HomeMy WebLinkAboutContract 53962-FP1 Invoice No. 53962-FP1
NN Coded 03.08.22
PO# FW060-16632 CSC No.53962-FP1
Earned - $125,299.55 FORTWORTH
Retainage - $41,140.50
56013-2060000-001286-CRETAN
Retainage - $70,828.25
56002-2060000-001286-CRETAN WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
NOTICE OF PROJECT COMPLETION
56002-001286
CS 53962
Regarding contract 53962 for 90-Inch (M-280) Sanitary Sewer Rehabilitation Project as required by the Water
Department as approved by City Council on 5-5-2020 through M&C 20-0309 the Director of the Water Department,
upon the recommendation of the Sr. Capital Projects Officer, Capital Projects Delivery,Water Department,has accepted
the project as complete.
Original Contract Prices: $5,591,888.00
Amount of Approved Change Orders: $131,982.69 No 2
Revised Contract Amount: $5,723,870.69
Total Cost Work Completed: $5,723,735.94
Less Deductions:
Liquidated Damages: 0 Days @$210.00/Day
Other Deductions(see comments):
Total Deduction Amount: $ 0.00
Total Cost Work Completed: $5,723,735.94
Less Previous Payments: $5,486,467.64
Final Payment Due $237,268.30
/�ph�j o a ti 2(72Z
Recommended for Acceptance Date
tor, Water Department
Christopher 4arder(Mar21,202215:12 CDT)
Accepted Date
Director, Water Department
'gana 24L( hd%ff
Dana Burghdoff(Mar21,202216:45 CDT)
City Manager Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Project Name: 90-Inch (M-280) Sanitary Sewer Rehabilitation Project DOE. Ns:
Comments:
56002-CO1286
CS 53962
City Project Numbers 01286 DOE Number 0298
Contract Name 90-Inch(M-280)Sanitary Sewer Rehabilitation Project Estimate Number 12
Contract Limits Within Gateway Park Payment Number 12
Project Type Sewer For Period Ending 1/15/2022
Project Funding
Project Manager Sahu City Secretary Contract Number 53962
Inspectors Johnson / Drake Contract Date 5/5/2020
Contractor S.J.LOUIS CONSTRUCTION OF TEXAS,LTD Contract Time 456 CD
P.O.BOX 834 Days Charged to Date 474 CD
MANSFIELD, TX 76063-0834 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed 2�
$5,7_�,735.94
Less 0 %Retained $0.00
Net Earned $5,723,735.94
Earned This Period $237,268.38
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $5,486,467.56
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $237,268.38
Monday,February 07,2022 Page 5 of 5
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name 90-Inch(M-280)Sanitary Sewer Rehabilitation Project
Contract Limits Within Gateway Park
Project Type Sewer
City Project Numbers 01286
DOE Number 0298
Estimate Number 12 Payment Number 12 For Period Ending 1/15/2022
CD
City Secretary Contract Number 53962 Contract Time 456D
Contract Date 5/5/2020 Days Charged to Date 474
Project Manager Sahu Contract is 100.00 Complete
Contractor S.J.LOUIS CONSTRUCTION OF TEXAS,LTD
P.O.BOX 834
MANSFIELD, TX 76063-0834
Inspectors Johnson / Drake
Monday,February 07,2022 Page 1 of 5
City Project Numbers 01286 DOE Number 0298
Contract Name 90-Inch(M-280)Sanitary Sewer Rehabilitation Project Estimate Number 12
Contract Limits Within Gateway Park Payment Number 12
Project Type Sewer For Period Ending 1/15/2022
Project Funding
Sewer
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 3331.2122 90"CIPP 705 LF $1,993.00 405,065.00 705 1,405,065.00
2 3331.4804 90"Fiberglass Sewer Pipe, 719 LF $2,164.00 _,555,916.00 726 1,571,064.00
3 3331.5779 36"PVC Sewer Pipe 50 LF $781.00 $39,050.00 50 $39,050.00
4 3339.1001 Cast-In-Place(CIP)Sewer 1 EA $126,000.00 $126,000.00 1 $126,000.00
5 3339.1002 Cast-In-Place(CIP)Sewer 1 EA $71,000.00 $71,000.00 1 $71,000.00
6 3339.1003 Cast-In-Place(CIP)Sewer 1 EA $76,000.00 $76,000.00 1 $76,000.00
7 3339.1111 5'Tee Base Manhole at Sta 1 EA $60,000.00 $60,000.00 1 $60,000.00
8 3339.6001 Epoxy Manhole Liner(T-Bas 23 VF $400.00 $9,200.00
9 3339.6002 Epoxy Structure Liner(New 0 SF $25.00 $0.00 0 $0.00
10 3339.6003 Epoxy Structure Liner(MH 0 SF $25.00 $0.00 0 $0.00
11 3339.6.004 Epoxy Liner for 90"RCP 260 SF $25.00 $6,500.00 602.17 $15,054.25
12 9999.0001 86"x 4.5"Series 95 Stop(CO#2) 0 EA $33,000.00 $0.00 0 $0.00
13 9999.0002 106"x 7"Series 95 Stop L(CO#2) 0 EA $49,000.00 $0.00 0 $0.00
14 9999.0005 3/8"Thick Aluminum Checke 60 SF $300.00 $18,000.00 60 $18,000.00
15 9999.0006 4'x 4'Aluminum Access Ha 1 EA $3,000.00 $3,000.00 1 $3,000.00
16 0385.3001 Concrete Repair(Repair Mo(CO#3) 425 CF $75.00 $31,875.00 524 $39,300.00
17 0385.3002 Concrete Repair(Crack Inj 300 LF $50.00 $15,000.00 300 $15,000.00
18 0980.0001 Riverside Box A Concrete P 2400 SF $25.00 $60,000.00 2400 $60,000.00
