HomeMy WebLinkAboutContract 57453��.l� (5���}LT
�i��' �'�� P��.��.
CSC No. ��4�3
, ----�
/�� �e���f�u�taa� .r =
�V�� ������'} " __'�'4. c.. � _ •—.—
CONTRACT
TOR
'I`IIE CONSTRUCTIOliT OF
�02� BRIDGE REHABILZT`A'TZON C�NTRACT �
City Prajec# Na. 1.Q34�6
Mat�ie Parket•
Mayor
David Coo�ce
Gity Man�ger
W illiam Johnson
Duector, Transpa�•tation and Public Wor!<s D�partment
Pxepared �ar
The City of Fort Worth
TRANSPORTATION AND PUBLIC WORKS
aozr
l����9k�a �E���3D
� :�°�' ���R�f�R�
' `wa; 1e'A��y �:r
�� � _ � ��"�
� �� �
��t ���'����T�rt�
�
Standard Construction Specification
D ocunc�ents
AdoptedSeptembe�•20i 1
00 0'0 OD
STANDAIiI] CONS'TR[7C'fION SP�.CIFICATCON DOCUMENTS
Page 1 of 2
sEcrioN ao 0o aa
TABLE OF CONTENTS
Di�ision OD - General Conditions
Last Revised
00 OS I O Ma. a�• and Council Commr,anication 07/01/201 I
00 OS 15 Addei�da 07/Q1/2011
00 l 1 I3 In�itation to Bidders 07/19/2021
00 21 13 Instructions to Bidders 11/02/2021
00 35 13 Conflict af Interest Statement D2/24/202b
00 41 Qp Bi�i I'az•m p913Q/2D21
QO 42 43 Pro osal Form Unit Price �9130/2021
04 43 13 Bid Bond �9130/2021
00 43 37 Vendor Corri liance io State Law Nonresident Bidder 05/27l201 I
00 45 26 Co��tractor Co.m liance with Warkers' Com ensation Lavv 07/0 1120 1 1
00 45 �0 Business E ui Goal 10/27/2021
00 52 �3 A �eement 11/23/2021
00 61 13 Performance Bond 07101/2bl 1
00 b� 14 Pa ment Bond 07,�01/2011
00 61 19 Maintenance Bond 47/O1/2011
00 61 25 C�rt�ficaie of Lnsurance 07f01/2011
00 72 00 Ganera[ Condrtions 08/23/2021
00 73 00 Su lementar Conditions 03/09/2�20
Division O1- General Re uirements Last Revised
O1 1100 5ummar of Warlc 12/20/2012
O I 25 DO Substitutian Procedures 07/01/2011
Q13119 PraconstructionMeetin 08/17/2012
O 1 3] 20 Pro'ect Meetin s a7/01 �'2011
O1 32 16 Canstructioz� Schedule a8/13/20l l
OI 32 33 Precanstruction Videa 07/01/2011
O1 33 00 Submittats I2120/2012
O1 35 I3 S ecial Pro'ec� ProcedUres I2J20/2012
O1 45 23 Testin and Ins ection Services �3109f2020
O1 SO 04 Tem oE•ar Facilities and Controls 07/01/2011
OI SS 26 Street LTse Permit ar�d Madificatians to Traffic Contral Q3I22I2�21
0 i 57 I 3 Siorm Watez� Pol[ution Prevention Plan Q7/01I2011
01 58 I3 Tem .orar Pro'ect Si n e d�/01/2011
01 60 00 Praduct R� uirements 03/09/2020
� m m��
OI 70 00 Mobilization and Remo.bilization I 1/22/2016
�1 71 23 Construcfion Stakin ar�d Surve �2/14120i8
O1 7A 23 Cleanfn 07/�1/2011
01 77 19 Closeout Re uirements 03/22I2021
O 1 78 23 O eration and Mainteilance Data 12/20/2012
�1 78 34 1'ro'ect Record Dncuments 07/01/2011
C1TY OP FDRT WORTH 2O22 BridgaRehahilihationContraot 2
STAIVDAR� CON5T[�UCTTON SPCC�'ICATION DOCUIVIL•�TS City PrajecC PIo. 103456
Revised Alovember 2, 2021
00 Ofl DO
STANDARD CONSTItUC'J'ION SPECTFICATI03+! DOC UMENTS
1'age 2 nf 2
Technical Specifications whzch have b�en naodified by �he Engineer s�cifically%x this
Pro,�ee�; hard copies are included in th.e Project's Confiract Documents
34 71 13 Traf�c Contral
��II30T Specifications for Constructian andll7aintenanee vf Highways, Streets, and
Bridges 2014 adopted lry the Texas Department of `.�ansportaiian are included for this
pra,�ect by reference and can v�ewa�ldownloaded from 'I'ADOT's website address below:
https : l/ftp, txdflt.�ovlpubltxdot- infolcm dlcs ezwelspecs/2014/standardlspe cbook-2014. pQif
Itea�z l. Q4
Item 132
Itam 360
Item 420
Itern 429
Item 432
Item 43 S
Item 450
Item 45.1
Item 454
Item 496
Item 54Q
Item 542
Item 544
Item. 545
Item 776
7tem 780
Item 7{l9
App�ndia�
GC-6.06.D
GC-6.07
GN 1.0
SD-1.0
Renaaving Concrete
EmbanZcment
�oncrete Pavem�nt
Concrete Substruatures
Concrete 5trueture Repairs
Riprap
Clcaarung and Sea.lizig 7oi�ats
Railing
Retrofit Railing
Drain.age 5ystern Cleaning
Reznovi�rig Struciures
Metal Beam Guard Fence
Removing Metal Beam Guard Fen.ce
Guardrail End Treatments
Cras� Cushion Attenuaiors
Metal Rai7. Repair
Goncr�te Crack Repair
Miscellaneaus
Muaority at�.d Wamen Owned Business Enterpri�e Compliance
Wage Rates
General Notes
5tandaxd Constructian Details
END OF SECTION
CTTY QF FORT �VORTH 2O22 Bridge Rehabilitatzon Contract 2
STANDARD COIVSTKi7CT'TON SP�CIF'ICATIOIN DOCUMEiNT5 City Froject No. 103456
12evised Naveinber 2, 2021
�I#y �f Fort W�rklw,
[I��yor �n�
�exa�
��un��E ��fi-r�r�ur-�i��ti��
�#7T�: �3J0$��2 M&� FILE 3+lUMB�R; h�S&� ��-Q1�0
LOC, NAM�: �020�? �Rf�G� REli�SII.I�A�ION ���FiR�CT 2
S�JBJECT
��D 2, �!] d, �D �, �€� 7. �� 8�nd �� 9} �u#ho��ze �xe�u�lan o# a�antea�t wfth Gibsor� an� Associai�s Inc.. in #h� Amoun! o! $679,��6,8� ior
#ktie Reh�ba�ita�lo+� of Vari��s B�dge �eclions
F�� �0�41�� CV DA�' ICI h1:
3t �s r��arr�mended that !he �Ity ��unclf a��harl�$ exa�utl�n of a Gonir��cR wilf� �Ib��r} �nr3 J�s�o�l�kes Inc_, In Che a�tiaunt of �67�.6+4�_60 �or
refit�bllil�tYo� �f v�r�ous bNdge �ectl�ns ior ��e 2�22 Be+dge I�ahabHilat�on �antrack �.
[}�S�iJSSIDAI:
1-�� Flsc�l Y�rr�r �.D�� ��y-�a ��r�lfeck �treefi ��laint�nance Program g�ou�+s v�ri�us �ypes of i�rld�e malntenan�e pro�ec#s insa s�e��fEc �on!{act
pacicages, Tha �0�� Brrtt�a R�E,�b311takion �onlr��i 7�rovl�l�s brld�� rehabllila#�on far �� brldfle se�;�lons undar En� �nnlre�t Siraet t,�leintena�rce
Progra�n ��f6y �r€�Jec� �fo, 9�3ii`x6}
C�nstrucl�an fo� lf�ks praJ��t ls ex}�e�tad ta sEael Iri ���ly �p2� €�rsd to foe compl�ie� by sU�nr�ar 242�. T�er� Is r�a �nllcl{�a#C�d �rn�act on the Gerie�al
Fund oF�e,raling burJg�l upon oon��leilor� ofi lF��s car��racl.
7hke pr�jec# was advartlsed for brd �n �]eGernbe� 16, �021 and �7aoember ��. 202'i, In I�+� �'orf lNo��r .S��r-Tele�ram, Or� January 13. 24�2, Ih�
fo1�Qw'��rg bld6 w�rB rB�eiVe�'
Bidd�rs II Amaunt
�Ihsar� & Assflr,latos Ir�c, �67�,6�6.
��Ibean �r�ter�rises �72�,01 �4,
IaCTX -- -- — — �76�.6�7.
R�gle Irtc, �77Z.37D.
1�+�+W�� OFFI�� _�li�sor� � AssocEsies I�c, is i� c�m3�N��te wl�� �he �ily's �usiness �quixy �rdlr���s�e by �ommi�kang �0 2��� eusi�ess E4�Hy
�articEpa[ran or� k1�is prn;c��c�, �he �Ily's ��51�ess �qui�y goal on k�i�s �sraJ��l I� �3°�a,
F�nding is ��dgeted ir� t�re TPUY f�ev1 Nt�hw�y 8� �Ereeis l]e�artment'a �aneral �aplt�l Rtp�eqts ��rs� f�r �h� purpose of fun�lr�g the ���� �rldge
Rehat�;F�ra�lun v{�Je��, �s app�opE,a�o�,
T�ese ptojecls �ro lo�k�d In C�UN�IL DI$TRl�T� 2. 4, �, 7. 8, �n[i 9,
F�SCAL INFORMAilO�f � ��I�Ll�J�A7��f�''
�I�e �ifectar oi ��na�rCe Cerllfle� k11�4 funds are a�+alEa�le in khe curr�nt C��IS�f budgal, as pF��+i�usly ap�raprlaEed, iri tn� �eneraM Ca�llal
t�ro��cks Fund �csr �02� Bridge I�eha� �or�irack 2 prp�c.�Ct 4o srr�7�urt the appr�val o� the aba�ea recomr�r�r��atior. and execut�on oi k�re rontr�ct.
Prlar [n any expendlluro beln� In�urred, Rt�e 7ransp�rtel�an and Public 1�.+�rks Depar�rnerrt ��s the res��nalb+liiy l� v�lid�ie Ri�e �veila�rlliry �f �ur�ds_
SuB�itt�d for C�#y..M���r.'s O�fEc� b� �ana Bur�hcfnif ��1Es
�r�ginatan� �usGr,es$ tJni� Head. U�Illl�rr� .fohnson �'S� �
Ad�ltion$I Inf�rrn�tion �nrftao#: �farfly �l�II ��6�
00 I1 13
INVITATION '1'p BIDDERS
P�ge 1 of 2
SECTIDN 00 1113
TNVITATION TO BrDDERS
RF�CEIPT OF BIDS
Sealed bids for the construction of 2022 BRIDGE REHABILITATION CONTRACT 2, City
ProjectNa, 103456 vai� be recei��d by the City of Fort Worth Purchasing Of�ce untiI 1:30 P.M.
C�T, Thursday, JANUARY 13, 2022 as further described belnw;
C�iy of �'ort Worth
Purchasing Division
200 Texas Street
Fort Worth, Texas 76142
Bids will be accepted by; iT� Maii, Courier, FedEx or hand delivery at the a.ddress above;
Bids will be opaned publicly and read aloud at 2:00 PM CST in the Cit�r Council Chambers.
GINIItAL DESCRIP'TION �F WORK
Th� major wark wilI consist of the (approximate) fallow ing;
152 SY Concrete Pa�ement
498 SF GoncreteStructuralReparr
1 EA Crash Attenuator
390 LF Rail
PREQUALIFICATION
Cer�ain improvem�nts included in this praject must be performed by a contractor or desi�nated
subcontractor whn is pre-qualified by the C'rty at the time of bid opening. The procedures for
qualif'ication and pre-qualification are outflned in the Section 3 of 00 21 13 — INSTRUCTIONS
TO BIDD�RS.
DOCCIMENI' EXAMINATION AND PROCURT�VIENTS
The Bidding and Contract Documents may be examined or obtainad on-line by visiting tk�e City
of Fort Worth's purchasing Divis'ron vvebsiis at http://w ww.fortwoithtexas. �ov/purchasin�/ and
clicking an the link to the advert'rsed projeet folders on the City's �Iectranic dacument
management and callaboration system site. The Contract Documents may be downloaded,
viewad, and printed by interested contractors andlor suppliers.
Capies of the Bidding and Coniraet Documents may l�e purchased from Nikki McLeroy. 817-
392-8363. City of Fort Worth, TPW, 200 Te�as St., Fort Worfh, TX 76102.
The cost ofBidding and Contract DoczunenCs is: $30.Od
EXPRFSSION OF INTIIt,.�FST
To ensura poteniial biddars are kept up to date of any new information pertinent ta t�is project, all
in�erested parties arc requssted ta email Expressions of Interest in this procurement to the City
Pro�ect Manager and the Design Engineer. The email should include xhe company's na�ne,
contact persan and that individual's email address and phone number. All Addenda will be
distributed directly to those who have expressed an interest in the procurernsnt and wiU aiso he
posted in the City of Fort Warth's purchasing website at httpJ/fortworthtexas.govlpurchasing/
CI'FY �F FORT WORTH 2D22 AridgeRehal�ilit�tion ConfracC 2
STANDARD CQNS'ERUGTIqN SPECIFIC.ATI4�T DOCi9MEi�TT City p�jec# No. i03436
Revised 7/1912021
00 I1 13
INVITATIQN TOBiDDERS
Paga 2 af 2
PREBID CO 4+ CE -- Web Conference
A prebid conference will be held as discussed in Section 40 21 13 - INSTRUCTIONS TO
BIDDERS at the following date, andtime wia a web conferencing applica#ion:
DATE: Wednesday, Decembej• 29, 2021
TINI�: I0.00 A.M.
Invitatians with links to the web conferencu�g application will be distributed directly to those
who have submitted an �xpression of Interest.
If a prebid conference is held, the presentation and any c�uestions and answers provided at the
prebid conf�rence will be issued as an Addendum to the call far bids. If a prebid conference is not
being held, prospective bidders ean e-mail questians or comments ir� accorda�ce witYi Section 6
of the Instrucfiions to Bid�iers referenced above to th� project rr►anager(s) at the e-mail addres ses
listed below. Emailed questians r�ill suffice as "questions in writing." If necessary, Addenda will
be issued pu�•suanttfl the Instructions ta Bidders.
CZTY'S RTGHT TO ACCEPT ORRE�ECT BIDS
City reserves the right to waive irregularities and to accept or reject any or all bids.
AWARD
City wi11 award a contract to the Bidder presentuzg the Tow�st price, qualif'ications and
campetencies cansidered.
F[JNDING
Any Contract awarded under this INVITATION TD BIDDERS is expected to be funded from
revenues generated from bonds, grants, etc. and r�served by the City for the Project.
INQUIRI�'S
All inquiri�s rela�ive to this procuretnent should be addressed to ihe following:
Attn: Iretomivra Otuyelu, City oiFort Worth
Enaail: iretomivra.otl.� el�.i fortworthtexas. w
Phone: 817-392-6747
ADVI+;RTISIIVIT,NT DATI'S
December 16, 2021
December 23, 2021
IND OF SECTION
CITY OP!'OR'I' 4VORTH 2O22 BridgeRehabilitatianConttaci2
STANDARD CON5TRUC1'ION SPEC�jCA'CION DOCUM�NT City praject �Ya. 103456
Revised 7/19/2D21
00 21 13
INSTRiICT10NS 1'O➢]DDERS
Page 1 of 8
SrCTION 00 2113
INSTRUCTIONS TO BIDDERS
1. D.efined Terms
I.1.Capitalized terms Used in these INSTRUCTIONS `I'O BIDDERS are def�t�ed in Section
00 72 00 - GENERAL CONDITIONS.
1.2.Certaic� addittonal terms used in these INSTRLTCTIONS TO BIDDERS have the
meanings it�dicated below which are applicable to both the singular and plural ther�of.
1.2.1, Bidcier: Any person, ficm, partnersl�ip, company, association, ar carporahon acting
dir�ctl� through a duly authorized r�presentative, submit�ing a bid for performing
the work cantemplated under the Contract Documents.
1.2.2.NonresidentBidder; Az�ty p�rson, firm, par�ne��ship, cocnpatly, association, or
corporatian acting directly through a duly authorized representative, submitting a
bid for peefornning the work contemp3ated under the Contract Documei�ts w�ase
principal place of busit�ess is not in the State of Texas.
1.2.3. �uceessful Bidder; The ]owest responsible and responsive Bidder to wiaam Citiy
(on the basis oiCEty's evaluation as hereinafter provided} mal�es an award.
2. Capies of Bidding Documents
2.1 Neifher City nor Engineer shall ass��me any responsibility for errors or mis�terprefiations
resUltin.g from the Biclders �se �£ incnmplete sets of Bidding Docutnents.
2.2.City and Engineer in making copies nf Bidding Documents available do so only for the
purpose of obtaining Bids for the Work and do no# autharize or confer a license or grarft
for any other use.
3. Prequalification of Bidders (Prime Contract4rs and Subcontractors) ONIITTFD
4. I`+.xaminatian af Bidding and Contract Documents, Other ReIated Data, and Sifie
4. I. Before s ubmitiing a Bid, each Bidder:
4.1, l, Shall exarnine and carefuIly study the Contract Documents and a.thar related data
identi�ed in the Bidding Documents {inc3uding "technical data" referred to in
Pai�agraph 4.2. below). No infnrination given by Ci#y pz• any representative of the
City ather than that contained in the Contract Documents arid officially
promulgated addenda thereto, shall be binding upon the City.
4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general,
1ocal and site canditions that may affect cost, p�•ogress, performance o� f�rnishing
of the Worl�.
CdTY OiF FORT W012T�I 2022 Bridge lZehabiliiation Coniracl 2
STANQARD CONSTIZUCCFON SPECIFICATIQN �OCUIbIEN"f' City Project No. 103456
RevisedlUpdated November2, 202i
002113
1NSTRUCTIpNS TO I3IDD�RS
Page2of8
4.1.3. 5hall consider fede:ral, state and lacal Laws and Regulatrons tl�at may affect cost,
progress, perfar�nance nr furnishing of the Work.
4.1.4. OMiTTED
4.1.5. Shall study all: (i) reports of explorations and tests af subsurface condiiions at or
contiguous ta the Site and alI dr•aw ings of physica] conditions relatir�g to existing
surface or subsurface sb'uctures at the Site (except Undez•ground Facilities) that
have been identif'i�d in i11e Contract Documents as containing reliable "technical
data" and (u) reports and draw ings af Hazardous Environmental Conditions, if any,
at the Sike that have been ident�ed ita the Contract Doc.uments as containing
reliable "technical data."
�4.1.6. Is advised that the Contz�act Documents on file vvith the City shall constitute all of
the information which the City will furnish. All additional i�r�formation and data
�rhich the City will supply after promulgation of the Fflrmal Contract Documents
shal] be issued in the form oiwritten addenda and shall become part of the Contract
Documents just as though sUch addenda were actually written into the original
Contract Dacuments. No information givan by the Ciry ather than that cnntained in
tne Cantraci Docurnents and officially proinulgat�d addenda thereto, shall be
binding upon the Cit�.
4.1.7. Should perform independent resea�-ch, in�estigatit�ns, tests, borings, and such other
tneans as may be necessary to gain a camplete knawl�dge of the conditions which
wiil be encountered during the consiruction o�'the project. For projects with
restricted access, upon request, City may provide each Bidder access to the site to
conduct such examinaiions., investigations, explorations, tests and studies as each
Bidder deems necessary for submission of a Bid. Bidd�r z�iust fill all holes and
clean up and res�ore the �iteto its former eonditions upon cotnpletion of such
explorations, inves�igations, tcsts and studies.
4.1. S. Shalj determine the d�ficulties of the Work and a�l aftending circumstances
affecting the cost of doing the Work, time required far its campletion, and obtair► all
information required tn make a proposal. Bidders shall re[y exclusively and solely
upon their ovvn estimates, investigation, research, tests, explorations, and oti�er data
which are necessary far full and complete information upan whick� the proposa] is
to be based. It is unders.tood that the subm�ssion of a proposal or bid is pz'ima-facie
evidence that the Bidder has made ihe investigations, examinations and tests �erein
required.
4.1.9. Shall promptly notify City of all conflicts, errars, ambiguiiies or discrepancies � or
between the Contract Dncurnents an�l suc11 ofi.her related documents. The Contractor
shall nat taice ad�antage of any gross erroi- or omission inthe Cont�•act Doeuments,
and ihe Ctty shall be permitfied to make s:uch corrections or interpretations as may
be deemed necessary for fulfitlment of the intent of the Contract Documents.
4.2. Reference is madeto Sectian 00 73 DO — Supplementary Conditions far identif'ication of:
C17'Y OF FORT WORTH 2O22 8ridgeRehabilitatioRContract 2
STANDARD CONSTRUG'fIQN SPECIFICATION D�CUMEN'i' City Project Nn. 10345b
IZevisac]/Updated November 2, 2021
aa z i i3
INS'1' R[ICT IONS T O Bll]1]EE�S
Page 3 of $
4.2. L those reparts of explarations and tests of subsurface condition� at or cantiguous to
the site which have been utilized by City in prepa�•ation o�the Contract Dacutxzents.
The lags of Soil Borings, if any, on the plans are �or g�neral information only.
Neither the Ciry not' the En�ineer guarantee that the data shown is representatrve af
conditions wlaich actually exis#.
42.2. those d�•awir�gs of phys ica[ canditio»s in or relating to existing s uxfac� and
subs�rface siructures {except Underground �'acilities) which axe at ar contiguo�as ta
the site tt�at haue be�n utilized by City in preparation of the Canta•act Docuinents.
4.2.3. copies �f such reports and drawings wilI be made availa�ale by City to any Sidder
on request. Those repotts and d.rawings may not be part of the Cont�•act
Documents, but the "technical data" contained therein upon which B�ddee is entitled
io rely as provided in Paragraph 4. 02. of the General Conditions has been ideniified
a��d established in Paragraph 5C 4.02 of the Supplein�ntary Conditions. Bidder is
responsible for any interpretation or conc lusiqn drawn from any "technical data" nr
any other data, int�rpretatians, opinions or information.
4.2.4.5tandarci insurance requirements, co�arages and limits.
4.3.The submission of a Bid wil[ constitute an incontrovertible representation by Bidder: (i)
that Bidder has complied with every r�qu�remei�t of this Pa��agrap114, (n} that rvithout
exceptinn the Bid is premised upon performing and furnishing tl�e Work required by the
Contract Documents and applying the specific means, methods, fechniques, sequenees ar
procedures of constniction (if any) that may be shown or indicated or expressly required
by the Contract Documents, (iu) that Bidder has gi�en City written notice of all
cnn�ficts, errars, ambiguities and discrepancies in the Gontract Doct�nents and the
writ�en resalutions thereof by City are acceptable to Bidder, and when said conflicts,
etc., have not 6een resolved through the interpretations by City as described in
Paragraph 6., and (iv} that the Cantract Documents are generally sufficient to indicate
and canvey unders.tanding �f all terms and conditions for perforening and furnishitlg the
Work.
4.4.The provis[ons ofthi� Paragraph 4, inclusive, do not appIy to Asbestos, Polychlorinated
biphenyls {PCBs}, Pe�roleum, �lazardous Waste or Rac[ioacti�e Material cavered by
Paragraph 4.06. of the General Conditions, unless specifically identifiet[ in the Contract
Documeilts.
5. Availabiiity of Lands for Work, Etc.
5.1.'I'he lands upon which the Work is to be performed, rights-of way and easements for
access thereto and other iands designated for use by Contractor in perfarming tha Work
are identified in the Contraet Documents. Ap additional lands and access thereto
required for temporar}� construction facilities, cnnstruction equipment or storage of
materials and equiprnent to be incarpoz•ated in the Work are ta b.e obtained and paid far
by Gontractor, F�asements for permanent st�uctures or permanent changes in existing
facilities are to be obtained and paid far by City un[ess otherwise provided in the
Contract Documents.
CTI'Y OF FpRT WQRTf3 2022 BridgeRehabilitat�on Contract 2
S'�'ANDARD CONS"fC�UCCIQI� SPECIFICATIbN DOCUMENT City Project No, 103456
Ra�isedlllpdated Novemher 2, 2021
qp 21 13
INSTRUCTIONS TO BIDDERS
Page4nf8
5.2.Outstanding right-of-way, easements, andlar permits to be acquu•ed by the City are listed
in Paragraph 5C �.01 of the Supplementary Conditions. �n the event khe necessac•y right-
of-way, easements, and/or permits are nat obtained, the City reserves the right to cancel
the award af contract at any time before the Bidder begins any constructian wor[c on the
praject.
5.3. The Bidder shaIl be prepared io comrnence cot�stn.iction without all executed righ�-o%
way, easements, and/orpet-mits, and shall submit a schedule to the City of how
construc.tion wili praceed in the other areas af the project t�►at do not requu e�aermits
and/or easements.
6. �aterpreta�ions and Ac�denda
b. l. A!1 questions about the m�an�g or intent of the Bidding Documents are to be directed ta
City in writing on or before 2 p.m., the Manday prior to tl�e Bid opening. Questions
rec eived after this day may not be responded to. Interpretations or clarif'ications
cansidered necessary by City in response to such questions willhe issued by Addenda
deli�ered ta all parties recorded by City. as ha�ing received the Bidding Documents.
Only ques�inns answered by farmal written Addenda w ill be binding. Oral and other
interpretations or clarifcaiians will be withaut legal effect,
Address questions to:
City of Fort Warth
200 T`exas Sireet
Fort Warth, TX 76102
Attn: Iretamiwa Otuyelu, Transportation and Puhlie Works
Email: ireto�iwa.otuyelu@fortworhtexas.gov
Phone: 817-392-67�7
6.2.Addenda may a3so be issued to naadify the Bidding Documents as deemed advisab�e by
City.
6.3.Addenda or clariFications may be pasted via the Gity's electronic document management
and collaboration system at https:lldocs.b360.autodesk.comishares17b1bfe6e-9bSt�-
4748-b8d4-ccfc2315'f 857
b.4.A prebid conference may be held at the tirne and place indicated in the Advertisement or
INVITATION TO BIDDERS. Representa#ives af City will be present to discuss the
Project. Bidders are encouraged to aLiend and participate in the conference. City will
transmit to a1� prospeciive Bidders of record suchAdd�rida as City c�nsiders necessa�•y
in respanse to questions arising at the conf�rence. Oral statemenis may not be relied
upon and r�viIl not be binding or legally effective.
'�. Bid Security
7.1.Each Bid must be accompanied by a Bid Bond made payable to City in an amaunt of fiv�
(5) percent of Bidder's m�imum Bid price, on the form attached or equivalent, issued
by a surety meeting tt�e requirements af Paragraph 5.01 of the General Cor�ditions.
CITY OF FORT WORT�-I 2Q22 BridgeRehabilitatianContract 2
STANDARD C�NSTRUCTfON SPECI['ICATION DOC[JMEIJT City Projoct No. [(?3456
RevisedNpdated November 2, 2021
00 21 13
1NSTTiUCTIONS TO BIDAERS
Page 5 af 8
7.2.The Bid Bonds provided by a Biddar wilI be retained until the condiiians oftheNotice of
Award have heen satisfied. If the 5saccessful Bidder faiLs to execute and ret�arn the
Contract Documents wi�lun 14 days afier the Notice ofAward con�veying saine, City
may consider Bidder to b� in default, res�ind the Notice of Award and act on tIie Bid
[3ond. Such action shall be City's exclusive remedy in the evern Bidder is deemed to
ha.ve defaulted.
$. Contract 7imes
The number oi days within which, or tE-�e dates by which, Miles#ones are to be achieved in
accordance with the Genera[ Rec�uirennezats a�d the Work is to be completed and ready foz'
�'inal Acceptance is set forth in the Agreemetat nr incorporated therein by reference to the
attached Bid Form.
9. Liquidated Damages
Frovisions far Iiquidated damages are set forth in the Agreement.
1.0, Substitute and "Or-Equal" Items
The Contt'acct, if awarded, �iIl be an the basis of mat�rials and equipment described in the
Bidding Docum�nts without consideration of possible substitute or "or-equal" items.
When��er it is indicated or specified in th� Bidding Documents that a"substitute" oE• °or-
equal" item of inaterial a�• equfpment may be furnished ar used by Con#ractor if acceptable tq
City, application for such acceptanee will not be cansidered by City until after the Effective
Date of the Agreement. The proced��re for submission oiany such application by Contractor
and consideration by City is set fortll in Para�raphs 6.OSA., 6.OSB. and 6. bSC. of the Gene�•al
Cond�tions and is supplemented in Sectian 0125 QO ofthe General Requit�ements.
11. Sub�ontractars, Suppiiers and Others
11.1. In accordaa�ce with the City's Bt.isiness Equity Ordinance No.251b5-10-2021 the City
has goals for the participation of minority business and/az v�romen business
enterpri�es in City contracts � 100,000 or greater. See �eetion 00 45 40 for the
M/WBE Projec� Goals and add�tional requir�rnents. Pailure to camply sha[1 render
the Bidd�r as non-responsive.
Business Ec�uity Ordir�ance No.2S 1fiS-10-2021, as amended (replacing Ordinan.ce
No. 24534-11-2020), codified at:
htt s:lfcodelibrar .aml� al.car�a/codeslftworth/latest/ftwaeth tx/0-0-p-22593
11.2. Na Contractar shalI be required to employ any Su6contractar, Supplier, other person
or organization a�ainst whom Contractor or City has reasonable objection.
12. Bid Form
12,1, The Bid F`orm is included with the Biddin� Docuznents; additional copies may be
abtained from the City.
CITY OF FORT WORTH 2O2.2 Br�dgeI2enabilitationContract 2
STAN]7ARD CONSTRUCTION SP�CIi'ICATION �OCUMENI' CityPmjectNo. ]4345fi
Revised/Updated November 2, 202I
d0 21 13
INSTRUCTIONS TO [3IDD�RS
Page 6 of 8
12.2. Ali blanks an the Bid Form musf be coi�apleted and the Bid k`orm signed in ink.
Erasures or alteratiQns shall be initialed in ink �y ihe person signing the Bid Form. A
Bid price shall be indicated for each Bid item, aiternative, anci unit price itern [isted
therein. In the ease of op�ianai alternatives, the words "No Bid," "No Change," nr
"Not Applicable" may be entered. Bidder shall statethe prices for which the Bidder
prc�poses to do the work contemplated oc furnish materials required. All enfries shal!
be legible.
12.3. Bids by corporations shall be executed in the cnrporate na�ne by tlze �resideni or a
viee-president ar ather corparate officer accompanied by evidence of authnrity tn
sign. The corporate seal shall be affixed. The corporate address and state of
incorporatian shall be shown below the signature.
12.4. Bids by pai�tnerships shal� be executed in the partnership name and signed hy a
partner, whose title must appear under the s�gnaiur� accompanied by evidenee of
authority to sign. The aificial address of the partnership shall b� shown below the
s ignature.
l 2.5. Bids by limited liaiaility companies shall be executed in the name of the firm by a
merriber and accompanied by e�idence of authority to sign. The state of for�nation af
the firm and the afFicial address of the firm shall be shown.
12.6. Bids by individuals shall show the Bidder's name and official address.
12.7. Bids by joint ventures sha11 be executed by each joint venture nl the manner indicatied
on the Bid Form. The aff�cial address of the joint venture shall be shown.
12.8. Ali names shall bE iyped or printed i�1 �lc below the sig�aature.
12.9. The Bid s halI contain an acknowledgement of receipt oi all Acidenda, the numbers of
which shall be filled in on the Bid Form.
I2.14. Pastal and e-rnail addresses and telephane number for cflmmunications re.ga�•ding the
Bid shall be shown.
12.1 I. Evidence of authority to conduct busin�ss as a Nonresident Bidder in the state of
Texas shall be provided in accordance with Section QO 43 37-- Vendor Compliance
to S.tate La.w Nan Resident Bidder.
I3. Submis5ion of Bids
Bids shall be submitied on t1�e pr�scribed Bid Form, provided wit� the Bidding Documents,
at the time and place indicated in the Advertisement ar INViTATION TO BIDDERS,
addressed to P�.irchasing Manager af the City, and shall be enc[osed in an opaque sealect
envelope, marked with the City Project Number, Projecttitle, the name and addrass of
Bidder, and accompa�nied by the Bid security and ather required documents. If the Bid is sent
through the mail or other delivery system, the sealed envelQpe shall be enclosed in a separate
envelope with the notatian "BID ENCLOS�D" on the face af it.
1�. Withdrawal of Bicis
C1TY pF PQRT WORTI-� 2022 BridgeRehabiliiation Contract 2
ST.4NDARD CONS7RlIC1'ION SPEClFICATION DOCLTMENT' City ProjecC No. 10345G
12evised/Updated November 2, 2021
00 21 13
INSTRIICTIONS TOBIDDERS
Page 7 pf 8
I4. I. Bids addressed to the Purchasing Manager and filed with the Pttrchasing �f�'iae may
be withdrawn prior ta the time set for bid opening. A request for withdrawaI inust be
made in writing and delivered fa the Purchasing Qffice tn r�ceive atime stamp prior
to the opening af Bids. A timely vvithd�•avvn bid �w ill ba returnad to the Bidder ar, Ef
the request is withiza one hour a�bid opening, �uill not be read alaud and will
thez•ea�tez• be returned c�nopened.
14.2. In tlae event any Bid for which a withdrawal request has been timely filed has been
[nadvert�ntly op�ne.d, said Bid and any recflrd thereof will subsequently be marked
"Withdrawn" and will be given no fWrthee consideration for the award of coaatrac�.
1�. Op�ning of Bids
Bids will be opened and read aloud publicly. An abstract of the amoLrnts of the base Bids and
major alternates (if any) will be made avaitable to Bidders after the opening of Bids.
16. Bids to Remain $ubject to Acceptance
All Bids w ill remain su6ject to acceptanca for a minimum of 90 days or the time period
specified for Notice of Avvard and execution and delivery oi a complete Agreement by
Successfi�lBiddez•. City may�, at City's sole discretion, release any Bid and rnilGfy the Bid
sec�rity prior to that date.
1�. E�aluation of Bids and Award of Contract
17.1. City reserves the right to reject any or all Bids, iricluding without lirr►itation the rights
to reject any or aIl nonconforming, nonresponsive, unbalanced or canditional. Bids
and to reject the Bid of any Bidder if City belie�es t�aat it would nof be in th� best
interest of the Froject to make an award to that Bidder. Citiy reserves the right to
vvaive irsfbrmalities not involving price, contr'act time or changes in the Work artd
award a cflntract to such Bidder. Discrepancies betwean t[1e multipfication of units of
Work and unit prices wi11 be resolve�i in favor nf th� �nit prices. Discrepancies
between the indicated sum af any column of figures and the correct stun thereafwill
be resaived in favor of tha corxect sum. Discrepancies betwe�n words and figures
will be resol�ved in favor ofthe u�ords.
17.1.1. Any or all bids will be rejecied if City has reason to belie�e that collusion exists
atnang the Bidders, Bidder �s an interested party to ai�y litigatian agains# City,
City or Bidder tnay have a c]aim against the other or be engaged in litiga.tion,
Bidder is in arrears on any existing contract or has defaulted on a previoLis
contract, Bidder has �erformed a�arior contractin an unsatisfactory t�nanner, or
Bidder has uncompleted worEc which in the judgment of the City will prevent or
hinder the prompt completian of additional war[� �awarded.
17.2. In addition to Bidder's a•elevant prequalification requirements, City may cons ider the
qualifications and experience of Subcontractors, Suppliers, and other persons and
arganizations proposed for those por�ons of the Work where the identity of such
Subcontractors, Suppliers, and other persons and organizations must be submitted as
provided in the Contract Docum�nts or upon the request af the City. City also may
consider the aperating costs, maintenance requirements, performance data and
guarantees of major items of materials and equipment praposed for incorporation in
the Work when stEcl� data is requ�red to be subrnitted prior to the Notice of Award.
CITY dFFORT WORTH 2O22 BridgeRehabilitationC.ontract 2
STANpAR1J CONSTRUCTIdN SPECIFICATTdN DOCUMENT City Praject Np, 103A56
RevisedlUpdated November 2, 2021
oa zi ts
1N5TRLTCTIONS TO BIDDERS
Page S of 8
17.3. City may conduct such investigatians as City deems necessa:ry to assast i� the
evaluation of an.y Bid and ta establ�sh the responsibility, quali�'ications, and financial
ability of Bidders, propased Suhcontractors, 5uppliers and other persons and
organizations ta perform and furnisS� the Work in accordance v�ith the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contraci:ar sha.11 perfoxm: with I�is own organization, w ork of a value not les s than
35% afthe value emhraced on the Contract, unless otherwise approved by the City.
17.5. If t�e Contract is to be awarded, it.will be awarded to lowest respozasxble and
responsive Bidder whose evaluation h�+ City indica�es that the avvard will be in the
best interests of the City.
i7.6. Pursuantto Texas Government Code Chapter 22S2.OQ1, the City willnot award
contractto allonresidentBidderunless theNonresidentBidder's bid is lawarthan
the lowest bid submitted by a responsible Texas Bidder by the satne am.ount that a
Texas res idez�t bidder would be req�ared to underbid a Nonresident Bidder to obtain a
camparable contract in the state in w�ich the noz�.resident's principal place of
business is located.
17.7. A contract us not awarded u�tiiformal City Council authorization. If the Contract is
to be auvarded, City will a�ward the Contract within 90 days after the day of the Bid
opening unless e�tended in r�vriting. No otherr act of City or others will constitute
acceptance of aBid. Upon the contraci awax�, allotice o�Award vviIlbe iss�.ed by
the C�.y.
17.7.1.The confractor is required to fill aut and sign the Certificate of Interested
Parties Form 1�95 and the fortn must be submitted to the Praject Manager
before the contractwill be presen�edto tlae City Caimcil. The form can be
obfained at htips:llwww ethics.sta�e.i�.us/data/forms1129511295.pdf
I7.8. Failure or r�fusal fo comply with the reguirements may result in rejection a� Bzd.
18. �igning of Agreement
18. J.. Wh.en. Czty issues a Notice of Award ta the SueeessfulBidder, it will be accompanied
by the required nuzn�er af unsigned counterparts af the Project Manuai. Within 14
days thereafter, Cnniractar shall s.ign. and deliver fihe required nutnber of counterparts
afthe Prbject Manual ta City with the required Bonds, Certificates ofInsurance, and
a].i other rec�uired documentation.
15.2. City shall thereafter de�verr one fu11y signed countarpart to Contractdr.
II�TD QF SECTION
CIT�t OF FORT Wd1tT'T� 2022 BridgeRehahilitatian Contract 2
STANT7Ai2D CONS`F12UCTION SPECIFICATIOFI DOGUMENT City Project No. 103456
RevisedJiJpdated No�veanher 2, 2021
003513
CONFLICT OF INSEREST STAT�MEN7
Page 1 of i
s�c�io� ao 3� 1�
CONFLICT OF INTEREST STATEMENT
Each bidder, offeror or respondent to a Ciiy of FQrt Worth procurement is required to complete a
Canflict of Interest Questionnaire or certify tt�at one is current and an file wifh the City S�cretary's
Office pursuant to state law.
If a member of the Fort Worth City Gouncil, any ane ar more nf the City Manager or Assistant
City Managers, ar an agent of the City who exercise discretian in the planning, recommending,
selecting or contracting vtirith a bidder, offerar or respondent is affiliated with your company, then
a Local Government Ofificer Conflicts Disclosure 5tatement (CIS) may be required.
Yo�a are urged to consult with counsel re�arding the applicability of these forms and Local
Goverr�ment Code Ci�apter 176 to your company.
The referenc�d forms may be dflwntoaded from the links provided below.
htt :/Iwww.ethics.state.tx.uslformslClQ. df
htt :Ilwww.ethics.state.Uc.uslformslClS. df
❑
0
❑
�
❑
❑
�iDDE�:
CIQ F'arm does not apply
CIQ Form is on file with City Secretary
CIQ Form is being provided to tF�e City Secretary
CIS Form does not app�y
CI� Form is on File with City Secretary
CIS Form is being provided to the City 5ecretary
Gilason & Associates, Inc.
11210 Rylicrest Drive
Balch S{�rings, Texas 75180
By: Alan C. Meacfor
Signature: -
Title: Vice President
��v� o� s�c�iot�
CITY OF FORi WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUIUI�NTS
Revised February 24, 2p20
CPiV9D3456_Bid Proposal Workbook (Filled Out)
00 41 00
BI� FORM
Page 1 of 3
TO: The Purchasing Manager
cla: The Purchasing Division
2�Q Texas Street
City of Fort Worth, �'exas 76102
FOR:
City Project No.: 103456
lJnitsl5ections:
1. Enter Into Agreement
S�CTIOR! 00 41 00
BIQ FORM
2022 BRIDG� R�HABILITATION CONTRACT 2
AT VARI�UB I.00ATIONS
The undersigned B9dder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in ihe form
included in ihe Bidding Docume�ts to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accflrdance with the other terms and canditians
of the Contract Documents,
2. BIDDER Ac�Cnowledgements and Certi�cation
2.1. In submitting this Bid, Bidder accepts al! of the terms and conditians ofi the INVITATI�N TO BIC7E]ER5 and
INSTRUCTIONS TO BIDDERS, including without limitakion those dealing with the dispositian of Bir� Bond.
2.2. Bidder is aware of all costs to provide the r�quired insurance, wiif do so pending contract award, and will
provide a valid insurance certificate meeting all requiremenfs within 14 days of notification of award.
2.3. Bidd�r certifies that this Bid is genuine and not macie in the interest of or on behalf of any undiscloseck
individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,
association, organization, or carporation.
2.4. Bidder has not directly or indirectly induced ar solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or indueed any individual or enttty to refrain from bidding.
2.6. Bidd�r �as no# engaged in corrupt, frauciufent, collusive, or coercive practices in competing for the Contract,
For the purposes of this Paragraph:
a. "corrupt practice" means the ofFering, giving, receiving, or solic9king of any khing of value ]ikely io
infkuence the action of a public official in the b+dding process.
b. "fraudulent practice" means an intentional misrepresenta#ion of facts made {a) to influence the
bidding process to the detriment ofi City {b) to establish Bid prices ai artificial non-competitive
leveis, or (c) to depri�e City of the benefits of free and open competition.
c, "collusive practice" means a scheme o� arrangement between two or more Bidders, with or without
the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive
levels.
CIZ'Y OF FORT WORTH
STANDARD CdNSTftUCTION SPECIFICATION DOCUiVIENTS
Reviaed 8I3012021 CPNi03456_Bid Proposal Workbook (Filled Out)
00 41 00
BlD FORM
Page 2 af 3
d. "cosrci�e practice" means harming or threatening to harm, directfy or indirectly, persons or the9r
proparly fo influence their participation in the bidding pracess or affect the execuiion of ihe
Carttract.
3. Prequalification
The Bidder acknawledges that the following work types must be pe�Formed only by prequalified contractors and
subcontractors:
a. Not applicable
b. '�i���.�
C. I �
d.
e.
f. ��dib
9 • _ . . _. _. . . . .�
h. ��rlc,t}����t��r�R�
4. Time of Completion
-_ -- -- --_ _ �~_ � �
�4.1. The Work will be complete for Final Acceptance within 18Q days after the date when the
the Contraci Time commences to run as pro�ided in Paragraph 2.D3 of the General Conditions.
4.2. Bidder accepts the pravisions �# the Agreement as to liquidated damages in the e�ent of failure to complete
the Work �and/ar achievement of Milestones} within the times specifiecf in the Agreement.
�. Attached to this Bici
The following documents are attached to and made a part of this Bid:
a. �his Bid Form, 5ection 0� 41 00
b. R�quired Bid Bond, Section OD 43 13 issued hy a surety meeting the requirements of Paragraph
5.01 of khe General Conditions.
c. Proposal �orm, 5ection 00 42 43
d. Vendar Compliance to State Law Non Resident Bidder, 5ection OQ 43 37
e. MWBE Farms (o�tional at tim� of bid}
f. Rrequalification Sta#ement, 5ection 40 45 12
g. Conflict of Interest Affida�it, Section 00 35 13
*If necessary, CIQ or C15 forms are ta be provided directly ko City Secretary
h. Any additional documents khat may be required by Section 12 of the lnstructions to Bidders
CITY OF FORT W�R7H
STANDAR� CdNSii�UCTIQN SPECIFICATfON DaCUM�N75
Reviset! 9I3012021 CPN103456_Bid F€oposal Workbook (Fllled Oul)
00 41 00
BID FORM
Page 3 of 3
6. Totaf Bid Amount
6.�. Bidder will complete the Work ir� accordance with the Coniract Dacuments for the following bid amount. In the
space provided below, pl�ase enter the to#al bid amount for this project. Onfy this figure will be r�ad publicly
by the City at the bid opening.
6.2. It is understood and agre�d by the Bidder in signir�g this proposal that the total bid amount enfered below is
sul�jeck ta �erification ancflor modification by multiglying the unit bid prices for each pay item by the respective
estimated quantities shown in this proposal and then tofaling all af the sxtended amounts.
6.3, E►�aluation of Alternate Bid Ifiems <use this if applicable, othervuise delete>
Tota! �ase Sid �use this if applicable, otherwise delete
Alternate Bid <use this if applica�le, Qtherw�se delete�
peductive Alternate<use this if applicable, otherwise
Additi�e Alternate <use this if applicable, otherwise
7otal Bid
�. Bid Submittal
This Bid is submit�ed on January 13, 2022
Respectfully submitted, ,
f ' � �
By: - "
(Signature)
Alan C. Meador
(Printed Name)
Tikle: Vice President
Company: Gibson & Associstes, Inc.
Address: 91210 Rylicr�st Drive
Balch Springs, Texas 7�180
State ofi I�corporation; Texas
Email: treym@gibsonassoc.net
Phon�: 972-557-1199
END DF SECTIOI�
CIN OF FORT WORTM
STAIVaARD CONS7RUC"fION SPECIFICATION QOCUMENTS
RevisOd 8I3012021
#REF!
#REF!
#REF!
#REF!
$679,646.60
by the entity named below.
Corporate Seal:
CPN103456_Bid Proposal Workbook (Filled Out}
00 42 43
BIQ FROP�SAL.
Page I of2
SECTION a0 42 43
PROP�SALFORM
I�R�I�' ��I�� �i�
Prnject lYem Infarm�cion
�idd�r'� App�i���'ron
liat Item Description TxpqT Spec �nit of Bid
No, Measure Quantity
1 FtEMOBILIZAT101V �A 1
2 REMOVE CONCR�T� PAV) �� � 104-6�01 SY 151�1
3 REMQVE CONCRETE (SII7EWALKS 104-6�15 SY 27.5
---- �-------� .._.�_....�..__ � _�.� .
4 REMOV� CONCRETE (APPROACH SLA_, B)__� 104-6D27 SY _ 151.1
5� EXCAVATION ROADWAY � 910-60Q1 CY 160
6 EMBAN.KMENT (FIPlAL) (ORD COMP) (TY B) _ 'f32-6003 CY___ mm 25 ,
7 CONCRETE PAVEMENT (CON7 REINF - CRCP} (7") 360-6001 5Y 152
8 CEMENT STABILIZ�D BACKFl�.L 400-6Q05 CY � 158
9 FLOWABLE BPiCKFILL �MT���W, ���""401-6D01 � CY 2
1D C� C CONC MISC � � 42p-6074 �CY 5
{ ___...�� �_�.._....._. ,
11 � APPROACH SLAB � 422-6015 M�CY � 55
�2 CONCRE7E STR REPAIR �VERTICAL & OVERHEAD) 429-6407 5F ^ 455
13 CONCRETE 8TR REPAIR (STANDARb) �� 429-6009 � 5F _ �43
1h RIPRAP {CONCRETE) (CLB) _��� ____ _432-6006 CY _ 0.5
15 � RlPRAP (S70NE,PROTECTI�N) (12 IN) �_ 432-6D31 mm CY 8.5
16 CLEAN AND SEAL EXIS7ING JOINTS �_ 438-60Q1 LF 4T0
17 CLEAIV ANd PAINT EXISTIG STRUGTURE 446-8010 LS 9
�_ ��__��_..�... . .....
18 f2AIL {HANDRAIL) (7Y A) ��___ 450-6447 LF _� 84
19 R�11L TY PR11) __�_______ �� 450-6103 LF 306
..�.,... �._. _..., , , ....m. �
2D CLEA�k EXISTING C�LVERTS 480-6002 EA _�� 5
�.Y_...,__......�...__�......,�.,. ___ ___..._.......__._..�._
21 R�MOVE STR (RAIL) ��__ __ 496-6D99 LF 290
22 CONGRETE SIi��WALKS 5"��) �,, ��__� 531-6Q02 SY , 50
�23 M7L W-BEAM GD FEN (TIM POST) _ _ 540-6001 LF � 388
24 MTL W-B�A�II GD F�N (THRI�-BEAM) _� 540-6ti06 �mm �A � 6
m25 MTL W BEAM GD FElV (TL2��_. �� 54D-6007 EA _ 1
26 DOWNSREAM ANCHOR TERMINAL SECTIOIV 540-6016 � EA 3�
27 �REMOVE METAL BEAM GUARD FENCE ��� 542-6001 LF � 430
28 REMOVE METAL BEAM GUARD FENCE TRANS 542-8005 EA 2
29 � GURRQRAIL END iREATMENT (INSTALL) ���"~mm�� 544-6001 EA �____ B
30 GUARDRAIL END TREATMEN7 (REMOVE) _�� 544-6003 EA mm, .2
31� CRASH CUSHION ATTENUATOR 545-BD13 EA � 1
� _._ �
32 7REE REMOVAL � 752-6005 EA ^ 1
33 REMOVEIREPLACE TlMBER PQST� 770-6010 EA 1
34 R�MOV�lREPLACE S7EEL POST �____ � 770-6010 EA 'f
� 35� REMOVEI REPLAC� BLQCKOU7� 77�-6019 EA 1
36 R�PAlR (EX1S71.NC METAL P��. RAfL�__ __� �� 776m6437 __ LF ,_ 105
37 CONCRETE CRACK REPAIFt (ROU� AfVA SEAL) 78Q-600.A mm LF ��19D
38 REPLACE NUTS, WASHE.RS & OTHER HARDWAREm 6000-6105 mm EA 22
39 CONSTRUCTI01� ALLOWANCE ���� m�m m� 00 Oa �0 L.S � 1
El\'D O� SEC'170N
Ridde�`s Proposai
Unit Price 1 Bid Vafue
80.Dfl
00.00
$a:oa
2,OOOAO _ $6[3,DO.O.OQ
�1 182.a0 � $65 01D.D0
$"l05.Q0 $47, , ,775.Q0
$$0.00 3 440.00
�2 OOO�OD ___ $�1 00�0�00
$730.fl� $6,205.00�
.m $30.00 �_._�$1,_._'4,1.QQ.00
!D 50�.00 $20,5�0,00
$215,00 $18 Q6Q.D0
$194.5D ��8 2�mm93.OD
's1�000.00 �.,,,._._$5,Q00.00
$,4^0.00 $11600.00
$3DO.D0, �__w $15 Q�b:OD
$73.15 $28,382.2iJ
62 854�.50 ,,,�., $17,.12i.00
�2,145.OQ $�,145..,mm0�
61,650.Q� ,� $4,,,�,,950.00
�4.13 � $1.775.90
650.00
],DOQ.00
'Catal Bici
C17'Y OF AUIi�' N`ORTH
STAZ+IDkRD CONSTRUCTION SPECIFICATION �OCUNfENT5
Kevised 9/30/2021 CPN{0345b_$id Proposal Warkbook (Filled OLf}
00 42 &3
B1I3 PROPO5AL
Pege 2 af 2
sECTioN ao az a3
PR�P05AL FOF2M
�fVli ��lC� �ID
��dd��'� ea►ppli�a�i�n
Project Item Information Bidder's Proposal
Bidlist Ttem Unit of 8id
Descriptian T�OT 5pec Unit Price 8id Value
No. Measure Quantity
CITY OF FORT WORTH
STANDARD COM57RU.CTTON SPECIFCCAT[ON D6CUL�fENTS
[tevised 9P30i2021 L'1'N I0�45&_Bid Praposal Work600k (AiYled Out)
40 43 13
eio aoHo
Page 1 aC 2
SECTtON 00 43 13
BlD �iOND
KN�W ALL BY TFiES� PR�5EM1ITS:
That we, Gibson & Associates,lnc. , known as
"Bidder" �erein and Federal Insurance Campany a corporate sure#y
dufy authorizetl ko do business in the Sfate of Texas, known as "Surety" herein, are held and firmly bound un#o khe C.ity
of Fart Wor#h, a munici�al corporafian createtl pursuant to fhe laws oF Texas, known as "City" herein, in the penal sum
of five�percent (5%) of BicEder's maxlrlEum hid p�ice, in lawtul money af the United 5tates, to be paid in Fort Wofth,
Tarrant County, Texas f.or tY�e payment of which sum well and truiy to be rr3ade, we bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severaliy, firmEy by these presents:
WHEREAS, the Principal has submitted a bid or prpposal ta perform `.Wark for the �ollowing project
designated as 2�J22 BRIpGE REHABILlTATION CONTRACT 2
�AT VARIpUS LOCATIONS
NOW, TH�R�FORE, fhe cond9tian of this obligation is sueh that if :the City shall award
the Cantract for the foregaing project to the P�inc'spa4, and the Psincipa� shall satisfy all reguiremenis and cartditions
required For the executio� af the Contract and sliall enter into the Gontract in writing with the �City in accorciance urith
the ferms af s.uch same, fhen khis ob�igation �shall be and beco�e null and void. lf, hawever, kl�e Principal fails to
execute sucfl Contracf in accardance with the terms 4f same.or faiis ta satisfy all requirements and conditions required
for fhe execution of th� Contract, this-bvnd shall become the prflperty of the City, without recdurse of the F�rincipai
andlor 5urety, not to exceed the penafty hereof, and sfiaN �e used ko compensate 'City for khe difference between
Pr[ncipal's total bid amount and the next sefected bidder's total �b�d amount.
PROViD�D FURiHER, that if any legal actlori be filed on this Borsd, venue shall lie in Tarrant County,
Texas ar the United States Oistrict Court for.the Northern Distric# of-�exas, For� Worth Di�ision.
lN WETNE5S WHEREOF, tMe Prirtcipal and the Surety have,SIGNED and SEAI.Ep this instri�ment by
duly authorized agents and officers on this the �pth day af January . 2022.
A7TE5T:
Witness as to Principal
CIIY pF FORT WORTH
STANpARO GONSTRl1CTION SPECfFICATfOiV t]pCUM�NTS
RByised 3130f202t
PF2INCIP,4L.:
Gibsan & Associates, Inc,
8Y: � •
Signature
�'►.l �v► �- • ��h �Y� �i � _�YtS�Zln�
Name and Title
2022 BrEdge Rehap bid band roms.xlex
ou aa 13
��� 60ND
F'age.2 pt 2
ness as ta 8u�rery
Att&ch Power of Attorney �(Surety) fo� Attoiney�llz-Fac#
Add�ess: 1121D Ryliecrest Dr,
Balch Springs, TX i5180
�URE7'Y;�
Federal Insurance Campany
�SY: �C�r.G,t ���2g�Pc�
�Signature
Ro�bi Marales, Attarney-in-fact
- -- -- �Name and Tltle .�. . ._.._ ^
Address: 5p05 LB,1 Freeway, Suite 1500
D�11 �s �'X 75244 .,..._
Telephone Murrtb�r, 2141989-00fl0
wiVote: I� signed �y an offi�cet �ff fhe 5urety� Camp�ny, thgre must b�e on file a cer#i#ied exfracf frani the by laws
showing'that�ihis perso� h�as autho�iry�p sign such obligatian. lf Surety°s pttysfeai address.is differe�t frbm
its �naiiing atldress, both musi �be prpvided, ihe rl��e af.#he bond st�all not be �rio"r to the date the Confraot
is awarcled.
�L='1�iD p'P S�C'I'{ON
GI7Y OF FORi 4VOitTH
STANI]FtRp CQhlSTRUGTIDH SPECIFlCATI4iV DOCLIMENTS
ReJsed 9/3QE2621
2tl22 Bhltlge Rehab bid B�d formsslsx
Pawer of At�orney
�ederal Insurance Cornpany I�`igilant Insurance Campany � Pacific xndemnity Cornpany
Itnow AlI by These Presents. That R6DERAL INSURANCB CfIMPAN7t, an Indiana corpoeation, VIGiI.AiVT INSIIRANCB COMPANY, a New York cnrporatlnn, and PACIFTC
mmEMN[TY COMPMCY, a Wisconsin corporatfon, do each hereUy consatute and appoint i}an E. Cornell, SQphinie Hunter, Tina McEwan, Rohbi Morales,
Tonie Petranek, Ricarcio .i. Reyna, Joshua Saunders a�d lCelly A. Westbrook of �allas, Texas; 5te�en Dwain Brotldnton of I.ittle Rack, Arkansas-----
each as ihef�• true and lawful Attomeyln-Ract to w�cer�te �nder such deslgnaiian in their names and to afFix their corpnrate seals to and deilver fur and on their hehaJF:rs surety
thereon ar otherwise, honds and undertandn�-s and other rvridn�s o6lf�atory in the nature thereof (other than bail bonds) given ar executed in the course oF husiness, and aqy
instruments amendingar altering the same, and eonsents to the mQdi�carionor alieration of any insh�ttnent referred ro in satd honds or oblf�rinns.
In Wimess'G4�hexeaf, said FERESAL fNSURANCE COMPANY, VjGTLAN'1' IN'5IlRAPfC� C�MPANY, and PACIFIC INDP.141NTT'Y COINP.ANY have each executed and attested these
presents and eYiixed the�r corporate seals on th[s20'� day ofMarch, 2019.
iV�-J'-3�}•....�'�• l.%�'o"`'""' '�„-'V`" v�` -�
Csavm 11.1:1�Earc�.;lssist:jni4�Yr��:rcy
ry���
Td�F — �f .�4y .
STAT6 OF NBWJ�RSL'Y
Caunty afIiunrerdan �'
�tc�ihcn 11. Il:ntt�y�. l'i�ti� Pr�s[�lcy�t
��� - ��
�IA� ,
On tbis 201h day of March, 20L9, hefore me, a Idotary PubIIc. nE New Jersey, personally came �awn M. Chloros, to me lmown [o be Assfstant Secretaiy of FL+DfiRAL INS[3RANCE
COMPANY, VIGELA[�'7' INSI�RANC� COMFANY, and PACIRIC I�tDEMNiTY C�MPANY, the companies which executed the fore�otng Power o# Attorney, and the said Dawn iN,
Chloros, beEng hy me duly sworn, did depose and say that she is Assistant Secretaty of FL'��RAL �I5LIRANCE COMPANY, VIGILAFVT INSLTIiANCE CQMPANY, and PACIFIC
1WI38MNITY COMPAPtY and ][�aws the corparaCe seals thereoF, tYiat the seals aEtixed Co the Foregoing Pnwer of Attnmey are such corporate seals and were thereto affuced by
authoriry nf said Campanies; and that she signed saEd Power of Attorney as Assistant Secretary of said Campanies by Ifke auEhority; and that she is acquainted with Stephen M.
}ianey, and lmnws iilm to be Vice Presldent of sa[d Companies; and that Che signature pf Stephen M. Haney, suhscribed to said Power oPAttorney ls in the genuine handwritir� of
Stephenivt. Haney, and was thereto subscribedbyautl�ariry of said Companies and in deponert's presence.
Nararial seal ° aosE cuRrrs �
�t�ny� N4TlWYPUBLIC6FNEWJEI�E1'
a„o�,� No. Stl072A00
�tr a Commff�mD�6e�f�namb�x2.Z027
�UL:II}` �'L3�7]�C
c�zt�zcATTaN
Resplutions adopted by Che Boards oFDirectnis of I'EDER{fL IN5URANCE COivINANH, VIGILANT IIVSURAI�CE COivEPANY. �nd PACIRiC II�iDEMNJ'i'Y COMPANY on August 30, 2016:
'RESOLIyLD, that tite Foriowing aud�orixatlons relate to the execution, foe and on behalt of the Company, of bonds, uudertakings, recagnizancEs, Aonttacts and other wvrit[en commimients of the Gompany
enteeed into En tl�e ordinary course of 6us3ness (each a"Wr3t�n GamrriitmenY�:
pj Nach of the Ghairman the President �iul the Vic�e [+residents of thc Company is riereby auchorized roexecuteany Wrltten Comisrianent iqrandon hehalf of the Cnmpany, under the
seal oFthe Companyor othenvise.
(2) Siach drily appointed attomey,i��fact oE the Cnmpany is here6y authorized to execute any written Cnmmitment !'or and on 6elialF oF the Campar�y, under the seak of the Company ae
othcrwise, m the e�e[en[ tliaFsucli acdon 3s euthaized l�y [he g�anc of powera provtded Par in such person'swri[ten appolnfime�t as sue[i attnrneyEirfac[.
(3) Pacti of the Ch3lrman, the President and the Vice P�stdents of [I�eCompanyishemhya�thorizc�d,fnrandon behaiFOFtheCampany,toappointin�vrit3ng any person rlie atrorney-
in•fact of die CompAny witU full pocver and au[1iori�v to execute. for and on hehalfof the Company, uttder die seal oFthe Comgany orotttenvlse, such WtitTen Commihnents of the
Company as may 6e specified in such written appointrnent, ahich spedficatlon ntiay 6c 6ygenetal type ar class aF Written Cnmmltments or byspeclticadon af one or more partir�rlar
V�Fi[t�13 �,'�ITIIII�kfl1Ef74S-
(h� Fach of the Chairman, t3ie Presldent anA the Vice Presidents of the Company is here6yauthor3zed, for and on hehalfnf tlie Company, [a delega[e En �vritingio any othec oEl�icerofthe
Companythe authority to execute. far and pn hehalf oF the Company, under Ehe Campany's seal or otherwise, such Written Comm3tments of the Company as are spedSed insuch
written delegation,whlchspeafira{ton may 6e by general cypeor dassoF+NMtten Commitments or hyspeci[icatlon ofonevrmnrepart3cularWrittenCvmmitmenis.
{,� The s9gnature of any o�'icer or ather pe�son execueng any Wrltten Crnnmihnent or agpolnnnen[ or delegalion pursuant ta thls Resoludon, and the seal of the Company, may be aRixed hy
facsEmite on such Wr3tten Comrnitment or �vrittenflppointment oi de]egatlnn.
RURTHEIt RLiSOLV6D, that the foregoing Resolut€on shall no[ be c3eemed to be an acclusive statement of the powe�s and authority of ot3icers, employees and other peraons t0 act for and on betialf of
the Company, andsuch Aesolutlon shall not Eimit or otllerwise atfect ttreexercise oFanysueh power or auFl�ority rnhenvise validly granted ai vested."
I, Aawn M. Chlorns, AssistantSecretary of FEDL�RAL INSURAI�CE COMPANY, V1CII.ANT 11VSU12AI3CB CRMPANY, and PACIPIClNDEMNPI'Y CQN�PAA]Y (the "Companies'� dD hereby
ce�rtity that
(�} the foregoing Resolution5 adopted bytheBnard of Directors of the Companies aze true, cnrrect and in ftell force and effect,
{j�) the Forego3ngPower of Attnrney Ss true; correct and in Full force and efFect
GlvenundermyhandandsealsofsaidCompaniesatWhitehouseStaC[on,�j,thisJanuary �OF 2�22
�� _ l �]�� �CS��.1�1 • �'�1�
' ���.
�n„�. a�� L�iwn 11.t:hl�,s��.:1s,i,l�ni
IN'THL� IlVIiD}T YO[I WISH T4-V¢I2II�Y'PfII: AUTHRA1TICfPY OF T8[S �OND DR t�f0'['�Y US OF ANY UTHT3R MftTfJ3R, C�LGASL* C�NTAGT [35 AT:
Tele hone (908) 903• 3493 rax (908) 903� 3656 cmaif: suce @chubb.cum
F�A- VI G-Pl (fev. OB-18y
��llcyl�olde►' Infvpr���i�n 1Vo�f��
in��o����t� �u��►��
To obtain infrormation or make a eom�laint:
You may ca11 Chubb's toll-iree tele�hone z�umber
for informa�ion nr to make a complaint at
�-soo-�6�c�u��
You may contact the Te�as Depariment of
Insurance to obtain infarmaiion an companies,
coverages, rights or complaints at
f ��00�25�d�43�
You may write th� Texas Depar�ment of Insurance
P. Q. B ox 149104
Aus�in, TX 7$7I4-91Q4
FAX # (512) 475��771
Web: http://www.tdi.state,tx,us
E-maii: ConsumerProtectionC�tdi.state.tx.us
���'f�`IUNI OR C�AIIVI �l�PUi��:
Should yo� have a di.spute cnncex�ing your premium
ar about a claim you shnuld contact the agent �irst.
If thE c�i.5pt�te �s not resoleed, you may co�tact the
Texas Department of Insurance.
ATT�CH TMIS Il��TI��' i� �'OUF� PQ�I�Y•
This notice is for in�Eormation on.Iy and does nat
become a parrt or cond�tion o� th� attached
document.
�v��o r��a�ranrr�
Para obtener infarmaci6n o para someter t�na
quej a:
�Usted puede llamar al numero de telefono gratis
de Chubb's para infarmacion o para someter una
quej a al
� ��00�36�CHU,��
Puede camunicarse con el Departamento de
Seguros de Texas para obtener informacion acerca
de compan.ias, coberturas, derechos o quejas al
1-�DU 2��-5439
Puede escribi� a1 Departamento de Segu.ros de
Texas
P.O. Box 149104
Austin, TX 78714-9104
FAX # (512) 475-1771
Vi�eb: http:llwww.tdi.state.tx.us
E-mail: ConsumerPratectxon@tdi.state.�.us
�1���! fA� �O�R� ��IMAS O I��C�AIPIIO�'.
Si ti.ene una d�sputa cQncerniente a su prima o a un
zeclamo, debe comunicars� con e1 agente p�mero.
Si no se resueve la �isp�ta, puede en�onces
eomunicarse con el departamenta (TD�.
�IIVA �5�� �1/1�0 � ��1 ��LI��:
Est� aviso es solo para proposito de informacion y
no se can�ierte en part� a condicion del c�ocumento
adjunto,
Farm99-10-�299 (Rev. 1-Q8)
Ob 43 37
VENDOR GOMPLIANCE TO STATE LAW
Fage 1 of 1
S�C�IOA! 00 43 3i
VENDOR COMPLEANGE TO STAT� l,A1N NQN FtESlDENT BIDDER
Texas Go�ernment Code Chapter 2252 was adopted for the award of cantracts to nonresidenk bidders. This law
provides that, in order to be awarded a contract as iow bidder, nanresident bidders (out-of-state contractors
whose corporate offices ar principal place of business are autside the Staie of T�xas) bid projects for
construction, improvements, suppli�s or servicas in Texas at an amount lower than the Iowest Texas resident
bidder by fhe same amount that a Texas resident bidder would �e required to underbid a nonresident bidder in
order to obtain a comparable contract in khe �tate which the nonresident's principal place of business is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet
specifieations. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident
bidders must check the box 9n Section B.
A. Nonresiden# bidders in the 5tate of ,51�i� k�lerta �,xr I�lan�s , our principal place of business,
are required to be �"� k�en4 percent lower than resident bidders by State Law. A copy of the
statute is attached.
Nonr�sident b9dders in the State of ��.�#�ars c�'�k� , our principal place of business,
are not required ta underbid resident biciders.
B. The principal place of business of our company or our paren# company ar majority owner is
in the 5tate of Texas. 0
�Id���:
Gibson & Associates, Inc.
1121 D Ryliecrest Bl�d
By, A�an C. Meador
�, � .
f
' (Signature)
Balch Springs, Texas 7518p
Title: Viee President
Dake:
END OF SECTION
1 11 212 0 2 2
C1TY OF FORT W�RTH
STANRARQ CONSTRl1CTION SPECIFICA710N pOCUMENTS
Revised S130I2021 CPN103456_Bid ProposaE Workhook (Fi11ed Out)
OU 45 12
PREQUALIFICATION STATEMENT
Page 1 of 1
SgC�ION a0 �4� 1 �
PREQUALIFICAT[ON STATEMENT
�ach Bidder for a City procurement is required to eomplete the information below by identifying the prequalified
contractors andlor subcontractors whom they int�nd ta utilize for the major worlc type(s) listed.
Major Work Type ContractorlSubeonkractor Campany Name Prequalification
Expiration Date
Nat applicable �.;r;sr�G�u:�rry ��J;��ir.s ti�{�.rr+F [r� 5�'s��:'�' G,f,,il�: a I�'rr� ��r :f��7C�1
Lisi work type here or space i.'c�rr�a:r�aiy f�;��+, �� � I I�:�� �� nr �n�sr.F_� i3f�l+� a-ir�re ar �p�c:�
List work type here or space �'�m�+�ny �l;��n}�s .��.���rF� tkr .;;:,��c:�.- C'rr,iF; r l�.�cs�, cir s�Es
List work type here or space f_r,�,��;.;.,� ;� � k�f, �,� � i� ��r- r�� -;fsc���;+• t,�;�il-. �i�r� �r �sp�c:e
Lis#worktypehereorspace �,� .i���.�,�n; �;�i�����_ Il;si�.: 1� �-r;�.;t�_ l��t::1�2"�,.�ar ��,;.��-_�.±�-
List work type h�re ar space �= :���kt+,+;ky �,I�st�st ��.i��;=.� ;+i �;r:��:f��,- �.F .�I ���i�.,i..� s.}p' Sp�r�C:t.■
List work type here or space �:on���aiay �l���1� I�ir�� ��,r : E��:r;a`� I�,,;�[�• I��ks��r�� caa s}�acw
Listworktype here orspace �csri'iE��ari�� �itirniF I�r:i�� _;� :;�,..s;� C��f�u �-Irar� ��r ;a�aaa�
7he unc�ersigned hereby certifies that the contractors andlor subcon#ractars described in the table abo�e are
currently prequalified fnr the work types listed.
�I���R:
Gibson & Associates, fnc.
'{ 1210 Rylicrest Dri�e
D
Balch Springs, Texas 751 SO
By: Alan C. Meador
(5ignature)
Title: Vice President
pate: ' + '
l�Np O� S€C�iDN
CI'T'Y DF FORT WORTH
STANDAR� CONS7RUCilON SPECIFICATION DOCUME�kTS
Revised 0913UI2U21 CPNi U3458WBid P€oposal Work600k (Filled Oui)
0� 45 26 -1
CQNTRACTOR COMPLIAfdCE WITH WORKER'S COlVIP�NSA710N LAW
Page i of 2
1
2
3 Pursuant to T�xas Labor Code 5ection 4�6.096(a), as amended, Contractor certifies tha� iti
4 pro�ides worker's compensation insurance co�erage for alf Qf its ernployees ern�loyed an City
5 Project No. 103456. Gontractor further certifies thaY, pursuant to Texas Labor Code, Section
6 406.096(bj, as amended, it will provide to City its subcontractor's certificates af compliance with
7 worker's compensatian eo�erage.
�
CONTRACTOR CD{VIPLIANCE WITH WORKER'S COMPENSATI�iV LAW
SEC�'101� OD 45 2G
9 CDNYRAC�OR:
10
17.
