,095,591.25 $13;095,691,25 816
Original Funds Available for Change Orders $260,125.00 $260,126.00
Remaining Funds Available for Ihis CO
Additional Funding(it necessary) $89,306,00 $89 305.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.69%
MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $16,257,857,81
JUSTIFICATIONi(Rg'ASONS)FOR CHANGEt,ORDER
Change order No. 2 provides for:
• Installation of sewer pipe by other than open cut method,utilizing wooden box tunnel, due to the
inavailability of steel liner plate.
• The deletion of pay item quantities that are no longer needed on the project.
Staff recommends the addition of 180 calendar days to the project for the change order and for differing site
conditions that were encountered during construction.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
In full(both time and money)for all costs arising out of,or incidental to,the above Change Order,
Conlracloes,Qom an yNome 'C'ontro*(Name ;Conlraetbr 9gnalure
NilliamISchulz,Inc.dbaOrcleCConsImgnw Teri Skelly Z/
Inspector )ale Pro'olMna or
dr6-202Z
r- *Supervisor
Director(Water .Dale Consl ucllon*Su ervisor Watar De tl Data.
'j) . S. Jan7,2022
AssIstapI.City Attorney Dale AssistanbQll rMane er Dale
Jan? zozz Jan 7 2022
Council Aollbn, If,Rd aired' OFFICIAL RECORD
M&C Number N/A M&C Dale Approved
CITY SECRETARY
FT. WORTH, TX
FORT Wo F,T14 City of Fort Worth
Change Order Additions
Project Name Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No.; 52102
Project No.(s): 66016 0700430 5740010 CO2515 1 DO[No. N/A City Proj,No.: 02515
Project Construct Parallel Relief Interceptor In Upper Big Fossil Basin and Rehabilitate Existing M-347 and M-386,
Description
Contractor William J.Schulz,Inc,dba Circle C Construction Co, Change Order:l � bale; 1212712021
City Project Mgr. Walter Norwood City Inspector John Robinson 7-1
ADDITIONS
ITEM ?DEP7_ Af Unit Uitlt'Cost Total
8 48"Sewer Carrier Pipe Sewer 317.00 LF $250.00 $79,250,00
115 Wooden Box Tunnel Sewer 694.00 LF $876.00 $607,250.00
l
i
i
t
r
l
r.
i'.
L'
Water
Sewer $686,500.00
Page 1 of d. Additions Sub Total $6B6,500.00
� City of Fort Worth
Change Order Deletions
Project Name I Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No,: 52102
Project No.(s): 56016 0700430 6740010 002515 DOE No, N/A City Proj.No.: 02515
Project Description Construct Parallel Relief Interceptor in Upper Big Fossil Basin and Rehabilitate Existing M-347 and M-386.
Contractor Wililam J.Schulz,Inc.dba Circle C Construction Co, Change Order: F-2 ] Date 1212712021
City Project Mgr. Walter Norwood City Inspector: John Robinson
DELETIONS
i7�M QESGRlRT1.0�1_ pl✓PT iQty ::"Wif:;, Uftit.Cast Totgl '
�• S * 48"Flberglass Sewer Pipe,Select backfill, Sewer 317.00 LF $435.00 $137,895.00
3 h7122 7 66"casing By Other Than Open Cut Sewer 377.00 LF $900.00 $339,300.00
85 Construction Allowance Sewer 0.60 LS $200,000.00 $120,000.00
f
i
i
E
t
[ff
I.
I
Water
Sewer $597,195.00
i
Page of 1 Deletions Sub Total $597,195.00
i
MIWBE Breakdown for this Change Order
Total
Previous Change Orders
coif bRfiM _ AMQUNT,.
Total
i
i
Page 1 of 1
Contract Compliance Manager
By signing I aclmowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements,
Signature
AI¢��- llfo►�wa
Name of Employee
Li
�` /►''�YIA'RPN`
Title �FOR'
' a� °00000° 4t
�.�►�°°° °0 0��d
p/�o
ATTEST: 0$ o=�
° °
J7ahtie-d2�f 0,74U 1 7 o °
J,��_tte S.Gnad;110=n 14 A)1 IJ21 CSi� � O °� �� ...
% * ° ° *d
000000
Jannette Goodall a�ti�SEX pS,oaQ
City Secretary,
f
{
f�f
f
i
k
1 OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
i
From: Black, Doug
To: Sholola.Tony
Cc: Soto.Vania Elizabeth; Norwood,Walter P;Sauceda. Norma
Subject: RE: Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor,CSC 52102(C01 and CO2)
Date: Tuesday, March 22,2022 4:31:35 PM
Ok to correct scrivener's errors.
DB
Douglas W Black
Senior Assistant City Attorney
200 Texas Street
Fort Worth,Texas 76102
817-392-7615 Direct
Dou .Black e,fortworthtexas.gov
City of Fort Worth Working together to build a strong community.
Fop.T WORTH.
RECIPIENTS -PLEASE CONTACT ME PRIOR TO FORWARDING MESSAGES
DESIGNATED AS ATTORNEY-CLIENT COMMUNICATIONS.
This e-mail and any files transmitted with it are confidential and are intended solely for the use of
the individual or entity to which they are addressed. This communication may contain material
protected by the attorney-client privilege. If you are not the intended recipient or the person
responsible for delivering the e-mail to the intended recipient,be advised that you have received this
e-mail in error and that any use,dissemination,forwarding,printing, or copying of this e-mail is
strictly prohibited. If you have received this e-mail in error,please immediately notify Doug Black at
the City of Fort Worth City Attorney's Office (817) 392-7615.
From: Sholola,Tony
Sent: Saturday, March 19, 2022 13:53
To: Black, Doug<Douglas.Black@fortworthtexas.gov>
Cc: Soto, Vania Elizabeth <Vania.Soto@fortworthtexas.gov>; Norwood, Walter P
<Walter.Norwood @fortworthtexas.gov>; Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov>
Subject: Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor, CSC 52102 (C01 and CO2)
Doug:
For the subject project, please give Vania the okay to replace existing CO's 1 and 2 (first attachment)
with updated CO 1 and
CO 2 (second and third attachments).The deletion pages of the updated CO's have been revised to
show the item no for 48" Fiberglass Sewer Pipe, Select backfill as 5 instead of 4 that was
inadvertently listed.The deletions (from CO 1 and CO 2)were correctly made to item no. 5 and not
item no. 4 as shown on the fourth attachment.
Thanks