19 0385.3003 Concrete Repair(Repair Mo 200 CF $75.00 $15,000.00 563 $42,225.00
20 0385.3004 Concrete Repair(Crack Inj 100 LF $50.00 $5,000.00 225 $11,250.00
21 3301.0001 Pre-CCTV Inspection 1441 LF $3.00 $4,323.00 697 $2,091.00
22 3301.0002 Post-CCTV Inspection 1441 LF $1.00 $1,441.00 1452 $1,452.00
23 3301.0101 Manhole Vacuum Testing(T- 4 EA $800.00 $3,200.00 1 $800.00
24 3301.0101 Manhole Leakage Testing(R 2 EA $1,500.00 $3,000.00 1 $1,500.00
25 3303.0001 Wet Weather Bypass Pumping 1 LS ,205,000.00 205,000.00 1 1,205,000.00
26 3303.0002 Wet Weather Bypass Pumping(C042) 13 DA $11,000.00 $143,000.00 10 $110,000.00
27 3305.0104 Groundwater Control I LS $1.00 $1.00 1 $1.00
28 3305.0109 Trench Safety 769 LF $1.00 $769.00 776 $776.00
29 3305.0110 Utility Markers 1 LS $2,000.00 $2,000.00
30 3305.1112 Concrete Collar 3 EA $1,000.00 $3,000.00 3 $3,000.00
31 3305.0206 Imported Embedment/Backfil(CO#2,3) 9480 CY $25.00 $237,000.00 9480 $237,000.00
Monday,February 07,2022 Page 2 of 5
City Project Numbers 01286 DOE Number 0298
Contract Name 90-Inch(M-280)Sanitary Sewer Rehabilitation Project Estimate Number 12
Contract Limits Within Gateway Park Payment Number 12
Project Type Sewer For Period Ending 1/15/2022
Project Funding
32 3305.0203 Imported EmbedmentBackfil 480 CY $100.00 $48,000.00 480 $48,000.00
33 3110.0103 12"-18"Tree Removal 1 EA $2,000.00 $2,000.00 1 $2,000.00
34 3110.0104 18"-24"Tree Removal I EA $3,000.00 $3,000.00 1 $3,000.00
35 3110.0105 24"and Larger Tree Remova 1 EA $5,000.00 $5,000.00 1 $5,000.00
36 3125.0101 SWPPP>1 acre 1 LS $10,000.00 $10,000.00 1 $10,000.00
37 3201.0204 Asphalt Pvmt Trench Repair 208 LF $171.00 $35,568.00
38 3212.0204 Asphalt Pvmt Replacement I(CO#3) 1197,77 SY $45.00 $53,899.65 1542.77 $69,424.65
39 3216.0101 6"Concrete Curb and Gone 412 LF $40.00 $16,480.00 575 $23.000.00
40 3231.0112 5'Chain Link Fence and Ga 40 LF $100.00 $4,000.00 36 $3,600.00
41 3292.0400 Seedin-Hydromulch 500 SY $1.00 $500.00
42 3292.0401 Seeding,Sod 12600 SY $4.00 $50,400.00 12600 $50,400.00
43 3471.0001 Traffic Control 1 MO $2,000.00 $2,000.00 1 $2,000.00
44 0171.0101 Construction Staking 1 LS $5,000.00 $5,000.00 1 $5,000.00
45 0171.0102 Construction Survey 1 LS $2,000.00 $2,000.00 1 $2,000.00
46 9999.0007 Construction Allowance(C042) 0 LS $150,000.00 $0.00
47 Conshield Corrosion @ Jnct Str @ Sta 526+58 1 LS $46,250.00 $46,250.00 1 $46,250.00
48 Conshield Corrosion @ Jnct Str @ Sta 519+51 1 LS $21,250.00 $21,250.00 1 $21,250.00
49 86"Series 95 Stop Log&Guide Frame w/Dual Seal 2 EA $39,003.00 $78,006.00 2 $78,006.00
(CO#2)
50 106"Series 95 Stop Log&Guide Frame w/Dual 1 EA $55,003.00 $55,003.00 1 $55,003.00
Seals(CO#2)
51 Removal of Concrete Trench Cap over existing 90" 388 LF $479.83 $186,174.04 388 $186,174.04
(CO#2)
Sub-Total of Previous Unit $5,723,870.69 $5,723,735.94
----------------- ----------------------
Monday,February 07,2022 Page 3 of 5
City Project Numbers 01286 DOE Number 0298
Contract Name 90-Inch(M-280)Sanitary Sewer Rehabilitation Project Estimate Number 12
Contract Limits Within Gateway Park Payment Number 12
Project Type Sewer For Period Ending 1/1 512 02 2
Project Funding
Contract Information Summary
Original Contract Amount $5,591,888.00
Chant=e Orders
Change Order Number 1 $0.00
Change Order Number 2 $6,683.04
Change Order Number 3 $I25,299.65
Total Contract Price $5,723,870.69
L� Date Total Cost of Work Completed $5,723,735.94
Contractor V Less 0 %Retained $0.00
Net Earned $5,723,735.94
sp Date 7.?Inspection Supervisor Earned This Period $237,268.38
//�� Retainage This Period $0.00
LT� �wa��Date 2 I7/ZZ Less Liquidated Damages
Project Manager
Days @ /Day $0.00
N/A Date LessPavement Deficiency $0.00
Asst.Director/TPW
Less Penalty $0.00
HApd,.t
Christopher Ftarder(Mar21,202215n2CDT) Date Less Previous Payment 35,486,467.56
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $237,268.38
Monday,February 07,2022 Page 4 of 5
FORTWORTH rev 03/05/07
WATER ENGINEERING&FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:12
NAME OF PROJECT: 90 INCH(M-280)Sanitary Sewer Rehabiliaton
PROJECT NO.: 8-.-:c- D/.� 86 CONTRACTO .S`iyowa
CITY PROJECT 8-
PERIOD FROM:10/01/21 TO: 01/15/21 FINAL INSPECTION DATE: 10/4/2021
WORK ORDER EFFECTIVE:9/28/2020 CONTRACT TIME: 465 Q WD QQ CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH H R GGEG CREDITED MONTH DURING
CREDITED
1. 1 16. 1
2. 1 17. 1
3. I 18. 1
4. 1 19. 1
5. 1 20. 1
6. I 21. 1
7. 1 22. 1
8. 1 23. 1
9. 1 24. 1
10. I 25. 1
11. 1 26. 1
12. 1 27. 1
