STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
SECTION 00 0010
TABLE OF CONTENTS
DEVELOPER AWARDED PROJECTS
Division 00 - General Conditions
Page 1 of 5
Last Revised
nn�? r..�,;�.,.:,.� +„ n:aae«., r�� i��r, nsvrs�.-vivn
nn�� r..,,+..,,,..:,..,� �„ a:aay..� n�i���n
00 41 00 Bid Form 04/02/2014
00 42 43 Pro osal Form Unit Price OS/22/2019
nnoo-n-n .�i.�-�9R� nn m�rv�r v�i-^r
nn�n c,�� - � _ nn m��T
00 45 12 Pre ualification Statement 09/O1/2015
nno n�� n� in��n
00 45 26 Contractor Compliance with Workers' Com�ensation Law 04/02/2014
nn�no — - — �o���$
00 52 43 A�reement 06/16/2016
00 61 25 Certificate of Insurance 07/O1/2011
00 62 13 Performance Bond O1/31/2012
00 62 14 Pa�ment Bond O1/31/2012
00 62 19 Maintenance Bond O1/31/2012
gg�Ag r-o..o...,, .-��a:+:,,..,� , , „�-z,-� `�'�--�r
�� - n 7 �nmToiriviT
00 73 10 Standard City Conditions of the Construction Contract for Developer O1/10/2013
Awarded Projects
Division Ol - General Re uirements Last Revised
O1 11 00 Summar� of Work 12/20/2012
O1 25 00 Substitution Procedures 08/30/2013
O1 31 19 Preconstruction Meetin = 08/30/2013
O1 31 20 Project Meetinr�s 07/O1/2011
O1 32 33 Preconstruction Video 08/30/2013
01 33 00 Submittals 08/30/2013
O1 35 13 S. ecial Pro'ect Procedures 08/30/2013
O1 45 23 Testin� and Ins ection Services 03/20/2020
O1 50 00 Tem orar� Facilities and Controls 07/O1/2011
O1 55 26 Street Use Permit and Modifications to Traffic Control 07/O1/2011
O1 57 13 Storm Water Pollution Prevention Plan 07/O1/2011
O1 60 00 Product Re uirements 03/20/2020
O1 66 00 Product Stora:ie and Handlin� Re uirements 04/07/2014
Ol 70 00 Mobilization and Remobilization 04/07/2014
n i� n n m�ro�o�T
O1 74 23 Cleanin� 04/07/2014
O1 77 19 Closeout Re uirements 04/07/2014
O1 78 23 O eration and Maintenance Data 04/07/2014
O1 78 39 Project Record Documents 04/07/2014
CITY OF FORT WORTH fftJi.:�'s:�' r'it.iC'T'. F'fi:9Sii 1 B
STANDARD CONSTRUCTTON SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS IPfiL:'f1-l]r75'
Revised March 20, 2020
00 0o ao
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 5
Technical Specifications which have been modified by the Engineer speci�cally for this
Project; hard copies are included in the Project's Contract Documents
None.
Technical Specifcations listed below are included for this Project by reference and can be
viewedidownloaded from the City's website at:
httn ://fortworthtexas.�ov/taw/contractors/
or
htt�s:!%� p,�js.fc�r€�e��c�rth teaas. €„€�v/ProiectResources/
Division 02 - Egistinb Conditions
02 4] 13 Selective Site Demolition
02 41 14 Utilit. Removal/Abandonment
02 41 15 Pavin�� Removal
Division 03 - Concrete
03 30 00 Cast-In-Place Concrete
03 34 13 Controlled Low Stren�th Material (CLSMf
03 34 16 Concrete Base Material for Trench Re air
03 80 00 Modifications to Existirn� Concrete Structures
Division 26 - Electrical
Last Revised
12/20/2012
12/20/2012
02/02/2016
12/20/2012
12/20/2012
12/20/2012
12/20/20l 2
26 OS 00 Common Work Results for Electrical 11/22/2013
26 OS 10 Demolition for Electrical SG stems 12/20/2012
26 OS 33 Racewa� s and Boxes far Electrical S.�stems 12/20/2012
26 OS 43 Under�round Ducts and Racewa� s for Electrical S� stems 07/O1/2011
26 OS 50 Communications Multi-Duct Conduit 02/26/2016
Division 31- Earthwork
31 10 00 Site Clearin� 12/20/2012
31 23 16 Unclassified Excavation O1/28/2013
31 23 23 Borrow O1/28/2013
31 24 00 Embankments O1/28/2013
31 25 00 Erosion and Sediment Control 12/20/2012
31 36 00 Gabions 12/20/2012
31 37 00 I Ri ra � 12/20/2012
Division 32 - Exterior Im rovements
�-A�--��
� ��g
32 O1 29 Concrete Pavin� Re . air �
�^�3 �i,..,:�.ie a..�,. �,.,,....,,..