Gibsan & Associates, Inc.
Company
11210 Ryliecrest Drive
Address
Salch 5prin�5, Texas 7518�
City/5tate/Zip
TNE STATE OF TEXA5 §
By: Alan C. Mea�or
12
13
14
15
16
17
1S
19
20
21
22
23
24
25
2fi
27
28
29
3�
3 �.
32
33
34
35
36
COUf�TY OF TARRANT §
(Please Printj
Signature: � �/E- �✓ .
Title: V9ce President
(Please Printy
BEFORE ME, the undersigned authority, on this day persanally appeared
Alan C. Meadar, known to rne to be the person whose name is subscribed to the foregoing
instrument, and acknowledged to me that he/she �xecuted the sarne as the act and deed of
Gibson & Associates, Inc. for the purposes and consideration th�rein expressed and, in the
capacity, therein stated.
GIVEN UNDER MY MAND AND SEAL OF OFFICE this 12`� day of
January z022 .
,••'�"'':�°�„ ��l411� _ t -
�t: i�t iNY�' �V�1Fav6��1 ��� , l' ��
'��,�� Et� �s �, 2ti24
.�;a�,,,, Notary Public in and for the State of Texas
CITY DF FORT WORTH 2422 Bridge RehabiliCation ContracY 2
5TANDAIiD COlVS'TRUCTION SPEClFICATIpN DOCUMENTSCity Project No. 1U3456
Revlsed July 1, 2011
004526-2
CONTRACfOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
page2of2
ENQ OF SECTIDN
CITY 4F FORT WORTH 2422 Bridge Rehabilitation Contract 2
STANDARD CONSTRiJCTION SPECIFICATION bOCUMENTSCity Project No. 103Q56
Revised July 1, 2011
06454fl-1
Susiness T�quiry Gnal
Page i of2
SECTION 40 �5 40
Bi.lsiness Equity GoaI
APPLICAT[QN OFPOLYCY
If the totaZ doIlar �alue of tk�e contract �s $ I00,000 or moi•e, then aBusi�ess Fcluity goal is applicable.
A Business Equity Firm refers to cea�fiedlViinority-, andlor Wo�ne�-, owried Business Eaterprises
(Nl1WBF�).
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
2b
27
28
29
30
31
32
33
34
35
36
37
38
39
40
4I
42
43
44
45
46
47
4$
49
POLTCY STATFMF,NT
It is the policy of the City af �'ort Worth to ensure the fu31 and equrtable pat�icipation of Busi.ne�s Equity
Firz�.as when appIicable, in the procurement of ali goods and services, All requr�ements and regu3ations
stated un the City's Business Equity Ordinance No.25165-10-2021, (repIacing Ordinance No. 2453�-1 I-
2020 (codified at: htt s:l/codelibrar .amIe aI.comlcodes/fiwortk�`�atest/ftworth tx10-0-0 22593 apply ta
this bid.
SUSIN�SS EQUITY PROJECT GOAL
The City's Business Ec�uity goal on this profect is �3% of fhe total bid value of the contract (Base bid
applies to Parks and CammunityS`ervices).
M�THOD� TQ COMPLY �4'ITH THE GQAL
On �ity contr.acis where aBusiness Equify Goal is appl�ed, oiferors are required to eoznply vaith the City's
Busin.ess Equity Ordinance 6y rrieeting or exce�ding the above staied gaa� or oth�rrvise comply w ith the
ordinance through one of the fallowing methods: 1. Commercially useful services performad by a
Business Fyuity prime contrac�nr, �. Business Equity sulacontractiung participation, 3. Combinahon
of Susiness Equiiy pri�z�ae services and B�usiaess Eguity subcon�racting participation, 4. Busi�ness
Equity Joint Ventare/Mentor-Prot�g� partici�ation, 5. Good Faith Effort documentatian, or 6.
Priine contrac�or Waiver documentation,
�USNaTTAL OF UIRED DOCiTNIl+:NTATION
Applicable documents (Jisted b�lnvv) must be received by the Pwrch.asing Division, OR the offeror shall
�vrarL the Business Equit� documentation to the assigr�ed City of Fort Worth Project Mataager or
Department Design��. Doeuments are to be received no later �han �:00 p,m,, oz� the tl�ird City
business day after the bid a�ning date, exclusive of the bid op�ning date.
The Offeror must submit one or more af ihe %lIawu�g documents:
I. Utilization Form aud Letter{s) of Tntent, iithe gaal is n:�et or exceeded;
2. Good Faith Effort Form and Utilizatzon Form, including supparting docu�mentation, i�
participation is less than stated goal, or no Business Equity participation is accampJished;
3. P;rirt�e Contractor Waiver Fortn, including supporting c�ocinnentation, ifihe Offeror will parform
all subcontract�gfsupplier opportunities; or
4. Joint VeIIturelMetator-Prot�ge Form, if goa.l is met or exceeded vvii�i a 7oint Venture or Mentor-
Protege participation..
Thes.e forz�s can be found at:
Business Ecluiiy Utilization Form and Letter of Intent
Y� s://a s.fortworthtexas, ov/Pro'ectResourceslResaurcesP160%20-
%201VIWBF,/NEW°/n20Bus ines s°1o20Equity%200rdinancelBusiness%20Ectuitv%2d�Ttilization%20Form.
� _.—
Letter of Intezat
CITY OF FORT WQFtTii
STANDAItD CONSTRUCTION SP�C7FICATION DpCUIvIHN'I'S
Revised Octuher 27, 2031
2022 BridgeRehahilitationContract 2
City project Na. 103455
aa�aaa-i
Agreement
Page i af 6
SECTI�N 00 52 43
AGREEMENT
THIS AGREEMENT, authorized on March 8, 2022,, is made by and b�twe�n the City of Port
Warth, a T�xas home rule municipality, acting by and through its duly authorized City Managar,
("City"), and Gil�son and Associates Tnc, authorized to do business in Texas, acting by and
through its duly authorized representative, ("Contractor"}. Ctty and Contractor may jointly be
ref�rred to as Parties.
City and Contractar, in cansideration of the muh,�a1 covena�ts hereinafter set forth, agree as
folIo�vs:
Article 1. WORK
Cantractar sl�all complete all Work as specifted or indicated in the Contract Documents for the
Pro�ect identifed herein.
Article 2. PRO�iECT
The project For which th� Work under the Contract Documents may be the whole or only a part is
generally described as follows:
20�2 BRIDGE REHABII,ITATIQN CONTRACT 2
CITY PR�3ECT NUMBER 103456
Article 3. CONTRACT 1'RTCE
City agrees tn pay Contractor for performance of the Work in accordance with the Contract
Dcacuments an amoun�, in current funds, of SIX HUNDRED SEVENTY-NINE THOUSAND,
STX HUNDRED FORTY-,SIX Doliars 60/100 ($6'�9,646.60), Contract price may be adJusted by
change orders duly atttharized �y the Parties.
Art'rcle 4, CONTRACT TIME
4, f Final Acceptance.
The Worl� sl�all be complete for Final Acceptance within 180 days af�er the date when the
Cantract Time cammenees to run, as pray.ided in Pa.ragraph 2.42 of the General Canditions,
plus any �xt�nsion thar�oF aIlowed in accordance with Article 12 of the General
Conditions,
4,2 Liquidated Damages
Contractor recognizes that time is of the essence for completion of Milestones, if any, and
to achieve Final Acceptance of the Work and City and the pubiic will suffer from loss of
use if the Work is no� completed within the �ime(s) speci�ed in Paragraph 4,1 above. The
Contractor alsa recognizes the delays, expense and difficulties involved in proving in a
legai proceeding, khe aetual lflss suffered 6y the City if tha Wark is nat compl�ted an
time. Aecordingly, instead of requiring any such proof, C.ontractar agrees that as
liquidatad damages for delay (but not as a penalty}, Contraetor shaIl pay City 5ix
Hundred Fif�y Dollars ($650.00) for each day that expires after the time speci.fied in
Paragraph 4.1 for Final Acceptance until the City issues the Finai Letter of Acceptance.
CTTY OF FORT WORTH 2O22 Bridge Rehabilitation Cantraet 2
STANDAItE3 CONSTRUCTION SPECiFICATION D.00UMENTS City praject 1Va. l Q345G
Revisad 111231202I
�04544-2
13usiuess Equity Goal
Page 2 of 2
I ht s:lla s.fartworthtexas, ov/Pro'ectResources/ResourcesP/60 - MWI�E/NEW Suszn.ess ua
2 OrdinancelLetter oflnien�-2021.pdf
3
4 Business Equity Good Fait1� Effort �'orm
5 I�ttps://�a .�p�. foz��vortritexas�ov/1'rajec�Resources/Res aurcesP/60%20-
6 %o20M�TVBEJNEVJ%20Business°lo20Eq�ity%20Qrdizaa�celBusiness%20Equity%20Goad%20Faith%a2QE#'
7 iart°lo�.OForm.pct� . � � —
l0
ll
12
13
1A
15
16
17
18
]9
20
21
22
23
24
25
2b
27
28
29
30
31
32
Business Equity Prime Contractor Waiver Form
htt s:lla s.far�voxthtexas. ov1l'ro'ectResourceslResourcesP/b0%24-
%2QMWf3E/NE�IJ%20Bus iz�es s°/420Equiry°/a2 00rd�anc e/Bus in�s s%2 OEc�uity%20Pritne°/fl 2.00ontractor
%20Wai.ver.pd�
Business Equi�y Joint Venture Farm �
https J/apps.fortwortht�as. �ov/Pxol�ctRes ouz�ces/Resourc esP/6Q%20-
%20MWBF'�NEW°fo20B�s mes s°/a 20Equity%200rdi.r�az�c e/Bus in.es s%20F_c�urty%207oznt%2aVen.ture. pdf
�'AILUR� T� AC`H�k,�E TH� GOAL OR OTI�i.WT$E COMPLX WTT'H TH� OR:IDNINACE WII,L
RESULT IN TAE BIDDII2/0 +{ OR BIII�TG DF.CLARID NON R.GSONSiVE AND THE BID
REiECTID.
�'AJLUR.E_TO SUBNIlT THE REOUIRID BiTSIN�'S:S E()UTY DOCUM�TTATION ORO'1�-�.2WIS�
CON�LY WY'TH TI� ORDINANCE WlLL RESULT IN TAE BID BIING D�CLARED NON-
�PONSNE, TAE BID RE + +D ANll MAY SUBJECT THC BIDDERIOI+'�'ROR TO SANC'1�ONS
AS DI'SCRIB�D IN,SEC. 20-3730�'THE ORDINANC'�
For Questions, PIease ContactThe Business Equity Division af the Department ofDiversity and
Ynclusion at (81'i} 39�-�6�4.
II�2D OF SECTION
CTTY OF �'ORT �LrJORTH 2b22 BridgeRehabilttation Contra�t 2
STANDARD CONSTRi7CTTOI�T SPBCIFICATION DOCCTIv1��TTS City pxnjecE Nn. 10345b
Revised October 27, ZD21
oa sza3 -z
Agree�nent
Page 2 of 6
Art�cle S. CONTRACT DOCUNIII�t'IS
5.1 CONTENTS:
A. The Contract Dacuments which comprise the entire agreemeni between City and
Contractor concerning the Work cansist of t�e foilowing;
i . This Agreement.
2. Attachments to this Agre�ment:
a. Bid P'arm
1) ProposalForm
2) Vendor Compl�ance to State Law Non-Resicient Bidder
3) Prec�ualificaiion Statement
4) State and Fede.ra.l documents (project spec fic)
b. Current Prevailing Wage Rate Table
c. Insurance ACORD Form(s)
d. Payme�nt Bond
e. Performance Bond
f. Maintenance Bond
g. Power of Attorney for the Bonds
h. Worker's C.ompeilsation Af�davit
i. MBE and/or SBE Utilizatinn Form
3. General Conditions.
4. Supplementary Conditio�s.
5. Specifications spec�'icaliy made a part of tha Contract Documents by attachment
or, if not attached, as incorporated by referance and described in the Table of
Contents af the Project's Contract Documents.
b. Drawings.
7. Addenda.
8. Documentation suk�mitted by Contractor prior to Notice of Award.
The foliowing which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the C.ontract Documents:
a. Notice to Proceed.
b. Fieid Orders.
c. Change Orders.
d. Letter of Final Aceeptance.
Article 6. INDF�M�FICAT�ON
6.1 Contractor cavenants and agrees to 'rndemnify, hold harmless and defen d, at iis own
expense, the cit�, its officers, �ervants and employees, from and agains t any an d all
claims arising out of, or alleged to arise out af, the work and services to be perfo rm ed
by the contractnr, itsoiiicers, agents, employees,sul�outractors, licenses or invitees
under this cflntract. This indemnifica#ian rovisionis s ci%ca[1 intended to o erate
and be effective even if it is alle�ed or proven that all or some of th e dam a�es bein�
soa�f�t were c�ns�d, in whole or 'tn� part, by an_y act, omission or ne�li�ence of the citY.
This indemniiy provision is iniended to include, withou� limitation, indemnity for
costg, e�:p2nsea and legal fees incurred by the city in defending againsf such claims and
causes of actions.
CI'I'Y �F FORT W ORTH 2O22 aridgeRehabilitation Contract 2
STANDAItD CONS'i'RUGI'ION SP�CIFICATION DOCUMEN'FS City projeet �Io. 103456
Revisexl l 1/23/2D2I
00 52 43 - 3
tlgreemertt
Page 3 of G
G.� Contractar covenants and agrees to indemnify and hold harmless, at its own expense,
the city, ita officers, servants and employees, fram and against any �nd alllos�, aannage
ar destructian of property of the city, arising oui of, or alleged to arise out of, �he vvork
and services to be performed by tke contractor, its officers, agents, employees,
subzontractor�, licensees or invitee� under this contract. 'Ihis indemnifieation
provision is specifically intended ta operafie and be eff�ctive evea if it is alle�ed or
praven that aCl or some of the dama�es bein� sou�htwere caused, in whole or in pa rt,
by any act, omission or ne�li�enee of the city.
ArticIe 'i. MISCELLANTAU�
7.1 Terrns,
Tertns used � this Agreement which a�•e defined in Article 1 of the General Conditians will
have the meanings indicated in fhe Ganeral Conditions.
7.2 Assignment of Cantract.
This Agreement, including all of the Contract Do�unrzents may not be assigned by the
Contraetor without th� advanced express written consentaf the City.
7.3 Succ�ssors and Assigns.
City and Con�-actor each binds itself, its partners, successors, assigns and tegal
repr�sentatives to the ather party hereto, in respect to aII covenants, agreements and
obligations contained 'u-i the Contract Documents.
7.4 �everabii[fy/Nort-Waiver ofClaims.
Any provision or pat-t of th� Contr�.ct Documents held to be unconstitutional, �oid or
unenforceable by a cacn•t of competent jurisdiction shaII be deemed stricken, and alI
renlau�ing provisions shall con#inue to be valid and binding upon City and Cantractor.
The failure of City or Contractor to insist upon the perfornnance of any term or pro�ision of
this Agreetnent or to exercisa any right �ranted herein shall nat cnnstitUte awaiver o�City's
or Contractor's respective right to insist upan appropriate pert'ormance or to assert any such
right on any future oceasion.
7.5 Gov�rning Law anci Venue.
This Agreement, including all of the Contract Documents is perfarmable in fh� State of
Texas. V�nue shall be Tarrant Counfy, T�xas, or the United States District Court far the
Northern District of Texas, Fart Warth Division.
7.6 Authority to Sign.
Contractor shall attaeh evid�nce of authority to sign Agreement if signed by someone otk�er
thanthe duly authorized signatory ofthe Contractar.
7.7 Nan-appropriation of Funds.
In ti�e event na funds or insufficient funds are appropriated by City in any fiscal p�riod ior
any payments due hereunder, City wiI] notify Vendor of such occurrence and this
Agreement shall terminate on the last day of the %scalperiod for vvk�zch appropriatior�s were
rec�ived without pena[ty or expense to City af any kind whatsoe�er, �xcept as ta the
portions of the payments herein agreed upon for which funds have b�en appropriated.
CiTY OF FQRT W�RTH 2O22 BridgeRehabilitation Contr�ct 2
STAI+TDAItB CQNSTRZICI'iON SPECIFICATION DOCUMEi�TS City project No. ]03456
Revised 11/23/2021
�0 52 43 - 4
Agreement
Page 4 oF 6
7.8 Prohibitioi7 On Co��tracts With Campanies �ioycatting lsrael.
Cnntractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of
the Texas Government Cade, if Contractor has IO ar more full time-employees and the
contract value is $100,OQ0 or mor�, the City is prohibited fram entering into a contract wit�
a compa�ly for goods or services unless the coniract contaitas a w riCten verification from the
company that it: (1) does nat boycott Israei; and (2) will not boycntt Israel during the term
of the co�tract. The terms "boy�ott Israel" and ``company" shall have the meanings
ascribed to those terzz�s ini Section 848.00 I of the Texas Governmeni Code. By si�;ning this
contract, Contractor ce!rti�ies that Contractor's signature provides �vrilten
verific�t�ion to the City fhat if Chapter 2271, Texas Governmen� Code applies,
Contractor: {1) does not boycott Israel; and {�} �ill not boycott Israel during the ierm
of the con�ract.
7.9 Prohibition on Bnycotting Energy Companies.
Contrac#or acknowledges that in accordance wiih Chapfer 227� of the Texas Government
Cod�(as added �y Acts 2021, 87th Leg., R.S., S.B. 13, § 2), Yhe C'rty is prahibited from
entering inta a contract far goads ar services that has a value Qf $ I04,000 or inore, which
will be paad wholly or partly from public funds of the City, with a company (with 10 or
more full-time employe�s) unless the contract contains a written verif'ication from the
company that it: (1) do�s nnt 6oycott energy companies; and {2) will not b.oycott energy
companies during the term of tI�e contract. The terms "baycott energy company" and
"company" have the m�aning ascribed to those terms by Chapter 2274 of the Texas
Government Code (as added by Acts 2fl21, 87th Leg., R.S., S.B. 13, § 2). Ta t�e extent
ihat Chapter 227�4 af the Government Code is applicable to this Agreenaez�t, by
signing this Agreernent, Contractflr certiiies that Contractor's signature provides
written verification to the City that Contractor; (1) does not baycott energy
companies; and (�) will not l�aycatt energy companies dnring the term af t3�is
Agre e m� nt.
7.10 Prohibition on Discrimination Against Firearm and Amrnunition Industri�s.
Contractor acknowledges that exceptas otherwis� provzded by Chapter 2274 ofthe Texas
Government C.ode {as added by Acts 2021, 87th Leg., R.S., S.B. I9, § 1}, the City is
prohibited from entering into a eontract %r goods or s ervices that has a value of $ I 00, 00 Q
or mare which will be paid wholly or partly from public funds of the City, with a company
(with 10 or more iull-tim.e empIoyees} unless the contract contains a wri�ten verificatinn
from the carr►pany that it: (1) does not have a practice, policy, guidance, or directive that
discriminates against a firearrr� entity or firearm trade assflciation; and (2) will not
discriminate during the term of the contract against a�z'earrzz entity or firearm trade
aSSOCI&f1011, 7'�10 t�i'TT15 "discriminate," ���lY�7Th1 E11�1ty" and "�z'earm trade assaeiatian"
ha�� the meaning ascribed to those terms by Chapter 227� of theTexas Gouernment Code
(as added by Acts 20�1, 87th Leg., R.�., S.B. 19, § 1). To the extent that Chapter 2�74
of the Government Code is appiicable to this Agreement, by signing this A�reement,
Contractor cerfifies that Couiraetor's signature provides written verification ta the
City that Contractor: (1) does uothave a practice, palicy, guidance, or directive that
discriminates againsta firearm entity o� firearrn trade assa�iation; and (2) will not
discrirninate against a firearm entity or f"irearm trade association civaring the term of
this A�reement.
CITY OF' P012T WORTH 2O22 BridgeRehabilitakionContract 2
STANDARD CONSTRUCI'IO?V SPECIFICATIQN DpCj.JMENTS Ciiy projecC l+lo. 103�156
Revised 11/231202]
(}0 52 43 - 5
Agreement
P&ge 5 af 6
7.11 Immigration Nationality Act.
Contractor sha1I verify the identity and emplaym�nt eligibility of its emplayees �who
perform work under this Agraement, including completing the Employrnent EligibiIity
Verification Form (I-9). LTpon request by City, Contractor shall p�•o�ide City with copies of
all 1-9 forms and supporting eligibility documentation for each employee who perforzns
work undei• thrs Agreernent. Contractor sha[1 adhei•e to all Federal and State laws as well as
establish apprapriate procedures and controls so that no services wiI! be performed by any
Contractar employee who is not ]egally eligible to perform such services.
CON'I17ACTOR SHAI.L INDEMNIFY CITY AND HOLD CITY' NAR1v�,F�S
FROM ANY PINALTIT.S, LIABILITIES, OR LO,SSFS DUE TO VIOLATIONS OF
THIS PARAG1tAPH BY CONTRACTOR, CONTRACTOR'S �MPLOYEES,
SL]BC�N'TRAC'PORS, AGrNTS, OR LICIIV�F.�S. City, upon written notice to
Contracta�•, shall have the right to immediate]y fermi.nate this Agreement for �iolations of
this provision by Contractor,
7. I2 _ No Third-ParEy Bene�ciaries.
This A�reement gi�%es no rights or benefrts to anyone otherthanthe City and the Contractor
and there are no third .party beneficiaries.
7.1�3 No Cause of Action �Against Engineer.
C.ont�•actor, its subcontractors and equipment and materials suppiiers on the PR�.T�C'I' ortheir
sureties, shall maintain no direcf action against the Engineer, its ofitcez's, eznployees, and
siab�ontractors, fiar any claim arising out of, in cannection with, ar res�lting from the
engine�ring services performed. Only the City will be the bene�ciary of any undertaking by
the Engineer. Tlze presence or duties of the Engineer's personnel ai a construci:ion site,
whether as on-site representatives or otherw�se, da nat ma[ce the �ngineer or its pers onnel
in any way responsible foe those duties that belozig �o the City and/or the City's construciion
contractors or othe�• entities, and do not relieve th� cnr�struction contractors or any athar
entEty of their abligations, duties, and responsibilities, including, but not limited to, a!1
construction methods, means, techniques, s�quences, and procedures necessary for
coordinating at�d campleting a]l portions of'tl�e construction work in accordance with the
Contract Docurr►ents and any E��alth or safety precautions required by such construction
wark. The Engmeer and its persnnnel have no authority to exercise any cantroI over an�
construct�on contractor or other �ntity or their employees in connection with their w ork or
any 1lealth or safety precautions.
CITY �F FORT WORT'H 2O22 Bridgel2ehabilitatinn Conlract 2
STANDARD CONSTftUCT]ON SPEC�'ICATION DOCUM��1T5 Ciryproject 1�'0. 103456
Re�ised 11/23/202)
ans2a3-6
Agrcamanl
Puge6 ofG
iN WITNESS WFIER�OF, City and ConSraator have each exacuted thfs Agreement ta 6e
affective as of the date subscribed by the City's deslgnat$d Assis#ant City Managar ("�ifeetive
Dake").
Coritt•actor: �, ;1� -,; irl �a'! �.,:, _",: ���C� � Clty of Fart Wortli
1 r r+
By: By:
�'
. — � � �a�.a,�,�r�� .
Signa�ure DRtifl B W�ghdoff
Assistant Clfy Manager
Al�n C. Meador _
{Printed Nsxne}
,jlir.a Presiden
Tltle
�f 121 d Ryliecrest Dr. _
Address
Balch 5,p�rinas. Te�as i5180
CitylStatelZip
fl31Ll:�L���.. - —
Data
D�te
Apr 16, 2022
,�:����'� �'.:�4`
��•� , ��`��,
����"" .'� :'�"� :
Atteskt
,7a�r�r�l�2 t� G�?�_
Jannette (3nodall,
Secretary � �"
�
(Seal) `���„�s
M&C; �.�^U15v �
Dat�: D3I0& 022
Farm 1295 No.: 2022-841324
Contract Compllanee Manage�•:
�y signing, I acknowledge that I am the parson
responsibke fo�� the monitoring and
administeation of kh�s con#ract, includir�g
ensurIng af1 performance and reparting
requirements.
�
Ireta�niwa�uyela - - - —
Froject Managar
Ap�roved as ko Form and L$gal{ty:
8�i
Douglas W. B1ack
5r. Asslsta�it City Attornay
APPROVAL [iBGOMMBI�Ep�l7;
��.�.�� .
a
William Jnhnson, Director
'Franspot�tation &PubiEa Worlcs Dcpartment
CITY Of CORT WOATH
STAMpAfiD CONSTRilCTlOtV SPGCIi'ICATiQH DOCi7iv1GNTS
iiavlscd i 1l23126ZI
���
-� �.'
202Z Xiri�gc itcl�a�iliinilnq Cn t 2.
������ �� �
;
� 4�4'���� �
Ba.nd No. K40427405
006113-I
PERFd3tMA]dC£ SOND
Page l of 2
I
2
3
4
S
6
7
8
9
SECTiON 04 61 13
PER�'ORMANCE BOND
THE STATE OF TEXAS §
§ KPIOW ALL BY THESE PRES�PITS:
COUNTY QF TARRAI�IT §
Thai we, Gibsan & Associates Inc. , known 85
"i'rincipal" herein and Federal Insura��ce Cam an a corporate
surety(sureties, if more than one) duky authorized to do busEn�ss in the State of Texas, known as
10 "Surety" herein (whethar one or more), are held and firmly bound un#o the Gity of Fort Worth, a
11 municipal corporatian created pursuant to the laws of Texas, ltnown as "Ciry" herein, in the penal
Six Hundred Seventy Nine Ti�nusand, Six ______ Dol[ars
12 5utn Rf, Hundred Fo Six and 50/1Q0---------------------
�3 ($, 679 646.6U �, lawful maney of the United States, to be paid in Fort Worth,
]4 Tarrant Couniy, Texas for the payme�t of w.hich sum welk and trufy to be made, we bind
lS oursel�es, our heirs, executors, adminisirators, successors and assigns, jaintly and severally,
16 firmly by these presents.
17 WHEREAS, the Principal has entered into a certain written contract with the City
18 awarded the 8TH day af MARCH. 2022, which Contract is hercby referred to and mad� a part
19 hereof for all purposes as if fully set farth herein, to furnish s[I materials, equipment labor and
20 other accassories defined by �aw, in the prosacution ofthe Wark, including ariy Change Orders,
21 as provided for in said Contract designated as 2022 B3tI�GE REHABIL[TATION CONTRACT
22 2, City praject No. 103456.
23 NOW, THEREFORE, the condition vf this obligation is such that if the said Principal
24 shall faithfufly perfarm it obligations under the Contract ar�d shall in afl respects duky and
25 faithf�fiy perfarm the Work, including Change Orders, under the Contract, accurding to the plans,
26 speci�cations, and contract documants therein re�erred to, and as well during any period of
27 extension of the Cantract thet may be granted on the part nf the City, then this obligation shal! be
28 and become null and void, otherwise ta remain iz� full force and e#fect.
29 PROViDED FURTH�A, t�at if any fegal action be �led on this Bond, �enue shal I lie in
30 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
31 Worth Div�sifln.
CITY OF fiORT WORTH 2O22 Bridge Aehabikitatian Conteact Z
STANDA RQ CONSTRUC7ION SPECiFlCA7'i0N DOCI3MENITS City projeot Na. 1 U3456
Revised Jufy 1, 20l I
0� 61 !3 -2
PERFORMANC&BQND
Page 2 of 2
2
3
4
S
6
7
8
9
10
I1
12
13
14
15
16
17
18
i9
20
21
22
23
24
25
2C
27
Z8
29
3R
31
32
33
34
3S
36
37
38
39
40
41
42
43
44
45
This bond is made and executed in compliance with the pravisions oi Chapter 2253 of ��e
Texas Govemment Code, as amended, and al! liabi�ities on this bond shall be deterrn�ned in
accordance with the pravisions of said statue.
IN WITtVFSS WHIItEOF, the Principal and the Surety have SIGNED and SEALED this
instrument by duly autharized agents and officers on this the 9th day of March
, 20 22 .
PRINCIPAL;
Gibson & Associates, �nc.
AT7`�'.,ST: �
�� � , �
(Pr�i�ipal} 5ecreta�y
- _• i� •� . _� 1
1d71tnesK as toPruicspa�~ f
f� . ,� ��
BY: _ �� _� .4 ._,� _� _
5ignature
��G. t � f''�tdi�d( �►� �� ``�i�r�
Name and Title
Address: 112101tyliecrest Dr.
Balch 5prings TX 75180
SURETY:
Federai Insurance Coin an
BY. ����g .�t ��i! � — /,��
S�gnature
Aobbi Morales, Attarne -in-fact
Nam� andTitle
Address: 5005 LBJ Freeway, Suite 1500
Dalias. TX 75244
rtness as to Surety Telepbone Number: 214/989-OOQQ
*Nflte: If signed by an of�cer of the Surety Campany, there m�stbe on file a certified extract
from the by-laws shawing that this person has autharity to sign such obligation. If
Surety's physica� address �s different from its mailing address, both mustbe provided,
The date of the bond shall not be prior to the date the Contract is awarded,
ClTY OF FQItT WARTFi
STATfDAR� CONSTRUCI'1pN 5PECIFTCATION DOCiJMEN75
Revised 7uly 1, 2611
2022 8ridgeReha6ilitatianCantBet 2
City proj ect No. ] 03456
Sond No. I�4�427405
00 61 l4 - 1
PAYMENT 90Nfl
Page 1 of 2
I
2
3
4
5
5
7
8
9
ia
I1
l2
13
!4
15
16
THE STATE OF TEKAS
COUNTY OF TARRANT
SECTIOlii OU 61 14
FAYMENT BOND
§
§ KP10W ALL BY THE�E PRE�ENT�:
§
That W�, Gibson & Associatas, Inc. , knawn as
"Principal" herein, and Fe�era{ Tnsur�nce Com any , a
corgorate sureky (sureties),, duly autharized to do business in the State nf Texas, knawr� as
"Surety" harein (whether one or more), are held and firmly bound untv the City of Fort Worth, a
municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein,
5sx Hundred Seventy Nine Thousand, Six DolEars
in ti7e penal sum of Hundr�d Forty 5ix and 60/i40-------------------------
{$ G79,6�F6.60 _ ), lawful money of the United States, to be paid in Fort Worth,
Tarrant County, Texas, for tha payment of which sum well and kruly be made, we bind aurselves,
our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
presents;
17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the
! 8 8TH day of MARCH, �022, which Contract is hereby referred to and made a part herevf for all
j9 purposes as if fuliy set %rth herein, to furnish al� materials, equipment, labor and other
20 accessories as defined by law, in tt►e prosecution of the Work as provided for in said Contract and
21 designated as 2Q22 BR.iDGE REHABILITAT20N CONTRACT 2, City Project No. 103456.
22 P10W, THEREFORE, THE CONDITION OF THIS OBi.IGA'['ION is such that if
23 Principal shall pay alE monies owing to any {and all} payment bond beneficiary (as defined in
24 Chapter 2253 of the Texas Gavernrnent Code, as amended) in the prosecution of the Work under
25 the Contract, t.hen this obligation shali be and become nu�l and void; otherwise to remain in full
26 force and effect.
27
2S
29
30
This 6ond is made and executed in compliance with the provisians of Chapter 2253 of the
Texas Government Code, as am�nded, and ali liabilities on this hand shail be determined in
accotdance with the provisions o�'said statute.
GTV O� F4RT WOR7H 2Q22 Bridge Raha6ilitation Contract Z
SiANpARD COAlSTRUCTiOI�! SPEC�FICA1']ON �OCiJNE£NTS City Prpject No. 103456
Revised luly 1,2�If
00 61 l4 -2
PAY1Vf�1T $OND
Pege 2aP2
Q
2
3
4
5
6
7
8
9
10
11
12
IN Wi'fN�SS WHEREOF, the Prineipal and 5urety have each SICrNED and SEALED
this instrument by duly autharized agents arfd officers on #h�s the 9th day of
March , 20 ��
ATTE�T;
f � _ _
(Principal) Secretary
- . - -s -- - _
V1II�l1P.SA 35 tp PrInC]T�3� �
,,
ATTEST:
_ . L ,
(Surety) Secretary . ' _ _
'� ��
W' ess as to Surety
��czP�.:
Siihson &. Associates_ In�,..,...__,_ .
�/ � i. / �'
Bi: y�� O,� y/•
Signature
����� p `' '�
__.��'Y]..._.L-�____�. f"� 1' �� _��f i.4 I�1� S �� 1 n�r
Nazne and Titl� �
Addre95: 112I0 Ry[ieci-est Dt•.
Balch 5prin�s, TX 75180
SURETY:
Tede��al Insurance Com�any
BY:
Signature
Rohbi Morales. A o y�f��t—__
Name and Title
Address: SOf}5 LB7 Freewa Suite 1500
Dal�as. TX 75244 _
Telephane Number: 214f989-�000 '
Not�: If signed by an affic�r of the Surety, there must be on i'ile a certifzed extract from the
bylaws showing that this person has authority ta sign such obligatian. If Surety's physical
address is different from its miailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is aw arded,
ELYD OF SECT�ON
CIfY 4F FORT WORTH
STANI]ARD CONS'i'RUCfION SPEC�'ICATION DQCUMENTS
Revised luly l, 2D11
2Q22 EtidgeRekiabilitatianConiract 2
City Project 3Qo. ] 03456
Bond No. K4Q427405
OObll9-1
MAENT£NAI+fCE BpND
Page l of 3
1
2
3
4
5
5
7
THE STATE OF TEXAS
COUNTY OF TARRAN'F
SECTIO�I OD 61 19
MAINTENANCE BOND
�
§ KNOW ALL BY THE�� PRESENT3:
§
8 Th3t we Gibson & Assacia�es, Inc. , known as
9 "Prtncipal" herein and Fedetal Insaranee Cornpanv _ , a corporate surety
10 {sureties, if mare than one} duly authorized to do business in the State af Texas, known as
i l "Surety" herein (whether one or mare), are held and firmly baund unta the City of Fort Worth, a
12 municipal cor orakion created pursuant to the laws of tlte State of Texas, known as "City" herein,
�ix Hundred Seventy Nine Thousand, �ix
13 i�1 The sum of Hundred Forky Six and 6D/100----------------------- pp����
14 (� 679,646.60 �, lawful money of the United States, to be paid in Fort Wor#h,
I 5 Tarrant County, Texas, fax payment of which sum well and truly be made unto the City and its
16 successors, we bind aurselves, our heirs, executors, administrators, successors and ass9gns, jointiy
17 and severally, firmly by these presents.
l8
!9 WH�REAS, the Principal has entered into a certain written contract with the City awarded
20 the S�-I, day of MARCH 2OZ2, which Cant�act is hereby referred to and a made part hereof for
21 all purposes as if fuliy set forth herein, to furnish all materiais, equipmenc labor and other
Z2 accessories as defned by law, in the prosecutian of the Work, including any Work resulting from
23 a duiy authorized Change Order (coI[ecti�ely herein, the "Work") as provided For in said contract
24 and designated as 2422 BRIDGE It�HABILITATION CONTRACT 2, City Project No. i 03�56;
25 antf
26
27 WHEREA5, Principal binds i#selito use such materials and to so construct the Work in
28 accordance with the plans, specificatians and Contract �ocuments that the Work is and wilf
29 remain free from defects in materials or workmanship for and during the period of two {a) years
30 a�Cer the date of Fina! Accep#ance of the VJork by the City {"Mafntenance Periad"); and
31
32 WHEREAS, Principal binds i#seif tn repair or reconstruct the Work itt whole or in �art
33 upan receiv�ng notice from the City of the need th�refor at any time within the Maint�nance
3�4 Perivd.
CITY pF FORT WpRTH 2O22 aridge. ftehabilitaiian Contract 2
STANt3ARD CDNSTRUCTEON SPECIFICATIdN DOCUMENTS City Projecl No, ]0345b
Revised Juiy V, 2011
aa6i �4-2
MAITiTENANCE BONb
Psge 2 of 3
1
2
3
4
5
6
7
S
9
10
ll
12
13
14
IS
15
17
18
19
20
NQW TIik'.REFORE, the conditian ofthfs obligat�or� is such that if Pr�ncipalshall
rernedy any defeetive Work, for which ti�nely notice w as provided by City, to a caxngletion
satisfactory to the City, then this obligation sha17 become null and �oid; otherwise to r�main in
full farce ar�d ef�ect.
PROVIDID, HOWE'VEK, if Principal shall fail so w repair or reconstruct any fimeiy
noticed defeciive Wark, it is agreed that the City �nay cause any and all such defactive Wark to
be repaired and/or reconstructed with al! associated costs thereof being borne by t�e Principal xnd
the Surety under this Maintenance bond; and
PROVIDID FURT�III2, that if any legal act'von be filed an this Bond, venue s hali lie in
Tarrant Caunty, Texas or the United States District Court for the Northern District of Texas, For�
Worth Division; and
PRUVIDID F[1R'I��IL, that this obligation shall be continuaus in nature and
successive recoveries may be had I�areon fqr successive breaches.
CITY OF FORT 1�/QRTii
STArCbARD GONSTRUCI'[ON 5PEC3FICATTON DOCUMENTS
Revis�dluly 1,2Q�1
2022 Bridge Rehahilitation ContTact 2
City Prqject No, ]03456
nn �5i 19-3
MAIDII Fx, r�tdcE �ic�:v'D
pags 3 of 3
�
2
3
4
5
6
7
8
9
10
11
I2
I3
I4
15
16
i7
18
19
20
21
22
23
24
25
26
27
28
29
30
3L
�
33
34
35
35
37
38
34
4U
41
I-N WITNESS WHII7FAF, the �'rincipal and the Surety have sach SIGNED and SEALED this
instrument l� duly authorized agents and afficers on this the 9th dayof Marcl�
2D 22 .
PR]NClPA L:
Gi�san & Associates, Inc.
.'
I3Y:'.�,� _ �_��'f� �
SEgnature
A'TTE��'T:
� � _ . .
(Principal) Secretary ^ � ^
�
. �� � , . '�'��e►��_ � 1.: .�!_ ���� �� �r��
Name an d Title
Address:._ 11210 R +Zliecrest Dr.
_,,,, Balch Springs, TX 75180
, � .
� • � = �. • �
Wi�ti�ssas toPrincipa�� � .
SLlith'�`Y:
Federal I�ysurance Corn an
Bl': �.{. �: �i�p�l��
Signature
ATTEST';
Robhi Morales, Attori�e -in-fact .
Nacue and Title
--..�
��,,,., _� __ Address; 5405 LB.1 �'reewa 5uite 1500
{Sure ) Secretary , Dallas. TX 75244 _
it ess as to Surety TelephoneNumber: 2�41989-QnOd
*Note: If signed by an afficer of the Surety Company, there must be an file a certified extract
from the by-laws slaowing that this person has autharity ta sign such obligation. Tf
Surety's physical address is di�ferent from its mai�ing address, both mustb� pravided.
The date of thebondshall nat be prior to the datethe Cantract is awarded.
CII'Y OF FQRT WORTIi
5?'ill+lD.4RD CONSTAUCI'ION 5PECTFICATIC}N DDCUII�EN'F5
Revised July 1, 2011
ZQ22 BridgeRehabil.itationCantract 2
City Projeat No. 103456
Power of Attor�ey
Federal Insurance Campany � Vigilant Insurance Co�npany � l'acific Indemnity Company
Westchester Fire insurance Company � ACE American [�s�rance Company
I{naw All &q Tl�ese Yresents, Yhat FBI]6RA41NSIIAANCE CON{PANI', a�� Indiana corpm•ation, VIG[LANT [NSURANC& COMPANY, a New York corporation, PACiFIC CNUEMIVT'!`Y
COMPANY, a Wiscansin corporation, WG5TCIIL�STL�R l�IAG INSUItANC� COMPAM' and ACII AML�RICAN INSURANCE COIvEPANY corpnrations of the Commonwealth af Pennsylvania,
do each herehyconstitute and appoint Dql� E. Cornell, 5ophinle Hunter, Tina McEwan, Robbi Morales, Mikaela Reppers, Tonle Petranek, Ricardo 1. Reyna,
Josh�ua 5aunders and Kelly A. Westlarook of Dallas, Texas; 5teven Dwain Brockinton of Little Rock, Arkansas--------------------�---�-------------------------
each as their h�ua and lawFul Attorney-in-Fact to execute under such r]esignation i n thei=• names and to affix their corpo3�ate seals Eo an d deliver For and on their behalFas surety tliereon
or otherwise, honds and unc3ertakings and other writings al�ligatory in tl�e nature thereaf [odier than bail bondsJ given or executed in the course of l�i�siness, and any instruments
amending or altering tl�e same, and cansents to the madificatlon or alteraNun of any instrument referred Co in said l�onds ar ohligations.
ln Wimess Whereof, said FEDSRAI. IHSURANCE COMPAMY, U[GILANT I]VSURANCS CONEPANY, PACIFIC IN�EMNITY COMT'AIVY, WESTCHESTER FIRE INSUItANCB COMPANY
and ACS AMERICAN INSURANCH COMPANY have each executed and attesced these presents and aff3xed their earporate seals on thfs 4�h day �f Fe6ruary, 2022.
1��9.4-� ti'ti 1`'�l. P�'�.C�lt�
17�iv� �3 11. l:ltlt�r�. il4hs�tun i ti�,�r�l.u�y
� � �•— � � � ��
�f` �'✓ � 5F.St�
F �L::'J' � �
�� `.
51'ATE OF iJEW jHRS6Y
County af Hunterdan
�� y-L l�l �
Stes�hen �I. I I:v�cry. YiCe PI'e�idcnt
��� — �� �� �'e� �
� ,� �
��
On this 41e day oF Fehruary, 202Z veFflre ene, a Notarq Puhlic of New Jersey, personally came llawn M. Chloros and Stephen M. Haney, to me known td 6e Assistant 5ecretary snd Vice
President, respectively, uf FE�BRAL �NSURANf.E CQMPAMY, V[GILANT fl�5lf HAHCE COMPANY, FACIRIC 14V �8 MN ITY C�iv[PANY, WESTCHEST6A C[RE [NSL]RANCE GOMPAIVY and ACE
AMHR1CAiV 1NSURANCE COMPANY, the companies wltich execnted the Faregoing Pnwer of Attorney, and the sald Dawn M. Chloros and Stephen M. Haney, being by me duEy sworn,
severalfy and each for herseff and h3mselF dtd depose and say that ihey are Assistant Secretary and Vice President, respectiuely, of FE➢EItAL ]NS[]RANCE COMPANY, VLGILA3YT
INSURANC6 COMNANY, PAC]FIC INDFivIN1TY C�MPANY, 1NESTCHE5TER P]RS INSUR.4NC� GOk4PANY and ACS AMEAECAN 1NSllRANCE COMPANY and know tlie corparate seals
thereof, that the seals affixed to the Foregaing Power nf Attnrney are sucli corporate seais and were tl�ereYo aFfixed hy authoriry of said Companies; and YhaY thelr sfgnahn�es as such
❑fficersweredulyaf€ixed and subscribezl hylike auti�ar'sty.
Nntariai Seal "�
�iARY
o��
pZBLIG
� g
KA"CH�RINE J. AtiE44AR
iVC?TAiiY P119F.IG QF 3V�W JERS�Y
k40. 231�6�6BB
CnmmlasSon Exp�res July 7e, 26a9
�
. n�o,�n �mi�
CERTIFI�ATION
Resolutions adoE�ted by the Hoards of oirectors oF AEDERAL [NSURANC� COMPANY, V[GILANT INSllllANCE COMPAI�Y, and PACIFIC [NUEMN]TY COMPANY on Augus.t 30, 2016;
WB57'CIiESTER FIItE 1NSURANC6 C6MAANY on llecemUer il, 2046; and RCE AME[iICAN 1NSURANCE COS�IPANY on March 20, 2609:
'RGSO[.VEO, thaf the fnlldwlttg authoi'izatioiis relate to [he cxecutlon, far and o�1 hehalf nf [he Cnntpany, aF 6ands, uod�rtakings, �•ecagnizances, conh�acts and other w�'�tEen commitments of the Company
euCered Ento in the ordinary course nf busLiess (each a"Writ6en Commltment"]:
(]] 8ach oF the Chali'Inan, thC President and the Vlce PTesfdent5 oF theCompaz�yishei'ek7y authorized toexecuteaisyWrittenCQmmiimen¢ foi'andonbel�alfoftheCompany,undertheseal
af the Campany or otherwise.
[2] 6achd�lyappolntedattarney-In-EaCkuFtheG4mpany5sherebyauthorized�toexecuteanyWrittenComniSt�nentforandonbehalFoFtheCompa�ty,underthesealoFtheGompairyorotherwise,
tn t3�e. exteot that such actlon Is authorlaed �y the gratlt of powees pPovided fm� iu such pCrsOn's written appointmenF as such attai'neyiA-Fact.
(3] Each af tlae Chainnau, the President and the Vice PxPstdents. af [heConipanyleherek�yauthdri2ed,foi'andon hehalFoFtheContpaqy,fo.apps�intinwi'iting any pel'son the atiorney-In-
Fact oF the Cnmpatty with f��ll power audauthnritymexecuEe, (ol anA' ntt hehalfaFtheCompany, untler the seal oftheCompanyarntherwisc,sudiWdttenCommiementsoftheCornpaixy
as nnay 6e speciBed itt Such wCithen appoiatnlent, which sp�ecification may 6e by geaeral type oc class af WeitN¢n COislmit�rzents nr hy speelficatlon of aife 9r moee pal'[icula�' 4V�itten
Co�mnit�nenis.
(4] Each of the Chairman, the President and ehe Viee Peesldellts oP the CanEpainy is hcreby autlsnrized, For and on hehaiF aF the Compnny, to dclegate in Writing to ahy okhei• ptCceC afthe
Cotnpany tfse autharity to exetuSe, for and un hehalf Of the Company. under the Conipan}rs sea[ or othcrwlse, such Wiitten Commltmcnks nFthe Cotnpany as are speritied irt suoh wrltten
delegaNmi,whichspeclficatiars may he by general typepx classof WS�Itten Gommltrnentc or hyspecifiration-oPoneorm�preparticu]arWrittenCommitn}en��
(� The signature nf any nfFicer or oth�er person exeniting any Writien Commitmznt nl' appointmeut or delegallon gel'silant to [his Resolution, and the seal of the �ompany, niay be afFxed hy
Facs'tmile oo such Wr�tten Commitment or written appointment or delegaUon.
FURTHER [2ESOLVE�, that the foregoing Re501utinn shall not be deemed to 6e an ex�lusive statemeut ofthe pnwei•5 and aGithorityof of�irers, em�luyees and oY�erpersotts ta art inr a�d on 6eh�lf of Ehe
Coiiipany, and si�ch Re591utian sha�l notJimit or otherwi5e afFecf the exercise of�any such power or authnrity olherwise validly gran[ed or veste�l:'
1, 4awn M. Chloros, Assistant 5ecretary of PBDERAL FNSE]RANCE C�DMPANY, VIGILANT ]NSIIRANC� COMFAAIY, PACIP]C IIVAk�MNITY COMPANY, WESTCHSSTER �IR6 ][VSllRANCE
COMPANYand AEE AMHR]CAN 1NSURAIVCS CdMPANY [the"�om�anies"j do here5y certify that
(i) the foregoing ResoEutions adopYad by the Snard of ➢irectors aFthe Companies are tr�e, correct and iu ftdl force and effect,
[ii) flie foregoing Power af Attarney is true, correcY znd in Full force and efFect.
Given m�der my hand and seals of said Companies at Whitehouse Station, Nj, this March 9� 2��2
+:+"'"'� ' .,r
� � ~'Y% � Q' sert
��� - .. � �
• f • � ��
++plML , .. .
�1��-�-+ � i�. l:.J�'�..1.S6+vti�
U:iv;n 1L Chlnrin.,l�kLuunt ti�erc[ary'
�IV'fH6 EVENT YOII W[SHTO VEAIFY THE AUTH�NT[C1TY OP Tll[S DOND OR NOTIFY US OF ANY OTHQR MA'I"i'6R, PLBASE CdNTACi' 115 AT:
Tele hnue 9. 903-3493 Fax 996 903-365G eaAail: sm�e �achu6h.ca�m
Camhined: FEO-VIG-PI-WF1C»AAIC (ray. 1�-19)
�A�►C]/f]O�C��P ii1�0�"I??��'1�1i 1���I��
1f�i����Aii�� N�il��
Tc� c�btain inrormatian or rr�ake a complaint:
Yau may call Chubb's toll-free telephone number
for information or to make a comp�aint at
9 �OOd36�CbU�B
Yau may contact the Texas Department of
In.surance to obtain in�orn7ation on companies,
coverages, rigllts or camplaints at
f �8AU�252 3439
You may write t.Yie Te�as Depariment of Insurance
P.O. Bax 149104
Aus�in, TX 78714-9104
FA� # (512) 475-].771
Web: http:llwww.ldi.slate.tx.us
E-mail: ConsumerProt�etian@tdi.sta�e.tx.us
P�4�'IVIIUNI f�R ��AI►IVl �I��C�i��.
Shauld you l�ave a dispute concerning you�r premium
ar about a claim you shauld contact the agent first.
� the dispute is not resolved, you may cantact the
Texas Departrrient of Insurance.
����� ��r,� nrarrc� ra You� ���►cv.•
This notice is far informatian anly and does not
become a part ar condition of the attached
dacument.
A!ll�� I�IIP�Ri'.�f���
Para obtener informaci�n o para someter una
queja.
Usted puede llamar al numero de �elefano gratis
cle Chubb's para informaei6n o para someter una
c�uej a a1
f �840 36�GF�r�[!��
Puede comunicarse can el Departamento de
Seguras de Texas para abtener informacion acerca
de campanias, caber�uras, derechos o quejas �1
T ��'00 2�2�3439
Pued� escribir al Departamento de Seguros de
Texas
P.O. Box 149104
Austin, TX 78714�91Q4
FAX # (512) 4'75-17'11
Web: http;I/www.tdi.state.�c.us
E-mai1: ConsumerProtection@tdi.stat�.tx.us
DISPUTAS 5��€�� P�Af��4� � I��'��Af���:
Si tiene una disputa cancernienle ��u prima c� a un
reclamo, debe camunicarse con e1 agente primero.
Si no se resueve Ia disputa, puede entonc�s
comunicarse can el dep�.rtamen�o (TDI).
�fVA ���'� �{/1�0.� S�1 POLI�4�
Este aviso es salo para prop6sito da informacion y
no se canvierte en pa�-te a condici6n de1 documenta
adjunto.
Fnrm 99-10-D299 (Rev. 1-Oi3)
THI� �fJpaf�S�[4A�fVT Cb�NGLS i�i� �O�t�Y. �L�Aa� ��A� Ei Cf�Fi�FU��Y.
���� �o����,��r���� ��,�r���� ���iY����� ���u���
ER1pOR��[�fl�i�T —� F��Ni A
i'hi� endars�m�nt modifies insurance prouided untfet the following:
COMMER�lAI. G�PI�RAI. LIABiLIYY �OVL��iAi�E �Ar�T
Polic_y Number
GF,2 i 1 d �F9'�
Agency Number
0765330
Poticy �ffecEive �at�
osr�azaz�
F'clicy �xpiration Date
�fi13R12022
Named Insurecf
Gibsan&1��soci�te�, :°�.,
C?ate
Agenty
Bow�N Mic�.¢T i r�- sAz�rT
LLC
Ac�ount Number
Issuing Company
AMERISi�RE
�DlSUkti�t�CE C�^+iP,�v'�
1. a. S�CTIC�w !! - WH[3 ES AN IN�URED is amende� to add as an additior�al ins�red any person or
organi�ation whnm y�u are r�c���re� !o ad� ds dn �ddi���nal Insured or� Ih�s p41�cy under a wrol#en conkra�t or wr�sl�!n
��re�meritr�lali��g la your Uu�irres5,
b. Th� wri#ten cantract or written agreement must;
('1} Require additiorral msured 3Satw5 fOC a tirC�� p�flod dueing the term ai k�1i5 �oll[y; and
(2) Be execut�d prior to the "hqdily injur�r", "propc�rly damagr", ar "p��6r�al ar�d adver�i;�n� in�ury" leadar�� io a
claiin unrier chis policy.
c. If, however:
(1) "Yaur wor�C" 6egan under a letier of intent or work arder; and
(z) The letter of intent ar work order led to a written contract ar written a���me� �t xv;;!� ;^ 3Q days of beginning
such work; and
(3j l�our custnmer's custarnary. contrac#s r�quire persons or organizations ko be named as addifional insureds;
w�! tnrin �,r;.v,'�� addi:�^ :! ;^;�re� stafus as specified in this end�rsement
2. 7he insurance �sr�vided under thas en�orsement is iirRlied as lol��ws�
a. That persan ar organi�atipn is an adclitional insured only wi�h respe�t �� ���h;;ity c�;:s�d, �n whnle or in part, by;
(1j Premi��s you;
(a) Own;
(b) Rent;
(c} Lease; �r
(d) �ccupy;
(�) Qngoing operatians performed #�y ytau flr vn your beftalf. Ongoing aperations does nnt apply to "badily
injury" ar "proper#y damage" occurring after:
(�� All wark �o +�� p���armed hy y4tu nr u+� �wur 6eh�lf for tl� �dditional insured(s} atthe site of the
co�efed o�era�ions Is tomp��le, irtGrUdiavg r�la[ed rr7;3ierFals. �ar�s or �quipment (other than servi�e,
IT�aIii�C�I1r71YCt� ar repa�rs�; or
(b) That portion o#'jrour work" out of which the injury or damage arises is puf ta iis intended use by any
person or organizatian ather than another eontractor w4rking for a prEn�ipal as a part o€ t �L �ame
praject.
lncEudes capyrighted material af insurance 5eroic�s Office, inc.
eG 70 �5 �01� Pages 7 of 3
Poli�.}r IVumher: GL2114797
Effective aates; 0613012021- 06130f2022
(�} Completed nperations cnverage, but oniy i�:
(a) The wrikten contract or written agreement requires completed opecat'ioRs crav�r �yo ur ";fV!!r :v^r�"
�F.JY�Ii�C�L� sl�:u
(b) Tl�is ebvera�}e P�r� µr�wd��s cowerag� !or "badify injury�� or "ponperty d�rnage" i��iude� wi;;'�n t!':e
"pradu�ts•�am��e[t�d aper,�tia�5 h�z�rd",
�iowever, the insurance aflorded io surh add��ianal ins�,red flnly appkF�� ao �I�e �xMenl ry�ern:��#�� I�y law
b. If the wriften contract or writ�ers agreement:
(9) Requires "arising out af' la�tgarage; or
(2) R�����r�a y;,;: �w 7rVui:!; additiona) insured coverage to that persan or organization by the Use af eitfier ar
bG�h aF lhe f�+�luwir�g;
(aj Additional Ins�red — uwn�+�. Les��e: ur C�^t:at�wrl— Scheduled Person Or Orc�anEzation
endorsemenkCG `1,p 7� S� Q1; ❑r
(b) Additional Insured � Own�rs. i.rt�sr.�� 4r �u��q+afiu�s �- Compl�ted Qperations encl�rsement CG 20
3710 01;
then the phcase "caused, in wf�ole or in part, by" in paragraph 2.a, abave is replaced by "arising out of'.
t. �� 1re wri[Eet7 c�ntr�f[ or wria#en �gr�emen� requiee� you �d praul[�e a�',''.�ti�:;�: GnsrJY�d tOV�fgg� Cp j#t�r ��rSCF}
or flrga�izal�on by Ikre u5� r�i;
('I) Ad�iti+�reaE Ires�Ce[1 — C]wr��rs. �4SSP�5 OC COIIIk�Ctt}YS— S{l1�dUl�� R�r50ri �r Qrge�nla3lian endar5errier�t
CG �0 1 Cl a7 ��4 or C� � U] D�4 13: or
Cz� +1ddFri ::a! lrstir�� -- C3wn�rs, tess�es tSr i�� �taattors — Cample3�d Q�eratior�s endo�semer�4 CG �4 3� 07
�4 or CCr 2i� �7 �� 13; or
(3} Boah �hase cr�dorsem�r�s wirh ��rh�r of �hose e����on d�ke�: or
(4? Eit�c�r or both of the following:
(a) Aciditiona! insured — U++,��tn.r�. ��;��6C, a� c�or�l+actars - 4cF�eduie¢ ��rs�e� Or�rganF�alian
�ndarsement CG 20 1� willrtx�R an ��itisrri da�� spec�t���: ar
{b) AddEtion�E lnsured — owners, L�SSeeS Oi' Carltra�tGrs —�afri��l�d OpCft'Y!{r��� �r��ryr50[n�n9 C� ��
37 wiifiou� an e�ii�i��k rJ�ale �peeiii�d;
then paragraph 2.a. a;+�v� ��;���s.
d. Premises. as r�sFect� �ragraph �Ja.('1) above. include �a���F��,�. u: wu�Ei� areas about :;.�ch �,re;r.:;�; e� �.,^
requ�ied l�x thn wril�en [an�r�[# 4r wfillzn agre�nren�.
e. /'�tiditann�l �r�sured s�i�us provicGed u^def paraa�raphs �.a.(� �(b} or �,a,[7}�c} �brn+e dae5 rr�t �xtend bey�rrd
the en�! o! a prem�5�5 I��S� rxr r�ntal �gtgemen�.
f. The lirll��5 �f in�ur�n[e �na� �p�ly la tM� a�di�ional insur�d �re the 1ea510l tkt�s� sp�cifi�d uti the;
(1) Written contraet;
(7j Written agreem�rrt; or
{3} we���yvt;�r� �f ►�E, w�!;ti}�.
The limils of ii7su►�+�ce are irrrlusive �f and nat i� addi�io�r !a U7e lim�?s ni Fns�r�3�e 5i�t�wr� �n ti�e �eclaration�.
g. The in5urance piovi�ed �o ifie addil�ortaf i7;5urer� does no: �ppl� tq "bodily i�jury" '•pro�3erty damage", or
"per�sorl�l a�d a[iveilasii�g �n�ury" afl5ing o�k oi an arChiTecr's, �n€�Ineer`s, orsurreyor'srertderin[� of, otf341ure
to render, �hy pfo��55i4n�1 SCfvlce�, In�lud+ny �u4 no� Ismk3ed 10:
i1) The prep�r9:,y, appraving, or ialirn� [o prepaFe or ap�xr�+le;
(a� Maps;
(b) [3rawings;
(c) Opir►ions;
Includes copyrighted mat�rial ofi Insurance �eruaces ����, I��L:
Page 2 of 3 CG 70 �� 9u �5
PolicyrNumhar: GL2114797
Eifectrve Oatas: 0613012D21 - 06/3012U22
(d) R.eports;
(e� Surveys;
�� Ch.SFtf�a nr�[�rt�
(g) besi�n specific�tlor�s; and
(2) Superv'rsary, �^4pnr trqn, ar engineerir�g sPrvrce�.
h. SECTIOM1� IV - C01�":�"�RCiAL G�N�RA� LI�461�I�Y CO�!;�S3G�IONlS, �aragraph 4. Other insuran�e is
deleted and repiaced w�th ihe ivllowing�
d. O#her Insuranee.
Cflverage provided by this endors�:ment is �x�ess over any other valid and collectible insurance available
to Ehe additianal ans�,r�� w}�k� ���r�
�. Prir+�2ry;
h� �xCess,
c. Contingent; or
d. �n any other basis°
bUt if th� wrll�en [Ut�tr�t� pr wrilkti+� �gree�nenl r�q��Mr25 fsrifrsary �nd n�n��cae�lr�lit�lflay c�ra�e, kl7is
InsuranCe will be prFrrtary and r,an-c�nV�bulory rel�li� tu r�t�r,�r �nsus�ru.� �+�ailabl� lo Il�e addtCian31
IIiSUYe�I wil+ch C�ver� tkwt pe�son or argar�iz�t�on as a t,�ame:� Inss,red, a�d we wi�i not s�st�rc wiRh ihai
other ins�,rance.
1, If the wriEten Ea�troti; t^.r ���;;±�on �nrnmm�nY �c n��4linnrl 9I'1Ak/O rart��irce ��ditional insured status b USE' Ui �u
y. t�.,,�,.��..,��.�,w�..��y....�� }+
1�! 1[� l3 �. th�n Ilr� � av�rag� �ravi�ed urrder lhis L'G 70 �� en�orsemen! do25 rrc]12�p1y �xC'pk �oi
p�s�gr�ph 2.N. Other Insur�n��. A��iC�onii ir��;afed sWtus fs 1i�11ite� Rfl th1�t pf4�+ided �y ��, 2p rtQ T 1 h75
5hown b�low ar�d �e�ra€�raph z.h. �il�er 1r�surance s�rown ab❑ve,
— - - ADDIiIONAL [tV�iJF�ED - OWNERS, L� ;�FE� OR
CC7NTRACTQRS {FQi�61 Bj
This er,dorstimA�,t mndifies irasur�nre �ro�ided u.nder th� fapowing:
CQM#w1�#��If4�. C1Eh]�3�rlL LI+��ILITY ��11F_l�i4G� K'AR'1'.
I
SCH�Cs'lYL �
�
#�amz �f P�rsnn �r O�c�an�zatkvn; �lankel wh��e reqvir�d I]y wrrllen {on�i�s�i far w',ii;ti;; �y;��':,n^r rl��►
Che ierm� of �� �U 10 I 1 85 ��ply,
�RI riu ���tty ap�+ca��s a�owe. i�iiur��iatio�, r�uired t� c�,,:�wl2{s this endorsement +ntill be aho+�vn in the
Qet�ardfiions a� appli��bl� ko Ihrs �ndor9�menl,k
1�u�1� i51lF,i INSUR�� �1�;,�c^;la �1 :rr�ended 141iii]Lld� �l� �n 1�rt51arr,d l�+C �1Cr5�11 Or 4Fgani7a9i4� �FI�Wil
In 4fi�e ��#�edu4e, �u� only wiCh respe[i E� a�bllaly �risirx� trr�� �r� "your work" for lha� insured by nr (or you_
�G �� 74 77 �s Capy+tiC�h;, i�,si.ia���t� Sp�:,s;�s ���it=. Irl�'„ 19�s
j. The insurance provided �; thie ars�lnrea:mgnt rInPG �Ot 8p�ljl t0 �ttj+ j3!'eiT1lSeS 41' W�tiS �0; wtr+ch th� �,�r�nrt or
organiza�ion is speciftcafly I�sted as an additiflna� ir�su��d aw anokhe� en��rscmea�R airac#�ed �� ihis pa�icy,
fncludes copyrighEed material ni (nsurance Service� Oific�, Inc.
C(� �Q tlS 1u i� Pages 3 af 3
Pnlicy Number. �L2114797
Effective Dates: 06L30/2021 - n6I�0I2Q22
`�HI� �RIfJ.ORSI�Ii��N�' C�ANG�S YM� �OLICY. �'Lf�A�I� R�A� ll" C�a�FU��Y.
���iC� �� ��h���� L�ll��l, Rl�l���l��"r�w�� C�� Il�YAT'��11•-��
�H�1�1�� � T'1-iIF�� ri���'Y
�f115 BiiC�LJ.w.n�n�nn� rr��rli4l�n.. �^,�,��r�nrn �r.^.�:��A,rl. �n��r �ha �allu'r'r':i i��
AUTD DEAI, ERS C01r�RAGF FGRiw"r
BUSINESS AkJTO COVERA�E rOR#u�
S€JSIAIES�AIIT[] �'NYS�Ct1L I�AQAAG� CCFs��f�}�GE FC]RiU
CDf��h�4C��lAI. CaCNEf�AL LIAHI�I7Y C�VCRAG� �DI�iIA
GDMA.�f�t;lAL UM��#ELLA �IABiLITY C(�VE��J1G� F�RM
c���tncE cov�r�e�c�� r�r�itr��
Mo��i� �,ar�r�G�r� cov�r�nc�� �oRM
I�#�C�Li�JC�F ��[fOMPLETE;.1 �F�E+�A�E�C}M11S LGA��LI?Y GDVEF�ACE F�Fih�4
'i`FiiJClC�F�S �OV�F�AGE FU�M
SU13,.PiCi� llj 11IYJ L.�JI ILQI1tllIU41 � w;;isions nt the �,overag$ �Qrm lo wi���h ihis �nrl�rs�rn�ril �s �ti�t�lx$�I, wr� will r�ol;
1. G�nr.r�l,
2. �lonrr-:nt�W= or.
3. M.��r.'na�sy c:htfii�l�: [rt�al�,c:� �r ras�ri�t�
this Covera{�e �arrr�. c,xcepk tnr r�vnp�yrr�c�nt ni �rofnlurn, untll yue provi�fe al I�as� �.i+. d�ys written nosic� aG
such C�ncell��l����, nca�tire���wa�l ts� rer�ker121t;Mti�ngE� �fflk#�F� a�7fac� wiEl hc� lo Ule p�rs�n of arq�ni�atlan rrarrl��1 In
the ScFx=-uw�e, �uah r�utir.e w11� be by �:ertifie� moi[ v.,lh relurrG rr���.l�i re�ue�ted
This notification of cancellatian, nnnrenewal or �rraterfal charrge ta the person �r e�rganizatian na�ned in the
Schedule t� intanded as a courtesy oniy, Olil' i�iil+�r? lri Grrnvkr{n �a�r.h nir�iF�r;��,�n wlil nnt;
1, �x9t3rrrl a��y C�'a�1� iray�, �nrfrl c3nc�_�latsnri e�a1a:
2. N�t�dle la,H s:H�1t�a'IHl;c�l i�S ��� �iiy irist�Ff!tl ��r aiiy r.r,r:iilcal�! 3tit�3cls��,
3. Previd� ar�y odcErtic�r��l insursrvv� lfFai wraul� nul JiaV� bs:en urol+i�€�d In kl�e abs�rl#:� U! lfel�l3kxfo�S4kT1#!�]l,
ar
4. Irnpose I'rability of any kirtd upon us.
This en�orsement d��s not �n#i�� 4t�r� p�ers❑n ar ueg�ni�af�ar� �amed in the 5chedule to any benefits, rights or
protection under #his Cov�rag�: Fo��i�t.
���t�[D�ILE
Name Of Person Or Organfaation f1+la€ling Address
Any persan or organizatia�t holc4ing a c�rtifcate of Insurance issu�d Th� address st�nw�� rC}F ffx3t (a�t6O� r5r pFgR�i,��110�1 i�l
fnr you, pCovided �he �ertlftGBte: tha# c�artifical� of Irisurttn�e
1. Rsfers to #his poiie�v:
2, States ihat notica of-
�. C�ncAllation;
b. iVonr�+tia�wal= �r
c. IViste�iai tfrr��fge reducing or re5tri�ting caverage;
wl{E be pra�riek�d ta that persan or organization;
3. ls in ef�ect at the �a�r� :: ;h��
a. Canceliation;
b. Nanrenewal; ar
c. Material change redt�r_.�nr� or r�strietfng coverage; and
4. Is on file at rw:�r ��nn; tir brok�r's office for this poNcy
IL i086 Q71�4
Policy Number; CA2114798
Eiteetive []ates: 48130I2021 -OSI3012022
7HFS �NC3U�t���[��lT �F��idCl�� i"�� pOLlCY. ��.��s� ���,� �r ca��Fu���.
N��'!�� ��' ���iC�LLA�I ��V, i��i�R�l��'�!'�4� �� I�IAi��I��
�HA1��E � iHII�Q �ARTY
�i118 @i'1(�OPSBEY1811� lI�OS�lF�ES �ii�ranno j r.n.:il,rjA.ri. wir� +In� �ho F�lipwina�
A11T0 DER��:?c C�!»�?Ar�� F`Grii4i
8EJ81NESS AI�T� ��V�RAGE F�R�4S
f3lJSiNE��� �IU7C} P��1YS1��1L C711MllCa� CC}VEF��IG� FC3FtM
�OMM�RCIAL ��#x1�f#AL LIA�3i�17Y�C�V��A[aE �(}f�ftih
CO�u1�1Ef�C�AL �]t�1BR�LLA L�I�BiLITY �c7VE�AGE FOR#u1
GAC��IGE �'4]V�F�A[�� F4'�}�Pv1
IIrSOT�R G15f�Rl�f� CC}V�]�A{at �{7F�14i
PROC�U�:T�t��MPL�T�D OPE�ATI�]h1� LIABiLI�fY GOV�RA�E FORM
i"fttlCK�h�S Ct�V�I�l�G� �O�tM
SubjecttQ th� cancellatian �ravissans af xhe L'averay�e ��rrra k� wh�ei� I#ila �ndarserrrei7t �s atl[�c��d, we wGU rial;
9. C�n�,�l,
2. M1IOnYr�niiw:Or,
3. ��t�ria€fy r:firar��rs {reduce or r�skricC)
this C�ivcragr_ Form, r3x[:ept fpr n❑npaym❑nk oi {�remlum, un�ll w+3 pfovlde at le�st _�� _ days wrifFen notice al
SUC}i Cai1��!IRHIi�11'I� +�a3�rr�ar���,v�l or r�»krrri�l cf��e�t�� WriE��r� nokicr: will br� �o I�rp Po�san nr flr���its�lo� exame� in
the ScF�edule. �u�h nollt3e w�ll l�e by �:c:llCkE+� fflRll WiRII Y�ILJf{�G r�CEl�il f��U£Sk�S7
This nntificatinn of cancellatinn, nanrenewal or materiai ��ange ta fi�e �erson :.� a�g�:±=����n named in the
Schedule is intended as a caurtesy on�y. �1��+ i�llsor� ?p �FrxVlr�� t���'11 +ti�'ifi�:;�tirsn vVi11 nnT
1. �xtend any Caverage Form canee�lr,t�rsn �l�iu=
2. lVegalr� tlt� r;�d�r;aEl�U�sl ��� �n �I�y ii��:�r�:tl �Fr aily {;�,rt�fl��l� �ual�or;
3. Provide any adrlilsr�n�l iiisur�n+�e �rsai wwuul4l nut �3av� beu�� �,r�yvi�ieti lif �a�� absence a( ��wla andoes�€rivr�l;
or
4. Impose liablliry of any kind upon us.
This endarsernent dcaes not entftEe the persan ar organizatian named in the Schedule to any bsnefits, righls ar
protsctta�n un�lert�is GAve�age �c�rrn.
S�i �Ut�UL�
Name Of Person Or Or�anizatlr�n Mailing Addr�ss
Any person or organization holding a certiftc�te of insuran�s isstted The �ddress shown for thal pe�snn or o�a�a�,�.a;;�r� i��
{17i �(:U� �I'OVl(�@L{ tfl@ Cu^i{ifiLatti�• fhat ceriifte�te of insurance
'I. F'tefers to this policy;
2. States #hat r�atica oF
a. Canaellat€on;
b. Nonrenewral; �r
c, Material change reducing or re�tricsting coverage;
wifi b� provided #o that person or orc�a����F;�^,
�. fs in efFect at the time of tha:
a. Ca�r-�lla#ion:
b. Nonr�n�wa3; or
e. M2�teri�l change r�ducing or restrl�fing caverage; and
4. IS D� �I� H� j�U4if �CJ�fS[ UT :7roket''� ofFl�� far this �o[icy
lL �0 8$ 07 � d
PalicyNumbar. WC2114798
Effective Dates: O6l3�I2�21 - 08f3012022
7Hf5 �NDORS�MENi GHAI+IGE$ THE POLICY. PLEA.�E �iEAi] I�` CA�4�IFLIi_i,Y.
