Loading...
HomeMy WebLinkAboutContract 42580-A1 AMENDMENT N0*1 ciTY SECPJETARY'�' CONTRACT TO CITY SECRETARY CO CT No., 80 WHEREAS, the City of Fort Worth CITY and Mu.. t a e'ch Engineering,, -Tnc. , (ENGINEER) mad and entered 'into City Secretary Contract No. 42580, the CONTRACT) which was authorized b M&C C-25135 on the 13th day of September, 2011 in the amount of $ 78, 276 . 0101; and WHEREAS, the CONTRACT involves engineerin.g services for the following pro]ec t Cedar Breaks Drainage Improvements, Project No. 1 068; DOE No. 6003 and WHEREAS, 'it has became necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW 'THEREFORE,. CITY and ENGINEER, acting herein y and through their duly authorized representatives,, enter into the following agreement, which amends the CONTRACT: Article I of the CONTRACT i s ,amended to include the additional ml engineering services specified in a proposal dated January copy of which 's attached hereto and 'incorporated herein. The cost to City for the additional design services to be performed by n i neer totals $ (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT i s amended to provide for an r ncrease in the foe to be paid. to Engineer for all work and services performed under the Contract, as amended, so that the total fee pared by the City for all work and services shall be an amount of $95, 311 . ' . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain 'n full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. . City o Fort Worth Professional Services Agreement Amendment Template plate PMO Official Release 8/1/2012 Page I of 3 CITY SECRETARY' RECEIVED APR — 9 2013 FTv WORTHs TX APPROVED.- City of Fort Worth ENGINEER Multatech Engineering, Inc. iiiiiiiij .....I. Wr .................... Fernando Costa Ja c. Otteson,, P. E. Assistant City Manager Principal DATE, DATE: 10? APPROVAL R zz OMMENDED: 0101 Douglas W. Wi4jsig, P.E. Director, Traps pours tionlPublic wo-rks Department APPROVED AS TO FORM AND LEGALITY,., M&C: Da,te,. Doug as W. Black Assistant City Attorney ti "AN ATTEST. C 0 Mary J. KL� r City Secretary City of Fort Worth OF CFIIAL RECORD Professional Services Agreement Amendment Template F1, 1A R:ECORD Y L Tir: T ] 'PMO Official Release 8/1/2012 Clorf SECRETARY " W Page 2 of 3 0 THI TX FTe WORTKTX FUNDING BREAKDOWN SHEET lity Secretary No. 42580 Amendment No. 1 Department Fund-Account-Center Amount T '22 5312001 2042801068 3� $17 r . i Total . $17 f O35 . 0 City of Fart Worth Professional Services Agreement Amendment Template PO Official Release 8/1/2012 Prue 3 of 3 MMULTA,TECH ARCH IT'ECTS a ENG IN LERS 2821 VVe,,-,,t 7(h Street,Suite 400. Fort VVc1rih, Phone 817-877-5571-Fax:8,17-877-4245- ........... January 2,1 31 20113 Mr. Michael Perkins, P.E. Project Manager City of Fort Worth 1000 Throckm,orton Street Fort,Worth, Texas 76102 Re: AMENDMENT No 1 COFW Project 01068, Cedar Breaks Storm Drain Extension Mr., Perkins, Originally, the Cedar Breaks scope was to extend the existing storm drain from the southwest end of Cedar Breaks Drive to the west end of Mesa Verde Trail. When survey and SUE were conducted, numerous utility conflicts were revealed. These conflicts, along with an existing concrete roads ayY made the preliminary engineer 11 s estimate approximately $583,000. At the 30% review, it was, determined that we should investigate the possibility of using underground ,detention and/or trench drains, as a means of reducing flooding in the Cedar Breaks area., A prelimi�nary analysis using NCTCOG contours indicates that the HOA lot on Starwood Drive has adequate elevation to accommodate underground detention. Additionally, a preliminary estimate from Contech was $100,000 for the installation of their Storm Trap system. However, detailed survey and SUE are required to conduct a full design. The initial survey and SUE only extended to the outlet of the concrete flume. It is assumed that the ground water will be below the detention, and this is supported by geotechnical testing in the area that indicated no groundwater to a depth of ten feet., An additional