13. 1 28. 1
14. 1 29. 1
15. 1 30. 1
31. 1
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD 107 107
PREVIOUS
PERIOD 367 367
TOTALS
TO DATE 474 474
*REMARKS:
Wm ( t w
S tJ sSG
Zzr -
CON CTOR DA SPECTOR DATE
Capital Projects Delivery,Water Department
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477•Fax:(817)392-8460
City of Fort Worth
Inspector's Estimate Worksheet
City Project Numbers 01286
Contract Name 90-Inch(M-280)Sanitary Sewer Rehabilitation Project DOE Number 0298
Contract Limits: Within Gateway Park Estimate Number 12
Project Type Sewer Payment Number 12
Control Number 029801 For Period Ending
Contract: 53962
Contract Date: 5/5/2020 Contract Time 456 CD
Days Charged to Date CD
Inspectors Johnson / Drake
Date Prepared by Inspector �_/ / _ Contract is %Complete
Construction ID: 13466
Item Description of Items Estimated Uni Unit Cost Previous Quanity Completed Total Cost
No. Quanity Quanity for Month Quanity
———— --------
Sewer
1 3331.2122 90"CIPP 705 LF $1,993.00 705
2 3331.4804 90"Fiberglass Sewer 719 LF $2,164.00 726
Pipe,
3 3331.5779 36"PVC Sewer Pipe 50 LF $781.00 50
4 3339.1001 Cast-In-Place(CIP) 1 EA 126,000.00 1
Sewer
5 3339.1002 Cast-In-Place(CIP) 1 EA $71,000.00 1
Sewer
6 3339.1003 Cast-In-Place(CIP) 1 EA $76,000.00 1
Sewer
7 3339.1111 5'Tee Base Manhole at 1 EA $60,000.00 1
Sta
8 3339.6001 Epoxy Manhole Liner 23 VF $400.00
(T-Bas
9 3339.6002 Epoxy Structure Liner 0 SF $25.00 0
(New
10 3339.6003 Epoxy Structure Liner 0 SF $25.00 0
(MH
11 3339.6.004 Epoxy Liner for 90" 260 SF $25.00 602.17
RCP
12 9999.0001 86"x 4.5"Series 95 0 EA $33,000.00 0
Stop(CO#2)
13 9999.0002 106"x 7"Series 95 0 EA $49,000.00 0
Stop L(CO#2)
14 9999.0005 3/8"Thick Aluminum 60 SF $300.00 60
Checke
Thursday,January 27,2022 Page 1
City of Fort Worth
Inspector's Estimate Worksheet
City Project Numbers 01286
Contract Name 90-Inch(M-280)Sanitary Sewer Rehabilitation Project DOE Number 0298
Contract Limits: Within Gateway Park Estimate Number 12
Project Type Sewer Payment Number 12
15 9999.0006 4'x 4'Aluminum 1 EA $3,000.00 1
Access Ha
16 0385.3001 Concrete Repair 425 CF $75.00 324
(Repair Mo(CO#3) " cam
17 0385.3002 Concrete Repair(Crack 300 LF $50.00 300
Inj
18 0980.0001 Riverside Box A 2400 SF $25.00 2400
Concrete P
19 0385.3003 Concrete Repair 200 CF $75.00 563
(Repair Mo
20 0385.3004 Concrete Repair(Crack 100 LF $50.00 225
Inj
21 3301.0001 Pre-CCTV Inspection 1441 LF $3.00 697
22 3301.0002 Post-CCTV Inspection 1441 LF $1.00 1452
23 3301.0101 Manhole Vacuum 4 EA $800.00 1
Testing(T-
24 3301.0101 Manhole Leakage 2 EA $1,500.00 1
Testing(R
25 3303.0001 Wet Weather Bypass 1 LS 205,000.00 1
Pumping
26 3303.0002 Wet Weather Bypass 13 DA $11,000.00 10
Pumping(CO#2)
27 3305.0104 Groundwater Control 1 LS $1.00 1
28 3305.0109 Trench Safety 769 LF $1.00 776
29 3305.0110 Utility Markers 1 LS $2,000.00
30 3305.1112 Concrete Collar 3 EA $1,000.00 3
31 3305.0206Imported 9480 CY $25.00 5100 J G{ ��
Embedment/Backfil(CO#2,3) ��F�
� I � � ,
32 3305.0203Imported 480 CY $100.00 480
Embedment/Backfil
33 3110.0103 12"-18"Tree Removal 1 EA $2,000.00 1
34 3110.0104 18"-24"Tree Removal 1 EA $3,000.00 1
35 3110.0105 24"and Larger Tree 1 EA $5,000.00 1
Remova
Thursday,January 27,2022 Page 2
City of Fort Worth
Inspector's Estimate Worksheet
City Project Numbers 01286
Contract Name 90-Inch(M-280)Sanitary Sewer Rehabilitation Project DOE Number 0298
Contract Limits: Within Gateway Park Estimate Number 12
Project Type Sewer Payment Number 12
36 3125.0101 SWPPP>_1 acre 1 LS $10,000.00 1
37 3201.0204 Asphalt Pvmt Trench 208 LF $171.00
Repair
38 3212.0204 Asphalt Pvmt 1197.77 SY $45.00 1525
Replacement (CO#3) �
39 3216.0101 6"Concrete Curb and 412 LF $40.00 575
Gutte
40 3231.0112 5'Chain Link Fence 40 LF $100.00 36
and Ga
41 3292.0400 Seeding, Hydromulch 500 SY $1.00
42 3292.0401 Seeding, Sod 12600 SY $4.00 12600
43 3471.0001 Traffic Control 1 MO $2,000.00 1
44 0171.0101 Construction Staking 1 LS $5,000.00 1
45 0171.0102 Construction Survey 1 LS $2,000.00 1
46 9999.0007 Construction 0 LS 150,000.00
Allowance(CO#2)
47 Conshield Corrosion @ Jnct Str @ 1 LS $46,250.00 1
Sta 526+58
48 Conshield Corrosion @ Jnct Str @ 1 LS $21,250.00 1
Sta 519+51
49 86"Series 95 Stop Log&Guide 2 EA $39,003.00 2
Frame w/Dual Seal(CO#2)
50 106"Series 95 Stop Log&Guide 1 EA $55,003.00 1
Frame w/Dual Seals(CO#2)
51 Removal of Concrete Trench Cap 388 LF $479.83 388
over existing 90"(CO#2)
--
:stimated Total This Unite S _723.8"0.69 Completed Total This Unit $5,598,436.29
-- - �. ' .
