HomeMy WebLinkAboutContract 50312-A5 CSC No.50312-A5 AMENDMENT No . 5 TO CITY SECRETARY CONTRACT No . 50312 WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 50312 , (the CONTRACT) which was authorized on the 30th day of January, 2018 ( M&C C-28566) in the amount of $3,099,361 . 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $229,755.00 authorized by M&C C-29067 on March 19th, 2019 and Amendment No. 2 in the amount of $366,004 .00 authorized by M&C C-29178 on July 25th, 2019 and Amendment No. 3 in the amount of $211,344 . 00 authorized by M&C 20-0137 on March 3rd,2020 and Amendment No. 4 in -the amount of $392, 668 .00 authorized by M&C 20-0460 on June 23rd,2020; and WHEREAS, the CONTRACT involves engineering services for the following project: Lake Arlington Lift Station and Force Main; and WHEREAS, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $323,249. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $4, 622,381. 00. 3 . All other provisions of the Contract, which are not expressly Prof Services Agreement Amendment Template, OFFICIAL RECORD Revislon Date: November 23, 2021 (Lake Arlington Lift Station and Page i of 2 CITY SECRETARY FT.WORTH, TX EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. APPROVED: City of Fort Worth ENGINEER Freese and Nichols, 2nc. aaa�8ccrAGu7cFF Dana Burghdoff Nick Lester, P.E Assistant City Manager Vice President DATE: Apr 22,2022 DATE: 04/18/2022 APPROVAL RECOMMENDED: worzo-2 � ,--- Chris Harder, P.B. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting .requirements. P.E. Project Man ger APPROVED AS TO FORM AND LEGALITY: M&C: 22-0290 01M Date: 04/19/2022 71 ck(Apr21,2022 I-: CDT) Douglas W. Black Form 1295: 2022-841298 Senior Assistant City Attorney ATTEST: ooqt FORA O`e�oo oo o0 'w o jjiette S.Good a I I(Apr 25,202209. CDT) Pvo Oz� (� O �� o o o *� Jannette S. Goodall P O00000000 City Secretary ����EXpsggo1 OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX Prof servlcea Agreement Amendment Template Revision iw:e: November 23, 2021 (Lake Arlington Lift station and Force Main) Page 2 of 2 (CPN 1009951 Innovative . .. FREESE Practical results WOMINKHOLS Outstanding 801 Cherry Street,Suite 2800 + Fort Worth,Texas 76102 + 917-735-7300 + FAX 817-735-7491 www.freese.com January 18, 2022 Ms. Pratima Poudyal, P,E. Project Manager City of Fort Worth Water Department 311 West 10'h Street Fort Worth,TX 76102 Re: Amendment 5 for the Lake Arlington Lift Station and Force Main(City Project No. 100995) Dear Ms. Poudyal: Freese and Nichols, Inc. (FNI) is providing this proposal to amend the Engineering Design Services for the Lake Arlington Lift Station and Force Main (City Project Number 100995).The following fee includes the costs for Parcel 11-14(Coyel) redesign, Parcels 24-25 redesign,aerial crossing redesign, easement acquisition assistance,and additional construction representation. FNI records show that this proposal would serve as Contract Amendment No.5. A summary of the additional costs is shown below: Item Fee Task 1-Parcel 11-14(Cove[) Redesign $27,820 Task 2- Parcel 23-24(Enchanted Bay) Redesign $55,710 Task 3 -Aerial Crossing Redesign& End Adjustments $42,619 Task 4-Easement Acquisition Assistance $33,111 Task 5 -Additional General and Construction Rep Support $163,989 Amendment No. 5 Total $323,249 Freese and Nichols, Inc.appreciates this opportunity and we would like to meet with you to discuss these additional services at your convenience. [FTW18195]T:\1.02 PM\Amendments\Amendment 5-Redesign&Easement Support\Amendment Letter w Survey Effort.docx CPN 100995 Amendment No.5 I 1 Lake Arlington Force Main January 18, 2022 Page 2 of 2 Original Contract Amount $ 3,099,361 Amendment No. 1 $ 229,755 Amendment No.2 $ 366,004 Amendment No.3 $ 211,344 Amendment No.4 $ 392,668 Amendment No. 5 $ 323,249 Contract Amount to Date $4,622,381 Sincerely, 