HomeMy WebLinkAboutContract 55235-A1 CSC No.55235-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No . 55235
WHEREAS, the City of Fort Worth (CITY) and TranSystems Corporation
dba TranSystems Corporation Consultants, (ENGINEER) made and entered into
City Secretary Contract No. 55235, (the CONTRACT) which was authorized by
M&C 21-0059 on the 12th day of January, 2021 in the amount of
$393,198 .00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Water and Sanitary Sewer Main Extension to Serve Buddharatanaram
Community; and
WHEREAS , it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $9,985. 00.
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $403,183. 00.
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [Water and Sanitary Sewer Extension to Serve
Buddharatanaram Community]
Page 1 of 2 [CPN 102994]
EXECUTED and EFFECTIVE as of the date subscribed by the City" s
designated Assistant City Manager.
APPROVED:
City of Fort Worth ENGINEER
TranSystems Corporation dba
TranSystem Corporation Consultants.
19ana Bu(cih�%ff
Dana Burghdoff(Mar 16,202211:22 CDT)
Dana Burghdoff Raul Pena III, P.E.
Assistant City Manager Senior Vice President
Mar 16,2022
DATE: DATE: 03-07-2022
APPROVAL RECOMMENDED:
CGIl-14gGleL h`�G���
Christopher H rder(Mar 14,202209:04 CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
Suby Varughese, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
0-10r, Date- N/A
DBlack(Mar 15,2022 18:46 CDT)
Douglas W. Black Form 1295 : N/A
Senior Assistant City Attorney
,d-ov�a��
ATTEST: aq FO 0 1.�4
Q�°°°°°°°°° L d
�7q������ C7000fGlGG �LL�►o° °o0�
Jan nette S.Goodall(Mar 17,2022 07:18 CDT) I P.
Nannette S. Goodall 0,vo 0=d OFFICIAL RECORD
° o° d
City Secretary Pay °°°OO°00°°°O° a� CITY SECRETARY
�44�EXASa4p
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [Water and Sanitary Sewer Extension to Serve
Buddharatanaram Community]
Page 2 of 2 [CPN 1029941
L . Systems
Date:March 4,2022
Suby Varughese, PE
Project Manager
City of Fort Worth Water—Capital Delivery
311 W 10th Street
Fort Worth,TX 76102
RE:Amendment 1 -Water and Sanitary Sewer Main Extensions to Serve Buddharataharam Community
City Project No. 102994
Dear Mr.Varughese,
TranSystems appreciates the opportunity to provide this proposal for additional services for the above referenced project.These
scope and budget modifications are needed to facilitate the changes to the sanitary sewer connection to the existing main.
Below is a summary of each contract and amendment.
Summary of the Contract and Amendments
Original Contract $ 393,198.00
Amendment 1. $ 9,985.00
Contract Total $ 403,183,00
The project specific scope changes/additions are listed below. The items listed below were in addition to the original
contract/scope.
Revisions to SS L-1
- Revise alignment to connect to existing sanitary main north of Wat Community
- Create new sheet for(approx.480 LF)SS L-1 that ties to existing sanitary main north of Wat Community. We will
restation SS L-1 in a way that we can keep the current sheet limits not impacting more sheets.
- Update location map and all associated text for SS L-4,as this will now be SS L-1.
Revisions to SS L-2
- Raise profile 1.5'and change in slope to 0.45%
- Verify existing houses can tie to revised profile—finish floor minus 3'minus 2%to new profile
- Restation SS L-2
- Create new sheet for(approx.250 LF)SS L-2 that ties to SS-L1 at manhole 6+33. We will restation SS L-2 in a way
that we can keep the current sheet limits not impacting more sheets.
- Update location map to reflect the new limits of SS L-2
Su rvey
- Topographic survey of an area approximately 255LF in length and a width of 40LF where possible.
Easements
- Create 2 new sanitary sewer easements—These 2 easements are covered under the current contract for number of
easements.No additional fee will be requested.
The attached level of effort spreadsheet provides a breakdown of the Amendment 1 fee.
If you have any questions or require additional information please give me a call.
Sincerely,
TranSystems Corporation Consultants
OAJ::)
Michael Hobbs, PE
Project Manager
1
{�
z\\§7\§;
) ;_;;;!
-
)}$ ! -__ -_
/
- /
&
J5 !\$(
E! )� (?
G/ \§\
\ ( \/00C
2}� 2(
z!
cn
� . \ -
\
a 21 { 2
_ [ %
5;
\ t � |
r !
Z3 §2 ; ; ! \
\}\\ , ,«m; rm m; !, ; ! , /