HomeMy WebLinkAboutContract 55382-CO3 CSC No. 55382-CO3
FORT WORTH. City of Fort Worth
~ f Change Order Request
Project Name North Beach Street&Basswood Boulevard Intersection Improvements City Sec# 55382
Client Project#(s)l CPN101582
Project Description Paving,Traffic Signal&Illumination Improvements for North Beach Street&Basswood Boulevard Intersection Improvements.
Contracto McClendon Construction Change Order# 3 Date 4/12/2022
City Project Mgr. Iskal Shrestha City Inspector William R.Roberson
Dept. TPW Contract Time
Totals (CD)
Original Contract Amount $1,537,331.40 $1,537,331.40 252
Extras to Date $23,258.00 $23,258.00
Credits to Date $37,867.00 $37,867.00
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,522,722.40 $1,522,722.40 252
Go to ADD&DEL Tabs to Enter CO Backup $0.00 90
Revised Contract Amount $1,522,722.40 $1,522,722.40 342
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $14,609.00 $14,609.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 9r
-0.95%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,921,664.25
JL JUSTIFICATION(REASONS)FOR CHANGE ORDER
The Contractor had 252 calendar days to complete the project for final acceptance per the executed contract.The Contractor begins work on Tuesday,April 20,2021,and
theirby completion date for final acceptance was Monday,December 27,2021.The Contractor achieved substantial completion within the contract time(252 calendar
days).The new traffic signal was fully functional and operational on August 24,2021.On all four(4)legs of the intersection,a dual left-turn lane,sidewalk,and ADA ramp
were installed and opened before December 27,2021.
However,The project's scope also includes furnishing and installing one(1)Street light pole.The streetlight pole couldn't deliver on time due to the long lead time.The
Contractor requested additional 33 calendar days for the street light.It was installed on January 12,2022.
On Tuesday,January 4,2022,City performed the Texas Department of Licensing and Regulation(TDLR)inspection of the sidewalk and ADA ramps.The inspection results
require the Contractor to modify the small portion of sidewalks and require the City to apply for a Variance application to address the TAS Section 303.2.The Variance will
allow the existing sanitary sewer manhole cover within the accessible route to provide a level change that exceeds 1/4".
On Tuesday,February 8,2022, City notified the Engineer of Record(EOR)to investigate and provide a solution for the non-compliance with the TDLR inspection report.
The TDLR inspection added work to the Contractor outside the project's original scope and needed to be complete before the final inspection.On Monday,February 28,
2022,the Contractor notified the City that all TDLR punch lists were complete except the one related to TAS Section 303.2.The FOR provided different options for TAS
Section 303.2.On March 1,2022,the City decided to apply for the Variance.The FOR provided the variance application on March 10,2022.The variance application was
submitted on Monday,March 21,2022.The final inspection was scheduled for Tuesday,March 22,2022.
The Contractor completed most of the work within the contract time,and they have done their due diligence to get this project completed on time.The added time was to
address the long lead time for One(1)street light pole and TDLR Inspection items.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor(Name) Contract Signature Date
McClendon Construction Co.,Inc Justin Blair a 04/13/22
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
04/13/22 ry 04/13/22
Program Manager Date Senior Capital Project Officer Date
�AVJ 04/14/22 04/14/22
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
ZMM& env 04/14/22 ' ' 04/15/22
I.
AssistantC� Date Assistant City Manager Date
04/15/22 04/18/22
ffw.
L.
