Project Name:1 2018 Bond Yr 2-Contract 6 City Sec No.: 56638
Project No.(s): 56002/0700430/5740010 M&C No. 22 0294 City Proj.No.: 101452
Project Description: Water,Sanitary Sewer followed by Paving improvement on several streets in CD 3
Contractor: Texas Materials dba TexasBit Change Order it 0 Date; 1 4/13/2022
City Project Mgr.l Brenda Oropeza City Inspector: I Steve Cisneros
Phone Number: 817-392-8271 Phone Number: 817-996-5855
Dept. Water Sewer Paving Totals Contract Time
(Calender days)
Original Contract Amount $2,079,497.19 $3,115,607.22 $1,997,562.10 $7,192,666.51 450
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $2,079,497.19 $3,115,607.22 $1,997,562.10 $7,192,666.51 450
Amount of Proposed Change Order $0.00 $851,816.79 $0.00 $851,816.79 060
Revised Contract Amount $2,079,497.19 $3,967,424.01 $1,997,562.10 $8,044,483.30 510
Original Funds Available for Change Orders $83,180.81 $124,624.78 $99,878.00 $307,683.59
Remaining Funds Available for this CO $83,180.81 $124,624.78 $99,878.00 $307,683,59
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 11.84%
MAX ALLOWABLE CONTRA CT AMOUNT(ORIGINAL CONTRACT COST+25%) $8,990,833.14
JUSTIFICATION (REASONS)FOR CHANGE ORDER
This change order will add 30"force main on Mary's Creek Drive that would eventually convey flow to the
Mary's Creek Wastewater Treatment Center as part of Water Department Master plan.Staff recommends that
the contract time be extended by 60 calendar days.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name c tractor Signature Date
Texas Materials dba TexasBit Jamie Greenwa a/1 a/2o22
Inspector Dale [Assistant
roject Man r Date
Steve Cisneros. 4-18-2022U� 20 CL 4/18/22
Director Wafer Dept) Dateonstruction Supervisor TP e t Date
T. s Apr 20,2022 D 4/18/22
Assistant CityAttorneyDate City Manager V Date
Apr 21,2022 Apr 22,2022
Council Action If Required) OFFICIAL RECORD
M&C Number 22.0294 M&C Date Approved 2 2022
CITY SECRETARY
FT.WORTH, TX
FCC RT WORTH City of Fort Worth
Change Order Additions
Project Name 2018 Bond Yr 2-Contract 6 City Sec No.: 56638
Project No.(s): 56002/0700430/5740010 DOE No, 22-0294 City Proj.No.: 101452
Project Water,Sanitary Sewer followed by Paving improvement on several streets in CD 3
Description
Contractor Texas Materials dba TexasBit Change Order:= Date: 4/13/20-2
City Project Mgr. Brenda Oropeza City Inspector Steve Cisneros
ADDITIONS
ITEM DESCRIPTION DEPT Qt Unit Unit Cost Total
Temporary Asphalt Paving Repair on Flexible ase ewer LF $40.50 $48,600.00
II-52 3301.0002 Post-CCTV Inspection ewer 1,197.00 LF $10.95 $13,107.15
II-55 3305.0109 Trench Safety ewer 1,200.00 LF $1.09 $1,308.00
II-66 3471.0001 Traffic Control(Sewer) ewer 2.00 Mo $1,641.92 $3,283.84
II-71 3331.4404 30"Sewer Force Main(SDR21) Sewer 1,197.00 LF J$607.40 $727,057.80
II-72 Sewer Fittings P401 Lined Sewer 1.00 LS $54,600.00 $54,600.00
II-73 3305.0114 Manhole Adjustment, Major w/Cover Sewer 1.00 EA $3,860.00 $3,860.00
Water
Sewer $851,816.79
Paving
Page 1 of 1 Additions Sub Total $851,816.79
FoP,fr W"R-Jr H City of Fort Worth
Change Order Deletions
Project Name 2018 Bond Yr 2 Contract 6 City Sec No.: 56638
Project No.(s): 56002/0700430/5740010 DOE No. 22-02 City Proj.No.: 101452
Project Description Water,Sanitary Sewer followed by Paving improvement on several streets in CD 3
Contractor Texas Materials dba TexasBit Change Order: F1 I Date 1 4/13/2022
City Project Mgr. Brenda Oropeza City Inspector: Fteve Cisneros
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Paving
Page 3 of 4 Deletions Sub Total
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Brenda Oropeza
Name of Employee
Graduate Engineer
Title
ATTEST:
,7a�r�rette�T GooclaCG c�����
J....Tt,S.G-d,11(Ap,25,202209:13 CDT) �t `OR r O`*o �*
000000OJannette Goodallo °�od0oo
City Secretary � 000 d
°000000 a
��nEXAsa�p
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, April 12, 2022 REFERENCE NO.: **M&C 22-0294
LOG NAME: 602018CIPY3C6CO1-TEXAS BIT
SUBJECT:
(CD 3)Authorize Execution of Change Order No. 1 in the Amount of$851,816.79 and the Addition of 60
Calendar Days to a Contract with Texas Materials Group dba Texas Bit, for Combined Street Paving
Improvements, Storm Drain and Water and Sanitary Sewer Main Replacements for 2018 Bond Street
Reconstruction Contract 6 Project, for a Revised Contract Amount of$8,044,483.30 and Adopt Attached
Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2022-2026 Capital
Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1.Authorize execution of Change Order No. 1 in the amount of$851,816.79 and the addition of 60
calendar days to City Secretary Contract No. 56638 with Texas Materials Group dba Texas Bit, for
combined street paving improvements, storm drain and water and sanitary sewer main replacements
for 2018 Bond Street Reconstruction Contract 6 project for a revised contract amount of
$8,044,483.30; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of$851,816.79 transferred from available
funds within the Water and Sewer Fund, for the purpose of funding the 2018 Bond Street
Reconstruction Contract 6 project (City Project No. 101452) to effect a portion of Water's Contribution
to the Fiscal Years 2022-2026 Capital Improvement Program.