option is to route the storm water to the existing storm system in Basswood Boulevard by installing an Inlet at the top of the concrete flume and tying It to the, back of the inearest inlet on Basswood. Finally, instead of extending the existing Cedar Breaks storm drain, trench drains may be installed to route the water with minimal impact to existing utilities and roadway pavem�ent., Due to the change in scope, MULTATECH is requesting an amendment to our current contract to cover the additional expense of survey, SUE, and geotechnical testing for the proposed detention area, the existing', concrete flume, and the adjacent streets (Basswood Boulevard and Starwood Drive) to determine if the runoff can be routed to underground detention using Contech or ADS detention systems or if'the water can be routed to the Basswood storm drain system. These options will be taken to the 30% design level. If it is determined that Contech or ADS systems are feasible for installation under the H:OA lot on Starwood Drive, it is anticipated that the remaining design work can be completed within the remaining budget of the original contract. This wound be due to reducing the project area and eliminating the utility conflicts. Contech or ADS would design their product for the site at no additional cost to the City. If either the Basswood storm drain or Cedar Breaks, trench drain system is selected, additional engineering design services will be required as listed bel�olw. 0 I A M U L.TATE, U; H Mi ARCHITECTS*EN131NEERS 2821 West 7'th Street,Belts 400, Fort Worth.Texas 76107-2219 'gore 817•M-5571.Rix:8 7.877-4245 vr m�rmult t ch,co m E Summary of Total Project lee: r Total MW BE Percent 1.Or'ginal Contract $78,27 $20�., 35 26.5% 2.Amendment eotechnical Svcs $2465 $2,465 100.0% SUE&Survey Svcs $7,100 $7,100 1 '0. En lineering Svcs $7,470 $0 O.Wo Total Amendmen,t No. 1 $171 35 $9,5665 56.1% Total r et $951311 $3+x,300 31.8%, Depend,ing on the design option selected!, additional ngineering services may be as much as ' Breakdown of Ad'dit'ional Engineering Services. ifi,on wl Engineering for Detention System 0.00 Additional Engineering for Basswood Storm Drain Extension 71470.00 J El M0.1 , ].qmegLring,Lor, C!g,q.�ar,[3reak,$Tren h, mins 61,2 7 Amendment 1 Engineering Services are not to exceed 71470.00 Anticipated nstr ct n savings are approximately$300,000 if the detention system or the Bassmod optlion is selected (assuming, minimal utility conflicts). All other terms and con,ditl rrs of our current contract will remain the seats. Attached are our estirnate for engineering design services and an xhibit of the project area. The percent of MBE partictpation in this amendment is 56.1%. The original City MU goal is 17%. If additional Information, 'is required, please contact me or April Carey at 817-289-1882 or by e- gall at e ere multateech com . J,ai A. Otteson P.E r art cep I' MULTATECH Engineering Inc. m 6 to 0 JLO 0 r-r-co uQ:4o In V- Ill 14 LO to <Clli . 0 ll 07 Il 4�49 of 69,64 41" 44 69 C; 0 ara o z m U); III U f.: 0 CL Ck. CL 0 X o c: L� 0— u (i E uj M LU w Cc C: In Cal c'0 10 co -- cc M: 0 in q 0 co 0* to C 0 Ln 0 r-CD C14 r- E to 0 Ui x UJ 10 Lo co(y) 0 "Iftf I o ru I N JN C( 0 4j, 0.21 0 0 0 CL u 0 a 0 4) r- Ic 4) 21 01 O.c z to v c CD m C c r- 0 m w tn 0 4) An 101 0 Q CL Z)— O C m ro- to -CE 0 a i d E M CO 0 4> Ev,2 1 2 C 'E- 0 cn 0 U. a.CL LL I'LL CO LL I I c) C CN 6 ce (I 0 4— m M x 0 4) (u > m Wi 0 LL E 0 0 o C CL IN, El CO: 0 "Ill',,................... 71111 lox .......... r uj OWNWAPP7 )tie, IF .................. WE/" 17s, 41 41:1 ,11 11 'w" �"0, 0 h 440.A�*M I I Ift lry ow, '­gv'mN1%s pil Al A"21 NIP!11 "I yj I W'1111/ '1� j I "s "A 1. Alm Oil Ap, /* i�,, J, A g. so/ 0 IF I'M J ................. ........... lfr�r N mr, /. .. ...... 71 A Alm 'K Aw/ Al 11,011"',4010/il/11111/1", PLA it A's L.J w" j Mwv/�y 'le C). MIR) `40 ff 1"T lilsllw 10 v A AW46 70 (al/v At C:) s rq C 0 S, 4-J unM, AVON& 0 "w "WO w, C12 1,0 s/1 I r SK w C)i g/ W_ for; "a A is, It,j? trl 0,0101 qA F/All 0 ull, 'a U 'Oo, yv; all In "I'd, AMASIOP: A 4 CIO g s 'e",