HomeMy WebLinkAboutContract 55455-CO2 CSC No.55455-CO2
FORT WORTH: City of Fort Worth
— r Change Order Request
Project Name Hulen Street and Granbury Road Intersection Improvements City Sec# 55455
Client Project#(s) 101017
Project Reconstruction of approximately 500 linear feet in all directions from the Hulen Street and Granbury Road intersection. The major items of work consist
Description of widening the intersection to construct double left turn lanes,new traffic signals and street lights.
Contractor Reyes Group,LTD Change Order# 2 Date 3/15/2022
City Project Mgr. Alejandra Ayala City Inspector Brian McGill
Contract Time
Dept. TPW Totals (CD)
Original Contract Amount $1,895,849.50 $1,895,849.50 365
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,895,849.50 $1,895,849.50 365
Total of Change Order $94,700.50 $94,700.50 79
Revised Contract Amount $1,990,550.00 $1,990,550.00 444
Original Funds Available for Change Orders $719,020.50 $719,020.50
Remaining Funds Available for this CO $719,020.50 $719,020.50
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.00%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,369,811.88
JUSTIFICATION(REASONS)FOR CHANGE ORDER
The traffic signal at the intersection was redesigned to a dual mast arm configuration. Oncor did not fully vet the review of the construction plans during the franchise review
process,therefore the single arm traffic signal had to be removed from the design due to the proximity of overhead,high voltage power lines. This change orderwill pay for
the remaining items needed to construct the dual mast arm and deduct the items from the single mast arm signal pole that was originally designed. This change order will
deduct various line items that will not be needed on the project. Additional quantity amounts have been added to various line items.
This change order also includes an increase of 79 days to the contract time. The contract was delayed due to utility relocations that were not moved in a timely manner by
AT&T,Oncor and Zayo.
There are no changes to bid items and unit costs remain the same per the contract bid amounts. This change order does not include any new bid items.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
NEContractor's Company Name Contractor(Name Contract Signature Date
Reyes Group, LTD Jaison Cherian 7,0teChmli h 04/01/22
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
03/31/22 AleiandaAvaa 03/31/22
Program Manager Date Senior Capital 1Project Officer Date
z 04/01/22 04/05/22
Assistant r(Dept) Date Director,Contracting Department(Dept) Date
�A'�'121 04/05/22 04/05/22
Assistant ate Assistant ag Date
04/06/22 oa"a g'"��d° 04/06/22
ouncil Action(if required)
M&C Number NA M&C Date Approved NA
ATTEST:
7PNNOGfA,pC�a�adP�C ���'p�nn�
Jannette Goodall,City Secretary ���o�OO°RT°�Da�d OFFICIAL RECORD
oo o�
vo o=� CITY SECRETARY
oo
P�a�
°o o*,� FT. WORTH, TX
oOO00000° ,d
���pSbgA.
F wo City of Fort Worth
Change Order Additions
Project Name Hulen Street and Granbury Road Intersection Improvements City Sec# 55455
Client Project# 101017
Contractor Reyes Group,LTD PM Alejandra Ayala Inspector.F Brian McGill
Change Order Submittal# O2 Date 3/15/2022
AUUI I IUN5
Unit ni os o a
Multi-Conductor a e
Multi-Conductor a e
Insulated Eec Condr
Insulated Eec Condr
Ground x I ype B,w ron
Ground x Type D,w ron
Furnish/Install 10'-14' e oe Assmbly
urnis install Type 33A Arm
wy Ilium Foundation TY J,b,6,an
Furnish/Install Rway Ilium TY 18 Pole
7771757 Furnish/Install Aum Sign Mast Arm Mount
--urnisivinstall P I Z Camera Cable
Interconnect Cable
1-urnishlinstall LIEU Lighting a ure watt o r
TPW S107,174.50
Sub TotalAdditions
Change Order Additions Page 2 of 4
Four Worx City of Fort Worth
Change Order Deletions
Project Name Hulen Street and Granbury Road Intersection Improvements City Sec#
Client Project# 101017
Contracto Reyes Group, PM Alejandra Ayala Inspector Brian McGill
Change Order Submittal# O2 Date 3/15/2022
UtLt I IONS
y Unit Unitos o a
b-Sect SignMeadssm
Furnish/Install Hybrid a ec ion Gable
Furnish/Install Preemption Cable
u i-- on uc or Cable
u i-- on uc r Cable
Multi-Concluctor Cable
up ex insulated Elec on r
Furnish/Install b' e s nan Push Button Pole
TPIN
Sub Totale e ions
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
NA
Total $0.00
Previous Change Orders
co# DATE AMOUNT
1 10/19/2021 $0.00
Total $0.00