32 11 29 Lime Treated Base Courses
�3✓ r�o..,o.,+ •r,.o.,,°a n.,�e r,.,,..�o�
�� i i z�
�JT -
�� n : �.�,., i, ❑.,
, � ��� ��,��
, � ���z
12/20/2012
, � ��� ��,��
12/20/2012
i � i��z
n Q i��3
, � ���z
CITY OF FORT WOKTH hf.;�;,�;n� 7��;{CI; ��y,,qc;; ?�
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS IFRC?i1-f��l6_
Revised Mazch 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 5
� �� �z�� - i � »��
32 13 13 Concrete Pavin� 12/20/2012
32 13 20 Concrete Sidewalks, Drivewa� s and Barrier Free Ram s 06/OS/2018
32 13 73 Concrete Pavinw� Joint Sealants 12/20/2012
27� l�o C1:�,-L. 1[.,�t D.,.,�.�.. 1'1/7�z
32 l6 13 Concrete Curb and Gutters and Valle�• Gutters 10/OS/2016
32 17 23 Pavement Markin�s 11/22/2013
32 17 25 Curb Address Paintin 11/04/2013
Z�� ��= r.�..,:.. �o,,..e� ..�a n.,.e� ,�i��;z
Z7�� tx�:..e ro..,.o� .,..,a !'.,.e� �7�7-rz.,. nzvrz�-,oiz
2r1�� [77.....7 L',......... ..«.] !'_..4.�., 1'1/7�z
2'1�� �
t
32 91 19 To soil Placement and Finishim� of Parkways 12/20/2012
32 92 13 H� dro-Mulchin�, SeedinL�, and Soddin� 12/20/2012
���� m..,.,,,. ,...a c�...,.i..� i�����
Division 33 - Utilities
33 O1 30 Sewer and Manhole Testin�, 12/20/2012
33 O1 31 Closed Circuit Television �CCTV) Ins ection 03/03/2016
3r�$�g . _��; , � r���
32� /l=,�o I..�.�r 17..�,.7:.,,�, .,.,.J C'I.,.,•�L,.,f I:...l.,•: 1"fNrz A-rr:orzoiz
'] 2�T !`..,.....�;.... !`....+....1 T.��+ C��..�:.�....., 17/7zzrzvrsviz
'22�i �.Ta..,�.�. �.�..� 4.....�i� !'.,.I,...�7.. Ll�........: .-. C..�..-..-... 7'f/'7zzrzv�viz
� ��� n�in��-
33 04 40 Cleanin� and Acce tance Testirn� of Water Mains 02/06/2013
33 04 50 Cleanin�� of Sewer Mains 12/20/2012
33 OS 10 Utilii� Trench Excavation, Embedment, and Backfill 12/12/2016
33 OS 12 Water Line Lowerin� 12/20/2012
33 OS 13 Frame, Cover and Grade Rin�.=s — Cast Iron O1/22/2016
33 OS 13.10 Frame, Cover and Grade Rines — Com osite O1/22/2016
33 OS 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 12/20/2012
Grade
33 OS 16 Concrete Water Vaults 12/20/2012
33 OS 17 Concrete Collars 12/20/2012
33 OS 20 Au�er Borin�? 12/20/2012
22�T T,,.,...ol T;..or Dl.,+o 1"f/�r�rrvriviz
33 OS 22 Steel Casin�, Pi e 12/20/2012
Z 2�� S}.,...i T'�..-..-...3:.-... 1') Mm-�orioiz
33 OS 24 Installation of Carrier Pipe in Casin�� or Tunnel Liner Plate 06/19/2013
33 OS 26 Utilit� Markers/Locators 12/20/2012
33 OS 30 Location of Existin� Utilities 12/20/2012
33 11 OS Bolts, Nuts, and Gaskets 12/20/2012
� ��� i � i��z
33 11 11 Ductile Iron Fittin�s 12/20/2012
33 11 12 Pol. vin� l Chloride (PVC} Pressure Pi e l l/16/2018
�2 �i i� - i�i�nr�ni�
»-�-rr� , � . rz.rtvrsoiz
2 Z� 1�T 7 � /�rn-cmzv �i-�7c
33 12 10 Water Services 1-inch to 2-inch � 02/14/2017
� ��T , � i��n,� n,,z
CITY OF FORT WORTH NC;f.:E,1' l'it,fC7; I'H;9SIi ?i3
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS IPRC'0-(1C76?
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 5
33 12 20 Resilient Seated Gate Va1ve 12/20/2012
ZZ�rr�izT 14��'.��eF-t��a.�.� Q.�::.�yrl., ■��.F._�,�. �7�7-�r�
33 12 25 Connection to Existin�s Water Mains 02/06/2013
� ��o , � ���z
33 12 40 Fire H� drants O1/03/2014
33 12 50 Water Sam le Stations 12/20/2012
Z�� ��no nc�iovrnrivi�
Z 2�L ]' 1 "1 /1�cvrr
2 27ni r� �~rt�'-L�'F9 1'7 /'f� llrrvTioii
]'2�S l l�..l� rlo,z.-���, il.-.I.�.�rl,. I.���o �l�i1C7C1 1')M�z
33 31 20 Pol� vin� 1 Chloride [ PVC� Gravit� Sanitarr Sewer Pi e 06/19/2013
33 3l 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer 12/20/2012
Pi e
33 31 22 SanitarL Sewer Sl� Linin� 12/20/2012
��� ��� — _", ����- ^�z
33 31 50 Sanitar� Sewer Service Connections and Service Line 04/26/2013
�z�.r�z--�rno r,�t,.�,;�n,.�.,, n;� �:.,i,:a o�,r c.,,,;..,�� c,.. �,. �..r,.v n.r.,:�� i�i��i�,��
33 39 10 Cast-in-Place Concrete Manholes 12/20/2012
33 39 20 Precast Concrete Manholes 12/20/2012
�� c;�,.� i...� AA....4,�,i i�i�ni�ni�
l TC� Cr^TC1J ��T•TCiIiTSoI �..] TLTZpf'LPrZ
'2'2mr *v il;.,,-r.�,,:.,��ow A...�.��� !`t...�.,!-..�.:11: A!�'� 77/7�
33 39 60 E ox4 Liners for Sanitar� Sewer Structures 12/20/2012
33 41 10 Reinforced Concrete Storm Sewer Pi e/Culverts 07/O1/2011
Z Z�T , 7 �7TP�v�ZViz
�'�7T�TL 7 1 /1�
��� G� h.��ti 7 7 M��z/7 M 7
���r n�m�i
2Z� •r«e.,,.�J n�m�,i
33 49 10 Cast-in-Place Manholes and Junction Boxes 12/20/2012
33 49 20 Curb and Dro Inlets 12/20/2012
33 49 40 �Storm Draina�e Headwalls and Win�walls 07/O1/2011
Division 34 - Trans ortation
2� nt in �,,, cC.,,,,,i, inri�i�nic
�-rrry -�1'-tl-t�-,r�r�Tacsra z-vri-z�-zvz�
�n ni inni n i,,,, tt � + i�iiQi�nic
�r�-x—ivvr rri��6rarr2iii 6ir�FAaeI' c-c rm o�v-��
2 A A�1 1 ll,a� - n���
2 A A�-�-ia�o� n ���
'� A� A�r - 1 1/'l� /7i-ry r�
'2 A� D�, �-,���.-:,-... Tr., EY:.- L C...,., I� 7') !'lz-srzvr��orz
2 A�� - 1 1 /7��
�-4i-i� �,,.� ...�:.,., u, s._;.� c:.....,� � � �����n, �
�
34 41 20 ' Roadwa• Illumination Assemblies 12/20/2012
�n n�� n�,o.-:.,� t s�r� o.,.,.�,..,, r, ncii�'z--S
�n n��z �r::.�.�,�,, f F,T7 Dn.�.i...�, r., - n�ii����
2A A��J I?.�.-;.i:..,r�..l I�il D,..,,a,,.� � I� o !1L/1��
34 41 30 Aluminum Si�ns 11/12/2013
34 41 50 Sin 11e-Mode Fiber O tic Cable 02/26/2016
34 71 13 Traffic Control 11/22/2013
CITY OF FORT WORTH Ht.;1:fi,n' TR�tC`7: I'1i:9,CI;' ?ff
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS IFRC?0-ii(�52
Revised Mazch 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 5 of 5
Appendix
�E�.B� $H��St3i'�&E2tii�riT:rivurv-vr,Qicrvnv
EiE�.B��iiiiia�6�FS �irPiivi�li�"tri-c�"rniiiiv "'�2
!'�� ��ge�s-r ~��t�kt�e 5
�E-6.Z4 ��ss��a��en
GR-01 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH HC%i,z;:�" 7'R�1C'7; I'H.1SIi ?;i
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS IPRC?�i-Gt752
Revised March 20, 2020
�
SECTION 00 41 00 — PROPOSAL
DEVELOPER AWARDED CONTRACTS
This proposal must not be removed from this book of Contract Documents.