Thursday,January 27,2022 Page 3
City of Fort Worth
Inspector's Estimate Worksheet
City Project Numbers 01286
Contract Name 90-Inch(M-280)Sanitary Sewer Rehabilitation Project DOE Number 0298
Contract Limits: Within Gateway Park Estimate Number 12
Project Type Sewer Payment Number 12
Total Itemized Amount(Including Change Order _$5,723,870.69 Q
DATE Total Cost of Work Completed
- = —
Inspector Less %Retained
Net Earned
Previous Payment $5,486,467.56 \
Material on Hand 15%
Balance Due This Payment _,/. [�-/-) 360
Thursday,January 27,2022 Page 4
M
w
0
O O o 0 o O O o O N Cl O o O O O O O O O
y O O O O O O O O O N O O O O O O O O O O N
O O O O O O O t O Cl O O Cl O O N O
O O O 69 69 N 69 69 O O O O O N N D1 L1.
c O O O O O O O O O O M O O N N O
�O �O O oo M Oi
M r-q n n \D .-� EH M --� \D
F� N 69 �.0 64 69 69 69 64 69 69 69 69 69
O O O O O
CL ca
O
o O'
O O O O Cl O O O O O O O O O O O O O O O Cl
O Cl O O O O Cl O O O O O O O O O O O O O O O
U M t � O O O O O N N N O O O O N O N N O M
y.. U �D oo O O O O O cV N N O O O O r- N N r- N 69
r O O O O -'I- 69 69 69 O O M O v9 69 v4 69 69
G" `O O 69 M O1 69 M
�3 64 --� 69 69 69 GO!) GO!)
fH
w w w d d d d u w w w Q Q w Q w w w w w w
�U a a a w w w w > v v v w w v w U a v) U a a
w O
W
A
HI
i".
O
w
U M
O N 3t
++ � O
a V Iz- U
3 a a o a - a a rn rn Q U tj cG U J
�1 v
cc y c°Ji chi chi a`i Do Sl 18 aIIi aIIi
bD
c4 c4 >
ul rn m U U U W W W w M d U U R U U P�
•1.+ N t O, N M N M N N M t
d. N O O O O O O O O O O O O O O O O O
L. .-� O_ _O O_ _ O O O O O O O O O O O O O O
U N t N "D ID O O O M cl1 O M M O
Ol Cl O, Cl cl O, Ol Cl O1 O1 Ol O\ N N O
U M M M M M M M M M M M O1 O1 O1 O1 00 00 00 W 00 O AO M M M M M M M M M m M O> O1 01 O\ M M 01 M M M N
M M M M M M M m Cl)M M m O1 O1 O1 ClO1 O O O O O M
Q` O
WN M t N oo D N N cc
A . cc
R
A O N M t N �D [— = cN O N t� 00 Q1 O .0
o0
N N N N N N N N N N N N N N N N N N N N N
M
W
O
F O O O O O O O O O O O O O O V1 O O O O O O N
O O O O O O O O O O O O O O O 1p O O O O O O N�
N O O O O ;; ,o O O CD CD O O CD 7 O CD O CD O O
O O CD O 69 tl- O O O O O O O N O O O O O O
c d 00 n O O tl- O O O O O O O ` O �D 7 O O O p"
N M v1 O C7, M M O
69 69 O Eft M 7 69 69 64 \o
c;! 69 69 Ef) 6 69
Gl�l 69 69 69
CD
N 't 7 CN
� M b
C,
CL cC
oa
U
O p Cl O O o o p O O O p O O o O o O O o o Cl O O
0 0 o p p O p O O Cl Cl o p O O o 0 0 0 o p o p o O
U o 6 6 0 -4 o 0 li 6 6 6 6 o v o o 4 o 6 0
O Cl O Cl 69 69 O O (14 O O O O CDt� 7 7 O 69 69 O CD O
ao �n O O O O 69 —� O O O O .-., GI) Eft O O O
Ef) — — 69 69 69
69 N 69 (fl Eft 69 V) Vf — EH Eft 69
GIs
•F+ O � O
'd 00 — .--i .-r .---
Vl
w
LZ
N �?
O �
b-0 0q U O
bC0 bOp � � U cxJ O d � C7
H H N ° ai a3 p p � ❑
Y W W U T a w H w o o c Ln
oA o
a>i > Ei� a� v •a H Fes- .�E-1 a
Nm LL ca 0 C C O b
C o ca `c "' °' = n N oo v 3 a a U U aria 0 0
N 7 D\ O_ N �O M M 7
d O O O O O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O
N N N
y O O O Cl O Cl O O O O O ti O M D 0 N
M M M A m M M M M M M M N N CV N N N 7 M M M M M In M M M M M M M M M M M M M M O O NO
M
I..1 N M CY ,D r- W O, O M <t ,D r- DD 01 C) N m r v�
N N N N N N N N M M M M M M M M M M :7 '3 V' d• '7' d• O
C
R
E— A o0 oNo O= 0000 0000 oo oho = oo, o oN M, o, C,, ate, C` rn rn o°,, Cl 0 0 0 0
~ N N N N_ N N N N N_ N_ N N N N N N N_ N N M M
M _ M M O
O
V'f N N N CN �n �n Vl to V'1 cn V) cn V1 Cn Vl V] Cn Cn V1 �n r'
N N N N N N N N N N N N rq N N N N N N N N N N
M
w
0
O o 0 0 � M
O O O O O O C M O M O a)
O O \o M 7 �n [� o0 0 - 00 O Op
E N N O O n N 69 N O in.
10 00 N 1p M �D l� O
d' 'a l� V1 00 N 00 M M
H 69 U 69 69 t— � N CV
s ll 64 69
N 00 69 69
00
Y � d
U N U
CD Cl O O O O O ClW
10
0 69 6N9 Gli 69
ACl) a .Cl)-1
'C C
N
N C
O
U cat
ti O
° o
U a
U U (J U
Q ti ti 48
o o o E
L� O
N O O .O cn C
r/o O
U U4.