�l������� 1'����l�� �� l►��E. ���W����
Ir�4J����E� � [ ��
Numher a� Days I�otice ��
For any statutorily petmitEed reason other than nonpaymeni of premlum, Ehe number of days required for notice ot canceltafian Is
lncreased to the number of days shawn in ihe Scha�u�o aboVa_
!F this �oii�y i� �ne�lled hy tfs 1+�� ;v:ll a��^ : t!;,^ ;'�F� ,aw ?�sstared �nci any party I�ted In ihe foilowing sof7erJule nolk�e n� c.�snrelt��tinn
based oz tk,e rrt:rn bar of ��ys Flali�e sFtiawr+ abave
SGF�EDUL�
i�,:;� of Person or Qr��ntzat�nn
7he Narne oi P��on �x� C3r�ar�I2aL14J11 13 [IlLy rS�S�� Y,� �:�Pr:IZaiIQPI I IO���RE�'a CEF�CI1�CCi�L CII IFiSLifY�I�CA
issu8d �ar you, �xowldetl ih4 certlflc�te:
1. R2fer5 to th1S po3icy;
2 St�tes that noYice of:
a. CancelEalion;
�. Nonr�n�wal; or
c. Material changa rodrrang ar f�svic�rrg ct�vs�ag�;
will be provided to that person or organization;
3, Is in effect a! lii� ;!rr�Q r�t thR,-
a. (,'��.,n,rnnll�t;nn_
b. %�S71lff{J7$s4�3_ dal
C. �a��F��f rltiPoolr�� fi3Sl,oi:irx� ear rf�s'rir_1InS'J G4+�r�{c�5�; Y��tl
4�. ls ort fi[� �t your ��s��Rt n� hrn�cer`� n��ir,� fe�r thtz pa�ls;y,
Ma3ling Adrfr�ss
The Meiling Address is the address shown far tha� porsua� ar ar�ar��rallafi I;� Iha� �ar��li�ta al
insuranGe.
IL 70 45 D� 07
EndorSement # 10
�lanl�e� i�1o��%cation �o Oiher� of �ancellation� �r
�onr�ne�val
�
�
������i
Palicy No. � Etf. Date of Pof. �xp. Rate of Pol. Efi. bate af End Produaer Add'I Prem. � Retum Prem.
i I
AEC 653724i-03 08/3017021 � Q&130.rtn2� p6J3�/2�21 09S610R0
Name� Insured and Mailing Address: �roducer:
GIBSON & ASSOCIATES INC WORLpWI[}E FACILI7IES WSURAIVCE S�RVICES,
11210 RYLI�CREST LLC
6ALCH SPR[NGS, 7X 7815p i25 S FIGU�ROA ST 5TE 190t1
LOS AI�GEL�S, CA 9�017-5498
iHIS ENC)ORS�M�NY CHIlNG�S THE F'O�ICY. R��AS� �dEAD IT C��€�'U�LY.
The follawing is added to SECTIaN V. CON�IT�ONS:
�lanket Natification ta Oth�r� of Cancellation or Nanren�wal
i. ff we cancel or non-renew #his policy l�y wriften notice to the (irst Named insured, we will rrtail or d�li�er notificatfon
that such po{icy ha� b�en c�nceEled or non-renewed to eacE� person or organizatinn shpwn in � list pravided to us by
th� first Named Insured if you are required by writien contract or written agreemeni to pro�icie such natification.
Woweuer, such notification will no# be mailed or delivered if a conditional natice of renewal Ft�� been sent to the first
Named Insured. SucE� I15i:
a. Must be pravided to us prior to cancellation or non-renewal;
b. Must cnntain the names and addresses af only the persons or aeganizatians requiring notiiicatian that such palicy
has been cancellec! or r�an-renewed; and
c. Must be in an electronic format that is aceeptab6e to us.
2. �ur noiliication as described in Paragraph 1. above will be basecf on th�: mast recen# list in aur recards as of the date
the natice of cancellation ar non-renewal is mailed or delivered to the fErst Named Insured. We will mail ar deliver
such notification ta each person pr organlzation shown in the Ilst:
a. Wifhin sever� days of the effective dats of the natiee of cancellation, i# we cancel for �on-payrnent of prerrtiurr�; ar
b. Rt ieast 30 days prior to the effec#E�e date af:
(1) Cancellaiion, if cancelled for any reason aiher tnan nanpayment of premiurn; ar
(�) Non-renewal, but nat Including conditional notice of ran.ewal.
3. Our mailing or deli�ery of noEification described in Paragraphs '1. and 2. abave is in#encEed as a courtesy anly_ �ur
failure ta provide such mailing 4r deli�ery witl not:
�. Extend the pnEicy cancelfation or non-renewal date;
b. Negate fhe cancellation or non-renewal; or
c. Pro�ide any additlana{ insurance ft�af would not ha�e b��n provided in ihe absence of this endarsement.
4. We are not respansibl� #or the accuracy, integrity, timeliness and �alidity of infarmat[on contained in tF�e Nst �ravided
to us as described in Paragraphs 1. and �. above.
ALL Oih1�R T��MS AND CONDi'�IONS AF iFl� POLICY Si�ALL d�RLY AN� R�MAIN U[VCF�ANa�B.
U-EX5-44t•A�CW (Oi/13}
Includes eopyri�h[ed materia! of Insurance Servlces ONlce, Inc., with its permissian. Page 1 of i
�T.A�ARD GEI�TEIZAL �OI�IIiTT���T�
�F THE COIlfSTRU�TI��T C�I�TR�iCT
CITY OF PORT WORTH
STANI]A1t17CON5TRUCTION SFECIFICATSON QOCUMENTS
Revision: 6rL311�21
STANDI�RD GENERAL C4NDITI�NS OF THE
CONSTRUCTIQN CONTRACT
TABLE OF CONTENTS
Page
Article 1 —Definitions and Terminology ..........................................................................................................1
I.O1 Defined Terrz� ............................................................................................................................... l
1.02 Terminology ..................................................................................................................................6
Article2— Preliminary Ma.tters ......................................................................................................................... 7
2.01 Capies of Dncuments ....................................................................................................................7
2.02 Corr�encemen� aF Contract Time; Notice to Proceed ................................................................ 7
2.03 Starting ihe Work .......................................................................................................................... 8
2.04 Befare SYarting Construction ........................................................................................................ 8
2.05 Precanstruction Conference ..........................................................................................................8
2.06 1'ublic Meeting .............................................................................................................................8
2.07 Initial Acceptance af Sc�edules .................................................................................................... S
Article 3— Cant�act Documents: Inient, Anlenciing, Reuse ............................................................................ S
3.01 Intent .............................................................................................................................................. S
3.02 Reference Standards ...................................................................................................................... 9
3.Q3 Reporting and Resolvir�g Discrepancies .......................................................................................9
3.Q4 Amending and Supplemeni�ng Contract Docurnents .................................................................10
3.05 Reuse of Documents ...................................................................................................................1Q
3.fl6 Electronic Data ............................................................................................................................11
Articie 4— AvaiIability of Lands, Subsurface and Physical Condrtians; Hazardo�s Environmental
Conditions; Reference Points ........................................................................................................... l l
4.01 Availability of Lands .................................................................................................................. I 1
4.02 Subsurface and Physical Conditions .......................................................................................... I2
4.03 Differing Subs�ace or Physical Condations .............................................................................12
4.04 Underground Facilities ...............................................................................................................13
4.a5 Re�er�nca Points .........................................................................................................................14
4.Ob Hazardous Enr�ironmental Conditian at Srte ..............................................................................14
Article 5— Bonds and Insurance ..................................................................................................................... I6
5A1 Licensed Sureties and Insurers ...................................................................................................16
5.02 Performance, Payment, and Maintenance Bonds .......................................................................16
5.03 Certificates of Insurance .............................................................................................................16
5.04 Contractar's Xnsurance ................................................................................................................18
5.05 Acceptance of Bonds and Insurance; Option to Re�lace ...........................................................19
Article 6 — Contractor's Responsibilities ........................................................................................................19
6.01 Supervision and Superin�endence ...............................................................................................19
C1TY OF FOR"f WQRTH
STANDA12DCilNSTRUCTION SP�GIFICAT[ON I�OCiJN1ENTS
Revisian: 8r131�(?21
6.02
6.0�
6.04
6.05
6.06
6.07
6.08
6.09
6.�a
6.11
6. I2
6.13
6.14
6.15
6.16
6.17
6,18
6.19
6.20
6.21
6.22
6.23
6.24
Labor; Workinng Hours ................................................................................................................20
Services, Materials, and Equipment ..� ........................................................................................2Q
PrajectSchedule ..........................................................................................................................27
Substitutes and "Or-Equals" .......................................................................................................21
�oncerning Subcantractors, SuppIiers, and Others ....................................................................24
WageRates .................................................................................................................................. 25
PatentFe��andRayal�ies ...........................................................................................................26
Permitsand UYilities ....................................................................................................................27
L�ws and R�gulations .................................................................................................................27
Taxes....... � ...................................................................................................................................28
Use of Site and Otl�er Areas .......................................................................................................28
RecardDocuments ................................................................................�..,.......,..........................29
Safeiyand Protect�on ..................................................................................................................29
SafetyRepresentative .................................................................................................................. 30
Hazard Co�nmunication Progams .............................................................................................30
Emergencies andlor Recti�ication ...............�..........................,...,................................................30
Subrnittals........................................�......................,......,...................................�.........,..,..........,. 31
Continuingth� V�ork ...................................................................................................................32
Contractor's General Warrantyand Guarante� ..........................................................................32
Indeirul�ication .........................................................................................................................33
Delegaiion of ProfessionaI Desigi Services ..............................................................................34
Rightto Audit ..............................................................................................................................34
Nontfisc riminatio n . . ... . .. . ... .... . ... ... . .... ... . .. ..... ... ........ ........ ... ..... ... .. ... ... .... � ... ........ ..... .. , ..... ......., ... .. 35
Article 7- Other Work at the Site ...................................................................................................................35
7.01 Related Worlc at Site ...................................................................................................................35
7.�2 C�nrr�inatinn- --- ---- - --- 36
............................................. . ................................ ....................
Article8 - Crty's Responsibilities ...................................................................................................................36
8.01 Communications to Contractor ...................................................................................................36
8.�12 Furn�sh Dafia ................................................................................................................................36
8.Q3 Pay WhenDue ............................................................................................................................3.6
8.04 Lands and �asements; Reports and Tests ...................................................................................36
S.a5 Change Orders .............................................................................................................................36
8.Ob Inspections, Tests, and Approvals ..............................................................................................36
8.07 Lirriitatians on City's Responszbilities .......................................................................................37
8.08 Undisclased Hazardous Environmental Conditian .................................................................... 37
8.09 Compliance with Safety Prograrn ...............................................................................................37
Articie 9- City's Observat'ron 5tatus During Constructian ...........................................................................37
9.01 City's ProjectManager ............................................................................................................37
9.Q2 Visits to Srte ..........� ..................................................................................................................... 37
9.03 Authorized Variations in Work ..................................................................................................38
9.04 Rejecting Defective Worlc .......................................................................................�..................38
9.05 Determinations for Work Performed ..........................................................................................38
9.06 Decisions on Requirements of Cantract Documet�ts and Acaeptability of Work .....................38
CITY OF �'ORT WbRTH
STANDARDCONSTI�UCTION SPECIF]CATIpN DQCUMENTS
Revisian: 8�3l1021
Article 10 - Changes in the Work; Claims; Extra Worlc ................................................................................38
10.01 Authorized Ck�a�ges in the Wark ...............................................................................................38
1Q.02 ilnauthorized Changes in the Work ...........................................................................................39
10.Q3 Exeeutian of Change Orders .......................................................................................................39
10.04 Extra Worlc ..................................................................................................................................39
10.05 Notif'ication tv Surety ..................................................................................................................39
10.06 Contract Cla�ns Process .............................................................................................................40
Article 1 I- Cost of the Wark; Allowances; L1nit Price Work; Plans Quantity Measurement ......................41
11.01 Cost of the Work ......................................................................................................................... 41
11.02 AIlowances ..................................................................................................................................43
1 I.03 Unit Priee Work ..........................................................................................................................44
1 l.04 P lans Quantity Measuremen� ......................................................................................................45
Article 12 - Change of Contract �rice; Change of Contract Time ................................................................. 46
12.D1 Change of ContractPrice ............................................................................................................46
12.02 C�ange of Cantract Time ............................................................................................................47
12.03 Delays ..........................................................................................................................................47
Article 13 - Tests and Inspectior�; Correction, Remaval or Acceptance of Defective Work ...................... 48
13.�1 Notice afDefects ........................................................................................................................48
13.�2 Access ta Work ...........................................................................................................................�$
13.03 Tests and Inspectians ..................................................................................................................48
I3.04 Unco�e�ing Worit ........................................................................................................................49
13.05 City May Stap the Work .............................................................................................................49
13.Ob Correctian or Removal of Defe.ctive Worlc ................................................................................50
13.0'1 Correciion Period ........................................................................................................................54
13.08 Acceptance ofDefective Work ...................................................................................................51
13.09 City May Correct Defective �ork .............................................................................................51
Article 14 - Paym�nts to Contractor and Comp�etion .................................................................................... 52
14.01 Schedule ofValues ......................................................................................................................52
14.02 Progress Payments ......................................................................................................................52
14.D3 Con�ractor's Warranty af Title ...................................................................................................54
14.04 Partial Utilization ........................................................................................................................55
14.05 Fnnal Inspection ...........................................................................................................................55
14.Ob Final Acceptance .........................................................................................................................55
1A.07 F�a1 Payment ..............................................................................................................................5�
14.08 Final Compl�tion Dela.yeci and Partial Retainage Release ....................>................................... Sb
14.09 Waiver of Claims ........................................................................................................................ 57
Article 1S - Suspension af Work and Termmation ........................................................................................57
15.OI Ci�.y May �uspend Wark ..........:..................................................................................................57
15.�2 City May Termmate for Cause ................................................................................................... 58
15.Q3 City May Terminate For Gonvenience .......................................................................................60
Article16 - Dispute Resolution ...................................................................................................................... 61
16.01 Methods and Pracedures .............................................................................................................61
CITY OF FdRT 4�+OIt7'H
STANBARDCONSTRUCT[ON 3PEC[FICATION DOCUMENTS
Revisian: 81Z�CLQ21
Article �7 —Miscellaneous ...........................................................................
17.01 Giviri.g Notice ...........................................................................
17.Q2 Camputaf:ian ofTimes .............................................................
17.03 Cumulative Rem�dies ..............................................................
17.04 Sur�ival of Obligations ............................................................
17.05 Headings ...................................................................................
................................................. 62
................................................. 62
...................................... �,......... �2
,...... .......................................... 62
. ............. ................................... 63
.................................................fi3
CITYOF POIZT WORTH
STANDARDCONSTAUC71QtJ SPECIFICAT[pN �OCLTMENTS
Revision: SI13/1.021
aa�zoa-�
GE�IERAL C�NDITION S
Page I of G3
ART�CLE 1— DEF�NITIONS AND TERNIINOLOGY
1.01 Defi�aed Terms
A. Whereverused in these General Condrtions or in other ContractDocuments, the terms �iisted i�elow
h��e the meanings indicated which are applicable to both the singuiar and plural thereof, and
words denoting gender shall include the masculine, feminine and neuter. Said terms are g�nerally
capitalized ar wri�tten in italics, but not always. When used in a context consistent with the
de�nition of a Listed-defuaed term, the t�rm shall have a rneaning as defrned below wh.ether
capitalized or italieized or oiherwise. In add�tion to terms specif'ically defined, terms with initial
capita.l letters in the Cott�ract Documents it�clude references to identif"ied articles and paragraphs,
and the titles of other documents or forms.
1. Addenda—Written or gi�a�rhic instruments issu�d priar to the apening of Bids which c�ar�y,
correct, or change the Bidding Requiretr�ents or t11e proposed Contract DocwYnents.
2. Agreement The written instrument which is e�idence af the agreement between City and
Contracfior co�rering the Work.
3. Application for Payrrrent—The form acceptable to City which is to be used by Contractor
during the course af the Work in requesting progress ar final payments and which is to be
accornpanied by such suppa�ting documentatian as is reguired by the Coniract Documents.
4. Asbestos—Any rnaterial that cantaiins more t�n one percent asbestas and is friable or is
releasing asbestos fbers into the air above current action leveLs established by the LTnited 5tates
Occupational Safety and Health Adminis�ration.
5. A�vard — Autharization by the City Council for the City to anter into an Agreement.
6. Bad The offer ar proposal af a Bidder subrnitted an the prescrbed form setti�g farth the
pric�s for tha Work to be performed.
7. Bidder—The individual or entity wha submits a Bid directly to City.
8. Biddfng Documents—The Sidding Requirements and the propased Contract Documents
(�cluding all Addenda).
9. BiddingRequirernents The advertisement or Invitation to Bid, Instxuctians to Bidders, Bid
security of acceptable form, if any, and the Bid �'orm with any supplements.
10. Busi�aess Day— A business day is defined as a. day that the City conducts normal busmess,
�eneraily Monday through Friday, except for federal or state holidays observed by the City.
11. Calenda�Day —A day cc�nsrsting of 2� hours measured from midnight to the next midnight.
CITY pF FORT W01Zi'H
STANDAAaCON3TRUCTION SPECIFiCATIQN DOCiJMENTS
Revisian: S123�1021
007200-1
GE�l�RA�CQNdITION S
PAge 2 of 63
12. Change Order A document, which i� prepared and approved by the City, which is signed
by Cnnt�•actor and Crty and authorizes an addition, deletian, or revision in the Work or an
adjustment iti the Cont�•act Price or the Contract Time, issued an or af�er the Et'fecfiive DaUe
of the Agceement.
13. City— The City of Fart Worth, Te�as, a home-rule municip�l corporatian, authorized and
chartered under ihe Te�s State Statutes, acting by its go�erning body through its City
Manager, his designee, or agents author�zed Under his behalf, each of which is requir�d by
Charter to perform specific duties with responsibiiity for final enforcement of the contract�
involving the City of �'art Worth is by Charter vested in the City Manager and is the entity
witl�a whom Contractor has entered into the Agreement and for whom the Wark is to be
performed.
14. Gity ACtoYney — The officially appointad City Attorney of tkze City of Fart Worth, Te�.s, or
his duly au�orized representative.
15. City Council - The duiy elected and quali�fed governing body af the City of Fort Worth,
Texas.
16, City Manage� — The official�y appoint�d and authorized City Manager of the City o� Fort
Worth, Te�.s, or h�s duly authorized representative.
17. Gantraet Clairr�—A demand or assertion by City or Contraetor seeking an adjust,�nent of
Cantract Prica ar Contract Time, or both, or other relief wiYh r�spect to the terms of the
Contract, A demand for maney or serv�ces by a third pat'tiy is not a Contract Claizxi.
I8. Contract—The entire and integrated written document beiween the City and Contractor
concerning the Worlc. The Contraci contains �he Agreei�nent and all Contracti D�cuments and
supersedes prior negotiations, representations, or agreemenis, wheYher written or oral.
19. Cont�act Documents Those itern� so desigtaated in tI�e Agreement. All items lis�ed '.m the
Agreement are Contract Documents. Appro�ed �ubmittals, other Contractoar submittals, and
the reports and drawings of subsurface and physicaI condifions are n.ot Contract Documants.
20, Contract Price The moneys payable by City to Contractor for completion of the Work in
accardance wrth the Cantract Documents as stated in the Agreement (subject to the provisions
of Paragraph 11.03 in th� case of Unit Price Work).
21. Coniract TirYre—The number o� days or the dates statad m the Agre.ement to: (i} ach'reve
Milestones, if any and (ii) complete the Work so that it is ready far �'it�al Acceptance,
22. Contracior—The iridividual or entity with whom City has entered into the Agreement.
23. Costof the Wo�k SeeParagraph 11.01 ofthese General Conditions for de%nition.
C1TX 4F FORT WdRTH
STANDAftDCONSTItllCTION SPECIFICATTON DOCiJMENT5
�2evision: $rL3f1(�1
ao�zoo-i
GENERAL CdN01T10N S
Page 3 of 63
2q�. Damage Clair�s — A demand for money or services arising from the Pro3eet or Site from a
ihird parry, City or Contractor exclusive of a Contract Claim.
25. Day ar day---A day, unless o�hea•wise def�ned, shall rnean a Calendar Day.
26. Direetor of Aviation — Th� officially appointed Directar af the Aviation Department of the
City of �ort Wo�th, Tea�as, or his duly appointed representative, assistant, or agents.
27. Director� of Parlcs and Cornmunity Services — The officially appointed Duectar af the Parks
and Community Services Department of the City af Fort Worth, T��as, or his duly appointed
representative, assistant, ar ag�nts.
28. Di�ectoN of Planning and Developnaent — The oificialIy appointed Directar of tI�e Planning
and Development Depart�nent of the City of Fart Worth, Texas, or his duly appointed
representative, assistant, or agents.
29. Director^ of Transportation Public Wo�ks -- The of�cially appointed Direc#or oi the
Transportation Public Works Departm.ent af the City of Fart Worth, Texas, or his duly
appointed representative, assistant, or agents.
30. Director of Wi�ter Depa�tmeni — The officiaIly appointed Director of the Water Department
of the City of Fort V4�orth, Texas, or his duly appointed representative, assistant, or agents,
31. Drarovings—That part of the Contract Docunaents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be perfanned by Contractor.
Submittals are not Drawttags a� sQ defined.
32. Effecfive Date of the Agreernent—The date indicated in the Agreement on which it becomes
effective, but i� n.a such dafie is mdicated, it means the date on whick� the Ageement is signed
and d�livered by the last of the iwo parties to sign and deliver.
33. Engineer The licensed professional engineer ar engu�eering firm registered 'm the State of
Tex�s perforn:�ing prafessional services for the City.
34. Ext�a Wo�k — Additional wor�C made necessary by changes or alterations of the Coniract
Documents or of quantities or for other reasons £ar which no prices are provided in the Contz�ac�
Documents. ExEra work shall be part of the Work.
35. Fieid Orde�—A written order issued by C�y which requires changes in the Work but which
does not involve a change in the Contract Price, Contract Tune, or the intent of the Engineer.
Field Orders are paid from Field Orcier Allowances incorporated irita the Contract t�y funded
work type at the tirne of award.
36. Final Acceptance — The written x�otice given by the City to the Contractor that the Work
�peci�ed in the Contract Documents has been cor�apleted to the satisiaei�on of ihe City.
CITY OP FORT WdATH
STANDARDCOI�STRUCTTON SPECIFICATiON �OCISMENTS
Revision: i3�131�21
00 �z oa - i
GE�iERALCON�ITIQNS
Page 4 of 63
37. Final Inspection — In�pection carried out by the City to verify that the Con�ractor has
completed the Work, and each and every part or appurtenanca thereaf, fulIy, entirely, and in
conformance with the Con�act Documents.
38. Getaeral Requirements—�ections ot'Division 1 of th.e Con.tract Documents.
39. Hazat�dous Envirdnmental Condition—The presence at �he Site of Asbestos, PCBs,
Petroleum, Hazardous Waste, Radioactive Material, or nther materials in such q�aanti�ies or
circumstances that nr�ay present a substantial danger to persons ar property e�posed thereto.
40. Hazardous Waste Hazardous vvaste is defiined as any solid waste ]isted as hazardous or
possesses one or more hazardous characteristics as defined in the federal wa�te regulat�ons,
as amended frorrt time to t�rne,
41. La�vs and Regulaiions Any and all appIicable Iaws, rules, regulations, ordinances, codes,
and ardars of any and a�l governmental bodies, agencies, authQrities, and cour�s having
j�ari�diction.
42. Lier�s Charges, security interests, ar eneumbrances upon Proj�ct funds, real property, oz'
personal property, .
43. MajoY Item— An I�em of work included in th� Contract Documents tk�at has a tot�al cost equal
ta ar greater than 5% of the original Contract Price or $25,dOQ whichever is less.
44�, Milestone A principal event specified in the Contract Documents relating to an intermediate
CantractTune priar to Final Acceptance afthe Work.
45. Notice of Awa�d—The writtan notice b� City to the Successful Bidder stating that upon
timely compliance by the Successful Bidder with the conditions precedent listed thereit�, City
will sig� and deIrver the Agreemant.
46. Notice to Proceed A rraritten notice given by City to Contractor f�in� the date on which tke
Goni�act Time wi� commence to run and on which Contractor shalI start to perforrr� the Work
specified in Contract Docunnents.
47. PCBs—Palyehlarinated biphenyl�.
48, Petr�oleum—Petroleutn, including nrude oil or any frac�ion thereof which is Iiquid at standard
canditions of temperature and pressure (&0 degirees Fahrenheit and 14.7 pounds per square
inch ahsoIute), such as oil, petroIeum, fuel oil, orI slud�e, oil refuse, gasolir�e, kerasene, and
oil m�ed with ot:her nan-Hazardous Waste and crude oils.
49. Plans — See de%nition af Dravvings.
CITY OF FOn'I" WORTH
STANDARDCONSTRUCTION SPCCICiCAT]ON DOCUMENTS
Re�ision: 8f13(1�21
00 �ra ou - i
CyENERAL CONQlTION 5
Page 5 of 63
50. ProjectSchedule A schedule, prepared and ��naintained by Contractor, in accordance with
the General Requirements, describing the sequence and duratian of the actieities eonnprising
the Contractor's plan to accomplish t�ie Work within the Contract Titne.
51. Project—Th.e Warkto be performed under the Contract Documents.
52. ProjectManager 'I`!�e authorized representative of the Ci�ty who will be assigned fo the
Srte.
53. Publfc Meeting — An announced meetiz�g conducted by the City to facilitate public
par�icipatian and to assist the public in gaming an inforxned view of the Project.
54. Radaoactive MateYial Source, special r�uclear, or byproduct material as defined by the
Atomic Energy Act of 1954 (42 USC Sect�on 2011 et seq.) as amended frorn time to time.
55. Regular Working Hou�s — Hours beginning at 7:00 a.m. and encling at 6:40 p.m., Monday
tl�ru �riday (excluding legal holidays).
Sb. Samples Physical ��mples of material�, equipment, or �vorkmanship that are
representative of some portian of the tiVork and which establish the sta.ndards by whuch sueh
portion of the Worle will be judged.
57. Schedule of Submittals—A schedule, prepared and maintained by Ca�tractor, oi requirad
submittals and �e tinne requirements to support scheduled performance of related canstruction
activities.
58. Schedzcle of Vcalues--A schedu�e, prepared and maintained by Contractor, alloeating portions
of the Contraci Price ta various pnrtions of the Work and used as the basis for re�iewing
Contractor's Applications for Payment.
59. Site—Lands or areas indicated in the Contracf Documenis as being furnislied by City upon
which the Work is fa be perforrned, includirng rights-of-way, permits, and easements for access
thereto, and such other lands furnished by City which are designateci for the use of Contractor.
6fl. Speeifications—That part of the Coz�►tract Docwnents consistsng of written requirernents for
materia.ls, equipzx�ent, systerns, standards and worlananship as applied to ihe Wark, and certai�
admnlistrati�e req�irexnents and proceduxal matters applicable khereto. Specif"icatiotls xnay be
specif'ically made a part of the Cont�act Documents by attachinent or, if not attached, may be
incorporated by reference as indieated in. the Table of Contents (Division 00 00 00) of each
Proj�ct.
61. Subcont�actor--An indi�idual or entity having a direct cont�ract with Coniractnr or with any
other Subcontractor far the performance of a part of the VVork at the Srte.
CITYO�' T'OILT WORTH
STA7�17ARDCONSTRIICTION SPECIFICAI]ON DOCiJMENTS
Rer+isian: 6��12,[
047200-1
GENERAL C4N� ITION S
Page G of 63
62. Subrnittals All dz•awirigs, diagrams, illustratians, schedules, and other data ar informatian
wh.ich are specif'ically prepared or assembled by ar for Contractor and submifted by Contractor
to illustrate some portion oithe Work.
b3. Substcantial Corrcpletion — The stage in ihe progress af the Profect when ihe Work is
su�fci�ntly complete in accardance with the Contract Docum�nts for Final Inspection.
S�. Success,full3idde� The Bidc�er submitting th.e lowest and most responsive Bid to whom City
makes an Award.
65. Superintendent— The representative of the Contraetor who is available at alI tirnes and abte
to receive instructrans from the City and to act for the Contractar.
6b. Supple�entary Condition.�That part o� the Coniract Documents which amends or
supplenr�ents these General Conditions.
67. Supplier A manufacturer, fabricatar, suppli�r, dist�•ibutor, inaterialman, or �vandar having a
direet contract with Co�atxactor or vvi�h any Subcontractar to furnish materials or equipment
to be incorporated 'm tk�e Work by Contractor or Subcontractor.
68. Undergraund Facirittes—All undergraund pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or otber such facilities or a�achments, and any encasemer�s
containing such facil�ies, including hut no� limited to, those that con�ey electricity, gases,
�tearn, Iiquid petroleum products, telephone or other ca�nmunications, cable television,
�vaier, wastewater, sto� water, other liquids or cham.icals, or traffc or vther control sysferxis.
69 UnatPNice Work—See Paragraph 11.03 oFthese General Conditions for definition.
7Q. Weekend �orkingHours—Hours beginning at 9;00 a.m. and ending at 5:00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
71. Wat�k=Tke entire constru.ction or the various separately ident�iable parts th�reaf required ta
b� provided under tk�e Contract Documents. Work �cludes and is the result af performing ar
providing a�l �abor, services, and documentation neeessary to produce such construction
ir�cluding any Change Order or Field Order, and furn�shing, installic�g, and incorparating a11
materials and �quipment inta such construction, aIl as required by the Contract Documents.
72. Working Day — A workin.g day is de�ined as a day, not ir�cluding Saturclays, Sundays, or lega 1
holidays authorized by the City for coniract purpases, in which weather or other conditions
not under the contro[ o� the C�ntractor will permit the performance af the principal unit of
work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m.
1,02 Terrrcinolagy
A. Tne �ords and terms discussed in Paragraph 1.02,B through E are not defined but, when used in
the Biddir�g Requirementa or Contract Documents, have the indicatad meanulg,
B. Iraientof CertairaT'erms orAdjectives:
CITY OP �'OCtT WflATH
STANDARDCONSTI�UCT[ON SPEC[F1CA1'[aN pOCUMENTS
Revisian: 8/1311A21
oo�zoa-�
GE�fERALCAN�IT]ON S
Page 7 oFb3
1. �'�e COn�C'aCt DOCUITl�ritS 111CILlde the terms "as aIlowed," "as appraved," "as orrdered," "a5
directed" ar ternr�s of lilce effect or import to authorize an exercise of judgmeni by Ciry. In
at�dition, �iTE a{L�OCtNeS "Cea50I]a�IO," "SUl�bl�," "accepiable," "�roper," "5at1S�aC�C7Ty," ar
adjectives oi Lke effect or �tnport are used to describe an action or determination of City as to
the W ork. Zt is in:tended that such ex�rcise of professional judgment, action, or datermination
will be so�ely to evaluate, in general, tlie Wark for complia.nce with the �formation in tl�e
Contract Documents and with the design concept of th� Project as a functioning whole as
shawn or indicated in tha Contract Dacuments (unless tliere is a specif"ic statennent in.dicating
otherwise).
C, Defectiue:
I. The word "deFective," when modifying the word "Wark," refers to Wark that is
unsatisfactory, £aulty, ar deficienti in that it:
a. dnes nat conform to the Contract Documents; or
b. does not meet the requirernents af any applicable inspec#ian, reference standard, test, or
approval referred to in the Coniract Documents; ar
c. has been damaged priar to City's written accepfiance.
D. Furnish, Install, Perfor�n, Provide:
1. The word "Fuz-nish" or the word `�nstall" or the word `�erforzn" or the word "Frovide" or
the ward "Supply," or any combination or sirnilar directive or usage thereof, shall mean
furnishing and 'mcorporating in the Work includiz�g all necessary labor, materials, equipment,
and everything nece�sary tn parform the Work it�dicated, uriless speci�'ically lirruted in the
conte� used.
E. Unless stated otherwise in the Contract Docurnents, wards or phrases that have a we31-known
technical or construction ir�dustry or trade rneaning are used in �he Contract Docutnents ir�
accordance with such recognized meaning.
ARTICLE � — PRELnVIINARY MATTERS
2,01 Capies of Docur��ats
City shall furnish to Contractor one (1} original executed capy and one (1) electc�onic capy of t�e
Contract Documents, and four (4) addi�ional capies of tb.e Drawings. Addrtional copies will be
furnished upon request at the cost of reproduction.
2.02 Commencernen#of Cont�act �'ifne; 1Votice to Praceed
The Contracf Tane wiIl commence to run on the day indicated in the Notice io Praceed. A Natice to
Proceed may be gi�er� no earlier than T4 days after the Effective Date of the Agreement, unless agreed
to by both parties in writing.
CITY OP FORT WQ12TH
STANDARDC(]NSTRUCTION SPECIFICATION DOCUiv1ENTS
REVISIOII: �-�irliil�
0472�0-I
GENERALCON�ITIONS
Page 8 af 63
2.03 Start7ng the Work
Contractor shaIl stai�t to perforrn the Work on the datia when the Contract Time co�ux�ences to run.
No Work shall be dane at the Si�e prior to the date on which the Contraet Time commences to run,
2.04 Before Starting Canstrucfion
Baseline Schedules: Stirbrnit in aceordance witla the Coniract Documents, and prior to starking the
Work.
2.05 Preconslructao�a Conference
Be%re any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documenfis.
2.06 Public Meeting
Coniractar may not mabilize any equipment, mat�rials or resources �a the Site priQr to Gontractar
at�ending the Public Meeting as schedu�ed 6y the City.
2.07 lnitial Accepiance of Schedules
No progress payrnent sha11 be made to Contractor unt�l acceptable schedulas are subinitted to City in
accordance �vi�h the Schedule Specification as provid�d in the Cantract Documents.
ARTICLE 3— CONTRACT D�CUMENTS: INTENT, AMENDING, REIISE
3.01 Intent
A, The Contract Doe�rrients are complem�nfiary; what is required by one is as bincling as if r�quired
by a1L
B. It is the intent of the Contract Documents to describe a fianctionally complete pxoject (ar part
therea�} to be canstructed in accordanca with tha Cant�act Documents. Any labor, documentalion,
services, �naterials, ar equipmeni: t11at reasonabIy may be inferred from the Contract Docurnents
or fironri prevailing custom or trade usage as being requ�red ta produce the indicaied result wiIl be
provided wheth�r or not spee�cally called for, at no additional cast to City.
C. Clari�cationa and interpretatians af tk�e Contract Dacuments shaIl be issued by City.
D. The Specifications rt�ay vary in farm, format and style. Same Speci#ication seciions may be written
in vatyin.g degrees of streainlined or decIarative style and some sectians may be r�latively
narraiive by comparison. Omission a� such words and phrases as "t�e Contractor shall," "in
conformity vvi�h," "as shown," o� "as speeified" are intentional in streamlined sections.
Omitted words and phrases shall be supplied by inference. Similar types ofpra�isions may appear
in variQus pa�ts of a section ar articles within a part depending on the fortnat of the
CITY OF FOhtT WOTiTH
STANDARDCONSTR[]CTION SPECIFiCATTON DOCUMII�3TS
Revision: &2.'�/102,1
oo�zao-�
GENERALCONdITI0M5.
Page 9 of 63
section. The Contractar s�aU not take advantage of any �ariation af form, forrt�at or style in
making Contract Claims.
E. The cross referencing of specif'�cation sections under Cl-ie subparagraph heading "Related
�ections include but are not necessaril� limited to" and el�evvhere within each Specification
section is provided as an aid and cnnvenience to the Contractor. The Contractor shall not reIy on
the crass referencing provided and shall be responsble to coordinate the entire Wr�rk unc�er the
Contract Doc�nents and provide a compiete Projeet whether or not the ciross re%rencing is
provided it� each section or whather or not the cross referencing is carnplete.
3.02 Refe�ence,�tandc�ds
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, spec�icatians, manuals, or codes of any teehnicai snciety, organizatior�,
or assaciatian, or to Laws or Regulations, wheth�r such reference be spec�ic or by implication,
shall mean fihe standard, spec�icatiort, m.anual, code, or Laws or ReguIatioz�s in effect at th�
time of opening of Bids (or on the Effe�tive Date of the Agreement if there were r�o Bids),
�xcept as rnay be ot4aerw�se specifcal�y stated in ihe Cantract Documents.
2. No provision of any such standard, speeificatian, rnanual, or code, or any ins�ruction of a
Supplier, shall be effective to change the ciuties ar responsibiliti�s of Ciry, Contractar, or any
of thei� subcontractars, consul�ants, agents, or employees, from those set forih in the Contract
Documents. No such provisian or instruction shall be effective to assign to City, or any of i�s
offcers, directors, mernbers, partners, employees, agents, consultants, or subcontractors, any
duty or authoriry to supervise or direct the perftorr�ance af tI�� Work ar any duty or authori�y
to undertaice responsbili�y inconsistent wi�h the pro�isions of the Contract Documents.
3.03 Reporting and ResolvingDiscrepancies
A. ReportingDi�crepancies:
Cont�actor sRevie�ofContractDacxsments Befo�eStartrng �ark: Before und�rtaking each
pa�t af the �Vork, Contractar shall carefully study and corr�pare the Contract Documents and
cheek and verify pertinent figures therein against all applicabie f�eld measUrernents and
cnnditions. Contractor shall promptly report in writing to City any conilict, error, ambiguity,
ar discrepancy v�rhieh Contractar discovers, or has actual knowledge af, and shail obtain a
wri�ten interpretati4n or clarification frorr� City beiare proceedin� witY� any Wark affec�ed
thereby.
2. Conircactor�'s Revrew of Contrcact Documents DuringPerformance of T�ork: If, during the
performance of the Work, Contractar discovers any canflict, errar, ambiguity, or discrepancy
vvithul the Contract Documents, or between the Contract Documents and (a) any applicable
Law or Regul�iion ,(b} any standard, specif'ication, manual, or code, or (c) any instruction of
any Supplier, then Contractor shall promptI� repar� it to City �n wrrtirag. Coniraetor shall not
proceed with the Work affected thereby (except in an �mergency as required by �'aragraph
CITY OF PORT WOR'iH
STANDARDCONSTRpCT[Ol� SPECIFICATION DOCUA/IENTS
Aevision: &23/1�12[
0072QD-1
GENERALCOiJ�ITION S
Page ]0of53
6.I7.Aj until an amandrnen� or supplement to the Coniract Docum�nts has been issued by
one of the metI-�ods indicated in Paragraph 3.04.
3. Cnntractor shall not be liable to City far failure ta report any eon#7ict, error, ambiguity, or
discrepancy in the Contract Dacuments unl�ss Cont�•actor had ac#uaI knowledge thereof.
B. Resolving Discrepancres:
1. Except as may be ntherwise specificalIy stated in the Contract Dacurnents, the provisions of
the Contract Documents shall talce precedence in resolving any conflict, error, ambiguity, or
discrepancy 6etween the pz-ovisions of the Contract Documents and the provisions of any
standard, specification, manual, or the instruction of az�y Supplier (whetlier ar not spec�'�cally
incorporated by referance in the Contract Documents}.
2. In case nf discrepancies, figtared dimensions shall govern over scaled d'unensians, P[ans shall
govern over Spec�cations, �upplemenfiary Condi�ions shall govern over General Canditions
and Specifications, and quantities shown on the Plans shall govern over those shown in th�
proposal.
3.04 Amending r.tnd Supplementing ContractDacu�ents
A. The Cont��act Doeuments may be amended to pro�ide for additions, deletions, and ��evisior�s in
the Work or to madify the ternas and conditions thereof by a Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Cantract Price or Cantract Time, may be
authorized, by one or more of the follawing ways:
1. A Field Order;
2. City's revie� of a Sub�n�ttal {subject to ihe pro�isions afParagraph 6.18.C); or
3. City's wriften Et�terpretatian or clarif'ication.
3.Q5 Reuse of Docurraents
A. Contractor and any Subcantractor or Supplier shall not:
1. have or aequire any title to or ownership rights in any of the Drawings, Specifications, or
ather docuznents (or copies of any th�reo� prepared by or bearin� the seal of Engineer,
including electronic rnadia editions; or
2. reu5� any such Drawings, Specificatzans, other documents, or copies thereof on e�ensions of
the Projeci or any atY�er project wzthout written consent of Ciiy and specific weitten. verification
or adaptatian by Eng�eer.
CITYOP FORT WORTEl
STANDARi)C.ONSTRUCTi6N SPECIFICATI6N I]OCUMENTS
Revision� &�i11021
ao�zoo-i
G�N�RALCON4ITION S
Page 11 of G3
B, The prohibi�ions of this Paragraph 3.05 wiU survive final payrnent, or terminat�on of the
Cantract. Nothing herem shall preclude Caniractor from retaining copies of ihe Contract
Docurnents for record purpases.
3.06 Elect�anic Data
A. Unless otherwis� stated iri the Supplexz�entary Condi�ions, ti�e data furtushed by City or Engineer
to Contraotor, ar by Cnntractor to City or Engineer, tkaat may be relied upon are liumited to the
printed copies in.cluded in the Contract Documents (also known as hard copies) and other
Spec�iGations referencedand located on the City's on-line ��ectronic document management and
collaboration systern site. Files in electronic media. format of text, data, graphics, or other types
are furnished oinly far the convenience of the receivin�g party. Any conclusion or informatian
obfiain�d or derived from such electronic files will be atthe user's sole r�sk. Ifthere is a discrepancy
between the �lectronic files and the hard copies, the hard copies gavern.
B. When transferring docurnents in electronic rnedia format, the transferring party z�nakes no
represenfa.tions as to long term cornpatibility, usab�ity, or readability of d�cuments resulting from
the use of software application pacicages, aperatii�g systems, ar computer hardware d�'fering from
those used by the data's creator.
ARTICLE �6 — AVAILABILITY OF LANDS; SiTBSURFACE AND PHY�XCAL CONDITIONS;
HAZARDOUS ENVIRONMENTAL CONDZT�ONS; REFERENCE POINTS
4.01 Availability of Lands
A. City shal� Furnish the Srte. City s�all nntify Contractor of any encumbrances ar res�rictions not of
general appIication but specifically related to use of the Sit� with which Cantractor mus� comply
in pez-�orming the Work. City will obtain ita a timely manner and pay for easements for permanent
structures or perrnanent changes in exisiing facilities.
1. The City has obtained or anticipates acquisi�ion of and/or access to cigilt-of way, and/or
easements. Any outstanding r�gh.t-of way and/or easem�nts are anticipated io be acquired in
accordance with the schedule set forth in the Supplementary Conditions. The Pro�ect Schedule
submitted by the Contra�tor in accordance with the Contract Dacuments must consider an.y
out�tand'mg right-of-way, and/ar ease�nents.
2. The City has ar anticipates ramoving and/or relocating utilities, and obstruction� to the Site.
Any� outstand'mg reznoval or relacation of utilities ar obstz�uctions � anticipated in accordance
with the schedule setforth ir� the �upplementary Conditions. The Project Schedule submitted
by tk�e Contractor in accordance vvith the Contract DocumEnts must consider any outstanding
u�ilities or obstructions ta be remov�d, adjusted, and/or relocated by others.
B. Upon reasonab�e written request, City shaIl futnish Contractor with a current statemeni of record
legal title and legal descriptian of the Iands upan which the Work is to be perfoz7med.
CI'I'Y OF FOCiT WORTH
STANDAItDCDNSTRUCTION SPECIFICATION BqCUMENTS
Revision: 8�3(�02]
007200-1
GENERAL G�ON� f TION S
Page 12 of 63
C. Con�ractor shall pravide for ali additional lands and access thereta that rnay be required for
constructian facilities or storage of materials and equipment.
4.Q2 Sa�bsurface andPhysical Conditzons
A. Reports andDrawings: The Supplementary Condi�ions identify:
1, tk►ose reports known to City nf explorations and tests of subsurface conditinns at or
contiguous to the Site; and
2. thos� drawings lmowra ta City of physical conditions relating to existing surface oc
subsurface struetures at the Site (except Underground FaciIities).
B, Limited Reliance by Cont�actor on Technical Datc� Autlzarized: Contractar may rely upon the
accuracy of the "�echnical data" canta.ined in such reports and drawit�gs, but such reparts and
drawings ar� not Contract Documants. Such "technieal data" is id�ntified iri the Supplementary
Conditions. Cantractar may not make any Contract Claim aga�nst City, or any of their off"icers,
directars, mennbers, partners, ernployees, agents, consulta.nts, or sub.cantractars with respect to:
l, the completeness of such r�ports and drawings for Cont�actox's purposes, including, but not
lunited to, any aspects of the means, methods, techniques, sequences, and pracedures of
con�truction to be employed by Contxactor, and safety prenaut�ons and programs it�cident
thereto; or
2. other data, interpretations, opinions, and information contained in suek� reports or shown or
indicated in sueh drawing5; or
3. any Con�r'actar interpreta�ion of or conclusion drawn from any "technical data" or any such
other da�, interpretations, opinions, ar informatzon.
4.03 Differ.ingsubsurface o� Physical Condiiiorzs
A. Nattce: If Contractor believes that any subsurface ox physical �andztion that is uncovered or
revealed ei�her:
1. is of such a nature as to establish that any "technicaI c�ata" on which Contractor is entitled to
r�ly as provided 'm Paragraph �.a2 is txzate�ially maccurate; or
2. is of such a nat�.u•e a� to require a change �n the Contract Documents; or
3. differs materialIy from that shown or indicated in the Conixact Dociunents; or
4. is of an unusual nature, and differs materially from conditions ordinar�ly encountered and
genera�ly recognized as inherent in work of the character prr�videa for m tf�e Contract
Documents;
CTTYOF FORT WORTH
STANDARDCONSTR[lCTION SPECIF[CA'C34N DOCUML?VTS
Revision; $%1,�21
OD7200-1
GENERALCANflITION S
Page 13 of (3
then Contractor shall, pramptly after becoming aware thereof and before fiu�ther disturbing the
subsurface or physical conditions or performing any Work in: connectian ther�with {e�cept in an
ernergency as requ�ed by Paragraph 6.17.A), no�y City in wrrting about such condition.
B. Passible �rice and Time Adjusstments
Con#ractor sY�all nat be entitled to any adjustment in the Cor►traet Price or Contract Ti�xxe if:
]. Contractor knew of the existence of such conditions at the tinne Contractor made a final
commitment to Ci�ty with resp�ct to Contract �rice and Contract Time by the submiss�on of a
Bid or becammg bound under a negotiated contract; or
2. the existence of such conditian could reasanably hav� been discovered or revealed as a resulf
of the examination of the Contract Docurn.ents or the �ite; or
3. Conix'actor Fa�l�d to give the �ritten notice as required by Paragraph 4.03.A.
4,0� tlndergroundFacilities
A. Shown or Indicated.• The infarmation and data shown or indicated in t1�e Contract Dacumcn�s
with respectto e�isting U�derground Facilities at or contiguous ta the �it� is �ased on it�formation
and data furnished ta City or Engineer by the o�wn�rs of such Underground Facilities,
mcluding City, or by others. Unless rt is otherwise e�pressly provided in the Supplementary
Canditions:
1. City and Engineer shall not be respansible for tha accuracy or completeness of any such
information or data provicied by others; and
2. the cost of all of the following will be included in the CQn�act Price, and Contractor shalI
have full responsbility far:
a. reviewing and eheeking aIl such ir�foz�aation and data;
b. lacating all Underground Facilities shown or indicated in the Contract Docurnents;
c. coordination and adjustment of the Wnrk with the owners of such Underground
Faciiities, including City, during construction; and
d. the safety and protection of all such Underground Pacilities and repairing any darnage
thereto resulting from the Work.
B. NotS'hown orindicerted.•
1. Xf an Underground Facility which canfiicts with the Work is uncovered or revealed at or
contiguous to the Si�e which was not shown or indicated, or not shown or indicated with
reasonab�e accuraey in the Gontract Documents, Contractor shall, promptly after becoming
aware ihereof and before further disiurbing conditions aif�cted thereby or perfarm�g any
C1TY OF FbRT WORi'H
STt1NBARDCONSTRIICTION SPECIF3CATION DOCUMENTS
Revision: 8�23/L021
0072DO-1
GENERAL OONtiiT14N 5
Page 14 of 63
Worlc in connection therewith (e�cept in an emergency as r�qu�ed by Paragraph 6.17.A),
identify the owner o� such LTndergro�and Facility and give notice ta tha� awner and tn Ciiy.
Ciry wiU revi�w the discovered Underground Facility and deternnine tl�e extent, if any, to
which a change may be required 'm the Contract Docunraents to ref�ect and document the
consequences of the existence or location of the Underground Facility. Contrac�ar sk�all be
responsible for the safety and protectian o� stich diseovered Underground Facility.
2. If City concludes that a change in the Coniract Docurnents is required, a Change Order may
be issued ta refle.ct and docunnent such consequ�nces.
3. Verii"ication of existing utilities, strue�ures, and ser�ice Iines shall iticlude notification of all
utility companies a minirnurn of 48 hours in acivance of construction including expioratary
excavation if necessary.
4.45 Reference Points
A. City shalI provide engi[zeering surve�s to establish reference poinis far construction, wk►ich in
City's jud�nent are necessary to enable Contractar to proceed with the Work. City will provide
constructiqn st�kes or other customary method of marking to establish lit�►e and gradas for roadvvay
a�d utility cons�ruction, centerlines and benek�marks for bridg�work. Cont�•actor shall protect and
preser�e the establisl�ed reference points and property monuments, and shall make no changes or
relocations. Contractor shall reportto City vvhenever any reference paint or property monument �s
lost or destrayed or requi.res relocation because of necessary changes in grad�s or Zocattons, The
City shall be respansi6le for the replacement ar relocation of eeference points or property
monuments not carelessly nr willfully destroyed by the Contrac�or. The Contractor shall notify
City m advance and witE� sufficient time to avoid delays.
B. Whenever, in the apinron of the Ciry, any reference pomt ar xnonument has been careiessly ar
t�villfulIy destroyed, distuxbed, or removed by ih� Contractor or any of his emplayees., the full cost
%r replacing such poinis plus 25% wiII be charged against the Contractnr, and the full amount will
be deducted from payment due the Contractor.
�.46 Hazarclous Envi�onmentai Condition atSi%
A. Repo�tsandDrawangs: The Suppl�mentary Cond'ttions identi�y those reparts and drawings known
to City relating to Hazardous Environmantal Canditions that have been identified at tE�e Site.
B. Limited Reliance by Contr�acto� on Technical Data At�thorized: Contractor may rely upon the
accuracy of tihe "tecl�nical data" contained in such reports and drawings, bui such reports and
cJrarxrings are not Contract Documents. Such "�echnical data" is identified in tha Supplementary
Conditions. Contractor rr�ay nat make any Contract Claim against City, ar any of iheir officers,
directors, members, partners, ernployees, agents, consultants, or subeantractors with cespect to:
l, the completeness of sueh reports and drawiz�gs far Con�ractor's purposes, incluc�ing, but not
limited to, any aspects of the means, met�ods, techniques, sequences and procedures oi
CITY OF FORT WORTH
STANi7ARDCONSTRUCTIQN SPECIr[CATION D�CUM�NTS
Ravisinn: 823/2Q2]
00 �2 00 - i
GEN�RALCONDITION S
Page ISoffi3
coxastruction fio b� employed by Ca�tractor and safety precautions and progranls it�cident
thereto;or
2, other data, interpretations, op�ions and information conta�ned in such reports or shown or
indicated � such drawings; or
any Contractor interpretatinn of or conclusion drawn from any "techr�ical da.ta" or any such
other data, interprefations, apinioz�s or infarmation.
C. Coniractar sha11 noi be responsible far any Hazardous Environznental Condi�ion uncavered or
revealed atthe Site which was not shown or indicated in Drawings or Specifications or identified
in the Contract Documents to be within the scope of the Work, Contractor shali be responsible for
a Hazardovs En��ronmental Condition created with any materials brought to the Srte by
Contractor, Su�contractors, Suppliers, or anyane else far whom Contractor is responsble.
D. I#' Cantractor encounters a Hazardous Enviro�unental Condition or if' Contractar ar anyone for
whom: Contractor is responsible creates a Hazardous Environznental Condrtion, Contractor s�all
immediaieiy: (i) secure nr otherwise isalate such condrtian; (u) stop all Work in cannection with
such condition and iz� any area affectec� thereby (except in an emergency as requi�ed by Paragraph
5.17.A); and (iuj notify Ciry (and pramptly thereafter confum such notice m writing). City may
consider the nec�ssity to retain a gualified experi ta evaluate such condition or take carrective
action, if an.y.
E. Contr�actor shall not be required to resutne Work in conneetion vvith such condition or m any
affectedareauntil afterCity has ob#ained any required permzts relatedihereto and delivered written
notice to Contractor: (x) specifying that such condition and a�xy affected area is or has been
rendered suitable for the resumption of Work; or (ii) spec�ying any special conditions under which
suc� Woek rnay be resunned.
F. If after receipt of such written notice Contractar does nat agree to resume such Work based on a
reasonable belie:f it i� unsa�e, or does not agree to res�.une such Work under such speeial conditions,
then City may arder the portian af the Work that is in the area affected l�y such condrtian to be
deleted from the Work. Ciiy may have such del�ted portion of the Wark perfarmed by Gity's own
forces or others.
G. To the fullest extentpermitted by Laws and Regulatians, Cantractor shall indemn� and hold
harmless Caty, frarrc and against all claims, costs, losses, and damc�ges (including but not limited
to all fees and charges of engineers, ar�chitects, attorneys, and other prafe.�raoncrls and all court
or arbitratfon oY otheY dispute �esolution casts) arising out af or �elating to a Hazaxdous
�nviranmentalCondition created by Contraetoror byanyonefo�whorrtContractor isrespo�rsable.
Nothing in this Parag�aph 4.Od.G shall obligate Contractor ta andemn� any individual or entity
f�om and c�gainst the consequen�ces of that indivadual's or entity'.s own �aegligence.
H. The �rovisions of �'aragraphs 4.02, 4.03, and 4.04 da not apply to a Hazardous Environmental
Conditian uncovered or reveaIed at tl�e Site.
C1TY OF FDRT WORTH
S'C.4NDARDCAiJSTRIICTION SPECIFICATION DOCUMENTS
itevisian: &231�'11
Q072p0-1
GENERALCONDIT10N5
Page 16 bf 63
ARTiCLE � -- BONDS AIVD rNSURANCE
5.01 Licensed Sureties and Insurers
A�i bonds and insurance required by the Contract Dacuments tio be p�.u�chased and znaintained by
Cantractar shall be obtained from surety or insurance companies that are duly licensed or aufilarized
iz7 the State o�` T�xas to issue bonds or uasurance policies for the limit,s and coverages so required.
Such surety and �surance co�npanies shall also rneet such additional requirements and gual�cations
as may be provided in th.e Supplementary Conditions.
5.02 Pe�^fo�^mance, Payment, andMaintenance Bonds
A. Cont�actor shall furnish performance and payment bonds, in accardance with Texas Crovernment
Code Chapter 2253 ar successor statute, each in an amount equaI to the Contract Priee as
security for the fai�hful performance and payment of a11 of Con�ractor's obligations under the
Contract Documents.
B. Conizactor shall furnish maintenance bands in an a�nount �qual to the Contract Price as security
to protect the City against any defec�s in any partion of the Work described 'm the Cnntract
Documents, IVlamtenance bonds shall remain in effect far two (2) years after the date of Final
Acceptance by the City.
C. AIl bonds shall be in the form prescrrbed by tke Contract Dacuments except as pro�ided otherwise
by Laws or Regula.tions, and shall be executed by such slireiies as are nar-zied in the list of
"Co.mpanies Holding Certifcates af Aufhority as Acc�ptable Si.u�eties an Federal Bonds and as
Acc�ptable Remsuring Corzipanies" as published in Circular 570 {amended} by the Financial
Management 5ervice, �urety Bond Sranch, U.S. Deparlment of the Treasury. AIl bonds signed by
an agent or attorney-in-fact must be accompanied by a sealed and dat�d power of attoz-ney which
shalI show that it is effective an the date fhe agent or attorney-in�fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared banlcrupt or becomes insolvent or its
right to do business �s termin.ated in the State of Texas ar it ceases to meet the rec�uirements of
Paragraph 5.02.C, Contz-actor shall prnmptIy notify City and shall, within 30 days afte� the even.t
giving rise to such notif"ication, provide another bond and surety, both of which shall comply with
the requirements of Paragraphs 5,01 and 5.02.C.
5.a3 Certzficates oflnsurance
Cantractor shall deIiver to City, with copies to each additional insure.d and Ioss payee iden�ified in the
Supplementary Conditions, cert�cates of �surance (other evidence of insurance requested by City or
any other addrtianal i�sured) in at least the minimum amount as spec�ied inE the Supplementary
Ca�►d�tions which Contractor is required to purchase and inaintain.
The certit'icata of insurarzce shall document the City, and all identified entities named in the
Supp�ementary Cond'hions as "Additional Insured" an alI liability policics.
CiTY OF FORT WQRTH
STANDI�RDCOHSTRUGTI4N SPECIF[CATIOW DpCUMENTS
Revisian: W?3/.2,021
OD7200-I
GENERAL CONp{71QN S
Page I7 of 63
2. T1ne Coniractor's general liability insurance shaII include a, "per praject" or "per lacatian"
endorsezx�ent, which �hall be iderrtified in the certificate of insurance provided to the City.
3, The certi�"icate shall be signed by an agent authorizeef to bind coverage on behalf' of the insured,
be cornplet� in its entirety, and show complete msurance carrier names as listed in tl�e current
A.1VI. Best Property & Casualiy Guide
4. The insurers for all policies must be licensed and/or approved ta do bus�ness in the State of
Texas. Excapt for workers' conn.pensation, all insurers mUst have a minimum ratin� of A-:
VII in the curr�nt A. M. Best Key Ratiu�g Guide or have reasanably equivalent fu�ancial
strengt� and solvency to the sati�faction of Risk Management. If ihe rating is below that
requi�ed, written approval of City is required.
Ail applicable policies shall include a Waiver of Subragation (Rig�its of Recovery) in favor
of ti7e City. Zn additian, the Contractor agrees to waive all rights af sularogation against the
Engineer (if applicable), and each addi�ional insiared identified in the Supplementary
Conditions
6. Failure of the Ciry �o demand such cert�ieates or other evidence of full compliance with the
msurance requ�retne�.ts or failure o� the City to identi.fy a defciency from evidenc� that is
provided shall not be construed as a wai�er of Gontractar's obligation ta maintain such liries
of insurance eoverag�.
7. If insurance po�icies are not written for specified coverage limi�s, an Umbrella ar Excess
�,iability insurance for any differences is requir�d. Excess Liability shall follaw form of the
primary coverage.
8. Unless otherwise stated, aIl reqt�ired insurance shal] be written on the "occurrenee basis". If
caverag� is underwritten on a claims-made basis, the retroact�ve date shall be coineident with
or prior to the date of the effecti�e date af the agreement and the certi�'icate of insurance shall
state that tlae co�erage is claims-made and the retroacfiive date. The insurance coverage shaIl
be maititained far tl�e duration nf the Can�ract and for t.�ree {3) years followung Final
Acceptance provided iander the Contract Documents or for the warranty period, whichever is
Ionger. An annua� certificate of insurance submitt�d to the City shall evidence such
insurance coverage.
9. Pa�icies shaD have no exclusions by endorsements, which, nerther nuliify or amend, the
reqvired lines of coverage, nor decrease the limits of said coverage unless such endarserr�ents
are ap�roved in writing by tha Ciry. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desixes additional msurance coverage,
and the City desires the con.t�actorlengineer to obtain such coverage, the cnntract price shalI
be adjusted by the cost of the premiuna for such additianal coverage p�us 1Q%.
10. Any self-insured retention (�IR), in excess of $25,000.00, affecting required ic�surance
co�erage shaIl be approved by the City in ragards to asset �alue and stockholders' equity. In
CITY OF FORT WQRTH
STAN�ARDCpNSTR[]CTION SPECIFICATI6N DOCi.IME�VTS
Revisinn: WL3I10'll
oo�oa-i
GEN�RALCONbiTION S
Yage l8 of G3
li�u of traditional insurance, alternatNe coverag� maintained �hrough insurance paoIs or risk
r�icntion groups, rnust alsa be approvad by City.
1I. Any deductible in excess of $5,000.00, for any policy that does nat provide coverage on a
first-dollar basis, must b� acceptable to and appro�ed by the City.
I2. City, at its sn�e discretion, eeser�es the right to ra�i�w the insurance requirements and to
make reasonable adjustments to ir�s.urance coverage's and their lirn�ts when deemed necessary
anc� prudent �y the City based upon changes in statutory Iaw, caurt decision ar the c�aims
history afthe industry as well as of the cantracting party to the City. The City shall be raquired
to provide prior notice af 90 days, and the insurance ad�ustments shalI be inc�rporated into the
Worlc by Change Order.
13. City shall be entitled, upon wriiten requcs� and wi�haut e�cpense, io receive copies of policies
and endorseznents thereto and may rnake any reasonable requests for deleiion or revisian ar
rr�od�cations of par�ic�alar policy terms, canditions, limi�ations, or exclusions necessazy to
confarm the poIicy and endorsements ta the requirements ofthe Contract, Deletians, re�isions,
or modifications shall not be required where policy provisions are established by faw ar
regulations bindir�g upon either party or the underwriter an any such policies.
14. City shall not be responsible for the direct payrrzent of insurance premium costs for
Cantxactor's ins�trance.
5.04 Contr-actor's Insurance
A. Wo�kers Compensation and Employers' Liahility. Contractor sha�l p�archase ane� maintain such
irisUrance coverage with limits consistent with statutory benefts outlined in the Texas Wark�rs'
Compensation Act (Texas Labor Cod�, Ch. 40b, as amended), and miniinurn limits %r Employers'
Lia.t�ility as is appropriate for the Workbeir�g perforzned and as wiIl provide protection from clairrzs
sef forth below which rnay arise out of or result fram Coniraetor's performance of the Work and
Contractor's other abIigations under tr�e Contract Dacuments, whether rt is to be perforined by
Contractor, any Su6cantractor or Supplier, or by anyone directly or in.directly employed by any of
therri tp perfarm any af the Work, or by anyone %r vvhose acts any of them rna� 1�e Iiable:
1, elaims under worlfers' compensatian, disability benefits, and other sunilar emplayee be��Cfit
acts;
2. claims fnr damages because of badily injury, occupational sickness or disease, or death of
Gontracior's employees.
B. Commercial Gene�al Laability. Coverage sf�all in.clude but not be litnited to cavering liability
(bodily injury or prop�rty damage) arising �irom: premiseslop�rations, independent contractors,
products/comp]eted operations, personaI injury, and liability under an itisured contract. Insurance
shalI be provided on an occurrence basis, and a� eomprehensive as tk�e current Insurance Services
Office (ISO) poucy. This insurance shall apply as primary itastarance witi� respect to any other
C]TYOF FORT W�RTi-[
ST;4N]aARDC0AI5TRlICTION SPECI�ICATION DpCiIMEi�''I'S
ReVision: 8I23I�021
oo�zoa- i
cENERALCallofTloN s
Page t4of53
insurance or self insurance programs afrforded io the Crty. The Commercial Gen�ral Liability
policy, shall have no excIusi�ns by endorsements that wauld alter of nul�y premises/operations,
prnductslcompleted operations, contractual, personal injury, or advert�sing mju�-}�, which are
normaIly coniained with the poliey, unless the City approves such excIusions in wriiing.
For construction pro�ec�s that present a substantiaj completed operation exposure, the Ciiy may
require the contxactor to maintain completed operations coverage for a rninunurn of nn less t1�an
three (3) years followung the completion of ihe project (if identified in the Supplementary
Conditions).
C. Autornobile Liability. A commercial business auto policy sha�l provid� coverage on "any auto",
defined as autos owned, hired and non-awned and pravide indemnrty for claims for damages
because bodiiy �jury or death of any person and or property damage arising out of the work,
maintenance or use of any mator wehicIe by the Contractor, any Subcantra,ctar or Supplier, or by
anyone directly or indirectly ennployed by an� af them to perform any ai the Work, or by anyone
for whose acts any of thein may be liable.
D. Rcail�oad Protective Liability. If any of the work Qr any warranty� work is within the limits oi
railroad right-of vvay, t�e Coniractor shall compiy with the requirem�nts identif'�ed in the
Supplementary Conditians.
E. Notafication of Palicy Cancellatian: ContractQr shall immediately notify City upon cancel�ation
or other loss of insuran.ce coverage. Cantractor shall stQp work until rapla.cement insurance has
been procureci. There shall be �a time credit for days not worked pursuant to �Ivs section.
5.05 Acceptanee ofBondsandlnsurance; Optfon to Replace
If C�.y has any obJection. to the coverage aiforded by or o�er provi�ions of the bonds or itasurance
required to be purchased and maintained by the Contracior in accordance with Article 5 on the basis
of non-confortnance with the Contract Docurnents, the City shall so notify the Contrac�or in rvri�ing
within 10 Business Days afterreceipi of the certif'icates (or other evidence requested). Contractor shall
provide to t1�e City such additional informa#ion in respeet of insurance provided as the City may
reasonably request. If Coniractar does z�►a� �aurchase or mau�tain all of tkie bonds and insurance required
by the ContractDocuments, the Ciry shall notify the Contractor in writirig of suc�a �ailure prior tc� the
sta.r� of the Work, or of such failure to maintain prior to any change in the required coverage.
ARTICLE 6 — CONTRACTQR'S RESPONSIBXLTTIES
6.01 Supervisian andSuperintendence
A. Cantractor shall supervise, unspect, and direct the Work competently and eff'iciently, devoting
such attention thereto and applying such skills and expertise as �ay be n�cessary to perform th�
Work in accardance with the Contract Documents. Contractor shall be salely responsble for the
means, methods, techniques, sequences, and procedures of constructinn.
C1TY OF FORT WORTH
5TA1+iDARDCdNSTA[1CT[ON sPECIFICAT]ON DOC[JMEN'I'S
Revision: �L3/2�}21
oa�2o.a-i
GENERAL CON� ITION S
Page 2� of 63
B. At all times during the �]�'O�I'S55 of the Work, Cantractar shall assign a comp�tent, English-
speaking, Superintendent who shall not he replaced wrthout written notxce to City. Tk�e
Superintendent will he Gontractor's representative at the Site and shall have authoxity ta act on
behalf of Cantractor. AU communication given to or received from the Superizrtendent shall be
binding on Cantractor.
C, Contractor shall notify tl�e City 24 haurs prior t� moving areas during th� sequence of construction,
6.02 Labor; WoYkingHours
A. Contractor shall pro�ide campetent, suitabl� qual�ied personnel to perfarm aonstruction as
required by the Contract Documenis. Contractor shaIl at all times rnazniain good discipline and
arder at the Site.
B. Except as othez•wise required for the safety or pratection of persons or the Work or praperty at
the Site ar adjacent thereto, and except as otherwise stated in the Contract Doc�ments, all Work
at the S�ite shall be performed dur�g ReguIar Working Hours. Con�ractor will noi permif the
performance of Work beyond Regular Working Hours or fof Weeken.d Worlcing Hours witihout
City's written cor�ent (which will not he unreasanably r�rithheld). Written request (by letter or
electronic communication} to perform Work:
1. for beyond Regular Working Hours requesf rrz�asi be made by noon at least tvvo (2) Business
Days prior
2. far Weekend Working Hours request must be rr�ade by noan of the preceding Thursday
3, for legal halidays request must be made by naon riva Business Days prtor to tl�e legal
holiday.
6.03 Services, Mcate�i�zls, and Equip�nent
A. Unless otherwise specified in the Contract Documants, Contractor shall provide and assurne full
responsibility for aIl services, materia�s, equipinent, labor, nansportation, constructiori equipm�nt
and machinery, taols, appliances, fuel, power, light, heat, telephone, water, sanitary faciIities,
t�mporary facilities, and all oth�r faciIities and incidenta�s necessary for the performance,
Cantractor required testing, start-up, and comp�etlon of the Worlc.
B. AI� materials and equipment incorparated into the Work shall be as specified or, if not specified,
shall be of good quality anc� nev�, except as oth�rwise provided in the Contract Documents. All
special warranties and guarantees required by the Spec�cations shall expressly run to the benaft
of City. If required by Ci�y, Contractor shall fu�`nish satisfactory evidence (including reports af
required tests) as to the source, kind, and quality of materials and equipmen�.
ciT� oF Fanr woxTT�
STftNDARDCflNSTRUCTION SPECIFICATIpN DOCUMEIVTS
Revi sion: 843f1A21
00 �z o.o - i
GEN�RAL CONp1TIpN S
Page 21 of 63
C. All materia3s and equipment to be incorporated i�tn the Work shall be stored, applied, instaued,
connected, erected, protected, used, cleaned, ar�ci condrtianed in aceardance with instructions of
the applzcable Supplier, e�cept as otherwise may Y�e provided in the Contract Documents.
D. All itetns of standard equipaxr.ent #o be incorporated into tha Work shall be the latast model at the
tirne af bid, unless otherwise spec�fed.
6.04 P�ojectSchedule
A. Contractor shall adhere to the Project �chedule established in accardance with Paragraph 2.0'7
and the Generai Requireinents as it may be adjusted �rnm time to time as provided below.
1. Cont�actor sha�. submit ta City for aeceptance (to the ezctent indicated itl P aragraph 2.07 and
the General Requirements} proposed adjustments in the Project Schedu�e that vvill not result
in changing the Cantract Time. Such adjustments will comply with any pcovisions af the
General Requireinents applicable triareto.
2. Contractor shall submit to Cit� a monthly Project Schedule with a manthly progress payment
for the duration of the Contract in accordance with the schedule specifcatian 01 32 I6.
3. Proposed adjustrnents in tha Project Schedule that will change the Cantract Time shall be
suhmitted in acernrdance with tlie r�quirements of Article 12. Adjustments in Contract Time
may only be made by a Change Order.
6.05 Su�stitutes und "Or-Equuis"
A. Whenever an item of material or equipmern is s�e�c�'ied or desGribed in the Cont�act Documents
by using the narne o�' a proprieta3ry item or the name of a particular Supplier, #he spec�ication or
description is intended ta estabiish the type, function, appearance, and quality required. Un�ess �he
specifcation or description contains or is followed by words reading that no L�ce, equivalent, or
"or-eqUal" iterri or no substitution is pennitted, other iterris of material or equipment of oiher
Suppliers may be submitted to City for revie�v under the circumsiances describec� below.
1. "Or-Equal"Items: If � Crty's sole discretion an item of material or equipment proposed by
Contractor is fianctionally equal to thai named and sufficiently similar so that no change in
related Work �rill be required, rt znay be consid�red by City as an "or-eqUal" item, in which
case review and approval of ihe praposed item may, in City's sale discretion, be aceomplished
without complian:ce witli som� ar all of the requirerrxents for approval of proposed substitute
items. For the purposes of t�is Paragraph 6.OS.A.1, a proposed itern of material or equipment
will be considered functionally e�al to an item so named �:
a. tha City deterxaiines thai:
1) it is at Ieast equal in rnaterials of construction, quality, durability, appearance,
strength, and design characteristics;
CiTY OF FbCtT VirOTtTH
STANDAI2UCONSTRiICTION SPECIFICATION BOCUMENTS
Revision: 8r23f�OQ1
oo�aoa-t
G�.NERALGON�ITiONS
Page 22 tif 63
2) it will reGably perform at Ieast equally weu the function and achiev� the results
irr�posed by the design concept of the campleted Project as a f�anctioning whole; and
3} it has a proven recard of perforznance and availability of re�ponsive service.; and
b. Contractor cer�i�ies that, if approved and incorporated into the Work:
I) there will be no inerease in cost to th� City ar increase in Contraet Tima; and
2) it wilI conform substantialiy to the detailed requirements of the item named in the
Cantract Documents.