DISCUSSION:
On September 28, 2021, Mayor and Council Communication (M&C) 21-0754, City Council authorized a
contract with Texas Materials Group dba Texas Bit, in the amount of$7,192,666.51 for the combined street
paving improvements, storm drain and water and sanitary sewer main replacements for 2018 Bond Street
Reconstruction Contract 6 project. The project included water, sanitary sewer and paving improvements on
Mary's Creek Drive (US HWY 377 to Pamela Drive).
Change Order No. 1 will allow for the early installation of a 1,200 foot, 30-inch diameter sanitary sewer force
main on Mary's Creek Drive to eliminate cutting relatively new pavement and causing disruption to residents
in the near future when the proposed Mary's Creek Sanitary Sewer force main system (which aligns through
Mary's Creek Drive) is constructed to convey flow to the future Mary's Creek Wastewater Treatment Center.
The staff has reviewed and verified the quantities for the additional work under this Change Order No.
1.Additionally, to complete this work, staff recommends that the contract time be extended by 60 calendar
days.
This change order will have no impact on the on the Water Department's annual operating budget.
It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of
within the annual budget ordinance, as projects commence, additional funding needs are identified, and to
comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion
of the City of Fort Worth's Fiscal Years 2022-2026 Capital Improvement Program, as follows:
Capital Fund FY2022 CIP Budget Change Revised
Name Project Name Appropriations Authority FY2022
(Increase/Decrease) Budget
Capital Fund FY2022 CIP Budget Change Revised
Name Project Name Appropriations Authority FY2022
(Increase/Decrease) Budget
56002 - W&S 101452 - 2018
Capital Bond Yr3 - $0.00 This M&C $851,616.79 $851,616.79
Projects Fund Contract 5&6
Funding is budgeted in the Transfer to Water/Sewer account of the Sewer operating budget for the purpose
of funding the 2018 Bond Year 3 —Contract 5 and 6 project within the Water & Sewer Capital Projects Fund.
Appropriations for the combined street paving improvements, storm drain and water and sanitary sewer
main replacements for 2018 Bond Year Three Street Reconstruction Contract 5 and 6 Project by fund will
consist of the following:
Fund Existing Additional project Total*
Appropriations Appropriations
2018 Bond Program - Fund 34018 $5,845,219.00 $0.00 $5,845,219.00
Water & Sewer Capital Projects -
Fund 56002 $9,035,141.00 $851,816.79 $9,886,957.79
JQ Project Total $14,880,360.00 $851,816.79 $15,732,176.79
* Numbers rounded for presentation purposes.
Business Equity: Texas Materials Group, Inc. dba Texas Bit is in compliance with the City's Business Equity
Ordinance by committing to 13.94 percent MWBE participation on this project. The City's MWBE goal on
this project is 15 percent.
This project is located in COUNCIL DISTRICT 3.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the Water& Sewer Fund and upon approval of
the above recommendations and adoption of the attached appropriation ordinance, funds will be available in
the W&S Capital Projects Fund for the 2018 Bond Yr3- Contract 5&6 project to support the approval of the
above recommendations and execution of the change order to the contract. Prior to an expenditure being
incurred, the Water Department has the responsibility of verifying the availability of funds.
FUND IDENTIFIERS (FIDs):
TO _
Fund Department ccount Project Program ctivity Budget Reference # mount
ID ID Year (Chartfield 2)
FROM
Fund Department ccount Project Program �ctivit�yBdget R�eerrence,.# mound
ID ear (Cield )
CERTIFICATIONS:
Submitted for City Manager's Office by: Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Brenda Oropeza (8271)
ATTACHMENTS
1. 602018CIPY2C15CO3-TEXASBIT - 1295 Exemption - Copy pdf (cFw Internal)
2. 602018CIPY3C6CO1-TEXAS BIT (NNO 1.28.22).xlsx (CFW Internal)
3. 602018CIPY3C6CO1-TEXAS BIT Compliance Memo.pdf (CFW Internal)
4. 602018CIPY3C6CO1-TEXAS BIT funds availabilitypdf (CFW Internal)
5. 602018CIPY3C6CO1-TEXASBIT MAP.pdf (Public)
6. 602018CIPY3C6CO1-TEXASBIT PBS CPN 101452.pdf (Public)
7. 602018CIPY3C6CO1-TEXASBIT SAM.pdf (CFW Internal)
8. 602018CIPY3C6CO1-TEXASBIT 56002 AO22(r2.docx (Public)
n Y1 'T
C c c
•
v v v
� m m
v v v
D D D
r1 n
0 0 0
O
0.
Q
D D D
<.
m
• Z
c
m m -c cw < m
m c 0 m e rD c
vrm .1 a a
Do
r(D m rD. i (D
X
N V) N vI N v
m
D' W
Z rtj
v0�n X a rt
3 0cu
3 3
r
m
3
D r+ D D
3
0 0 0
c c c
Z
(D
fD
a
m
a
i
v -o �'•v
c c c
v o v
0 0 0
W w
m m m
x x x
ro m ro
� 1 1
11VII/ANo R A H 10 G o U IINI C�L C 0 hA M U IkIl II G v,T ll O INII h/h
01
O -
--
�Q a' I
(p
;J
--- i Q
LL
iz
ol
co
Pv
P r YA!.
\r\ Jr r0 r( W
4q
Fill
yMARYS,6REEKiDR� _I l
FO RT WO,R �°