HomeMy WebLinkAboutContract 55827-CO3 CSC No. 55827-0O3
FORT WORTH, City of Fort Worth
Change Order Request
Project Name Commander Road-Midfield Stage II City Sec# 55827
Client Project#(s)
Project The scope of the Commander Road-Midfield Stage II project is to construct a proposed roadway for future hangar development at Meacham International Airport.The project
Description includes site utilities,drainage improvements,electrical improvements,relocation of an existing gate,installation of new fence,and the construciton of a proposed concrete roadway.
Contractor North Texas Contracting,Inc. Change Order# 3 Date 4/14/2022
City Project Mgr. Tyler Dale City Inspector Steven Aguirre
Dept. Aviation Contract Time
Totals (CD)
Original Contract Amount $3,699,645.00 $3,699,645.00 210
Extras to Date $282,483.00 $282,483.00 62
Credits to Date $202,880.00 $202,880.00
Pending Change Orders(in M&C Process)
Contract Cost to Date $3,779,248.00 $3,779,248.00 272
Amount of Proposed Change Order -$40,756.00 -$40,756.00 0
Revised Contract Amount $3,738,492.00 $3,738,492.00 272
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.05%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,624,556.25
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This Change Order will serve as the Final Reconcilation Change Order to address all additional items,overruns,and underruns of existing project bid items.Additional items
within this change order include 12"X 8"Tapping Sleeve,Temporary Fencing,and Additional Seeding quantities.These items were deemed necessary in order to fully
complete this project to adhere to the plans and specifications within the contract documents.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractors Company Name Contractor(Name Contract Signature Date
North Texas Contracting,Inc. John Gockley 7oGu�o�k�ha 6oclleti Ar 20,2022orzo,=� P
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
-".Ju Apr 20,2022
Program Manager Date Senior Capital Project Officer Date
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
a�nwozo.z�z=a�a�n �Ap
20,2022 aq�,-- Apr 21,2022
Assistant City Attorney Date nt City Manager Date
r2D2022 Apr 26,2022
kL Council Action if required)
M&C Number N/A M&C Date Approved N/A
ATTEST:
="Pools a moo on
pa�FT��a
a a
Jannette Goodall,City Secretary O�000000 0
o
o
o °°o �
0vo °_0
° o* d OFFICIAL RECORD
°
]�oo o 41
a�aa�rEX o Icy CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
lr�— Change Order Additions
Project Name Commander Road-Midfield Stage II City Sec# 55827
Client Project#
Contractor North Texas Contracting,Inc. PM Tyler Dale Inspector Steven Aguirre
Change Order Submittal# Date 4/14/2022
AUUI I IUNS
Unit Unit Cost Total
Drainage Pipe Removal Aviation
Concrete Pavement Removalviation
Asphalt Pavement Removalviation
Bituminous Surface Course viation
Concrete Pavement viation
Reinforced oncrete Pipe, ass viation
24 - Reinforced oncrete Pipe,Class 111,Concrete Encasec Aviation
Concrete Sidewalkviation
Prefabricated Eectrica an o e,Size TW x x viation
Marking viation
ence Removal
ence Removalviation
6-Foot Black PVC CoatedChain Link Fence with areWire viation
xTapping Sleeve Aviation
emporary ence Aviation
77737 Additional Seeding viation
Reinforced oncrete Pipe,Re-Stocking Fee o of Materialon Hand Cost) viation
Aviation $63,974.00
Sub I otal Additions
Change Order Additions Page 1 of 1
FORTWORTH City of Fort Worth
11� — Change Order Deletions
Project Name I Commander Road-Midfield Stage II City Sec# 55827
Client Project#
Contracto North Texas Contracting,Inc. PM Tyler Dale Inspedor Steven Aguirre
Change Order Submittal# O3 Date 4/14/2022
DELL NUNS
y Unit m o o a
Power Utility Allowance via ion
Reinforced oncre a Pipe,Class 111,Concrete Encased751on
Grout and Abandon ExistingWater Line viation
Grout and Abandon Existing Water Line via ion
77— Grout and Abandon ExistingWastewater Line viation
Cap via ion
brick Pavement Aviation
69 6-1--oot blackCoated ain Link 1--ence with are ue Aviation
Aviation
Sub TotalDeletions
Change Order Deletions Page 1 of 1