2. Substitute Ite�as;
a. If in City's sale discreiion an item of material or equipment propased by �ontraetor does
not quali#'y as an "ar-equal" it�m under 1'aragraph 6.�S.A.1, ii may b� submitted as a
propo�ecE substitute item.
b. Contractor shall submit �u�fcie.nt infaxmation as provided below to allaw City to determine
i� the item of materia� or equipznent proposed is essentially equivaIent to that named a.nd
an acceptable substi�t�.rte therefor. Requests %r review of praposed substitut� rtems af
iriaterial or equipment �vill no� b� accepted by City firom anyone other ihan Contractor.
c. Contractor snall malce written application ta City for revievw of a praposed substitute iiezn
of rnaterial or equipment that Contractor seelcs ta furnish or use. The application shall
comply with Section 41 25 00 and:
1} shall certify that the proposed substitute i�em will:
a) perform adequately the functions and achieve the results called t'or by the general
design;
b) be similar in substance ta thaf specified;
c) be suited to the same use as that specif"ied; and
Z) will state:
a) the extent, if any, to which the �ase of the propased su6siitute item will prejudice
Contractor's achievement af firial completion on time;
b) whether use of the proposed substitutie rtern in the Wark wilI require a chang� in
any of the Coni�act Documents (or in the provisions of any other direct cantract
with City for other wark on the Project) to adapt the design to the proposed
substitute item;
C1Ti' D�' FOItT WORTH
STANDARDCONSTRUCTION SPECIFICAI'ION DOCUI�ENTS
ftevision: 82312D21
0072a0-1
C�NERALCpNplT�ON 5
Page 23 of 63
c} whetlaer incarporation or use of the proposed substit►rte iter►i in connection with
tl�e Work is subject to paymem of any licensa fee ar royahy; and
3} will identi�y:
a} all variatians af the proposed sul�stitute item from. that speciFied;
b) available engineering, sales, maintenance, repair, an�l re�lacement services; and
4} shaU contain an itemized astiimate of aU costs or credits thai �rill result directly or
indirectly fram use of such substitute item, including cas#s oi redesign and Dama�e
Claims of other contractors affected by any rasulting change.
B. Substitute Canst�-uctionMethods orProcedure.r: If a specific means, method, technique, sequence,
or proced�re of con.sfiruction is expressly requir�d hy the Cont�act Dacuments, Contractor may
furnish ar utilize a subst�tute rrzeans, method, fiechniqve, sequence, or procedure of construction
appro�ed by City. Cantraetor shau submit suf£'icient in%rmatinn to allow City, in City's sole
discretion, to determine that the substrtutc proposeci is eyuivalent to tl�at expressly ealled far by
the Contract Documents. Contiractor shall mak� written application to City for review in the same
manner as those provided in Paragraph 6.QS.A.2.
C. City's Evaluatian: City wilI be allowed a reasonable tirne wrthin which to evaluate each
proposal ar subinittal made pursua�t to Paragraphs 6.OS.A and 6.OS.B. City may require Contractor
to furnish additional data about the prr�posed substitute. CiCy will be ihe sole judge of acceptablity.
No "or-equal" or substi�ute will be ordered, installed or utilized unt�l City's review i� complete,
which will be evidenced by a Change Order in the case of a subs#itute and an accepted Submittal
for an "or-equal." City will adv�se Contracior �n writmg of its determination.
D. Special Guarantee: City may require Confractor to furnish at Contraetar's expense a specia.l
performance guarantee, warranty, or other surety with cespect to any substrtute. Contractor shall
indemnify and hold hczrmless City and anyone direct�y or indirectly employed by themfrom cxnd
agains� any and alr clainas, damages, losses and expenses (inciuding attor�Meys fees) arising out of
the use of suhstituted rnaterials o� equipment.
E. City's Co.�tRcimburse�neni: City wiU record City's casts in evaluating a substitute proposed ar
submitked by Contractar pursuant 1:a Paragraplis 6.O�.A.2 and 6AS.B. Whether or na� City
approves a substilute so proposed or subnnitted by Contract�r, Contractar may be required tfl
reimburse City for evaluating each such proposed substi�tute. Contractor rnay a�so be required to
reimburse City for the charges for �aking changes in the Cont�aet Documents (or in the provisions
of any other direct contract witl� City} resultmg from fhe acceptance of each praposed substitute.
F. Cont�actor's F�cpense: Contractar shall provide all data in support of any propo�ed substituie or
"or-equal" at Contractor's e�ens�.
C1TY OP FORT WORTH
STAIVDARDCONSTR[1CtE0N SPECIFTCA7'ION DOClJMENT5
Revision: &r1.'#�Q21
ao�aao-t
GENERAL CANp I710N S
Page 24 of 63
G. City Substitute Rezmbursement; Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Cantract by Change Order.
H. Time Extensaons: Na addrtional iime will be gran�ed %r substitutions..
6.Of ConcerningSubconti-acto�^s, Supplier^s, andQthe�s
A. Contractor shall perforr� wi�h his ou�n orgata�zation, work of a vaIue not less than 35% of ihe
vaIue embraced on the Contract, �anless otherwise approved by the City.
B. Contractor shaU not emplay any Subcontractor, Supplier, or otl�er individual or entity, whether
i�itiaIIy or as a replacement, agairist r�vham City may have reasonable objection. Contractor shall
not be rrequired to emp�oy any Subcontractor, Supplier, ar ot�er indi�idual or entity to fu�aish or
perfoz7m any of the Wark againsi whom Cantractor has reasonable objection (excluding those
acceptable to City as indicated in Paragraph b.46,C).
C. The City may from time to time r�quire th� use af certair� Subcontractors, Suppliers, ar otner
individuals or entities an the project, and will provide sUch requirements in the Supplementary
Cond�tions .
D. Minoraty Bicsiness Ente�prise Compliance: It is City policy to ensure the �ull and equitable
participation by Minority Business Enterprises (MBE) in the procurement of goods and ser�ices
an a coniractual basis. Tf the Contract Documents provide for a MBE goal, Contractar is required
to comply with the inteni of ihe City's MBE Ordinanee (as amended) by the fallowing:
1. Contractor shall, upon requesi by City, provide cannplete and accurate informatian regardin.g
actual vvork p�rformed by a MB� on the Contract and payrnent therefor.
2_ Contractor will not make additions, deletions, or substitutions af accepted MBE withaut
written consent of the City, Any unjustified change or deletion shalI be a rnaterial breach of
Contract az�d may result in debarrn�nt in accordance with the procedures ou�lined in the
4rdiz►ance.
3. Contractor shall, upon request by Gity, allow an audit andlor examination of any books, records,
ar files in the passession af the Contractor that will substantiate the actual work perforrned by
an MBE. 1Vlaterial rr�isrepresentation of any nature will be graunds for termit�a�ion of the
Contract in accordance wiih Paragraph 15.02,A, Any such misrepresentation may be �aunas
�or disqua�if'ication o� Coniractor to bid on future contracts �nrith the City for a period of
not less than thre� years.
E. Contractor shali be fuI�y responsible ia City fnr all acts and arnissions of the Subcnntractors,
Suppiiers, and other individuals or entities performing ox f�zrnishing any of the Work just as
Contractor is responsib�e for Cantractor's own acts and omissions, Nothing in t�-ie Contracf
Documents:
C1TY OP PORT WORTH
ST.A2QDAR.QCONSTRi7CTI0N SPECIFICATION DOCUMENTS
Revisian: 823I2021
oa�zoo-�
GENERAL CAN�ITION S
Page 25 nf 63
1. sha]I creaie for the benefrt of a1�y such Subcontractor, Supp�ier, or ather indivic�ual or entity
any cont�actual relationship between City and any such Subcor�tractor, Supplier or other
individual or eniity; nor
2. shall create any abligation on the part of City to pay or to see to the payment of any moneys
due any such Subcont�ractor, Suppl�er, or other iridividual or entity except as may atherwise be
required by Laws and Regulaiions.
F. Contractor s�all be solel� responsible for scheduiing and caordinating the Wark of Subcontractors,
�uppliers, and Qther ir�dividuals ar entrt�es performing or furnishir�g any of the Work under a direct
c�r irld�rect contract with Contractor.
G. AlI Subcantractors, Suppliers, and such other individuals ar entities performing or furnishmg any
of the Work shall connmuaicate with City through Contractor.
H. All Work performed for Contractor by a Subcontractor or Suppfier wi� be pursuant to an
appropriate agreemeni between Contractor and the Subcontracior or Supplier which speciiically
binds the Subcontractor or Supplier io �e applicable terms and conditians of the Contjract
Dacuments for the benefit of Czty.
6.07 Wage Rates
A. Duty to pay Prevailing Wage Rates. The Cantractor shall compiy r�ith all requiurements of
Chapter 2258, Texas Governn�ent Code (as amended), includir�g the payment of not less than the
rates defierm�►ed i�y tI�e City Counc� of the City of Fort Worth to be t�e prevailmg wage rates in
accordance with Chapter 2258. Such prevailing �rage rates are included in ihese Contract
Documents.
B. Penadty far Violation. A Contractor or any Subcontractor who does not pay the prevailing r�+age
shall, upon demand made by tl-ie City, pay to the Ciry $60 far each worker employed for each
calendar day ar part af the day that th� worker is paid Iess than the prevailing vwage rates stipulated
in these contract documents. This pena.lty shaIl be retained by the City to ofFset its administrative
costs, pursuant to Te�s Government Code 2258.fl23.
C. Camplcrints of T/iolations and City Dete�mi�aation of Good Cause. On receipt af information,
ir�cluding a complaint by a worker, concerning an alleged vialation of 2258.023, Texas
Gaverrkment Code, by a Contractor or Subcontractor, the City shall make an initial
detertnination, before tl�e 31st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shalI noiify in writing tb.e
Cantractor or Subcontractor and any affected worker of �ts initial de#ermination. Upon the City's
determination tha� ti�ere is good cause to believe the Contractor or Subcontractor has violated
Chapter 2258, the Ciry shall retain the full arnounts claimed by the claimant or clainaants as t�ie
d�'%rence betweenwages paid ancf wages due under the prevailitig wage rates,such amounts being
subtxacted from s�accessive progress payments pending a final determicaatian of t�►e vio�ation.
C1TY QF FORT WORTH
STA]VDAIiDCONSTAUCTIDN SPECIP[CA7ION DOCUMEIVTS
Revisinn: ii!?-3l�021
oo�zoo-i
GENERAL COND1710 N 5
Page 26 of b3
D. Arbitration Requi�ed if ViolationNotResolved. An issue relating to an alleged violatian af Section
225$.023, Texas Government Code, inclt�dang a penal�y ovwad to the City or a� affected woricer,
shal� be subi�ni�ted to bind�g arbitratzon in accordance with the Texas Cxeneral Arbitration Act
(ArticIe 224 et seq., Revised Statutes} if' ihe Conh•actor or Subcontractor and any affected worker
does not resolve the issue by a�reemenfibefore the 15th day afterthe date tha City malces i�s initial
determinatian pursuant to Paragraph C above. If the persons raquired to arbitrate under this
section do not agree on an arbitrator befare the I 1th day after ihe date that arbitratian i� required,
a dastriet court shall appoint an arhitrator on the petition of any af the pez•sons. The Ci�y is not a
party m th� arbitration. The deci�ion and at�ard of the arbitrator is �nal and binding on aIl parties
and rn�y be enforced in any courl: of competent jurisdictiora.
E. Records to be Maintaine�. The Contractar and each Subcontractor shall, for a period of three (3)
years fo.11owing the date of acceptance af the work, nlaintain records that show {� the name and
occupation of eachworker ennplayed by the �ontractor in the constz•ucti�n of the Wark provided
for in this Contract; and (u} the acival per diem wages paid to each worker. Th� records shall be
open a� all reasoraable hours for mspection by �e Ciry. Tlae provisions of Paragraph b.23, Right
to Aud'zt, shall pertain to this inspection.
�'. Progress Payr�rents. Wi�h each progiress paymeni or payroll periad, whichever is less, the
Contractor shall subrnit an affidavit stating thai the Contractar has cornplied with the requirements
of Chapter 2258, Te�s Gavernment Code.
G. Pasting of Wage Rates. The Contractor shall past pre�aalit�g wa.ge rates in a conspicuous p]ace at
all times.
H. Subcontracto� Campliance. The Contractor shall include in its sub��n�racts and/or shalI
otherwi�e requira all of i�s Su6contractors to comply with Paragraphs A through G abo�e.
6.08 PatentFees and Royaltzes
A. Contractar shall pay all license fees and royalties and assume a�l costs incident to the use in the
perforzx�ance of the Work or the 'rncorporation it� the Work of any invention, design, process,
product, or device which is the subject of pateni rights ar copyrights held 6y others. If a particular
invention, design, process, product, or device is specified in the Cantract Docuinents For use in the
pet`formance of the Work and if, to the actual knowledge of Ci�ty, its use is subject to patent rights
or cdpyrights caUiztg for the payment nf any license fee or rayalty to others, the existence af suah
rights shall be disclosed by City m the Contract Documents. Failure of tI�e City ta disclose such
information does not r�lieve the Contractor from its obligatians to pay far the use of said fees or
royalties tn ot�ers.
B. To the fullest extentperrrrftted by La}vs and Regulalions, Co�atractor shall indemnify and hold
harnzless City, fromcrnd againstall claim,s, costs, losses, ana'damages (including butnatlimited
ta all fees and chcarges of engir�eer�, architects, attorneys, and other professionals and all court
or arbit�atian or other dispute resolution costs) arising autof or� relafing to any infringement of
patent rrghts or copyraghts incident to the use in the performanee ofthe Work o� �esultingf�om
CITY OF FORT WpRTH
STANDA[ZDCONSTRUCTION SP$CIFICAT[ON DOCUMEN'I'S
Revision: 8/L'�/1(121
ao�zoo-i
GENERAL CON�1TlQN 5
Page 27 af 63
the incorporation in ihe LYo�-k of afay invetation, design, process, produ.ct, o� device notspecified
in the Conl�act Documents.
6.09 Permits and Utilities
A. Contracto� obtained permits �nd iieenses. Coniractor shall abtain and pay for all construction
permits and licenses except those provided for in the Supplemen.tary Conditions or Contraet
Documents. C�ty shaIl assi�t Contractor, when neeessary, in obtaining such permits and licenses.
Contractor shall pay all g�v�rnrnental char�es and inspection �ees neaessary far the prosecution of
the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the
Effective Date of tihe Agreement, exeept for permits provided by the City as speciiied in 6.09.B.
City sha�l pay all charges of utilily owners for eannectians for proviciing permaneat service to the
VVork.
B. City obtai�redpe�mitsand licenses. City will ob�in and pay far aIl pern:�rts and licenses as provided
for in the Supplemenfary Conditions or Cont�act Documents. It will be the Contractor's
responsibility to carry out the provisions of the permit. Yf the Contractor irirtiat�s changes to the
Cnntraet and the City approves the changes, the Contractor is responsible %r obtaining clearances
and coordinating with the appropriate regulatory agency. The City will not reimburse the
Contractor for any eost associated with these requirements of any City acquired permit. The
following are perrriits the City will obtain if required:
1. Texas D�partrnent of Transportation PeLrnits
2. U.S. Army Corps of Engineers Permits
3. Texas Gorrunission on Enviranmental Quality Permits
4. Railraad Company Penruts
C. Outstanding permits and licenses The Cnty anticipates acquisition of andlor access to permit,s
and lic�nses. Any outstazading perrnits and licenses are anticipated to be acquired in accordance
with the schedule set iarth in t�te Supplementary Conditions. The Project Schedule submitted by
ih� Contractor in aceordance with the Contract Documents must consider any outstanding permrts
and licenses.
6.10 Laws and Regulations
A. Contractor shall give all nntices required by and shail eomply vvith aIl La�vs and Regula.tions
applica6le to the perfor�nance of the Work. Except where otherrvi�e expressly required by
applicable Laws and Regulations, the Cily shalI not be responsible for moni�oring Cantract�or's
compliance with any Laws or Regulations.
B. If Contractor performs any �Vork knovving ar having reason ta know that i� is contrary to Laws or
Regulatians, Contractor shall bear aIl claims, costs, iosses, and dannages (including but not limited
to all. fees and charges of engineers, arck�itects, attorneys, and other professionals anc� all
CITY OF FORT WORTI-1
STANDAI2DCONSTRUCTION SPECIF[CA7ION DOCLJMENTS
Revision: 8/l_3?A21
OD72b0-]
GENERALCOI�p1T16NS
Page 28 of G3
cotart or arbi�ration or ather daspute resolution nosts) arising out of or relating to such Wark.
However, it shall noi be Contractor's responsibilil� ta make certain that the Specifications and
Drawings are in aecordance rr,rith Laws and Regula.tions, but this shal] not relieve Contractor of
Contractor's obligations under Paragraph 3.a2.
C. Changes in Laws or Regulatians nat �rnown at the time oi opening of Bids having an effect on
the cast or tune of perfarmance of the Wark may be the subject of an adjustment in Con�ract Price
or �ontract Time.
b.11 Taxes
A. On a contraet awarded by the City, an organization �vhich qualifies for exemptian pursuant to
Texas Tax Code, Subchapter H, Sections IS 1.301-335 {as amended), t�e Contractor may p�.�rchase,
rent or lease alI rnaterials, supplies and equipment used or consumed in the perfnrmance of this
contract by issuing to his supplier an exemption cert�"icate in lieu of the tax, said exemption
cert�cate to comply with State ComptroIler's RUling .�07. Any such e�emption certificate issued
to the Contrac�ar m Iieu of the tax shall be subject io and shall comply wi�h the provisian of State
Cornptrolle�•'s Ruling .011, and any other applicable rulings pertainin.g to the Texas Ta� Cad�,
Subchapter H,
B. Texas Tax permits and informaiion may be obtair�ed firom:
1. Comptroller of PubLic Accoeants
Sales Tax Division
Caprtol Station
Austin, TX 78711; or
2. h Jlwww.window.state.tx.usltaxinfo/taxfartns/93-forms.ht�n]
6.12 Use of Site andOth�rAreas
A. LiYnitation on Use of Site anrl OtherAreczr:
Contractor shall confine construction equipment, the storage of materials and equypment, and
the oparations of workers to the Site and other areas permitted by Laws and Regulations, and
shaU not unreasonably encumber the Site and other areaswith construction equipment or ather
materials or equipment. Contractor shall assume full responsibi�ity foz any damage to any such
land or acea, ar to tIae owner or occupant thereof, or af any adjacent land nr areas resulting
fratn the perfarmance of the iUork.
2. At any iime when, in tl�e juclgment of the Ciry, the Contractar has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, ar easement greater than is
necessary for proper execution of the �ork, the City may require the Coniractor to finish the
sectian on which operations are in progress before work is commenced on any add'ztiona [
area of ihe Si�e.
C1TY OF rORT WORTH
STANL?ARDCOT�SS'CRIICT[ON Sf'ECIFICATION DOCUME]�T5
ReSrision: &�Z3C�D21
oo�zao-�
GENERAL CONQ ITIQN S
Page 29 of 63
3. Should any Damage Claun �e made by any such owner or occupant because o�the performance
of the Wark, Contrantor shal3 promptly atternpt to resalve tlie Damage Cla.im.
4. Pursuant to ParagYaph 6.21, Contt-actor shctll indemnify and hold harmless City, frotn and
againstall clairrts, cosis, losses, and darnages a�isingo�t of o� �elating to any claim oN action,
legal or equitable, brought hy any such owner or occupant against Ciiy.
B. Remoual of Deb�is During Performance of the YYork: During the progress af the Work
Contracior shall iceep ihe Site and other areas free from accuinulations of waste materials, rubbis h,
and other debris. Removal and disposal of such waste rnaterials, rubbis�, and other debris shall
confortn to applicable Laws and Regulations.
C. Site 1Ylaintenan�e Cleaning: 2� haurs after vvritten notice is given ta the Contractor that the
clean-vp an the job si�e is proceeding in a manner unsatisfactory to the City, i.f the Contractor fails
to correct the unsatisfactory praceciure, the City may take such d�ect action as the City deems
appropriate to co�rect the clean-up de�ciencies cited to tk�e Contractor in the written notice
(by Ietter or electronic communication}, and the costs of such direct action, pIus 25 % af such
costs, shall be deducted from the monies due or to bec�me due to the Contractor.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractar shall clean the Site and
the Wark and make it ready for utilization by City ar adja�ent property owner. At the completion
of the Work Contractor shal� remove frorxi. the S�e all tools, appliances, eonstruction equipment
and machinery, and surplus rnaterials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Slruciu�es: Contractor shall nat load nor p�rmit any part of any structure to be loaded
in any manner fiha.t will endanger the si-ructure, nor shaIl Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
6. I3 Record Documents
A. Caniractor shall mamtain in a safe place atthe Szte or in a pla.ce designated by the Cantractor and
approved by the Czty, one (1) recard capy of all Drawings, Specifications, Addenda, Change
Ordexs, Fi�ld Orders, and w�ritten interpretations and clarifications in good order and annotat�d to
shaw changes made during constructian. Tb.ese record documents together with all approved
Samples and a counterpart oi ali accepted Submittals will be available to City for reference. Upon
completion af the Work, these tecard documents, any operation az�d maintenance manUals, and
Submittals will be delivered to City prior to Fm�l Inspection. Contraetor shall include accUra�
Locations for buried and imbedded items.
6.�4 5`afetyandProtection
A. Contractor shall be �olely responsible for mitiating, ma.intaining and supervising aIl safety
precautions and programs in connection with the Work. Such r�spansi�ility does not relieve
Subcontractors of their responsbility for the safety af persons ar property in the parformance of
the� work, nor for corz�pliance with applicabie sa�ety Laws and Regulations. Contractor shall
CITY QF FORT WORTH
STANDARDCONSTRUCTION SPECiF]CAT[ON D(3CUME7VT5
Revision: 8�1.�10'LI
oo�zao-�
GENERALCONDITIONS
Page 30 af b3
take all necessary precautrons for fhe safety of, and shall provide the necessary profection to
prevent damage, injury or loss to:
1. all persons on the Szte ar who rnay he affected by fihe WarIc;
2, aIl the Work and materials and equipment to be it�corporated therein, whether in storage on
ar aff the Si�e; and
3. other property at fihe Site or adjacent thereto, including trees, shrtabs, lawns, wallcs,
pa�emenfis, roadways, structures, utilities, and ilnderground Facilities not designated for
removal, relocation, or replacement 'rn the course af construction.
B. Contractor shall comply wit� aIl applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of person� ar property from damage., injury, ar lass; and
shall erect and maintain all necessary safe�aards for such safety and protectio�n. Contraetor shall
notify owners af adjacent property and of Und�rground Facilities and other utili�y ovvners wh�n
prosecutian of the Work may aff�ct them, and shall coaperate with them in the pratection,
remo�al, relo.eation, and reptacement of their propez�ty.
C. Contracior shall compiy with the applicable req�irements of Gity's safety prograins, if any.
D. Contracior shall inform City of the spec�"ic require.ments of Contractar's safety program, if any,
w�th which City's employees and representatcves must comply while at the Site.
E. All damage, �jury, or loss to any property referredta in Paragraph6.14.A.2 or 6.14.A.3 caused,
directly or indi�ectly, m�wnole or in part, b� Contractor, any Subcontractor, Supplier, or any other
individual or entity directly or indirectly employed by any of them to perfarm any af the Work,
or any�ne for whose acts any af them rr�ay be liable, shalI be remedied by Contractor.
F. Contractor's duties and responsi6ilities for safety and far protection of the Worlc shall coniinue
until such time as all the Work is campleted and City has accepted the Worfc.
&.15 Safely Representaiive
Contracior shau inform City in writing af Cantractor's designated safety represer►ta�ive at the Site.
6.16 HazaYd Comrn�snicatian Programs
Contractor shalI be responsibl� for cnnrdirtat�g any exchange of material saFety da�a sheets or other
hazard communication information required �o be made avai]able to or exchang�d between or among
employers in accordance with Laws ar Regu�ations.
6.17 Eme�genca�s and/or Rect�cation
A. In emergencies affecting the safety or pratection �f persons or the Work or propert� at the Sit� o�•
adjacent thereto, Contractor is obligated to act to pre�ent threatened damage, injury, or loss.
Contractor shall give Gity prompt written notice if Contractor beli�ves that any significant
CITY OF FORT WORTH
STANDARDC�NSTRitCT]flN SPECIPCCATION ➢OCiJN[ENTS
Revisian: 423/ZOZ1
ao�zao-i
C�N�RALGOI��1TIdN S
Page 3 ] of 63
changes in the WQrk or variatians from the Contract Documenis have been caused thereby or are
requ�red as a resuIt thereaf. If City determines that a change in the Contract Documents is r�quired
because of the action taken by Con�ractor in response to such an emergency, a�hange Order may
be issued.
B. Sl�auld the Cantractor fa�l to respond ta a requesi from the City to rectify any discrepancies,
omissions, or correction necessary to conform with the requirernents af the Contract Docurr►ents,
the City shalI give the Contractar written notice that such work or changas a.re to be perforrned.
The writ�en notice shau direct attention ta the discrepant condition and request the Contractor ta
ta�Ce remedial actian ta correct the crnndition. In the event the Contractor does not take poshi�ve
steps to fu]#ill this written r�quest, or does not show just cause for not taking the praper action,.
vsrithin 24 hours, the Cit� may take such remedial action with City forces or by contract. The City
shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any
funds due or became due the Contractor on the �roject.
6.18 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance in aecordance
with the accepted Schedul� of Submitta�s (as required by Paragraph 2.07). Each submittal will be
identifiad as Ciiy may require.
1. Submit number of copies specifed in the Gen�ral Requirements.
2. Data shown on the Subrnitta�s will be coznpiete with respectta quantities, dimer�sions, specifed
performance and design criteria, materials, and simi�ar data to show C�ty ti�e services,
materials, and equipn:lent Cantractor proposes to provide and to enable City to review the
i�formation for th� limiied purpases required by Paragraph 6.18.C.
Submittals submitted as harein provided by Contraetor and reviewed by City far
confor�nance with ihe design concept sha3l ba executed in canf'ormily with the Contract
Documents unless otherwise required by City.
4. When Subax►ittals are submitted for the purpose of shawing the instaUation in greatec detail,
their review shall not excuse Contractor from requirer�aents shown on the Drawings and
Spec�'ications.
5. For-Infornaation-Only submittals upon which the Ciry is not expected to conduct re�iew or
tak� responsive action may be sa identified in tile Contract Dacuments.
6. Subrnit reguired numbar of Samples spec�ed in the Specifications.
7. Clearly identify each Sampl� as io material, Supplier, pertinent data such as cataiog numbers,
the use for which uatended and other data as City may require ta enable City to review the
submrt.tal for the lirn�ted purposes required by Paragraph 6.18.C.
ciTY nF �a�r wo��
STANDAILDCONSTRUCTIQN SPECIFICATEON QOCLIIv1EN'F5
Revision: 823fLD21
oo�zoo-i
C�N�RAL CON�ITIDN S
Paga 32 of 63
B. Where a Subiniltal is requu•ed by the Contract Docuinents ar the Schedule of SubmittaIs, any
re�ated Work pe�-formed priar to City's review and acceptance of the pertinent submittal wilI be
at th� sole expense and responsibili�y af Contractor.
C, City's Review:
City vvill pra�ide tunely review of required Submittal� in accoz�dance with the Schadule of
Submittals acceptable to City. City's revi�w and acceptance will ba anly to datermine it' the
items covered by th.e submittals wiU, after installation or incorporation in the Work, confarm
td the information given in the ContractDocume�.ts and be compatibl� with the design concept
of the cornpleted Prnject as a functioning v�hole as indicat�d by tl�e Coniract Doc��nents.
2. City'� review and acceptance will not �xtend to means, methods, techniques, sequences, or
procedures of construction (except wi�ere a paz`�icuIar tneans, method, technique, sequence,
or pracedu�re of construction i� specif'ically and expressly ca�led for by the Cont�'aet
Dacuments) or to safety precautions or prograxr�s 'vncident thereto. The review and accep#ance
of a separate item a� �uch will not indicate appraval of the assembly in which the �em
functiians.
3. City's review and acceptance shalI not rekeve Contractor frorn respnnsi6iIify for any
variation from the requirernents of'the Cantract Docurnents un�ess Contractor has complied
with tkae requirements of Seetion Ol 33 00 and City has given writ�en acceptance of each
such variation by spec�ic written notaiion thereof incorporated in ar accompanying the
Subrnittal. City's review and acceptance shall nat r�I�eve Contractor from responsibi�iLy for
complying with the requirez-nents of the Contiract Documents.
6,19 Cantinuangthe Work
Except as otherwise pro�vided, C.on�ra�tor shall carzy on the Work and adhere to �he Project Schedule
duri�g aIl dasputes ar disagreements with City, No Work shall be delayed or postponed pending
resolution of any disputes or disagireements, excepi as City and Cantractor may otherwise agr�e in
writing.
b.20 Contractar's Gener�al War��anty and GuaNantee
A. Cantractor �varrants and guarantees to City that all Work will ba in accordance wrtk� the Coniract
Dacuments and �r�l not 6e defective. City and its offcers, d�rectars, members, partners,
employaes, agents, consultants, and subcontractors sha�l be er�titled to rely an representation oi
Gnntractor's warranty and guaranl:ee.
B. Cantractar's warranty and guarantee hereunder excludes defects or damage caused by:
l. abuse, modification, or improper main.tenance ar operation by persons other #.han Contractor,
5ubcontractors, Suppliers, ar any athar individuaI or entity for whom Contractor is
responsible; ar
C1TY OF FORT W012TI-I
STANI�ARDC(7NSTRUC'CI:ON SPGCIr[CATION BpCUMEI�lTS
Revisian: &23�p21
ao�aoo-�
GEIdEftAL COND]TlON S
Page 33 ofb3
2. narmal wear and tear under normal usage.
C. Cantractor's obligaYion to perform and catnplete the Work in accordance with ihe Contract
Docuznents shall be absolute, None of the following will constitute an aeeeptance of Work that rs
not in accordance with the Contract Documents or a releas� of Contractor's obliga�ian tQ pert'orm
the W�rk in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City of any pragrass or i'rnal paymen�;
3, t1�e issuance af a certificate of Final Acceptance by Ciry or any payrnent related thereto by
City;
4. use or occupancy of the Work or any part thereof by Ciry;
5. any review and acc�ptanca of a Subinittal by City;
6. any mspection, test, oc appro�al by ott�ers; ar
7. any correctian of defective Work by Ci�ty.
D. The CQntractor shall remedy any ciefects or damages in the Wark and pay for any damage to
other work or property resultir�g therefrom which shaU appear within a period o£ twa (2) years
frorn tha date of Fi�al Acceptance o�the'Wark unless a langer period is �pecif"ied and shall furni�h
a good and sufficient maint�nance bond, campiying with the requ�ernents of Articla
5.02.B. The City wi�l give notice of observed d�fects with reasanable promptness.
6.21 Indemnification
A. Contractor covenants and agrees fo indemn�ify, hold harn�less and defend, at its own
exper►se, the Cify, i�s o�,cers, servants and employees, irom and against any and all elaims
arising ont of, or alleged to arise out of, the work and services to be performed by the
Contractor, its officers, agents, emplaye�, subcontractors, licenses or invitees under thi�
Contract. TNT� TNUEIYINiFTC`ATiON PROViST[lN TS SPECTFTCALLY 11VTENDED TQ
VE T
[}R S ME OF TH .1�AMA[�F,� RF,TN[T SCICT(�RT �FRE CAUSED. TN WHCl1.F [7R TN
PART. RY ANY ACT. O]YiISSION �]2 NT'.(?T,I(TF,NC`F, nF THi{', CTTY. This indemnity
provision is intended to include, without lirnitation, indemnity for costs, �xp�nses and legal
fees incurred by the City in defending agains� such claims and cae�ses ofactions.
B. Contractorcovenantsanda�reestoindemnifyandholdharmless,atitsnwne�pense,theCity,
its o�icers, servants and emplayees, from and against any and all loss, damage or destrt�cii�n
of property of the City, arising out o�, or alleged to arise out o� the work and services to b�
gerfarmed by the Contr�actor, its officers, agents, employees, subcon�ractors, Iecensees or
invitees u�der this Contract. THIS�NDF.MNTFYCATYON PROVISION iS
CITY OF FORT WOILTH
STANDARDCdNSTRUCTION SPBCIFICATION DO(;[1NIENTS
fteei si an: 8r73f1.0�1
oo�zoo-i
GENER;4LCpN�ITIQNS
Page 34 4f 63
' � ►_ ►1 1 _I 1_`_ � I►i .
�_ \
_� ! :_':1 / ► '=-�- � :---1IL— i- -'-- �:-11_:_ : ► � l;.II
./_ : _ 1 . � i � ► ` = ► ' _ ► - - - -- �� — 1 �- 1-.-
► 1
6.22 Delegation of Professaonal De,�ign Se�uices
A. Contractar wiil� not be rec}uired to provide professional design services �anless such services are
speeifically required by the ContractDocuments for a portion of the Work or unless such services
are requieed to carry out Contractor's responstbzlities for construction means, mefikods, techniques,
sequenc�s and procedures.
B. If professional design services or certiiications by a d�sign professional rela.ted to systezns,
materials or equipment are spec-ifically required of Cantractor by the Contract Documents, Ci�y
will specify all perform�nce and design criteria that such services must satisfy. Contractor shall
cause such services or certificat�ons to be provided by a properly licensed pro%ssional, whase
signature and seal shall appear on ail dra�vings, calculatinns, spec�catians, certificatzons, and
�ubmittals prepared by such professional. Submittals related to the Wark design.ed or certified by
such prafessional, if prepared by others, shall bear such pro�essionaI's written appraval when
submitted to City.
C. Crty shal� be entitled to re[y u�on the adequacy, accuracy and compl�ten�s� of the services,
certif'ications ar approval� perfortned by such design professionals, provided City has specif"ied
to Contractor performance and design criteria that sUch services must satisfy,
D. Pursu.antto this Paragraph 6.22, City's review and acceptanee af de.sign calcu�ations and design
drawings wiil be only for the limited purpase af checkizig for confarm�nce with performance and
design criteri� given and the design concept expressed in the Contract Docurnenfis. City's review
and acceptance o� Submittals (except design calculations and design drawings) will be anly for
tl�e purpose stated zn Para�raph 6,18.G,
b.23 Right to Audit
A. The Contracior agrees that tk�e City shall, until tt�e expiration of three (3) years aiter fmal
paymant under this Contract, have access to and the right to examine and phatocopy any dieectly
p�rtment book�, documents, papers, and records of the Contractor involving transactioras relating
to thig Cantract. Contractor agrees f:hat the Ci�y shall have access d�.iring Regular Working Hours
to all necessary Contractor faciIities and sl�all be provided adequate and appropriate work space
in arder to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasanable advance notice of intended audrts,
B. Contractor further agreesta incl�de �n a11 its subcontracts hereunder aprovi�ion to the effectthat
the subcont�actor agrees that the City shall, until tne expiration of three (3} year� after fina.l
payrnant under this Contract, have access ta and the right to examine and photocopy any di��etly
pertinent baoks, dacuments, papers, and records of such Subcontractor, involvir�g transactions ta
the subcontract, and further, that City shall have access during R�gular War�dng Hours to all
CITY OP FpYtT WORTH
STANDARDCONSTRIICT[ON SPSCIFICATION I}DCLINfENTS
Revision: 8�13I102]
00720D-I
GENERAL CON� ITION 5
Page 35of63
Subcontractor iacilities, and sk�all be provided adec�uate and appropriate work space in order to
cQnduci audits �n compliance with �he provisions of tivs Paragraph. The City shall give
SUbcontractor reasonabie advance notice of intended audits.
C. Contractor and Subcontractor agree to photocopy such dacuinents as may be requested by ttze City.
The City agre�s to reimburse Contractor for the cost af the copies as fallows at the rate publiushed
in the Te� s Administrative Code in effeci as of the time copying is performed.
6.24 Noradrscrimainatian
A. The City is responsible for operating Public Transportation Programs and implement�ng transi�-
related prajects, which are funded in part with �'ederal £'�ancial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administ�atian (FTA}, w�hout
discrinvnating against any person in the Uni�ted States on tne �asis of race, colar, or natio�al origin.
B. Title Vl; Civid RightsAct of 196� as anaended.• Contractor shall comply with t�te requirements of
the Aet and the Regulatians as further defined � th� Supplementa.ry Cond.itions far any project
recei�ing Federal assistance.
ARTICLE i— OTHER WORK AT THE SITE
7.01 Related Wor�k atSite
A. City may perform other worl� related to the Project at ihe Sit� r�vith Ciry's emproyees, or other
City eantractars, ar through other dir�ct contractstherefor, or have otiler work p�rf�ormed by utility
owners. If such other work is nnt nated in the Contract Docurnents, then written notice thereof
wilI be givan to Contractor prior to starting any such ather rvork; and
B. Contractor shall affard cach other contractor who is a party to such a direct coniract, each utility
ownar, and City, if Crty i� perforniing other work with Ciry's employees or other City cantractars,
proper and safe access to the Site, provide a reasonable opportunnity for the introduction and storage
of materials and equiprnent and the executi�n of such other work, and proparly coordinate tkte
Wock wikh thei�s. Contractar shall do all cutting, fittin.g, and patc�g of the Work that rnay be
required to properly connect or otherwise make its several parts came together and properly
�tegrate �rith such other work. Coniractor shaiI nnt endanger any work of others by cutting,
excavating, or otherwise a�tering such work; provided, bowever, tliai Coniraet�r may cut or aher
others' work. with the written consent of City and the others whose work will be aff�cted.
C. Ifthe proper execution or results af any part of Contractar's Work depends upon work performed
by others under this Article 7, Contractor shalI inspecf such other work and promptly report to
City in writing any delays, defects, or deficienaies izi such other work that render it una�ai�able
ar unsuiCable for the proper execution and resul�s af Contractor'S Work. Contractor's faiiure to so
report vvill constitute an acceptance of such ather work as �'�t and proper for integration with
Contractor's Work except for �atent defects in the work provided by others.
C1TY OF FORT WORTfI
STANDARDCONSTRUCTION SPEC[FICATIaN bOCUM�fi1TS
Tievision: 8�?3fI�D21
OD7200-I
GEN�R�1L CQN�ITION S
Page 36 of 63
7,�2 C001"G�itiLatiOYd
A. Ii City intends to contraat with others for the perfarmance o� other work Qn the Project at th.e
Site, the foJlowizig will be set forth in Suppleinentary Cond'ztians;
I. the indi�idual or entity who will have authority and z•esponsibil�y for coardination of the
aetir+ities arnong the various contractors will be identifie.d;
2. the specific rnatters ta be covered by such auihority and responsibility will be itemized; and
3. the e�tent of such authari�y and responsibilitias will be provided.
B. Unle�s otherwise provided in th� Supplementary Conditions, City shall have authority for such
coordination.
ARTICLE S — CITY'S RESPONS�SILTT'�ES
$.OT Comr�unica�i'ons to ContractoN
Except as otherwise provided in the Supplementary Conditions, City shall �ssue all communications
to Cantractor.
8.02 F��rtish Data
City shall timeIy iurnish the data. required under the Contract Dacuments.
8.03 Pay When Due
Ci�y shall maI�e payments to Contractor in accordance with Article l4.
8.04 Land,s and Easett�ents; Reports and Tests
City's dtzti�s with respect ta pro�iding lands and easements and pro�idir�g �ng�eering surveys to
estahlish reference points are set forth in Paragraphs 4.01 and 4.05. Paragxaph 4.02 refers ta City's
identifying and nnaking available to Contractor copies of reports af explorations and tests of subsurface
condition�s and drawings of physical conditions relating to exisiing surface or subsi.u•face structUres at
or contiguous to the Srte that have been utilized 6y City in preparing the Contract Documents,
8.05 Change ONders
City shall execute Change Ordars in accordance with Pa.ragraph 10.03.
8.Q6 Znspeciians, Tesi�s, and�lpp�o�als
City's responsibility with respect ta certain inspections, tests, and ap�ro�als is set Forth in Paragraph
13,03.
C1T Y 0�' P ORT �JVDRTH
STANDARDCONSTnUCTION SPEC1rTCATIdN DOCLTMENTS
Revision; 923/1021
oo�zoa-�
GENERAL CONOITIdI� S
Page 37 af 63
$.07 Litrzatations on City's Responsibilities
A. The City shalI not supervise, d�ect, or have cantro! or authority aver, nor be responsible for,
Contractor's means, method�, techzuques, sequences, Qr procedures of consiruction, or the safety
precautions and programs incident thereto, or for any £ailure of Coniractor to comply wi�h Laws
and Regulations applicable to the performance of the Work. City wiil not be responsibie far
Contractor's failure to perforrn the Work in accordance wiCh the Contract Docuinents.
B. Gity will not�y the Gontractar of applicable safety plans pursuant ta Paragraph 6.14.
8.08 Undisclosed Hazardous E�rvaronmental Conditian
City's cesponsibilrty with respect to an und�sclosed Hazardaus Environmental Condition is set fo�th
ir� �'aragraph �.06.
8.09 Compli�rcce with Scrfety P�ogram
�Vhile at the Site, City's employees and representatives shall comply with the specific applicable
requirem.ents of Contractor's safety programs of which City has been informed pursuant te
Paragraph 6.1�.
,ARTICLE 9— CITY'S OBSERVATION STATUS DURING CONSTRUCTION
9.01 City'sProjectManager
City will provide one or more Project Manager(s) durmg the constructian period. The duties and
responsibilities and the limitations of aut�oxity of City's Project Manager during construction are set
forth in the Coniract Documen�s. The City's Project Manager far this Cnntract i� identified in the
Supplementary Conditions.
9.02 Visits to Site
A. CiLy's Project Manager will make visits to the Site at intervals apprapriate to the various stages
of canstruction as City deems necessary in order to abserve the progress that has been made and
the quality oi the various aspects of Contractar's executed Work. Based on information
obtained during such visits and observations, City's �roject Manager wiil determine, in general, if
the Work is proceedi�g in accardance with the Coniraet Documen#s. City's �'raject Manager will
not be required to �nake exhausti�e or continuous inspections on the Site to check the quality or
qUantity af the Work. Crty's Praject Mana�er's efforts will be directed toward provid'mg City a
greater degree of canfidence that the cornpleted Work wilI conform generalIy to the Contract
Documents.
B. City's �'rojecf Maz�ager's visits and observations are subject to all tlie limitations on authority and
responsii�iJity in the Contract Docurnents includ�ng those set farth m Paragraph
8.07.
CITY OF FORT WQRTH
STAN�ARDCQIVSTRUCTION SP�CIFICATION DOCiJMENTS
Revision: 82.'�21
oo�zoa-�
G�NERALCONaIT1DNS
Page 38 of G3
9.03 Authorized Yariations in WaNk
City's Pro3ect Manager may authorize minor variations in the Work from the requirements of the
Contract Doctunents which do not in�olve an adjustrnent in the Contract Price or the �ontract Ti�na
and are compatible with the design concept of the camplet�d Project as a functioning whole as
indicated by the Gontract Doeuinents. These may be accomplished by a Field Order and will be
bindzng on City and alsa on Contractor, who shall perform the Work iinvoIved promptly.
9.04 Rej ecting Defective Work
City tv�lI have au#hority ta reject Work which City's Projec�t Manag�r helieves to be defecti�e, or will
not produce a completed Project that confarms 1:o the Confract Documents or that will prejudice the
integrity of fhe design concept of tl�e completed Praject as a f�nctionin.g whale as indieated by the
Contract Documents, City will f�ave authority ta conduct special inspection or testit7g of the Work as
pro�ided in Article 13, whether ar not the Work is fabricated, installed, or campleied.
9.05 DeterminatdonsforWo�kPet�for�rrted
Contractor wi]I determine the actual quanti�ies and class�ications of War� performed. Cit�'s Project
Manager will review with Contractor the preliminar� determination� on such mat�ers before rendering
a written recommendation. City's writfien deciszan will be fznal (except as modi�ied to reflect changed
factual condit�ans or more accurate data}.
9.06 Decisians on Reqz�iYefnents ofContt�actDocumenfs andl4ccepta6ility of YI'opk
A. Ciry will be the itartial interpreter af the requirements of the Contract Da�uments and judge of the
acceptability of the Wark thereunder.
B. City will render a writ�en decision on any issue referred.
C. City's written dec�sion on the issue referred will be fmal and binding on the Confractor, subject
to the pravisions of Paragraph 10.06.
ARTICLE ] 0— CHANGE� IN THE WORK; CLAIMS; EXTRA WORK
10�O1 Authorized Changes in the Wo�k
A. Withotrt in�alidating the Contract and withaut notice io any surety, City may, at arry iime or from
time to time, order E�ra Work. Upon notice of such Extra Waris, Contractor sha�I prornptly
proceed w�th the Work involved which will be performed under the applicable conditians of the
Contxact Documents (except as atherwis� specifically provided}. Extra VVork shall be
memorialized by a Change Order which may or ri�ay nat precede an arder of Exira work.
B. Far rninor changes of Worlc not reyuiring changes to Contract Time ar Contract Price, a Fielci
Order may be issued by the City.
CITY OF PORT WORTH
STANDAI�DCONBTR[]CTION SPECIFICATION DOCLIMHN'TS
Revision; 82'3/$121
oo�zoa-�
GENERAL CONDITION S
Page 39 of 53
10.a2 Unauthorized Chc�tges in the Work
Cont�actor shak not be entitled to an increase in the Contract Price or an extension of the Contraet
Time with res�ectto any work performed that is not required by tY�e Contract Documents as am�nded,
modifi�d, or supplemenied as provided in Paragraph 3.04, except in the case of an eznergency as
provided in Paragraph 6.17.
10.03 F�ecutaon of Change �rders
A. City and Contractor shall execute apprapriate Change Orders aovaring:
1. changes iri t11e �ork which are: {i) ordered by Czty pursuant to Paragraph l 0.O1.A, (u) required
because of acceptance of defective Work uttder Paragraph 13.08 or City's correction af
defective Wark under Paragraph 13.09, or {i�) agreed to by the parties;
2. changes in the Contraci Price or Contract Time w�ch are agreed to by fhe parties, including
any undisputed su�n or amourrt of tim� for Wark actually performed.
10.04 Extra Work
A. Should a difference arise as to what does or does not constitute E�#ra �ork, or as to the payment
thereof, �nd the City insi�ts upon its per%rmance, the Contractar shal� proceed with the workafter
making written reque�t for written orders and shall keep ac�urata account of the actual reasanable
cost thereoi Contract Claims regard'mg Extra Work shall be rnade pursUant to Paragraph 10.06.
B. The Contractor shall furnish t.�ie City such installation recards of all deviations from the original
Contract Documents as tnay be necessar�to enable the City ta prepare for permanent recoxd a
corrected set of plans showirig the actual installation.
C. The compensatza� agreed upon %r Eatra Work whether or not imitiated by a Change Order shall
be a fu�, complete and final payment fnr alI costs Contractc�r mcurs as a result or relating ta the
change or E�ra Work, whether said eosts are lrnown, unlrnown, foreseen or unforeseen a� that
time, including without litnitation, any casts for deIay, ex#e�nded a�erhead, ripple ar unpact cost,
or any other effect on changed ar unchanged vcrork as a result of the change ar E�ra Wark.
10.05 Not fication to Su�ely
Ifthe provisions of any bond reguire notice to be �en to a surety of any change af�ectingthe general
scope of t�ie Work or the provisions oi the Contract Documents (iriclud'u�g, but not limited to,
Con�ract Price or Contract Time), the gi�i�g of any such nntic� will be Contractor's responsibility.
The arn.ount af each appIicable bond will be adjusted by the Contractor to ref�ect the effect of any
such change.
CITY QF FORT WORTH
STAI�DARDCONSTRUCTION SPECIFICATI�N DOCI.JNIEtV'I'S
Revision: 82'3i1C121
aa�zoa-i
GENERAL C4ND ITIaN S
Page 40 of 63
10.Q6 ContpactClai�n,sProcess
A. City's Deciston Ilequired: AlI Confract Cla.ims, except those �vaived pursuant to Paragraph
14.09, shall be refet�red to the City for decisian, A decision by City shall be requ�red as a condition
precedent to any exercise by Contraetor of any rights or remedies he may ofinervvise ha�e under
the Cantract Documents or by Laws and Regulations in respect af such Contract Clairz3s.
B. Notice:
1. Written not�ce stating the general nature of each Contzact Claim shall ba delivered by the
Contractor to City no Iater than 15 days after the start of the er�ent giving rise thereto. The
responsi6ility ta substantiate a Contract CIaim shall rest with the party making the Canh•act
Claim.
2. Notice of the arnount ar axtent of the Contract Claim, wrth supporting data shall be deli�ered
to tih� City an or before 45 days from fl�e start of the evetit girving rise f.hereto (Unless the City
alIows additional time fox Contractor to submit additional or more accurate data in support of
such Contract Claim).
3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with
the provisions of Paragraph 12.01.
4. A Contract Clairri for an adjustment in Contract T�e shall be prepared in accordance with
the provisions of 1'arag�aph 12.a2.
5. Each Contract Claim shall be acco�npanied by Contractor's written statement that the
adjustment c�aimed is the entire adj�asim�nt to whieh the Contractor believes it is eniitled as a
result of said event.
b. Th� City shall submit any response ta the Contractar within 30 days after receipt of fihe
claimant's last submittal {un.less Contiract allows additional time).
C. Cixy'sAction: City wilI review each Coniract Claim and, within 30 days after receipt of the last
submzttal of the Contractor, if any, talce one of the iallowing actions in writin�:
1. deny the Contraci C1aim in whole or in part;
2. approva the Conteact Claim; ar
3. notify the Contt�actor that the City is unable to resolve the Contract Claim if, ir� the City's
sal� discretion, i� vvould be inappropriate for tf�e Ci�y to do so. Far purposes af iiu-ther
resolution of the Con�ract Claun, such notice shall be deemed a denial.
crry or roxT woxTx
STAIVDFIRRCONST.RUCTION SPECIF[C.0.TION DOCCIMENI'S
Revision; 823✓1D21
Oo72o0-]
GENERALCAN�ITION 5
Page 41 vf 63
D. City's written action under �aragraph ]0.06.0 will be final and binding, unless City or
Contractot in�oke the dispute resolution pracedure s�t forth in Article 16 v�ithin 30 days of such
action ar denial.
E. No Contract Claim far an adjustment in Contract Price or Contract Tnne will be valid 'zf not
submitted in accordance witl� ihis Paz•agraph 10.06.
ARTICLE I1— COST OF THE WORK; ALL�WANCES; UNiT PRICE WORK; PLANS
QIIANTITY MEASUREMENT
I 1.01 Cost of the Work
A. Costs Included: The term Cost of the Woric means the sum o� all costs, except thase excluded in
Paragraph 11.QI.B, necessar�ly incurred and paid by Contractor � th� proper perforn�ance of the
Work. When ti�e �value of any Work covered by a Change Order, the costs to be reimbursed to
Contractar wzIl be only thos� acidi�ional or incremental costs required �ecause of the change in the
Work. Such costs s�all no# iriclude an� of the costs rtem�zed in Paragraph 11.01.B, and shall
incIude but not be limited to the following i�ems:
PayroU costs %r employees in the direct e►x�ploy of Contractor in the performanc� af the
Work under schedules of job cla.ss�'ications agreed upon b� City and Contractar. Such
employees shall include, without litnitation, superintendents, foremen, and other personnel
employed full time on the Work. 1'ayroIl casts �or amp�oyees not employed full time on the
Work shall be apportioned on the basis of their time spent on the Worlc. PayraIl costs shall
i�clude;
a, sa�ries with a 55% maricup, or
b. salaries and wages plus the cost of fringe benefrts, which shall include social s�c�ity
contributions, unemployment, excise, and payroll taxes, workers' compensation, health
and retirement benefrts, bonuses, sick leave, �acation and haliday pay applicable thereto.
Tk�e expenses of performing Wark outside of Regul�r Woxk�ng Hours, Weskend
Working Haurs, ar I�gal holidays, shall be included in the above to the extent authorized
by City.
2. Cost of all materiafs an�i equipment furnished and incorporated in tlae Work, including costs
of transportatian and s�orage ti�ereof, and Suppliers' field services required in connection
therer�ith.
3. Renta�s of all construction equipnnent and machinery, and the parts thereof whether re�ted
fram Contxactor or others in accordance with rental agreements approved by City, and ihe
costs of transportation, Ioading, unloading, assembly, dismantling, and removai therea£ All
such eosts shall be in accordance with the tarms of said rental agreements. The eental of any
such equipment, machinery, or parts shall cease when the use thereof is no Ionger neeessary
far the Work.
CiTY OF FOKT WQ12TEi
STANDARI]CONSTRUCTION SP6ClFICATION DOCUMENTS
Revision: 823I1021
OQ72D0-]
GENERAL CONnITION S
Page 42 of 63
4. Payments rnade by Cantractor ta �ubcontractors for Wdrk per%rmed by Subcontractors, If
req�aired by City, Contractor shall obtain competitiv� bids fram subeont�ractors acceptable to
Ciry and Contractor and shall deliver such bids to City, who wiIl then determme, which bids,
if any, will be acceptable. IF any subcontract provides that the Subcontractor is to he paid an
the bas�s of Cost of the Work plus a fee, th.e Subcontractor's Cost of the Work and fee sha11
be determined in the saine manner as Contractor's Cost of the Work and £ee as providad in
this Paragraph 11.01.
5. Cosfis of special consultants (iricluding but not lirnited to engineers, architects, tesiing
la.boratories, s�rveyors, attorneys, and accountants) employed for services specifcally reIated
to tk�.e Work.
6. SupplementaI costs including the folla�ving:
a. The �roportion af necessary transportation, traveI, and subsistance expens�s oi
Contractor's enaplo�ees incurred in discharge of dt�ties conrzectad with the Vi�ork.
�, Cost, including transportation and maintenance, of all materia�s, supplies, equipn�ent,
maehinery; appliances, of£'ice, and temporary faci]i�i�s at the Site, and hand tools not
awned by the workers, which are consumed in the performanee of the Work, and cost,less
market value, of such iterns used but not consumed whicl� rernain the praperty of
Gontractar.
c. 5ales, consumer, use, and other similar taxes related to tha Work, and for wlaich
Contractor is liable not covered Under Paragr�.ph b.11, as im�nsed by Laws and
Ragulations.
d. Deposits lost foz causa5 otiher than negligence of Contractor, any Subcnntractox, or
anyone di�ectly or indirectIy emp�oyed by any of thezn ar for whose acts any at' fikiem may
be liable, and royahy payments and fees for permits and licenses.
e. Losses and damages (and relat.ed expenses) ca�ased by damage to tk�e Worlc, not
compensated by msurance or otherwise, sus�ainad by Cantractor in connection with the
performance of t�e WorI�, pro�+ided such losses and darr�ages have resulted fram causes
other fhan the negligence o� �ontractor, any Subcontt�actor, ar anyone dir�ctly or induectly
employed by any af th�m or for whose acts any of them may be ]iable. Such losses shalI
include settI�menfis made with the written cansent and approval oF Ci�y. No such losses,
damages, and expenses shall be included in the Cost of the Work for the purpose of
determining Contractor's fee.
£ The cost of utilities, fuel, and sanitary facilit�s at the Site,
g. Minor e�penses such as teZegranns, �ong distance tel�phone calls, felephone and
cornmunication services at the Site, express and caurier services, and similar petty cash
items � connection with the Work.
CITY OF FORT WORTH
ST�NDAR[]CflNSTRtICTION SPECIFICAT[0�' DOCUNiENTS
Revisian: &23/2(121
fla�2oa-i
�E�vE��calloir�oNs
Page 43 of 63
h. The costs of premiurns for aIl bonds and insurance Contractor i� required by the Contract
Aocuments to purchase and maintain..
B. Costs Excluded: The term Cost of the Work shall not it�clude any of the following items:
1. Payroll costs and other compensation af Contractar's off'icers, executives, principals (of
partnerships and sole proprietarships), generai �nanagers, safety managers, engineers,
architects, estirriators, attorneys, auditors, accountants, purchasing and contracting agents,
e��editers, timekeepers, clerl�s, and other persnnnel employed by Contractor, whether afi �he
Site or in Contractor's princi�al ar branch offce for gen�ral a,dministration of the Work and
not specificafly included in the a�reed upon schedule of Job classifications referred to in
Paragraph 11.01.A.1 or specifcally covered by Paragraph. 1 I.a1.A.4, all of which are to be
considered adminisfarative costs co�ered by the Contractor's fee.
2, Expenses of Contractor's principal and branch offices ather than Contractor's office at the
�ite.
3. Any pari of Contractar's capztal expenses, incIud�g interest on Cont�actor's capita l
eznplaye� for the Work and charges against Contractor �ar delinquent payments.
4. Costs due to the negligence of Contractar, any Subcontractor, or anyone directly or indirectly
employed by any of them or for whose acts any of tham may be liable, in.cluding but not
limited to, the correction of defective Wark, disposal oi matarials ar equipment wrongly
supplaed, and making good any damage to property.
5. Other overhead ar general e�pense costs of any kind.
C. Cantractar's Fee: When all the Work is perfor�ed on the bas�s of cost-plus, Contractor's fee
shall be determined as set forth in �he A�reement. When the value of any Work covered by a
Change Order for an ad�ustrnent �n CQn�act Price is datermined on the basis af Cost oi the
Work, Contractor's fee shall he deterr�i�ed as set farth in Paragraph 12.O1.C.
D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to
Paragraphs lI.O1.A and 11.O1.B, Cantractar rvill establish and maintain recards fhereof in
accordance with generally accepted accounting practices and s�rbmit in a form acceptable to City
an itennized cost breakdo�vn together with supportiu�g data.
11,02 Alla�?ances
A. Specifiecl Aliotivance: It is understood that Contractor has included in the Gontract �'rice all
allowances so named in the Contract Documents and shall cause the Work so covered to be
perfbrmed for such sums and by such persons or entities as may be acceptable to City.
S. Pre-bid�Illawanees:
1. Contractar agrees that:
CIT'Y OP FOR'1' WORTH
STANDA1t17CON5TRUCTION SPECIFICATION DpCiIN�E1VT5
Revision: $�Z�202]
oa7zoo-�
GENERAL CON�lTION S
Page 44 of 63
a, t�e pre-bid allowances include the cast to Corit�racior of materials and equipm�nt required
by fhe allo�ances to b� delivered at the Site, and all applicable taxes; and
b. Contractor's costs for unlaadir�g and handling on the Site, Iabor, installation, overhead,
profrt, and oiher expenses contemplated for the pre-bid allowances have been included in
the allawances, and no demand for additional payrnent on account of any nf �he
foregoing will be valid.
C. ContrngencyAllowance: Contractar agrees fhat a contingency allowance, i� any, is far i;he so�e use
of City,
D. Prior to imal payment, an appropriate Change Order will be issued ta reflect actu�l amount� due
Contractor on account of Work co�vered by al�owances, and the Contract Price shall be
correspondingly adjustad.
1I.03 UnitPNfce Wot�k
A. Wh�re the Cantract Documenis provide that aIl or part of the Wark is to be Unit Price Wark,
uutially the Contract Price will be deemed to include for a1l Uni� price Wark an amoUnt ec�ual to
the sum of the unit price for each separately identified itert� of Unit Price Work tim�s the esfiimated
quantity of each i�em as indicated in the Agreezx�ent.
B. The estimated quantities of itern� o� Uni� � Price Work are nat guaranteed and are soIely for the
purpose of comparison af Bids and determining an initial Cont�act Price. Detez-min.ations of the
actual quantities and �lassifications of Unit Pr�ce VVorIc performed by Contractor will be made by
City subject to the provi�ions of Paragraph 9.05.
C. Each unit price will be deemed to include an anno�ant car�sidered by Cant�actor to be adequaie to
cover C�ntractnr's overhead and profit for each separately identif�d itern. Worlc descrzbed in tlze
Contract Doc�arrients, or reasonably infe�-red as requirad for a fun�tionally caz-�aplete installation,
but not identified it� the listing af unit price it�ms shalI be consid�red incidental to unit price wark
�isted and tk�e cost of incic�ental vvork included as part of the unrt p�ice.
D. City rnay malce an adjustment in �e Contract Price in accordance with Paragraph 12.01 if:
1. the qu�ntity of any i�em of Unit Price Work perfarined by Contractor differs matecially and
sign�'�cantly from the estitx�ated qaantity of sutch iterr� indicafied in the Agreement; and
2. there is no coz-re.sponding adjustrnent �viih respect ta any other item of Waric,
E. Inc�eased or Deerecrsecl Quantities: The Cily reserves the right ta arder Extra Work in
accordance with Paragraph 10,�1.
1. If the changes in quantrties ar the alterations do not significantly ehange the character of
vuork under the Contraet Documents, thc aI�ered work will 6e paid for at the Contrac� unit
price.
C1TY QF FORT WORTI3
STANDARDCONSTRUCTION SPECIP'ICATIdN D�CUMEAI'I'S
Revision: 8�7�1
00720Q-1
GENERAL CON�ITION S
Page 45 oF 63
2. If the changes in guantities or alterations sign�'icantly change the character of wark, the
Contract will be amended by a Change �rder.
3. If no unit prices exist, this will be cansiciered Extra Work and the Contract wi� b� amended
by a Change Order un accordance with Article 12.
�. A significant changa in tha character of wark acc�us when:
a. th� character ofwork for any Itern as altered differs i�naterially in kind or nature from that
in the Contract or
b. a Major Item of work varies by more than 2S% from fihe originaj Contract quantity.
5. When the quantity of work ta be dane under any Major Item of the Contract is more than
12.5% of the original quantity stated an the Conh•act, then either party to the Contract raay
request an adjustment to the unit price on the portion of the work that is abova 125°/Q.
6. When the qUantiEy of worl� to be done unc�er any Major Item of the Contract is less than 75%
of tHe original quantiry stated in the Contract, then ei�har party to the Contz�act may request
an adjustment to the un�t price.
11.04 Plans Quantity tYlea.s�rernent
A. Plans quanti�ies may or nnay not representthe e�ct guantity of wark perfozmed oz� material moved,
hand�ed, nr placed durmg the execution a� the Contract. The astimated bid quantities are
designated as �iraal payment quantiti�s, unless revised by the go�erning Section or this Article.
B. If the quantity measured as autlined under "Price and Pa�rnent Procedures" varies by rnare than
25% (or as stipulated under "�rice and Payment Procedures" far spec�'ic Tterns) firom the total
estitxaated quantiry for an individual It�m originally shown in the Contract Documents, an
adjustment may be nnade to the q�aantity ofautharized work dane for payment p�arposes. The party
to the Contract requesting the ad�ustment wilI provide field measurements and calcula.tions
showirag the fmaI quantity for which pay�ment wiil be �nade, Paym�nt for revised quantiry will be
made at the unit price bid �'or that Item, except as provided for in ArticIe 10.
C. When quant�ies are revised by a change in design appro�ed by the City, by Change Order, or ta
correct an error, ar to correctan error on the plans, the pla.ns quantity will be increasedor decreased
by ihe amount involved 'u� the change, and ihe 25% variance will apply to the new plans quantiry.
D. If ihe total Contract quantity nnu�tiplied by the unit price bid for an individual Item is less than
$250 and fhe Item is not ariginally a plans quantity Itern, then the Item may be paid as a p�ans
quantity Itern if the City and Contractar agee in writing to fi� the fina.l quantity as a pIans quantity.
CTI'Y OP FORT WORTH
STANI7ARDCONSTRUCTION SP6CIFICATION DdCU]VI57VT5
Revision: 8I13I1021
oQ7zao-i
e�r��ws,�calloir�o�s
Page 46 of 63
E. For caIlo�t work ar non-srte specific Contracts, the plans quantity measuremant reauirements are
not applicable.
ARTICLE 12 — CHANGE OF CONTRACT PRZCE; CIIANGE OF CONTRACT TIME
12,01 Change ofContractPrice
A. The Contract �arice may only be changed by a Change Order.
B. The value of any Worlc covered by a Change Order wilI be determined as follows:
1. vvher� the Work involvetl is covered by uni� prices contained in the Contract DocUnnents, by
application of such uni� prices to the quanti�ies nfihe i�ems mvolved (subject to the provisions
of Paragraph 11A3); or
2, where the VJork involved is not covered by unzt prices contained in the Contract Documents,
by a rr�utually agreed lump sum or unit priee (which rr�ay include an aIlo�vance for overhead
and profi� not necessarily in acaordance with Paragraph 12.O1.C.2), and shall include the casi
of any seconctary i�x�pacts that are foreseeable at the time of pricing tk�e cost of Extra Warlc;
or
3. where ihe �+Torlc it�volved is not covered by unit prices contained in the Contract Docurnents
and agreement to a lump sum or unit price i� nat reachadunder Paragra}�h 12.O1.B.2, an the
basis of the Cast of the Warlc (deternnined as provided in Paragraph I 1.01) plus a Cantractor's
f�e %r overhead and prafrt (determined as provided in Paragraph I2.OI,C).
C. CantractoY's Fee: The Contractor's additional f�.e for overhead and profrt shaIl be determined as
follows:
1. a mut�aally acceptable f�ed fee; �r
2. if a f�ed fee is not agreed upon, th�n a fee based on the foilowing peX•centages of the various
portions af the Cost of the Work:
a, for casts incurred under Paragraphs I1.p1.A.1, f 1.O1.A.2. and 11.O1.A.3, th�
Contractor's additional fee shall be 15 percent ea�cept far:
1) rental %es for Contractor's own equipment using standard renta l rat�s;
2) bands a.nd insuran.ce;
b. for costs incurred �ander Paragraph 11.OT.A.4 and I1.Q1.A.5, the Cantractor's fee shall be
five percent (S%);
1} whara nne or mare tiers of subco�tracts are on the basis of Cost of the Work plus a
fee and no fviced fee is agreed upan, �e intent of Paragaphs 12,O1.C.2.a and
12.Q1.C.2.b is that the Subcontractor �,vho actually perforrns the Work, at whatever
CITY pF FORT WORTH
STANDARDCONSTRUCTTON SP�CIPICATIO�T DOCCTNIENTS
Revision 82�1�1
no�aoo-i
GEN�RAL CON�ITION S
Page 47 of 63
tier, vvill be paid a fee of 15 percent of the costs incurred by sucl� Suhcontractor under
Paragraphs 11.Q1.A.1 and 11.fl1.A.2 and that any higher tier Subcontractor and
Contractor will each be paid a fee of five percent (5%) of the amount paid to the next
lower tier Subcontractor, however in no case shalI ihe cumulative total of fees paid be
in excess of 25%;
c. no fee shall be payable on tlie basis of costs itemized under Paragraphs 11.01.A.6, and
1I.O1.B;
d. the arnount af credrt to be allor�ed by Contaractor to City ior any change which results in
a net decrease in cost will be the arnouni ofthe actual net decrease in cast pIus a deduction
in Contractor's fee by an anriount equal to five percent (5°/Q) of such net decrease.
12.02 Change of Contract Time
A. The Contract Ti�ne rnay only be changed by a Change Order.
B. No extension af the Contraci Time wili be allowed for E�ra Work or for claimed delay unless the
Extra Work eonte�plated or claimed delay is shown to be on the cri�ical path of the Praject
�chedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed
delay ad�ersely affects the critical path.
12.03 Delays
A. Where Contractor is reasonably delayed in the perfortnance or completion of any part of the
Work within ihe Cantract Time due to delay beyond the control of Cont�aetor, the Conl�act Tirne
inay be extended in an amQunt equal to the time lost due to such delay if a�ontract Claim �s rnade
therefor. Delays beyond the control of Contractor shall i�clude, but not be limited to, acts or
negIect by Ciry, acts or negleci of utility owners or other catatrractor5 per%rming other work as
conter�ap�ated by Articl� 7, fires, floods, epidemics, abnormal vc�eather conditions, or acts of God.
Such an adjustment shall be Contractor's sole aad exclusive remady for the de�ays described in
this Paragraph.
B. If Contractor is delayed, City shaIl nat be liable ta Cantractor for any claix�ns, costs, losses, or
damages (includi�g but nat limited to all fees and eharges of engine�rs, architects, attorn.eys, and
other professionaIs and all court or arbitration ar other dispute resolution costs) sustained by
Contractor on or in connection witl� any otker projee� or anticipated prajeet.
C. Contractor shall not be eniitled to an adjustnnent in Cantract Pric� or Contract Tir,ne for delays
witiiin the eon�rol of Contz�actat. Delays attributable to and withir� the con�ral of a Subcontractar
or Supplier sha�1 he deemed to be delays wiihm the control of Con�ractor.
D. The Contractar shalI receive no compensation for dela.ys or I�indrances to the Work, except when
di�ect and unavoidable e�ra cost to the Contractor is cau,sed by the failure of ihe City to provide
information or material, if any, which i� to be �urnished by the City.
C1TY OF FORT WORTH
S7'ANDAATIC4NSTRUCTION SPEC[FiCATION DOCUMENTS
R,evision: 8TL3(�021
0072D0-1
G�NERALCONpITION 3
Page 48 of 63
ARTICLE 13 — TESTS AND XNSPECTIONS; CORRECTION, ItCMOVAL ORACC�PTANCE OF
DEFECTIVE WQRK
13.01 Notzce af Defects
Natice of all d�%ctive Work of vuhich City has actual kt�owledge will be gi�en ta Contractor.
Defective Work may be re�ected, coz-rected, or accepied as provided in this Article 13.
13A2 Access ta Work
City, independent testing la.boratories, and governrnental agencies wFth jurisdictional interests will
ha�e access to the Si�e and the Work at reasonable times for their observaiion, inspection, and tes�ir�g.
Contractor shall provide them proper and safe conditians for such access and advise ihem of
Contractor's safery procecfures and prograrns so that they may comply therewrth as applicabfe.
I3.03 Tests and Inspectians
A. Conir�ci:ar shall give Ciiy tirnely notice af readiness of the Worlc for all required inspectians,
tests, ar appravals and shall caapecate with inspection and t�sting personnel to facilitate required
inspections or tests.
B. If Cantract Docur�zents, Laws or Regulations of any public bady having jurisdiciion require any
of the WorIc (or part thereof� to b� inspected, tested, or approved, Contr�ctor shall assume full
responsibility far arranging and abta ir�ing such independent ir�peetions, tests, retests or approvals,
pay all costs in connection therewith, and furnish City the required cert�'icates of inspection or
appra�vaI; �xcepting, however, those fees spacifically identified in the Supplementary Conditions
or any Texas Department of Licensure and R�gulation (T`DLR) inspections, which shall ba paid as
described in the Supplementary Conditions.
C. Contractar shall ba rasponsible for arranging and obtainmg and shall pay alI costs in connectian
�vith any inspections, tests, re-tests, or approvals required For City's acceptance af nnaterials or
equipment to be incorporated in tk�e Work; or acceptance ofmaterials, mix desig�as, or equipment
submitted idr appro�al prior to Contractor's purcha.se thereaf for incorporation in tl�e Work.