TO: HAWKINS FAMILY JO1NT VENTURE
PROPOSAL FOR: WATER, SANITARY SEWER, STORM DRAIN, PAVING, AND
STREET LIGHT IMPROVEMENTS
PROJECT NAME: HULEN TRACT, PHASE 1B
FILE NO. W-2714 & X-26524
CITY PROJECT NO. 102746
Includes the furnishing of all materials, equipment and labor for the installation of inedian
openings, left turn lane, water & sanitary sewer improvements and all necessary appurtenances
and incidental work to provide a complete and serviceable project designated as:
WATER, SANITARY SEWER STORM DRAIN PAVING. AND STREET LIGHT
IMPROVEMENTS TO SERVE HULEN TRACT, PHASE 1B
Pursuant to the foregoing Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, the Technical
Specifications listed in this contract, the site of the project and understanding the amount of work
to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor,
equipment and material except as specified to be furnished by the City, which is necessary to
fully complete the work as provided in the Plans and Contract Documents and subject to the
inspection and approval of the Director of the Department of Transportation & Public Works of
the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a
contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and
such other bonds, if any, as may be required by the Contract Documents for the performing and
completing of the said work. Contractor proposes to do the work within the time stated and for
the following sums:
Furnish and install, including all appurtenant work, complete in place, the following items:
Page 1 of 3
PART B - PROPOSAL (Cont.)
After acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver an approved Surety Bond and such other bonds as required by the Contract Documents,
for the faithful performance of the Contract. The attached bid security, if reyuired, is to become
the property of the Developer.
The successful bidder shall be required to perform the work in accord with these contract
documents and the technical specifications available in City of Fort Worth's Project Resources
website site (httE�s://a�s.f€�rtwc�rtl�te�as.�,fl��-'I'roiectRe�t����ces'} and incorporated herein and
made a part hereof for all purposes.
The undersigned assures that its employees and applicants for employment and those of any
labor organization, subcontractors, or employment agency in either furnishing or referring
employee applicants to the undersigned are not discriminated against as prohibited by the terms
of City Ordinance No. 7278 as amended by City Ordinance No. 7400.
Page 2 of 3
.--.
The Bidder agrees to begin construction within �� working
days after issue of the work order, and to complete the contract within (�
working days after beginning construction as set forth in the written work order to be furnished
by the Owner.
I(we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials)
Addendum No. 2 (Initials)
Respectfully submitted,
Name of Contractor
Addendum No. 3 (Initials)
Addendum No. 4 (Initials)
.
By:
(Signature)
Brock Hu��ins
(Printed Name)
Title: President
Company Name:
Address
Email
Telephone
Conaster Construction TX. L.P.
5327 Wichita St.
Fort Worth, TX 76119
Brock_�r:cctxl�.com _
817-534-1743
Page 3 of 3
SECTION 00 42 43
PROPOSAL FORM UNIT PRICE
Hulen Tract, Phase 1B
UNIT PRICE BID Bidders's Application
Conatser Construction TX, L.P.
