Loading...
HomeMy WebLinkAboutContract 40121-A5 CITY SECRETARY CONTRACT NOV A ENDMENT No. 5 TO CITY SECRET R CONTRACT WHEBEAS, the City of Fort Worth (CITY) and RJN Group, Inc. (ENGINEER) made and entered into City Secretary Contract No. 40121, (thae CONTRACT) which was authorized by M C C-2,,4176 on the 13th day of Apr 1, 2010 in the amount of $432,396. 00; and WH ERFC, the CONTRACT' was subsequently revised, by: Amendment, No. 1 in the amount of $92 , 009. 001 which was au,thaor red by M&C C-24999 on July 121' 2011 Amendment No. 2 in the amount of $21 f ►0 0 . 00 which was administratively trat.ivel y auth on zed on August, 30, 2011 and Amendment No 3 in the amount of $23,388 . 50, which was administratively authorized on, October 14 2 0,11. and Amendment, Nc.4 in the amount of $ 3 7, 6 7 8' .a 01 which, was authorized by M&C C'-25433 on February 14, 2012 . 5E EAS, the CONTRACT involves engineering services for the following pro j ec t Clear Fork Drainage Basin M-210 Sanitary Sewer Improvements; and WHEN ', it has become necessary to execute Amendment No. 51 to the CONTRACT TRACT tc include an im ncreased sco a of work and revised fee NOW THEREFORE,, CITY and ENGINEER, acting herein by and through their duly authorized representatives , enter into tae following agreement, which amends the CONTRACT Article I of the CONTRACT is amended to nclude! the a.dditional. engineering services specified in a proposal dated January 24, 2 01. , a copy of which is attached hereto and incorporated herein. The cast to City for the additional design services to be performed by Engineer totals $45, 750 . 00 . 2 Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract,, as amended, so that the total fee paid by the City for all work and services shall be an amount of $852, 822 . 00 . 011FICIAL RECORD, 0 01 C CITI ITY SECRETARY F cy T. WORI"HI TX RECEIVED gage t -l - 3. All other provisions, of the Contract, which are not expressly amended herein,, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date; last written by a signatory, below. APPROVEDO City of Fort Worth ENGINEER RJN roup I'nc,. Fernando Costa, Peter Laai. P.E. Assistant City Manager Vice President 0019 DATE: 418113 DATE.- I I'll, I I APP RECOMMENDED: IRV- S. Frank Crumb P.E. Director, Water Department "PROVED AS TO FORM AND LEGALITY M&C: N/A Date. N/A MIN MIM1111MV Douglas W'. Black Assistant City Attorney ATTEST: 000% OAJ 10i A Se Ity 01 )000000 10C!Y OFFICIAL, RECORD, C I 'ITY SECRETARY FTv WORTHj TX Page Jarruary 24, 20 3 TTN Mr. Robert SauCoda, PM Fort Worth Water Department City of Fort Worth 1000 TTrod niorton Street. Fort Worth, 1" xa 6 102 R E Contract Amendment No. 5R Clear Fork Drainage Basin— -210 Sanitary Sewer Relocation City Project No. 010222, City Secretary No. 40121 R,JN Gr oup File No� 18242500 , Mr. SaLlceda: Per your direction, please find attached the revised Contract Amendment No. 5R request to, the M-2,10 Sanitar-y Sower Relocation Project. 'This revised am ndrnont request represents the previously agreed to amendment items sul raaittcd to the prior project manager in September 20 12, That prior submission addressed significant extra services during construction phase work performed from June 2011 to March 2012 during the construction of the M-210 Part 1 project. This revised) amendment request now also seeks to recover labor and expenses associated with the additional lid phase and construction services provided for M-2 10 Part 2 project to rnodify the storm sewer outfa.11 plans and specifications after they were previously approved and accepted by the Water department and to address geld stoma sewer con flicts discovered during construction. Each of these amendment cost centers will he discussed in greater detail in the amendment sr rni ries shown below. M-210 PARTS I and 2— CONSTRUCTION PHASE SER VICES—EXTRA WORK previously Performed Construction Phase Services on Part 1 from June 2011 through March 2012: During this period, RJN produced and issued conformed Part 1 construction documents J l conducted several prolec.,t site visits at the request of the City and RWD,- RJN addressed extensive c'ontractor's R.F1 and shop drawing submittals; RJN conducted numerous hydraulic analyses and assessments during Part I construction to verify the functionality of the proposed siphon through the numerous and extensive field changes made by the Contractor; RJN was also asked to run a comprehensive hydraulic analysis reflecting all of the field changes to verify siphon performance, RJN was asked to produce 1-ar e cilanieter manhole details for Part l; and lastlly, due to the last niinL to requested st ern outfall design changes, R.IN produced and issued conformed docurrrerit tbrw M-2 1 0, Peel 2 More specifically, these aniendraaent iterrr etf::its it clr.rc edlw 1. M-210 Part 2, Production of PACSD Requested Significant Storm Sewer