Such �nspectians, tests, re-tests, or approvals shall he per�c�rnned by organizaiions acceptable to
C�ity.
D. City may arrange %r the services af an in�dependent testing faboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any par� of the Work, as deternnined solely by
City.
1. Gity will coordinate such Testing to the extent pass ble, with Contractor;
2. Should any Testir�g under this Section 13.03 D result in a"�ail", "did nat pass" or other
simi�ar negative result, the Contractor shali be responsibl� for paymg for ar�y and aIl retests.
Cantractor's cancellation without causa o� City initi�ted Testing shall be deemed a negative
resul� and requira a retest.
C1TY bP FORT WORTH
STANL7ARnCONSTRUCTI4N SPECIFICATI0IV DOCiJMENTS
Revisi on: 8�13/2021
007200-1
GEN�RAL CONqITION S
Pa�e 49 of 63
Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the
Testing Lab by Contractor. City vvill forward a� invaices �or retests to Contractor.
4. If Cantractor �a.ils to pay the Testin.g Lab, City will not issue Final �'ayment until the Testing
Lab is paid.
E. If any Work (or the work of others) that is to be inspected, tested, ar approved is covered by
Contractor wi�hout writt�n concu��rence oi City, Cantractor shali, if requested by City, uncover
such Worlc £or abservatinn.
F. Uncovering Work as pravided �n Paragraph 13.03.E shall be at Contractar's expense.
G. Contractar shall have the right to mal�e a Contract C�aim regarding any retesfi or invoice issued
undar Section 13.03 D.
13.04 Uncovering Wark
A. If any Work is covered contrary to tl�e Cantract Dacurnents ar specif'zc instructions by the City, i�
mvst, if requested by City, be Uncovered for C�ty's observatton and replaced at Contractor's
expense.
B. If City considers rt necessary ar ad�isable that covered Work be observed by City or inspected or
tested by others, Contractor, at City's reqUest, shall iancover, expose, or otl�erwise mak� a�railable
%r observation, inspectiQn, or testing as City may require, that portion of the Worl� in question,
furnishing all necessary labor, material, and equipment.
1. If it a� found that the uncovered. 'VVork is defective, Contractor shall pay ail claims, costs,
iosses, and darnages {including but not ]imited ta all fees and charges of engineers, architects,
attarneys, and other pro�essionals and a11 court ar other dispute resoluiion costs} arising out of
or relating ta such uncovering, e�osure, observation, inspectzan, and t�sting, and of
satisfactozy rep�.cemeni or reconstruction (incjuding but nat ]imrted to all casts of repair or
replacement of work of athers); or Ciry shall be entit�ed to accep�defective Work ira accordance
with Paragraph 13.08 in which case Caniractor shall still be respansible for all costs assoeiated
with exposing, observing, and testin.g the defective Work.
2. If �he uncovered Work is not found to be defective, Contractor shall be al�owed an increase
in the CantractPriceor anextension ofthe ContractTime, or both, directly attributable to such
uncovering, exposure, observatzoza, inspection, testir�g, replacement, and reconstructian.
13.05 City May Stop the �'or�k
If the Work �s defeeti�e, ar Contractor fails to suppIy sufficient skilled wotkers or suitable materials
or aquipment, or fails to perform the Wark in such a�sray that f.he eompleted 'Wark will conform to
the Confract Documents, City may order Contractor to stop the Wnrk, or any portian thereof, until the
cause far such order has been eliminated; how�ver, this righ.t of City ta stap the Work shal� not give
rise to any duty on tha part of City ta exercise this right for the benefit of Cantractor, any
CITYOC FORT WORTI-I
STANDARDCON3TRUCTION SPEC[FICATION DOCLIMENTS
Revision: 8rL�021
00 ��. oa - i
GE�2ER,ALCONDITION S
Page 50 of G3
Subcontractar, any Supplier, any other indNidual or entiiy, or any surety for, nr �mpZoyee ar agent of
any of them.
13.a6 Co�rectian a� Rerytaval of Defective Work
A. Prornptly aiterreceipt of written notice, Contractor shall correct a]] defect'rve Vtilork pursUant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been
rejected by City, remove it from the Project and replace it with Work that is nat defeetive.
Contxacto� shall pay alI cI�.ims, costs, addi�ianal testing, lasses, and damages {incIuding but not
limited ta all faes and charges of engineers, architects, at�orneys, and o�her professionals and all
court ar arbi�ration or ather dispute resolution costs) arisir�g out of or relating to such correction
or removal (including but not limited ta all costs of repair ar replaceinent of work of others},
Failure to iequire the removaI ofany defecti�e Work shall not constitute acceptance afs�ach Work.
B, Wh�n correc�ing defecti�e Worlc under the terms of this Paragaph 13.06 ar Paragraph 13.07,
Contractor shall tak� no action that wa.uId void or otherwise impai� City's special warranty and
guarantee, if any, on said Wark,
13.07 Cor�ection Period
A. If within iwo (2) years aft�r the date af Final Acceptance (or such Ianger period oftirne as may be
prescri6ed by fhe tarms of any applicable special guarantee required by the Conttact Documents),
any Work is %und to be defective, or if the repair af any damages to the land or areas rnade
avai]able for Cantractor's use by Ci�y ar perrnitted by Laws and Regulations as contemplated in
Paragraph6.1Q.A is found to �e defectiv�, Contraci:or shall pronnptly, without costto City andin
accordance with City's wriiten insiructions:
1. xepair such defective land or areas; or
2. correct such defective Work; or
3. i� the defecti�e Work has been rejected by City, remove it frorn the ProJect and replace it
with Work that is not defective, and
4, satisfactarily correct or repair or remove and replaca any damage to other Work, ta the �vork
of others or nth�;r ]and or areas resulting therefrom.
B. If Contractor does not prazxiptIy comply with the t�rms ot' City's written instructians, or in an
emergency where deIay wou�d cause serious risk of loss or damage, City may have the defectrve
�'Vork corrected or repaired or may have the rejected Work removed and replaced. AlI clairns,
costs, losses, and damages (including but not limited to aIl fees and charges af engineers,
architects, attarneys, and other professionals and alI couri or other dispute resoIution cost5) arising
out oi or re�ating ta such correetion or repair or such remo�al and replacemer�t (including but not
limited ta aIl costs of repair or replacemeni of wark of others) wilI be paid by Cantractor.
CTI'Y OF FORT WQRTH
5TANDARbCDNSTRUCTIDN SpECIfICATION DOCiJMEN7'S
Revisian 8�L3f2Q2]
oo7zoo- i
GEN�RALCO3JplTIQN S
Page S 1 of 63
C. In special circunnstar�ces where a particular item of equipment is pl�ced � eontinuo�ts service
before Final Aeceptance of all the Wark, tkie corr�ction period far that item may start to run from
an earlier daie iF so provided in the Contract Documenfis.
D. Where defrective Work (and damage to other Work resu�ting therefrom) has been corrected or
removed and replaced under this Paragraph 13.07, the correction period hereunder with respect
to suc� Work may be required to be extended �or an addrtional period of one year after�he end of
the inrtial carrection period. City shal� pro�ide 30 days written notice to Contractor should such
additionaI waxranty co�erage be required. Contractor may dispute this requirement by filing a
Contract Clairn, pursuant to Paragraph 10.Q6.
E. Contractor's obligations under this Paragraph 13.Q'1 are m addition to any other obligation or
warranty. The provisions af this Paragraph 13.07 shall nat be construed as a substitute for, or a
waiver of, the provisions of any appiicable statute of limitation or repose.
13.Q$ Acceptance of Defective Work
If, insteari of requiring correction ar removal and replaeement of defective Work, C�ty prefers to
accept it, City may do so. Contractor shall pay all elaims, costs, losses, and damages (i�cluding but
not Gnnited to all fees and charges of engineers, architects, attorneys, and other professio�als and all
court or other dispute resolution costs) attrbutable to Ciry's evaluation af and determination to accept
such defecti�e �Vork and for the dimmished vaIue of the Work to the extent not otherwise paid by
Cantractor. If any such aeceptance occurs prior to Finai Acceptance, a Change Order wi�l be issued
incorparati�g the necessaryre�isions in the Contract Dacuments w�h respectto the Work, and Ciiy
shall be entitIed to an appropriate decr�ase in the Contract Price, reflecting the diminished value of
Work so aecept�d.
13.09 City May CoYrect Defective Work
A. If Contractor fails wzthin a reasonable time after written noiice firom City to carrect defective
Work, or to remove and replace rejected Wo�k as required by Gity in accordance wi�h Yaragraph
I3.06.A, or iF Coniractor fails tg perform the Work fn accordance with the Contract Docuznents,
or � Coniractor faiLs to comply wi�fi any ather pro�ision of t�ae Contrac� Doc�am�nts, Ciiy may,
after se�wen {7} days written notice to Contractor, correct, or rerriedy any such defic�ency.
B. In exercising the rights and remedies under this Paragrap� 13.09, City shall proceed
ea�editiously. In cannection with such corrective or remedial action, City may exclude Contractar
from all or part of the �rte, take possession of all or part of the Work and suspend Contractor's
services related thereto, and incorporate � the Work aII mater�als and �quiprnent incorporated in
tY�e Work, stored at the Site or for which Gity has paid Coniractor but which are stored elsewhere.
Contractor shall allow City, City's representatives, agents, consultants, employees, and Gity's
oth�r contractors, access to the Site to enable Ciry to exercise the rights and rernedies under this
P aragraph.
C. All claims, costs, losses, and damages (includ'mg but not limited to aIl fees and charges of
engitte�rs, architects, attorneys, and other professionals and aIl co�zrt or other dispute resolution
CTTY OF FORT WORTH
STANDARDC�NSTRUCTION SPECIFICATifIN DOCUMEI�TS
Revisinn: &��2621
007200-I
G�NERALCON�ITION5
Page 52 of 53
costs) incurred or sUstained by City u� exercising the rights and remedies under this Paragraph
13.09 will be c�aarged against Coniractor, and a Change Order will be issued incorparating the
necessaryrevisions in the Cantract Documents with respectto the Work; and City shall be entitled
to an appropriate decrease in the Contract �rice.
D. Contractar shall not be al�owed an �xten�ion of the Contract Time be�ause o� any delay m the
performance of the Wark attributable to th� exercise of City's rights and remedies under this
Paragraph 13.09.
ARTICLE 1� — PAYMENTS TO CONTRACTOR AND COMPL�TION
14.fl1 Schedule af Values
The Schedule of Values for luzx�p sum contracts established as provided in Paragraph 2.07 wi� ser�e
as the basis for progress paytnents and will be mcorporated into a form af Application for Paymerit
acceptable to City. Progress payments on account of Unzt Price Work wil� be based on the number of
units complet�d.
14.02 P�ogress Payments
A. Applac�ations for Payments:
1. Con.tractor is responsiblc far provid'mg all informatian as requi�ed to become a�vendor of the
City.
2. At least 2Q days be�ore the date esta.blished in the GeneraI Requirements far each progress
payment, Contractor sha�l sub�xiit to City for re�iew an Application for Payment fiued out and
signad by Contractar covering the Work compteted as of the daie of the Application and
accompanied by such supporting docurnentatian as is rec�u�red by the Contract Dncum�nts.
3. If payment is requested on tl�e basi� of materials and equipment noi incorparated in the Work
btat delivered and suitab[y stored at the ,5ite ar at another location agreed to in writing, the
Application far Payment shall also be accoinpanied by a bill of sale, invoice, or other
documentation vvarranting that City has receivedthe materials and equipment free and clear of
a]] Liens and evidence that the mat�rials and equipment are cavered by appropriate insuranc�
or other arrangements to protect City's interest thereiir►, alI of which mUst be satisfactory to
City.
4. Beginning wi�h the second Application for Payment, eachApplieation shall include an affidavit
of Contractor stating that previous progress payrnents receivad an account of ihe VVork ha�e
been applied on account to discharge Contractor's legitimate obligations associated with prior
Applications for Payment�
5. The amount of retainage with respect to progress paymenis will be as described in
subsection C. unl�ss otherwise stipulated in th� Contract Documents.
C 1TY OF F ORT WORTH
STANDAADCONSTRUCT[OR SPECIP[CAT1�N DD.CiJNIENTS
Revision: 8123f1D21
UU7200-1
G.�N�RAL CON�ITION 5
Page 53 of 63
B. Review ofApplzcations:
I. City will, after receipt of each Application %r Payment, either in.dicate in writing a
recommendatian of payment or return the Application to Contractor indieating reasons for
refusing payment. In the �tter case, Contractor may malce the necessary corrections and
resub�nit the Application.
2. City's processing oi any payment requested in an Application for Payment will be based on
City's observatiorrs of the executed Work, and on City's re�iew of the Application far Payment
and the accompanying data and schedules, that to the best of City's knowlecige:
a. the WQrk has pragressed to tl�e poic�t �ndieated;
b. the quality of the Work is generally in accordance with the Contract Documents {subject
to an evaluaiion of the Work as a funcfiioning whole priar io or Upon �`ir�al Acceptance, the
results of any subsec�u�nt tiests called for it� the Contract Documents, a final determination
of quantities and classifications for Work performed under Paragraph 9.05, and any other
qualifica�ions stated in the recommendatio�).
3. Process�g any such payment wi�l not thereby be deemed to have represented that:
a. inspections rnade to check the quality or the quantity of the Work as it has been performed
have been exhaustrve, eatended to every aspect af the Wark in progr�ss, or involved
detailed inspections of the Work beyand the r�sponsibilities speci�fically assigned to City
in the Contract Docurnents; or
b. there may not be other matters or issues between the parties that rrvght entitle Contractor
to b� paid addi�ionaIly by Ciry ar entitle Ci�y to withhold payzx�ent to Coniractor; or
c. Conbractor has complied with Laws and Regulations applicable to Contractor's perfonnanee
of the VVork.
4. City may refuse to process the whole ar any part of any payment because of subsequently
disco�ered evidence or tha result� of subsequent mspections or testa, and xevise or revoke
any such payment previously rnade, to such extent as may be �ecessa�y to protect Ciry from
lflss because:
a. the Work is def�etive or compfeted Work has been damaged by the Contractor or
subcontractors reyuiring correction or replacement;
b, discrepancies in quantities contained iri previous applications for payment;
c. the Coz�tract Price has been reduced by Change Orders;
d. City has been required to enrrect dsfective Work or cornplete Work in accordance with
P aragraph 13. 09; or
C1TY OF C012T WORTH
STANDA]ZDC011�5TRUCTION SPECIFICATION DOCUMENTS
Revision: 82'i�21
aa�aoa-i
G�NERALCON[I.ITION 5
Page 54 of 63
e. City has actual knawledge of the occurrence of any of the e�ents enumerated 'm
Paragraph I5.02,A.
C. Retainage:
1. For contracts less than $44�,000 at the tune of execution, retainage shall be ten percent
( I a°/n).
2. For contraeis greater than $�00,000 at the tirne of ��ecuiion, retainage shall be five percent
(5%).
D, Liguidated Da�nages. For each ealendar day that any war� shall remain uncompl�ted after the
tirne specified in the Con�ract Documents, the surn. pex day specified in the Agreement will be
assessed against the monies due �l�e Contractor, not a� a penalty, but as darnages su�fered by the
City.
E. Payment.• Contractor will 6e paid pursuant to the requirements of this At�icle 14 and payment
�vill became d�ae in accordance with tk�e Contract Documents.
F. Reduction in Paymeni:
1. City rnay refuse to make payment af the amount requested because:
a. Li�ns have been filed �n connection with th� Worlc, except where Contractor has ci�livered
a specific bond satisfactory to Ci�y to secare the satisfaction and dischar�a of such Liens;
b, there are otk�er items entitling City to a�et-off against the amaunt reco�nrnended; or
c. City has actual knowledge of the occurrence af any of the events enumerated �n
Paragraphs 14.02.B.4.a through I4.Q2.B.4.e or Paragraph IS.p2.A.
2, I� City refuses to malce payment of the arnaunt requested, City widi girre Contractor written
notice staiing the reasons for such action and pay Contractor any amount remaining after
deduction of the amount so withheld. City shall pay Conta•actor the amount so withheld, or any
adjustrrient thereta agreed to by City and Contracior, when Contractor remedies the reasons
for such actian.
14.03 Gontpactor's Warranty of Title
Contractor warrants and guarantees tha� trtle to alI Work, materials, and equiprnent covered by any
Application for Payment, whether incorporated in the Project or not, w�ll pass tn City no ]ater than the
time of payment free and clear of all Llens.
C[TY OF FORT WOl2TH
STANDAR[]CONSTRUCT[Oh' SPECIP[CAT[ON DOCUM�1'CS
Revision; 8��02]
OD7200-1
GEN�RALCDNDITI01� 5
Page 55 Qf 63
14.04 Partial Utilization
A. Prior to Firial Acceptanca of all t�e Work, City may �se or occupy any part of the Work which
has specificaily been ident�'ied in the Contract Dacunnents, or which City deterrriines constilutes
a separately functiazling and usable p�r� of the Work that can be used foi• its intended purpose
without signifcant interference with ConYractar's performance of the remainder of the Work. City
at any time may natify Contractor in writing ta permit City to us� or occupy any such part of the
Work which Czty determines to be ready for �ts intended use, sub�ect to the following conditions:
Contractor at any time Tz�ay notify City in writing ihat Contractor considers any such part of
�he Work ready for its intended use.
2. Within a reasonable time after notif'ication as enumerated in Paragraph 14.OS.A.1, Ciry and
Contractor shali make ar� �spection of that part of the Work to determine its status Qf
campletion. If City does not consider that part of the Work to be substantially eomplete, City
will natify Contractor in wri�ing gi�ing tk�e reastins therefor.
3. PariialUtilization will not canstitute Final Acceptance by City.
14.05 .�'inal.lnspection
A. Llpon wri�en notice from Cor►tractor that the entire Warlc is Substantially Compiete in
accordance with the Contract Docum�nts:
1. Withiri 10 days, City vvill schedule a�'inal Inspectzon with Coniractor.
2. Ciry wiU. notify Contractor in writing of all particulars in which this inspection reveals thax
t�ie Wark 'rs incomplete or de£ective ("PUneh Lisi Ite�ns"). Confractor shal� imrnediateIy taka
such measures as ar� necessary to complete sunh Work or remedy such deficiencies.
B. No time charge w�il be made against the Contractor between said date of notification to tl�e City
of Substantial Completion and the date o� Final Inspeetion.
l. Should the City dete:rmine that the Work is not ready for Final Inspection, Ciry will not�fy the
Contractor in wrrting of the reasons and Coniract Time wili resurne.
2, Should th� City concur that Substantial Completion has been achieve� with the e�ceptinn of
any �'unch List Items, Contract Time will resu�ne for fi�ie duration it takes for Cozatractor to
achieve Final Acceptance.
14.06 Final Acce�tance
L.Ipon campletian by Cnntractor to City's sati�sfactzon, af any addiiianal Work identi£ied in the Final
Inspection, City will issue to Contrac�ar a letter of Pinal Acceptance,
C1TY OF PORT WORTI3
5TANDAILDCONSTRUCTIQN SPECIFICi1TI0N DOC C5
Revision: 823f1021
ao�2oa-i
GENERAL CONO ETION 5
P�e 56 of 63
14.07 FinalPayment
A. Applic�xtionfo�^Payrrtent:
I. Upon �inal Acceptance, and in the opinion of City, Cantractor may make an applicatian for
final payment following the procedure for pragress payrnenfs in accordance with the
Contract Docucnents.
2. The %nal Application for Payment shall be accompanied (except as previaUsly deiivered) by;
a, all doeumentation called for in the Contract Documents, including but n�t limited to the
evidence of insurance required by Paragraph 5.43;
b. consent of the surety, if any, to finaI payment;
c. a list of all pending or released Damage Cla.ims against City that Contractor believes are
unsettled; and
d, affidavns af payments and complete and legally effective releases or �raivers
(satisfactory to City) of all Lien rights arising out of or Liens filed in connection with tha
Work.
S, Paymend Becorf2es Due:
1. After City's acceptance ot' the Applicaiian �or Paynnent and aecampanying documentation,
reQuested by Contractor, less previous payrz�ents made ar�d any sum City is entitled,
includin� but not limi�ed to liquidated damages, will become due and payable.
2. After aI1 Damage Claims have been resolved:
�.. directIy by the Contractor or;
b. Con�acto� provides evidence that the Damage Claitn h�as been repot�ted io Contractor's
insurance provider for resolutzan.
3. The making of the final payinent by the City shall not relieve the Contractor of any
guarantees or afiher requiren:ients of the Coniract Documents which spec�cally continue
thereafter.
14.08 Final Campletion Delayedand Partial Retainage Release
A. T� final completion of the V�ork i� significa�tly de�ayed, and i� City so confi�rns, Ci�ty may, upon
receipt of Coniractar's firial Application for Payment, and wiil�aUt terminafing the Coniract, make
payment af the balance due for that portion of �he Work iully complated and accepted, If �he
remaining balance �o be held by City for Wnrk not fully camp�eted or carrected is less ihan t-he
retainage stipulated �n Paragraph 14.02.C, and if bonds have been furnished as required in
Paragrapk� 5.42, the writ�en cansent of the surety to the payment of the balance due for that
CITY QP FORT WORTH
STAND�IRDCONS'FRUCTION SPECIF[GAT[ON DQCUMENTS
Revision; &/1�1�21
007200-]
GENERAL CON�ITIDN 5
Pa$e 57 of 63
portion af tha Worlc full� cozx�plated and accepted shall be submitted by Contractor to City v�r�ih
the Application %r such payment. Such payment shall be made under the terms and conditions
governing faraal pay�rzent, exeept that it shall noi canstitu�e a waiver o� Con�ract Claims.
B. Partial Retairzage Release. For a Contract that provides for a separate vegetaiive establishment
and maintenance, ar►d test and performanee periods follar�ving the completion of all oiher
constructian in tl�e Contraci Dncuments for a11 Wark lacations, the City may release a portian of
the amount retained provided that aIl ofher work is completed as deferrnined by the City. Before
the reIease, all submittals and fi�al quantities must be completed and accepted far alI other wark.
An amount sufficient to ensure Contract compliance will be r�tainad.
14.09 Waiver of Claims
The acceptance o�fina! payment w�ll canstitute a reI�ase of the City from all claims or liabilities
under the Contract for anythir�g done or furnished or relating to the work under the Confract
Documents ar any act or negiect of Cily related to or connecied with th� Contract.
ART�CLE 1� — SUSPENSIUN OF WORK .AND TERMINATION
1 S.O1 City May 5uspend l�ork
A. At any time and without cause, City may suspend the Work or any portian thereof by written
notice to Contractor and which naay f� �e date an vvhich Wark will be resumed. Contractor shalS
resume the Work on the date so f�ed. During temporary suspension of the Wor�C ca�ered by th�s�
Contract Documents, for any reason, tl�e Cily r�ill make no e�ra payment for stand-by titne of
construction equipment ar�dlor construction crews.
B. Shou�d the Coniractor noi be able to complete a portion nf the Project due to causes beyond th�
control of and withaut �e fault ar negligence of the Contractor, and should it be determined by
mutual consent of t�e Cantractar and City that a solution to allo�v consiructian ta proceed is not
availabie withiri a reasonable periad of ticne, Cnntractor ma.y request an e�ension in Contract
Tirne, directly attributable to any such suspensian.
C. If it should becorne necessary to suspend the Wark for an indefinite period, the Contractor shall
store all materials m such a naanner that they w�ill not obstruct or impede the public unnecessarily
nor became da.mag�d in any way, and he shall ta�e e�ery pracautian to prevent damage or
deteriaration of the work performed; he shall provide suitable drainage about the work, and erect
temporary struciures vvhexe necessary.
D. Contractor may be reimbursed far the cost of rnovmg his equipment off the job and ret�rn�g the
necessary equipment to the job when it is determined by the City that construction may be
resuined. Such reimbuxsement shall be based on actual cost tfl the Cantractar of moving the
equipmeni and ero prof�t w�ll be allowed. Reimbursement may �ot be a�awed if the eguipment is
moved to another construction project for the City.
CITYOP FORT WORTH
STA3V➢A[2DC01VSTRUCTION SPECIFICATION DOCUMENT5
RevisioiL 8/13DA21
00 �Z oa - i
GEI�ERALCONdITIQ�f S
Page 58 of 63
15,02 City Mcx}� Ter��in�ie far Cause
A. The occurrence ofany one nr more of ihe foIlowing events by �ay of e�ample, but nat of lirz�itatian,
�nay ju�tify termination for cause;
1, Contractor's persistent failure to perforrn the Wark in accordance wzth the Contract Documents
{including, but �ot IiYnzted to, failure to supply sufficient skiJ�ed worlcers or suitable materials
or equipment, failure to adl�ere to ihe Project ScheduIe established under Paragraph 2.0'7 as
adjusted from time to time pursuant to Paragraph b.04, or failure to acEhere to the City's
Business Diversity Enfierpri�e Ordanance #20020-12-201lestablished under Paragraph
5.06.D);
2. Contracto�•'s cfisregard of Laws ar Regulations ot' any public body having jurisdiction;
3. Coniractor's repeated disregard of the authority of City; or
4. Contractor's viola.tion in any substant�al way of any provistons of the Contract Docuznents;
ar
5. Contractor's failure ta promptly make good any defect iu� materials or worlcmat�ship, or
defects of any nafure, the carrectian of which has been directed in writing by th� City; or
6. Substantial indication tnat the Coniractor has zr�ade an unauthoriz�d assignment of the
CQnt�act or any funds du� tY�erefram far the benefrt of any creditor or fo�• any othez• purpose;
or
7. �ubstantial ev�idence that the Cont�actor has benome insolvent or bankrupt, ar ofherwise
�'inancially unable to carry on the Work satisfactorily; or
S. Cantractor coznmences legal ac�ion in a court of cornpetent jurisdiction against fihe City.
B. Cf one or more of the events identifed in 1'aragraph 15.fl2A. occur, City will pravisie wrztten notice
to Cont�actor and Surety to arrange a corLference with Contractor and Surety to address
Contractar's failure ta perforrn the Wark. Conference shall be held not later than 15 days, after
receipt of notice.
i. If the Crty, the Contractor, and %�e Surety da not agree ta allow the Contractor to proceed to
pez Form the constructian Cantract, tl�e City ma�, to the extant permitted by Laws and
Regulations, declare a Contractor default and formally t�rminate the Cant�ractor's right to
complete the Confract. Cantractor default shall not be declared earlier than 20 days after the
Contractor and Surety have received notice o� conference �o address Contra�tor`s failure to
perfoz-im the Work.
2. If Contractar's services are terminated, Surety shall be o6ligaied to take over and perforn:� the
Wor1c. If Surety does not eommence performance theraof vvithin 15 consecutive calendar days
after date of an additional written notice d�manding Surety's performance o�` rts
CITY OF FORT WORTI-I
STANDARDCON5TRlIC'fION SP6CIFICAT[OM DOCUMSNTS
Revision: &43/J.[3�1
ao�2on-i
GENERALCONOlTIONS
Page 59 of 63
obligations, then City, wit.�out process or action at law, zriay take over any portion of t�e
Wark and complete it as described below.
a. Xf City complet�s the Work, City nnay exclude Contractar and Surety �ra�n the site and
take possession af the Wark, and all materials and equipment incor�orated into the Work
stared at the Site or for which City has paid Contract�r or Surety but which are stared
elsewhere, and finish the Worlc as City rna.y deem expedient.
3. Whetl�er C�t}+ or Surety completes th� Work, Con.tractor shaIl not be �ntitled ta recei�e any
f�ar�her payment until the Work is fmished. If the unpaid balance of fihe Cnntract Price exceeds
all claims, casts, losses and daznages sustained by City arisir�g out of or resulting from
co�npleting tY►e Work, such excess wilI be paid ta Coniractor. Ifsuch c�ain:ss, costs, losses and
damages exceedsuch unpaid balance, Contractor shall pay the di�ference to City. Suc� claims,
costs, losses and damages incurred by City will be incorporated in a Changa Order, prov�ded
that when exercising any rights or rernedies under this Paragraph, City shalI nat be required to
obtain tiae lowest price for the Work performed.
4. Neither City, nor any of its respective cansultants, agenis, officers, directors or empiayees
shall be in any vs�ay liable or accouz�table to Contrac�ar ar Surety for the method by whicH the
completion of the said Work, or any portion filtereof, rriay be accornplished or for the price paid
therefor.
Ciry, notwithstanding the method used in completing the Contract, shall not forfei� the right
ta reco�er damages from Contractor or Surety for Contractor's failure to timely compl�te the
entire Contract. Contractor shall not be entitled to any cla�n nn accaunt of the methad vsed
by City �n completit�g ihe Contract.
6. Maitrtenar�ce of the Work shall contin.ue to be Contractor's and �urety's responsibilities as
provided for in the bond req�irements of the Contract Docume�ts ar any �pecial guarantees
provided for under the Contract Docum�nts or any otl�er obligations otherwise prascribed by
law.
C. Notwithsianding �aragrap�s 15.02.B, Coniractor's services will not be terminated if Contractor
beg�s witliin seven days of receipt of notice of mteni to terminate ta correct its failure to per�orm
and praceeds di�g�ntly to cure such failure wi�hin no more than 30 days of receipt of said notice.
D. Where Contractor's services have been so terminated by City, the termination wilI not affect any
rights or retnedies af Czty against Contractor then existing or which may thereafter accrue. An}�
retention or paymant of moneys due Contractor by City will not re�ease Contractar frorn liability.
E. If and to the extent that Contractor has provided a perfaimancE bond under th.e prov�sions af
Paragraph 5.02, the term.ination procedures of that bond shall not supers�de the provisions of this
Article.
CITYOF FORT WDRTI3
STAN�A[2DCON5TRUCTION SPECIF[CAT10N IJOCUML�NTS
Revision: 823/1.021
oo�2ao-i
GE�[ERALCONbITlQiJ S
Page 6d of 63
15.03 CityMay Terminaie For Convenience
A. City may, without cause and �ithout prejudice to any other right o�• remedy of City, termina.te th�
Contract. Any terminatzon shall be efFectedby mailing a noizce of the termination to the Contractor
spec.ifying the extent to which p�rformance 4f Work under t1�e contract is terminated, and the date
upon whieh such termination becomes effective. Receipt of the notice shall be deemed
conclusi�vely presumed and established when the let�er rs placed in the United States Pastal Sarvice
Mail by the Ciry. rurther, [t shall be deemed canclusively presumed and established f.hat Such
t�r7nination is rnade wzth jUst causa as therein stated; and no proof in any claim, demand or suit
shall be required of the City regarding such discretzanazy action.
B. After receipi of a notice af termmation, and e�cept as ot�ervvise directed by the Czty, the
Contractor shall:
1. S�op work under the Contracton the date and to the extenf spec�ed in the notice oFterrninatian;
2. place no further orders ar subeontracts tar materials, ser�ices ar facilities except as may be
necessary for campletion of such portion of the Wark under the Contract as is not terc-ninated;
3, terminate all ord�i•s and subcontracts to the extent tha.t th�y re�ate to the perfortnancE of the
Work terminat�d by notice o� tez-mination;
4. iransfer trtle to the City and deliver in the rrianner, at the times, and to the extent, if any,
�.irected by the City:
a. th.e fabricated ar unfabricate�l parts, Work in pi•ogress, carnpl�ted Work, supplies and
other material produced as a part of, or acquired in ennnection with the perfoz-�nance of,
the Work terminated by the notice af the terrriination, and
b. the completed, ar partia�ly completed plans, drawing.s, infort�r�atzon and other property
vwhich, if the Contract had been completed, would have been requ�red to be furnished fio
t�e Crty.
S, co�nplete perforrnance of such Work as shall not have l�een terminated by the notice of
termination; and
b. take such action as may be necessary, or as �he City may direct, far the protection and
preservation of the property related to its contract which is in the possessinn of the
Contractoz� and in which the owner has or �y acquire the rest.
C. At a time not later than 30 days aiter the termination date sp�c'rF'ied in the no�ice of terminatzon,
the Contractnr may submit to the City a list, eertified as #o quantity and qUality, of any or all rtems
of termina�ion inventory not previo�ly dispased o�, exclusive of i�eizas the disposition nf wY�ich
has been directed or authorized by City.
CITY QF FpRT WORTH
STANDARDCONSTRUCTION SPBCIPiCATTON DOCUMENT5
Revision: �8C�3f2021
Q072U0-t
GEIVERAL CDNQ ITION S
Page 61 of 63
D. Not later than IS days thereaf�er,the Crty shall accep� tit�e to such iiems provided, that th� list
submrt�ed shali be subject ta �erifieation by the City upon remo�al of �e iterns or, if the i�ems are
stored, within 4S days from the date o� submission of the list, anc� any necessary adjustments to
correct the list as submitted, sHall be made prior to final settlem�nt.
E. Not later than b0 days afterthe notice af termination, ihe Conhactor shall submit h� termination
clairr� to t�e Ciry in the form and wi�h the certification prescribed by the City. Unle�s an eactension
�s made in writing within such 60 day period by the Contractor, and granted by the City, any and
all such claims shall be conclusively deemed waived.
F. In such case, Contractor shall be paid for (without dup�ication vf an� items):
1. complete� and acceptable Work executed in accordance with the Contract Dacuments prior
to the effective date of ter�nination, �cjuding fair and reasonable sums for o�erhead and pro%t on
such Work;
2. expenses sustained prior to the affectrve date oi t�rmination in perfarmmg services and
furnishing labor, materials, or equipment as required by the Contract Documents in connectian
with uncompleted Worl� plus fair and reasonable sums for overhead and prafir on suchexpenses;
and
3. reasonable expenses directly attributable to termination.
Gr. Zn the event of the fail�.�re o� the Contractor and City to ag�ree upon the whole a�nount to be paid
to the Cantractor by reason of the terzn�ation of the Worlc, the City shall d�t�rir�me, on the basis
of information avai�able to it, th� amount, if any, due to the Contractor by reasonof the termination
and shall pay to the Cantractor the amounts detexnnined. Conteactor shall not be paid on account
of loss af anticipated profrts ar re�enue or ather economic loss arismg out of or resu�ting from
such termir�.ation.
ART�CLE 16 — DISPUTE RE�4LUTION
16.01 Methods and Procedures
A. Either City or Contractor may request mediatian of any Contract Claim submitted for a decision
under Paragraph 10.06 before such decision becomes final and �inding. The request for mediation
shall be s�bmiti�d to the other party to fhe Contract. Tirnely submission of tha request shall stay
the effect of Paragraph 10A6.E.
B. City and Contractor sk�all participate in the mediation process in good faith. The process shall be
com�xaenced w�hin 6� days of filing of the request.
C. I�the Contract Claim is not resolved by xnediation, City's aetion under Paragraph 10.06.0 or a
denial pursuant to Paragraphs 10.06.C.3 or 1Q.06.D shall becorne final and binding 30 days after
termination of the mediation un�ess, within that time periad, City pr Contractor:
CITY O�' FORT WORTH
STANDARDCONSTRllCTIDN SPECIFICATION DOCLIIvi�[�fTS
Revisinn: 8�L311.f711
QO 72 00 - I
GENERALCAN�ITI�NS
Fage fi2 af 63
l. eIects iti writing ta in�olce any other dispute resolUtion process provided for in the
Supplementary Conditians; az•
2, agrees with the other party. to submit the Contract Claim tn another dispute resal�tion
process; ar
3, grves written notice to the other party o� the intent to submit the Coniract Claim to a cnurt oi
competent jurisdiction.
ART�CLE 17 — MISCELLANEOUS
17.OI GivingNotice
A. Wheneverany provision ofthe Contract Documents raquires fihe giving of wriit�n notice, it will
be deerned to have been validly given if:
dalivered in person to fhe indi�idual or to a membe�� of the firm or to an officer af the
cnrporation for wha�r�: it is intended; or
2. delivered at ox sent by regist�red or certified mail, postage prepaid, ta the Last business
address knawn to the giv�r oi the notice.
B. Busiu�ess address chang�s must be pro�nptly ma.de in writing to the other party,
C, Whenever th� Contract Documents specifies giving notice by �lectronic means sUch electronic
natice shaIl be deemed suff'tcient upon confirmatian of receipt by the recei�ing party.
17.02 Computation ofTirtaes
When an� period of ti�ne is referred to in the Contract Docurnents by days, it will be compuiec[ to
exelude the �cst and include the last day of such period. If the Iast day of any such periad falls on a
Saturclay or ,Sunda� or on a day made a legal holida.y ihe ne� Warkir�g Day shall become the last day
af the period.
17.43 Cumulative Rernedies
Th� duties and abligations ur�pos�d by these General Conditions and the rights and remedies ava�lable
hereunder to the parti�s I�ereto are in addrtion to, and are not to be canstrued in any way as a limita tion
of, any rights and remedies available to any or alI of them which are atheru�ise irr�posed or a�ailable
by Laws or Reguiations, by special warranty or guarantee, or 6y other provisions of the Contrac]:
Dncuments. The provisions of this Paragraph will be as effective as � repeated spec�ically in �e
Contract Documents in connection wi�h ea.ch particular duty, nbligation, right, and remedy to which
theY apP�'•
CITY �x �'ORT WaRTH
�TANDARDC01�5TRlICTION SPECIFICATIOM BDCUMEN'T'S
R�vision: 8I23/2021
oo��ao-�
GEIVERAL CAN�ITION S
Page G3 of G3
17.04 SuYvival of Obligatiarrs
All representations, indemniFications, warranties, and guarantees made in, re�ui�ed by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Coni�ract Documents, will survive final paynr�ent, cam�letion, and acccptance of ihe Wark or
tern�ination ar cpm}�letion af the Contract or terminatian of the services of Contracior.
17.05 Headings
Article and paragraph headings are inserted �or convenience only and do not constitute parts of these
Generaj Canditions.
ci�Y o� �oxT wort�
STANDARDCONSTRUCTI4N SPEC[�ICATION DOG[TIv[II�l"I'S
Aevision: $/�.1
ao �3 00
S UPPL�MENT AIRY C ONDITIONS
Page 1 of G
s�cTTON o0 7� ao
SUPPLEIvI�NTARY CONDITIONS
TO
GENERAL CONI]ITIONS
Supplementary Canditions
These 5upplementary Conditions inodify and supplement Section OQ72 pQ - GeneralCanditions, and ofiher
provisionsoftheConh�actDocumentsasindicatpxlbelow. A[lpravisi.onsoftheGenei�alCondifionsthata�E
rnodified or supplementedremain m full force and effect as so modi�ed orsup�lemented. Allprovisions
of the Gen eral Cond itions �,which are n ot s o mo dified a r snpplementedremain m full force an d e ffe ct.
De�ned Terms
The temas used in these Supplementary Conditions which are defned in the GeneralCond.itions ha�ethe
meaning asszgn�dto tk�err►in the Genei�al Gonditions, untess speeificaliy natedherein.
Mndiiicat'tons and Supplements
The �allawing are instruciionsthatmodify orsupplement speciticparagraphs in t�e GeneralCondi�ions and
otherCqntract Documents.
SC-3.03B.2, "Resalving Discrepan�ies"
Plans gn�ernoverSpecifications.
S G4.01 A
Eas ement limits shown onthe Drawingare appro�mate and were pro.�idedto establish abasis farbidding.
Upon rece'r� ing the imal e as �ments desez�iptions, Cantractor s h alI comp are tham ta the lir►es s hown on th e
Co ntract Drawing s.
S G4.01 A.1., "Availability of Lands"
The foIlowing is a list oflmown outstandingright-af way, and/or easements to be acquired, ifany as of
December7, 2021:
Ou�standingRight-Of-Way,and/or Fasements tu Be.A,cquired
PARCEL OWNER
NUMBER
NONE
TARGET DATE
QF POSSESSION
Th e Contractor understands andagrees tha� th e dates listed above are es timates only, are n o t gu arant e ed,
and do notbindthe City.
IfContractarconsidersthefinaleasemenTspro�idedtodifferznateriall�fromtherepresentations on the
Contract Drawings, Contr•actor shall within �ive (5) Bus �ess Days and b�fore proceeding vvith th e W ork,
notify City in writir�g associatedwith tha differing easement Gne ]ocatians.
S C-4.fl 1 A.2, "Availabi lity of Lands"
IItilities or obstructions to be removed, adjvstec3, and/or relacated
CITY O�' PORT W�RTH 3022 IIridgeRehabi]itationContract 2
STANDAItD CONSTRUCCION SPECIFICATIQN DOCUMENTS CityProje�C No. ]0345b
Revised Mar�ch 9, 2�20
OD 73 00
SUf'PLEM�TAi2'Y CO�DITIONS
Page 2 oF 6
The follo wing is list oiutilit�es andlar ob structions that haueno.tbeen remo�+�d, adjusted, andlo�• relo cated
as ofDecember7, 2021
�XPECTID UTII Tl'Y AND LOCATION
OWNER
TARGET DATE O�'
ADNSTMENT
NONE
The Contractorunderstands andagrees tk�atth�dates listed abaveare estimates only, are notguaranteed,
and do not bindthe City.
SC-9.02A.,"Subsurfaee andPhysical Conditians"
The fo Ilowing are rep arts o f expio rations andtests of s ubsurFace conditions at the s ite ofthe W ork:
A"None" Report No. , dated , preparedby "None", a sub-cansultant of"None", a
cons ultant o f the City, providing additional inforn�ation on "Noz►e".
The fallowing are drawings afphysical condi�ions in or relating to existing surface and s ubsYu�f'ace
structures {e�ccept iJndergraundFaciIities )�vh ich are at or contiguous to th e site o f the W ork:
"Nvne"
SC-4.46A.,"HazardousF�nr+�ronmentai Conditions at Sitc"
The following are reports and drawings of e�sting haz�ardous environmental conditions lmown ta the Gity:
"Nane°'
S C-5.03 A., "Certi�cates of �ns u rance"
The entitie,s listed below are "additionaI insureds as thtir interest may appea�" includingtheirres�eetive
of�icers, directars, agents and emplayees.
(]) C�h'
{2) Cansultant: "None"
(3) Oth�r; "Npne"
SG5.04A.,"Co�tracEar's Insurance"
Thelvnits ofliabi�ty FortheinsurancerequiredbyParagraphGGS.(}4 shal[providethefollowing
coverages for not less than the fo llowing amounts orgreater where required by laws andxegulatip.ns:
5.04A. Warkers' Compensafiion, underParagraph GC-5.04A.
Statutory limits
Employer's liability
$100,000 each accidentloccurrence
$I00,400 Disease-eachemployee
$500,000 Disease-policylimit
SC-5.Q4B„ "Contractor's Ins urance"
CI'1'Y OF FDRT WQRTli 2022 BridgeRehabilitationCnntract 2
STANDARB COAdSTftUCI'IQN SPECIFICATIOI+I DOCUMENTS C.ity Project No. iQ3456
Revised March 9, 202Q
ao �3 ao
SUFPLEMENT'Al2Y CONDITIOIVS
Page 3 of b
5.Q4B. Cnrnrr�ercial �neraI Liability, underParagraph GC-S.Q4B, Cantractor's Liability Insu��nce
underParagraphGC-5.04B,, vakaichshaI]beonaperprojectbasiscoveringtheContractorwith
minimum ]imits of:
�l,aon,000 e��� o��u�r��
$2,OOQ,040 aggregate limit
The policy must have an endaraem�ent{Amendment—Aggregate Lim�ts ofInsurance}making the
Gen eral Aggregate Limits app ly s eparately to each job s ite .
The Commercial General Liability Ins uxancepolicies shallprovide "X", "C", and"U" coverag�'s.
Verification ofs uch coveragemust be shownin the Remarks Article ofthe Certificate ofI�isurance.
S C S.OQ C., °` Contracior's Ins urance"
5.04C. AutomobileLiability,underPa�-agraphGC-5.04C. Contractnr'sLiabilityinsuranceunder
Paragraph GC-5.04C., which shall be zn an arnount not less than the following azxsounts:
(1) Automobile Liabilitty- a commercial bus iness palicy shalIprovide coverage on"AnyAuto",
defined as autios arv��d, hired and�.on-owned.
$1,�QO,aoa eachaccidentonacombinedsinglelimitbasis.5�litlimiYs areacceptableiflimits areat
least:
$25�,aoa BodilyInjuryperpex•sonl
$SOO,D00 Bodily Tnjury peracnident/
$]00,000 FropertyDatnage
SC-SA4D.,"Contractor's [nsu�rance"
The Contractor's eon.struc�ion activities will require its emp loyees, agents, subcontractors, equipment, and
material deliverics to crass iailroad properties and tracks "None".
The Contractor shall conduct its operations onraih•oad pt�ope�ties in sucha manneras notta interF�re with,
hinder,or obstzuctthe raih•oad campany in any mannerwhatsoever in the use oroperation ofits/fhei� trains
orotherproperly. SuchoperationsanrailroadpropertiesmayrequirethatConhactortoe�cutea"Rightof
Entry Agreem�nt" with thepar�icularraih•oad company arcampanies in�olved, andto this endthe
Contractorshould satisfy itselfas to the requiremenYs afeach railroad company and ba prepa�•edtae�cute
the right-of-entry {iiaz� y) re quire d hy a rail�•o ad company . The rec�u irernents specified here in likewis a relate
to the Co ntractor's use ofprivate an d/or c onsfru ction acc ess roads cro ssing s aid railroad camp any's
properties.
Th e Cantzactual I,iabiIity coverag e requ ire d by Paragraph 5.04D ofth e General Can ditions shall pro�id e
co � erage for n o t l�s s than the fo lio wing arnaun ts, is s ueri by co mp anies s atisfaciory to the City and tn the
Railroad Company far a term that continues fors o long as theCantractor's operations andworkcross,
occupy, ortouch railroad properiy:
{1) Gene3al Aggregate: N/A
(2) Each Occurrence: N/A
_ Aec�un�ed %r this Contract X Nat required forthis Contract
W ith respe�t ta the ab ave out lin ed in surancE requiremen ts, tk e fa llq wuig sh all govern:
CITY OF FQRT WORTf-� 2022 Bridge I�ehabilita#ion Contraet 2
STANbARD GONST`RUCT[ON SPECIFICATIDN DOCUMENTS City Project No, 103456
Revised MArch 9, 2020
00 73 OQ
SUPPL�M�N'1'AItY CONDITIONS
Page 4 of 6
l. Wkere asinglerailraad companyis invoIved, the Contractorshallprovideone insurance policy in
the name of the railroad company. However, if more than one grade separation or at-grade
crossingisafFectedbytheProjectafientirelyseparatelocationsoatkaelineorl�nes afihesame
railroad company, s eparata coveragemay be requi�•ed, each in the amount stated above.
2. Where rnore than onerailroad company is aperating onthe same right-of-way or wh ere s everal
railro ad companies are in�olvecl and ope�atad on their own s eparate righis-of way, the Cantrac to r
may be required to pravideseparate inswance policies in the name ofeach rail��oad cpmpany.
3. If, in addition to agrade separationoran at-grade crassing, otherworl�oraetivity is propnsedon a
raiIroadcompany'sright-of-wayatalocationentirelyseparaxefroYnthegrade separatian ar at-
grade omssing, insurance coverage forthis workmust be incIudedin the poliey co�ering tk�e grade
s ep aratian,
4. If no �.rade s eparation is involv ed but otherwork is propo sed on a railroad co mp any' s rig h t-of-
way, all s uch othe�r work tnay b e co v ered in a s ingle po licy for that railro ad, eventh ough the work
may be attwo ormore separate iocations.
No work or activities an arailroad company's properiy to be perforrned bythe Cnntractarshallbe
commenced untilthe Contiactarhas furnished the Ci�y with an originalpalicy arpolicies ofthe insurance
for each railroad cornpany named, as reguired above. A ll such insurance must be appra�edby the City and
each affectedRailroad Companypriorto the Contractor's beginning work.
The insurance spec'if'ied above mustbe carried until all Workto be perFormed an therailroad right-of-way
has been compieted andth�grade crassing, ifany, is no longerusedby theContractox. in additidn,
insurance mustbe carried duringallmaintenance and/orrepairvrorkperFormed in the railroadright-of-way.
5uch ins urance must name the railro ad compaz�y as the ins vred, together with any tenant or l�s s ee ofthe
railroad company operatingoveriraeks aivol�edin thePraject.
S C-6.fl �1., "Project S che[lnle"
Pro ject s chedule s ha11 be tier 3 far the pro�ect.
SG6.07., "WageRates"
The following is the prevailing wagaratetable{s) applicable to ti�is project and is provided in the
Appendixes: GC 6.07: 2013 Prevailing W age Rates (Heavy and HighvNay Construction Pro�ect)
A co�y ofthe table is aIs o auaiIable by aocessing the City's website at:
htt s:lla s.fortworthtexas. ov/Pro'eetResources/
You can access Y.he f�le by. following the directory path:
p2-Construction Documents/SpecificationsfDivOfl — General Conditions
SC-6,D9.,"�errnits and Utilities"
SC-6.09A.,`�Contractorobtainedpermitsand licens�s"
"I'he following are known permits andlor licsns es required by the Contractto bE acquiredhy ihe Contractor:
"Nane"
SGG.69B. "Cityobtained permits and licenses"
The fo�lowing are known p�mrits and/or licens es required by the Coniractta be acquiredby the City:
"None"
CITY OFFDRT WORTH 2O22 BridgeRet[abilitationContract 2
STAPIDARD CONSTl2[1CTION 5PEC1F'ICATI�N DbCiI11�f6NT5 CiryProject No. 103456
Revised Ivianch 9, 2020
00 73 OQ
SUP PI,EMENTARY CONT3ITION5
Yage 5 pf 6
S C-6.09 C. °° Outstanding pe rmits and 1 i cens es"
The faIlowing is a Gst oflcnown o.utstandingper�nits and/orlicensesto be acquir�d, ifan}� as ofDecember
7, �D2I :
Outstanc3ingPermi�s and/orLicensest�BeAcyuired
OWNER PF�MIT ORLICENS� AND LOCATION TARGET DATE
OF POSSESSTON
SC-6.24B,, "'IStie V�, Civil Rfghts Act of I964 as amended"
Duringthepert'ormanceofthis Conh•act,theContractor,foritself its assi�nees andsuccessnrs ininterest
(hereina8errefenred to as the "Contractor" ) agi�ees as follows :
1. Com�liance with Regulations:'The Contractor shallcomply vvith the Regulationrelative to
nondiscrimination in Federally-assistedprograrr,s ofthe Departznent ofTransportation (hereinaffer,
"DOT") Title 49, Gode ofFederal Regulations, Part21, as they znay be amendedfi•arntime to time,
(hereinafter refe�l-ed to as the Regulations), �vhich are l�erein incorporated hy reference andmade a p�t
ofthis conlract.
2. Nondiscrimination:TheContractor,withregardtotheworkparformedhyitduringtheeontract,shall
not dis criminate on thegrounds afrace, co[ar, ornationalprigin, in the selection andretention nf
s ub contractors, in cluding p ro ciu•ements o f materials and le as �s o f equip rrient. The Co ntractor s hall not
participateaitherdirectlyo.rindirectlyinthediscriminationprohibitedby�9CFR, seetion21.5nfthe
Regulatinns., includingemployinentpi�actices when the contractcovers apro�ramsetforth in
AppendiYB ofth� Regulations.
3. Solicitations for S�bcontractars, including Procurements ofMaterials and Fquigment: Tn all
s o licitatians either by comp etitive b idding or negotiation made by the contractor for warlc to b e
pei%rmed under a s ub contract, in cluding pracurements o finaterials o�- leas es of equipment, each
potentia[ s ubcontacYor or s upp�ier sh a11 b e notified by the �Qntractor o f the Gontractor's oblig ations
underthis coniractandthe Regulations relati�eto nandiscriminatian on the g�•ouncis ofrace, colar, or
national or�gin.
4 �nformation and Raports:Th�Cont��actorshallprovideallinfonnationandreportsreyun•edbythe
Regulations or directiv es is su ed pursuant thereto, and s hall perrnit access to its bo oks, records,
accaunts, othersources aiinformation andits facilities as tnay be dete�minad byCity orthe Texas
Department afTranspoi�tafionto be pert�nentto ascertain compliance with suchRegulalaons, orders
and instnxctian s. Where any infozmation required o f a contracYor is in th e e�lus i� e p assession of
anotherwho fails orre�usesto furnishthis infoi�nation the contractorshallsp c�rtii'y tathe City, orthe
Texas Department of Transportatian, as apprapriate, and shall s et foith what effi'orts it has made to
obtain the informatio.n.
Sanetions far Noneompliance: In the event ofthe Contractor's noncompliance with the
nondiscrimnlatianpro��sions ofthis Contract, City shallimpos e sueh contractsancfiions as it orthe
Texas Departmar�t ofTranspartationmay detez�rr►ine to be appropriate, including, but nat limitedto:
a. withholding ofpayments ta theContractorunderthe Contractuntilthe Contractor
camplies, andlor
b, cancellation, terminationoz'suspensionofthe Contract, in whple or in part.
CITY �F FORT WpftTH 2O22 E3ridge Rehabilitation Contract 2
STAriDARD CflNST`RUCT'ION SPECIPICATION DOCUMHNTS CityProjectNo, 143456
Revised March 9, 202D
00 �s ao
SUPPLEM�NTARY CQNDITIONS
Page 6 af 6
6. Incorpuration ofProvisions:TheContractarshallincludetheprovisionsofparagraphs(1)through
(6) in every subcontract,including procurements ofmaterials andleases ofequiprnenf, unless e�empt
by the ReguFaiions, or directives is sued pursuant thereto. 'I'h�Contractor s hall take s u ch action with
respect to a.ny subconYraetorproeurementas City orthe `I'exas Dapar�nentafTransportation inay
direct as a means af enforcing such provisians in clu ding s anctions foz non-camp lian ce: Provided,
howe�e��, tha� in the event aconh�ctor6e¢ames in�olvedin, oris threafienedwith,.litigation with a
s uhe ontractor or s upplier as a res ult af s uch d irection, the contraetar may request City to enter inta
s uch liligation to protect the interasts of City, an d, in addition, thecontractor may reguest th eUnited
States to enter into such litigation to protect th�e interests ofthe Unitecl5tat�s.
AdditionalTitle VI i�quire�nents ca.n beiound in the Appendix
S C-'�.02.,"Coordinatian"
The individuals or entities listedbelowhave coniracts with the City forthe performance ofotherworkat
the Site:
Vendor Sco of Work Coordination Authari
None None Nnne
SC-8.Q1,"Communieafions toContractor"
None
SC 9.01.,"City's Pra3ectManager"
The City's 1'roject Manager for this Contractis Iretomiwa Otuyelu, orhis/Yier successorpursUant to �it6en
notificationfi-om the DirectorofTranspartatinnanciPublic Works.
5 C-13.03C., "Tes ts and Ins pectiops"
"None"
SG16.O1C1, °Gll'Iethods and Pracedures"
"None"
IlVll OF SEC'1�ON
Revision Log
bATE NAME SUMMARY OF CHANGE
112212a16 F. GriFfin �G9.�'f., "City's Project Representati�e° w ording changed to Cify's Project
Manager.
3I912a20 D_V. Magat�a SG6.07, Updated the link such khat files can 6e accessed via the City's
w ebsite.
CiTY OF FORT WORTII 2022 Bridge RehabiliEatian Contract 2
STANDARD CONSTRUCI'ION 5PEC1FiCAT10N DOCUMENTS CityProject No, IQ3455
Revised March 9, 2D20
oiiiaa-i
SUMMARI' OF WOItK
Page l of 3
SECTION Q1 11 UO
SUMMARY �� WORi�
PARTI- GENERAL
l.l. SUMMARY
A. Section Includes:
1. Summary of V4�ork to be performed in accardance with tlne Contxact Documents
B. Deviations frozaa this City nf Foi�t Worth Standard Specification
MOBILIZA"1'ION AND DEMOBILIZATION SHALL BE S�JBSIDIARY TO
THIS PRO.TECT PAY I'T'�MS, NO SEPARATE PAY. NO PAYMENT WILL BE
MADE FORMOBILIZATION AND DEMOBII.,IZATION FROM ONE
L4CATION TO AN�'I`HER IN NOI�MAL PROGRESS OF PERFORMING
THE WORK. REMOBILIZATION PAY ITEM SHALL BE PAIi� �'OR
SUSPENSION OF WORK SPECIFICALLY REQUIRED IN THE CONTRACT
DOCUMENTS OR A5 REQUIRED BY 'I'H� CI`I'Y
C. Related Specification Sections include, but are not necessarily limited to;
1. Di�ision 0- Bidding Requirements, Contrac# Forms, and Conditions ofthe
Contract
2. Division 1- General Requirements
I.� PRICE AND PAYM�NT PROCEDUR�S
A. M�asurement and Payment
l. Work associated u+ith this Item is considered subsidiary to the various items bid.
No separate payment wilI be allawed for this Itean,
7..3 RET�R�NCES [N�T US�D]
1.4 ADMINISTRATNE R�QUIREMENTS
A. Work Govered by Contract Documents
l. Work is to include fiu�nishing a!1 labor, materiaLs, and equipment, and performing
all Work necessary for this construction project as detailed in th� Drawing� and
Specifications.
B. 5ubsidiary Work
Any and all Work specif cally gnverned by documen#ary require�nents for the
praject, such as conditians imposad by the Drawings or Contract Documents in
which no specific item for bid has been provided fbr in the Proposal and the item is
not a typical unit hid item included on th� standard bid item ]ist, then the item shali
be cansidered as a subsidiary item of Work, the cost oiwhich shall be incladed ir�
the price bid in the Proposal for various hid items.
2. MOB�LI�ATION AND DEMOBILIZATION SHALL NOT BE PAID DIRECTLY
BUT SHALL BE CONSIDERED SUB�IDIARY TO 'I'HE MA..10R ITEMS OF
WORK. NO PAYMENT WILL BE 1VIADE FOR MOBILIZATI4N AND
DEMOBILIZATION FR�M ONE LOCATION TO ANOTHER IN NORMAL
PROGRESS OF PERFORMING THE WORK.
CITY 01+ PORT WORTH 2O22 Bridge Rehabilitation Contract 2
STANDAItll CONSTRiICT70N SPECiF[CATION DOCUFVIEI�TS City Praject na. 103451i
�2evised �ecember 20, 2012
O11140-2
SUMMA#tY OF WORK
Page 2 of 3
C. Use of Prenr�ises
I. Coot•dir�ate uses of pi�emises under directiQn of the City.
2. Assume fitll respansibility for pt•otection and safelceeping of materials and
equipment stored on the Site.
3. Use and occupy only partions of the public s�reets and alleys, or other public pIaces
or oth�a' rights-of-way as provided for in th.e ordinances ofthe City, a�. shovt+n in the
Cant�acE Documents,. or as may be specificalIy authorized in writing by the City.
a. A reasona6le arnount af tools, materials, and equipment far canst�-uction
purposes inay be stored in such space, but no mare t1�an is necessary to avaid delay
in the c�nstruction opet�a#ians.
b. Excavated and waste materials shall be stared in sueh a v�ray as not to interfere
with the use of spaces tlZat may be designated to be left free and unobstn�cted
and so as not to inconvenience occup�ts of ad3acent property.
c. If the street is occupied by railroad tracl�s, the Work shall be cartied on in such
manner as not to interfere with the operation of the railroad.
1) All Work shall be in accordanee withrailroad requirements set forth in
Division 0 as well as the railroad permit.
D. Work within Easements
1. Da no.t enter upon private property for any purpose without having previausly
obtai�ed permission from the owner of such property.
2. Do not store equipmant or material on pz'ivate property unless and until the
sp�cified approval afthe prop�rty owraer has been secured in writin� by the
Cantractor and a copy furnished to the City.
3. Unless speci�cally provided otherwise, clear all rights-of-way or easemer►ts of
obstructions vahich inust be removed to mal�e possible proper prosecution of the
Work as a part of the proj�ct construction operations.
4. Preserve ar►d use every precaution to prevent damage to, a11 trees, shrubbery, pIants,
Iawns, fences, culverts, curbing, and ail other ty. ges of structures or improvements,
to alI watei, sewer, and gas lines, to a1I conduits, overlaead pole lines, or
app�.�rtenanc�s thereo% including the construction af temporary fences and to all
other public or private property adjacent to the Work.
S. Not.ify the groper z'epresentatives of the owners or occupants of the public ar private
lands of interest in lands which might be affec�ed by the V4'ark.
a. Such notic� sha�i be made at least 48 hours in advance of the beginning of the
Work.
b. Notices shall be applicable to both pubiic and private utility companies and any
corporaiion, carnpany, individual, or other, either as owners or oecupanis,
whose land or interest in land might be affected by the Wark.
c. Be responsihle for all da.tr�age or injury to property of any character resulting
from any act, omission, neglect, or misconduct in the manner ar method �r
e�ecuticsn af the Work, or at any time due Ya defactive work, material, or
equiprnent.
6. Fence
�. Restore all fences encountered and removed during construction of the I'roject
ta the original or a better than ar3ginal candition.
b. Erect temporary fencing in place of the fencing remnved whenevar the Wark is
not in progress and when the site is vacated overiught, and/flr at aIl times to
provide siie security.
a The cost for all fence work within easements, including renno�+al, temporary
closures and replacemet�t, snall be subsidiary to ihe �ariou.s items bid in the
project propasal, unless a bid item is speciiteally provid�d in the proposal.
CITY OF FORT WORTH �622 Bridge Rehabilication Cantraet 2
5TANDARD CONSTRUCTION SP�CiFCCATIOAT DdCUMENTS Cit}r Proleet na. 103456
Revised ]7ecernber20, 2D12
011100-3
SUMMARY OF WORK
Fage 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACT�QN SUBNIITTALS/INI'ORMATIDNAL Si7BMITTALS �NOT IISED]
1.7 CLOS�OU�" �UBNIITTALS [NOT USED]
1.S MA7NTENANCE MATERiAL SUBMITTAL� [NOT US�D]
1.9 QiTALITY ASSURA.NC� [NOT USED]
1.10 DELIVERY, �TORAGE, AND HANDLING [NOT USEDJ
1.11 FIELD [SITE] CONDITIONS [NOT USEDI
I.I� WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
�ND OF SECTION
CI'T'Y OI' FORT WOIt7'ti 2022 Bn�idge Rehabilitation Contraet 2
STANI}�tRD CONST[tUCTION SI'BCII'ICATION bOCL1M$NTS City Yroject no. 10345b
Revised December 20, 2012
U l 25 00 - 1
SU88TITUT101+] PROCEI7UIZFcS
Page l of 4
SECTION 01 25 00
SUBSTITUTION PROCEDUR�S
PART1- GENERAL
1.1 ST]MMARY
A. Section includes:
The pracedure far requesting the approval of substitution of a product that is not
eqliivalent to a product which is specified by descriptive or perfnrmance criteria or
dafined by raference to 1 or more of the follo�azng:
a. Name Qf manufacturer
b. Naine of vendor
c, Trade name
d. Catalog nurr►ber
2, Substitutions are not "or�equais".
B. Deviations fram this City of Fort Worth Standard Specifcation
1. None.
C. Related Specification Sections include, but are nat necessarlly limited to:
1. Division 0— Bldding Requirements, Contract Farms and Conditions of the ContracY
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PR.00EDITRES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary io the varinus items hid.
No separate payment will be allowed for tlus Itern.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATNE REQUIItEMENTS
A. Request for Subsiitution - General
1. Within 3Q days after award of Contract (unless noted otherwise), the City will
consider formal requests frnrn Contractor for substitution of products in place of
those specified.
2, Certain types of equipment and kinds o�materiai are described in Specifications by
meazas of references to nannes oi manufacturers and vendors, trade nam�s, or
catalog numbers.
a. When this methad of specifying is used, it is no# intended io exclud� frozn
consideration other products bearing other manufacturer's or vendor's names,
trade names, Qr catalog numbers, provided said products�are "or-equals," as
determined by City.
3. Other types of equipment and kincfs of material may be acceptable substitutions
under the following candztians:
a. Or-equals are unavailable due to strike, discontinued production of products
meeting specifzed requirements, o.r other factors beyand contral of Con.tractor;
or,
CITY OF FORT WORTH 2D22 �ridge Rehabilitation Contraet �
STANDARD CONST7tUCTION SPECII'TCAT[ON DOCiJMENTS City i�roject na. 103456
Revised Juiy 1, 2QI1
012500-2
SUBSTITUTCON 1'AOC�DURES
Page 2 qf4
b. Contractor proposes a cost and/oz' tiine reduction incentive to the City,
1..5 SUBMTTTAL�
A. See Request for Substitution Form (attached}
B, Proc�dure for Requesting Substitunon
1, Substitutian shall be considered only:
a. After award of Contract
b. Under the conditions st�ted herein
Sub�nit 3 copies af eaGl�. written req�est for substitution, including:
a. Daci.unentatian
I} Complete data substantiating carnpliance of proposed substitution with
Contract Documen#s
2} Data relating to changes in construction schedule, when a reduction is
proposed
3) Data relating to changes in cost
b. I'or products
1) Product identi�ication
a) Manufacturer's name
b) Telephone numb�r and representative contact name
c) Specification S�ction or Drawing reference of originally speciiied
product, including discrete natne or tag number assigned to ariginal
product in the Contract Documenfs
2) Manufiacturer's literature cIearly marked to show compliance of proposed
p:roduct with Contract Documents
3) Itemized comparison of original and proposed product addressin� product
characteristics including, but not necessarily limited ta:
a) Size
b) Coinposition or materials of consfruction
c} Weight
d) Electrical ar mechanicaI requirernents
4) Prnduct experience
a) Location oipast projects utilizing product
b) Name and te]ephone number af persons associa#ed with raferenced
projects knc�wledgeable cnncernmg proposed product
c� Available �e�d data and reports associated with praposed product
5) Samples
a) P�•ovide at request of City.
b) Samples become the property of tla� City.
c. For eonstruciion methods:
lj Detailed descripiion of propQsed method
2) Illustrat[ota drawings
C. Approval or Rejectian
1. VVritten approval ar rejectiota of s�bstitution given by the City
2. Ciiy reserves the right to require proposed grodLict to coinply with colpr and pattern
of specified product if necessary to secure design intent.
3. In the event the substitution is appraved, the resulting cost and/or time reduction
will ba documented by Change Order in accordance with fhe General Conditions.
Cl'1'Y OF FORT WORTH 2422 Bridge Reha�ilitation Contract 2
3TANDARl7 CONSTRUCTION 5PECIFICAT[ON DOCUMIENI'S City Project no. 103456
Revised July l, 2b1 l
O] 2500-3
SUaSTITUTIpN PRQCEDUR�S
Page 3 of 4
�. No additional contraei time will be given �pr substitution.
5. Substitution will be rejected if:
a. Submiifial is not through the Contractor with his stamp of approvai
b. Request is not made in accordance with this Specification Section
c. In the City's opinian, acceptance will require substantial revision of the original
design
d. In the City's opinion, substitution will not perform adeq.uately the function
consistent with the design intent
1.6 ACTION SUBMITTALSIIN�'ORMATI�NAL SUBMITTAL� [NOT USED]
1,7 CLOS�OUT SUSMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUSNIITTALS [NUT USED]
L9 QUALITY AS�iTRANCE
A. In tnaking reques� for substitution or in using an approved product, the Contractor
represents that the Contractar:
1. Has investigaied propnsed product, and has determined that it is adequa�e or
superior in a31 respects ta Y.hat specified, anc� that it will perform function for which
it is in�ended
2. Will provide same guarantee for substitute itein as for produGt specified
3. �JVill coordinate installation of accepted substitution into Work, to include bttilding
modifications if n�:eassary, making such changes as may be required for Work to be
con:zplete in all respects
4. Waives all claims far additional costs related to suhstitutian which subsequently
arise
1.10 DELN�RY, STORA.GE, ANll HANDLING [NOT USED]
1.11 F� IELD [SITE] COND�'X4NS [NOT iTSED]
112 WARRANTY [NOT USED]
PART 2 - FRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Reaisian Lo�
DATE N11IvIE 51_TMMARY OF GHANGE
Cl7'Y OF POR7" WOR'I'H 2U22 Bridge 12el�abilitation Cantract 2
STANAARD COATSTRUCTION SPECIFTCA7'ION DDCUMENTS City Pra�ent no. 10345G
Re�ised 7uly 1, 20l ]
a � as oa - a
SUBST[TUTION PRbCEDURF_S
Page a pf d
EXHIBIT A
REQUEST FOR SUBSTITUTION FORM:
TO:
PROJECT: DATE:
We hereby �ubmit for your consideration the following product instead of the speciited item for
the above projec�
SEC'TI�N PARAGRAPH SPECIFIED ITEM
Fraposed Suhstitution:
Reason fnr Siibstitutian:
Incfude comp]ete information on changes to Drawmgs and/or Specifications which proposed
suhstitution will reqt�ire for its proper installation.
Fill in Blanks Below:
A. Wil] ihe undersigned contractor pay for changes to the buifding design, including engin�ering
and deta[ling costs caused by the requested substitution? �
B. WIZat �;ffect does suhstitution have on other
C, Differences between praposed suhs#itution and specifed item7
D. Differ�nces in product cost or product deli�ery
E. Manufacturer's guarantees oftl�e proposed and specifed it�ms are:
Equa1 8etter (�xplain an attachment)
The undersigned states that the function, appearat�ce and quality are equivalent or superior to the
speczfied ite�n.
Submitted By: For Use by City
Signature
as noted
Firm
Address
Date
Tel�phone
For Use by City:
Approved
City
� Recaminended _ Recommended
Not recommended Received [ata
�y �
Date
Rernarks
Dafe
Rej ected
CIT'Y OF FORT WORTH 2�22 Bridge Ctehabilifation Contract2
STANDA[2D COTiSTRUCTION SPECCFiCAT10N DOCUNIENT5 City Proleei no. 103456
Ke�ised 7uly 1, 2011
O1 3l 19 - 1
PRECONSTRUCTION MEETING
Fage 1 of 3
S�CTXON 013I 19
PRECONSTRUC'i'ION MEETING
PART 1 - GENERAT,
1,1 SUMMARY
A. Section Includes:
1. Provisions for the preco.nstruction �neeting ta be hejd prior to the start of Wark to
clarify constr�etion contract administration grocedures
B. Deviations from this City of Fort Worth Standard Specification
l. Nane.
C. Related Specification Sections include, buf are not necessarily limited to:
1. Dit�ision D— Bidding Requirernents, Contract Forms and Conditions of ih� Contract
2. Division 1— General Requi�•ements
1,2 PRICE AND PAYMENT PROCEDURES
A, Measuz'ement and Payment
1. Work associa#ed with this [tem is considered subsidiaty to #he various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMIN�STRATIVE REQi1IREMENTS
A. Coardination
1. Attend preconstruction nneeting.
2. Representatives of Contractor, subcontractors and supplpers attending t�eetir�gs
sha11 be qualiiied �nd authorized to act on behalf of fhe entity each rapresents.
3. Meeting administered by City may be tape r�corded.
a. If recorded, ta�es vvill be used to prepar� minutes and retained by City for
future reference.
B. Preconstruction Meeting
1. A precanstruction meeting will be held within 14 �iays after the execution of the
Agreement and before Worlc is started.
a, The ineeting will be scheduled and adzz�inistered by the City.
2, The Project Representative will preside at ti�e meeting, prepa�'e the nates of the
meeting and distribute copies of same to al] participants who so request by fully
completing the attendance form to be circuIated at the beginning af the meeting.
