HomeMy WebLinkAboutContract 57481 CSC No.57481
TRAFFIC SIGNAL
IMPROVEMENT AGREEMENT
The State of Texas §
§ Know all men by these Presents:
County of Tarrant §
RECITALS:
That FORT WORTH & WESTERN RAILROAD COMPANY, 6300 Ridglea Place, Suite 1200,
Fort Worth, Texas 76116 (hereinafter called "FWWR" or "Railroad") and the CITY OF FORT
WORTH, 200 Texas Street, Fort Worth, Texas 76102 (hereinafter called "City"), do hereby agree
as follows:
WHEREAS, FWWR is a rail carrier engaged in interstate commerce providing common
carrier railroad transportation services by rail including within the City's city limits which
crosses City's street network at various locations; and
WHEREAS, City owns and maintains for public use a street network which crosses
FWWR railroad tracks at various locations; and
WHEREAS, FWWR and City desire to improve or rehabilitate the crossings from time
to time; and
WHEREAS, City desires to improve the traffic signal system located at the intersection
of Bch Avenue and Windsor Place, DOT 672914D, located at or near Mile Post 1.95, Fort Worth
Subdivision, Tarrant County, Fort Worth, Texas (hereinafter called "Project"), as more
particularly identified on the print hereto attached, marked Exhibit"A"; and
WHEREAS, the Project will be completed per the plans as shown on Exhibit "B"
attached hereto; and
WHEREAS, City agrees to pay the costs of the Project and reimburse FWWR in the
amounts specified in this agreement and as shown in Exhibit "C" attached hereto.
NOW THEREFORE, in consideration of the premises and of the promises and conditions
set forth in this agreement, the parties hereto agree as follows:
OFFICIAL RECORD
FWWR&City of Fort Worth 1
Traffic Signal Improvement Agreement CITY SECRETARY
811 Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision FT. WORTH, TX
Document No. 20220411-01
i
AGREEMENT:
The Railroad shall, subject to the reimbursement provided for in this agreement, furnish
all labor, materials, equipment, flagging services and supervision for the Project at the above
location ("FWWR Services").
City agrees to reimburse FWWR the entire cost of all FWWR Services, as depicted on
Exhibit C, in the amount of Forty-Four Thousand Eight Hundred Eight Dollars and 29/100
($44,808.29) ("City Reimbursement"). City also agrees to reimburse FWWR for FWWR
Services costs in excess of City Reimbursement(the "Excess Costs"), if any, unless such Excess
Costs are due to the cause of FWWR. Excess Costs which cause the City's total expenditure to
exceed the City Reimbursement by One Hundred Thousand Dollars ($100,000) or greater will
require additional City authorization before payment can be made.
City also agrees to provide for the Project, at the City's sole expense, relocation of the
traffic control system including but not limited to, all signs, signals, markings, other warning
devices,and their supports along roadway approaches and at grade crossing and a Traffic Control
Plan as needed (collectively the "City Work").
City intends to self-perform the City Work. City is self-insured. Prior to beginning of
work on the FWWR's right-of-way, City will provide FWWR a copy of the City's self-insured
documentation. City's contractor(s) and subcontractor(s), if any, shall provide FWWR a
certificate of insurance covering the below listed insurance coverage:
Comprehensive General Liability Insurance—Amounts:
Bodily Injury & Property Damage $2,000,000 each occurrence
$2,000,000 Aggregate
Products & Completed Operations $2,000,000 Aggregate
Or
Combined Single Limit $2,000,000
This insurance shall be kept in force until the work described in this contract on FWWR's
right-of-way has been completed and accepted by the City of Fort Worth.
FWWR&City of Fort Worth 2
Traffic Signal Improvement Agreement
8"'Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01
i
i
FWWR shall be included as an "Additional insured." A "Waiver of Subrogation
Endorsement" in favor of FWWR shall be a part of each policy. The City's contractor(s) and
subcontractor(s) shall be responsible for any deductibles stated in the policy(s).