Project Item information 5327 Wichita Street
Fort Worth, TX 76119
Bidlist I[em .. Specification Uni[ of
No. Descnpt�on Section No. Measure B�d Quantity Unit Price Bid Value
war�� in��S�ivEwi��r$
3311.0241 8"WaterPipe 33I112 LF 3,323 $34.00 $112,982.00
3312.2003 1"WaterService 331210 EA 98 $950.00 $93,100.00
33122103 I 1/2" Water Service 33 12 10 EA ] $2,000.00 $2,000.00
33123003 8" Gate Valve 33 ]22o EA 10 $1,250.00 $12,500.00
3312A001 FireHydrant 331240 EA 4 $4,200.00 $16,800.00
3311.0001 Ductile Iron Water Fittings w1 Restraint 33 11 I I TON 4 $4,500.00 $18,000.00
3305.0003 8" Waterline Lowering 33 OS 12 EA 3 $3,500.00 $10,500.00
3305.0109 Trench Safety 33 OS 10 LF 3,323 $1.00 $3,323.00
241.1118 4"-12"PressurePlug 024114 EA 1 $1,000.00 $1,000.00
3471.0001 TtafficControl 347113 MO I $1,500.00 $1,500.00
3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 3 $1,200.00 $3,600.00
TOTAL WATER IMPROVEMENTS $275,305.00
S11\TT.►R] S��['E1i I.tiiPRO��LM1I�M1T�S
3331.4115 8" Sewer Pipe 33 31 20 LF 3,038 $48.00 $145,824.00
3339.1001 a Manhole 33 39 20 EA 12 $4,000.00 $48,000.00
9999.0001 :"'+� k;ncasement for Utility Pipes 33 OS lo LF 192 $20.00 $3,840A�
3339.1003 t E�ctra Depth Manhole 33 39 20 VF 25 $I 55.00 $4,625.00
3305.0113 Trench Water Sto s 33 OS 15 EA 18 $300.00 $5,400.00
3331.3101 4" Sevrer Service 33 31 50 EA 9S $700.00 $68,600.00
9999.0007 Connect to Ex Sewer 00 00 00 EA 2 $1,500.00 $3,000.00
3301.0101 Manhole Vacuum Testing 33 01 30 EA 12 $175.00 $2,100.00
3305.0109 Trench Safery 33 OS ]0 LF 3,038 $2.00 $6,076.00
3301.0002 Post-CCTVlnspection 33013] LF 3,038 $3.00 $9,114.00
241.1 ll 8 4"-12" Pressure Plug o2 41 14 EA ] $500.00 $500.00
SANITARY SEWER TOTAL $297,079.00
S'%OtltNi Dttali�i T�IPRUV��iv7`5
3341.0409 as^ RCP, Class III 33 4] lo LF a�s $155.00 $64,325.00
3341.0402 42" RCP, Class III 33 41 10 LF 201 $135.00 $27,135.00
3341.031 36" RCP, Class N 33 41 ]0 LF 399 $125.00 $49,875.00
3341.0309 36" RCP, Class III 33 41 10 LF 396 $105.00 $41,580.00
3341.0208 27" RCP, Class llI 33 41 ] 0 LF 77 $80.00 $6,160.00
3341.0205 24" RCP, Class III 33 4I 10 LF 45 $70.00 $3,150.00
3341.0201 2]" RCP, Class DI 33 41 10 LF 73 $60.00 $4,380.00
3349.5001 10' Curb Inlet 33 49 20 EA 6 $3,200.00 $19,200.00
3349.5002 I S' Curb Inlet 33 49 20 EA 2 $4,200.00 $8,400.00
3349.0001 4' Storm 7unction Box 33 49 10 EA 3 $5,000.00 $15,000.00
3349.0002 5' Storm 7unction Box 33 49 lo EA 1 $9,500.00 $9,500.00
3349.0004 7' Storm Junction Box 33 49 10 EA 1 $13,500.00 $13,500.00
9999 0003 a5" Sloping Headwall 00 00 00 EA 1 $5,800.00 $5,800.00
3305.0109 !'rench Safety 33 OS 10 LF 1,614 $1.00 $],614.00
STORM DRAIN TOTAL 5269,619.00
r�
•�i
`-1
'"1
PAVII�G IMPAOVEMENiS
! 3213.0101 fi' Conc Pvmt 32 ]3 ]3� SY 11,266 $37.00
� 3213.0301 �a• Conc Sidewalk 3213 20 SF 1,000 $3.25
3211.0501 16' LimeTreatment 32 1 I 29 SY 12,043 $3.25
3211.04 HydratedLime 321129 IN 193 $185.00
3213.0506 Barriu Frcc Rarty�, Type P-1 32 13 2(I EA 8 $1,400.0�
9999.0005 Remrne End of Road Sersicade oz 41 13 Fr1 2 $20�.00
9999.0006 ConnectlaExStreetHeader �m 32I313 LF 58 $20,00
3291.01 Topsoil � 32 9l 19 CY 111 i $18.00
3242.04 Sceding,Hydromuleh T 329213 SY 1,336 $1.50
3471.4001 TrafficConvol _� _� 347113 MO 1 I $1,500.00
PAYING 7'OTAL
Alum Sian Ground Ma�t
_ f 344130 � EA I _ 5
26U5.3015 2' CONDT PVC SGH 80 (f)
3441.305 Fumish/L�stall LED Lighiing Fixh�ro (7D wett ATBO Cobra
3441.3301 Rduy Llum Fwndatian TY 1,2, end 4
-- - ...�..�».,�..... .
34413351 Fumishllnsmll Rdway Dlum TY 1 l Pale
3441.1646 FumishlListell Type 33S Arm
3441:141 NO 10 Insuhrted EJec Con�
Sonita-v SewcN ImprovemenLs
S�orm Ihain Lnproveanents
I Pa.i�:� Improvements
_ . .. 157r�5,gns — �
SrcetLig],b
1Payme� & Pafortnance Bonds
] MaiMenance Bond
535,705,00
S11.200.00
$400.00
51,160�
S1
26 OS 33 LF � 935 $1;
34412p EA 14 $1,001
344120 EA 14 $1,001
3441 20 EA ��M���`"�m�.,14. �.µm . �2,801
344120 "WWEA�...� ..— l4 S30i
3441 10 LF �80i ' $�
� STREEf LiCATS T07'AL
Sese Bid
Toial Base
Allvnate Bid
� _ �
Total Alterna�e
� Deductive Alternale Bid �
�
i
� Total Deductive Alternate
Additive Alternate Bid
Toisl AdditSve Allernete
� Total Bid
� � S1,081,791.7:
/�'� L�� �. �` �a� � �,�� �
}� � � �� .�
. _ �,� � � ��B �r ,: ��� �„�._.�
ooas iz
DAP PREQUALIFICATION STATEMEN7
Page 1 of 1
SECTION 00 4512
DAP — PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work
Tv e" box rovide the com lete ma'or work tr �e and actual descri . tion as rovided bv the Water
De��artment for water and sewer and TPW for pavin�r.
Major Work Type Contractor/Subcontractor Company Name Prequalification
Ex iration Date
Water Distribution, Development
8-inch diameter and smaller ���S�Y' CO�h'L�I C'�l �Yl �j�C � l.P � Q� 3 �� a�
Sewer Collection System,
Development 8-inch and smaller C,�r�crt�rCoi'�s�iv�nchion-nc, �p (O/3� �a,�
Concrete Paving
Construction/Reconstruction ��tser cons-tw�c�tian Tx, �p � � 3 i a3
(15,000 SY�
Roadway and Pedestrian
Lighting C��p-��r C�1S'fYIJIC�'l� '(5C �� j/�/ o'�,
The undersigned hereby certifies that the contractors and/ar subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
C�tiq-i-s�erCs�r�s�ructia-� Tx � l�
53 a-� v�/ i C,IrI i ta St .