1,00 j Nicholas Lester, P.E. Vice President Attachments Scope of Work Schedule Level of Effort Summary Spreadsheet Effort Detail Backup [FTW18195]T:\1.02 PM\Amendments\Amendment 5-Redesign&Easement Support\Amendment Letter w Survey Effort,docx Lake Arlington Lift Station and Force Main CPN 100995 Amendment No.5-Scope of Work TASK 1 Part 1- Parcels 11-14(Coyel)Tunnel Redesign Description: Extend the US Hwy 287 tunnel to cross the Coyel auto salvage yard properties.The City prefers to tunnel beneath the auto salvage yard to avoid paying and coordinating for the removal of the scrap cars required for open cut construction.The tunnel access shaft will be removed from Parcel 14 (Coyel)and placed on Parcel 11 (Rafah Real Estate). • Coordinate alignment lowering and tunnel redesign with Gresham-Smith (GS) • Redesign tunnel (GS) o Revise 1 plan sheet o Add 2 tunnel extension plan sheets • Coordinate open cut plan and profile with the redesigned tunnel section. Incorporate tunnel redesign into main plan and profile. o Revise 3 plan and profile sheets(C-21 to C-23) • Update and clean up 4 additional sheets(major adjustments) o Index(G-1) o Sewer location map(C-6) o Easement plan (C-9) o HGL(C-13) • Update OPCC • Meet with City for review and approval of redesign • Provide up to 1 additional temporary construction easement document for bore pit relocation (to be placed on parcel 11) Assumptions • No additional topo or tree survey • No additional SUE(all levels) o Previous coordination with Coyel representatives and easement acquisition assistance is included in Task 4. TASK 2 Part 1-Parcel 23-24 Enchanted Bay South (Waterview Estates) Re-alignment Description: Realign the plan and profile across the proposed Enchanted Bay(South)subdivision to follow the future street right-of-way. FNI will need updated plans from the developer's engineer to coordinate utility crossings and final plan and profile. Lake Arlington Lift Station and Force Main Amendment No.5 [FTW18195]T:\1.02 PM\Amendments\Amendment 5-Redesign&Easement Support\Scope of Work w Survey Effort.docx Changes from previous assumptions discussed:FNI previously coordinated with the developer's engineer on a proposed realignment,The developer has since revised the plat layout.The new layout requires a completely new re-alignment.This new re-alignment is longer than the original re-alignment. There are 2 additional proposed TCEs with this re-alignment.Additional sheets that need to major updates due to the revised re-alignment on the front side of the plan set are included. • Coordination with developer's engineer(file sharing,checking, and cleanup) required for the new re-alignment. • Coordination with developer's contractor for construction access and timelines, • Provide topographic survey for up to 1,500 LF of new alignment. • Coordination with design team, including traffic control,erosion control, environmental/archaeological,tunneling, and odor control to update corresponding plans as needed • Redesign horizontal and vertical alignment across parcel 25 only.Coordinate beginning and end of redesign with original alignment and easements on parcels 24 and 26. o Revise 5 plan and profile sheets(C-42 to C-46) • Update 30 plan and profile sheets following revised alignment and grade(minor adjustments) • Update and cleanup 7 additional sheets(major adjustments) o Cover o Site plan and control sheets (C-2) o Overall Map(C-4) o Sewer location map(C-6) o Easement plan(C-10) o HGL(C-13) o Erosion control plan (EC-2) • Update OPCC • Meet with City for review and approval of redesign • Revise up to 1 permanent sewer easement and 3 temporary construction easement documents. Check developer provided limits and coordinate the beginning and end locations with other easements. Assumptions • No additional tree survey. Developer's engineer to provide tree survey if