G. o o v n o
O
u o c Q V)
A Cl U U oho N
�+ M
Iyi V' � 00 C, O
a3
CG
A C oo CD
0 0 0 �o �o 10 c
M
N N N N N N
CSC No.53962-0O3
City of Fort Worth
Change Order Request
Project Name: 90-Inch(M-280)Sanitary Sewer Rehabilatation Project City Sec No.: 1 53962
Project No.(s): 56002-0700430-4956001-CO1286 DOE No. N/A CityProj.No.:l 01286
Project Descriplion: Sanitary Sewer Rehabilatation M-280B Located in Gateway Park
Contractor: S.J.Louis Construction Of Texas,Ltd. Change Order# 0 Date: 1 1/13/2022
City Project Mgr.1 Walter Norwood City Inspector: I Carmen Drake
Phone Numbed (817)392-5026 Phone Number: (817)392-8347
Dept, Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $5,591,888.00 $5,591,888.00 456
Extras to Dale $6,683.04 $6,683.04 0
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $5,598,571.04 $5,598,571.04 456
Amount of Proposed Change Order $125,299.65 $125,299.65 0
Revised Contract Amount $5,723,870.69 $5,723,870.69 456
Original Funds Available for Change Orders $167,757.00 $167,757.00
Remaining Funds Available for this CO $161,073.96 $161,073.96
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS% ORIGINAL CONTRACT 2.36%
MAX ALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $6,989,860.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER .
Change Order No.3 will provide for increased quantities of imported backfill,90-inch fiberglass pipe and repairs
to existing sanitary sewer structures due to actual conditions that were encountered during construction.
I
i
i
i
i
i
I
Contractor's Company Name Contractor Name 92ntractorionature D e
S.J.Louis Construction Of Texas,Ltd. Adam Lundsford J 2Z
ectof-: Date Project Manager bate
�l, — •a 1 14 z
Director Water Dept Date -Construction Supervisor Water Dept) Date.
T. S. J-N,zozz
Assistant City Attorney Date Assistant City Manager Date
Jan zi,zozz Jan 22,2022
Council Action If Required)
M&C Number 22-0039 M&C Date Approved 112022
FO RT' WORTH City of Fort Worth
Change Order Additions
Project Name 90-Inch(M-280)Sanitary Sewer Rehabilatation Project City Sec No.: 53962
Project No.(s): 56002-0700430-4956001-CO1286 DOE No. N/A City Proj.No.: 01286
Project Sanitary Sewer Rehabilatation M-280B Located in Gateway Park
Description
Contractor S.J. Louis Construction Of Texas,Ltd. Change Order:= Date: 1/13/2022
City Project Mgr. Walter Norwood City Inspector FCarmen Drake
ADDITIONS
ITEM
DEPT Qty Unit Cost ,. -:-Total:',
16 Concrete Repair(Repair Mortar)-Riverside Box A Sewer 200.00 C 7$75.00 $15,000.00
31 Imported Embedment/Backfill,Acceptable Backfill Sewer 4,380.00 CY $25.00 $109,500.00
38 Asphalt Pvmt Replacement Including Subbase Sewer 17.77 SY $45.00 $799.65
Water
Sewer $125,299.65
Page 2 of 4 Additions Sub Total $125,299.65
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name 90-Inch(M-280)Sanitary Sewer Rehabilatation Project City Sec No.: 1 53962
Project No.(s): 56002-0700430-4956001-001286 DOE No. N/A City Proj.No.: 01286
Project Description Sanitary Sewer Rehabilatation M-280B Located in Gateway Park
Contractor S.J. Louis Construction Of Texas, Ltd. Change Order: 111 Date 1/1312022
City Project Mgr. Walter Norwood City Inspector: F Carmen Drake
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Page 3 of 4 IDeletions Sub Total
MMBE Breakdown for this Change Order
MBE Sub Type of Service Amount for this CO
Total $OAO
Previous Change Orders
co# DATE` AMOUNT
Total
Page 4 of 4
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Walter Norwood
Name of Employee
Project Manager
Title
ATTEST:
Jannette S.Goodall(Jan 24,2022 07:37 CST)
Jannette Goodall
City Secretary
DB-0154
Revised 10/14/10
MONTHLY DAVIS BACON ACT CERTIFICATE of COMPLIANCE
Submittal by Owner (Sub-Recipient)
TWDB Project No. 73750
Loan/Grant No. L1000573
This executed certificate must be submitted with each Outlay Report requesting payment
for labor included with construction contracts. This Certificate applies only for LOANS
CLOSED AFTER 10/30/2009.
I Walter Norwood Project Manager of
(Name) (Title)
City of Fort Worth, Water Dept - hereby certify that interviews, periodic reviews ofa
(Name of entity)
representative sample of the weekly payroll data, and contractor weekly payroll
certifications such as OMB No. 1215-0149, have been performed to verify that contractors
and subcontractors are paying the appropriate wage rate for compliance with the DAVIS
BACON ACT, 40 U.S.C. §§3141 et seq. as amended and in conformance with the U.S.
Department of Labor regulations at 29 CFR Part 5, (Labor Standards Provisions
Applicable to Contracts Covering Federally Financed and Assisted Construction) and 29
CFR Part 3 (Contractors and Subcontractors on Public Work Financed in Whole or in
Part by Loans or Grants from the United States).
I understand that a false statement herein may subject me to penalties under federal and
state laws relating to filing false statements and other relevant statutes.
3-8-2022
Signature Date
D13-0156 10/18/2010 Page16
TWDB-1106-A
Revised: 3/25/2015
Monthly American Iron and. Steel Certificate
Compliance Submittal by Owner (Sub-Recipient)
,I
TWDB Project No.
Loan/Grant No.
This executed certificate must be submitted with each Outlay report for iron and steel
projects included within construction contracts.
i
L Ronald Etter Project Manager of
(Name) (Title)
SJ Louis Construction of Texas.LTD. hereby certify that all iron and steel
products and/or materials incorporated into the construction, alteration,
maintenance, or repair of the subject project are in full compliance with the
American Iron and Steel requirements of Section 608 of the Federal Water
Pollution Control Act for the Clean Water State Revolving Fund or P.L. 113-
235, Consolidated and Further Continuing Appropriations Act 2015, for the
Drinking Water State Revolving Fund, or comply with waivers granted by the
U.S. Environmental Protection Agency.
I understand that a false statement herein may subject me to penalties under federal and
state laws relating to filing false statements and other relevant statutes.
03/08/22
Sigtaature Date
t
Pay Estimate #12- FINAL PAYMENT
now
1
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, January 11, 2022 REFERENCE NO.: **M&C 22-0039
LOG NAME: 602SSM280B90INP2B-SJLOUIS
SUBJECT:
(CD 4)Authorize Execution of Change Order No. 3 in the Amount of$125,299.65 to a Contract with S.J.