No work is to be performed by the City, City's contractor(s) and subcontractor(s) until
they have provided prior notification to FWWR's dispatch office (817) 731-1180 and the
Director of Planning/Special Projects, at(817)201-4450.
FWWR shall not be liable to the City or the City's agents, or employees for any injury
to person(s)regardless of cause or of any fault or negligence of FWWR, its agents or employees,
occurring while they are performing services for or on behalf of the City, and the City does
hereby release FWWR from any and all liability and causes of action with respect thereto.
To the extent allowed by law, the City shall indemnify and hold harmless FWWR from
any loss, damage, injury, death, liabilities, claims, fines, actions, costs or expenses whatsoever,
including attorney's fees, which arises as a result of any and all actions of the City, City's
employees or contractor(s)/subcontractor(s), whether such actions are intentional or not.
The City agrees to have its contractor(s)or subcontractor(s), if any, abide by and comply
with all applicable laws, statutes, rules, and regulations of any federal state, or municipal
authority, or any other public body having jurisdiction, including without limitation, laws,
ordinances and governmental regulations controlling air, water, noise, solid wastes and other
pollution, and environmental damages, and to file all reports or statements required in
connection with the conduct of its business in the conduct of its operations hereunder. The City
will provide in its contract with its contractor(s) that the contractor(s) shall indemnify and hold
harmless FWWR from any and all loss, cost or expense whatsoever, incurred by reason of any
violation of such rules and regulations.
If a contractor(s) is to do any work within or upon FWWR's right-of-way or any other
FWWR property, then City shall require its contractor(s)to execute FWWR's form Temporary
Right of Entry Agreement (hereinafter called "TROE"), City acknowledges such requirement
and will inform its contractor(s) of the need to execute the TROE. Under no circumstance will
City's contractor(s) be allowed onto FWWR's right-of-way or any other FWWR property
without first executing the TROE and FWWR retains the right to remove any contractor who
has not executed the TROE.
It is further agreed that the execution of this Agreement shall not constitute a waiver by
FWWR, with respect to third party claims asserted against the City and the City's contractor(s)
and subcontractor(s), of any defense allowed by law.
FWWR&City of Fort Worth 3
Traffic Signal Improvement Agreement
8th Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01
The terms of this Agreement and all rights and obligations hereunder shall be governed
by the laws of the State of Texas.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed in duplicate on the date herein written.
Executed this 26 day of April 2022
Fort Worth & Western Railroad Company: City of Fort Worth
By: i By?",
,
Kevin Erasmus, President& CEO Dana Burghdoff,
Assistant City Manager
�,davnan�
pF°FAR T�0
p�o �Q�� Attest:J ette S.Goodall(Apr 27,202213: CDT)
0
v o 0 2 City Secretary
Pa0000
o
°°°°°°°°°° b (Seal)
n �EXASoAp M&C N/A
Date: N/A
Form 1295 No. N/A
APPROVAL RECOMMENDED:
William Johnson
Director, Transportation and Public
Works Department
Contract Compliance Manager:
OFFICIAL RECORD
FWWR& City of Fort Worth 4
Traffic Signal Improvement Agreement CITY SECRETARY
81h Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision FT. WORTH, TX
Document No. 20220411-01
By signing, I acknowledge that I am
the person responsible for the
monitoring and administration of this
contract, including ensuring all
performance and reporting
requirements.