Council Action(if require
M&C Number M&C Date Approved
ATTEST: q4t
Ay 0° o
Jannette Goodall,City Secretary pP,•o00
°o oo'f1d� OFFICIAL RECORD
0�o 004d
o o=� CITY SECRETARY
�� °°000000°°°° 4Y FT. WORTH, TX
FORTWORTH City of Fort Worth
' IT-- Change Order Additions
Project Name North Beach Street&Basswood Boulevard Intersection Improvements City Sec# 55382
Client Project# CPN 101582
Contractor McClendon Construction PM skal Shrestha Inspecto William R.Roberson
Change Order Submittal# O3 Date 4/12/2022
ADDITIONS
y Unit Unit Cost Total
TPW S0.00
Sub Total Additions S0.00
Change Order Additions Page 2 of 4
Puk L F�r 1 City of Fort Worth
Change Order Deletions
Project Name North Beach Street&Basswood Boulevard Intersection Improvements City Sec# 55382
Client Project# CPN 101582
Conlraclo McClendon Construction PM Iskal Shrestha Inspector William R.Roberson
Change Order Submittal# O3 Date 4/12 2022
DELETIONS
ty Unit UnitUost I ota
TPW $0.00
�iub I otal ueletions
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
N/A
Total $0.00
Previous Change Orders
co# DATE AMOUNT
1 6/15/2021 $23,258.00
2 7/21/2021 -$37,867.00
Total -$14,609.00
IPAPE-DAWSON
ENGINEERS
AGENDA
101582- Beach St&Basswood Blvd
MEETING TITLE: On-Site Progress Meetings DATE: 12/16/2021
ATTENDEES: Iskal Shrestha (X),Justin Blair(X), Matthew Mabry(_), Peter Hsu (X), Eric Canales(X),
Present=(x) Riley Roberson (X),Scott Porter(_), Eduardo Veliz(X), Donny Burns(_),Jason Pruett(_)
AGENDATOPICS:
1.Safety 1.1—Safety Items(Phillips)
1.1.1—Reminder. Make sure that anyone on the job site is wearing appropriate gear.
1.1.2—Workers must wear hardhats all the time
1.1.3—Follow standard COVID procedures for safety
1.2—Traffic Control
1.2.1—Lane closures with flaggers during striping
1.2.2—Pick up cones next week after striping is done
2. Environmental 2.1—SWPPP
2.1.1—Plan done and on site
2.2—Inlet Protection
2.2.1- In place, reminder to check after storm event
2.2.2—Sod is in place, inlet protection to be removed after sod is established
3.Schedule 3.1—Work Completed
3.1.1—Sodding
3.1.2—Additional pavement marking
3.1.3—Signage started
3.2-Four Week Look Ahead
3.2.1—Week 1: Striping,signage,adjust ped buttons NW corner
3.2.2—Week 2: Wait for light pole, punch list,traffic control items removed
3.2.3—Week 3: Final walk through
3.2.4—Week 4:
Transportation I Water Resources Land Development I Surveying I Environmental
telephone: 817-870-3668 address: ONE RIDGMAR CENTRE,6500 WEST FREEWAY,SUITE 700 FORT WORTH,TX 76116 website: PAPE-DAWSON.COM
Fort Worth I San Antonio I Austin I Houston I Dallas Texas Engineering Firm#470
AGENDA
Page 2 of 3
4. RFIs/Submittals 4.1-RFI Status
4.1.1—Upcoming RFIs: None
4.2.1—Outstanding RFIs: None
4.2-Submittal Status
4.2.1—Upcoming Submittals: None
4.2.2—Outstanding Submittals: None
S.Change Orders 5.1—Upcoming Change Orders
5.1.1—Reconciliation—JB should have numbers by early January
5.2—Change Orders Under Review
5.2.1—None
6. Percent Complete 6.1—Phase IA(EB): 100%
6.2—Phase IB(WB): 100%
6.3—Phase II(SW/SE Ramps): 100%
6.4—Phase IIIA(NB): 100%
6.5—Phase 1116(SB): 100%
6.6—Phase IV(NW/NE Ramps): 100%
6.7—Striping:95%
7. Pay Applications 7.1—Last one paid.Anticipate 2 more 99%and after light pole
7.2—Might be two weeks over on Message Boards—to be handled by reconciliation
7.3—The Project PM reminded that contractor is not allowed to invoice Traffic control for
more than quantity mentioned in the Bid proposal. Even though the duration of the
contract time is more than the duration of traffic control.The quantity of traffic control was
addressed during pre-bid meeting and addendum.