Design gn Modifications (Task 5.3 During, t1 e hid please of the project, the PALS requested the re-design of the proposed stop l iniprovernents in Rogers Rd. over concerns about potential darna e to a -each Pecan tree in the Rogers Rd. parkway. mrr, r W, ww .ri n com A'dC,yWWW adjacent to R")rest Park. J"he stedr nn,, sewer changes required a revised stori n sewer hydraulics analysis t o assess the inipacts of tyre proposed changes tc tile overall storm sewer s stern flood risks in this area, five 5 plant street revisions, modifications ations to the contract do eurnents and spec i ficat ions,the re-design of the storm water baffle box and the, prodr.reti n and release of two 2 addendrIrrrs for this pro' t. RJN's staff hours, labor and expense costs i neurred to perorrn this item, are shown in tyre Summary cost table below. 2. M-210 Part I Supplemental Site "Visits and Weekly Field Meetings (Task . Due to schedule ule delays, numerous field, changes made and construction practices, used by the Contractor, a large number Of Unbudgeted site visits, were made. F JN is only seeking compensation fcr a total of three site visits/field meetings that were conducted at the reCluest of the „."RW D (1/24/12 and 3/9/12) and the City (1/13/12). RJN's staff 11edcrrs, labor and expense costs incurred to perl"drrrr this item are shown in the summary cost table blow. 3. 21 Part I C'unforrnied Documents (Task . Due to the large project Addendum issued for Part 1 and that the Contractor requested the evaluation of a new w i p g M , R 1 was directed to produce conformed rivet cressrn lan sera �� r� h trrnn construction documents for contractor execution which was dome and new plans and specifications, were issued to the City in June 20111. R.1" 1's staff fours, labor and expense casts incurred to perfonil this item are shown in the SUIllmary cost table below., 4. M-210 part 1 Excessive RFI and Shop Drawing Reviews, (Ta,sk 61.IC;I)-, Significant extra ti ire and efforts were required to address project RF1's and shop drawings submitted by the contract or, S Jr. Louis, for review and comment. blue to their schedule delays, a number of critical project materials DPE & FRP: pipe, rebar and structural concrete) were ordered late and the Contractor requested alternates be evaluated which was done and lied to several iterations of reviews and correspondence for each. Additionally, many of their Submittals were incomplete and again required multiple iterations to resolve. We also had a rlUniber of issues associated with their pressure grout mixes, tunnel grouting plans and rir%seellaneous material Submittals. Addressing the RFI'si and slop drawings for M-210 Part I re i u. rred over 5%of the original task budget to be used. F. N's staff hours, labor and costs expense e� c .� p � incurred to pet-form this item are shown in the summary east table below. 5. M-21n0 Part 2 extensive RFI and Shop Drawing, Reviews (Task .l'C2)-,, Extra t are and effort was required to address project RFI's Zrnd slop drawings scrbmitted by the contractor, North Texas ontra:cAin . 'I"his, includ d multiple iterative reN iews of large diameter pre-east man-hole submittals, and concrete mix designs tor pavenlent. Li d ilea ales. A a,irr extra coordination w, as required red to insure the proper integration of ConShield into these structure mix designs. Another rn4jor effort included coordination efforts, including field investigations made, to resolve the existing start-r sewer alignment conflict with the M-2 10 aligru-rent discovered at the initiation of the 67011 Brentwood Stair Road,Suite 11 OOW*Fort Wor1h,TX 76112-3363,@ 817-451-3500*fax 817.451.3506 14( wwwrin.com Part 2 coristruction phase. R.IN's staff" hours, labor and expense costs incurred to perform this item are shown in the SLInitnary cost table below. 1 j- 6. M-210 Part 2 Conformed Documents (Task 6.1D)9 Due to the requested stot-n sewer changes to the Part 2 plans and specifications during bidding, RJN was directed to produce conf►rnied construction documents for contractor execution. RJN's staff hours, labor and expense costs incurred to perform this item are shown in the summary cost table below. 7. M-2110 Part 2, Issued, Revised, Plan, Sheets to address existing 54-inch storm sewer alignment conflict discovered during construction (Task 6,.IE).- Due to the discovery, of a majjor storm sewer and sanitary sewer alignment conflict, a revised sanitary sewer alignment had to be developed and revised plans issued. Changes included revising the storm sewer "as-built" infor-oration on the plans to match field potholes conducted and realigning the proposed M-210 sanitary sewer. RJN's staff hours, labor and expense costs incurred to perform this item are shown in the summary cost table below. 8. M-2 10 'Part 3 Conformed Documents and the Production of As-built Documents for Parts 2 and 3 (NEW OR FUTURE TASK - Task 6.IF).