F�/�- �N�� +Tx 1�� � 9
BY: R��k �g� � n s
.
�Signature)
TITLE: I�eS � �n�
DATE:
END OF SECTION
crry oF Foar woarr+
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS HULEN TRACf, PHASE 1B
Form Version September 1, 2015 IPRQO-0062
00 45 26 - 1
Company
1 SECTION 00 45 26
2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
4 provides worker's compensation insurance coverage for all of its employees employed on City
5 Project No. IPRC20-0062. Contractor further certifies that, pursuant to Texas Labor Code,
6 Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of
7 compliance with worker's compensation coverage.
8 CONTRACTOR:
9 _Conatser Construction TX. L.P. By: _ i`�j1�pGk. j-f uC�G � 1'� S
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
5327 Wichita Street _
Address
_Fort Worth. TX 76119
City/State/Zip
THE STATE OF TEXAS
COUNTY OFTARRANT
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 1
§
�
(Please Print)
.
Signature:
Title: �E�SI��Y�'�"
(Please Print)
BEFORE ME, the undersigned authority, on this day personally appeared
_�0(.F- ��L14G11f1`7 , known to me to be the person whose name is
subscribed to the foregoing instrument, nd acknowledged to me that he/she executed the same as
the act and deed of �1 for the purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN LTNDER MY HAND AND SEAL OF OFFICE this � day of
Ic�_ , 20Z,L .
�"'.��=- � �[ary Public, State of Texa Notary Public in and fo he ' f Texas
,�° � f:,.^,mrn. Expires08-?�-2'
c.
-i�"r � ni., ,....in•�n.*�,n
END OF SECTION
CITY OF FORT WORTH HULEN TRACT, PHASE 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS IPRC20-0062
Revised April 2, 2014
00 52 43 - 1
Developer Awarded Project Agreement
Page 1 of 6
1
2
3
SECTION 00 52 43
AGREEMENT
4 THIS AGREEMENT, authorized on is made by and between the Developer,
5 Hawkins Famil■ Joint Venture, authorized to do business in Texas ("Developer") , and Conatser
6 Construction TX. L.P.. authorized to do business in Texas, acting by and through its duly
7 authorized representative, ("Contractor").
8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
9 follows:
10 Article 1. WORK
11
12
13
14
15
16
17
18
19
20
21
Contractor shall complete all Work as specified or indicated in the Contract Documents for the
Project identified herein.
Article 2. PROJECT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
Hulen Tract. Phase 1B
IPRC20-0062
Article 3. CONTRACT TIME
3.1 Time is of the essence.
All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
Documents are of the essence to this Contract.
22 3.2 Final Acceptance.
23 The Work will be complete for Final Acceptance within working days after the date
24 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard
25 City Conditions of the Construction Contract for Developer Awarded Projects.
26 3.3 Liquidated damages
27
28
29
30
31
32
33
Contractor recognizes that time is of the essence of this Agreement and that Developer
will suffer financial loss if the Work is not completed within the times specified in
Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of
the Standard City Conditions of the Construction Contract for Developer Awarded
Projects. The Contractor also recognizes the delays, expense and difficulties involved in
proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
completed on time. Accordingly, instead of requiring any such proof , Contractor agrees
CITY OF FORT WORTH HCTLEN TRACT, PHASE 1 B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS IPRC20-062
Revised June 16, 2016
00 52 43 - 2
Developer Awarded Project Agreement
Page 2 of 6
34
35
36
37
that as liquidated damages for delay (but not as a penalty), Contractor shall pay
Developer Five-hundred Dollars ($500•001 for each day that expires after the time
specified in Paragraph 3.2 far Final Acceptance until the City issues the Final Letter of
Acceptance.
38 Article 4. CONTRACT PRICE
39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
40 Documents an amount in current funds of One million, four-hundred ei�ht� -one thousand, seven-
41 hundred ninetv-one and seventv-five Dollars ($1.481.791.751.
42 Article 5. CONTRACT DOCUMENTS
43 5.1 CONTENTS:
44 A. The Contract Documents which comprise the entire agreement between Developer and
45 Contractor concerning the Work consist of the following:
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
1. This Agreement.
2. Attachments to this Agreement:
a. Bid Form (As provided by Developer)
1) Proposal Form (DAP Version)
2) Prequalification Statement
3) State and Federal documents (project specific)
b. Insurance ACORD Form(s)
c. Payment Bond (DAP Version)
d. Performance Bond (DAP Version)
e. Maintenance Bond (DAP Version)
£ Power of Attorney for the Bonds
g. Worker's Compensation Affidavit
h. MBE and/or SBE Commitment Form (If required)
3. Standard City General Conditions of the Construction Contract for Developer
Awarded Projects.
4. Supplementary Conditions.
S. Specifications specifically made a part of the Contract Documents by attachment
or, if not attached, as incorporated by reference and described in the Table of
Contents of the Project's Contract Documents.
CITY OF FORT WORTH HULEN TRACT, PHASE ] B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PRO]ECTS IPRC20-062
Revised June 16,2016
005243-3
Developer Awarded Project Agreement
Page 3 of 6
65 6. Drawings.
66 7. Addenda.
67 8. Documentation submitted by Contractor prior to Notice of Award.
68 9. The following which may be delivered or issued after the Effective Date of the
69 Agreement and, if issued, become an incorporated part of the Contract Documents:
70 a. Notice to Proceed.
71 b. Field Orders.
72 c. Change Orders.
73 d. Letter of Final Acceptance.
