Loading...
HomeMy WebLinkAboutContract 55827-CO3 CSC No. 55827-0O3 FORT WORTH, City of Fort Worth Change Order Request Project Name Commander Road-Midfield Stage II City Sec# 55827 Client Project#(s) Project The scope of the Commander Road-Midfield Stage II project is to construct a proposed roadway for future hangar development at Meacham International Airport.The project Description includes site utilities,drainage improvements,electrical improvements,relocation of an existing gate,installation of new fence,and the construciton of a proposed concrete roadway. Contractor North Texas Contracting,Inc. Change Order# 3 Date 4/14/2022 City Project Mgr. Tyler Dale City Inspector Steven Aguirre Dept. Aviation Contract Time Totals (CD) Original Contract Amount $3,699,645.00 $3,699,645.00 210 Extras to Date $282,483.00 $282,483.00 62 Credits to Date $202,880.00 $202,880.00 Pending Change Orders(in M&C Process) Contract Cost to Date $3,779,248.00 $3,779,248.00 272 Amount of Proposed Change Order -$40,756.00 -$40,756.00 0 Revised Contract Amount $3,738,492.00 $3,738,492.00 272 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.05% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,624,556.25 JUSTIFICATION(REASONS)FOR CHANGE ORDER This Change Order will serve as the Final Reconcilation Change Order to address all additional items,overruns,and underruns of existing project bid items.Additional items within this change order include 12"X 8"Tapping Sleeve,Temporary Fencing,and Additional Seeding quantities.These items were deemed necessary in order to fully complete this project to adhere to the plans and specifications within the contract documents. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractors Company Name Contractor(Name Contract Signature Date North Texas Contracting,Inc. John Gockley 7oGu�o�k�ha 6oclleti Ar 20,2022orzo,=� P Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date -".Ju Apr 20,2022 Program Manager Date Senior Capital Project Officer Date Assistant Director(Dept) Date Director,Contracting Department(Dept) Date a�nwozo.z�z=a�a�n �Ap 20,2022 aq�,-- Apr 21,2022 Assistant City Attorney Date nt City Manager Date r2D2022 Apr 26,2022 kL Council Action if required) M&C Number N/A M&C Date Approved N/A ATTEST: ="Pools a moo on pa�FT��a a a Jannette Goodall,City Secretary O�000000 0 o o o °°o � 0vo °_0 ° o* d OFFICIAL RECORD ° ]�oo o 41 a�aa�rEX o Icy CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth lr�— Change Order Additions Project Name Commander Road-Midfield Stage II City Sec# 55827 Client Project# Contractor North Texas Contracting,Inc. PM Tyler Dale Inspector Steven Aguirre Change Order Submittal# Date 4/14/2022 AUUI I IUNS Unit Unit Cost Total Drainage Pipe Removal Aviation Concrete Pavement Removalviation Asphalt Pavement Removalviation Bituminous Surface Course viation Concrete Pavement viation Reinforced oncrete Pipe, ass viation 24 - Reinforced oncrete Pipe,Class 111,Concrete Encasec Aviation Concrete Sidewalkviation Prefabricated Eectrica an o e,Size TW x x viation Marking viation ence Removal ence Removalviation 6-Foot Black PVC CoatedChain Link Fence with areWire viation xTapping Sleeve Aviation emporary ence Aviation 77737 Additional Seeding viation Reinforced oncrete Pipe,Re-Stocking Fee o of Materialon Hand Cost) viation Aviation $63,974.00 Sub I otal Additions Change Order Additions Page 1 of 1 FORTWORTH City of Fort Worth 11� — Change Order Deletions Project Name I Commander Road-Midfield Stage II City Sec# 55827 Client Project# Contracto North Texas Contracting,Inc. PM Tyler Dale Inspedor Steven Aguirre Change Order Submittal# O3 Date 4/14/2022 DELL NUNS y Unit m o o a Power Utility Allowance via ion Reinforced oncre a Pipe,Class 111,Concrete Encased751on Grout and Abandon ExistingWater Line viation Grout and Abandon Existing Water Line via ion 77— Grout and Abandon ExistingWastewater Line viation Cap via ion brick Pavement Aviation 69 6-1--oot blackCoated ain Link 1--ence with are ue Aviation Aviation Sub TotalDeletions Change Order Deletions Page 1 of 1