- Due new City engineering contracting policies, R seeks the funding needed to produce Conformed Documents for M-210 Part 3 during bidding and Services During Construction (SDC) tasks. Additionally, funds are needed for RJN to produce the required project as-built or record drawings for Parts 2 and 3. RJN's staff hours, labor and expense costs incurred to perf rrn this item are shown in the surnmary cost table below. 9. M-210 Part I — Hydraulic Analyses of Project Material and Field Design Changes (Task 9.1H): As noted previously, extensive field changes occurred throughout this project, necessitating recurring hydraulic calculation checks to continually verify the impacts of those changes to the functionality of the proposed sanitary sewer siphon crossing the 'I"rinity River. These field changes, and material variations included: dropping the river crossing depth 5 ft from the dies,ign elevation and then recalculating again when Survey verified the depth was proven to be actually 6-ft deeper; the deliveredi F[DPE pipe and fittings had smaller ID"s than approved in the shop drawing submittals; field generated butt fused bead sizes exceeded manufacturer's recornmendations; the proposed siphon pipes were reversed in the tunnel; and the flow line elevation at siphon box two ('S B,#2) was 0.35 ft lower than the design elevation. MlmerOUS intermediate siphon, hydraulic calculations Nvere made during this firne and a comprehensive summary model, run was made at the end to verify the hydraLdiCS t;f* the constructed main and facilities as part of this task. RJN's staff'hours, labor and expense costs incurred to per orri'l this item are shown in the SLIMinary cost table below. 10. M-240 Part 1, Large Diameter Manhoie Detaill. Production (Task 9.11): During tile construction phase of Part I, the Contractor was unable to submit certified structural designs. for their proposed large dianieter manholes as required by the 6701 Brentwood Stair Road,Suite 100W 9 Fort Wodh,TX 76112-3363&817.4511.3500 W 817,451,3506 ® a �� rn. o contract. 1-he City requested RJ N o develop n produce splecific large dianieter manhole details r this r c . R JN produced Moose desig (a details whit were p r ided to the City and tile Co r� or. JN' staff h ' rs labor and x e costs ire rr-red to per o 1iis item are shown in e SLI111mary cost tabile below. A surnmary of RJN'I's anticipated s taff hours, labor and expenses th,at are requested for the world items noted above ve are shown in the ta,bile below: r y; �; ✓ /. f✓ ,. / / . / .i.... r [. i/r ..i. :, .rte ,./ .../. r ✓.,%r r / // /, � / /, r/r.. � 1 1, y /,/ J � r l / .,, / Nr�/ 1 / er Y', f/ r /r r,//, /,/, /.Ir l /l/ v r�, � f r / /� ✓ r/,/r / / FINAL ID P tE SE VICES, 5.3 torm Olutfall Re-desi gn 82, $91,910-00 75-00 subtotals- 82 0 $9 9 1 0.01q] NS UCI ,/,/,M , LION 6.1 Construction Support 5.01 875.00 35..00 91 0.00 l x r Site Visits 6.l . Coilifo rued, Documents 24 2,380-00 S 2155. for 2 10 Part 6.IC , �. 10,050.00 ami reviews Field Visits M.. Mart 1 6.1 C Extensive RFII Shop 2 0 3,220.0101 3 �.0 31250.00 ra iu g Reviews Field Visits Park 6. D Confomied for 2 10 Part .1 E Preparation of Revised 28 31380.00 S 6 .00 3,440.00, Plan Sheets o address Storin Conflict on M- 10 Part 2 .1F NEW TASK — Prepare 46 51,050.00 1100.00 5,1 X0.0 Conformed Documents, for M-2 10 Part 1 and Record ra w'i n mss for Parts 2 & 3 9.1 H Hydratilic Modeling of 40 5,240,00 0.0 1 5,240.00 Details Subtotals„ 268 3513 0*0 455. 15 X 5.0 T'O, A I-,S: 350 S 45,220.00, S 530.001 S 45,750.001 Worth,6701 BrenbNood Stai�r Road,Suite I OOW*Fort 0 #fax UPwww.ri n,,com E:A C a 1 0-rc e th C)U"q h 0 vc� '�e r Therefore, Nve are requesting revised Contract Aniendnient No. 5R to the M-2101 Sanitary Sewer. Relief Main Agreement in the aniount ot'$4,5. # ,750.00. There are no new services required to be performed by certifi ed M/WB,E firm associated with this amendment request. Contract Amendment No. 5R represetits, approximately a six percent (5.67%) increase in the total contract value. 41 For your convenience, a surnniary of*the total project fees are as follows.- Contract Item 'Fee Original Contract Arnount $ 4321396.00 Amendment No. 1 $ 92,009.00 Ainendment No. 2 $ 21,600. Arnendment No. 3 $ 231388.50 Arnendunent No. 4 $ 237,6 7'8.5 0 Arnendment No. 5:R, $ 4 5 750.. 0 0 Amended Contract Value 852,8122.00 Please do not hesitate to contact LIS Should you have questions, or need any background infon-nation concerning this matter. Thank you for your time and consideration. Sincerely, log Chris, Brooks, P.E., Senior PrQJect Manager A'"'I"TACHMENTS CC. Tony Sholola, P.E,., FWWD,Ci,ty of Fort Worth, Hugh Kelso, Regional Manager-Vice President, RJN Group Peter Lai, Vice President, RN Group 6701 BreintNood Stair Road,Suite 10OWo FortWoM,TX7611'2-3363*817'.451-3500 fax 817.451.350-6