74
75
CITY OF FORT WORTH HULEN TRACT, PHASE 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PRO]ECT3 IPRC20-062
Revised June 16, 2016
00 52 43 - 4
Developer Awarded Project Agreement
Page 4 of 6
76 Article 6. INDEMNIFICATION
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
egpense, the city, its officers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification rovision is s eciiicall�� intended to o erate
and be effective even if it is alle ed or roven that all or some of the dama es bein
sou�ht were caused, in whole or in nart, bv anv actx omission or ne�li�ence of the cit�•.
This indemnity provision is intended to include, without limitation, indemnity for
costs, expenses and legal fees incurred by the city in defending against such claims and
causes of actions.
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own egpense,
the city, its officers, servants and employees, from and against any and all loss, damage
or destruction of property of the city, arising out of, or alleged to arise out of, the work
and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemnification
nrovision is srrecificall�� intended to operate and be effective even if it is alle�ed or
roven that all or some of the dama es bein � sou ht were caused in whole or in art
b� anr� act omission or ne li ence of the cih�.
97 Article 7. MISCELLANEOUS
98 7.1 Terms.
99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
100 the Construction Contract for Developer Awarded Projects.
101 7.2 Assignment of Contract.
102 This Agreement, including all of the Contract Documents may not be assigned by the
103 Contractor without the advanced express written consent of the Developer.
104 7.3 Successors and Assigns.
105 Developer and Contractor each binds itself, its partners, successors, assigns and legal
106 representatives to the other party hereto, in respect to all covenants, agreements and
107 obligations contained in the Contract Documents.
108 7.4 Severability.
109 Any provision or part of the Contract Documents held to be unconstitutional, void or
110 unenforceable by a court of competent jurisdiction shal] be deemed stricken, and all
CITY OF FORT WORTH HULEN TRACT, PHASE 1 B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS IPRC20-062
Revised )une 16, 2016
ao ,� a� _ ;
llevelpper pwarded Prulect Agrecment
Pag� 5 of 6
1��
112
113
1.14
115
116
117
rerrfaining provisions shatl continue to be valid and binding upon DEVELDP�R and
CONTRACTOR.
7.S Governing Law and Venue.
This Agreement, incfuding afl af the Contract Documents �s performable in the State of
Texas. Venu� shall be Tarrant County, Texas, or the ilnited States District Gourt for the
Northern District of Texas, Fort Worth Division.
128 7.6 Authori�} to Sign.
�39 Con#ractar shall attach evidence of auihority to sign Agrcement, if other than duiy
�z4 authnrized signatory ofthe Contractor.
121
122 IN WITN�SS WHEREOF, Developer and Co�itractor have executed this Agreement in rnultiple
123 co�nterparts.
124
125 This Agreemer�t is effectiue as of #he ]ast date signed by the Parties (=`Effective Date")
126
Cantractor:
�onatser Construction TX, �,.P
BY _ _„�.. t
(S r ture)
�,�. �.
{Printed N�ne)
'S'itJe: Presiden#
___---.. _
_..._..�__.�._.... _----
Campany Name: Conatser Construction
TX, L,P.
De�e]oper:
Har��kins F'amily Jaint V�nture
(Printed Name)
Title; President
_�__...
Company nai�ie: 13aw[cins Family Joint
Venfure
CITY pF FORT V�'4RTl I
STANL7AfZLf C�]v'STRiJC"I'IDN SPEC[F[CATEpA' I}OCUMENTS — i}EVLLqPL•R AWAFiLi�ll YEtp1tL"C4 HLII_E\t TRA(;T, i'lNAS� IB
itevised ]une 16_ 2016 [PRC2D-[l62
Ste�e Nawkins �
--- -_..__ � -i-�.-��.- � ; �.,
005243-6
Developer Awarded Project Agreement
Page 6 of 6
127
Address: 5327 Wichita Street
City/State/Zip: Fort Worth, TX 76119
Date
Address: 7201 Hawkins View Dr., Suite 101
City/State/Zip: Fort Worth, TX 76132
Date
CITY OF FORT WORTH HULEN TRACT, PHASE 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS IPRC20-062
Revised June 16, 2016
00 61 25 - 1
CERTIFICATE OF INSURANCE
Page 1 of 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
SECTION 00 6125
CERTIFICATE OF INSURANCE
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
HLILEN TRACT, PHASE IB
IPRC20-0062
Bond No. 0235123
00 62 13 - I
PERFORMANCE BOND
Pagc 1 of 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
TIiE STATE OF TEXAS
COUNTY OF TARRANT
SECTION 00 6213
PERFORMANCE BOND
§
§
§
KNOW ALL BY THESE PRESENTS:
That we, Conatser Construction TX. L.P.. known as "Principai" herein and
Berkle� Insurance Com�an5� _ , a corporate surety(sureties, if more than
one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one
or more), are held and firmly bound unto the Developer, Hawkins Familv Joint Venture.
authorized to do business in Texas ("Developer") and the City of F�rt Worth, a Texas municipal
corporation ("City"), in the penal sum of, One million. four-hundred ei�ht��-one thousand, seven-
hundred ninet} -one and seven�•-five Dollars ($1.481.791.75y, lawful money of the United States,
to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to
be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, Developer and City have entered into an Agreement for the construction of
community facilities in the City of Fort Worth by and through a Community Facilities
Agreement, CFA Number CFA20-0092; and
WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
22 the day of , 20_, which Contrac# is hereby referred to and made a
23 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
24 and other accessories defined by law, in the prosecution af the Wark, including any Change
25 Orders, as provided for in said Contract designated as Hulen ?ract. Phase 1 B.
26 NOW, THEREFORE, the condition of this obligation is such that if the saic! Principal
27 shall faithfully perform it obligations under the Contract and shall in all respects duly and
28 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
29 specifications, and contract documents therein referred to, and as well during any period of
30 extension of the Contract that may be granted on the part of the Developer and/or City, then this
31 obligation shall be and become null and void, otherwise to remain in full force and effect.
C1TY OF FORT WORTH HULEN TRACT, PHASE ] B
STANDARD CITY CONDITIONS — DEVELOPER AVJARDED PROJECTS 1PRC20-0062
Revised January' 31, 2012
006213-2
PEi2FORMANCE BOND
Page 2 of 3
1
�
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant Counry, Texas or the United States District Court for the Northern District of Texas, Fort
3 Worth Division.
4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
5
6
7
S
9
10
11
12
13
14
15
16
17
�s
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Texas Government Code, as amended, and atl liabilities on this bond shall be determined in
accordance with the provisions of said statue.