/flfe ff - r ,utlha
Mal Shrestha(Apr 20,2022 10:34 COT)
Project Manager
Approved as to Form
WA
Mack(Apr?S.202212:44 CDT)
Douglas W Black,
Sr. Assistant City Attorney
OFFICIAL RECORD
FWWR&City of Fort Worth CITY SECRETARY 5
Traffic Signal Improvement Agreement
811 Ave. and Windsor Place, DOT#797685J FT. WORTH, TX
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01
Exhibit "A"
rr
o ,o
1
pr fir-
Iwo
-
iA
i -
FWWR&City of Fort Worth 6
Traffic Signal Improvement Agreement
81'Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01
Exhibit "B"
;. •x 'FFFJ
m z,
pp - a_ P
6 •
I
i 21l t
J s - *' A-^
— TH
w,
[- ---1 -
-1
1 1
01
Pz
I , •" , 1 I 1�■9��ti 1 I
• 3' 1 . 1 I 1 1ll�x I ,
I i I I I i I I I
L__ I
� a� d d A �.kolo�� ❑4®I� .t-P
le
jr Al
silI AYI'•1 -W NI Ai,7z'TPAFFK7 SIGNAL I.WW)VF.WN-F%
FWWR&City of Fort Worth 7
Traffic Signal Improvement Agreement
81h Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01
i
ppk�� It
8 y �
I � rc.'_'� f.'v:•tlf rill
..-•-�---.-- .�.... ,.�_f.. ����
:If=fir •I F--
._.._.__._...
.. .rt u
'M
I
rg �fj% _
!9 w, 1.
Z y'
!l 10
e i „
Ml.�vFKF rF A r WND90R PLACE-?PAFFt[SWINAC R -w'svE.FIEws
FWWR&City of Fort Worth 8
Traffic Signal Improvement Agreement
81h Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01
7'
3
I aq
F
7 r.. .
+ Pn 7 F vk
E / F
zj
W NWW W W
n GG11
O n
r
MI 1 VF'N.iF.IT WiNFIV*M.ACP.TRAMC SIGNAL kFM1VEWN`1
FWWR&City of Fort Worth 9
Traffic Signal Improvement Agreement
8th Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01
_� I
I
P
I
y -
5
!NTH ;''E' 1E
r �
RTII A WN E AT WlNI1.SLIR FI A0 TRAFX'IC 44NAL I%VItr)VI 5K 1 5
FWWR&City of Fort Worth 10
Traffic Signal Improvement Agreement
8t"Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01
Exhibit "C"
FWWR SERVICES COST ESTIMATE
8th Avenue and Windsor(DOT 672914D) Signal Rehabilitation Project Amount
FWWR Project Cost $5,403.64
Signal Modification Cost(see attached CDL Electric Company, Inc. proposal) $7,469.68
FWWR Administrative Cost (10%of Signal Modification Cost) $749.97
Flagging Cost(27 days @ 10 hrs.per day(includes 2 hrs.per day at over time rate)) $31,185.00
Total $44,808.29
FWWR&City of Fort Worth 11
Traffic Signal Improvement Agreement
8'Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No 20220411-01
CDLw Proposal
Railroad.kgnal Dnon
00M, i c;,;1:p.)d t' rtAc nv sooutkms Lea N.WoMmk:eror P4=buq,a®M
Ph,(QQ13314MG wr�r.odrriK#k mr
PROPOSAL SUBMITTED TO: PHONE: DATE:
Foot Furth&WastQm (866)U99 2826 fatmm 3,2>S"
5TRFFT: JOB V kME:
6300 R.idglaa PL, 5ts 1100 Prima Cabla Instal3arian(672 914 D)
CrlrY,STATE mad ZIP CODE: JOB LOCAT141s:
Fort Worth, TX 76116 8'&Wimilsor
COrr ACT: JOB N.rj1.\M
$ill Paritar-wrp ii.iu%zslat XCP-1101
lira barab-� sub=t spec:ficanDm and as==ws for
R-03LIlGi__ nCable R"&Windsor ffi7?914D:
CDL Electric proposes to maha modiEcadimss at the location listad abovv.Incbadad in this propoul is
the numriz:. labor, and equ ipasaot to instill a mar pn=ptim cable at to locz6na listed above.At
this tom,tho Cirv's contractor wM b4 pre i&ng and aum fling tba preempdon boar.A,ftar all
modifisatiatls nra complete,wn WM POPM-h-tuSt and g:aca tba MMMiag Mtom bash in smlrica.