Louis Construction of Texas, Ltd.for Sanitary Sewer Main M-280-B Rehabilitation Project and Adopt
Attached Appropriation Ordinances
RECOMMENDATION:
It is recommended that the City Council:
1.Authorize execution of Change Order No. 3 in the amount of$125,299.65 to City Secretary
Contract No. 53962 with S.J. Louis Construction of Texas, Ltd., for Sanitary Sewer Main M-280-B
Rehabilitation project for a revised contract amount of$5,723,870.69;
2.Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of$125,300.00, transferred from available
funds within the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer Main M-
280-B Rehabilitation project(City Project No. C01286); and
3.Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the
Water and Sewer Bond 2017 Fund in the amount of$5,591,888.00, by increasing estimated
receipts and appropriations in the Sanitary Sewer Main M-280-B Rehabilitation project(City Project
No. C01286), and decreasing estimated receipts and appropriations in the CWSRF Series 2017
programmable project (City Project No. P00100) by the same amount.
DISCUSSION:
On March 5, 2020, Mayor and Council Communication (M&C 20-0309), the City Council authorized a
construction contract in the amount of$5,591,888.00 with S.J. Louis Construction of Texas, Ltd. (City
Secretary Contract No. 53962) for Sanitary Sewer Main M-280-B Rehabilitation Project Located in
Gateway Park. The contract was subsequently revised by Change Order No. 1 with zero cost
administratively authorized November 6, 2020, that provided for concrete antimicrobial admixture in lieu
of epoxy coating for the project sewer manhole structures, and Change Order No. 2 in the amount of
$6,683.04 administratively authorized April 7, 2021, that provided for removal of previously unknown
concrete cap located in the trench of the existing 90 inch diameter sewer and the importation of borrow
material to replace the unsuitable backfill material.
Change Order No. 3 will provide for increased quantities of imported backfill, 90-inch fiberglass pipe and
repairs to existing sanitary sewer structures due to actual conditions that were encountered during
construction.
Appropriations for Sanitary Sewer Main M-280-B Rehabilitation, are as depicted below:
Fund Existing Additional Project Total*
Appropriations Appropriations
W&S Capital Projects $782,707.00 $125,300.00 $908,007.00
Fund 56002
Water/Sewer Bond $750,000.00 $0.00 $750,000.00
2016 Fund 56005
Sewer Capital
Legacy Fund 59607 $1,852,243.00 $0.00 $1,852,243.00
Water & Sewer Bond $5,591,888.00 $0.00 $5,591,888.00
2017 Fund 56013
Project Total $8,976,838.00 $125,300. 01$9,102,138.00
*Numbers rounded for presentation purposes.
Business Equity: S.J. Louis Construction Of Texas, Ltd. agrees to maintain its initial M/WBE commitment
of seven percent that it made on the original contract and extend and maintain that same M/WBE
commitment of seven percent to all prior change orders up to and inclusive of this Change Order No. 3
Therefore S.J. Louis Construction of Texas, Ltd. remains in compliance with the City's M/WBE Ordinance
and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form
executed by an authorized representative of its company.
Approval of recommendation No. 3 would adjust appropriations between the programmable project and
convert the Sanitary Sewer Main M-280-B Rehabilitation project (City Project No. C01286) into a static
capital project. This action is needed as future funding for the Sanitary Sewer Main M-280-B
Rehabilitation project (City Project No. C01286) is anticipated from other funding sources and the scope
of this project differs from that of the current programmable project.
This project is located in COUNCIL DISTRICT 4.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Water& Sewer Fund and upon
approval of the above recommendations and adoption of the attached appropriation ordinances, funds
will be available in the W&S Capital Projects Fund for the VC Odor Control Improvements project. Prior to
an expenditure being incurred, the Water Department has the responsibility of verifying the availability of
funds.
FUND IDENTIFIERS (FIDs):
TO
Fund Department ccount Project Program Lctivity Budget Reference # mount
ID ID Year (Chartfield 2)
FROM
Fund Department ccount Project Program ctivity Budget Reference # mount
ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by_ Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Walter Norwood (5026)
ATTACHMENTS
1. 602SSM280B901NP2B-SJLOUIS 1295.pdf (CFW Internal)
2. 602SSM280B901NP2B-SJLOUIS APC.pdf (CFW Internal)
3. 602SSM280B901NP2B-SJLOUIS 56002 A022(r2)r.docx (Public)
4. 602SSM280B901NP2B-SJLOUIS 56013 A022(r3)r.docx (Public)
5. 602SSM280B901NP2B-ST LOUIS.pdf (CFW Internal)
6. 602SSM280B901NP2BCO3-SJLOUIS FID Table (WCF 12.15.21).xlsx (CFW Internal)
7. 602SSM280B90INP2BCO3-SJLOUIS SAM.pdf (CFW Internal)
8. 60SSM280B901NP2BCO3-SJLOUIS Map.pdf (Public)
T T T
C C
cn
7 7
a fl O
'
O O O
� m o
•
Ln
D D D
n ei n •
O n V, O
_' C C C
.�. 0 0M C K
1 1
Q O
c
K ~ co co 00 00M
v v o
D D D
K n n
< m < G
m00 00
Z
pi
C
< m m < W < W
v Q 0 obi Q d o
ao
ao
`° m
LD
X
m
D W
r
m
o Pi o 0
c c c
3 Z oNJc CD 0 CD
fD
fD
n.