required. • No additional SUE(all levels) • No revised UFP, developer to provide/coordinate UFP as needed • Previous coordination with Peloton (developer's engineer) regarding revising the horizontal and vertical placement of the alignment is included in Task 4. ➢ Part 1—Submit a complete,revised Part 1 100% plan set to the City 0 5 half-size sets&OPCC hard copies. o Specifications will be provided in PDF format. Lake Arlington Lift Station and Force Main Amendment No.5 [FTW18195]T:\1.02 PM\Amendments\Amendment 5-Redesign&Easement Support\Scope of Work w Survey Effort.docx TASK 3a Part 2—Aerial Crossing Redesign Description: Lower the Lake Arlington aerial pipeline crossing.This will remove the high point, specifically the sewer CAV and its enclosure,which was required to contain wastewater seepage from the air valve. FW Water Field Operations is concerned about access for maintenance during high lake level periods. FNI will study and coordinate design of a lowered crossing in accordance with the new Nationwide Permit 58 (NWP 58). The use of Nationwide Permit 12(NWP 12; Utility Lines)was recommended in the Tech Memo to authorize proposed impacts to waters of the U.S., as well as strategies to avoid NWP 12 pre-construction notification (PCN)triggers. In 2021,the U.S.Army Corps of Engineers(USACE) reissued and modified several NWPs, including NWP 12,which is currently available for oil and natural gas pipeline activities only.The USACE issued NWP 58(Utility Line Activities for Water and Other Substances)on March 15, 2021. NWP 58 differs from the 2017 version of NWP 12 in several ways, including a reduction in PCN triggers. FW Water will consider the redesign of an aerial crossing over Lake Arlington to a crossing at the normal pool elevation,which would previously have triggered NWP 12 PCN submittal. • Environmental coordination on NWP 58 and addendum to the 2019 Lake Arlington Force Main Tech Memo to evaluate the use of NWP 58 and design implications for the Lake Arlington crossing. o Work with the design team to implement changes under the NWP 58. • Team coordination (structural,environmental,and erosion control) • Redesign of the vertical alignment across the lake o Revise 5 plan and profile sheets(C-30 to C-34) • Structural recalculation and possible redesign of casing and piers due to increased forces/more frequent wave action at lake surface. • Update and cleanup 9 additional sheets o Index(G-1) o Sewer location map(C-5) o HGL(C-10) o Revise 4 detail sheets o Erosion control plan (EC-2 to EC-3) • Meet with City for review and approval of redesign Assumptions • No revisions to permanent or temporary easements. • No additional topographic, hydrographic,or tree surveys. • No additional SUE (all levels) • No PCN submittal. • No USACE coordination. Lake Arlington Lift Station and Force Main Amendment No,5 [FTW18195]T:\1.02 PM\Amendments\Amendment 5-Redesign&Easement Support\Scope of Work w Survey Effort.docx Task 3b Part 2—Vortex Manhole&RJN Gravity Main Incorporation Description: RJN plans for the Rosedale/SH 303 gravity main crossing, near the end of the force main, will be incorporated into the Part 2 plans and specifications. RJN is also recommending the relocation of the vortex manhole at the end of the force main to accommodate a proposed future gravity main (not currently in design). • Coordination with RJN on the relocation of the vortex manhole and force main/gravity main connection. o Incorporate RJN plans into Part 2 plan set • Plan and profile updates o Revise 1 plan and profile sheet(C-41) o Update and clean up 6 additional sheets o Cover o Index sheet(G-1) o Site plan(C-3) o Sewer location map(C-5) o Easement layout(C-9) o HGL(C-10) Incorporate RJN specifications for the gravity main into the Part 2 project manual o Coordinate and update OPCC to include the gravity main. Assumptions • No revisions