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
this instrument by duly authorized agents and officers on #his the dav of
, 20_
PRINCIPAL:
Conatser Construction TX, L.P.
ATTEST:
c
(Principat) Secreta _
�-�- �
Witness as to Principal
BY: ,
Signature
Brock Hu> >ins, President
Name and Title
Address: 5327 Wichita St.
Fort Worth, TX 76119
SURETY:
Berkle� Insurance Company
r��
BY: = �
Signature
Robbi Morales, Attorne� -in-fact
Name and Title
Addres5: 5005 LBJ Freewa. , Suite 1500
Dallas. TX 75244
— Telephone Number: 214/989-0000
'itness as to Surety
CITY OF FORT VVORTH HULEN ?RACT, PHASE 1B
SiANDARD C1TY CUNDlTIONS — DEV ELOPEA A W ARDED PRO]ECTS 1PRC20-0062
Revised January 31, 2012
00 62 13 - 3
PERFORMANCE BOND
Page 3 of 3
2 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
3 from the by-laws showing that this person has authority to sign such obligation. lf
4 Surety's physical address is different from its mailing address, both must be provided.
6 The date of the bond shall not be prior to the date the Contract is awarded.
7
C1TY OF FORT WORTH HULEN TRACT, PHASE 1B
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS ]PRC20-0062
Revised Januaq+ 31, 2012
Bond No. 0235123
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1b
17
18
19
2�
2I
22
23
24
25
Z6
27
28
29
30
31
32
33
34
35
SECTIOIV �0 6214
PAYMENT BOND
THE STATE OF TEXAS §
006214-1
PAYMENTBOND
Page 1 of2
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, Conatser Construction TX L P, known as "Principal" herein, and
._ Berkley Insurance Compan�
, a corporate surety ( or
sureties if more than one), duly authorized to do business in the State of Texas, known as
"Surety" herein (whether one or more), are held and firmly bound unto the Developer, Hawkins
Famil � loint Venture, authorized to do business in Texas "(Developer"), and the City of Fort
Worth, a Texas municipal corporation ("City"), in the penal sum of One mi[lion, four-hundred
ei�htti•-one thousand seven-hundred niner -one and sevenri-five Doilars ($],481.'791.75), lawful
money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of
which sum wel! and truly be made jointly unto the Developer and the City as dual obligees, we
bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
firmly by these presents:
WHEREAS, Developer and City have entered into an Agreement for the construction of
community facilities in the City of Fort Worth, by and through a Community Facilities
Agreement, CFA Number CFA20-0092; and
WHEREAS, Prii�cipal has entered into a certain written Contract with Developer,
awarded the day of , 20 , which Contract is hereby
referred to and made a part hereof for all purposes as if fully set forth herein, to furnish ail
materials, equipment, labor and other accessories as defined by law, in the prosecution of the
Work as provided for in said Contract and designated as Hulen Tract, Phase lB.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
the Contract, then this obligation shall be and become null and void; otherwise to remain in full
force and effect.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code, as amended, and all ]iabilities on this bond shall be determined in
accordance with the provisions of said statute.
CITY OF FORT WORTH
STANDAftD CITY COND17']ONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
HULEN TR�1CT, PHdSE IB
IPRG20-OD62
0062 t4-2
PAYMENT BOND
Page 2 of2
1
2
3
4
IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
this instrument by duiy authorized agents and officers on this the day of
, 20
PRINCIPAL:
Conatser Construction TX, L.P.
ATTEST:
(Principa!) Secre .
Ko�-�-�- ��'�e�
Witness as to Principai
ATTES'T:
� �
J .r
(Surety) Secretary
�
'itness as to Surety
5
6
7
8
9
10
11
12
13
BY: � �
Signature
Brock Huggins, President
Name and Title
Address: 5327 Wichita St.
Fort Worth, TX 76119
SURETY:
Berklev Insurance Company
BY �3-%�' ���..�-�
Signature
Robbi Morales. Attorne -in-fact
Name and Title
Address: 5005 LBJ Freeway, Suite 1500
Da11as�75244
Telephone Number: 214/989-0000
Note: If signed by an officer of the Surety, there must be on file a certified extract from the
bylaws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
C1TY OF FORT WORTH HULE.'V TRACT, PffASE 1B
STANDARD CITY CONDIT]ONS — DEVELOPER AWARDED PROJECTS IPRG20-0061
Revised 7anuary 31. 2U 12
Bond No. 0235123
006219-I
MAINTENANCE BOND
Page 1 of 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
THE STATE OF TEXAS
COUNTY OF TARRANT
SECTION 00 62 19
MAINTENANCE BOND
§
§ KN�W ALL BY THESE PRESEIVTS:
§
That we Conatser Construction TX L.P , known as "Principal" herein and
� Berkle4� Insurance Com anv , a corporate surety (sureties, if more than
one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one
or more), are held and firmly bound unto the Developer, Hawkins Familv 3oint Venture.
authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal
corporation ("City"), in the sum of One million. four-hundred ei�h«-one thousand. seven-
hundred ninet�•-one and sevent►�-fve Dollars ($1.481.791.75), lawful money of the United States,
to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum �vell and truly be
made jointly unto the Developer and the City as dual obligees and their successors, we bind
ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
firmly by these presents.
20 WHEREAS, Developer and City have entered into an Agreement for the construction of
21 community facilities in the City of Fort Worth by and through a Community Facilities
22 Agreement, CFA Number CFA20-0092; and
23 WHEREAS, the Principal has entered into a certain written contract with the Developer
24 awarded the day of , 20_ , which Contract is
25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish aIl
26 rnaterials, eyuipment labor and other accessories as defined by ]aw, in the prosecution of the
27 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
28 the "Work") as provided for in said Contract and designated as Hulen Tract. Phase l B: and
29 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
30 aceordance with the plans, specifications and Contract Documents that the Work is and will
31 remain free from defects in materials or workmanship for and during the period of two (2) years
32 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
33
CI'I'Y OF FORT R'ORTH HULEN TRACT, PHASE 1B
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJPCTS IPRC20-0062
Revised January 31, 2012
006219-2
MAINTENANCE BOND
Page 2 of 3
1
2
3
4
WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
upon receiving notice from the Developer and/or City of the need thereof at any time within the
Maintenance Period.