c c c
0 0 0
x x x
FORT WORTH
WATER ENGINEERING & FISCAL SERVICES
PIPE REPORT FOR:
PROJECT NAME: 90-INCH(M-280)SANITARY SEWER REHABILITATION PROJECT
PROJECT NUMBER: CO 1286
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
HOBAS FRP 90 Sanitary Sewer 726
CIPP Cured in Place Pipe 90 Sanitary Sewer 705
FIRE HYDRANTS: VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Passed for the entire project
NEW SERVICES: yes
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: PASSED
NEW SERVICES:
WATER ENGINEERING&FISCAL SERVICES
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311
(817) 392-4477 •Fax: (817) 392-8460
VORT ®RTH REV:02/20/07
Capital Projects Delivery,Water Department
PERFORMANCE EVALUATION OF CONTRACTOR
CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
S.J.Louis 90 inch(M-280)Sanitary Sewer Rehabilitation Project
Water Engineering Inspector DOE Number
Carmen Drake CPN CO-45 01286
Water Engineering Inspector Project Manager
❑Water 2 Waste Water ❑Storm Drainage ❑ Pavement Walter Norwood
Initial Contract Amount Project D ifftculry
$5,591,888.00 *Simple O Routine Q Complex
Final Contract Amount Date
$5,723,735.94 2/2/2021
H)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
I Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety I5 y 3 60 45
8 Traffic Control Maintenance 15 Y 2 60 30
9 DaiIy Clean Up 5 y 3 20 15
10 Citizen's Complaint Resolution 5 Y 3 20 15
11 Property Restoration 5 Y 3 1 20 15
12 After Hours Response 5 Y 1 3 20 15
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 321
BONUS POINTS(25 Maximum)(B)
III)CONTRACTOR'S RATING TOTAL SCORE(TS) 321
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MSj*100%) 321 / 448 = 72%
Performance Category Good
<20%=Inadequate 20%to<q0%=Deficient 40%to<60%=Standard 60%to<80%=Goad >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature Inspector Signature Contractor
Signature Inspector's Supervisor
CONTRACTOR`S COMMENTS
Capital Projects Delivery,Water Department
The City of Fort Worth•1000 Throclanorton Street•Fort Worth,TX 76012-6311
(817)392-4477-Fax:(817)392-8460
VORTW®RTH REV:02/22/07
Capital Projects Delivery,Water Department
CONTRACTOR'S EVALUATION OF CITY
I PROJECT INFORMATION Date:
Name of Conlractar Project Name
S.J.LOUIS 90 inch M-280)_Sanitary Sewer Rehabilitation Project
Water Engineering Inspector Project Manager
Carmen Drake Walter Norwood
DOE Number Project Dculty Type of Contract
QQ Simple O Routine Q Complex ❑Water 21 Waste Water ❑Storm Drainage
g El Pavement
Initial Contract 4mounl Final Contracl Amount
$5,591,888.00 5,723,735.94
H)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT(0-4) RATING
INSPECTION EVALUATION PLANS&SPECIFICATIONS (0-4)
1 Availability of Ins ector q 1 Accuracy of Plans to Existing Conditions Z.
2 Knowledge of Ins ector 3 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities '�p 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities Z
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs I l Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
] Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Openin&to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature Inspector
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
Capital Projects Delivery Water Department
The City of Fort Worth•1000 Throckinorton Street•Fort Worth,TX 76012-6311
(817)392-4477•Fax:(817)392-8460
FORT WORTH
CONSENT OF SURETY COMPANY
City of Fort Worth,TX TO FINAL PAYMENT
Bond No. 190044900
PROJECT: 90-Inch(M-280)Sanitary Sewer Rehabilitation Project PROJECT'NUMBER:
WNER: Ci of Fort Worth Texas 1286
ONTRACfOR: S.J.Louis Construction of Texas Ltd. 22005
ENGINEER: CDM Smith
The Surety Company,on bond of the Contractor listed above forthe referenced protect in accordance with the
Contract Documents,hereby approves final payment to the Contractor,and agrees that final payment to the
Contractorshall not relieve the Surety Company of any of its obligations to the Owner under the terms of the
Contract and as set forth In sald Surety Company's bond.
In witness whereof,the Surety Company has hereunto set Its hand this 1st day of February 20 22.
Liberty Mutual Insurance Company
Surety Company
ByAutho—rized epresentative
Title Heather R.Goedtel,Aftorney-In-Fact
Address:
175 Berkeley Street
Boston,MA 02116
Attach Power of Attorney
- CONSENT OF SURETY COMPANY
City of Fort Worth,TX
TO FINAL PAYMENT
PROJECT: 90-Inch (M-280) Sanitary Sewer Rehabilitation Project Bond No. 190044900
PROJEC T NUMBER:
OWNER: City of Fort Worth Texas 01286
CONTRACTOR: S.J. Louis Construction of Texas Ltd. 22005
ENGINEER: CDM Smith
The Surety Company, on bond of the Contractor listed above for the referenced project, in accordance with the
Contract Documents,hereby approves final payment to the Contractor, and agrees that final payment to the
Contractorshall not relieve the Surety Company of any of its obligations to the Owner under the terms of the
Contract and as set forth in said Surety Company's bond.
In witness whereof,the Surety Company has hereunto set its hand this 1st day of February 20 22.
Liberty Mutual Insurance Company
Surety Company
By
Authorized epresentative
Title_Heather R. Goedtel,Attorney-in-Fact
Address:
175 Berkeley Street
Boston, MA 02116
Attach Power of Attorney
This Power of Attorney limits the acts of those named herein,and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Libe-,r't_y7 Liberty Mutual Insurance Company
Mutual The Ohio Casualty Insurance Company Certificate No: 8207187-190003
SURETY West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS:That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that
Liberty Mutual Insurance Company is a corporation duty organized under the laws of the State of Massachusetts,and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana(herein collectively called the"Companies"),pursuant to and by authority herein set forth,does hereby name,constitute and appoint, Blake S.
Bohlig;Brian D.Carpenter;Craig Olmstead;Erik Thomas Gunkei•Heather R.Goedtel•Irene Marie Nichols;Jessica Hoff Kelly Nicole Enghauser Laurie Pflug-
Megan Nicole Scott;Michelle Diane Halter Nicole Langer
all of the city of Bloomineton state of MN each individually if there be more than one named,its true and lawful attomey-in-fact to make,
execute,seal,acknowledge and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 27th day of January , 2022
Liberty Mutual Insurance Company
P-V INSUR9 P0,( INSp a%NSU� The Ohio Casualty insurance Company
DO'i y
+Taofi �Jra°"POR*ro�y� P=oR°Oa,,oyC% West American insurance Company
C6 r �1912yo O 1919 1991cs
s � O G O
s
�djl';CNO`' .rib ZO HHAMPS� D �sf��HD1AN''�•Oa� By: 7 , 00
V
m David M.Carey,Assistant Secretary a
ca State of PENNSYLVANIA =»-
:County of MONTGOMERY ss co E
oa) On this 27th day of January 2022 before me personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Q
`m Company,-The Ohio Casualty Company,and West American Insurance Company,and that he,as such,being authorized so to do,execute the foregoing instrument for the purposes
Fu
tha) caerein contained by signing on behalf of the corporations by himself as a duly authorized officer. >�
= IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania,on the day and year first above written.