to permanent or temporary easements • No additional topo or tree survey • No additional SUE(all levels) • Coordination with 7000 Rosedale developer's engineer is included in Task 4. Y Part 2—Submit a complete, revised Part 2100% plan set to the City o 5 half-size sets&OPCC hard copies. o Specifications will be provided in PDF format. TASK 4 Easement Acquisition Support Description:This is out of scope effort for support provided to the City during easement acquisition,This does not include any effort for layout,drafting,coordination with the City and RLPS on easement limits, or review of the draft and final easement documents included in the original scope of work and existing amendments, • See letter detailing easement acquisition support provided and anticipated support remaining. Lake Arlington Lift Station and Force Main Amendment No,5 IFTWI8195]T:\1.02 PM\Amendments\Amendment 5-Redesign&Easement Support\Scope of Work w Survey Effort.docx • Estimated effort already spent is 121 hours.This effort includes extensive responses FNI provided to landowner,developer engineer,or attorney questions;site visits specifically related to easements and landowner requests; creating maps and exhibits to assist in easement acquisition and for landowner coordination. o Estimated additional effort still needed is 62 hours.This effort is anticipated for review of the final agreement terms for all easements,application of terms and landowner comments to the plans, revisions to easements,and any final landowner coordination required for outstanding parcels. Known effort is listed below. o Coordination for landowners that are still in negotiation and respond to their questions and requests as needed until easements are recorded. o Revision of 1 temporary construction easement document for Parcel 20. o Coordination with P21-P23 owners and incorporation of their noted storm drains and other agreement requirements. o Coordination with P27—new development(Enchanted Bay(North))that is currently under construction. o Revision 1 temporary construction easement document for Parcel 32(Lakeview RV Park). Incorporate landowner requirements into plans. o Incorporate P34-1335 landowner requirements into plans. o Incorporate P57 landowner requirements into plans. o Coordination with P58-proposed RV park. TASK 5 Additional PM and General Representation Description: Extension of time and effort to complete monthly project reporting, construction general representation and resident representation services for both the force main and lift station based on current project status and schedule. • PM reporting extension of 22 months and force main design extension of 6 months. o September 2021 was the end of the scheduled 36 reporting periods o Design is anticipated to be complete in March 2022, pending easement acquisition, developer coordination, and archaeological survey. o See updated schedule for details. Lift Station RPR extension of 3 months o Drawing reviews began 9/2020—18 months ends 2/2022.Anticipated FNI end is 5/2/2022. Additional General Representation o Lift Station construction general representation extension of 3 months. o Additional general rep effort is detailed in Table 1 below. • Expected effort for the force mains is based on the number of submittals required by the 90%project manual. • Expected effort for the lift station is based on the number of submittals already received plus the anticipated remaining submittals. Lake Arlington Lift Station and Force Main Amendment No.5 [FTWI8195]T:\1.02 PM\Amendments\Amendment 5-Redesign&Easement Support\Scope of Work w Survey Effort.docx Table 1:Current and Anticipated General Representation Efforts Completed Add'I ContractAmounts Effort Expected Effort Remaining Effort Original Amend- asof Force Force Contract ments Total Lift Station Total (LS&FM) 1-4 10/4/21 Main 1 Main 2 