Attendance shall include:
a. Proj ect Representa#ive
b. Contractor's pro}ect manager
c. Contractor's superintendent
d. Any subcantractor or supplier representatives vvhor� the Contractor may desire
ta invite or the City may requesf
C1TY aF FQRT WORTH 2O22 Bridge Aeha6ilitatian Contract 2
STANDARD CONSTRUCT[DN SPECIFICATION DOCUM$NTS Ciiy Praject no. k03456
Re�'tsed Aagust l7, 2012
0131 19-2
PR�CdNST12lJCTfON MEETING
Page 2 of 3
e. Other City representatives
£ Others as appz`opriate
4. Construction Sclaedule
a. Prepare baseline consiruction schedule in accordance with Section O1 32 16 and
provide at Precanst�'uction Meeting.
b. City will notify Contractor of any schedule changes upon Natice of
Preconstruetian I�ileeting.
S. �reliminaiy Agenda may include:
a. lntroduction of Pro�ect Personnel
b. Gen�ral Description ofProject
c. Status of right-of way, uti]ity clearances, easements or other pertinent pet•mits
d. Contractat's woz'k plan and schedule
e. Contract Time
£ Notice to Proceed
g. Canstruction Staking
h. Progress Payments
i. Extra Work and C17ange Order �'rocedures
j. Field Orders
k. DisposaI ,�ite Letter for Waste Material
1. Insttrance Renewals
in. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Con�enience
p. Docuinentation of Pr�-Construction Conditians
q. Weekend Work Natifcation
r. Legal Holidays
s, Trench Safety Flans
t. Con�ned Space Entry Standards
u. Coordination with the City's representative for operations of existing water
systerns
v. Storm Water Pallution Prevention Plan
w. Coordination with other Contractars
x. Ear3y Warning System
y. Con�ractor Evaluation
z. Special Cond'ttions. applicable to the project
aa, Daanages Claims
bb. Submittal Procedures
ec. Substituiion Procedures
dd. C�rrespondence Aa.uting
ee. Record Drawings
ff. Temporary canstructlon iacilities
gg. M/WBE or MSEISBE pracedures
hh, Final Acceptance
ii. Final Payment
jj. Questions ar Comments
CITY Or PORT WORTH 2O22 Bridge Rehabilitation Contract 2
STANDAFtD CONSTRUCTION SPECC�'tCATION BOCUMENTS City Prajeet no. 10345b
Revtsed August 17, 2012
O1 31 19-3
PRECON5TRUCTION MEETIIVG
Page 3 of 3
I.5 SUBNIITTALS [NOT iTSEDI
i.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOVI' SUBMITTALS [NOT USED]
1.8 1VIAINTENANCE MATERTAL SUBNIITTALS [NOT USEDj
1.9 QUALTTY ASSURANCE [NOT USED]
1.10 DELIV�RY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIQNS [NOT USED]
1,12 VVARi�ANTY [NOT USED]
1'ART 2 - PRODUCTS [NOT USED�
PA.R.T 3- EXECUTION jNOT USED]
END �P� SECTION
Revision Log
DATE NAME SUMMARY OF C��LNGE
CITY OF FORT WOATH 2O22 Bridge Rehabilitativn Contract 2
S'T'ANDAT2D GONSTRL�CTIQN SPECIFICATION 170CUMENT3 City Projecf no. ] 03456
Revised August 17, 2� l2
O13I20-1
PR07ECT MC'ETINGS
Page 1 of 3
SECTION 01 3120
PR07ECT MEETINGS
PARTI- GEN�RAL
1.1 SUMMARY
A. Section Inc[udes:
]. Provisions for project meetings thro.ughout the construction period to enable orderly
review of the progr•ess of the VVa�'k and to provide far systematic discussion of
potential problems
B. Deviations this City of Fort Woi�th Standard Specification
l. None.
C. R�lated Specification Sections include, but are not necessarily limited to:
1, Dit�ision 0—Bldding Rec�uireinents, Contract F'orms and Conditions of the Contraci
2. Division 1— General Requireinents
1.2 PRICE AND �AYMENT PROCEDLTRES
A. Measurerrient and Payment
1. tiVork associated with this Item is considered subsidiary to the various iiems bid.
No separate payment will be allowed for this Item.
I.3 REFERENCES �NOT U�ED]
1.9 ADNIINISTRATIVE REQUIItCMENT�
A. Coardinafian
1. 5chedule, aftend a�ad administer as specified, periodic progress meetings, and
spe�ially called ineetings throughout progress of the Work.
2. Representatives of Contractox, suhcontractors and suppliers attending meetings
shal] he quali�ed and authorized to act on behalf of the entity each represents,
3. Meetings administered by City rnay be tape recorded.
a. If recorded, tapes will be used to prepare nr►inutes and retained by City far
future raference.
4. Meetings, in addition to those specified in this Section, rr�ay be held when reyuested
by the C[ty, Engineer �r Contractor.
B. Pre-Constr�.tction Neighborhood Meeting
I. After the execution of the Agreement, but before construction is aIlowed to begin,
attend 1 Public I�ileetin� with affected residents to:
a, Present projected schedule, including construction start date
b. Answer any construction related questions
2. Meeting Location
a. Location of ineeting to be determined by the Cily,
3. Attendees
CITY pF FORT VWORTf3 2022 Bridge Reha6ilitation Contract 2
STANDf�RF3 CONS"fRUCTCON SPECIFICATTdN DQCUM8NT5 City Project nq, I03qS6
Revised Juiy 1, 20l 1
O13120-2
PRdJEC'1' MEETINGS
Page 2 of 3
a. Conttactor
b. Project Representative
c. Other City representatives
4. Meeting Schedule
a. In general, the neighborhoad meeting wiIl accur within the 2 weeks following
the pre-canstruction conference.
b. In no cas� will construction be allowed to begin until this meeting is held.
C. Pro�ress Meetings
1. Formal project coordination meetings will be held periodically. Meetings will be
s.ci�eduled and adminisYered by Project Representative.
2. Adc�itional pragress �neetings to discuss specific topics wi116e cnnducted on an as-
ne�ded basis. Such additional meetings shall include, but not be limited to:
a. Coardinating shutdowns
b. Installation af piping and equipment
c. Coordination between other construction projecis
d. Resolution of canstruction issues
e. Equipment approval
3. Tbe Praject Representative wi11 preside at prograss meetings, prepare the notes of
the meeting and distribute copies of the same to all participanis wlaa so request by
fully completing the attendance form to be circulated at the beginning of eaeh
meeting.
4. Attendance sha�S include:
a. Contractor's project manager
b. Contractor's superintendent
c. Any 5ubcontractor or suppIier representatives whom the Contractor may desire
to invite or the City may cequest
d. Engineer's representatives
e. City's representatives
f. Others, as requ�sted by the Project Representative
Preliminary A�enda nnay include;
a. Review of Work progress sznce previous meeting
b. Field observations, problems, conflicts
e. Items wluch imped� construction schedule
d. Review of ofF site fabrication, dejivery schedules
e. Review of canstz'uction interfacing and sequencing requirements with other
canstruction coniracts
f. Carr�etive measures and procedures to regain projecied seheduie
g. Re�isions to construction schedule
h. Progr�ss, schedule, during s�cceeding Work per�od
i. Coordination of schedules
j. Review submitta! schedules
k. Maintenance af qualit� standards
1. Pendzng changes and substitutions
m. Review propased changes for:
1) Effect on consfruction schedule and an completian date
2) Effect on other cantracts of the Project
n. Review Record D�cuments
o. Review monthly pay request
CTT"Y O� PORi' WORTH 2O22 Sridge Rehahilitation Contract 2
5TA3YDARD CONSTRUCTION SPECIFICATIOl� DOCUMHNTS Cit� Prpject np. 10345b
Revised Juty 1, 20l l
O131 20-3
PROJECT MEET[NGS
Page 3 of 3
p. Review status of Reqtiests for Information
6. Meeting Schedule
a. P�'agress maetings wilI be held periodically as determined by the Project
Repr�sen.tative.
1) Additiona] meetings may be held at the request of the:
a) City
b} Engineer
c) Contractor
7. Meeting Location
a. The City will estab]isI1 a meeting Io�ation.
1} To the extent practicable, meetings will be held at the Site.
�..5 �USNIITTALS [NOT USED]
I.G ACTION SIIBMITTALSlINTORMATI011iAL SUBMITTALS [NOT i7S�D]
1,� CLO�EOUT SUBNIITTALS [NOT i7SED]
LS MA�NTENANCE MATERIAL SUBMTI'TAL� [NOT IISEDj
1.9 QUALITY ASSURANC� [1VOT i1SED]
1.10 DELNERY, ST�RAGE, AND HANDLING [11'OT U�ED]
1.11 �'IELD [SIT�] CONDIT�4NS iNOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EX�CUTION [NOT US�D]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OP FORT WORTH 2O22 Bridge Rehabilitation Contract 2
STANDAAB CONSTRUCTION SPECIFICATION DQCUMEN7'S City Projecl no. 103�56
lZevised 7uly 1, 2011
U13215-I
CONSTRUCTInIV PROGliE53 SCf�i]L1LE
Fage l of ! D
2
SECTION Ol. 32 I6
CONSTRUCTION SCHEDULE
3 PART 1 - GENIIZAL
4 l.l. SiJMMARY
5 A, Sectian �ncludes:
fi 1. General requirements for the preparatinn, subrnrttai, updating, status reporting and
7 managernent of tl�e Canstructian Frogress Schedule
8 2. Specific requirements are presented in the City of Fart Worth Schedule Guidance
9 Doc�ment
IO B. Deviations from this City nf Fort Worth Standard Specification
11 1. None,
12 C. Related Specification �ections include, but are not necessar�ly limited ta:
13 1. Di�ision 0— Bidding Requirements, Contract Farms and Conditions of the Contract
14 2. Division 1— Generai Requirements
15
16
17
1&
19
20
21
22
23
24
25
26
27
28
29
30
D. Purpose
The City af Fart �Vorth (City) is committed to delivering quality, cost-effective
infrastructure to its citizens in a tzzxxely manner. A lcey tool �o achi�ve �his purpose is a
properly structured schedule with. accura�e updates. This supparts e�fecfive monitaring
o� pragress and is input to critical decis ian making by the project manager throughout
tlae life of the praject. Data from the updated project schedule is utilized in s#atus
reparting to various levels of the Ciiy organization az�d the citizenry.
This Doeutnent complements the City's Standar�iAgreement to guide the construc#ion
contractor (Contrac�ar) i� preparing and submitting accepta�le schedules for use by the
City in project de6very. The expectation is the performance of the work follovvs the
aceepted schedule and adhere to the cnntractual timeline.
The C�ntractor will designate a qualified representative (Praject Schedul�r) responsib�
for develaping and updating the schedule and preparing status reporting as required by
the City.
31 1.2 PRICE .AND PAYMIIVT PROCIDURES
32 A. Measurement and Payment
33 l. Work associated with this Item is considered subsidiary to the variaus items bid.
34 No separate payrnent will be a�lowed for this Item.
35 2. Nan-compliance with this specification is grounds for City to wi�hhold payment of
36 the Contractor's invaioes until Contractor achieves said compliance.
37 1.3 �tF,F+'H:RElVCES
38 A. Project 5chedules
C7TY OF FORT WORTI-1
STANDARD CONSTRUCTION SPEC]FICATTOIV DOCLTIvIENTS
Revised August l3, 202i
2D22 Bridge Rehabilifation Contract 2
Ciry Prnject no. 1030.56
ot 3z�s-z
CONSTRUCTIONPROGRE55 SCHEDIIL�.
Page 2 of 10
1 Each prnj�ct is rc;presented by City's master project schedule that etacosr�passes th�
2 entu'e scope of acti�ities en�is ioned by tne City to properly deli�er the work. When the
3 City contraets wi�h a Contractor to perform construction of ti�e Woxk, the Coniractor
4 will develop and maintain a schedule for their scope of work in alignment with the
5 City's standard schedule requirements as defined het`ein. The data and information of
b each such schedulewilI �e leveraged and becnrne integral in the master project
7 schedule as deemed apprapriate by the City's Project Control Specialist and approved
8 6y the City's Project Manager.
10
I1
I2
I3
14
IS
16
17
1$
19
24
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Master Project Sck�edule
'I'he m.aster project schedule is a hoiistic representation of the scheduled activities
and milestones for the total project and be Critical Path Method {GPM) based. The
City's Praject Manager is aecountable for o�ersight of the development and
rt�airnaining a master project sck�edule for each project. When ihe City contracLs for
the design andlor construction of the project, the master pro�ect schedule wiil
incorporate elements ofthe Design and Canstruction schedules as deemed
appropriate by the City's Project Control Specialist. The assigned City Project
Contral Specialist creates and maintains the master projec� schedule in P6 (Gity's
scheduling software).
2. Construction Schedule
The Contractor is responsible for developing and matntanling a scheduIe for the
scope af the Cnntractar's contractual requirements. The Contractor �vilI issue an
initial schedule for review and acceptan�e by the City's Praject ControI Specialist
and the City's Proj�ct Mana�er as a baseline schedule for Con#ractor's scope of
work. Contractot' uvill issue current, accurate updates af their sck�edule {Progress
Schedule) to the City at the end of each month throughout t�e lifa af their wQrk.
B. Schedule Tiers
The City has a portfolio of projects that vary widely in size, complexity and content
requiring different sc3�eduling to effectively deIiver each project. The City uses a
"t.iered" approach to align the proper schedule witk� the criteria for each project. The
City's Project Manager determines the appropriate schedule tier for each praject, and
includes that designation and the associated requirements in the Contractor's scope of
work. The fo[lowing is a summary of t11e "tiers".
36 1. Tier 1: 5ma11 Size and Shart Duratiar� Project {design not required}
37 T�e City develops and maintains a Master Project Schedule for the praject. Aio
38 schedule submittal is reqLiired from Coritractor. City's Project Cantt'ol5pec[alist
39 acquu•es any necessa�y sehedule status data or information through discussions with
40 the rasp�ctive party an an as-needed basis.
41
42
43
44
45
46
47
48
49
2. Tier 2: Small Size and Short to Mediurn Duration Project
The City develops and maintains a Mastar Project Schedule %r the project. The
Cflntractor identifies "start" and "finish" milestone dat�s on key elements of the�r
w ork as agreed w itY� tf�e City's Project Manager at t�e kickofi oi their w ork effart.
The Cantra.ctor issues to the �ity, updates to the "start" and "finish" dates for such
milestones at the end of each trzonth thrnughout the life of their work on the project,
3, Tier 3; Medium and Large Size and/or Complex Projects Regardless of Duration
CT'1'1' OF T�RT WORTA 2022 Bridge Rehabilitation Contract 2
STANDAIZD C�1V5`TRUCi'ION SPECIFICATTQN QOC[IMENTS Cily Prajcet no. ]03456
Revised August 13, 2D21
O1 3216-3
GOI+ISTRUCTION PROGRESS SCHEDULE
Page3oflD
1 The City develops and mauitains a Master Project Schedu�e for the project. The
2 Contractar develops aBaseline Schedule and maintains the schedule of their
3 respectiv� scope of work on the project at a level of detail {generally Le�el 3} and iri
4 alignment with t�e WBS structure in Section 1.4.H as agreed by the Praject
5 Manager. The Contractor issues ta the Ciiy, updates of their r�spective schedule
b (Progress Schedule) at the end of each month throughout the life of thev work on khe
7 project.
8 C. 5chedule Types
9 Project delivery for the City utilizes twa types of schedules as noteei below. Tlae City
1D develo.ps and manitains a Master Project Schedule as a"baseline" sclledule and issue
I 1 monthly updates to the City Project Manager (end of each month) as a"progress"
l2 schedule. The Cantractor prepares and submits each schedule type to fulfill their
13 contractual requirements.
14
15 1. Baseline Scheduie
16 The Contractor develops and submits to the City, an initial schedule for their scope
17 of work in al�gnment wit� this specification. Once r�viewed and accepted by the
18 City, it b�comes the "Baseline" schedule and is the hasis against which aIl progress
19 is measure.d. The basaline schedule will be updated when there is a change ar
20 addition to the sc ope nf w ork impacting tk�e duration af the w ork, and only after
21 receipt af a duly authorized change order issued by the City. In the event progress i�
22 signi�cantly behind schedule, the Ci�y's Project Manager may authorize an updaie
23 to the baseIine schedule to facilitate a mor� practical eva.luation of progress. An
24 exampl� af a BaseGne Schedule is pravided in Speci�ication O l 32 16. i
25 Construetion Praject Sehedule Baseline Example.
26
27 2. Progiress Schedule
28 The Contractor updates their schedule at the end of each month to represent the
29 progress achieved in the work which includes any impact from authorized chalages
30 in the work. The updated schedule must accurately re�lect the current status of �he
31 work at that point in time and is referred ta as the "Progress Schedule". The City's
32 ProjeetManager and Praject Control Specialist re�+iews �nd accepts each pragress
33 schedUle. Tn the �vent a progress schedule i� deemed not acceptabla, the
34 unacceptable issues are identified by the City within 5 working day�s and the
35 Contractar must pro�ide an acceptable progress schedule within 5 working days
36 after receipt of non-acceptance �otification. An exanlple of a Progress Schedule is
37 provided in Specificatian 41 32 I6.2 Construction Praject Schedule Progress
38 Example.
39 D. City Standard Schedule requn•ements
40 The following is an ove�view of the methodology for deVeloping and maintaining a
41 schedule for delivery of a project.
Cl'I'Y OF FORT WORTI-1 2U22 Bridge RclaaUilitatiaR Cantract 2
STANDtLRD CO]NSTRtlCI'I03+! SPECIFICATI�1+1 DOCUMENTS City Praject no, 103455
Revised Atigust 13, 202.1
O1 32 16 -A
CONSTRUCTIDNPROCiRl;SS SCHEDULE
Page 4 of 10
1
2
3
4
S
6
7
8
9
1Q
11
12
13
1�F
15
16
17
18
19
20
21
22
23
24
25
�.s
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
�4
45
46
47
Schedule Framework - The schedule will be based on the defin�d seope of wark
and fallow the (Criiical Path Metl�adology) CPM method. The Contractor's
schedule will align with the requ�rements ofthis specification and wiIl be cost
lor�tlerl ta reflect their plau fox executian, Complianee with cost loading ean be
provided with traditional cost loadiug of line items OR a projected cost g�r
month for the prpject when the initial schedule is snbrnitted, ugdafed on a
quaY-t�rly basis is si�nificant change is aniicipated. Overall schedule duration
w ill align with the conta•actual requirements for the respective scope of work and be
reflected in City's Master Project Schedule. The Project Number and Name of the
Project is required on each sch�dule and must match the City's projeet data.
E. Schedule File Name
AlI schedules submitted to tlae City for a project will ha�e a file name that begins with
the City's projecl number follnwed by the nr�me of theproject followed by haseline {if
a baseline schedule) or theyear antl month (if a p��ogress schedule), as shown beior�v.
� Bas�line Schedule File Name
�'ormat: City Projec#Number_ProjectName Baseline
E�ample: 101376 NorthMantgomeryStreetHMAC Baseline
• Progress ScheduleRileName
Format; City Froject Number Project Name YYYY-MM
Example: 101376 North Montgomery Street HM11C_2018_Q1
o Project Sehedule Progress Narrati�e File Name
Format: City Project Number Project Name_PN I'YYY MM
F�cample: 10137b North Montgomery Street IIMAC_PN 2p 18_O 1
P. Schedule Templates
The Contractor will utilize f�ae relevant sections from tha City's templates pravided in
the City's document managament system as the basis for creatingtheir respective
praject schedule. Specifically, the Contractor's schedule will align with the layout nf
the Construction section. The iemplates are identified by type of project as n:oied
below.
� �lrterials
� A�iation
• Neighborhood 5treets
� Sidewalks (tater}
� Quiet Zones {]ater)
� Street Lighis {later)
e Intersection Improvements (later)
� Parks
� 5torm �vater
0 5treet Maintenance
o Traffic
o Water
48 G. Schedule Calendar
c��r� o� rox�- wox�rx
STANDARll CONSTi2UCT[QN �PECIFICATIOI+I DOCUMENTS
Revised August 13, 2021
2022 Bridge Reha�iIitation Contract 2
City Project no. ]03�}5G
U1 321G-5
CO7VSTRUCTIOI�IPROGR�3S SCE�DUL.�
Pagc 5 af ] 0
1 The City's standatd calendar for schedule de�elopment purposes is based on a 5-day
2 workweek and accounts for the City's eight star�dard holidays (New Yeats, Martin
3 Luther King, Memorial, Yndependence, Labor, Thanksgi�ing, day after Thanksgiving,
4 Christmas). The Contractar will establish a sclledule calendar as part of the scheduie
5 development process and provide to the Project Cnntrol Specialist as part of the basis
6 for their schedule. Variatzons between the City's calendar andth� Contractor's
7 calendar must be resolved prior to the City's acceptanee of their Baseline pxoject
8 schedule.
IO H WBS & Milestone Standards far Schedule Develapment
11 The scope of work to be accomplished by the Contractor �s represented in th� schedule
12 ir� the form of a Work Breakdown Structure (WBS). The WBS is the basis %r the
13 c{avelopz�aent of the schedule activities and shall be imbedded and depicted in the
14 schedule.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
sa
31
32
33
34
35
36
37
38
39
4a
41
42
43
The follawirzg is a su�nmary oftlie standards to be %llowed in preparing and
maintaining a�ch�dule for project delivery.
1. Contractor is requ�ed to utilize the City's WBS structure and respective
pro�ect type template for "Constructian" as shown in Sectian 1.4.H be�ow.
�,,ddifional activities may be added to Levels 1- 4 to accozz�madate the needs
of the orgat�.izatzon e�cecuting the work. Speci�icaIly the C.ontractor will add
activities und�r WB5 XXXXXX.8Q.83 "Construction Execution" that
delineates the acti�vities assoeiated with the various components ofthe work.
2. Contractor is required to adhere to the City's Standard Milestones as shown
in Section 1.�.I below. Contractorwill include additional milestones
represen.ting intermediate deliverables as required to aecurately reflectthe�r
scope of vvork.
I. Schedul� Aetivitie�
Activities arethe discrate elements of work that make up the schedule. They will be
arganized under the umbrella of the WBS. Activity descriptions should adequately
describe the activity, and in same cases tl�e extent of the activity. Ali activities are
iogically tied uvith a predecessor and a successor. The only exception to thi� rule is for
"project start" and "pro�ect fini�h" miiestones.
The activiiy duratian is based on the physical amount of ivork to be performe�i for the
stated activity, with amaximum duratzan of 20 working days OR a continuous activity
in one location. Ifthework for any on� activity exceeds 20 days, break�hat activity
down incrementally io achieve this duration constraiu�t. Any exception to this requires
review and acceptance by the City's Project Control Specialist.
44 J. Change Orders
45 When a Change Order is issued by the City, the impact is �ncarporated into the
46 previously accepted baseline schedule as an update, to clea�rky show impactto the
47 project timeline. The Contractor submits this updated baselin� schedule to the City for
C1TY OP PDRT WQRTH 2622 Brsdge RehaUilitatioR ContracE 2
STANI?ARI] CONSTRUCTiON SPECIF'ICATION DOCUM�NTS City Project no. 103A56
Revised Augusf 13, 2021
01 32 16 -6
CONSTRUCTIONPkLO.f3R�SS SCi�DULE
Pagcbof]o
1
2
3
4
5
6
7
8
9
10
11
az
33
14
15
16
I7
18
I9
2�
2l
22
23
24
25
26
27
28
29
30
3I
32
33
34
35
36
37
38
39
40
41
42
�}3
�
45
46
47
review and acceptance as described in Sectian 1.5 below. Updated baseline schedules
adhere to the fallow ing:
1. Time extensions associated with approved cantract modifications are [irr��ted to the
actual amount of time the project activities are anticipated to be delayed, unless
o#hervvise approved by the I'rogram Manager.
2. The re-baselined schedule is submitted by the Contractor within ten workd�ys after
tk�e dafe o� rec�ipt of'the approved Change Order.
3. Th� c�anges in logic or durations approved by the City ar� used to analyze the impact
of the chan�e and is included in the Change Order. The coding �or a new activiiy(s)
added to the schedule for the Change Order includes the Change Order nurnb�r in the
Activity ID. Use as ma�ly activities as needed to ace�rately show the work of the
Change Order. Revisions to the ba�eline schedule are not effective until aceepted by
the City.
K City's Work B��eakdown Structure
WBS Code WBS Name
XXXXXX Praject Name
�X.3Q Design
XXXXXX.30. T 0 Design Cantractor Agreement
X��.XXXX.30.20 Conceptual Design (30%j
XXXXXX.30.30 Preliminary Design (64%}
X�XX�X.30.40 Final Design
X��XX.30.50 Environrz�etatal
XXXXXX.30.6p Pernnits
XXXXXX.30.60.10 Permits - Identification
XXXXXX.30..6fl.20 Permits - Review/Approve
XXXXXX.40 ROW & Eas�ments
XXXXXX.40.10 ROW Negotiatians
XXXXXX.40.20 Condemnation
XXXXXX.70 Utility Relocafion
XXXXXX.70.10 Utility Relocaiion Co-ordination
XXXXXX.$0 Constraction
XXXXXX.8Q.8I Bid and Award
XXXXXX.8Q.83 C.onstruction F.�:ecution
�XXX3�. 80.85 Inspection
XXXXX��.BQ.$6 Landscaping
X��A'X.90 Claseout
XXXX�X.90.10 Cnnstruction Contract Close-out
XXXXXX.9a.40 Design Contract Closure
L. City's Standard Milestones
The following milestone activities {i.e., important events on a project that mar� critical
points in time) are of particular interest ta tha City and mUst be ref[ected in the project
schedule for all pi�ases af work.
CITY pF FQRT WORTI-I
ST�.NDARD CONSTRUCTIQN SPECIFICATION DOCUMEAi`C5
12evised August 13, 2021
2022 Bridge Rehak�ilitation Contract 2
Cl� PCD�EGt rip, �{��aS(7
Ol 3216-7
COTTSTRUCTIOPI PROGRESS SCHEDULE
Pa�e 7 af 1p
1
2
3
4
5
G
7
8
9
1p
11
12
I3
l4
15
16
17
18
19
2[l
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
A2
43
44
45
46
Activit_y iD Ar.tivity Nam e
Design
3Q2Q Award Desig� Agreement
3040 Iss�eNoticeto Proceed - Design Engineer
3100 D�sige� Kick-off Meeting
3120 Submii Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water,
Water & Sewer
315D PeerReview Meeting/D�sign Review meeting (technical}
3160 Conduct Design PubIic Meeting #1 (required)
3170 ConceptualDesignCo�nplete
3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traf%c,
Parks, Storm Water, Water & 5ewer
3250 Conduct Design Public Meeting #2 (requi�ed)
3260 Preliminary Design Complete
3310 Submit Final Design to Utilities, ROW, Traf�c, Parks, Storm Water,
Water & Sewer
333Q Cnnduct Design PubIic Meetzng #3 (if required)
3360 Final Design Complete
ROW & Easements
4000 Right of Way Start
4230 Right of Way Complete
Utility Relocation
70Q0 iltilities Start
7120 Utilities Clearecf/Complete
Construction
Bid and Award
8� 10 Start Advertis ement
8150 Conduct Bid Opening
8240 Award Construction Contract
Construction Executian
8330 Conduct Construciion Public Meeting #4 Pre3-Constructian
$350 Canstruction Start
8370 Substaa�tial Completion
85�4b Canstruction Cornpletion
9130 Notice of Completion/Green Sheet
9150 Gonstruction Coniract Closed
9420 Design Contract Clased
1.4 SUBMITTALS
A. 5chedule Submittal & R�view
The City's Project Manager is responsible for reviews and acceptance of the Cantractnr's
schedule. The City's Project Control Specialast is responsible for ensuring alignment of
the Contractor's baseline and progress schedules with the Master Pro}ect 5ahedule as
suppnrt to the City's Project Manager. The City review s and ac cepts or rejects the
schedule wiihrn ten workr[ays of Coniractor's submittal.
CITY �F FORT WORTTi
STANDARD CONSTRUC'I'ION SPECIFICATION DQCUMEIYTS
Revised August 13, 2021
2422 Bridge RehaUiiifation Contract 2
City Project na I43h56
0.1 3216 -$
CONSTI2UCTION PRQGRESS SCI-iEl]ULE
Page 8 of l0
2
3
4
S
G
7
8
1. Schedule Farmat
The Contractor vvilf submit each scheduIe in two electronic forms, one in native file
forinat (.xer, .xml, .mpx) and the second in apr�farmat, in the City's dacument
management system in the location dedicated for this purpose and identifed by t�e
Project Manager. In the e�ent the Contractor does not use Primavej'a Pb or MS
Project far scheduling purposes, tl�e schedule informatian must be submitted in.xls or
.xlsac format in compliance with the samp[e Iayout (See Specif'ication al 3215.1
Construction Praject Schedule Baseline E�ample), including activity pred�cessors,
successors and total flaat.
10
il 2. Inrtial & BaseIine 5chedule
i2 The Contractor will develop th�ir schedule for their scope of work and subnlit thear
13 initial schedule in electronic form (in the file farmats noted abo�e), in the City's
14 docuznent managerraent systerr� in the lncation dedi�ated for this purpose atleast 5
l5 working rlrays priar to Pre Co�estruction Meeting.
16
I7 The City's Project Manager and Project Control Specialist re�iew tk�is initial schedule
IS to determine alignment with the City's Ma�ter Praject Schedule, including farinat &
I9 WB5 structure. Following the Ciry's review, feedback is provided to ihe Cantractor
20 for their use in finalizing the�r initial schedule and issuing (wrthita ftue workdr�s) their
2l Baseiine Schedule for firaa] review and acceptance by the City.
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3G
37
3. Progress Schedule
The Contractor will update and issue their project schedule (Progress Schedule) by tfie
lrrst �lrcy of ench month throughout the lif'e ot'their work on the project. The Progress
Schedule is submi�ted in electronic %rm as noted abave, in the City's document
r�anagement system iri the location dedicated for this purpose.
Tha City's Praject Control team reviews each Progress Schedule for data and
in�ormation that suppdr� the assessmentof the update �o the schedule, In tY�e event
data or information is miss�ng or incomplete, the Project Contrals Specialist
communicates direct[y with the Contractor's scheduler for providing same. The
Contractor re-submits the corrected Progress Schedule within S warkrlray,s, follnv,ring
the submittal process noted above, The City's Project Manager and Project Contro]
Specialist review the Contractor's progress schedUle for aeceptance and to monitor
performance and pragress.
38 The fallow irig list af items are r�quired to ensure proper s�atus information is
39 coz�fai�ed in the Pragress Sch�dule.
40 • Baseline Start date
41 • Baseline Finish Date
A�2
43
44
�5
46
47
48
49
o % Complete
o F1oat
p Activity Logie {dependencies)
� Critical Path
• Activities add�d nr deleted
• Expected Baseline Finish date
� Variance to the Baseline Finish Date
C1T'Y O�' PORT WORTH 2O22 Bridge Rehabilitation Contract 2
STANDARD COI�ISTf2UCT'T�N SI'EC�'iCATION DDCUMENTS Ciry Froject no. 103456
Revised August 13, 2021
Dl 3216-9
CONSTRiTCT[ONPROGRESS SCHED[TLE
Page 9 of 10
1
2
3.
4
5
6
7
8
9
B. Monthly CQnstruction Status Report
The Cantractor submits a written status repart (referred to as aprogress narrative} atthe
inanthly progress meetuig (if monthly meetings are held} or at the end af each rnonth to
accompany the Pra.gress Schedule submittal, usi��g the standard formai provided in
Speciiication �1 32 16.3 Construction Project Sched�ale Progress Narraiive. The c.ontent
of the Construction 1'roject Schedule Progress Narrative shauld be concise and caxnp�ete
to include only changes, delays, and anticipate� prablems.
C. Subznittal Pracess
10 o Schedules and IVlonthly Construction Stafus Reports are submitted in in the City's
11 document management syste�n in the location dedicated far this purpose.
12 • Once the project has been camp�eted and Finai Acceptance has been issued by the
13 City, no further progress schedules or consiruction status reports are required from
14 the Contractor.
15 1.
16 l..S ACTiON SUBMI'ITALS/INFORMAT�ONAL SUBMITTALS INOT T�SEDj
17 1.6 CLOSEOUT SLTBMITTALS [NOT USID�
I8 1.7 MAINI�IANCE MATE[2iAL �USNaTTALS [NOT USID]
19 1.8 QUALITY AS�UItANCE
20
21
22
23
24
2S
A. The person preparing and r�vising the construction Progress Schedule shall be
experienced in the preparation of schedules of similar complexity.
B. Schedule and supporting documents addressed in this Specif'�cation shall be prepared,
upda�ed anci revised to aecurately reflect the performance ofthe can�truction.
C. Contractor is res.ponsible for the quality of all submittals in this section meetingthe
standard o�care for the construction industry for similar projects..
26 1.9 DEL�VERY, S'PORAGE, AND HANDLING [NOT USEII]
27 i.10 FIELD jSITE] COI�IDITIONS [NOT USID]
28
29
30
3I
32
33
1.11 WARRAN"I'Y [NOT USIDj
1.1� ATTACHN�NTS
5pec O1 32 I 6.1 Construction Project Schedule Baseline Example
Spec Ql 32 16,2 Construction 1'raject Sehedule Progress Example
Spec 013216.3 Construction Project Schedule Pro�ress Narrative
CI"fY QF FORT WORTH
STANDARD CONSTRUCTfO1V SPEC]FICATION 1]OCUMENTS
Revised Augusf l3, 2fl21
2D22 Bridg� Rcha6ilitatian Cnntraet 2
Cit� Praject na. 103456
O1 32 16 - 30
CONSTRUCTION I'ItOGItESS SC]-IEDiII,E
Page 10 aP 1D
PART 2 - PRODUCTS [NOT USID]
PAR'P 3 - ��Ci]TION [NOT LTSED]
4
II�ID OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
8113/2a2I Michae] Orren Revised to updatespecification requirements and eliminate dup.licate schedule
specifications.
C1TY OF Fqlt'1' WpRCH 2O22 Bridge Reha6ilitation Contract 2
STANDARD CONSTRUCTIQN 5PECIF'ICATION DOCUM�NTS City Project no. 103456
Revisad August 13, 2021
Qi 32 16.1
COhISTFtUCTIONPROGRE55 5CI3EIJULE—BASELIIVHEXAMPL�
Page 1 of 5
1
2
SECTION 01 3� 16.1
CONSTRUCTION SCHEDULE — BASELINE EXAII�LE
3 PART 1 - G1�Nl+:I�tAY,
4
S
6
7
8
9
ia
11
12
13
14
15
16
17
18
19
2D
zi
z�
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
The following is an example of a Contractor's projeet schadule that illustrates the data and
expectation for schedule con�ent depicting the baseline for the project. This version of the
schedule is referred to as a"baseline" schedule. This example is intended to pro�ide
guidance far the Contractor when developing and submitting a base�ine schedule. See CFW
Specifcation O1 32 16 Construction Schedule fo.r details and requirements regarding tk�e
Contractor's projectschedule.
CI'I'Y OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMCN7'S
Revised August 13, 2021
2022 Bridge Rehabilitation Contract 2
City Projec! na. 10345G
O1 32 I6.1
CONSTRUC7'IONI'ROGRFSS SCIIL.DULE—BASELINERXAMPLE
Fage 2 of 5
u
w
� �
� o
� •-
-� �
b ro
� �
.�
�
'�
.�
�
�
�.
�
�
�
�
�
�.%
�
��
�
�
� �
� �
� �
� �
I u
�O
1— �
�
m
�
0
�
�
�
�
_y
�
� q ��c3jp c1 �
Ns
_ �' -I _ _'
� I �
w � �
� � a ,-
"a� � ° `�w ni '.. m
Oip O Oi❑
' tl ' tl Cl [�1 , f
ro'm � a�'�a�
� �� �r,�, .� �m
� � � 4 ; i 'n�'.
N ���� �
m .a .. � � w
rysa I� N• � iPil
�. � � i c� � �.
a a �i ,. w: i :+�i
Mtl t� � �-�e`I
� i �� � w �ti
�i
p'
d��
n
�
o ,�
� � .
�
w
�
c,
qqG
i � G
F
4
p �
y
�� �4
� � W
����
p �� �
s � t�
� o � �
w� z n. �
n yi �n .- n
� m n� �I �� s� �
�m
i N'C] 5�'t3 f: r.}.C�Y ��y _. Ja G� 4� 4 '�1.
} '' h^ r`i 9�^ � f� �. I= iL �r� � i� i
�1 � �p. IJ i0
�i .s i� � .. ; � 4 �= �^, �� �1 � H i Nr �� � u � i �
'�n :i �i. i�- s , -
•� I' f�7 7' iM +] i'•1 r� � �6 M r^ 'I � iH i i+t r � �� ;�
N p.] e p "O* j a '� A� `s n� T n ite i} in �o t��- i rn ry
M
.m �,o -i '-�, �n � :� m ri m„' i; n M.1 �, .
�5 �n �n .. q, �a . �ry �n? � ra ro � µy m m m
�'+ a:� �� , i � �� � �o v a� o o n n u r� o,',�a" F ��& �� o
�i $' V` r� ,� '� r ry k' �.c� N.M w r.� .M ri ry
�j z �" �, � � • �' r '� �C �k r '� `� a
'i�� � 7� ,%�p 7 7 q�+ ^��i � �Y � ^� i i# � '' .Y � i •y � � a $ Q �. ¢ o o �,�5
o� n 'p �u : d �:� y- d.a S r; .rS n di iL h�, '� ;- c.� ��� �
�•, :a ❑ r a r� r.
03 v i^i w IXl .O r x� '� i„ �p ��i �. r� m �W� Np Wp�. �., �a .a u1 ��. Oo .p �
�ry n n T' i'1 �� ri 7r rj r' Clj .�.� Gj i� '1i� rvlkCj 1-! el i�~ 1�1 i N N�4 ['i �^I
.'", �' q � � s" i i �,�r ,i �` �' 4 y � � � � L{' �� � y '� '.} o �
� � � i � �f � � cn �6 � �` 7 'h 7 a � # 1. � {% 4 Y Z z �
. � :; . �� i�i`c+.n rvoiv ,�, ."",� � ro r.v Mo b� °':oi.+`� m
�� +� 'I �a �,�y in �;r I�i id. ��� iO { �O .� irVl- VY 00 ilt ��� V] N ry�ry i,'] �� �}
Ci �
Ct �y
tl , '� i� � ;�� 4i � ei In � 47 � ..r ' � �� �'# Y] � �1 �? i� �i 41 �1 'ry I, � w
�
� � � � � � �
y, �
�{ � yi ol � tl A'I� I i �
L" N a ii ru � �*i r
���r� , � � �''��� � ;
. F � � n � u
� f1 C 3� ��. � p� o g �� r5�, ��i i7 q� o�' ry
s � � � q_ y S m is. i+ � };Q g �� ro i
�'� t � a�a i � F b. E h= � q 14 'u �
PF � �'� �� �'� ���:, ��. � {� �� � r* '3 �' '9 .I'-' t �u w n" � �3 ti
L. � o� rJI � uf i� Ga �� h � s� y Mi, d rt t W� u m io1. �1+'4
�R �� • r� � n n{ i`�9� � � i� M MI �I +" M� � M/ M! i'I �'i �"1 .f �
� } h a
u: �n rrr �
CITY OF FORT W012TH
3TANI�A,RD CONSTRUC'T[ON SFECIFICATION TJOCUMENTS
Revised August 13, 2Q21
�
�i
�
�
�
�
�
� �
� p _
X 1 �S
b�
� F'
��/� �
V I Ql
"{+ �
@ �
� �
�
�4 �
�QI QI
i� �
F+N �
�
�
�/ �
Y�u%
�
�a
� �
� � �
� ��i' �
�
F�
Q
� �..% 4+
� '� .
� � �
.�
0
�rn
� C
4 �
� � �
3 � C3"`
"c
� � ro
E ,'.��
� � �
� � I
2022 Hridge Reha6ilitation Contract 2
City Project no, 103456
Ol 3216.1
CONSTTtUCTYONPROGI2ESS SCHEDULE—BAS�LINE�XAMPLE
Page 3 of 5
1
Z
cv
r
C�
N �
�
� �
� �
N �
.. d
�
��
4
�p
R.
�
�
^.'�
�
�
�
l.�II
�
�
.�
�
; ' I ' s
-----'--'"'-"—�""""--`------�--' -------�-----...
»�...._.�_..---�--------'!•--•-'-'-•"'-'•..-------'----------�---_._.......»._..W--•--- -----"-'-'--'----' ----------r-----
! � ! I � � k � I [
.. ., �: .al�` �i �`o ,"n`� �i� : ., .,,�,� �;�,e���-.� �_ ���,u � - o us ra ca raln W e � �: "I o � '
� I
- -.� -- ,
_ �. _..
y� o
i�: ' i � sn
�ry� �J i� fj -- �.: �� r� 0�1� o
..j ':� °�' .. r�l '.. n a P� .,� 6; �+C :; ��k ., 'i �;� �'� �%� o m' a� m zo rn .�. ���
—! �..
' iy - -
i,
.m
�o '
w ' �M1 C]
[ � ��
N 40 {, p �
�] y 1S]J � 6�� O Q� C�rJ�� � �n:� m��h �' I+ W� O Ay IQpIt�'! � lY M �I fJ
� f�*' ^] �'�1 r3 MI .� �.\ }j iS �: �h � � 5 i j i M ix .i M M�. M�-0�G �� NW N _.
f� �1 W #3 d0 O 0 O C� .1 � p� �Yi O� w O� �
P� N o� �:��u - n o x' a'A �. F� �}; r�� ~ ia a n:. �� -� F`F `� ���; o n ;S :� Q �t
h � S 1y $ F � � �� � i� t4 fi a a `i ' � � m `.. "i g 1� . '= i�' � �_ a � � ; � �
�,� � i� c� ��'}, o a ri 7 c'� _ Ct V a o_i `� -g a�:r 'F 'F T�r �? p� y
d A� " � � �1� N �i n : t� -� i, �i�n ;; ,,°°y i� hi .� - o � ��: �. � � :�: M � i� ti r'- +a �,v _
- — 'I
�� c. ,,, ,� .� .. o� .. �: ,, � LL.- ro. -� �r. � �i� �. -.� w m �. �: Y� r.�� � �� .��
�:I.� n� i r.� � in ;V rvi c� :1 a°F `i � n;.� Fi �,..• v i. � � �. ': `;i :7 e4'i ii n% a; n+i
Y. u vi �1} � � 2 n ?� c �i Y a � u' � rY ;f� �j rS �� � R � � � � 'J ti � �
� L p � C` N � �� T ^ y� � � Sls � � � 1_ L.' 7 W�' �.Y d � � '' �S � p � b � CF �
�� u7 _ rj i. n gl �.� n� i n cv - a
?.r m-� h', ���� � c a¢� �� „ u.z ��r �F � u o.� � u n�� M � �r m� ��� ��. +n ,4,
o�-
, � �. �. � .. w. ��.� ^.�, „� � � _ � � " ��. � � � }S f1 r "ll'�k� 'r� � �� - 4+ �'i %� x. .� ti �i
�
�
�
G
'�
�
Q ~
� �
� �
Yf �
� �
d
. � ,S�
� �
� �
� �
•J� 1/'S
F� �
i �
�
r-E
�
�
�
II
I I I I
�
> �
.�j �
� �
�
� �
A7
� �
l�
� m
I �
� �
� �
�
� �
ni �
n' � �
M � {u
I I ��� � �
`� `� � � V U
�E 4 � � $oa
s y � �. �
� ��� �
,� a �. �
{�
. y�d !1 E n n + O $ �
Y � �
� � �:� � �u � e �
' � v+ �F = i.; � � e� � � �
�a � � �G ,�
� U ���' � , � . �
�- ,��.. ,� ��'��' �. � L ,
!: �'I �' • n � !�I �� f i ip » v ^ `i 4 � � 04' O G
n" : 7 .��- g. � � ' ` a �� +� p � C,,,, *�' g ,�., a -' � ' � � � � ""ry F4. '� � �
� 4�. � '� � � ? � Y E n : . ao �n n � �7 ^ _. �� r, E 78 � � � i �' � Q � 0.�
m � F. �. r� � I � � � b � � � � �'s a+ � ,� .� p[
� � r iii .i � � �% n � I� � i�' �i '� �= .i '� m � i�a w_ � G r .i � ' �7 � y� x c}J{ �
.� cF u � �� u -� �u s+ y n CF � .", rn c � � � � }� [' � � ;P
i7 � .'� � i: � �; �; :� � � � ^ ;' �: � 'ti �' � �' " � :� :�� ��' � � � � � ,� � m y,; � t i
a �� ��1 Q� I
�.� w ' �n "a m � m U
�I � I �
CITY OF FpRT WORTfI
STANI3ARD CONS'I'[2UGTION SPECIFICATION DQGiI�1�IENT5
Revised August l3, 2021
2022 Bridge Rehabilitatinn Conkract 2
Cily Praject na. 10345fi
01 32 ]6.1
CONSTRiTCTIOI�IFROGRE55 SCHEDUL�—BASELINEEXAIviPLE
Page�lof5
CITY OF FORT W'qRTH 2O22 Bridge Reha6ilitation Confract 2
STANT7AKD CbNSTRUCI'ION SPECIFICATIpN DOCUMENTS City Projeet no. ]03456
Revised August 13, 202]
oi �a�6.�
COIYSTRi1CTION PILOGRE55 SCHEDUL�--BASELINE SXAMPLE
Page 5 af 5
1 IND OF SECTiON
Ravisivn Lag
DAT� NAME SiJMMARY O�' CI7ANGE
JuIy 20, 2018 M. 7arrell initialIssue
May 7, 2021 M Ow�n Revised name due to revising the scE►edule specifcation
CITY QF FbRT WOCiTH 2O22 Bridge Rehabilitation Contract 2
STANDARD CONSTRUCTION SPEC�'ICATI03V DQC111V1ENT5 City Yraject no. 103456
Revised August 13, 2U21
4l 32 16.2
CONSTRUCT'ION P120GRCS5 SCHEDlILE—PRDGRE85 EXAMPLE
Page I of 0.
1
2
3
4
5
5
7
S
9
IO
11
I2
13
14
15
16
1'7
18
19
20
21
22
23
24
25
26
27
SECTION 013� 16.�
CONSTRUCTION SCHEDULE — PROGRESS E�AMPL,E
PART 1 - GENFItA,L
The follo�ring is an example of a Contractor's project schedule #hat illustrates the data anc[
e�pectation far schedule content depictirig the progress for the project. This �ersion ofthe
schedule i� referred to as a"pragress" schedule. This exarnple is intended to pro�ide
guidance for the Contractai• when developing and subrnitting a pragress schedul�. See
C�'W Specification O1 32 16 Construction Schedu]e far details and requir�ments regaxding
the Contractor's project schedule.
CITY OF FORT VJORTH
STANI7ARD CQNSTRUCIION 3PECIFICATION dOCUMEIVTS
Revised AqgusE l3, 2021
2022 E3ridge Reha�ilitation Contract 2
City Project no. 1D3456
01 32 16.2
CONS7"RUCTIQIV PROGItE55 5CI-�]?ULE—PRDGRE55 EXAMPLE
Page 2 af 4
1
�
�
N �
c '�
� .�-
� �
r� �
ni
�
O
�
�ry �i �i N1N�SY �t
��r �, ra �n o_ . u �t �}'� 4�;� � n'a r,. ri n�� � rf r�p
„ � ,. _ � , i �;: h� f=�f: r
�
�
�
�
�a
�
�+
�
��
�
�p
C�J
4
h
�
�-
� "p� Wp=0pD'0p�.no
ry �I,D! N N'c�l
I }
� ;�� ��-�
i .[ r
m ro's�a .o�u � a6 �a�a e�o
i� �' [Y � � N N
���� ���
� �m IO ^ �O.a
� � �,' � � �
� ,� � � ���
� , � P��
w m,w w w �p��po
� N � LV N
� ���`� ��'�
� �' I � �' a
m o ��. ..� ,.� .� .�. w �� .� �, ��. �. N •, ., �� ��y ��i .� �n � rr i�;� �„ ., .? .i n +n ��- ��
:� � : ��1 31 �� .I �i "+y %i � ;j _� r"n. �• ':; n i � s"�,+ N M " � � n nl
1 �{.� S i ��}�� L� ��.. L-. L� L 5� � q 3 �� � 4!
��i �! '� L+--S,�� .h,�� � � ���,ti{� ��br�����f �� .t
n � .i �' — ii — — v � r .F �e. ci o n n'o ki — �-ti
� �, � r r �. ;y .� .. n 4 .., � W � . m � m � ..� � !n
� :'1 � �F�` �} I� �� :-i :: �� � �� �' ;i Fi � ��a'" :i .`�. o � rc', o ry �/ � :� " ;
]� .1..1.3.".J._. ' _ � � 4i,�Ltq -� � �5��
��'�������s ,�;���J4 9��rl���ry��������� ����
�q.0 2a st b� kl � •� I I � fi f4 a-J }i � L3 � M€
�
�
� v�
�
0
�
C�
�
I� w
V �
��
� ��`��7
� " _
(,%% �d
� �
a �
� �
�
.�� �
/ �
i �
I h.
� F�y
i, ��,
�
�
p� a .i " ��, ��. � �i .. ,'= r �' � " � .. .. { �� ..� ..� .. ... :, w ,�, .�. { .. ., _�
�� � "? '� Ik � ��� w] ;' r. � � i �:� f � � �'f� ��j �p i iy �'.� n n e�',4 `�,v i-i i: c� �i �
,• ti . ,�
Q � � } .�J '* 4 �S � �� � � � p '� '1 � *l' i I il ry � � � y � n � � � V �
�.. � .,.,..�. ��, �,�. .,�., �,.,.,..�,ww���, w ,
& } � � � � { �; �.� �+ �i ^c� � g � i; � " �1i ^1 •�+�I "' �44 �u � � u' n h
���T � t � 2f L. � w � d � � � � � � .7�� t5 � 7� �� � � � � � �
'�3 U' ' � � '�` �4 �� �; .�- y �� ��` .4 JI � { � . ,�- ia' N r� �°
� ,q .r r. f x ��r�=na��r �.
ct F�Fi � a �u�i�i��ii �sluaoao oaaaaq�� � o
�
� �,
._ �
� �
� �
� �
s a
��
�
�
�.,,~ `�
q w S'3IO S1 1:] Ci w ��, ,� ' r�r i� u� � �} , I r � tl � r 4� w ii r� .� �� s� Fi {: L� �� i ��
�•�j n7 Oin� � r M� �y ,r-f�, +} O?'.sj �i � ii� ii�.� �{+ o��.!I �ii il. li• � n'4i �r� N �'! y"i'F'+ I} �� nl �4
.r �
4�
�i
�
U
U7
C
�
^1
�
�
a
I�
a
I�`
I�
� �
i� �
��3' � ��
�:� 6 ��
$��
n �� ��
8 ��o,
� �;� � � ���
�� � �
�;� � � �: �
��i�� ���
N
N �
.4 �
�
� ,G7
� � �
Ql :p[�
�
� l,l U
� � �
4 f �
�
�
�,
L ,�
4 �
� � �
� � �
'e �
�o 'm
� �
d � U
� � �
� ��� �
�- ������ �
� v 9 � i .�� 1J
� � � � � u� w h ,� � �
� � � i's c � c � 9
�" ia �� �i�' ����.�f� a��'4�;j }
� ����t� �1����� ���;���� ,�P,���� �� i
� �� 'rl hW k; v'r.� `x n � *� �t.., � ^ � � �u'i �=' �''- � C'a a� ",q � �, r•
� � � : '� ^. 5C � � :� � � � � � �, � y, .: ,+, ; ��I hl y; � {; i �
�
� � a �
CITY OFFORT W�RTH
STANDARD CQNSTRlICT'ION SPECIFICAT[ON I]pCUf�I�N"I'S
Revised August ! 3, 2021
2022 8ridge Rehabi[itation Coniract 2
Cily Project no. 143456
O1 32 16.2
CONSTRUCTTO?J I�120GItHSS SCHBDUL�-PROGnESS �XAMPL�
Page 3 of 4
i i � � � t �
� i i t � i � � �
w _.._i.-•---•--�-_-__..�.••-••-••-•!-•-••-•• • o--�-•---------,._---�--r.._....
. . .._..--- ' -
� • � � T---•----•,--�—�----,----------•--------- ��--�-------� i i
� t� - +----------�;--�--�-•��-�-----
. ,
- �-- -------- --------- -•----• ---
cy 1 1 � t--------�---•—•...---- �--•-•�----1------•—�----�---1-- �
� Q ""�I'�"�'I_—""' `"""_" `"_"_' i "__'-i _"__'I"._.._..`._..'_"_ _'_""" ' �"_"_""
� I , "'_' "�_"_"_"" �"""""; "
� .�...' ""'_"'" "_"'_' 'I ' """ ' " ' ' '
...�.....�.-r_M1.......�.._Y i j7
� N 1� .Y....... � I i _ ,- - � ` -{"--'-- �L - '-- - �---- --'--� �
� � ' .-,._J.-..-..-,.�..-,--..-1.._......,.�..._.._..l...�....L .........:.............�....__.._ _.ti_.__. _
�`'� � --�---i--------�i---------1----------1--�-- �-..___.i__.---�L .. ..��,--- -':�---- --1--�--�--��-�-
.
.. . , • , -- -- ;
w
� i � ' ,—�-- - ._..._ � _.._... ..... � ._.._
•-�..-� • � - ---•�•--••-- - � ---------�--�--•--
--.-•.. _ ..�..
� � � i i �---- i -.�_.._.._... i.. .. i_. ..ry...
� � , -�---.,-..---------�----•---�---- -----�-----�---------�------------- ------ T- --�-
,
,
----- ----- ------- ------ .. ......... ...--•-- _..._.._. _.._._..
,� . , , , . . ------- - --�--�--�- �--------------------- - - - -- ---
� m rl �� [V [4 cy CI C'1 2�'i'I N�IV i+! CJ CI,N H f'1 rl CJ fY'�SY M[�l N N CV C! Cl,hl C� �� �. �'�'I ['1 [Y'N,Ci Ci,CI � �
� �,
� I
—'— — _ �] O O f.� n 4 tl tl�..—� _.. _.. -. ... � � t O C O'Ca F3 ci O
- - . c� in .n c+�n.n - u -:i
.. , . _. _.. _ .
�� "IM fa`fafa'CtLi �n r n ra,a a o� ' J: � �
�o �'m � ao w o.� ., m w ro �� .. .o m m a� Yi,�r� m- o� m m cn oi r� �., .�� �. �n e� rr,.n�mlw..�..w: 4
o^ E�oo ci b"` oiii�" �i� -' ci '. lo � �
� ; �€�ryNn � ai��}8 ���€����_ €������a J=is�nry�N,�;n��: �
i E "`o i`�� �� �`�, •� m dy.�'��: ��+�-�'5� � �YX �5 �� 1�',��0 �
!�� � ��:� edv � � rv�i fi # iW 1� � � %� �b � � � ry � � ry . „7� � 4 � �' �. +5 �� � ; J, � ���y�h. � r� �"+
� � �� F� �. I :3 '� �, .l � ,}- h � ._.__,_ ._. _ ..... ......... .f �
��~ rv,�� i,v o tl �,� ��.�.� o � 4 IY � e s��� `, ��� M� � N{i' ft s.�i rv+,.^�,....'.� bll ��
� �� ;� � - �9 � �� C.i �
� ��� �.� ���';���i:�������1� ���"�. ������� '�� �; � �
'� . _.... ` __'' _,.i_.;_. _'__—.. ._..;._ i. t � I�
�� w � m m�.i� x. M �e w w m r,i, � a�imlrn�m m. � m y: � m m .,� .�� .. ��� � m a�� a� �n' f� Gd
� y m w �. • ,�, m : •-�
¢ ^ a n S' F �� = e. i a a�,3 c� '" - ,� ea �I
� ��'i� r�ica �e" e�i j'i� � :� � h ;� �`sd�'sv�t�`<`' ������, `��a � Gl'.-,� ry r�in'ai rsra' � "�
a � �� � � � i � �qi �a m S� � � `i �4 �. �J 9 �, ro � � n� 4y' � � �� 'i q ts �i �' �
� !� -� =� r,� ,� �"
r � c�q w�4: �14�4rii:�� ���1.. 'ws��i�3�,r- ��� �'�� ci � n.� M�_��} �Qi �° 43
� r- w w ., .��, n o, c„ rn m m F � m � F�� .. m � R V]
� � e1 �M1 40 4] 0] W 03 a5 ai �w ,�SI u� V� f4 ��� �I 4� � lTi �T �
�1 �9 �ry �` L
� � }�]�� T T Nyy� N �1C{���� � 6'I, t�� n 1`n! N N� C N N[�`i ��1 N N � �Y v ry[� N .� �„ �:
' I�S�f��N�� d1���5��^'��i���u'N����+' ��25��� ��il �i��8� �i,!. fN, ��~ ii
_ _
� ' 1 '
r• � "• __ _.__` �,• �� ' �• �
.._. .
�
0 x� a� -.xr.a�x - r..���r�� xa��aua�� a��r�v�� • � x��.x�� ,
0 oaa oco �. o 0o ao 00 ono n+a�o a rsn nn ��
� �� � ' _ �
�� � L! � .� � � � �, � � .n �� m � �i y� � r� es � �-� � i � � � � r � Ni ��. �: m m'� P c? ' Ir�'d
� o «. � �.n m fl � ;? i:i � �." 'N :� "� n� '� ��• � � ���i;�',� � � Ai `�' �i .. cr � � ., ii �'s �i o �� c� ., I �d
�
C
��y 07
.l7
�
i I � 2-
-= 'r9
� � �
�� � ���
�� � �" ���
�� � s
5 �p�'
� � a � � • m G
U �,� r .���¢� � � Q $
� � N � � =' '�
� � � R � � ��� � � � � �
.._ � � J "�'�, � ��� � � �oP'�� �
cU a �; o�- �� i � 3� � r� e� '� " Y C
a, a� p � °rt�. a ai.'� � � P LL 0 • �"�� � �' '�
� � gr �G S �J � �` � c o �q Ig e �a� � � � � �w S? .� �' �C � �ra
i� ~ z �° �'� er�� �� � � �'a3+��* � ,�'�Ui Tl'8��5��� T � : 4] ^�+� C7 � �
'� �� � ������� �P_ �� '-� ����a�� I�?k��e� ����������� � ,� �
� r e� �n, Zi �" 3�'I-"-9�°'�� 3f n.r..ti r, s�t`3rti�c� �� �p S zCei.. �a
�� � �3 �q 1�� IN� ���,j, Ltl�l c3 ���q M ��I � hM�p LMI5� Y.tl I�y N+f �� .3 r� 4 w! !�i Y uY w � d7 �
� �-' '.� 9� � i+Ye NA I+t Y� �+} � =�1 I� x+� �:� '� �H �i ' i+i �� NI NI r � iSi ' �� J�i W m � i� �
� 1 � C5 C] i�.n1 O
� + M r� m 90 � tN0'� , 4�
� � IG I� i I �
e
�
CIT'Y OF F01tT W QRTH 2O22 Bridge lteha6ilitation Contract 2
STANDAI2D CONSTRUCCIQN SPECIFICATCON DOCUMENTS City Project na, 103k5b
Revised August 13., 2021
O] 32 1b.2
CONSTRL1CTIpN PROGRESS SCHEDUL�— PTtOGRE55 EXAMPLE
Page 4 of 4
1 END OF ST�CTION
Revision Log
DA'I`E NAIV� SUMMARY OFCHANGE
duly Z0, 20] 8 M. Jarrell Initial Tssue
May 7, 2021 ivf Qr�en Revised name due to revising the scliedule speci�cation
C1TY OP PORT WO[ZTH 2O22 Bridge Rehabilitation Cpatract Z
STAI�IDARD CDNSTRUCTION SPECIFICAT101� DOCUMENTS Ciry Project no. 10345fi
Revised August 13, 2021
013 2 16.3
—PROGRESSNARRATIVG
Pagelofl
�ECTION 0132 1G.3
CONSTR�JCTIOfV PROJECT SCHEDUI,E PROGRESS NARRATIVE
Reparting Period: Date Issued:
Project Name: ContractorCompanyName:
City Project Na: CantractorSe�edule Cantact:
City Praject Manager:
A. List of activities changed in the reporting period.
1. (insert te� here)
2. (insert text hereJ
3. (insert text hereJ
4. (insert text har�)
5. (insert text herej
fi. (insert text here)
B. List any potential delays and provide mitigation actions
1. (insert text here)
2. (insert text here}
3. (insert te� here)
C. �.isi arty actual delays and pro�ide recovery actions
1. (insert text here)
2. (insert text here)
3. finsert text herel
Ciiy of Port Worth, Texas
Constru�tion Project Schedule Narrative Report for CFW Projects
Revised August 13, 2021
Page 1 of 1
nt�zs3-i
PREC�NSi'RUCTfQN VIDEQ
Pagc l of 2
SECTION 0132 33
PRECONSTRUCTION VIDEO
I'ART 1- G�.NERAL
1.1 5`UIVIMAItY
A. Section Includes:
1. Adrninis�rative and procedural requirements for:
a. Preconstruetion Videos
B. D�viations fronn this City of Fort Worth Standard Specification
1. None.
C. Related Specificatinn Sectzons include, but are nat necessarily limited to:
1. Division fl— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Divisinn 1— General Requirements
1.2 PRICE AND PAYMENT PR�CEDURES
A. Measurement and Payz�tent
1. Work assoeiated with khis Item is considered s�absidiary to the various iYems bid.
Na separa#e payrrient wi11 be aljowed for this Item.
I.3 REFERENC�� [NOT USED]
1.4 ADMINISTRATIVE REQUII2EM�NTS
A. PreconstrucYion Video
1. Produce a preconstruction video of the sitelalignm�nt, incIuding all areas in the
vicinity af and to be affected by eonstruction.
a. Provide digital copy of video upon request by tha Ciiy.
2. Retain a copy of tne preconstruction video un�il ihe end of the maint�nance surety
periad.
1.5 SUBMITTALS [NOT USED]
L6 ACTION �UBMITTALSIINF4RMATIONAL SUBMITTALS [NOT USEDJ
1.7 CLOSEOUT SiTBMITTALS [NOT USED]
1.8 MAINTENANCE MA,TERIAL SUBMITTALS [NOT USED]
1..9 QUALITY ASSURANCE [NOT iJSEDj
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
11I FIELD [SIT�] CONDITXONS [NOT USED]
1,12 WARR�NTY [NOT USED�
PART 2 - PRODUCTS [NOT USED]
CITY QF FORT WORTH 2d22 Bridge RehabilitaCion Contract 2
STAI�D/�ItD CONSTRUC'I'ION SPECIFICATION DOCUIvTEN`I'S City C'raject na. 103456
Revised luly 1, 2011
ni3z33-z
PRECpNS'f�I2UC'1'101V V[I)E.O
Page 2 of 2
PART 3 - EXECUTION [NOT US�Dj
END OF SECTTON
R�vision Log
llATE NAME SUMMARY OF CHANGE
CTTY OF FQRT W�RTH 2O22 ➢ridge Rehabilitation Contract 2
STANDA.RD CONSTRUCTION SPECIFICATIDN DOCUMEF�FTS City Projecina. 1�3456
Re�ise.d luly l, 2�11
013300-1
SUBMITTAL3
Page 1 of 8
SECTION 0133 DO
SUBMITTALS
PART1- GEN�RAL
1.1 SUMMARY
A. S�ction Tncludes:
1. Gen�ral mefhods and requirernents of submissians applicable to the follawizag
Work related subrnittals:
a. Shop Drawings
b. Product Data (iucluding 5tandard Product List submittals)
c. Samples
d. Mack Ups
g. Deviations from this City of Fort Worth Standard Specifcation
l. None,
C. ReIated Specification Sections include, b.ut are not necessarily jimited to:
l, Divisian 0— Bidding Requirements, Contract Fonns a�d Condit�ons of t17e Contract
2. Division S— General Require�nents
1.2 PRICE AND PAYMENT PROCEDiIR�S
A. Measurement and Payment
1. Work associated with this Item is considered subsidzary ta tk�e variaus items l�id.
No separate payment will be allowed for this Iteztz.
1.3 REFERENCES [NDT i7SED]
1.4 ADMINISTRATrVE REQUIREMENTS
A. Coardination
1. Notify the City in writing, at the time of submittal, of any deviations in the
submittals from the requirem�n�s of the Contract Documents.
2. Coordination of Subrnittal Times
a, Prepare, priaritize and transmit each submittal suft"iciezltly in advance of
performing the related Work or other applicable activities, oz' within the time
specified in the individual Work Sections, of the Specifications.
b. Contractor is responsible such that th.e installation will not be delayed by
processing times including, but noi lixnited to:
a) Disapprovai and resubmittal (if required)
b) Coordination with other submittals
c) Testing
d) Purchasing
e) Fabrication
fl D�li�ery
g) Similax sequenced activities
c. No extension of time will be authorized becaUse of the Contractor's faiIure to
transrnit submittals suff�iciently in advance ofthe W ark.
C1TY OF FORT WORTTi 2Q22 Bridge Rehabilitation Contract 2
STANDARI) C.ONST[tUCTIDN SPEC�'ICATI4N DOCi3MENTS City ProjecE no. 103456
Revised December 2Q, 2012
oi�3ao-2
SUBMITTAL,S
Page 2 of 8
d. Mak� submittals promptly in accordance with appra�ed schedule, and in such
sequence as to cause no delay in tk�e Work oz' ii1 the war� of any other
con�ractor,
B. 5ubmitta� Numbering
When s�2bmitting shop drawin�s or sasr�ples, utilize a 9-cl�aracter submitial cross-
referenca identification numbering syste�n in the following mann�r:
a. Use the first 6 digits of the applicable Specification Sectioa N�Ymber,
b. For �Iie next 2 digits number use numbers 01-99 to sequentialIy number each
initial separate item or drawing submitted �Ender each specific Section number.
c. I,ast use a 1ett�r, A-Z, indicating the resubmission oFthe same drawing (i.e.
A=2nd submissian, B=3rd submissian, C�4th submission, etc.). A typica]
submitial nutnb�z' would �e as follows:
03 30 �0-O8�B
1} 03 30 Ob is the Specification Section for Cancrete
2) 08 is the eighth initial submittal undar this Speci�catiocx Sectaan
3) B is the third submission (secnnd rasub�nissinn) of'that particulat• shop
drawing
C. Contractor Certification
Review shop drawings, product data and samples, including those by
subcontractors, prior to submissia.n ta determine and verify the following:
a. Field rneasurements
b. �'ield construction criteria
c. Catalog numbers anri similar dafa
d. Conformance with the Cantract DocLiznents
Z. Pravide each shop drawing, sample and product dafa submif�ed by the Car�tractnr
with a Certi�cation Statement aff xad ineluding:
a. The Contractor's Company naine
b. Signature of submittal reviewer
a Cert�f cation Statement
1) `By this subtrzittal, I hereby represent that I have deterrnined and �erified
field �neasurements, feld constt•uction criteria, materials, dimensions,
catalog numbers and similar data aaad 1 hav� ehecked and coordinated each
item with other applicabl� approved sl�op drawings."
D. Submit�al Format
1, Fold shop drawin�s Iarger than $%2 inches x 11 inches to 8%z inches x I linclles.
2. Bind shop drawings and product data sheets together.
3, Order
a. Cover Sheet
1) DescriptionofPacket
2) Cantracto3- Certification
b. List of items / Table af Contents
c. Prod�ct Data /Shop DrawingslSamples /Calculatians
E. Submittal Content
1. The data pf subrnission and ihe dates of any previous submissions
C1TY QF FpR�' WORTH 2O22 Bridge Reha�ilitation Contract 2
STANDARD CON�TRUCiTDN SPECIFICAT[O�T DOCUNiEN'T'S City Proje�t no. 1fl3456
Revised Deeem6er 20, 2012
0133E1q-3
SUBMITfALS
Page 3 of 8
2. The Project title and numbei�
3. Contractar identification
�. The names of:
a. Contractor
b. Supplier
c. Manufacturer
5. Identification ofthe product, with the Specifcation S�ction number, page and
paragraph(s)
6. Field dimensions, clearly identified as such
7. Relation to adjacent or criticaI features of the VWork or materials
S. AppIicable standards, such as ASTM or Fedaral Specification nutnbers
9. Identification by highlighting of deviatians frotn Contract Documents
10. Identifcation by highlighting of revisions on resubmittals
11. An 8-inch x 3-inch blank space for Contractor and City statnps
F. Shop Drawings
1. As specified in individuai Work Sections includes, but is not necessarzly limited to:
a, Custom-prepared data such as fabrication and ereetion/installation (worki�g)
drawings
b. Scheduled informatian
e. Setting diagratns
d. Actual sliopwork manufacturing instructions
e. Custom templates
f. Speciai �viring diagrams
g. Caardinatio�� drawings
h. Individual syste�n or equipment inspection and test reports including:
1) P�rfo�'tnance eurves and certifications
i. As applicable to the Work
2. DetaiIs
a. Relafion oFthe various parts to the rnain members and lines ofthe structure
b. Where correct fabrication ofthe Work depends upon field measurements
1} Pro�vide such measurements an.d note on the drawings ptior to submitting
far approval.
G. FrodL�ct Data
1. Fox submittals of product data fQr products included on the Cit}�'s Standarri Product
List, clearly identify each item selected fQr use on the Project.
2. For submittals af praduct data for products nat included on the City's Standard
Px'oduct List, subinittal data may include, but is not necessarily lirnfted to:
a. Standard prepared data for ma��ufactured products (sorneti t�r�es referred to as
caYalpg data.)
1} Such as the manufacturer`s product speci�cation and instaIlation
instruetions
2} Availability of colors and patterns
3) Manufacturer's printed stataments oFcompliances and applicability
4} Roughing-in diagrams a�zd templates
5} Catalag cuts
5) Product photographs
CITY O�' FOTZT W03iTH 2O22 B3tidge Rehal�ilitation Contract 2
STANDA.EtD GQNSTRCTCTION SPECTFIC�ITiON DOCUMENTS CiEy Project no. E03456
Revised Qecember 20,2012
OL 330Q-4
5UBM7TTAL5
Page 4 of $
7) Standard wiring diagrams
8) Printed performance curves and operational-range di�grams
9) Production or quality control inspection a�id iest reports and certifications
10) MiII reports
] l) Praduct np�.rating and maintenance instructions and recommended
spare-parts listing and printed product warranties
12) As appiicable to the Work
H. Samples
1. As specified in individual Sections., include, but are not necessarily limited to:
a. Physecal examples of the Work such as:
1) Sections af inanufactured or fahricated Work
2) Small cuts or cantainers of materials
3) Complete units oirepetitively used products color/texture/pattern swatches
aa�d range sets
4) Specimens far caardination of visual e�'f'�ct
5) Graphic symbols and units af Work to be used by the City for independent
inspection and testing, as applicable ta ihe Work
I. Do �ot start Work requiring a shop drawing, sample or product data nor any material to
be fabricateci or installed prior to th� approval or qualified approval af sueh item.
]. Fabrication perfarmed, rnaterials purchased or on-site construction accoznplished
which does not conform to approved shop drawings and data is at the Contractor's
risk.
2, The City will not be liable fox• any e�pense or delay due to con�ectioizs or reinedies
required to aecomplish confnrmity.
3. Complete project Work, materials, fabrication, and installations in canformance
with approved shop drawings, applicable samples, and �aroduct data.