� NOW THEREFORE, the condition of this obligation is such that if Principal shall
6 remedy any defective Work, for which tirnely notice was provided by Developer or City, to a
7 compietion satisfactory to the City, then this obligation shall become null and void; otherwise to
8 remain in full force and effect.
9
10
11
12
13
14
15
16
17
18
PROVIDED, HOWEVER, if Principal shall faiE so to repair or reconstruct any timely
noticed defective Work, it is agreed that the Developer or City may cause any and all such
defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
by the Principal and the Surety under this Maintenance Bond; and
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division; and
19 PROVIDED FURTHER, that this obligation shatl be continuous in nature and
20 successive recoveries may be had hereon for successive breaches.
21
22
23
24
25
26
27
28
29
30
31
32
C1TY OF FORT WORTH NULEN TRACT, PHASE 1 B
STANDARD CITY CONU]TIONS — DEVELdPERAWARDED PROJECTS IPRC20-0062
Revised 3anuary 31,2012
006219-3
MAINTENANCE BOND
Page 3 of3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
�6
�7
18
I9
za
2i
�Z
23
24
Z5
7�
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
instrument by duly authorized agents and officers on this the _ day of
, 20
PRINCIPAL:
ATTEST:
(Principal) Secret _
��-
W itness as tc� Pri nc i�al
�tness as to Surety
Conatser Construction TX, L.P.
BY: `�� �
Signature
Brock Huggins, President
Name and Title
Address: 5327 Wichita St.
Fort Worth, TX 76119
SURETY:
Berkle� Insurance Company
BY: � -� ��
Signature
Robbi Morales, Attorney-in-fact
� Name and Title
Address: 5005 LBJ Freeway, Suite I 500
Dallas, TX 75244
Telephone Number: 214/989-0000
*Note: If signed by an officer of the Surety Company, there must be on fiie a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH HULL'N TRACT, PHASE 1 B
STANDARD C1TY GOTD1T10NS — DEVELOPER AWARDED PROJECTS 1PRC2U-0062
Revised January 31; 2012
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
No. BI-7280j-el
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERI{LEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware, having its principal o�ce in Greenwich, CT, has made, constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Sophinie Hunter;
Robbi Morales; Kelly A. Westbrook; Tina McEwan; Joshua A. Saunders; or Tonie Petranek of Aon Risk Services Southwest,
Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal,
acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that
no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds
had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own
proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25, 2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney-in-fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, riotwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
TN WITNESS WHEREOF, the Company has caused these prasents to,be si�ed and attested by its appropziatie afficers and its
cozQorate seai hereunto affrxed this 2nd day of ,lune , 2020 .
/ 5 RANC '. A�PS� �• Berkl v Insurance Campany
�y`a` irc �
�`: �yRPpRq� �i . .,f
� u�s �i .J��i�l� � �� r By �1_� .
',m �� i97� t ._darman 7e y h� . after �
� �� � ,• Exec�tive Vice President & Secretary '•.,S ' i� resident �
�..,� _ �
STAT� OF CO"V11'`ECTICUT )
) ss:
COLfi'TY OF FAIIt�':C��.D )
Swom to before me, a I3otary Public in the State of Connecticvt, t�iis 2nd day of June , 2020 __ , by Tra S. Lederman
and JeSrey M. Hafter who are sv�om to me to be ihe Executive Vice Presiden Secretary, and t� Sanior Vice President,
respecti�ely, of Berkley lnsurance Company. �A'Nof�Rv�'� 4c� �� �i `--�_���
co�r,ecr�cur ���
MY COMMI5910N E)tPIRE9 —
�H� au, zozs � otary 1'ubtic, State of Conuecticut
CER'TIFICATE
I, the undcrsigned, Assistant Secretazy of BERKLSY IL�TSUR.A23CE COMAANY, DQ HEREBY CERTIFY that the foregoing is a
true, correct and compleie copy of the on�nal Power of Attomcy; that said Power of Attorney bas not beea revokad or rescinded
ancy#lrat-t�aat�►ority of ibe Attorney-in-FacY set fortb therein, who executed t}�e bond ar undertaking to which this Power of
,�ii�uftAl�t
.%'aieached, is in fulI %rce and eftect as af thas date.
�' �' �'�' ��1• der my hand and seal of ths Company, t}zis day of ,
� i, SI�,r1I� z� —
� � 1975 �
�tmxap� . � Vu�icent P. Forte
IMPORTANT NOTICE
To obtain information or make a complaint:
You may cal� Berkley Surety Group, LLC and its affiliates by
telephone for information or to make a complaint:
BERKLEY SURETY GROUP, LLC
Please send all notices of claim on this bond to:
Berkley Surety G�-oup, LLC
(866} 768-3534
412 Mount Kemble Avenue, Suite 310N
Morrisiown, NJ 07960
Attn: Surety Claims Depar�ment
You may contact the Texas Depar-tment of lnsurance to obtain
information on companies, coverages, rights or complaints at:
'i �800-2�2-3439
You may write the Texas Department of lnsurance:
P. O. Box 149104
Austin, TX 787'14-9'! 04
Fax: (512) 475-1771
Web: htf :Ilwww.tdi.s�ate.tx.us
E-maii: ConsumerProtection tdi.state.tx.us
PREM(UM OR CLAfM DISPUTES:
Should you have a dispute concerning your premium or about a claim
you should contact your agent or Berkley Sure�y Group, LLC firsf. If
ihe dispute is not resolved, you may contac# the Texas Depar-tment of
insurance.
ATTACH THIS NOTICE TO YOUR BOND:
This notice is for information only and does not become a part or
condition of the attached document and is given fo comply wifh Texas
legal and regulatory requiremenfs. �