Shop Drawings 100 8 108 120 10 35 32 89 CTRs 20 20 6 4 5 5 0 Record Data 50 50 9 11 15 15 0 O&M Manuals 25 25 0 19 3 3 0 RFIs 20 2 22 19 7 8 8 20 Change/Field 6 6 10 2 3 3 12 Orders Site Visits 24 6 30 8 4 9 9 0 Monthly Construction 24 6 30 12 6 12 12 12 Meetings Assumptions • Force Main Resident Project Representation is not included Additional General Representation for additional construction effort related to the lake crossing water work is not included. City elected witness testing is not included. Lake Arlington Lift Station and Force Main Amendment No.5 IFTWI8195]T:\1.02 PM\Amendments\Amendment 5-Redesign&Easement Support\Scope of Work w Survey Effort.docx ||} !! !§ ! ! •. !f - ■(` ! ! ! !! ! / � ! ; ! , , n au , § , ., . ; , ! �(\k/ ! , § § ! / | |||� §/} :0 : g m!= e m = O 7$] § 222 f {3 c ) §\ ( / () § � \ \ lz � \ ` ( ooE ff7 ,n � k / 2\ km= & / q ] ammo } aR § on [ ° ID (D Ln:3 (D z ; $ ; m \ [ � ( \ § § E ` ® m n# / g & , E & � \(\ ( 4 « \ y2 ( } M J A ro O V A A O N N N V N U D° N N N 4I N -� F o o nt o o O� o O Ul (n_ 0 Q -_n '_n (7 3 v ti w a ' , b wn m 2 2 R 2 3 e (n io -I 2 vp1i n L. P. E..o to n w d m ? m m D. ' > > > 3 a w n N m 3 x 00 5 3 d v C7 3 p » T a � ' o ^ A a ti r v 0 � a N C m P o W 0 r n 3 vt w 41 J N N V � w v A A N O O A m A N V A D v n (n c N o A d N S �t o m f 0N' 04 m � "7 o ; ° so' mv C, N m (D O o N ro U M A V m m V (J�j W C U7 O r L' r* n 7' o W W N n (p N W W N W O W V W D A V ONi W O�1 J A b C A O N N N tP O Ol N A t0 N O 40 co w 3 � o00 0 o W W m a � N Z C N W U1 VI O )< A N a 0 Z •� ^ a a ? [ � mulco W 2 o m W W m W rn m m a) fil G In d _ C D r 2 3 tD Ut N N A A W 9 v N v oc 3 in o 0 o w C N O W W N -i N x N W W W [ o O lD O W O N O VI O W W Ot O OI W N O N N �D Vi O 0) U O O !§¥ .- §}) [!/ - „ _ !;; ({� \( _ o I\ , I L §�} {r /[ -I gom ! « }{7§} §� 7 ;-#@m , _ }� {§j \ »($ \) ( \[�2} z~ § § k ; ! « ( w / - �:\ :[! !■� e !# ; (}§ ■a2 l) \� § 2 k 2;, § ;«� # I# . O ({ \! ) 3 °® 2 / £ r § \ ;t2 = oG (\ k, g /�@ § lme �"o I. Tier (Dk �)( '-` = \z,e 2 - q; ; E k2j § j01 2 § » ; on ! : § } n e - #k � / , §®§2 §#` � = !E | § !, ; E\ (( | 7(! k ,\ P. 22m2 &�> a §o ( \ - 4G ; 442 ! 3 m \{f{ \{{ Ep ml ; 3a O 3! \ [ [r Q@ , & m 1.11 w . m ] * Ln \a8&g2q 04 q § }\(GE ° \E / ( ID m § 10 ( m \ � \ � City of Fort Worth, Texas Mayor and council communication DATE: Tuesday, April 12, 2022 REFERENCE NO.: **M&C 22-0290 LOG NAME: 60LALSFMA5-FNI SUBJECT: (CD 5 and City of Kennedale) Authorize Execution of Amendment No. 5 in the Amount of$323,249.00 to an Engineering Agreement with Freese and Nichols, Inc. for the Lake Arlington Lift Station and Force Main, and Adopt the Attached Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2022-2026 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1.Authorize execution of Amendment No. 5, in the amount of$323,249.00, to City Secretary Contract No. 50312, an engineering agreement with Freese and Nichols, Inc. for the Lake Arlington Lift Station and Force Main project for a revised contract amount of$4,622,381.00; and 2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water & Sewer Capital Project 2018 Fund by increasing estimated receipts and appropriations in the amount of$323,249.00 for Lake Arlington Lift Station and Force Main (City Project No.100995) and decreasing estimated receipts and appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount to effect a portion of Water's contribution to the Fiscal Years 2022- 2026 Capital Improvement Program. DISCUSSION: On January 30, 2018, Mayor and Council Communication (M&C) C-28566 authorized an engineering agreement with Freese and Nichols, Inc., (City Secretary Contract No. 50312) in the amount of $3,099,361.00 for the preparation of plans and specifications for the Lake Arlington Lift Station and Force Main project. The agreement was subsequent revised by Amendment No. 1 in the