J. Sub�nittal Distributian
Electronic Distribution
a. Confirtn de�elopmen# of Project directory for electronic submitfals to be
uploaded �o City's Buzzsaw site, or another external FTP site approved by the
City.
b. 51aop Drawings
1) Upload submitral to designated praject directory and a�o�ify approp�•iate
City representatives via email of submittal posting.
2) Hard Capies
a) 3 copies for al1 submittals
b) If Contractor requires more than 1 hard capy of 5hop Drawings
returned, Coniractor sha1l submit mai•e than the number of copies listed
above.
c. Product Data
I) Upload submittal to designated project directoiy and notify appropriate
City representatives via email of submitta[ pasting.
2) Hard Copies
a) 3 copies for aii submittals
d. Samples
1) Distributed to the Project Representative
2. Hard Copy Distribution (if requir�.d in lieu of electronic distribution)
CITY OF FORT WORTH 2O22 Bridge Relia�ilitation Contract 2
�TANDARb CbN�TKUCTTON SPECIFICATSON DOCUMENTS City Project no, 103456
Revised December 2p, 2012
01 33 q0 - S
SUBMITTAL3
Page 5 vf 8
a. Slaop Drawings
1) Distributed to the City
2} Copies.
a) S copies for mech�.nical submittals
b) 7 copies for a�i other submittals
c) If Contractor requires more than 3 copies of Shop Drawings returned,
Contractor shall suhmit mare than ihe number af copies listed above.
b. Product Data
1) Distributed to the City
2) Copies
a) 4 copies
e. Sarr►ples
1) Distributed to the Projec� Represe�atative
2) Cop.ies
a) Submit t%e numher stated in the resp�ctive Specification 5ections.
3. Distribute reproductions of approved shop drawings and copies of approved
product data and samples, where required, to the job site file and elsewhere as
directed i�y the City.
a. Fravide number of copies as directed by Y�e City hut not exceeding the number
previously specifed.
K. �ubmit�al Review
1. The review of shop ciz'awings, data and samples will be for general conformance
with the design concept and Cot�tract Dpcuments. This is nat to be construed as:
a. Permitting any departure from the Contract requirements
b. Relieving the Contractor of responsibility for any errors, including details,
dimensions, and materials
c. Agproving deparYures from details furnished by the City, except as o.therwise
p:ravided herein
2. The review and approval of shop drawings, samples or product data by ihe City
does not relieve the Contractor from his/her responsibility with re�ard to the
fuifillment of the terms of the Contract.
a. A!1 rislcs qf error and omission are assumed by ti�e Contractor, and the City will
have no responsibility therefore.
3. Tl�e Contractar remains responsible for details and accuracy, for cnordinating the
Wark with a11 other associated wbrk and irades, for seleciing fabrication processes,
far techniques of assernbly and for performing Work in a safe manner.
4. If the shop drawings, data or sarnples as submitted descr'1be variatioz�s and show a
departure from the Contract requirements which City fmds to be in the interest of
t�ae City and to be so mir�or as not to invo.lve a change in Contract Price oz' time far
perfarrnance, the City may raturn the reviewed drawings without noting an
exception.
5. Submittals wilI be return�d to the Contractor under 1 of the following cades:
a. Code I
1) "NO EXCEPTIONS TA�EN' is assigned when there are na natations or
comments on the submittal.
a) When returned und�r tlais cade the Contractor may release the
ec�uipment and/or material foz' manufacture.
b. Code 2
CITX OF FQRT V4'ORTH 2Q22 Bridge Rehabi[ita4ion Contract 2
STAi�TDARD CONSTRUCT[pN SPECIFICATIDN DOCIJMENTS City Project na. 103456
Revised December 20, 2012
n� 33 00-�
SUSMITTAi,S
Page b oF 8
1} "E�C�PTIONS N4T�D". This code is assignecf when a coiifirmation of
the no#ations and commei7ts IS NOT required by the Coniractor.
a) The Contractor may releasa the �quipmant or znaterial for zr►ar�uiacture;
h4wever, a11 notations and comments inust be iz�corpnrateci into the
final product.
c. Code 3 .
I} "EXCEPTIONS NOTED/RESUBMIT". This combinatioil of cQdes is
assigra�d wY►en na�ations and comments are extensi�e enough to require a
resubmattal of the package.
a) The Contractor may re]ease the equigtnent or material for manufacture;
however, all notatinns a�ad comments must 6e incorporated into the
�nal product.
b) This resubmittaI is to address all comments, omissions and
non-conforming items tl�at were noted.
c} Resu6mittal is to be received by the City. within 15 Calendar Da�s of
the date of the City's transmittal requiring the resubmittal.
d. Code 4
1) "NOT APPROVED° is assigneci when the submittal does not meet the
izttent ofthe ContractDocuments.
a) The Contractar rnust resubmit ttae ��tz�-� package revised to bring the
submittal inta conforinance.
b) It may be necessary to resubinit usii7g a differe�Zt manufacturer/vendor
to meet the Contract Documents.
6. Resubmittals
a. Handled 'm the same manne�� as �rst submittals
1) Corractions other than requested by the City
2) Marked with revisinz� triar�gle or other simila�� rr�ethod
a) At Cantractor's risk if not marked
b. Sub�nittals for eacl� itein wi116e reviewed no nr�ore ihan twice at the City's
expense.
l) Atl subsequent reviews will be performed at times convenieni to tih� City
and at the Co��tractor°s expense, based on t�e City's or City
Regresentative's then prevailing rates.
2) Provide Contracior reimbursement to the City within 30 Calendar Days for
a[I such fees invoiced by the City.
c. The need for more t}�azi 1 resubtnission or any other delay in obtainin� City's
re�iew of submittals, will not entitle the Contracior to an extension of Contract
Time.
7. �artial Submittals
a. Ciiy re.ser�es the right to nat re�iew submii�als deemed partial, at the City's
discretion.
b. 5ubmittals deemed by the City to be not complete will be returned to the
Contractor, and wilI be considered "Not Approved" until restibrni�tad.
c. The City may at its option provide a list or mark the submitta[ directing fhe
Contractor io the areas that are incomplete.
8. Ifthe Contractar eonsiders any correction indicated on the shop drawings to
constitute a change to the Contract Documents, Ehen v�ritten notice must be
provided thereof to the City at least 7 CaIendar Days prior to release for
manufactur�.
CITY OF FORT WQRTH 2O22 Bridge Rehabilita#ion Cnntract 2
STP.NDARD COIVSTRUCTION SPFCIPICATIQN i]OCUMETiTS Ciiy Project no. 103456
Revised December 20, 2012
O133DO-7
SUSM19"TALS
Yaga 7 af 8
9. When the shop drawings ha�e been completed to the satisfaction of the City, the
Contractar may carry out the canstruction in accordance therewith and no further
ahanges therein excepf upon �uritten instructions from the City.
I0. Each submittal, appropriately caded, will be returned within 30 Calendar Days
foIlowing r�c�ipf of submittal by the Ciiy.
L. Mock ups
1. Mock Up uilits as speci�ed in individual Sections, include, but are not iiecessarily
limi.ted to, cornplete units of the standard of acceptance for tllat type of Work to be
used on the Project. Remove at the completion of the Woric or when direcied.
M. Quali�cations
1. Cf specifically required in other Sections ofthese Speci�ications, submit a P.E.
Certification for each itein reguired.
I�I. Request for Information (RFI}
Contractor Request for additional infor�ation
a. Cl�rification or intsrpretation of the contract dacuments
b. When the Contractor believes there is a conflict between Coniract Docun�ents
c. When the Contractor believes there is a conflict between the Dravvings and
Specifications
1) Identify the confli.ct and request elarification
2. Use the Requeat far Information (R�`I) form pro�ided by the City.
3. Nttmbering of RFI
a. Frefix with "RFI" followed by series number, "-x�", beginning with "01" and
increasing sequent�ally with each additional transmittal.
4. Suffici�nt infortnation shall be attached to pennii a writtan raspo�se without further
information.
5, The City will log eaeh request �nd wiIl review the request.
a. If review of the project information request indicates that a claange to the
Contraet Documents is required, th� City will issu� a�'ield Order or Change
Ordar, as appropriate.
�.5 SUBl1'IITTALS jNOT USED]
1.6 ACTION SUBMITTALSIINFORMATIONAL SUSMITTALS �NOT USED]
�.'7 CLOSEOUT SUBM�TTALS [NOT USED]
1.8 MAINT�NANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSXJRANCE [NOT USED]
1.10 DE�IVERY, STORAGE, AND HANDLIN(� [NO'1' USED]
1.11 �'IELD [SITE] CONDITIONS [NOT USED]
L12 WARRANTY [NOT U�ED]
CITY OF FORT WORTH 2O22 Bridge Reha6ilitation Contract 2
STANDARD COIVSTRUCT[OI� SPECIFICATIOi`i DOCIJIVISNTS City Yrajecf no. 103456
Revised December 20, 2012
O 1 33 (}fl - 8
SUBMTTTALS
Page $ of $
PART 2 - �RODUCTS [NOT US.E]]]
PART 3 - EXECUTTON [NOT USED]
END OF SECTXON
Revision Log
D.ATE N�1ME SUMMARY OF CIIANGE
12/2d/2012 D. Johnson ].4.K.8. 1h�or[cing �ays modified to Calendar Days
C1TY OF FCIRT WDRTET 201z dridga Rehal�ilitaCion Contract 2
STANDAI2D CONSTRUCT[pN SPECIFICATION I70CiJMENTS Cit} Projectno. 103456
Revised Decembar 20, 2012
013513-]
5P�C1AL PR07ECT PROCEDURES
Page 1 oP 8
1
z
3 PART 1 - GENIItAL
4 l.l SiJNDVIARY
5 A. Section Includes:
6
7
8
9
IO
II
12
13
14
15
16
17
18
19
SECTION Ol 3513
SPECIAL PROJECT PROCEDURES
1. Th� procedures for spec�al project ci�cumstances that includes, but is not limited to:
a. Coordination with the Texas Departzx�ent of Trar�spartation
b. Work near High Voltage I�ines
c. Coniined Space Entry Program
d. Air Pollufion Watch Days
�. Use ofBxplosives, Drap Weight, Etc.
f. Water Department Natificatian
g. Public Natif"icationPrior to Be�nning Construction
h. Coord.ination vvith United States Army Corps af Engineers
i. Coordinat[on within Railroad perr�its areas
j. Dust Control
k. Employee Parking
B. Deviations from this City of �'ort Warth Standard Spec�cafion
l. Nane.
20 C. Related 5pecifiication Sections include, 6ut are not necassarily limited to:
21 1. Division 0— Biddiag Requirements, Cantract Forms and Conditions of the Contract
22 2. Division 1— Genaral Requirements
23 3. 5ection 33 12 25 — Connection to Existing Water Mains
24 1.2 PRICE AND PAYNiENT PROCIDURFS
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
A. Measurement and Payment
1. Coordinatian within Railroad permit areas
a. Measurement
1) Measurernent far this Item will be by Iump sum.
b. Payment
1) The work perfarmed and materials furnished in accordance with this Itezn
will be pa.id for at tha Iump sum price bid for Aailroad Coordination.
c. Th� price bid s.hall include:
1) Mobilization
2) Ynspection
3 ) S aFety training
4) Additional Insurance
5) Insurance Certificates
6) Other requiremen#s associated with generai coordination witlz RaiIroad,
including addi�ional eYnployees required to protect the right-of-way and
property of the Railroad from darr�age arising out of and/or from the
construction ofthe Project.
2. Railroad Flagmen
CTTY OF FORT WORTH 2O22 Bridge Rehahi] itation Contract 2
STANDARD CONSi'RUCTION SPECIEICATTON DOCUMENTS City Pmject Na 10345b
Revised December 2D, 2012
Ol 35 l3 -2
5 PECIAL PR03ECT PROCEDURES
Page 2 af 8
1
2
3
4
5
b
7
8
9
lfl
11
12
13
a. Measurez�nent
1) Measurement �or lkiis Item vai[1 be per working day.
b. 1'ayment �
1) The wark performed and materials iurni�h�d in accordance with this Item
will be paid for each working day that Railroad F�'lagmen are present at the
S ite.
c. Tlze price bid shall inelude:
1) Coordination for scheduling flagmen
2) Flagmen
3) Other requirements assaciated with Railr�ad
3, All other items
a. Work assaciated r�dith these Itc�s is considered subsidiary to the various Ttems
bid. No separate paym�nt will be allowed for this Item,
14 1.3 R+. <, TTTC E,S
15 A. Reference Standards
16 1
1�
18
19 2
20
21 3
22
Referance st.�ndards �ited in this Speeif'ication refer ta the eurr�nt reference
standard published at fhe time of'the latest revisian data Eogged at the end ofthis
Specification, unless adate is spec�cally cited.
Health and Safety Code, Title 4. Safety, Sub�itle A. Public Safety, Chapter 752.
High Voltage Overhead Lines.
North Ceratral Texas CoL�ncil of Governm.ents (NCTCOG) — Clean Construction
Specificatian
23 1.4 ADNIINTSTRATIVE R�QTIRFIVIINTS
24 A. Coordination with the Texas Dep�rtment of Transportation
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
�l3
44
45
1. When wark in the right-of-way which is under the jurisdiction of the Texas
Department af Transportation (T�QT};
a. Not�'y tlze Texas Department of Transportation prior ta catnmencing any vvark
therein in accordance with the pro�isions of the permit
b. All wark perforrned in the TxDOT right-of-way sha[1 be parformed in
compliance with and subject to app�•aval fi•om the Taxas Depaa•tme��t of
Transportatian
B. Work near High Voltage Lines
�
3
4.
i . Regulatory Requireznents
a. All �rVark near High Voltage Lines (more than 60D r�olts measured betwe�n
conductars or between a conductor and the ground} sliall be in accordance with
Healih and Saf�ty C�de, Title 9, Subtitle A, Chapter 752.
Warn�g sign
a. Pra�ide sign af sufficient size n�eeting all OSHA requirements.
Equipment operaiing within 10 feet of high �oltage lines will require the follovring
safety features
a. Insulating ca�e-type of guard about the boom or �•m
b. Tnsulatoe links on the lift hook connections for back hoes or digpers
c. Equipment must meet the safety requirements as set forth by OSHA and the
safety requirements of the owner of the high voltage lines
Wark within 6 feet af high voltage electric lines
C1TY OF F'OR7' WORTH 2O22 BridgeEteha6ilitationContraet 2
STANDAI2D C�I�STRUCTION SPECIFICATION DOCLJIvIENTS City Yrojeet Na 10345b
Rcvised December 2�, 2012
01 35 13 -3
ST'ECIALPRO.TEC"� PROCEDURCS
Page3of8
1
2
3
4
S
6
7
8
9
10
lI
12
13
14
I5
16
17
18
]9
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3b
37
38
39
40
4l
42
43
44
45
a.
�
c
Notif'zcation shall be given to:
1) The pow er company {example: DNCOR}
a) Maintain an. accurate log of ail such ca11s to power company and record
action taken in each case.
Coord�nation with power company
1) After notif"ication coordinate with the power company to:
a) Erect temporary mechanicaI barriers, de-e�ergize the Lines, or raise or
low er the lines
No persotuae� may work within 6 feet of a high voltage line before the above
requirements have been met.
C. Con�'ined Space �ntry Pragram
1. Provide and follow approved Confined Spaee Entry Program i� accordance with
OSHA requirements.
2. Confined Spaces include:
a. Manholes
b. All other confin�d space� iri accordance wit� OSHA's Permit Required for
Canfined Spaces
D. Air Pollution Watch Days
1, General
a. Observe the following guidefines relating ta working on City construction sites
on days designated as "AIR POLLUTION WATCH I]AYS".
b. Typical Ozone Season
1) May 1 through �ctobez• 31.
c. Critical Emission Time
1} G:00 a.m. to 10:Q0 a.m.
2. Watch Days
a. The Texas Coznznission on Environmental Quality {TCEQ)., in �oordination
withtheNatinnal Weather Service, will issuetheAir Pal�ution Watch by 3,00
p.m. on the afternoon prior to k.he WATCH day.
b. Requirements
1) Begin work after I 0:00 a.m. whenever construction phasing requires the
use af motorized equipment for periods in excess ai 1 hour.
2) However, th� Contractor may begin work prior to 10:00 a.m. if:
a} Use af motorized equipment is less than 1 hour, ar
b) If equiprnent is new and ceriified by EPA as "Low Emii#ing", ar
equipment burns Ultra Low Sulfur Diesel (ZJLSD), diesel ennulsions, or
alternative fueJs suc� as CNG. -
E. TCEQ Air Permit
1. Obtain TCEQ Air Permit for construction activities per requirements of TC�Q.
F. Use ofExplosi�es, Drop Weight, Etc.
1. GVhen Contract Dacuments permit an the projectthe following wili apply:
a. PUblic Notif'ication
1} Submii notice to City azid proof of adequate insurance coverage, 24 hours
prior�o commencing.
2} Minimum 24 hour public natif"ication in accordance with Section Ol 31 13
46 G. Water Departrnent Coordination
CITY OF T'OI�T WORTH
STANDARfl CONSTR�lGTIO1V SPECIFICAT{QN I)OCUFv1ElV'I'3
Revised DecemUer 2Q, 2�12
2022 BridgeRaha6ilitation Contiact 2
CitS Project No 103455
fll 3S 13 -4
SP�CTALPRO.T�CT PROC�DURrS
Page 4 of S
i 1. Durin� fhe construction afthis project, it will b� necessary to deactivate, fo�� a
2 period ofti�rie, existing lirres. The Cant�-actar shall be required to coordinate with
3 the Water Department �o determine the �est times for deactivating and activating
4 thos e lines .
5 2. Coordinate any e�ent that will require connecting to or the aperation af an existing
6 City water line system with the City's representative.
7 a. Coordination shall be in accordance with Secfion 33 I� 25.
8 b. If needed, obtain a hydrant r�ater meter firor� the Water Department fnr use
9 dUrin.g the Iife nf narned praject.
10 c. In the e�+ent that a water valve on an existing live systein be turned off and on
11 to accom��date the constr�actian ofthe project is required, coardinate this
12 activity throLigh the appropriate City representative.
13 1} Do not operate water line valves of existing water sy�stem.
1� a) Failure to comply wil[ render the Contractor iri violation of Texas Penal
15 Code Title 7, Chapter 28.03 (Criminal Mischie#) and the Contractor
15 wili he prosecuted fo the full extent ofthe la�u.
17 b) in addition, the Cantractor w�l assume all IiabiIzties and
18 responsibiIities as a resuii of these actions.
19 I� Public Notification Prior to Beginnmg Construction
2o 1. Prior to beginning construction on any bIack in the projeet, on a block by block
21 basis, prepare and deliver a notice or fly�r o�'the pending construction to the �'ront
22 door of each i•esidence ar business that wi7lbe impacted by constrLrction. The notice
23 s�a11 be prepared as follows:
24 a. Post notice ar flyer 7 days prior to beginn�ng any construction activ'rty an each
25 block in the projeci area.
26 1} Prepareflyer on the Contractor's �eiterhead and include the followin�
27 information:
28 �) Name of Project
29 b) Cil.y ProjectNo (CPN)
30 c) Scope ofProject (i.e. type of construction activity)
31 d) Actual con�truction duratian within the blaek
32 e) Name of the coniractor's fareman and �ahone number
33 fj Name of the City's inspector and phone numher
34 g) City's after-hours phone number
35 2) A sample of the `pre�canstructian notification' flyar is attached as Exhibit
36 A,
37 3) Submit schedule showing the construcl�on start and finish time fnr each
3& block of the project to tha inspector.
39 4} Deliver flyer to the City Insp�ctor fnr review prior to distribuiion.
40 b. No construction will be allowed to begin on any blocic unti� th� fiyer is
41 delivered to all residents of the block.
42 I. Pubfic Notification of Temporary Water Service Interruption during Construction
43 1. In the e�ent it becomes necessary to temporarily shut dovvn water s�rvice to
44 residents or busines�es dura�g construction, prepare and deliver a notice or f[yer of
45 the pending interruption to the front door of each affected resident.
46 2. Prepaeed notice as follows:
47 a. The natification ar flyer shall be posted 24 hours prior to the temporary
48 interruption.
CITY OI' PORT WC7RTH 2O22 BridgeRehabi[itatianCanCraet 2
STt�NDARD CONS'I'12UCI'ION 5PEC1EICAT[QN DOCUMENTS CityPraject No 103456
Aevised Becember 2D, 2012
013513-5
SPECIALPR07ECT PRO��IIUR�S
Pa�a5of8
3
4
b
7
10
11
12
13
14
ls
16
17
18
19
Za
2I
22
23
24
25
26
27
2$
29
30
31
3z
33
34
35
3G
37
38
39
40
41
42
+�3
44
�
e,
f.
b. Prepare flyer on the contractar's letterhead and incIude the fallowit�g
ulformatian:
1) Name of the project
2) City ProjectNumber
3) Date of the int�rrup�ion af s ervic e
4) Period the interruption will take place
5) Name of the contraetor's foreman and phone number
6) Name of the City's inspzctor and phone number
A sample of the temporary water service interruption notification is attached as
E�hibi� B.
Deliver a c opy of the temparary interruption notification to tk�e City inspector
for review prior to being distcibuted.
No interruption af water service can occur unti3 the flyer has been delivered to
all affected residents and businesses.
Electronic �ersions of the sample flyers can be obtained fram the Project
Gonstruction Inspector.
7. Coordination with United 5tates Army Corps of Engineers (USACE)
1. At Ineations in the Projeet where constructior� acti�ities occur in areas where
USACE permits are required, m.eet all requiretnents set forth ir� each designated
permit.
K Coordination wit.�iin Railrnad Permit Arreas
1. At locations in the project where constr-uction activities occur in areas wh�re
railroad permits are required, meet aIl requirements set forth in each designated
razlroad permz�, This includes, but is not Iimited to, provisions %r:
a. Flagmen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certificates
f. Other employees required to protect the right-of=way and property afthe
Railroad Company from damage arising out of and/or from the construction of
the prnj�ct. Proper utiIity clearar�ce procedures shall be used in accordance
wiih t�e permit guic[elines.
2. Obtain any supple�nental information needed to comply withthe railroad's
requirements.
3. Railroad Flagmen
a. 5ubmit receipts to City %r veriiication of working days that railroad ilagzzien
v�ere present on Site.
L. Dust Control
1. Use acceptable measures to control dust at the 5ite.
a. If vwater is used to cantrol dust, cap#ure and properly dispose af waste watet.
b. If wet saw cutiing is perforrtied, capture and properly dispose of slurry.
M. �mployee Parking
1. Provide parking far enaployees at locations approved by the City.
CITY OF FORT WOR'I'I-E
5TANDARD CONSTRUCTION SPECIFICATION Df7CUMENT5
Revised Decembcr2D, 2012
2022 $€idge Rehabilitation CnntracY 2
City Proj ect No 7 �3456
O1 35 13 -b
SPCCIAI.PROIF.•,CT PROC�DUR�S
Page 6 of $
1 1.5 STJB1VnTTALS [NOT USEU]
2 1.6 ACT[�N SUBNIITTALS/�NFORMATCONAL SUENIITTALS [NOT USID]
3 l,T CLQSEOUT SUBNIITTALS [NOT USID]
4 LS MAINTTNANCE MAI�RIAL �UBIVIITI'ALS [NOT USID]
5 1.9 QUAL�TY ASSUIZ�NCE [NOT USID]
6 1..I0 DEGIVCI2Y, STORAGE, AND HANIILING [NOT U5ID]
7 1.11 FIELD [SITE] CONDITIONS �NOT USID]
8 1.12 WAIt12AN'1'Y [NOT USED]
9 PART 2- PRODIICTS [N�T iISID]
10 PART3 - EXECUTCON [NOT USED]
11
12
II�1D OF SECTION
Revision Log
DATE NAIVIE SUMMAAYOF CHANGE
1.4.8— Added reqLureme��t ofcompliance with T�ea1C6 and Safety Code, Title 9.
813112Q12 D. .Tohnsnn Safety, �btitle A. Pu6tic Sa%ty, Cltapter 752. �-Iigh Voltage Overheadl.ines.
1.4.E — Added Contra�tor responsibility for obtaining a T CEQ A€r P ermit
13
CTTY OF FDRT WORTH �p22 BridgeRehahilitation Contract 2
STA?�IDARD CONS7RUC.TI�N 5PEC3FICAT'ION DOCUMEN'I'S City Pro�e�t No 3d345b
Reuised December 2Q, 2D12
Dl 35 f3 -7
SPECIAL PROJEC'1' P1tOCEDiIRES
Page 7 of 8
1
z
3
4
5
6
7
8
9
10
tl
12
13
14
15
l6
1�
18
19
20
21
22
23
�4
25
26
27
28
29
30
31
32
33
34
35
36
37
D�te:
CPN No.:
Prajeci Narn�:
Mapsco Location:
Limits of Construc#ion:
I+�IIIBIT A
(To be printed on Contractor's Letterhead)
- - - - -
� � 'i '�
� ���
II
�
I
�
� I �
� �
�'FiIS fS TO INFOFtl�1 Y4L1 ibAi 11NDER ACONTRACT WfiFi TH� C1TY OF �ORf
WOR�W, DUR COM PANY VIlILL W�RK ON UTILITY LINES OAI �R AROIJNQ YOUR
�ROPER�Y.
COAISTRUC7101V WI�� ��GIW A��ROXI�IIAT�LY 5�1/�N 9AYS 1�R�M TH� DAiE
OF TI�IS NOiICE.
I� YOU HAV� QU�Si{OAIS A�OUi ACC�S5, SECIJRITY, S�ETY OR AIdY OTH�R
fSSIl�, ���AS� C���.
Mr. CCbI�TRACTORS SUP�IM'EN�ENT� Ai CTE�LFPI�ONE NO.>
C�7:�
�Ij]r. C�I7Y lN5PEC70R� A� � TEL�PHONE HO.�
A�i�R 4:30 PM OR OM W��K�NDS, �L�AS� CA�� (81i) 39� 8306
PLEASE KEEP TNI S FL YER HANDY WHEN YOU CALL
CI"1'Y OF FQ12T WORTH
STANDARD COl�iS'FRUCTIOI�T SPECIFICATI03+f DQCUMENTS
Rwised December 2U, 2012
2022 BridgeRehaF�ilitation Contra�l 2
CityProject No 1Q3456
O1 3S l3 -8
SPECIALPR07ECT nROCET7UR.HS
Page 8 of S
1
2
N81�+#I�i ��i3
F�RT WORT
aue:
�O� I��. ]CXRX
projece I��a:
������ �� ��������� ����� ������
�����������
Di7E TO ITTIT.ITY IMPROV�II�ENTS IN YdiiR NEIG��aRHOOD, YOUR
WA'I'Elt �ERVICE WILL BE 71V'C'ERIiiJPTEp ON
HE,'I'WEEiV T$E 7rI0UIt5 OF ANA
IF YQU TiAVE QUESTIONS ASOU'I' TFIIS SHUT-OIIT, PT.�AS� CAI.I.:
MR. AT
(CONTRA,CTqR5 SUPERSIV'T�NDENT) (TELEP�I[lNE NUMBER)
OR
MR. AT
{CTTY IiVSP�CTpR) (T�L�Y�UNE NUMgER)
THI5 INCd1�IVEiV�PFCE W�I.L BE AS SH4RT AS POSSIBT,�.
'1'FIA14K YOU,
COTYTI2ACTOR
� -- - -- -- - — - -
4
Cl'tY OF FOR'C W4R'I'H 2O22 BridgeRehabilitationConhact 2
STANDARI] CONSTRUCTTON SPEC]FICATION DQCUMENTS City F'roject AIo 10345b
Revised Deeember20, 2�12
O 1 45 23
TESTING ANB 1NSPF.CTION SERVICBS
Page 1 of 2
SECTION Ol 45 �3
TESTING AND INSPECTION SERVICES
PART1- G�NERAL
1.1 StiMMARY
A. Section Includes:
I. Testing and inspectia� services procedures and coardination
B. Deviations fram this City af �'ort Worth Sfandard Specification
1. Nan�.
C. Related Specifcation Sections inelude, but are not necessarily limited to:
1. Divisian 0— Bidding Requirements, Contract �`orms and Conditions af the Contract
2_ Division 1�- General Requirem�nts
1.2 PRICE AND PAYMENT PROCEDURES
A. Measureinent and Paynnent
Work associated with ihis Item is considez'ed subsidiary to the various Items bid.
No separate payment will be allawed for this Item.
a. Contractor is responsible far performing, coordinating, and payment of a11
Quality Control testing.
b. City is responsible for performing and payment for first set of Quality
Assurance testing.
1) If the f�rst Quality Assurance test perfarmed by the City fails, the
Contractor is responsible for payment of subsequent Quality Ass.uranc�
testing until a passing test occurs.
a) Final acceptance wil.l not be issued by City untiI all required paymanis
for testing hy Contractor have 6een paid in full.
1.3 REFERENCES [NOT ZTSED]
1.4 ADMINISTRA.TNE REQUIl�EMENTS
A. Testing
1. Complete testing in accordance with the Contract Documenis.
2. Caardination
a. When testing is required to be performed by the Ciiy, notify City, sufficiently
in ad�ance, when testing is needed.
b. Wnen te5ting is raquired to be completed by the Contractor, notify City,
sufFciently in advance, that testing will be performed.
3. Dist�ibution of Testing Reports
a. Electranic Distribution
1} Coniirm developmant of Project directory for electxonic submittals to he
upjoaded. to ihe Czty's document management system, or anothex• external
FTP site approved by the City.
CITY OP FORT �IORTH 2U22 Bridge Rehabilitation Contract 2
STAbfDARD CONSTRUCTIQiV SPCCIFlCATIp1+I DOCUMENTS Cit�+ Froject na. 103456
itevised March 9, 2U20
0 l 45 23
TEST1TiG AND INSPECTION SCRVIC�S
Page 2 of 2
2) Upload test reporta to de�ignated project direetoiy and notify appropriate
City representatives �ia emai] of submittal postin�.
3) Hard Copies
a} I copy for all subrnittals sLtbnnitted to the Project Representative
b. Hard Copy Disfribution (i�'required in lieu of efectranic distribution)
I) Tests performed by City
a} Distribute 1 hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to City's Project Representafive
4. Provide CiCy's Project Representative u+ith trip tickets for each deIivered load of
Concr�te or Lime material including the following information:
a. Name of pit
b. Daie of d�live:ry
c. Material delivered
B. Inspectian
1. Inspection or lack of inspection does not relieve the Contractor from ob[igatian to
perform work in accordance with the Contract Dqcuments,
1.5 SUBMITTALS [NOT USED]
1.6 ACTIQN SCIBMITTALS/INFORMATI�NAL SUBMYTTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTAL� [NOT USEDI
1.9 QUALITY ASSURANC� [NOT USED]
]..14 DELIVERY, STORAGE, AND HANDLING [NOT iJ�ED]
l.11 �"TELD [SI'�E] CONDITXON� [NOT TJSED]
1.12 WAItRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PAR� 3� E�ECUTION jNOT USED]
�ND OF SECTION
Revision Log
DAT�. NAME SUMMARY O�' CH�,NGE
3/912R2Q D,V. Magana Removed reference to F3uzzsaw and nated that electronic submittals be uploaded
through the City's document management system.
C11'Y OF FORT VJORTH 2O22 Sridge Rehal�ilitation Gantrnct 2
STANDARD CONSTRUCTIClN SFECIFICATION DDCUM�NTS City Project no. 163456
Revised March 9, 2D2Q
01 SQQO- 1
`I'�Ml'OC2ARY FACILITIES AND CONTROLS
Page 1 of4
SECTION Ul 50 00
TEMPORARY FACILTTIES AND CONTROLS
PART1- GENERAL
1.1 SUMM.ARY
A. Section Ine�udes:
Provide temporary facilities and cantrols needed for the Work including, but �ai
necessarily Iimiied to:
a. Temporary utilities
b. San�tary facilities
c. Storage 5heds and Baildings
d. Dust control
e. Temporary fencing of the construction site
B. Deviations from this City of Fort Worth Standard. Specifieation
1. None.
C. Related �peciii�ation Sections include, bu� are nat necessarily limited to:
I. Division 0— Bidding Requirements, Cantract For�s and Conditians af the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYNI�NT PROCEDUR�S
A. Measurement and Payment
1. Work associaied with tlus Item is considered subsidiary to the �arious Itezns bid.
No separate payment will be allawed for this Item.
I.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Temporary LJtilities
1. Obtaining Temporary Servlce
a. Make arrangements vvith uiility service companies for temparary services.
b. Abide by rules azrd regulatians of utility �ervice companies or autharities
having jurisdict'ron.
c. Be respnnsible for utility servic� costs unti] Work is ap�rovad for k'inal
Acceptance.
1) Included are fuel, power, light, heat and ather ut�Iity services necessary for
execution, compl�tinn, testing �nd initial oparation of Work.
2. �Vater
a. Cont:tactor to provide water required for and in connection wifh Work to be
perfarmed and for speci�ed tests of piping, equipment, devices or other use as
required for the compleYion ofthe Work.
b. Pra�ide and �naintain adequate supply of potable water for domestic
consumption by Contractor personnel and City°s Project Representatives.
c. Coordination
1} Contact City 1 weelc before water for construciion is desired
C1TY OF FORT WORTI-I 2022 Brid�e RehabiliEation Cnntract 2
STANDARD CdNSTR[7C`TTON 51'�CIFICATION DOCUMENTS City Project no. 103456
Revised 3uly 1, 201 i
015000-2
`I'�MPOKAR�C F':4CILITIES ANT] CQIV7TZOL5
Page 2 of 4
d. Cnntractnr Payment for Canstructinn Water
1) Obtain construction water meter fram City for payment as billed by City's
estabIished rates.
3, Electricity and Ligh#ing
a. Pro�ide and pay far electric powered se��vice as required for Work, including
testin.g of Work.
1) Pravide power for Iighting, operation of equipment, or ather use.
b, Eleetric power service ineludes teinporary power service or generator to
maintain operatians during scheduled shutdowr�.
4. `I'�Iephorae
a. Provide emergency telephone seivice at Site for use 6y Contractor personnel
and others perforining work or furnishing services at Site.
S. Temparary Heat and Ventilatian
a. Provide texnpoi•ary heat as necessary fa.r protectian or completion of Work.
b. Provide teinporary heat and vent�lation to assure safe working conditions.
B. Sanitary Facilities
1. Provide and maintain sanitary facilities for persons on Site.
a. Comply with regulations of State and local departments of health.
2. Enforce us� nf sarzitary facilzties by construction personzasl at job site.
a. Enclose and anchar sanitary facilities.
b. No diseharge will be allowed from these fac�lities.
c. Co[lect and store sewage and waste sa as not to cause nuisance or health
problem.
d. Haul sewage and waste off-site at no less than weekly intervals and properly
dispose in accordance with applicable regulation.
3. Locate facilities near Work Site and keep clean and maintained throughout Project.
4. Remove faciliti�s at completion of Project
C. Storage Sheds and Buildings
I. Pror�ide adequately ventilated, watertight, weatherproof storage facilities with floor
abQ�e ground level for materials and equipment susceptible ta weather damage.
2. 5torage of materials not susceptible to weather damage may be on blocks off
ground.
3. Store materials in a neat and orderly manner.
a. PlacE materials and equipin�nt to permit easy access for identzficatinn,
inspection and inventory.
4. �quip building with lockable doors and lighting, and provide al�ctrical serviee for
equipment space heatars and heating or ventilation as necessary to provide storage
environments acceptable to specified man.ufacturers.
5. Fill and grade site for temparary structures to provide drainage away from
temporary and existing buildings.
6. Remove building from site prior to Fina] Acceptance.
D. Temporary Fencing
1. Provide and maintain %r the duration or constructfon when required in cantract
doeurnents
E. Dust Contro]
CTTY OP PdRT WDRTI-I 2022 Bridge Rehabifitatian Contract 2
STANDARD COAIS'['1ZUCTION SPECIFICAT[ON DOCUNfENTS CiYy Project no. 103456
Revised July I, 2011
ai soao-3
TCMPORr�RY FACILITT65 AND CONTROLS
Page 3 of 4
1. Cantractor is responsible for maintaining dust conhol through the dur�tion oit�e
project.
a. Contractor remains an-ca11 at all times
b. Must respond in a tim�ly manner
F. Temporary Protection of Construci.ion
1. Contraetor or subcontraciors are respansible for prntecting Woric irozn darnage due
to weather.
1.5 SiTBMITTALS [NOT iTSED]
1.b ACTION SUBMITTALS/INFORMATIONAL SiTBMITTALS [NOT U�ED]
1.7 CLDSEOUT SUBMITTALS [NOT USED]
1.8 MAIN-TENANCE MATERIAL SUBMITTALS [NOT USED]
1,9 QUALITY ASSiTRANCE [NOT USED]
i.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODLTCTS [NOT iTSED]
PART 3 - EXECUT�ON [NOT USED]
3.1 INSTALLERS [NOT USED]
3.� EXAMINATI�N [NOT USED]
3.3 PREPARATION [N�T USED]
3.4 INSTALLATION
A. 'I'emporary k'acilities
1. Maintaiaa all famporary facilities for duration of construction activities as needed.
3.5 [REPAIR] / [RE�TORATION]
3.6 RE-INSTALLATION
3.7 FIELD [oa] SITE QUALITY CQNTROL [NOT IISE.D]
3.8 SI'STEM STARTUP [NOT USED]
3.9 ADNSTING [.NUT USED]
3.10 CLEANING [NDT USED]
3.11 CL05EOUT ACTIVITIES
A. Temporary Facilities
C1TY OF FORT WORTH 2O22 Bridge Rehabilitation Contract 2
5TANDARD CONSTRUCTTON SP�CIi'ICATION DOCUM3�N1'S City PrajecE no. 103456
Revisad July 1, 2q I 1
O 1 50 QO - �4
TEMP4RARY FA.CILITIES AND CONTROI.S
T'age 4 of 4
1. Remove all temporary facilities and restore area after completion of the Work, to a
condition equai ta or better than prior to start of Work.
3.12 PROTECTION [NOT USEDj
3.13 1VIAZNTENANGE [NOT i7SED]
3.14 ATTACHMENTS [NOT USED]
END aF SECTION
Re�+isian Log
DATE N11ME 5T TMMARY OF CHANGE
CTI'Y bF FORT WbRTH 2O22 Bridge Rehahili(ation Contract 2
STANDAWJ CONSTRUCTION SPECIFICATION I70CiTMENTS City Project no. 103h56
Revised 7uly 7, 2011
O] 552G-1
STRE£T USEPERMIT ANDMODIFICATI01�2S TOTRAx'FIC CONTROL
Page 1 of 3
�
2
sEc�roN ax ss z6
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
3 PART 1 - GTd�TF.RAI.
4 i.I Si]1VIiVYARY
5
6
7
8
9
10
11
12
13
14
15
A. Section Includes:
I. Administrative procedures far:
a. Street Use Permit
b. Modification of approved traffic control
c. RemovaI of Street 5igns
B. Deviations fram this City afFort Worth 5tandard Specif'zcation
1. Nane.
C. Related Specification 5ections inclucie, but are not necessarily lirnited io:
1. Division 0-- Bidding Requirannents, Contract Farms and Conditions of the Coniract
2. Divisian 1— General Requirements
3. Section 34 71 13 — Traf�c Control
16 1.2 PRICE AND PAYMENT PROCIDiJR�S
1'] A. Measurement and Payrnent
18 1. Work associated witk� tk�is Item is cansidered su6sidiary to the various Items bid.
19 No separate payment will be allc�r�ved for this Item.
20 1.3 ��:�'�:R +.T'1�TCF5
2l A.Reference Standards
22 1. Reference standards cited in this specification refer to the current reference standard
23 pu6lished at the time of the ]atest revi�ion date lagged at the end of this
2A specification, unless a date is specifically cited.
25 2. Texas Manual on Ilnifo.rm Traffic Contral Devices (TMi�'I'CD).
26 1.� ADNIINISTRATIVE RT�QiTIRENIIIVTS
27
28
29
30
31
32
33
34
35
36
A. Traffic Cantral
1. G�neraI
a. Contractar shall minIInize lane closures and impact to vehicular/pedestrian
traffic.
b. When traff�c control plans are included in the Drawings, pravide Tr�c
Control in accardance with Drawings and Section 34 71 13.
c. When iraffic cantrol plans are not included in the Drawings, prepare traffic
control plans iri accordance with Sectian 34 7I 13 and submit to City for
review.
1} Allow minunum 10 �orkin.g days far review of proposed Tr�ffic Control.
C1TY OF FpRT WORTH 2O22 Bridge Rehabilitation Contract 2
5TANDAR.� CONSTIZUGTI01� SPEC`1FICATIO�I DOCI]]VE�NTS Ciry Project no. 103456
Revised March 22, 2021 �
ai ssas-z
STREET USEPSRM3T ANDMODIF'ICATIONS TO TIiAFF1C CONTR01.
Page2of3
1 2) A trafitc control "Typical" published by City of Fort Worth, the Texas
2 Manual Unified Traffic Control Devices (TMiTTCD) or Texas Department
3 of Transportation (TxDOT'} can be used as an aiternative to preparing
4 project/site specif'ic traff'ic can�al plan if the typical is applicable to tE�e
5 specific praject/site,
6 B. Street C 7s e Permit
7 1. Prior to installation of Traffic Control, a City Streei Us e Permit is required.
8 a. To abtain 5tt•eet Use Permit, subm'rt Traffic Contral Plans to �ity
9 Transportation and Public Warks Department.
l0 1) Allaw a minimum af S working days for permit revievv.
11 2) It is the Cantractor's responsibility to coordinate review of Traffic Control
12 plans for Street Use Permi�, such that constructian is not delayed.
I3
14
15
16
17
1$
19
20
2l
22
23
24
C. Modif'ication to Approved Traffic Control
1. Priar to installation traffic cantrol:
a. Submit revised traffic control plans to City Department Transpor�ation and
Publ�c Warks Department.
1) Rc�is� Traffic Conirol plans in accordance wiih SecUon 34 71 ] 3.
2) Allow minimum 5 working days for review af revised Traffic Control.
3) It is the Cnnri•actor's responsibility to coordinate review ofTraf£�ic Control
plans for Street Use Permit, such that construction is not delayed.
D. Removal of Streat Sign
1, If it is determined that a street sign must be removed for cans�uction, then contact
CitSr Transportation and Public Works Department, Signs and Markings Division to
remo�e the sign.
2S E. 'I'empoz•ary Signage
26 1. In the case a�regulatory signs, replace permanent sign with temporary sign meeting
27 requirements of the latest edition of the Te�as Manual on Uniform Traffic Control
28 De�ices {M[]1'CD).
2R 2. Install temporary sign before the removal of permanent sign.
30
3l
32
33
34
3. When construction is complete, to the extent that the permanent sign can be
r�installed, cnntact the City Transpartation and PE�blic Works Department, Sige�s
and Markings Division, to reinstall the permanent s ign.
F. Traffic Control Standards
1. Traffic Control Standards can be found on the City's websit�.
3S l.S Si]BMITTALS [NOTTJSID]
36 A. Submit all required documentation to City's Praject Representative.
CITY QF FORT W pRTH 2Q22 Bridge Rehabiliffition Contract 2
STANDARD CONSTItUCTIOAI SPECIFICATIDN DOCUMENT5 City Project no. 103456
Rev3sed March 22, 2021
Ol SS26-3
STREET USE PERMI'i AND MOD�'ICATI�NS TO TRAFFIC CQ1VTRdL
Page 3 of 3
1 1,6 ACTION STIBNIITTALSlINFORMATIONAL SiTSNIITTALS [NOT USIDj
2 L7 CLOSEOiJT SUBIVICTTALS [NOT USID]
3 1.8 MAIN'IINANCE MAT'IIZiAL SUBMCTTALS [NOT USID]
4 1.9 QUALITY ASSUitANCE jNOT IISID]
5 1.10 DII�IVII2Y, STORAG�', AND HANDLTNG [NOT USID]
6 1.11 FIII.D [SI'TL+`J CONDITIONS [NOT USID]
7 1.12 WARRAIVTY [NOT USID]
8 PART Z— PRODUCTS [NOT USED]
9 PA.RT 3— EXFaCiJTiON [NOT USID]
IQ
11
IND OF SECTiON
Revision L.og
DATE NAM� SUMMARY OF CHANGE
1.4 A. Added ]anguage to emphasize minimizing of lane closures and.impact to
traffic.
3/22/2D2 I M Owe+� Y•4 A. I. c. Added language to allow for use of published traffie control "Typicals" i
applicable to specific prpject/site,
1.4 F. 1) R�mo�edreference to Buzzsaw
1.5 Added language re: submittal of p.ermit
12
CTI'Y OF FORT WORTH 2O22 B�idge Reha6ilitatio� Contract 2
STAIVDARD CONSTRUCI'iON SPECIFICATION DOCUNEENTS City Projact na. 103h56
Revised March 22, Z021
ois-�r3-i
STbRM WA"TBRPOLLUTIdN PREVEIVTIdN
Page I of 3
SECTION 01 5713
S`I'�RM WATER �OI,LUTION PREVENTION
PARTX- GENERAL
i �i�y .0 .��1
A. Section Inch�des:
I. Frocedures for 5torin Water Follution Prevention Plans
B. Deviations from this City of Fort Worth Standard Specificatian
1. None.
C. Related Speciiication Sections include, but are not necessarily limited to:
I. Division 0— Biddin� Requirements, Contract Forms ar►d Conditians of the
Contract
2. Di�ision 1— General Requixements
3. Section 31 25 00 —Erosian and Sediment Canfrol
1..2 PRiCE ANIl PAYMENT PROCEDi7RE�
A. Measurement and Payment
1. Construction Acti�ities resulting in less than 1 acre of disturbance
a. Wark associated with this Item is considered subsidiaiy to the various Items
bid. No separate payment will be allowed for this Item.
2. Construcfion Actit�ities res�Elting in great�z' than 1 acre of distL�rba.nce
a. Measureznent an.d �ay�nent shall be in accordance with Section 31 25 00.
l.3 REk'ERENCES
A. Abbreviatians and Acronyms
1. Notice af Intent: NOI
2. Notice af Terminatian: NOT
3. Storm Water Pollution Pre�ention Flan: SWFPP
4. Texas Commission on Environmental Quality: TCEQ
5. Notice of Change: NOC
A. Ref�rence Standards
I. Referetace standa�'ds cited in this Speci�catian refer to the current reference
standard published at the time of the latest revisian date ]ngg�d at the end of this
Specification, unless a date is specifically cited.
2. Integrated Storm Management {iSWIV� Teehnical Manual for Construction
Cantro[s
1.4 ADMIIVISTRATNE REQUIREMENTS
A. General
1. Contractor is responsible for resolution and payment of any fines issued associated
wiih campliance to Stormwater Pollution Prevention Plan.
C1TY pF FDRT jNORTH 2O22 Bridge Rehabilitation ContracC 2
STANDAf2D CON9TRUCTIDN 5PECIFICATION DOCi1MENT5 City Project no. ] 03456
E2evssed duly l, 20l 1
015713-2
S"fORM W�+TER PpLLU7'IdN PREV�NTIOIV
Page 2 of 3
B. Construction Activities resulting in:
1. Less than 1 acre nf disturbance
a. Provide erosion and sediment control in accordance with 5ectian 31 25 00 azYd
Drawings.
2. 1 to jess than 5 acres o�'disturbance
a. Texas Pollutiant Discharge Elimination System (TFDES) General Construction
Permit is required
b. Complete SWPI'1' in accordance with TCEQ requirements
Ij TCEQ Small Gonstruction 5ite Notice Reguired under general permit
TXR150000
a) Sign and post at joh site
b) Prior to Preconstructian Meeting, send 1 copy to City Depaz'tment of
Transportation and Public Works, Environm�ntaJ Division, (817) 392-
6088.
2) Provide erosion and sediment eonlral in acGnrdance with:
a) Seetion 31 25 00
b} The Drawings
c} TXR154000 General Permit
d} S WPPP
e) TCEQ requirements
3. S acres or more of Dis�urbance
a. Texas Pollutant Discharge �linninaYion System (TPDES) General Canstruetion
Perinit is required
b. Complete SWPPP it� accordance vaith TCEQ requirements
1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
a) Sign and post at job site
b) Sand capy to City Department of Transportation and PubIic Works,
�nvirQnmental Division, {817) 392-6088.
2) `I'CEQ Notice of Change required if making changes or updates to NOI
3) Provide erasion and sediment control in accordance with:
a} Section 31 25 00
b} T�e Drawings
c} T�R150000 Ge�eral Permit
d) SWPPP
e) TCEQ requirements
4} Once the project has been completed and all the clns�out raquire.znents of
TCEQ have been met a TCEQ Notice of Termination can be submikte.d.
a) �end eapy ta City Department of Transportation and Public Warks,
En�ironmental Division, (817) 392-6088.
1.5 SIIBNIITTALS
A. SWP�'P
Submit in accordance with Section 01 33 00, except as stated her�in.
a. Prior to the Preconstruction Mee�ing, submit a draft capy of S WPPP to the City
as follows:
1) 1 copy fio the City Project Manager
a) City Project Manager will forward to the City Department of
Transportation and Public Works, Environmental Di�ision for review
CTTY OF FORT WORTI-1 2022 Sridge Rehabilitatian Contract 2
STAI�DARD CONSTT2UCTION SPECIFICATTQN DOCUMENTS City Praject no. 103456
Revised July 1, 2D11
a�s�i3-3
STdRM WATERPdLLUTIOIV PRE�INTION
Page 3 of 3
B. Modified SWPPP
1. Ifthe SWPPP is revised during construcfion, resubmit modifed SW�'PP to the Cit}+
in accordance with 5ection O1 33 00.
i,b ACTTON SiJBNIITTALSfINFORMATIONAL SUBMITTALS [1VOT USED]
�.7 CL�SE�UT SUBMITTAL� [NOT USED]
1.8 MAYNTENANCE 11�ATERYAL �UBMITTALS [NOT USED]
1,9 QUALTTY ASSiTRANCE [NOT USED]
1.10 DELI'VERY, STORAGE, AND IiANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIQN� [NOT USED]
1.12 WARRANTY [NOT USEDI
PART 2 - FRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTI�N
Revision Log
DAT� NAM� SUlVIMARY OF CHANGE
[:ITY OF FORT WORTH 2p2z ]3rid$e 3telaabilitation Cot�Vact 2
STFLNDAItD COidSTRUCTIdi� S�ECIF'ICATCON DOCLTMENTS City Praject no. 103456
Revised Iuly 1, 201 l
015813- I
T�IVIPORARY PRO.]ECT SIGNAGE
Page 1 af3
�ECTION OY 5813
TEMPORARY PROJECT SIGNAG�
PART1- GENERAL
1,] SrT1VLMARY
A. Section Includes:
1. Temporary Project Si�nage Requiremenfs
B. Deviations from this City of Fort Worth Standard Sp�cificatian
l. None.
C. Related Speciiication �eations include, bui at'e n.ot t�ecessarily limited to:
1. Division 0— Bidding Reyuirements, Contract Forms and Conditians af the Contract
2. Division 1— General Requirements
1.,2 �RICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Wark associated wifih this Item is considered subsidiary to the vaz'ious Itams bid.
No separate payrnent will be allowed for this Item.
1.3 RE�'ERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
L5 SUBMITTAL$ [1vOT USEDI
I.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED�
1.'i CLOSEQ�7T SUBMITTALS [NOT USED]
1.8 MATNTENANCE MATERIAL SUBMITTALS �NOT US�D]
1.9 QUAL�TY ASSiTRANCE [NOT USEDI
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] C�NDITIONS [NOT USED]
1.1� WARRANTY [N4T USED]
PART 2 - PRODUCTS
2.1 OWNER-FURNT�HED [ox� OWN�R-SUPPLIEDPRODUCTS [NOT USED]
�.2 EQUIPMENT, PR.ODIICT TYP�S, ANI� MATERIALS
A. Desigza Criteria
l. Provide free standing Project Designation Sign in accordance with Ciry's Standa��d
Details for project signs.
CITY OF FORT WORTH 2O22 Bridge Rehabilitation Contract 2
STA]�IDARD CONSTRUCTION SPECII'ICATION DOCUME]VTS City Project no. 103456
Revised 7uly 1, 241 I
O15833-2
TEMPaRARY PltOJECT SIGNAGE
Page 2 of 3
B. Materials
1. Sign
a. Constructed of 3/4-inch fir plywood, grade A-C {exte�•ior) or better
�.3 ACCESSORI�S jNOT USED]
2.4 SOURCE QiTALITY CQNTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT US�D]
3.3 PR�PARATIQN [NOT U�EDI
3.4 INSTALLATION
A, General
1, Provide vertical installation at extents of project.
2. Relocate sign as needed, upon request of tltie City.
B. Mounting aptions
a. Skids
b. Posts
c. Barricade
3.� REPAIR / RESTORATIQN INOT USED]
3.6 RE-INSTALLATION [NOT US�D]
3.7 I+'IELD [ox] SITE QUALI'TY CONTROL [NOT IISED�
3.$ SYSTEM STARTUP �NOT iJSED]
3.9 ADJ[1STING [NOT US�Dj
3.10 CY,EANING �NOT USED]
3.11 CLOS�OUT ACTIVYTY�S [NOT USED]
3.12 PR�TECTION jNOT iTSED]
3.13 MAiNTENANCE
A. General
1, Maintenance wi11 include painting and repairs as needed or directed by the City.
3.14 ATTACHM�NT� [NOT USED]
EIVD OF SECTION
CTTY OI' i'�RT WORTI-T 2022 Bridge Rehabilitation Contract 2
STANDARD CONSTRUCTION SPECIFICATIpN DOCUMEN'TS City Project no. 103456
Revised Jvly 1, 2011
oi ss ia-�
TCMPORARY PR07ECT 3iGNAGE
Page 3 of 3
Revision Log
DATE NAME SUMMARY OF CIIANGE
CI`TY O�' FpRT WOI�iTH 2d22, Bridge Reha6ilitation Contract 2
STANDARD CQNSTRUCTIdN SPECIP'ICATION DOCUMENTS City Project no. I U3456
Revised 7uly I, 2Ul I
dl 6D OD
PRODUCT REQC7IItEMENT5
Page 1 af 2
s�eTroN o160 00
PRODUCT REQUIREMENTS
PARTI- GENERAL
1.1 SUMMARY
A. Section Inclu�ies:
1. References for Praduct Requuements and Ci#y Standard Products List
B. De�iations from this City of Fort Worth Standard �pecificatian
1. None.
C. Related Specification Sections include, but are not necessarily limite.d ta:
l. Division 0— Bidding Requirements, Contract Forms and Conditians of the Contract
2. Division 1— Genet•aI Rec�uirements
i.2 FRICE AND PAI'M�NT PROCEDiTRES [NOT USED]
1.3 REFERENCES [NOT USED]
1.4 ADMIIVISTRATNE REQUIREMENTS
A. A]ist of City approved products for use is availablc th�•ou.�h the City's wahsite at:
https:/lapps.fortworthtexas.g+av/ProjectResources/ and following the directory path;
02 - Constructian Documents/5tandard Products List
B. Only products specifically included on Ciiy's Standai•d Fi•ocfuct List in these Contract
Documents shall be allowed for use on the Project.
1. Any subsequently approved produ�ts will only be allowed for use upon specific
approval by the City.
C. Any speci�c product reauireznents in the Contraet Documents supersede similar
produeis included an the City's Standard Product List.
1. The City reserves the right to nat allow products ta be used iar certain projacts e�en
though the �roduct is listed an fhe City's Standard Product List.
D. Although a specific praduct is iiicluded on City's Standard Product List, not all
products from that rr�anufactEirer are approved for use, including but not limited to, that
manufactarer's standard product.
E. See Section 0 i 33 00 for submittal requiremer�ts o�Product Data included on City's
Standard Product List.
1.5 SUBMITTALS [NO'T US�D]
1.6 ACTION �UBMITTALSIINFORMATIONAL SUBMiTTALS [NOT USED]
1.'� CLOSEOUT SUBMITTALS [NOT USED]
1.S MAINTENANCE MATERXA.L �UBMTTTALS [N�T US�D]
1.9 QUALITY ASSURANCE [NOT U�ED]
C1TY OF EORT WORTH 2O22 Bridge Rehabilitation Contract 2
STANDARD CON5TRUCTION SPECIFICATIbN DOCiJME1VT5 City Project no. 103456
Re�ised March 9, 2Q2p
07 6a aa
PRQDUCT REQiJ1REMENT5
Page 2 oP2
1.10 DELIVERY, STORAGE, AND HANDLI�NG �NUT �C1SEDj
1.11 FIELD [SITE] CD1uD�TI()NS [NOT U�EDJ
1.12 WA.R:I3.A,NTY [NOT USED]
PART 2 - PRODUCTS [NOT US�D]
PART 3 - EXECUTION [NOT USED]
END O�' SECTION
Revision �og
DATE NAME SUMMEIRY OF Cf�IANGE
16/12/12 D. dohnson Modified Location oi City's Standard Product List
3191202Q D,V, Magana Removed reference to Buzzsaw and noted that Yhe City approved products ]istis
accessible through the City's we6site.
C1TY OF FORT WORTH 2O22 Bridge RehaUilitation Contract 2
STANDARD CONSTRUCTiON SPECIFICATIqN DOCUMENTfi City Project no. 103456
1Levised March 9, 202D
o� 7oao-i
M�BILIZATION AND. REMOBILIZATIdN
Page I nf 4
� srcTTON oi 7o ao
2 MOBILiZATION AND REMOBILIZATION
3 PART 1 - G�+:N�'.XtAl ,
�l 1.I SUNIlI7ARY
5 A. Section Includes:
6 1. Mobilization and Demobili7atian
7 a. Mobilization
8 1) Transgortation of C.ontractor's personnel, equipment, and aperating supplies
10
11
12
13
14
15
1b
17
]S
19
20
21
22
23
2�l
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
�#0
41
42
43
q4
45
ta the Site
2) Establishment of necessary general facilities for the Contractor's operation
at the Site
3) Premiums paid for performance and payrnent bonds
4) Transpartation of Contractor's persnnnel, e.�{uipment, and operating supplies
to anather location within th� designated Site
5) Reloca�ion of necessary genet-al �acilities for the Contractor's opegation
from 1 location to another location on the Site.
b. Dem.obilization
]) Transportation of Contractor's p.ersonnel, equipment, and operating supplies
away from the Site including disassembly
2) Site Clean-up
3) Remo�al of all buildings andlor other facilities assembled at the Site far this
Contract
c. Mobilization and Demobilization do nat include activities for specific items af
work that are for which payment is provided elsewhere in the eontraet.
2. Remobilization
a. Remohilization for Suspensian oi Wark specitically required in the Contract
Documents ar as required by City includes:
� ) Demobilization
a} 'Franspartation of Coni:ractor's personnel, eqUipmeni, and operating
supplies frorn the Site including. disassembly or temporari[y securing
equipment, supplies, and ather facilities as designated by the Contract
Docu3nents necessary ta suspendthe Wor1c.
b} �ite CIean-up as designated 'm the Contract Documents
2) Remobilization
a} Transportation of Cantractor's personnel, equzpment, and operating
supplies to the Site n�cessary to resume the Wark.
b} Establishmant of neces.sary ganeral facilities %r the Cantractnr's
operation at the Site necessary to resume the Work.
3) No Payments wilI be made for:
a} Mobilization and DemobiIization from one location to anotI-ier on the
Site in the narmal pragress of perform�ng the Work.
b) �tand-by or idle time
c} Lost profits
3. Mabilizations and Damobilization for Miscellaneous Projec�s
a. Mobilization and Demobilization
C1T1' O�' FORT WORTTI 2022 Bridgeitehahi]itationContract 2
S'1'ANi�AIiD CO�TSTRUCI'ION SPECIFICATION DOCUMENTS City Project No. 103456
Revtsed No�emher 22, 2016
o� �000-z
MO�[I,TZt+:TION AND REMOBILIZATION
Page 2 of 4
6
7
S
9
10
1I
12
13
1�4
15
i6
17
18
19
zo
21
1) Mobilization shall consist of the activities and cost an a Work Oj•der basis
necessary for:
a) Transportation of Contractor's personnel, equipmenr, and operating
supplies to the Site for the issued Work Order.
b} Fstablishment of necessary general facilities for the Contractor's
operation at t�e S'rte for the issued Wark Order
2) Demobilizatzon shall consist afthe activrties and cast necessary for:
a} Transportation of Contractor's perso�ln�I, equipment, and operat�ng
supplies from th� Site including disassem6ly far eack� issued Work
Order
b) Site Clean-up for each issued Work Order
c) Removal of all buildings or other facilities assembled at the Site fnr
eaeh Wark Oder
b. Mohi�izatian and Demobiiization do not include activrties far specif'ic items of
wark for which payment is provided elsewhere in the contract.
4. Emergency Mobilizations and Demobilization %r MiscelIaneous Prajects
a. A Mobilization for Nliscellaneous Projects when directed by the City and the
mobilization occurs within 24 hours of the issuance of the Work Order.
B. Deviations from this City of Fort Warth Standard Specif'ication
1. None.
C. Related Speei�cation Sections include, but are not necessarily limited to:
22 1. Divis ion 0-- Bidding Requirements, Coniract Farms and Conditions af the Contract
23 2. Division 1— General Requirements
2� 1.2 PRICE AND PAYNiEIVT PROCEDL]RES
25 A. Measurement and Payment [Cansult City Departrnent/Division for di�ection an if
26 Mobilization pay item ta be incIuded or the item should be subsidiary. Include tne
27 appropriate Section 1.2 A. 1.]
28
29
30
31
32
33
34
35
3b
37
3$
39
40
41
42
A3
4h
45
46
1. Mobilizatinn and Demobilizatian
a. Measure
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) T�e work performed and materials f�nisheci in accordanee with this Item
are subsidaary to the various Items bid and no other corrlpensation wi]I be
allow ed. �
2) The work performed and matarials furn�shed for dezx�.obzGzatian in
accardance with this Itern axe subsidiary to the various Iterns bid arid no other
compensation will be allawed.
2. Remobilizatinn �nr suspension of Work as specifically required in the Contract
Document5
a. Measurement
1) Measurement for fihis Item shall be per each r�mabilization performed.
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" wi� be paid %r at the unit
price per eaeh "Specified Remobilization" in accordance with Coniract
DocLiments.
C1TY OF FflRT WORTH
STANDAAD CONSTi2UCI'ION SPECIFICATION DOCiTMENTS
Revised Novernber 22, 2U16
2p22 BridgeRehabilitationContraet 2
City Project No. 103456
01 7400 -3
[vIOBILIZATIQN AND REMOBILIZATION
Page 3 oi 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2D
2I
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
3&
39
40
41
c. The price shall include:
1j Demobilizafion as described in 5ection I.1.A.2.a. I)
2) Remobilization as described in Sectian I,1.A.2.a,2)
d. No payments wili be made for standby, idle time, ar lost profits associated this
Item.
3. Remobilization for suspensinn of Work as required by City
a. Measurement and Payment
1) This shall be submitted as a Contract Clairn in accordance with Article IO
of Section 00 72 00.
2) No paynlents will be made for standby, idle time, or last profits associated
with this Item.
4. Mobilizatians and Demobilizations far Miscellaneous Projects
a. Measurement
1} Measurement for this Itt;m shall be for each Mobilization and
Demobilization required by the Contract Documenis
b. Payment
1} The Wo.rk perfarmed and materials furuished in accordance with th�s Item
and measured as provided under "Measurement" will be pafd for at the unit
price per each "Work Order Mo�ilization" it� accardance with Contract
Doeuments. Demohilization shall be considered subsidiary to mobilization
and shall not be paid for separately.
c. ThepxiceshalJ include:
1} Mobilizatian as described in Section 1.1.A.3.a.I)
2} Demobilizatian as described 'm Section 1, I.A.3.a.2)
d. No payments will be madefor standby, idletirne, nr lnst profits associated this
Item.
5. Emergency Mabilizations and Demobilizat�ons for Miscellaneous Projects
a. Measurement
1} Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b, Pay�nent
1} The Work perfarmed and materials furnished in aecordance with this Item
and measured as provided under "Measurement" will be paid for at tk�e unit
price per each "VJork Order Emergeney Mabi[izatian" in accordance with
Contract Documen.ts. Demobilization shall be considered subsidzaxy ta
inobilization and shall not be paid for separately,
c. Thepriceshallinclud�
1} Mobilization as describ.ed in S�ctian 1.1.A.4.a)
2) Demobilization as described in Section I.1.A.3.a.2)
d. No payments wi[] be made for standby, idle time, or lost profits associated this
Item.
42 1.3 RFF�`+.RFIVCF� [NOT U�ED]
43 1.4 ADNIIIYISTRATIVE REQLJIREN�F�TTS [NOT USED]
44 1.S SiJBMITTALS [N�T USID]
4S 1.6 INFORMATIONAL SiTBMITTALS [NOT i1�ED]
46 1.7 CLOSEOUT SUBNIITTALS [NOT iTSID]
CITY OF FdRT WORTH 2o22 BndgeAehabiliYation ContracY 2
STANDARD CONSTRUCTIaN SP6CIFICAT[ON AOCUMENTS Ciry Project Na. 143456
Revised November 22, 2016
01 7000 -4
1vIOBILIZATION AN17 REMOBILIZATiON
Page 4 of 4
�
2
3
4
s
1.8 MAINTII�IANCE MATERIAL SiJBNlrTTALS [NOT U5ID]
1..9 QUALITY A�Si7RANCE [NOT iTSID]
1.10 DII.�VCRY, STURAGE, AND HA1VllLING [N�T USED]
1.11 FIELD [SITEj CONDITIONS [NOT USID]
x. x2 wARUA� �NOT u�Enl
6 PA.RT 2- PR�DUCTS [NOT USED]
7
8
9
PART 3 � EXI'.CiJTIQN [NOT USEU]
II�iD OF �ECTION
Revisian Log
DATE NAME �UMMARYOF CHANGE
1 i 122J1 b Michael Or�n 12 Price and Payment P rocedures - Revised specification, including blrae text, to
make specification flexible far either subsidiary or paid bid item forMobilization.
ia
C1TY OF FOR'T' WORTH 2O22 BricEgeRehabi]itationContract 2
STANDAitD CQNSTRUGTION SPECIFiCATiOiV dOCl1MENTS City Praject No. kQ3456
Rev.ised No�emher 22, 201G
O17I23-1
CONSTRUC7'IDN STAI�ING AND SLTAVEY
Page 1 nf S
SECTZON 017123
GONSTRUCTION STAKING AND SURVEY
PART 1 - �ENERAL
1.1 SUMMARY
A. Section Includes:
1. Requirernents for canstruction staking and constructian suz'vey
S. Deviations frorn this City af Forf Worth Standard Sp�cification
1. Nane.
C. Related Specification Sections include, but are not necessarily jirnited fo:
1. Division 0— Bidding Requirements, Cantract Forms and Conditions af the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYII�NT PROCEDiTRES
A. Measurement and Payment
I. Construction Staking
a. Measurement
1) Measurement for fhis It�m shall be by lump sui�a.
b, Payment
1) The wark perFormed and the materials furnished in accordance with this
[tem sha[1 be paid far at the lump sum price bid fo�• "Construction Stal�ing".
2) Payment for "Canstructian Stalcing" shall be macfe in partial payments
prorated by work completed compared to tota[ work inclnded in the luEnp
sum item.
c. The price bid shall includc�, but nat be lirnited to the foflowing:
1) Verificati�n of cantrol data provided by Cit3r.
2) P[acerr�ent, maintenance and replacernent of required stakes and rr�arkings
in the fiE[d.
3) Preparation and subinittal of canstruction staking documentation in the
form af "cut sheets" using the City's standard template.
2. Construction Survey
a. Measurement
1} This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work parformed and the materials furnished in accordance with this
Item are subsidiary to the various I#ems bid and no other compen�ation will be
a[lowed,
3. As-Built Survey
a. Measurement
1) Measurement for this Item sha11 be by lump surn.
b. Payment
1) The wark perfoimed and the materials furnished in accordance with this
Item sl�all be paid for at the Iump sum price bid for "As-Built �ur�ey°'.
C1TY OF FpR"C WOR'I'H 2fl22 Bridge Rehabilitatinn Contr�act 2
5TANIIARD CQNSTRiICT[QN SPECIFICATION DOCLTNfENTS City Project no. 103�4�b
Ltevised �ebruary 19, 20I8
at �� Zs - 2
CONSTRUCT[ON 5TAKING AIVD SUIZV&Y
Page 2 of 8
2) Payment for "Const�-uction Sfaki�a�" shall be zxzade in partial payments
prarated by work connpleted campared to Yotal wark included in the lc�mp sum
itein.
c. The price bid sha1l include, but not be limited to the fallowing::
1} F1e�d m�asurenaents and survey shats to identify location of campleted
facilrties.
2) Dacumentaiinn and submittal af as-built survey data onto contractor redline
plans and digital survey fzles.
1.3 RCFERENCES
A. Definitions
1. Construction Surv'ev - The survey measurements made prior to or while
canstructian is [n progress to cantrol elevation, horizontal position, dimensions and
configuration of structureslitxzpravements incfuded in the Project Drawings.
2. As-buili Survev --The �neasurements made after the construction of the
irrtprovernent feaiures are complete to provide pasition coordinates for tlie features
of a project.
3. Construction Stakin� —`The placement of stakes a.nd markings to pro�ide offsets
and eIevations to cut and fill in order to locate on the ground the design�d
structureslimprovements included in the Project Drawir�gs. Construction staking
shall include staking easements anci/or right of way if indicated on the plans.
4. Surve "Field Checks" — Measurements made after construction staking is
completed and before constructian work begins to ensure that structures markad on
the ground are accurately located per Froject Drawings.
B. Technical References
1, City of Fort W�rth — Construction Staking Siandards (available on City's Buzzsaw
we6site) — D 1 71 23.16.0 i_ Attachment A_Survey Staking Standards
2. City of Fort Worth - 5tandard 5urvey Data Collector Li6rary (fxl) fil�s (available
on City's Buzzsaw website).
3. Texas Departmeni of Transportation (T�OT) Survey Manual, Iatest revision
4. Texas Society of Prafessional Land Surveyors {TBPS), Manual of Practice for Land
Surveying in the State of Texas, Category S
1.� ADMINXSTRATIVE REQUIItEMENTS
A. The Contractar's selection of a sarveyor musE comply wit� Texas Gavernment
Cade 2�54 (q�talificatian� based selection} for ti�is project.
1.5 SUBMITTALS
A. Sui�mitta�s, if required, shall be in accordance with Secfiion Ol 33 D�.
B. All submittals sha�l be received and revievved by the City priar ta delivery af vvork.
1.G A.CTI�N SUBMITTALSIINI'ORMATIONAL SUBMITTALS
A. FieId Quality Control Submiftals
C1TY OF FORT WORTI-I 2D22 Hridge Rehabilitation Contract 2
STANDARD CdNSTRUCTION SPECIFICATION DOCUMENTS City ProjecE no. ] 03�#56
Revised Tebruary 14, 201$
417123-3
CONSTRUCTIQN STAKD�G AND SURVEY
Page 3 of 8
1. Documentatian verifying accuracy of field engineering worl�, including coordinate
conversions if plans do not indicate grid or graund coordinates.
2. Submit "Cut-Sheets" conforming to the standard templat� provided by the City
{refer to OI 71 23. I6.01 — Attachment A— 5urvey Staking Standards).