02 yr, PAST a O
W F�
L Q� F Commonwealth of Pennsylvania-Notary Seal
NON
dj O r Teresa�" Ca a Pastella,Notary Public O
N Montgomery County
OF My commission expires March 28,2025 B `O
a�v Commission number 1126044 Y- ��2� y
a) k NSY1211 \G Member,Pennsylvania Association of Notaries Teresa Pastelia,Notary Public Q p
cu N 'QRY P p 0
i `�
of4? This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company,Liberty Mutual 3 ago
Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: d M
6 ARTICLE IV-OFFICERS:Section 12.Power of Attorney.
Co
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject to such limitation as the Chairman or the
President m rescribe,shall appoint such attome s in fact,as m be necessary to act in behalf of the Corporation to make,execute,seal,acknowledge and deliver as surety C
-- o may P PP • Y=- may ry rp
> C: any and all undertakings,bonds,recognizances and other surety obligations.Such attorneys-in-fact,subject to the limitations set forth in their respective powers of attomey,shall a
o have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation.When so executed,such o ai
Z instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attomey-in-fact under the
provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority. [i a
ARTICLE XIII-Execution of Contracts:Section 5.Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president,and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attomeys-in-fact,as may be necessary to act in behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,
bonds,recognizances and other surety obligations.Such attomeys-in-fact subject to the limitations set forth in their respective powers of attorney,shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company.When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation-The President of the Company,acting pursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretary to appoint such adomeys-in-
fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety
obligations.
Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
1,Renee C.Llewellyn,the undersigned,Assistant Secretary,The Ohio Casualty Insurance Company,Liberty Mutual insurance Company,and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy of the Power of Attorney executed by said Companies,is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF,I have hereunto set my hand and affaed the seals of said Companies this lst day of February 2022 .
P�tNSU� �Il IN SV 1NSrr�,
4°00R4rR9y `P °aPorr4 qy
> ;1912 q o 0 1919 2 1991 Vy`
rd��i�*u5 aD y��yhgsipstNyDO rs��4o,,H��ya By:
Renee C.Llewellyn,Assistant Secretary
LMS-12873 LMIC OCIC WAIC MuIB Co 020
FORT NORTH CONTRACTOR'S AFFIDAVIT OF
PAYMENT OF DEBTS AND CLAIMS
City of Fort Worth, TX
PROJECT: 90-Inch (M-280) Sanitary Sewer Rehabilitation Project PROJECT NUMBER:
OWNER: City of Fort Worth,Texas 01286
CONTRACTOR: S.J. Louis Construction of Texas, Ltd. 22005
ENGINEER: CDM Smith
The Contractor, in accordance with the Contract Documents, hereby certifies that, except as listed below, all
obligations for all materials and equipment furnished, for all work labor, and services performed, and for all known
indebtedness and claims against the Contractor for damages arising in any manner in connection with the
performance of the Contract referenced above for which the Owner or his property might in any way be held
responsible have been paid in full or have otherwise been satisfied in full.
EXCEPTIONS: (If none, write"NONE". The Contractor shall furnish a bond, acceptable to the Owner,
for each exception.)
None
Y
"��� TINA M. ROARK
,pP P 6
A i� Notary Public,State of Texas
CONTRA TOR S.J. Louis Construction of Texas. Ltd. ;9f., .:+Q Comm.Expires 08-26-2023
Notary ID 124104300
BY
TITLE VtC6 tp6wl'r
Subscribed and s fn to before me this 1st day of February 2022
Notary Public: 6 ,
�6Zf My Commission xpires: o I _3
FORT WORTH CONTRACTOR'S AFFIDAVIT OF
—�'� PAYMENT OF DEBTS AND CLAIMS
Y�J
City of Fort Worth, TX
PROJECT: 90-Inch (M-280) Sanitary Sewer Rehabilitation Project PROJECT NUMBER:
OWNER: City of Fort Worth,Texas 01286
CONTRACTOR: S.J. Louis Construction of Texas, Ltd. 22005
ENGINEER: CDM Smith
The Contractor, in accordance with the Contract Documents, hereby certifies that, except as listed below, all
obligations for all materials and equipment furnished, for all work labor, and services performed, and for all known
indebtedness and claims against the Contractor for damages arising in any manner in connection with the
performance of the Contract referenced above for which the Owner or his property might in any way be held
responsible have been paid in full or have otherwise been satisfied in full.
EXCEPTIONS: (If none, write"NONE". The Contractor shall furnish a bond, acceptable to the Owner,
for each exception.)
None
�
Y� A P�ii, „� TINA M. ROARK
Notary Public,State of Texas
CONTRA TOR S.J. Louis Construction of Texas. Ltd. 9j +P Comm.Expires 08-26-2023
OF tE`��
,,,,1�� Notary ID 124104300
BY
TITLE VMC6 1046#41
Subscribed and rn to before me this 1st day of February 2022
Notary Public:
My Commission xpires: 101z(,1Lm3
FORT WORTH
March 03,2022
SJ Louis Construction of Texas,LTD
P.O.Box 834
Mansfield,TX 76063-0834
Re:Acceptance Letter
Project Name: 90-Inch (M-280) Sanitary Sewer Rehabilitation Project
Project Type: Sewer
Project Ns: 01286
DOE. Ns: 0298
Contract Ns: 53962 Dated: 3/3/2022
Gentleman:
On October 04,2021 a final inspection was made on the subject project. There were punch list items identified
at the time. The punch list items were completed on October 04,2021. The final inspection and the corrected
punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by
the City. The warranty period will start on October 04,2023,which is the date of punch list completion and will
extend for(2)years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance,please feel free to contact me at(817) 392-6054
Yours Truly,
6t. /,, /6
Tony Sholola,P.E.,Assistant Director,Water Department
TS /
cc: Chris Harder,P.E.,Director,Water Department
Laura Wilson,P.E.,Deputy Director,Water Department
Captain Michael Skains,Fire Department
Luke Coffman,Sanitary Sewer Systems Superintendent,Water Department
Cesar Zavala, Water Systems Superintendent,Water Department
Walter Norwood PE,Project Manager,Water Department Capital Projects Delivery
David R Johnson,Inspection Supervisor,Water Department Capital Projects Delivery
Carmen Drake,Inspector,Water Department Capital Projects Delivery
CDM Smith,Consultant
SJ Louis, Contractor
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102
817-392-8240 * FAX 817-392-8195
cD Printed on recycled paper