amount of$229,755.00 (M&C C-29067, March 19, 2019)that provided for the design of 1,000 linear foot aerial crossing of the force main across Lake Arlington additional geotechnical investigations at 8 locations along the force main; Amendment No. 2 in the amount of$366,004.00 (M&C C-29178, July 25, 2019)that provided for the preparation of plans and specifications for additional tunneling design, archeological survey, additional survey along Quail Road, lead testing along lift station access road and design for erosion improvements on Village Creek Tributary near Salt Rd; Amendment No. 3 in the amount of$211,344.00 (M&C 20-0137, March 3, 2020)that provided for preparation of additional temporary and permanent easement documents, urban forestry permit application, and additional subsurface utility engineering (SUE) services, and Amendment No. 4 in the amount of$392,668.00 (M&C 20-0460, June 32, 2020) that provided for resident project representation (RPR) and start up assistance on Lake Arlington Lift Station. Amendment No. 5 will provide for additional easement acquisition assistance, plan redesigns, aerial crossing design and additional resident project representation support. It is the practice of the Water Department to appropriate its Capital Improvement Program (CIP) plan throughout the fiscal year as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2022-2026 Capital Improvement Program, as follows: 60LALSFMA5-FNI Capital Fund Project Name FY2022 CIP Authority Budget Revised Name Appropriations Change FY2022 Budget Decrease) I ---I W&S Capital 100995 - Lake Project 2018 - Arlington, FM, LS $ 0.00 This M&C $323,249.00 $323,249.00 Fund 56014 and SS Funding for the Lake Arlington Lift Station and Force Main project is depicted in the table below: - - - ------------- FUND Existing Additional ions Appropriations Project Total* Appropriat W&S Capital Project 2018 - $9,306,709.00 $323,249.00 $9,629,958.00 Fund 56014 WS Capital Project 2020A - Fund 56019 $11,064,526.00 $0.00 $11,064,526.00 Project Total $20,371,235.00 $323,249.00 $20,694,484.00 *Numbers rounded for presentation purposes. Funding is currently available in the Unspecified-All Funds project within the W&S Capital Project 2018 Fund for the purpose of funding the Lake Arlington, FM, LS and SS project. Business Equity: Freese and Nichols, Inc., is in compliance with the City's BDE Ordinance by committing to 20.81 percent SBE participation on this project. The City's SBE goal on this project is 10 percent. The project is located in COUNCIL DISTRICT 5 and CITY OF KENNEDALE. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified-All Fund project within the W&S Capital Proj 2018 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Proj 2018 Fund for the Lake Arlington, FM, LS and SS project to support the approval of the above recommendations and execution of the amendment to the agreement and contract. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs),: TO _ Irunld-Ei6par-t-m-e—n-t ccount Project �Program[Activity Budget Reference Amounli ID ID Year Chartfield 2 FROM r—undl--DepartineInt Account Project Program[Activityl Budget Reference # mount ID ID Year Chartfield 2 CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Pratima Poudyal (6149) ATTACHMENTS 1. 60LALSFMA5- FNI MAP.pdf (Public) 2. 60LALSFMA5- FNI SAM.pdf (CFW Internal) 3. 60LALSFMA5-FNI funds availabilitypdf (CFW Internal) 4. 60LALSFMA5-FNI 1295.pdf (CFW Internal) 5. 60LALSFMA5-FNI PBS CPN 100995.pdf (Public) 6. 60LALSFMA5-FNI PBS CPN Compliance Memo.pdf (CFW Internal) 7. 60LALSFMA5-FNI Updated FID table.xlsx (CFW Internal) 8. 60LALSFMA5-FNI 56014 AO22(r2).docx (Public) T T T C C c 7 7 7 a a a v v o v v v rt rt �kCD 0Xt -i n n O O O C C C 41 7 7 7 rt rt rt O O O (D 0 CD (D (p' .� N `� .^r a v o tn rn o0 rt LD LoOr . Z . LDM M o; v 0 r rn N P, 1 uq 1 c c { c v v v 0 0 o � � X I