8. Inspections 8.1—Scheduled Inspections
8.1.1-TDLR on Jan 04,B:OOAM
8.1.2—Light Pole,TBD
8.1.3—Parks for SOD
9. Material Testing Status 9.1—Scheduled Material Testing—None remaining
10.Critical Path 10.1—Long Lead Items Schedule
10.1.1—Supplier lost light pole,order another,ship date TBD.
PAPE-DAWSON
ENGINEERS
AGENDA
Page 3 of 3
ACTION ITEMS:
• JB—Need to check last couple of Ped push buttons after ramps installed
• IS—Need to reach out to coordinate Oncor/Spectrum
• JB—Schedule pre walk-thru &then set up final with redlines(if any)
• JB—Send redline notice to RR& PH
• IS—Contact Parks
• JB: provide an expected date for the light pole to begin the CO process to add contract time in the contract.
ACTION ITEMS COMPLETED:
• MM—Schedule TDLR for Jan 41"
• JB—Check Ped Push Button system on West side
• JB—Submit updated schedule to the City PM
ACTION ITEMS OUTSTANDING:
NEXT MEETING:
- Jan 04,2022—S:OOAM TDLR Inspection
- Jan 04,2022—S:OOAM Engineers(civil&traffic)for Punch List
- Last meeting will be Final Walk Thru scheduled by RR(after pre-final, redlines, light pole installed and
punch list completed)
r1iPAPE-DAWSON
ENGINEERS
SITE PHOTOS - 12/16/2021
lolaaz- aeacn zt&Basswvva cnva
Page 1 of 5
Photo 1: Looking Northwest- Phase II SE Ramp Island-Sod complete,need striping
Photo 2: Looking North - Phase IV Northeast Ramp-Sod complete,need to complete striping
l
1 V'
-.ram-..o'.. �...
r0iPAPE-DAWSON
ENGINEERS
SITE PHOTOS - 12/16/2021
10imlaz- oeacn zt&Basswooa anva
Page 2 of 5
Photo 3: Looking Northwest- Phase IV Northwest Ramp-Sod complete,need striping
ill-lift ow
N
*.�
Y'
Photo 4: Looking South - Phase II Southwest Ramp-Striping and sod completed
�, ..
yF
r0iPAPE-DAWSON
ENGINEERS
SITE PHOTOS - 12/16/2021
lozaaz- oeacn zt&Basswooa cnva
Page 3 of 5
Photo 5: Looking East- Phase IB- Needs to complete crosswalk striping
a
- -------- -
Photo 6: Looking West- Phase IA-Striping completed,need RFI#9 sign
r
r0iPAPE-DAWSON
ENGINEERS
SITE PHOTOS - 12/16/2021
lozaaz- aeacn zt&Basswoou cnvu
Page 4 of 5
Photo 7: Looking North - Phase 111B-Striping completed
Photo 8: Looking South-Phase IIIA-Striping completed,need light pole
r0iPAPE-DAWSON
ENGINEERS
SITE PHOTOS - 12/16/2021
lozaaz- oeacn zt&Basswoou cnvu
Page 5 of 5
Photo 9: Looking East-Striping completed,sign bases installed
Ak
ON M
Photo 10: Looking West-Inlet protection still installed until sod established
Pp
RO
9e„
aagpp ::
4t
r �
.,�'
P �X
r0iPAPE-DAWSON
ENGINEERS
Shrestha, Iskal
From: Justin Blair <jblair@mcclendonconstruction.com>
Sent: �sday, December 21, 2021 12:41 PM
To: Shrestha, Iskal
Cc: Roberson,William R
Subject: Beach & Basswood
CAUTION:This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Iskal,
Couple items to update you on following our meeting last week.
The barricades are being picked up today.
The light pole estimated ship date is 1/21/22. 6&uld suggest we extend the time to January 31 or maybe even the
Friday of that week, February 41", in case any other unexpected delays.