Any e:srhaad or w3daaFo=d utiiEities that mzv inro_am w th rha inst Oawa or proper operabon of
t6.a proposal work mast ba relooftd at the azpanso of otan. C.D-L.Elactrsa,Iacorporatad vrM not
bib respousiblo for any cosr(%; assaciatnd wrth:abor or matarialts)rKuixod to reiocare ntiliaes at this
location_
If concsata,asphalt or any other typo of roadMW4`wa&-ay material must bo ramavvd for tba proper
installation and operation of the proposed work,titan addiiticaal chargas may apply. C-D.L.Elactnc,
Iacarp=orawd will not ba rospon-mblo for any cost(s)associated with labor or mataria.l(a)ray replace
caacroW asphalt or ant otbar taupe of roadss-aT wal way*matmtal ivmn4-ad during tlaa installaton
process of tho proposed simud rsatarial.
Wa bomby p ropDw m&sris a r u mrial and labor—camp7Am=ascard mw w2h abmv spxmfimoak for d a sum
of 27. 0..69.
Ile prise bceakdovn is as-foIlam:
Mwterial-Sea hams an Mwmral List and HzwEing Gauges: 1944.69
Labor-Cmw Mobilisat A Clow Iu;all.C'ffica;np£m-t,ProjectMMmt.: 53,0 0.00
FgoipmQnt-Trua(s)wrath Trallar(s),lei wnitar
Total SalUn t Rnco: %7r4-64.69
FWWR&City of Fort Worth 12
Traffic Signal Improvement Agreement
81h Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01
RCP-1101.Preeroptson Cable.P&Windsor j672 914 Da continued-
PROPOSED MATERIAL(MEW StJBJ =TO CHANGE AS REQUIRED) QTi Y UM
CONDUIT,FTrMGS,ELBOWS I LT
CABLE,SIGNAL U.G..12 CORD. 14 AWG 50 Fr
14IISC_WIRING,TAGS,LABELS I LT
Please Note the fallowing:
I. Proposed Pricing is valid for Ninety(90)days ftam the dace of this Proposal,beyond 90 days prices are
mbject to change
2. Proposed pricing is based an Lamp Sam
3. Tons:Nat Duo 30 Days fian Invoice Ddo
4. This proposal may be wWidrawn by as if not accepted widbin M%V. (90)days
S. Craw labor will be paid per their standard pay wages with overtime whan applicable,and iachide standard
benefit pactage as outlined in th&employee handbook
6. Pticing is based on craw being allowed to wort mmrestrictod hags scm days per week
7. If traffic control for the public roadway,other than typical"Crew WoftW type dgnage is man&ted by a
tWrd pasty,thca outer CbKV s May S*y
S. When applicable,existing sad matic waming system will be mm ved and aamaported to nearest railroad
yard
Au xe Signature:
bosh S
VP,Railroad Construction Services
j9*.*=Mh b&4k1MpWA.
(417)209-7962
-AD msmW is_-=Veedvo be u gecffhed_fl wod[to be camkKed m a wa&mm1Ae xcmdw m-izodsdptamres.Any ahmam or
desk frm sbm-e 3ped5ca s Mvulrh2g 0=cosh wLl be emorted only upon wmmn aruers and soli became in dnW aster md 3bam
the es� AZ CMDr n upon mar,aced or Ma-s besvod am con1101 ORMer to=Sn-.tm=&Sad odw wmaz y
=Emu.Our wcdw,are Uly crosff db5 Riadmufs Campemaamlmmmce.
Acceptance of Proposal—the above prices, specifications and conditions are satisfactory and are
hereby-accepted_You are authorized to do the wo&as specified_Payment will be made as outlined
above-
Date of Acceptance:
Simature:
Signature-
FWWR&City of Fort Worth 13
Traffic Signal Improvement Agreement
811 Ave. and Windsor Place, DOT#797685J
MP 1.95, Fort Worth Subdivision
Document No. 20220411-01