Let me know your thoughts.
Thanks,
Justin Blair
McClendon Construction
817-295-0066
1
Shrestha, Iskal
From: Drew Shipman <Drew@durablespecialties.com>
Sent: Tuesday,January 11, 2022 2:36 PM
To: Veliz, Eduardo Z;Justin Blair
Cc: Shrestha, Iskal; Patrick Bryan; Zef Luna; Ruffin, Darryl K
Subject: RE: 103.011122 CPN 101582 - N Beach St/ Basswood Blvd - Pending items
CAUTION:This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Ed& Justin,
Good afternoon!
We ina y received the Type 18 pole today and have scheduled installation for first thing in the morning.
Hopefully we can get this wrapped up quickly now.
DREW SHIPMAN
DURABLE SPECIALTIES INC.
DREW#DURABLESPECIALTIES.COM
OFFICE 972-296-6324
From: Drew Shipman
Sent:Tuesday, November 16, 2021 12:09 PM
To:Veliz, Eduardo Z<Eduardo.Veliz@fortworthtexas.gov>
Cc:Justin Blair<jblair@mcclendonconstruction.com>; Shrestha, Iskal <Iskal.Shrestha@fortworthtexas.gov>; Patrick
Bryan <Patrick@durablespecialties.com>; Zef Luna <Zef@durablespecialties.com>; Ruffin, Darryl K
<Darryl.Ruff in@fortworthtexas.gov>
Subject: Re: 103.111121 CPN 101582 - N Beach St/ Basswood Blvd - Pending items
Yes sir Mata will take a look.
Sent from my iPhone
DURABLE SPECIALTIES, INC
DREW SHIPMAN
O: 972-296-6324
C: 817-401-3070
drew@durablespecialties.com
On Nov 16, 2021, at 10:26 AM, Veliz, Eduardo Z<Eduardo.Veliz@fortworthtexas.gov>wrote:
Good morning Drew,
The 3 streetlights just north of the intersection are NOT energized. Durable is responsible for the
illumination of these streetlights per plan.The city has received multiple calls regarding the streetlight
outs.This will need to be addressed as soon as possible. Please let us know when you all can return to
take care of the lights.
1
Shrestha, Iskal
From: Justin Blair <jblair@mcclendonconstruction.com>
Sent: Tuesday,April 12, 2022 2:05 PM
To: Shrestha, Iskal
Subject: RE: Beach & Basswood
This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Looking back through the emails I found this shipping ticket and it looks like Durable received it on January 11t",the
same day I sent Riley the pre-final check list.
STRAIGHT BILL OF LADING - Copy
EOL NBR 900041055
DATE 17/30/2021
TERMS FOB Origin Freight Prepaid
CARRIER Iran Horse Freight Line Inc.
TRAILER 8619 CUSTOMER PO S1
CONSIGNEE
9O-j,.4i055 DURABLE SPECIALTIES
1170 107TH ST
SHIPPER
VALMONT/ BRENHAM GRAND PRAIRIE TX
2551 VALMONT DRIVE
BRENHAM TX 77-633
(979) 836-9393 Ext. STOP 1
BILL TO OR REMIT TO Customer Order so.
Valmont/U.S. Bank c/o Syncada Customer PO No s1
usbank.freight@usbank.com Customer REF No
PO Box3001 Consolidation No 14
Naperville IL 60566-7001 Commodity Code D4
GENERAL COMMENTS
Purchase Order No: SIS70160. . Carrier CaIL: Otis Flowers/ 977-796-6374, 48 HRS PTD. . Marks: 103 f North Beach St,'
51570160. .
PIECES IN H PART NO DESCRIPTION WEIGHT RATE
1 3238947 POLE,ASSEMBLIES 33ft6in 11 Ga. NMFC; 161210 sub 3 317
1 BO01 BO01 Miscellaneous Parts NMFC; 160270 4
50 4396-3-1
2 ORDER TOTAL 316
Thanks,
1