1.7 CLOSEDUT SUBMITTALS
B. As-built Aedline Drawing Sub�nittal
1. Subnnit As-�uilt Survey RedIine Drawings dacumenting the locations/elevations of
canst�•ucted improvements signed and sealed by Regisiered Professional Land
Su�•veyor (RPLSj responsible for the wark (refer to O 1 7I 23.16.01 — Aitachment A
— Survey Staking Standards) .
2. Contractor shall submit the praposed as-built and completed redline drawing
submiital one (1) vsTeek prior to scheduling the project fnal inspectian far City
review and comment. Revisions, if necessary, shall be made to the as-built redline
drawmgs and resubmitted to the City prior to scheduling the constrLiction final
inspect�on.
1.8 MAINTENANCE MATERIAL SUBMITTAL� [NOT USED]
1.9 QIIALITY A�SURANCE
A. Canstruction Staking
1. Constructian stal�ing will be performed by the Contractor.
2. Coardination
a. Contact City's Praject Representative at least ane week in advance notifying
the City of when Constxuction Stalcing [s schedu]ad.
b. It is the Cantractor's responsihil�ty to coordinate stafcing such that
constructian activities at'e not delayed or negatively impacted.
3. Ganeral
a. Contractor is responsible for preserving and rnaintaining statces. If C'ity
sur�eyors are required to re-stalce for any reason, the �antractar will be
responsible for costs to perfarm staking. If in the opinion Qf the City, a
su�cient number of stakes or markings have been Iast, destroyed disturbed or
omitted that the contracted Work cannot �ake place then the Contractor will be
reyuired to stake or re-sfake the deficieni areas.
B. Constructiqn Survey
1. Construction Survey will be perfarmed by the Cantractor,
2. Caordination
a. Contractor to verify that horizontal and vertical control data es#ablislsed in the
des'tgn survey and required for construction suivey is available and in place.
3. General
a. Canstruction survey wili be performed in order to construct tt►e work shown
on the Construction Drawings and specifad in the Contract Documents.
b. For construct.ion methods other than open cut, the Contractor shall perfflrm
construction survay and verify control data including, but not limited to, the
following:
1) Verification that established 6enchmarks and control are accurate.
CTTY OP FORT WORTII 2622 $ridge Reha�ilitation Contract 2
STANDARD CONSTRUCTION SPEC[FICATION DQGUMENTS Ciry Project na, 10345b
Revised February 14, 2018
017123-4
CONSTAUCTI�3V S.TAKING AND SURV�Y
Page 4 af 8
2) LTse af Benchmarks to furnish and anaintain all reference lines and grades
for tunneling.
3) Use of line and grades to establish tha lacafiion of the pipe.
4) Subrnit to the Gity copies of field natesused to establish all Iines and
grades, if rec�uested, and allow the City to eheck guidance system setup priot•
to beginning each tunneling drive.
S) Provide access far the Ci .ty, if requested, to verify the guidance system and
the line and grade of the carrier pipe.
6) The Contractor remains fully responsible for the accuracy of the worl� and
correction af it, as required.
7) Manitor iine and grade cantinuously during construction.
8} Record deviatian with respect to design tine and grade once at each pipe
joint and s�bmit daily records to the City.
9} If the installation does not meet the specified tolerances (as outiined in
�ections 33 45 23 and/or 33 OS 24), immediately notify the City. and correct
the installation in accordance with the Contract Documents.
C. As-Built 5urvey
1. Required As-Built Su�•vey will be performed by the Contractor.
2. Coordination
a. Contractor is to coordinate wiih City to coniirm which features require as-
built surveying.
b. It is the Contractor's responsibility to caordinate the as-built survey and
required measurements for items that are ta be 6uried such that construction
acti�ities are not delayed ar negatively imgacted.
c. For sewer mains and water mains 12" and under in diameter, it is acceptable
to physically measure depth and mark th� lacation during t�e progress af
construction and take as-built survey after t�ae facility has been buried. The
Cantractor is responsible for the quality control needed ta ensure accuracy.
3. G�n.eral
a. The Contractor sha11 pravide as-built survey including tha elevation and
lacation (a�tzd provide wriY�en documentation to the City) of construction
t'eatures during ihe progress of t�e constrnction including the following:
1) Water Lines
a) Top of pipe e�evations and eoordznates for waterlines at the fpllowing
locatians:
{1) Minimum every 250 linear feet, including
(2) Horizontal and vertical paints of inflection, curvature,
etc.
(3) �'ire line tee
(4) Plugs, stub-outs, dead-end lines
(5) Casing pipe {each end) and a11 buried fittings
2) Sanitary Sewer
a} Tap of pipe elevations and eoordinafies for force mains and siphan
sanitary sewer lines (non-gravity facilities) at the fallowing locations:
(1) Minim�am every 2501inear feei and any buried fittings
(2) Horizantal and �ertical points of inflection, curvature,
etc.
3) Stormwater — Not Applicable
C1TY OF FORT WORTH 2O22 Bridge Rahabilitatien Corrtract 2
STANDt1RD COi�TSTRUCTION 5PECIFICATION DOCi1MENTS City Projeci no. 10345b
Revised Febrna�y 14, 2�I$
017123-5
CONSTRUCTION STt1I�1NG AND SURV�Y
Page 5 of 8
b. The Contractor shall provide as-built sur�ey including the elevation and
location (and provide written docu�nentation ta tlie City) of construction
features after the construction is eompleted including the following:
I} Manholes
a) Rim and flowline elevations and coordinates for each manhoIe
2) Water Lines
a) Cathodic protectian test sta#ians
b) Sampling stations
c) Meter boxes/vaults (All sizes)
d) Fire hydrants
e) Valves (gate, butter�ly, etc.)
� Air Release vaIves (Manhole rim and vent pipe)
g) Blow off valves (Manhole rim and va[ve lid)
h) Pressure plane valwas
�) Underground VauIts
(1) Rim and flowline elevations and coordinates far each
Und�rgraund Vault.
3) Sanitiary Sewer
a} Cleanouts
(1} Rim and flawline elevatians and coordinates for each
b) Manholes and 7unction Structures
(1) Rim and flowIine elevatians and coo�•dinates for each
manhole and j unction structure.
4) Stormwater -- Not Applicable
1.10 DELIVERY, STORAGE, AND I3ANDLING [NOT USED]
I.11 FIELD [SITE] CONDITIONS [NOT USED]
I.12 WARRANTY
PART�- PRODUCTS
A. A cansfruction survey will produce, but will not be limited to:
1. Recovery of relevant control points, points of curvature and points of intersectian.
2. Establish temporary horizontal and �ertical control elevations (benchmarks)
sufficientty permanent and [ocated in a manner to be used throu�hout canst�-uction.
3. The location of planned facilities, easements and imp��ovements.
a. Establishing final lin� and grade stakes £or piars, f�oors, grade baams, park3n.g
areas, utilities, streets, highways, tuzu7�ls, and oth�r construction.
b. A reeord of ravisions or correctians noted in an arderly manner far ref�rence.
c. A drawing, when required by the client, indicating the horizontal and vertical
locatian of facili#ies, easements and improvements, as built.
4. Cut sheets shall be pro�ided ta the City inspector and �urvey Superintendent for all
constrtitction stakin� projects. These cut sheets shall be on the standard city template
which can 6e obtained from the Survey S.uperiniendent (817-392-7925),
5. Digital survey iiles in the following formats shall be acceptable:
a. AutnCAD {.dwg)
b. ESRI Slaapefile {.shp)
C1TY O� PORT WORT[-I 2022 Bridge Raha6i[itation Contract 2
STANDARD COPiSTRlICTIQN �PECIFICATIOIV dOCUMENTS City Praject no. I03456
Revised February 14, 2418
01 7l 23 - 6
CONSTRUCTIQT! 5'I'AKll+IG ANIJ 5UFtV�Y
Page 6 af $
c. CSV �le (.csv), formatied with X and Y cQordinates in separate columns (use
standard templates, if available}
6. Survey files shall incl�Ede �et�ical and horizonta] data tied to original project
cantrai and benchrnarks, and shail include feature descriptions
PART 3 - EXECUTION
3.1 INSTALLERS
A. Tolerances:
1. The staked location of any improvement or facility should be as accurate as
practical and necessary. The degree of precision required is dependent on many
factors a11 af which must remain judgmental. The tolerances listed hereafter are
based on �eneralities and, under certain circumstances, shall yield ta specific
requir.ements. The surveyor shall assess any situa�ion by review of the overall plans
and thrn�gh consultatian with responsible parties as ta the need for specific
tolerances.
a. Earthwork: Gracies iar earthwork or rough cut should not exceed 0.1 ft. vertical
tolerance. Horizontal alignment for earthwork and rough cut should not exceed
1.Q ft. tolerance.
b. Horizo�ta] alignixient on a structure shall be within .O.lft tole:razzce.
c. Paviz�g or concrete %r streets, curbs, gutters, parking areas, drives, alleys and
walkways sIaall ba lacat�d within th� con�nes ofthe site boundaries and,
accasionally, along a boundary or any nth�r res�ricti�ve [in�. Away fram any
restrietive line, these facilities should 6e staked with an accuracy prodncing no
more than O.OSft. tolerance from their specif ed locations,
d. Underground and overhead utilities, such as�sewers, gas, water, telephone and
electric lines, shall be located horizantally within their preseribed areas ar
easements. Within assignerl areas, these utilities should be staked with an
accuracy producing no more than 0,1 ft tolerance from a specified location.
e. The accuracy required for the verticai location of utilities varies widely. Many
underground utilities require only a minimum cover and a tolerance of 0.1 ft.
should be maintained. Underground and overhead utilities an planned profile,
but not depending on gravity flow for parformance, should not exceed b.1 ft.
toferance.
B. Surveying instruments shall be kep# in close adjushnent according to manufaeturer's
speeifications or in compliance to standards. The City reserves tlae right to request a
calibration report at any time and recommends regular maintenance schedule be
performed by a certified technician every 6 months.
1. Fie1d measurements af angles and distances shall be done in such fashion as ta
satisfy the c�osures and tolerances expressed in Fart 3.1.A.
2. Vertical Iacations shall be established from a pre-established benchmaxk and
checked by closing to a different bench mark on the same datum.
3. Canstructian survey field work shall carrespond to the client's plans. Irregularities
or conflicts found shall be reported promptly to the City.
�k. Revisions, corrections and other pertinent data shall be logged for futwre reference.
C1TY OI' I'ORT WORTH 2O22 Bridge Rel�abilitation Gontract 2
STANDATLI7 CO1+151TiL1CT10N SY�CIT�TCATION DOCUMENTS City Froject no. 103456
Revised Februaty 14, 2Q1S
017123-7
CONSTRUCT10I�i S'1'AKING AND SURVEY
Page 7 of 8
3.2 EXAMINATION [NOT US�D]
3.3 PREPARATION INOT USED]
3.4 APPLICATION
3.5 REPAIR / RESTORATION
A. If tt�e Cantractot•'s worlc damages or destroys ane or more of the contral
monumen#s/po.ints set by the City, tk�e monumenis sha11 be adequately referenced for
expedient restoratian.
1. Notify City if any control data needs to be restored or replaced due to damage
caused dut�ing construction operations.
a. Cantractor shall perform replacements andlor restorations.
b. The City may �'equic•e at any time a su��vey "Field Check" of a.�zy monurnent
or benchmarks that are set be ��rifi�d by the City suzveyors before further
associated work can mave forward.
3.6 RE-ZPTSTALLATZON [NOT USEDj
3.'� �IELD �ox� �ITE QL]ALITY CC)NTROL
A. It is the Cantractor's responsibility to maintain aIl stakes and control data p[aced by the
City in aceordance with this Specification. This includes easements and right of way, if
noted on the plans.
B. Do not change or relocate staLces or control data wiihout approval from the City.
3.8 SYSTEM STARTiTP
A. Surv�y Checks
1. The City res�r�es the rigtat to perfoa•r►a a Survey Ch�ck at arzy time deemed
necessary.
2. Checks by City personnel or 3`� party contracted surveyor are not intended to
relieve the contraetor of hislher responsibility for accuracy.
3.9 AD.TUSTING [NOT USED�
310 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHIVIENTS [NOT USED]
END OF SECTI�N
Re�rision Log
C1TY OF FdRT WdRTf3 2.022 Bridge Rehabilifation Contract 2
STANDAKD CONSTRUCTION SPECIFICAI']ON DOCl1MEiVT5 Cily Project na. 10.3456
Revised Febr[�Rry 14, 201$
017123-8
CO]VSTRUCI'iON STAKING AND StiIRVEX
Page 8 of 8
DATE NAM� SLTMN'IARY OF CHANGE
8/31/2012 D.Johnsnn
Added instruafion and ma�difzed measu��emant & paynient under 1,2; added
8/31/2017 M. Owen definitians and references �nder i.3; mndiiied 1.6; added 1.7 closeout submittal
requirements; modifed 1.9 QuaIity Assurance; added PART 2—PRDDUCTS ;
Added 3.1 Insfa[lers; added 3.5 RepairlRestoration; and added 3.8 System 5tartup.
Removed "b[�e text"; revised measuremenl and payment se.ctions for Constructi�n
5taking and As-Built Survey; added reference to selection campliance wi� TGC
2/I4/2018 M Owen 2254; revised action and Closeout submittal requirertients; added aceeptabl� depth
measurement criteria; revised list of items requiring as-huilt smvey "dw•ing" and
"after" caustructiqn; and revised aeceptable digita! survey file format
CITY OF FORT WORTH 2O22 Bridge Rehabilitation Coutraci 2
STt�YDAIt]] CONSTRUCTIpN SPECIFICATIQN DOCU�vIE1+FT5 City Praject no. 103456
12evised Fe6ruary 14, 2018
._ i �
Section O1 71 �3.02 - �ttachrne�nt �
Su�rv�y Staking St�nd�rds
February �017
0:�5pecs-Stds Governance Process\Temporary 5pec Files�Cap'rtal Delivery�Cap Delivery Div 01�0171
23,16.01_Attachmet�t A_Sur�ey 5taking 5tandards.docx
Page 1 of 22
7'hese procedures are intend�d to pro�ide a standard method far construckion staking services
associated with the City af Fort Worth projects. These are not to be considered all inclusi�e, but anly as
a general guidelin�. Forprojects an TXDOT right-of-way or through faint' TXDOT participution,
adherence ta the TXD�T 5urvey Manual shall be foIlowed and if a discreppncy arises, the TXDOT
manualshall prevaif. (http://anlinemanuals.txdot.�ov/txdatmanuals/ess/ess.pcff)
If you have a unique circumstance, please consult with the pro�ect manager, inspector, or survey
de.partment at 8�.7-392-7925.
Table o� Con�en�s
I. City of Fort Worth Contact information
II. Construction Calors
III. StandardStaking5upplies
IV. Survey Equipment, Control, and Datum Standards
V. Water Staking
V!. Sanitary Sewer Staking
VIL Storm 5taking
VIII. Curb and Gutter Staking
IX. Cut 5heets
X. As-built Sur�ey
O:�Specs-Stds Governance Process�Temporary 5pec Files�Capital Deli�ery�Cap Deli�ery Div Q1\017i
�3.16.01_Attachment A Survey 5taking Standards.do�x
Page � of 22
1. Sur�ed Departmen� Con�act Information
Physical and rnailing address:
8851 Camp Bowie West Bouleuard
5uite 300
Fort Warth, Texas 761�.6
pffiee: {$17j 392-7925
5ur�ey Superint�ndent, direct line: (817) 392-8971
II. Construction Color�
7he following colors shall be used for staking or identifying features fn the field. This
includes flagging, paint of laths/s#akes, paint of hubs, and any identification st�ch as pin flags
if necessary.
Utility Color
PROPOSE� EXCAVATION WH11"�
ALL EL�CTR]C AND CONDUITS • e
POTABLE WATER 1-; ' � �
GAS OR OIL YEI.E�:�N
T���PHOiVE/F]BER OPTIC tIRAiV�C
SURVEY C�NTR�L P�INTS, BENC.HMARKS,
PROPERTY CORNERS, RIGHT-OF-WAYS, AND PI��!C
ALL PAVING INCLUDING CIJRB, SIDEWALK, BUILDING CORNERS
SANITARY SEWER �� ; ,:f,�k5�
IRRIGA710iV AND R�CLAIM�b WA7ER "�1�.
III. $tandard S�akin� SupplieS
Item iVlinimum size
Lath/Stake 36" tall
Woaden Hub (2"x2° min. square preferred) 6" tall
Pin Flags (2,5" x 3.5" preferred7 21" long
Guard Stakes NQt required
PK or Mag nails 1" [ong
Iron Rods (1/2" or greater diameter} 18" long
Survey Marking Paint Water-based
Flagging 1" wide
Marking Whiskers (feathersj 6" long
Tacks (for marking hubsj 3/4" long
O:�Specs-5tds Governance Process�Temporary 5pec Fi[es�Capital Deli�ery�Cap Delivery Di� 0�.�0171
23.16.01MAttachment A Survey 5taking Standards.docx
Page 3 of 22
fV. Sur�e�+ Equ�pmen�, Contral, and Datum Standards
A. City Benchmarks
All city benchmarks can be found here: http://for�worthtex_a_s,�o_ �/itsolutionslGlS
Look for `Zoning Maps'. Under `Layers' , expand `Basemap Layers', and check on
'Benchmarks'.
B, Canventional or Robotic Total Station Equipment
I. A minimum of a 10 arc-secand instrument is required.
ll. A eopy of the latest calibration repart may be requested by the City at any time.
I# is recommended that an instrument be calibrated 6y certified technician at
least 1 occurrence e�ery 5 month5.
C. Networlc/V.R.S. and statiC GPS Eq�ipment
I. !t is critical that the surveyor verify the correcfi horizontal and �ertical datum
priar cammencing work. A site calihratian may be required and shaA consist of
at least 4 control points spaced evenly apart and in varying quadrants.
Additional field checks of the horizontal ar�d vertical accuracies shall be
completed and the City may ask for a copy of the calibration report at any tirne.
II. Netw�rk GP5 such as the Western Data Systems o.r SmartNet systems may be
us�d for stakir�g of property/RA.W, farced-main water fines, and rough-grade
only. Na GPS staking for concrete, sanitary sewer, storm drain, final �rade, or
anythin� that needs vertical �radin� with a talerance of 0.25` ar less is
allowed.
p. Corttrol Points Set
I. A!I control points set shall be accorrtpanied by a iath with the appropriate
Narthing, Easting, and Elevation (if applicablej of t�e point set. Control points
ean b� set rebar, `X' in concrete, or any other apprapriate item with a stable
base and of a semi-perrt�anent nature. A rehar cap is optional, but preferred if
the cap is marked `control point' or similar wording.
II. Datasheets are required far all contral points set.
Datasheet should inelucle:
A. Horizontal and Vertical Datum used, Exampke: N.A.D.83, North Central Zone
�2D2, NAVD 88 Elevations
B. Grid or ground distance. — If graund, pravid� scale factor used and base
point coordinate, Example: C.S.F,=0.999125, Base point=North: 0, East-O
C. Geoid model used, Exar�tple: GEOfD12A
O:�Specs-5tds Governance Process�Temporary 5pec Files\Capital Deli�ery�Cap Delivery Div 01�0171
23.ifi.01 Attachment A 5urvey Stak9ng 5tan�ards.docx
Page 4 of 22
E. Preferred Crid Datum
Although many plan sets can be in surface coordinates, the City's preferred grid datum
is listed helow. Careful consideration must be tak�n to verify what datum each proj�ct is
in prior to beginning work. It is essential the surveyor be fam�liar with coardinate
transformations and haw a grid/surFace/assumed coordinate system affect a project.
Proiected Coordinate
System: NAD_1983_5tatePlane_Texas_North_Central_FIPS_4202_Feet
Projection: LambertWConformalTConic
False_�asting: 1968500.000000�0
False_NDrthing: 6561666.66666667
Central Meridian; -9850040000
5tandard Parallel 1: 32.13333333
5tandard Parallel 2: 33.96665657
Laiitu�e_Of_Origin: 3 �..56666667
Linear Unit: Foat US
Geographic Coordinate 5ystem: GCS_I�orth Arr�er�can_1983
Datum: D North American 19$3
Prime Meridian: Greenwich
Angular Unit: �egree
Note: Regardless of what datum each particu[ar �roject is in, deiiverables to the City
must be converted/translated into this preferred grid datum. 1 copy ofthe deliverable
should be in th� �roj�ci datum (whatever it may bej and 1 copy should be in the NAQ83,
TX kVorth Central 42Q2 zane. See Preferred File Naminq Convention below
F. Preferred DeliUerable Format
.txt ,csv ,dwg .job
G. Preferred Data Format
p,N,E,Z,Q,N
Point Number, Northing, �asting, �levation, Description, Notes (if applicable}
H. F'referred File Naming Convention
This is the preferred format: City Project Number Descrip�ion_Datum.cs�
�xam le for a ro'ect that has surFace coardinates which must be translated:
File 1: C1234 As-built of Water on Main 5treet Crid NAD83 TXSP 4202.cs�
0:�5pecs-S�ds Govert�anee Process�Temporary Spec Files�Capital Delivery�Cap Delivery Div Q1�0171
23.15.01_Attachment A_Survey Staking 5tandards.docx
Page 5 of 22
F'i!e Z: C12�4_As-built of Water on Main 5treet_Project 5pecific Datum.csv
�xamp�e Confirol 5fiakes
q:�5��cs-5tds Governance process\7emporary Spec Files�Capital belivery\Cap Deli�ery Div 0110171
23.16.01_Attachment A Survey Staking 5tandards.docx
Page 6 of 22
�
�
�
�
��
��
��
I�
�
W
�
�
�
�
�
�
Q
�
��1�
�
w
m
�
�
�
h—
�
Q
�
�
O
�
�
�
�
C�
��
�
�
�
�
�
�I ��
�
CL'
d
�
_
�
�
J
[f7
w
�
�
�
C�
�
�
�
4
�
_
C�l
�
.__.�
�
�
J
�
�
C�
d
�
Q
�
�
�
W
�
W
E�. � � oa. aa'
(J)
w
�--
�
�
d
�
C7
�7
C_]
r�=�oaa.ao E=�aao,�a
��
�w
��
o�
� �
4'� �j
� LJ
F— �
� —
_ �
(i7 �
� �
� �
� �
W
CL �
�
m �
W p�
� �
�N
V. !�la�er S�ral�in� Standards
O:�Specs-5tds Governance Process�Temporary Spec Files�Capi�al Delivery\Cap Delivery Div 0��0171
23.16,Q1_Attachment A_Survey Staking Standards.docx
Page 7 of 22
A. Centerline 5#aking--Straight I.ine Tangents
I. Offset lath/stakes every 20Q' an even statians
II. Painted blue fath/stake only, no hub is required
{II. Grade is to top of pipe (T/Pj for 12" diameter pipes ar smaller
IV. Grade ta flow line (F/L) for 16" and larger diameter pipes
V. Grade should be 3.Sa' f�elaw the proposed top of curb line for 10" and smaller
diameter pipes
VI. Grade should be 4.Oo' below the prdpased tap of curb line for 12" and [arger
diameter p9pes
VII. Cut 5heets are required on all staking and a copy can be received from the
survey superintendent
Optronal: Actual stakes shall consist of a 60D nai! or hu6 set wifh a whisker
B. Centerline 5taking - Cur�es
I. If arc length is greater than 104', POC (Point of Cur�ature) ofFset stakes should
be set at a 25' interval
II. Same grading guidelines as above
III. 5taking of radius points of greaterthan 100' may be omitted
C. Water Meter Boxes
I. 7.b' per}�endicularoffset is preferred to the center af the box
11. Center of the meter should be 3.0' b�hind the propased face of curb
IIL Meter should be staked a minimum of 4.5' away from the edge af a driveway
1V. Grade is to top of box and should be +0,05' higher than the propos�d top of
curb unless shown otherwise an the plans
D. Fire Hydrants
I. Center of Hydrant should be 3.0' behind proposed face of curb
II. Survey offse# stake should be 7.a' frorn the cent�r and perpendicular to the curb
line or water main
III. Grade of hydrants should be +0.30 higher than tf�e adjacent top of curb
E. Water Val�es & Vaults
I. Offsets should be perpendicular to the proposed water main
II. RIM grades should anly be pro�ided if on plans
Exampl� 1Alater S�aCces
0:�5pecs-Stds Governance Process�Temporary 5pec Files\Capital Delivery\Cap Deli�ery bi� b1�0171
23.16.01 Attachment A�Survey Staking Standards.docx
Page 8 of 22
�
� �
� �
� �
d
�
� w
C]
tf]
�
7' q f 5� W./L
��
�
� �
�U
�
�
� W
❑
LJ1
��
�
� J
L�.J �
f� �
��
W �
��
�W
�
�
t�a �
d,�J
L� �
��
� J
�
7'Q/S�WfL
m �
w
L1.
t`I
z
Y
�
�
�o
w N
� �
Z
U �
����
_��
��
�����
����
� ��
� �
o �
��
� U
� 1417 FL- 101.16`
I - -� V.�J"
I �
� �
� �
�
I--� �
� w
❑
L17
�
cWi
2
Y�-
�
O
�
O
�
rS
���
5 �
� �d
5^
�n
�
��� �
� �-�,62
�
�
�
�.�.v-�
6TA=�S+72_81 � C-3_81
4
w�
2 �
��
��
{}
�
O
¢
i�
nW.
a
a
a
H
�
F
w
O
�
�
�
I �H
�
U
W*
��
d�
�
�
n
� �'
� U
z 14ta - 10�A
� u
m LL � �
�
e o �
u � W
m
�
S
VI. Sanitarr� Sewer 5takin�
F-
y0
H�
��
a�
��
0
�u
��
y�
��
m�
� Q
y��U'
�
�
�
�
�
. '��_��
�� Y
� j O �
"�m�W
F�gm
����
� �
W
= m Q
�
0:�5pecs-5tds Go�ernanc.e Process�Temporary Spec Fiies�Capital Deli�ery�Cap Delivery Div 01�0171
23.16A1_Attachmen� A_5urvey 5taking 5tandards.docx
Page 9 of 22
A. Centerline 5taking — 5traight �ine Tangents
I. Inverts sl�all be field verified and compared against the plans before staking
II. painted green lath/stake WITH f�ub and tack or marker dot, no f[agging required
IIf. 1 ofFset stake between man�oles if manholes are 4DQ' or less apart
IV. Offset stakes should be located at e�en distances and perpendicular to the
centerline
V. Grad�s will be per plan and the date of the plans used should be noted
VI. If multiple lines are at one manhole, each line shall have a cutffill and direction
nated
VII. Stakes at every grade break
VIII. Cut sheets ar� required an al! staking
OptranaL• Actua! stakes shall corrsist� of a bOD nail or hub sef with a whisker
B. Centerline Staking-� Curves
I. If arc length is greater than 7.OQ', POC (Point of Curwature) offset stakes should
be set at a 25' interval
II. 5taking of radius points of greater fhan 100' may be omitted
C. Sanitary Sewer Manholes
I. 2 offset stakes per manhole for the purpase of pro�iding alignment to the
cantractor
II. Flowline grade should be on the lafh/stake for each flow[ine and direction not�d
III. RIM grade should only be on the stake when provided in the plans
0:�5pecs-Stds Governance Pracess�Temparary Spec FiI�s�Capital Deli�ery\Cap DeEi�ery biv D1�0171
23,16.01_Attachment A_Survey Staking Standards.docx
Page 10 of 22
E�cample Sanifarr� Sewer Stakes
� �
�
� �
� �
Q
� �
� W
�
{�
�
� �
� �
� �
L��.
� �
0
�
��
� �
�— � ���
� ��
� z ���
�J � ��� {�' �� � 5Tk=3�1-71� `',W.�fl C^4�'��z C^d
�
LI.J
us� � �
��� �
���
vnt�
�aa
12' 0�5 �, SS1 � STA�3+T1� �.v� C-3� I�� C-3��I ��0�
1
�
W �
�� � �
�� ��e � � n��� � ss �
p = �
'�- Lh pr � iJ�
Q � � � L�
� F�.�.. � \/
.J �
r =
{a^ IL
r� �L 4
�
�. �i.
� ��
w
z
�" �j � � a O
�� � �� �
�] � I � �
r'\ �eo � W �
� �
- ��' -0_ � � �
� � �s
� � � � �n � e i
� �C �`�Q� � �JJ�', Z ..STl�C
� �
� �] *s
f!] ���
�--.
� nn,
!
0
a
12' o/s � ss � sra�a�a � c--a� ��-'� �s� a c.-a� ��
� � � — � � - -- -- ---- � m
��UJ zv~i �i'
��� �� �r
L� '� � o s
4 r
� � ��
W� ��
�4 ��
_
�
� �..�G0.
,.
����
�� �
��� �
� `�� =
���
�
�
�� �
5
�
�
�Il I��
R 1 �k �
�� � �
�//� w �
~/ C����
F �'�iL�p
���a�
F����F
�caa z
W `� y�
L]W�aw�
m����
� �¢�
a
d
o �
W � �
�� � �
p ��
�
� �J]
Wd W *
� � J
FT� �,�
�i � � �
�� �o
4
�
� �
� �
� ��
a UQ i
w w*�
� ��.�«
0 0��
� �
v
w� �
�� ��
�
�U �
� w �3 �
� ��
�� ��
w� ��
o� gfl
�
�
�
�
��
v,
�� ���
� ����
0
I q���
O��Z
��,s
�3;
���
0:�5pecs-5tds Governance Process�Ternporary Spec Fi4es�Ca.�ital Delivery�Cap Delivery Div D�.�0171
23.16.01_Attachment A_5urvey Staking 5tand.ards.docx
Page 11 nf 22
Vll. S�orm Sewer & Inlet Stakin�
A. CenterIine Staking — Straight Line Tangenis
I. 1 ofFset stake e�ery 200' on even stations
IL Grades are to ffowline of pipe unless otherwise shown an plans
III. Stakes at euery grade break
IV. Cut sheets are required on all stakmg
Optional: Actual stakes shal! consist af a 60D nai! or hu6 se� wrth a whrsker
B. Centerline 5taking—Curves
I. If arc length is greater than 1Q0', PDC (Point of Curvature) offset stakes should
be set at a 25' interva{
I1. Staking of rad.ius points of greater than 1�0' may be omitted
C. Storm Drain Inlets
[. Sfaking clistances should 6e measured from end of wing
II. Sta.nciard 10' lnlet =16.00' total length
III. Recessed 10' lnlet � 20A0'total length
IV. 5tandard double 10' inlet = 26.67' tatal length
V. Recessed double 10' inlet = 30.67' total length
D. Storm Drain Manholes
2 offset stakes per rnanhole for the purpase of providing alignment to the
contractor
II. Flowline grad� should be on the lath/stake for each flowiine and direction noted
111. RIM grade should only E�e on the stake when provided in the plans
0:�5pecs-5tds Governance €'rocess\Temporary Spec Files�Capital Delivery\Cap Qelivery fli� 01�0171
23.16.01 AttachmentA_SurveyStaking5tandards.docx
Page 12 of 22
�xample 5torm inlet Stalces
FR�I� T
{sia� ��ac«c �)
8���
{suc FAanc R.aw.]
P47INi # �,��,
�
I
HIA ELEVATIOM m
m�
z= —�
4
�
�� .
I �
m�
I o �.
�.
�.
+r
!�
'� �
�,
�� Ii�EN13FlES i1NICH
END �]F TH� 1�1NG
BEItIG STpi4E0
� .
� � INLET S'fAII4N
+ pF Wo�a ar� p�NsZ
�'.
�a
�i���� ��n�
T�� TO TCP OF CURB
+
O
�
�'
��} IpEN[IFlES CRApE
`^-y' 1"0 FiAVNN�
G7
i �
�
� ��
B�1Gh(
{�oE F�nnc e.a,w.}
PGNT � �
I
HUB E1.E'WF,71tl11 �
i
��
��
�:
\ '
�
I � !
I � 1
�i
��� •
� -��- .
��i
.�
� �I�E]WlIFlES 1lHICH
EH� OF 'fHE 4AMG
HQM� �I'AKEG
: �
i�
� r�
�
+
�
�
!
��
� .
�:
' �I�fANCE9 FOR INLFT.� ' �
���—� sr�no�ea yo' — 1s� —�..__..�s
R�££SSEp 1CY � 2i1'
5TANdfRO dQ41BLE 1�' -� ?6.67'
� — -- — FiECE55`cD OO�JBIF Ia� ��34=67 � ,_u�..�
HUB Vr1TH 7��K — �'-- —
' � � , �_,
� �
� 9AiSt OF INLET
�I ' 1�: � i..: 1,-" _ ',�A • ;�d•• ~I
�I �� [ .''x �ti
�I " LiA�RHiILE - ol
y� •A
l"I f` I
� 'a� � f �
e,ar�c c� a�aB
--------- �1'nN�f" .'<�`.t;�,;. :�4.. :. .a,;' " - •� •'e' •w1M4+•.
FLOWILINE F.4CE OF INLET • FhCE OF�INLET •
µ EDf� dF' pAdElAEN7u ET3� 4P F'At'EMENT
F�R�NT
�si Q� F��i r�� ��
ix'�. F' E' ,,rW i��f'' ' ��.�.'
EpC� QF PA4E�IENT
�:� o� cu��
� FL.CYVAJhlE u — —
EOGE {:F PAIcFAENC
0:�5pecs-5tds Go�ernance Process\Temporary Spec Files\Cap'rtal Deli�ery�Cap Delivery Div 01�0171
23.16.01_A�tachment A_5urvey Staking Standards.docx
Page 13 of 22
VCIC. Curf� and Cutter Siakin�
A. Centerline Stalcing—Straight Line Tangents
V, 1 offset stake every 50' on even stations
VL Crades are to top of curb unless otherwise si�ow� on plans
VII. Stafces at every grade break
VII1. Cut sheets are required on all staking
Optional: Actua! stakes shafl consist �f a 60a nail or hub set wifh a whisker
B. Centeriin� Staking — Cur�es
III, If arc length is greater than I04', POC (paint of Curvature) offset stakes should
be set at a 25' interval
IV. 5taking of radius points of greafer than �.�0' may he omitted
0:�5pecs-Stds Governance Process�Temporary SPec Files�Capital beli�ery�Cap Defivery Div 01\0171
23.16.D1_Ai�a�hment A_5urvey 5taking Standards.docx
Page 14 of 22
Example Curb & Gutter 5�akes
FR�NT
(51dE FACI�'G �.)
��
I1.
Q7 iaovnr�es or�ser is m
�earx c� cuna r� F,ra
e� F�,e� oF auae
FRC�NT
�si�� F�c��c �)
ol
0
.�
g��:
ioeMns�e5 STpaT � F4 :
POWI OF WftVAlURE
. �
�
�
i�0
FRQNT
{�DE FAGINt3 �}
:�3
,o�
�n
�
FR �3N T inwn��s �ro
[SUE FACIIIQ � Tkl ��a�F
�
�-_�
,HC
:PT� �
:r�i. '�
�' �
n
L..7J�yLE1
(51QE FkCING R.O,W.}
PDINT � [sJ;
.�
u�
HWG� EI.�VA7lflpa s I
�a
, �
� ,
.� � � f,� � I I I I
� � �
� ��� I
�'� iavmFles c�hoe is �� �� I I I I
'T�. TQ T4Y OF 4UFE � � � �
� ,n hKl 13RA17E 6N I
� R RFyRIUS PGyNTS . —� i q k�
�" , , . . � ,—.—_ 1 � ti t
, , � , I 1 I S
I � ��'�� ��r1 r � i
" � ��, r � � f t
� �_ _.�_� � e�,.,�`,` rf r� i
�
� � �, , f : `� ,''f ,�A r�
� `� r' ' • � f
� �^ Y r, �- ,�.- i,� f
� r E
7CJf' C}F CL1R� � �
��`. r.�,� --Y� {�,r y,� �f
.� 'F � .�,-� . �.�� n' � � �
r--���' � _ � Y�x I ���
}�+��{y�/.y-�{� � ��F ��� X��
G7741iK �� l.UfkQ f..r'r"� �r... r
��\ �`_�_r� ��r��.
��j �
� ���y�''y �
I �. ��! � rrr 'r � l 4
���� oF cu�� � ��i_—�'� �� �� ���.
�� ��
FL01+uL114E
�CIG� i!fi �Av�I��MT
�xample Curb 8� Cautfier Stakes at Intersection
O:\Specs-Stds Go�e.t-nance Pt'ocess�Temporary 5pec Files�Capital Deli�sry�Cap �eli�ery Dlv 01�0171
23.16.a1_Atiachmeni A_Survey 5taking Standards.docx
Page 15 of 22
�
� ���
/-� � � �om'o
l.J-_ C? �"''` ._ ........ ..��._� ............... ...
���}/� I 1�� 9f5 m STAr2iS0ll � F-�0� -
� lI..L'-. � — � -- � -
L� �
O
�
�i �� ,0 G
\�� U _ —'
� �
Ci � � �
.. �
Ll1
X
�
�
�----
�
�
a
�
�
._ �v. -
�
�
N
❑
Y�.
Q
s
�
_,
�
�
�
�
�
h
�;, � _
�
0
a
�}
�:--.
U
i
0
�4
�
w
Y F O [}
F � F 1[7
��� �
a �
b �� ,� G
b � W
� 2
d�
� �
��� ; -, o'��r
-- �4V1
W l'"'.� O UY i�'J.�
V i�
q � W
H
N
A W
}F UI
4 �
� M �
���
� a�
r� �
— �i
,[} � � f.a ,
���� f
° F ��/ r z
p�3�� ��Qtj �wa
oi ���'
� n���a
! �w
, a���r-
J �,����_q ;�.
_ I I�
o� �a�va.sia xvry ,as I�
.tJ
�g��
a �=�m
�� m
��
tl �� o
� ����
�Q
ean� �o x3va
p.� 3�Ntl.lS1L1 7s4'YI ,95 � Ci
r
�WdF�_
a� �a J � ��
� �?r�i�4 f"z�
� � ¢F
, o�PN
�j-1� $ � VJ
" /� � CrJ M v. 2
� d U ���� � W
❑ �
0. ' �
q u~i +D.a �4^' �
,CiL � \ .
-- L :�;
�
.� a
� �Y�
� ��o "�aR
� �
�
o � 7Ci
u} w¢
—�'C)qd�ii
'q� -- a���
��
O:�Specs-5tds Go�ernance Process�Temporary Spec Files�Capital Deli�ery�Cap Delivery Di� 01�Q171
23.16.01_Attachme nt A_Su nrey Staki ng Sta n d a rd s.docx
Page 16 of 22
IX. Cut Sheets
A. Date of field work
B. 5taking Me�hod (GPS, tatal station)
C. Project Name
D, City Project Number (Example: C01234]
E, Loeation (Address, cross stre.ets, GPS coordinate)
F. 5urvey campany name
G, Crew chief name
H. A blank template can be obtained from the survey superintendent (see item I abovej
Standard City Cut Sh�e�
Date�
❑ TOTAL
5taking Methoc{: ❑ GPS STATIOf�
LOCATION:
City Praject
Number:
Project Name:
0 OTHER
CONSULTANTICONTRACTOR
5l1RVEY CREW INITIALS
AL.L GRAD�S ARE TO FLOWL.INE OR TOP OF CURB [iNLE�S OTHERIN[SE NOTED,
PT # STATION OFFSET DESCRIPTION PROP. STAKED _ CUT + F1LL
-LT/+RT GRADE ELEV.
O:�Specs-5tds Governance Process�7emporary 5pec Files�Capital Deli�ery�Cap Delivery Div 01�Q1 71
23.16.01_Attachmenfi A_5urvey Staking Standards.docx
Page 17 of 22
�. �s�buil� S�ru�v
A. Definitian and Purpose
ihe purpose of an as-built survey is to verifiy the asset was installed in th� proper location
and grade. Furthermore, the in�ormation gathered will be used to supplement the City's �IS
data ar�d must be in the proper format when submitted. 5ee secr►on IV.
As-built survey should include th� fvllowing (additianal items may be requested}:
Manhales
%p of pi;ne elevations every 250 feet
Horrzonta! and vertica! points of ir►fleCtion, curvature, etc. [All Fittings)
Cathodic pratect�ion fest sta�rons
Sampling statians
Meter boxes/vaults (A!! sizesJ
Frre Irnes
Frre hydrants
Gate valves (rim and top of nut)
Plugs, stub-outs, dead end lines
Air Release valves (Manhole rrm and vent pipeJ
�low off valves (Manhole rim and valve lidJ
Pressure plane valves
Cleaning wyes
Clean outs
Casing pipe (each endj
lnverts of pipes
Turba Meters
O:�Specs-Stds Governance Process\Temporary 5pec Files�Capital Delivery�Cap belivery Di� 01�0171
23.15.OS_Attachment A_5urvey 5taking Standards.docx
Page 18 of 22
B. Example Deliverable
A hand written red line by the field surveyor is acceptable in mast eases. Th�s should be
a copy of the plans with tha point numk�er nated by each asset. If the asset is missing,
then the surveyor should write "NDT FDUND" to notify the City.
O:�Spees-Stds Governance Process�7emporary 5pec Files�Capital I�eli�ery�Cap �elivery Di� 01�01 71
23.3.6.01_Attachment A_Survey Staking Standards.docx
Page 19 of 22
�
r
�
� �
a� �
��
�� ��� ���
,� �. �
�
��I�'9� !� ��I� °a �� �41
I{i1iL � dYS���d �b a
�� i �"r,�7�b�'cSE'�fI6°!f
i � �� G{' J ' �. �
� �� �� �I ��t�'j .If'16r'�
,I ` �$ aF:���_-�iz'.i�,
�� i:- c'�
3'°�� g � k�����`��.I�IE
�<� ���� o �s � ��;'�
i P �4kE;..J � �-l.
��--,1�_T_—_ -,�:—_:.�;:.-
�; -= . . . . ..
�� -,r=:�. .,_ ix;��t,.•3+Ni �:ti;Y�� .. _.�-i..�
6 LL�4h�� �° -� ' F� T~ i
�� � '.+y�if,� - ._Ls- �ii
-�'— ir�_:-
��' ��dlif�i Yi. --'-�--: � -. ' �
�ter„��1�5= �^ �- - _ _�'��--�--�
xr -. _ _.._. �_ _'_ ._ . . _
6 —' ' _�_"_' .. _ . . . . ,
_.�. .. � :- ----
�� : - : ���=:... .. � i =---'
� -- � T---�
�;' ;;_;--_�,.;� �:��� _-.___::: _ .
I _"_"5_1� . . _"_ "_�" I
=YQCI
_"""" 'r-�� � �
.�-._.__ � .,�...: _.
.J.__ '',�.. � �. ..__ .I._ - ",
' �� - - +-'- -.�
.'I .. ---'`ri � , ..., --- - � � � �
=r�+av_+�- _'F± --- --'�--'---!I��-1:
-_ J�1`."� - irr r. __�— I ---� - , - - - -
ti —"..�'7..��.._�r�",_,{!�_'il_' -'
=+ �- � r ��—�--- -�. ; �' }:,`! , i
wF'i �.— �-5�___�+��r..i
-1
....
- -.._..� .:-:_-- ' y,
.. ....
_. .. ----- �.. .
.. —.:—_. - -
� y . ._... - . - -_ -. . _..---�- � � +� - -
� � . :_i: _ �._____:.:_ �;_.. � r_. _
�' =:.. �� ! '_._. . - -- -
':.'�' I:.I'�! .i � .` f �:- -
-�=- � i�� �,
i_ r_—� _.�� r_4 _�.:, �.
��.�.zr
� �.---- ._--=; �.:,:- ��.: ; �.
�._ -=----;; _ - = �- � .
—1 �i--;�;---`;=-���, ...
�i� -�--- _:ir------._; .
� ::_:� � _;=__ �j`�--r:.::�j....: ...
; � -- __-;. .._,.; _�;--��.-..,,�
-�--.rf. . .-- -
�:-. _ I, F=F� ' �._ "�'F '.---
- {. . _ . . '.��.=i �--' -
i... ���.--- '.:. " _ _�_ ��' ' .--i�:��
�, �.i�,-v�RFib� `---r l��-°1�. ��s,�c'
I4.���r��l:f,�� 1" '�
L �...;_�.
�f�iw��'.�i-��-"___��. F � _ �_
_` - T il=�-.�"Y.` ..._. r��' � � :� ��11�
!'�'_�i�,JVra'riFr" .1' �j�r F—�;
�-- . .. __ — z ' � " "_r_�s YQ
� -_' '�4�+Y __ _" �i{'li ..
T:_'.::.ir�...�ti� ! _ ���.�� _�.� I
� �il�:- �- ;;���::�..fT� .-��....-'..�- �.��
; �.,.ro-z,:T�, �„ :��r __... =.�.-"�_...
�- -=���-1 '�_y �� � -�'--
� : - � i - t= ��w:. � - -. _, ' "_'
-,��4��i�+_�--� -- �k� _ --- - - �
��-��' ` �---�-- ��i__�` !_I__��
-�-;'� -----_' ' �:._:.-�-I 'il: _ �t�__=
� .i`i, Et.=--
: �-="- - F_�-- -
-- ; ���- �� - -��--= �-=- ' - i_� :�-_ = I
;i . ��-� _�----F -- --� ,�
:.�=.�_�;�-"'�" _r�v .^:-`D�._� � �,
__ � --_ ._ . . . — , , , c� _ ��
I \
d
�� �
��� �R
�� ��
� : �� ��
���'
e� 'I
��� � �� �-
� `�! � ebi��x S
W If� ,� l�F�� �°i�
0:�5pecs-5tds Governance Process\Temporary 5pec Files�Capital Delivery\Cap Deli�+ery Di� 07.\017�.
23.16.D1 Attachment A_Survey Staking 5tandards.docx
Page 20 of 22
ppppp -12WL iX! OLO'TCW Ral
K ��12WiV'FAfFIfXn ARJ
�Z.eENb -..
,�,� � l'�=�r,
B� 6 �
� 2
.iR�' �s�� �d4FMIfoYh
/ � 4��qria�'t± W
NEYOY� EX1ST.-�
l�fYR'ER
��Y
.� �
a�,
Q�
�� .
57'AP57!)0 � 1,2'WL fFWYO lMil
IiE1.`dVE' � $�VYA��' FJ17ST.
QATF VNYE G NEa1C£R
a.1UXf'Cl TO EX151: SWi9'£R
!flS7711. 1-!E'S17UA SLEEYE
arzx a�rt �
free,,r�-v.�v� �
N�swossegao i ��
�•z�ae.�r.37A94 .�
� ��w
P9C�75 - B'WL r ��'
g M� re� �� j r
,
'. �Sr � ' � r , . �
- �� y �� !; �
� ..��y . �
�� �� ��n, �,
,��,; ;:/,/�_. �,?
�p �,ii
����''��/ � �
� �/� �
� ��
ir e � �
_ � �
��� . .. _ . .... ---.__....... .. . ...,.__
r�wr...��.��
1 �
�f -� '�.rr�or.�►w.r,�►,r.N'r�:+.r'�,,r.,'r.T/.r.�rrtn �t �.'.� I�l.�r��/I�1'��
.�i'swiri a►'r.r..vfs.r.�r,rr�+� aw�r�r�r�'i�.vs-.�iri �.�..��iii � .i.�.,r�cr,v,�.�►r�'�'rir�i
�� � ���
� _ �
� ��t�.�
� " �.r►..�..�o�
t ����
��
� ��,�i�rr.�� �:�:.
� 4
+�-��ave a� skv�
�rm: c.v�� v,mrs
- rz�wc
[Ol" A
. �%(Q $7.1 cWtl 0.Mk 6YKFnlWIN
� FN.• �0.4R.'�/
TA
sr� a�aom - fzwt ff�rnn �u srti asrsa - r�w sra asasa � rrr�,
rxsr.wl, rrrsr�u, r,y,�,�,
F r�,�.caxro �v� r rx,�v�rr:s�m f r2 t.€v�rrr. aExn
S7 iF GI� !P' WATE'7 PJ�E N�471755S94T' H-s4a10.s2.9G53
Owr1NECT TO E%!57'.1E'h"X/f@ E��563A3.P913 �-224r391.87AQ
N{8417A5.f779 �
E•22�G3�itF1'.i6
PF�OPOSEO
5AIVITAPo' ;
SE'E SH�'�
O:�Specs-5tds Governance Process�Temporary 5pec Files�Capital L7elivery�Cap Delivery Di� 01�0�. 7J.
23,16.01 Attachment A_Survey SYaking Standards.dncx
Page 21 of 22
=�`��f t.�t.�1 X-_f ,1:`� �P� -5-� ��
23.16.01_Attachment A 5urvey 5taking Standards.docx
Page Z2 of 22
�
1ai ��.
Z3.16.01 Attachment A_Survey Staking Standards.docx
Pag� �3 of 23
O�viflusly the .cs� or .txt fi{e cannot be signed/sealed by a surveyar in the forrnat
requested. This is just an �xampl� and all this information should be noted when
delivered to the City so it is clear to what coordinate system fihe data is in.
POINT N0,
1
2
3
4
5
6
�
6
9
lU
11
i2
13
iA
15
16
17
18
19
20
21
2Z
23
a4
Z5
26
27
28
Z9
30
31
32
33
34
35
36
37
38
39
4a
41
�k2
43
44
45
G6
NORTHING
69A6257.189
fi9A6260.893
6946307.399
6995220.582
6946195.23
5J46190.528
6946136.012
fi946002.267
6946403.055
6945984.677
690.598fi.4i3
6945895.077
69A5896.591
69459�4186
6945936.727
6945835.678
6945817.488
6945759.776
6945768.563
6945743318
6945723319
fi945682.21
6945621,9tlZ
6945643.407
694557i.p59
6945533.498
fi945519.834
5995417,879
6945456.557
5945387.356
694537�.688
&'945383,5�
69A532T.228
6945319.365
69A5242.289
B4A5233.524
G945206.483
6J451A2.015
6945119.4R5
69A5Qq9,62
890.50A1,024
6945D38.878
6945D05.397
694A9Qq.782
5940.943.932
694A850.916
[ASTING CLEV
2296079,165
229bqb2.141
2296038.3Q5
zze�axl.ozs
2296U15.1iS
2296022.721
2295992.115
2295919.I33
2Z95933.41$
Z29588Q.52
2295869,892
2295$60.962
229586z.188
22958A1.925
2295830.441
2295799.7d7
2Z95827.011
Z295758.643
2295778.424
2�95i88.392
2295754.334
zz�s7�a.z2
2Z95fi69,471
2295736.03
ZZ95655.195
22956fi7.803
ZZ95619.49
2295580.27
2Z956q3.145
2295547.].01
7�95606.793
2Z95610,SS9
2295551,105
2295539.728
2295570.715
2295544.626
2295529.305
2295557.666
2295520.335
2295527.345
2295552.675
2295552.147
2295518.i35
2295520.635
2295556.A79
229553A.397
OESCRIPTION
7z6.09 SSMii Rlhil
725.668 6V RIM
726.85 GV RIM
723358 SSMii RlM
722.123 GV RIM
722.325 FH
718.9A8 WM RIN3
713331 WM RIM
713.652 CO RlM
713,G62 SSM}i RiM
710.046 WM] RINi
707.72 WM RIM
798.205 WM RIMY
709A67 WM RIM
710.a&4 t0 REM
707.774 5SMH R[M
708392 SSMH R!M
711.218 SSMN RIM
710.086 GV RiM
710.631 GU RIM
712.849 GV RIM
716.686 WM RIM
723.76 WM RIM
719.737 CD RiM
T27.514 SSMH RiM
729.123 WM RIM
732.689 WM Riivl
74fl.521 WM Rlivi
736,451 CD R1M
74p,75b GV R1M
740.975 GV R1M
740.q�8 FH
746.34 WM RIM
746,777 CO R1M
748.454 WM RIM
749.59 SSMH RfM
751.058 WM RIM3
750.853 WM RIM
751.871 WM RIM
752.25i SSMH RIM
751.79 WM RIM
751.8$ WM RIM
752,615 WM RIM
752.801 WM RIM
752.156 WM RIM
752.986 SSMH R�M
i�'a4-t 7� r.� . �• (r
l_ �C�- bli-+ � c
f /�%
�.% .�.�. r�4
TX. tJ . C�'PG-i¢ L
C.i�i .� �,�1 ��.�
U r�{�-l� c F} �
C G[� �� I f�-�
i ►.�
� .� ��, ��
U�
�-�--
�-
C �'Ll F�(� r����
�
� 4 h-� i�' L..� j�C� N��
L I S-1�� , rJ
-�-+� r c. t}N �
�� ���4��� �
�p, �-: _�!
S� i �� �
��G •zFT�
Il1^' � �j���t���
.�S#-�#fF
�,y �-�
�
t�y s.�`-�� f�r�. ����,���
O:�Specs-Stds Governance Proeess�Temporary 5pec Files�Capital belivery�Cap beli�ery biv D1�0171
23,16.01_Attachment A_Survey 5taking Standards.docx
Page 24 of 24
C. Other preferred as-built deliuerable
5ome vendors ha�e indicated that it is easier to deliver this informatian in a different
format. Below is an �xample spreadsheetthat is also acceptabl� and can bc dbtained by
request from the s�ar�ey superintendent.
O:�Specs-5tds Go�ernance Process�Temporary Spec Files�Capital Delivery�Cap Delivery Div 01�0171
23.16.01_Attachment A_5urvey Staking 5tandards.docx
Page 25 of 25
O:�Specs-5tds Gavernance Process�Temporary Spec Flles\Capital Delivery\Cap Deli�ery Div 01\07. 71
23,16.Q1_Attachment A_Survey Staking 5tandards.dorac
Page Z6 of 26
01 74 23 - 1
CLEANI7�G
Paga 1 of 4
SECTION Ul 74 23
CLEANING
PARTI- GENERAL
1.1 SUMMARY
A. Section Includ�s:
1. Intermediate and finaf cleaning for Work not including special cleaning of closed
systems specified elsewhere
B. Deviations from this City of Fort Warth 5fandard Specification
L None.
C. Related Specification Sections include, but are not necessarily limited to:
I. Divisior► 0— Bidding Requirements, Contract Foims and Conditions oithe Contract
2. Division 1— General Requireinents
3, Section 32 92 13 — Hydro-Mulching, Se�ding and Sodding
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
l. Work associated wiY� this Item is considered subsidiary to the variaus Items bid.
No separate payment will be aIIowed for this Item.
1.3 REFERENCES [NOT US�D]
1.4 ADMINISTRATNE REQUIREMENTS
A. Scheduling
1. Schedule cleaning operations sn that dti�st and ather cnntaminanfs disYu�'bed by
cleaning process will nqt fall on nevvly paint�d surfa.ces.
2. �chedule �nal cleaaaing upon completion af Work and immadiately prior to final
inspecfion.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSIIN�ORMAT�ONAL SUBMYTTALS [N4T �US�D]
1.'� CLOSEOTIT SIIBMITTALS [NOT USED]
1.S MAINTENANCE 1VIATERIAL SUBMITTALS [NOT USED]
]..9 QiTALITY AS��CTRANCE [NOT USED]
1.10 STORAGE, AND HANDLING
A. S�orage and Handling Requirements
1. Stare cleaning products and claaning wastes in cantainers specifically designed for
tl�ns� materials.
CTTY OF FORT WORTH 2O22 eridge R�habilitation Contract 2
STANDARD CbNSTRUCTION SPECIFTCATION DOCUMENTS City Frojaci no. 103455
l2evis.ed July I, 20I 1
017423-2
CLCANING
Page 2 of 4
�.11 F�ELD [SITE] CQNDITION� [NOT USED]
1..� 2 WA12ItANTY [NOT LTSEDj
PART2- PAODUCTS
�.1 OWNER-Fi�RNISHED lox] OWNER-SUPPLIEDPRDDUCTS [NOT �CJSED]
�.� MATERIALS
A. Cleaning Agents
l. Compatible with surface bein.g cleaned
2. New and uncontaminatad
3. For manufaetured surfaces
a. Material recommended by tnanufacturer
2.3 ACCESSORIES [NOT U�ED]
2.4 SOURCE QUALITY CONTROL [NOT IISED]
PART 3 - EXECi7TION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATiON [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION [NOT U�ED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.7 FIELD [oR] SITE QUALITY CONTROL [NQT USED]
3.8 SYSTEM STARTUP jNOT USED]
3.9 ADJUSTXNG �N4T USED]
3.10 CLEAN�NG
A. General
1. Prevent acc�nulation af wastes that create hazardaus conditions.
2, Conduct cleaning and disposal operations to coinply wifih laws and safety orders of
governing authorities.
3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in
storm or sanitary drains or sewers.
4. Dispose af degradable debris at an approved solid waste disposal site.
5. Dispose of nondegradable debris at an approved solid waste dispnsaj site or in an
alternate manner approved by City and regulatory agencies.
CITY OF FdAT WqRTH 2O22 Bridge Rehabilitation Con#ract 2
STANDARD COlNSTRUCT'ION SPECIFICAT[ON DOCUNIE�+TI'S City Project no. 103456
Revi5ed 7uly l, 2�J11
017423-3
C]..EANiNG
Page 3 of4
6. Har�dle materials in a control]ed manner with as few handlings as possible.
7. Thoro�zghly clean, sweep, wasli and polish a[1 Wark and equipment associated with
this project.
8. Rernove all signs of teinporary construction and activities incidental to construction
of required permanent Work.
9, If project is nat cleaned to the satisfaction of the City, t�e City reserves the right to
have the clearzing carnpleted at the expense af the Cantractar.
10. Da not burn on-site.
B. Intermediate Gleaning during Constructiqn
1. Keep Work areas clean so as not to 3�inder health, safet�+ or convenience of
personnel in existing facility operations.
2. At maximum weekly intervals, dispc�se of waste materials, debris and rubbish.
3, Confine construction debris daily in strategically located container{s}:
a. Cov�r to prev�nt blowing by wind
b. StQre dabris away from construction nr operationa] aciivities
c. Hau! from site at a minizaauin of once per week
4. Vaeuurn clean interior areas when ready to receive finish painting.
a. Continue vacuum cleaning on an as-n�eded basis, until Final Acceptance.
S. Prir�r to storm events, Yhoroughly clean site of all loose or unsecured iterns, which
may become airborne or #ransported by flowing water during tl�e storm.
C. lnterior Fina1 Cleaning
1. Remove grease, enastic, adhesives, dust, dirt, stains, fingerprints, labels and other
foreign materials irom sight-exposed surfaces.
2. Wipe all lighting fixture re£lectors, lensas, lainps and trims clean.
3. Wash ar�d �hine glazing and mirrors.
4. 1'olish glossy surfaces to a clear shine.
S. Ventilatin.g systems
a. �lean permanent filters and reptace disposable fi[ters if units were operated
during construction.
b. Clean ducts, blowers and coils if units were operated vvithaut filters during
construction.
5. Replace all burneci oui lamps.
7. Broom clean proc�ss ar�a flonrs.
8. Mop o�kiee and control room �laors.
D. �xt�rior (Site or Aight of Way) F'inal Cl�aning
1. Remove trash and debris containers ff•dm site,
a. Re-seed areas disturbed by locatian of trash and debxis containers in accardance
with Section 32 92 13.
2. Sweep roadway to remove all rocks, pieces of aspha�t, concreie or any other oUjec#
that may hinder or disrupt the flow of traffic along the roadway.
3. Clean any interior areas including, but not limited to, vaults, manholes,. structures,
junction boxes and inIeis.
CTTY OP I"ORT WORTH 2�22 Bridge Reha6ilitation Contract 2
STANDARp CQNSTRUCTIqN SPECIFICATIOl�i DQC[.]MENTS City Project no. ]03456
Revised duly 1, 2011
ai �4 a3 - a
cz,�arrnv�
Page 4 of 4
q. If no long�r required for maintenance of erosion faci�ities, and upon approval by
City, remove erosion control from site.
5. Clean signs, ligf�ts, signals, etc.
3.11 CLOSEOUT ACTxVXTiES �NOT USED�
3.1� PROT�CT�4N [NOT USED]
3.13 MAINTENANCE [N�T USED]
3.1� ATTACHMENTS [NOT USED]
END OF SECTION
Re�ision T.ag
DATE NAME SLTMII�IARY OF CHANGE
C1T'I' OP FORT WORTH 2O22 B3'idge Reha6ilitation Cantract 2
STANDEIRA GONSTRiJCTION SP&C3FICATION DQCiJMENTS City Project no. [63456
Re�ised .Tuly 1, 2D1 !
017714-1
CLp5E0UT REQU[REMENT5
Fage ] of 3
t
2
3 PART 1 - GENEIZAL
4 1.1 SiJNIl�ARY
sEc�roN ai �7 i�
c�,os�o�rr xEQuix��rrTs
5 A. 5ection Includes:
6 1. The procedure for closing out a contract
7 B. Deviations from ihis Ciiy of Fort Worth Standard Speci�'ication
8 1. None.
9 C. Related Specifica�ion Sectior�s include, bL�t are not necessarily limited to:
�p I. Di�ision 0—Bidding R�quirements, Contract Forms and Conditions af the Contz'act
11 2. Divisinn 1— Gen.eral Reyuire�nents
12 1.2 PRICE AND PAYNIENT PROCID[]R�'�
13 A. Measurement and Paymen�
1q 1. Work associated withthis Item is considered subsidiary to the vario��s Items bid.
15 No separa�e payment will be ailowed for thi� Item.
16 1.3 REI'ERENCrS [NOT USID]
17 1.4 ADMINIS�RATIVE 12EQUIltI�"11�FJ1VTS
18 A. Guarantees, Bonds and Affidavits
19 1. No application %r �'inal payment w ill be accepted unti] a�l guarant�es, bonds,
20 certificates, licenses and affidavits required far Work or equipment as specified are
2I satisfactoriIy %led with the C.ity.
22 B. R�lease nf Liens or Claims
23 1. No application for %nal paym�nt will b� accepted until �atisfactory e�idence of
24 release of liens has been submitted to the City.
25 1. � �UBNIITTALS
26 A. �ubmi� al� required documentation to City's Project Representati�e.
27
28 I.6 INFORMATIONAL SUBNIITTALS [N�T IISID]
29
30 1.7 CLOSEOUT �i7BMITTALS [NOT USID]
31 PART Z- PROD[TCTS [NOT USID]
32
C1TY DF FORT WpRTH 2O22 BridgeRehabilitation Contract 2
STANDARD CONSTRUCTTON SPEC�ICATION �OCUMENTS City Pxoject no. 103455
Revised March 22, 2021
Ol 7719 -2
CLOSEOEJT REQi.JQ2Eh4SNTS
Page 2 of 3
PART 3 - EXECUTION
2 3.1 INSTALLERS �NOT USID]
3 3.2 EXAM[NATIQN [NOT LTSID]
4 3.3 PREPARAT[ON [N4T USID]
5 3.4 CLOSEOUT PROCEDiJR�
6 A_ Prior ta requesting Final Inspectian, submit:
7 1. Project Record Documents in accardance wixh Section Q1 7$ 39
S 2. Operation and Maintenance Data, if required, in accordance wrth Sect�an U178 23
9
10
11
12
13
14
15
16
17
18
19
2.0
21
22
23
�4
25
26
27
zs
29
30
31
32
33
34
35
3C
37
B. Prior to reguesting Final Inspection, perform fmaf cleaning in accordance with Section
O I 74 23.
C. Finai Inspection
1. After final cleaning, pravide notice to tt-►e City PrQject Representative that the Work
is eompleted.
a. The City will ma.lfe an initial Final Inspeetinn with the Cantractar pr�seni.
b. Upan completion ofthis insp�ction, the City will not�ythe Contractor, in
writing within 10 business days, of any particulars in which this inspection
reveals that the Wark is defecti�e or inc amplete.
2. iJpon receiving wrrtten notiee from the City, im�r►ediately undertake the Work
required to remedy deficiencies and complete the Work to the saiisfaction of the
City.
3. The Right-o.f-way shall be cleared o.f all construction rnaterials, barricades, and
ternparary signage.
4. Upon campletion of Work associat�d with the items list�d in ihe City's written
notice, inform the City that the required �Vork has been completed. Ylpon receipt of
this natice, the City, in the presence of the Contractor, will make a subsequent Final
Inspection of the project.
5. Provide ail special accessories required to place each item of equiprnent in full
operation. These special accessory items inalude, but are noi limited to:
a. Specified spare parts
b. Adequate ail and grease as requu ed for the first lubrication of the equipment
c. Initial fill up of all ehemical tanks and fuel tanks
d. Lzght bulbs
e. �'uses
f. VauIt keys
g. Handwheels
h. Other expendable items as required for initial start-up and operation of all
equipment
38 D. Notice of Project Completion
34 l. Once the City Praject Representative firids the Work subsequent to FinalInspection
40 to be satisfactory, the City w�l issue allotice of Praject Comrpletion {Green Sheet).
41 E. 5upporting Documentation
CITY OP FORT WQRTI-I 2022 Hridgs Rehabilitafipn Contract 2
STAI�IDARD CONSTRUC'I']O�T SPHCIFICATION DOCL]MENTS City Project no. l[13456
Revised March 22, 2021
ai �r� i9 -3
CLOSEOUT REQUIItEMENTS
Page 3 oF 3
l
2
3
4
5
6
7
S
9
1�
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
1. Coordinate with the City Yroject Representati�e to coinplete the following
additional forms:
a. Final Payment ReqUest
b. Statement of Contract Time �
�, Aff'idavit of Payment and Release of Liens
d. Cansent of Su�•ety to Final Payment
e. Pipe Report (if requu'ed)
f. Contractar's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter ofFinaf Acceptance
1. Upon review and acceptance afNatice af Project Completion and Supporting
Documentation, u1 accordance with General �anditions, City v,wil! issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RFSTORATION [NOT USIDj
3,6 RE-INSTALLATION [1vOT USID�
3.� FIELD �o�] SITE QUALI'I'� CONTROL [NOT USID]
3.8 SYST�M STARTUP [NOT �C7SID]
3.9 ADJUSTING [NOT U5ID]
3.10 CLEANING [NOT USIDJ
�.�t cLos�ov�r Ac�vz�Fs �NOT usEn�
3.12 PROTEC`TION [NOT iTSID]
3.13 MAINTENANCE [NOT U�SID]
3.1�t ATTACHiV�NTS jNOT USID]
IIVD OF SECTTON
Revision T..og
DATE NAME SUMMARY OF CHANGE
3122/2021 M Ov�en 3,4 C. Added language Co clarify and emphasiae requirement to "Clearing ROW"
26
C1T1� OF FQRT WORTH
STANDARD CONSTRUCTION SPECIC ICATI03V DOCUM�NTS
Revised Mm�ch 22, 2D23
2022 Bridgc Rchabilitation Contract 2
City Project no. 103456
017$23-1
OPE1�1'[ON AND MAIN'T�NANC& DATA
Page 1 of 5
�ECTXON 017$ x3
OPERATION AND MAINTENANCE DATA
PARTl� GEN�RAL
11 SUMMf A.1tY
A. Section Includes:
l. Product data and reIated information appropriate for City's maintenance and
operation of products furnished under Contraet
2. Such products may include, but are not limited to:
a. Traffic Controllers
b. Irrigation ControlIers (to be operated by the City)
c. But�erfly VaIves
B. Deviations from this City of Fort Worth Standard Speci�ication
1. None.
C. Related Speciiication Sections include, but are not necessarily limiteri to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROGEDC7RES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various [tems bid.
No separate payment wi11 be allowed for this Item,
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATNE REQUIREMENTS
A. 5chedule
1. 5ubmit manuals in final for�n to the City within 30 calendar days of produci
shipment to the project site.
1.5 SUBMITTALS
A. Submittals shall be in aecordance with Section O1 33 00 . All submittals shall be
a.pproved by the City priar to delivery.
E�f��aC�] ��J4��L�r�Yr -; � � �C�y
A. Submittal Form
1. Prepare data in form of an instructional manual far use by City personnel,
2. Format
a. 5ize: 8%2 inches x I1 inches
b. Paper
I) 40 pound minimum, white, for typed pages
2} Holes reinforced with plastic, cloth or metal
c. Text: Manufacturei's printed data, or neatly typewritten
C1TY OF FORT WOIiTH 2O22 Bridge Rehahilication Cantract 2
STANDARD COTI$TRUCTI01+1 SPECIFiCAT10N DqCUMENTS CiLy Project no, ]0345b
Revised liecember 20, 2012
ai�s23-2
OPERATION Al*]D MAII�ITENANCE DATA
Page 2 of 5
d. Drawings
1) Provide eeinforced p�nched binder tab, bind in with te�t
2) Reduce larger drawin�s and fold to size o�text pages.
e. Provide fly-leaf for each separate product, or each piece of operating
eqtiiipment.
1) Provids typed description af product, and maj or component parts of
equipzr�ent.
2) 1'rovide indexed tabs.
f, Covar
1} Idantify each voluine with typed o�• print�d title "OPERATING AND
MAINTENANCE INSTRUCTI�NS"
Z} List:
a} Title ofProjact
b) Id�ntity of sepa,rate str�rcture as applicable
c} Identify of gen�ral subj ect znatter covered in the manual
3. Bind�rs
a. Comzaaercial quality 3-ring binders with durable and cleanable plastic eovers
b. When multiple binders are used, correlate the data into related consistent
groupings.
4. If available, provide an electronic form ofthe O&M Manual.
B. Manua] Cantent
Nea�l}� typewritten table oi contents for �ac� vn[ume, arranged in systematic order
a. Contractor, name of responsible principal, address and t�lephane number
b. A list of each p.raduct required ta be included, inciexed to content af the voluine
c. List, with each prnduct:
l) The name, address and telephone number of #he subcontraetor or insta]]er
2) A Iist of each product required to be included, indexed to content of the
volume
3) IdenYify area of respansihilitSr of each
�) Local source of �upply for parts and replacement
d. Identify each produet by produet naz�ae and oYher identifying syinbols as set
forth in Contract Documents.
2. Produc# Data
a. Include only those sheets which are pei�tinent to the specif c product.
b. Annotate each sheet to:
1) Clearly identify specific product or part installed
2) Clearly identify data app.licable to installation
3) Delete references to inapplicable information
3. Drawings
a. 5upplement produ�t data with drawings as neeessary to clearly i1lListrate:
1) Relations of component parts of equip� r�ant and sysfams
2} Control and flory diagrams
b. Coordinate drawings with information in Praject Record Dacuments to ass�re
correct illustration of completed installation.
c. Da not use Project Record Drawings as maintenance drawings.
4. Written text, as required to supplement product data for the particular installation:
a, Organize in consistent farmat under separate headings for different procedures.
b. Provide logical sequence of instructions of ea�h procedure.
C1TY pF T'ORT WDRTH 2O22 ]3ridge Rchabiliiation Go�r�act 2
STANDARD CONSTRUCTIOI�i 5PECIFICATIQN DOCiIMENTS City Projac# no. 10345b
Re�ised Deeember 20, 2012
017823-3
QPERATFON AND MAINTENANCE DATA
Pagc 3 of 5
5. Copy of each warranty, bond and service contract issued
a. Provide informaiion sheet foi• City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect val.idity of warranties or bonds
G. Manual for Materials and Finishes
1. Submit 5 copies of complete manual in final form.
2. Content, far arehitecturai praducts, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, camposition
2} Color and textt�re designations
3) [nformation required for reordering special manufactured products
b. Instruciions for care and maintenance
1) Manufacturer's recomznendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are deirimentaI to
product
3) Recommended schedule for cleaning and maintenance
3. Content, for moisture prote�tion and weather exposure products:
a. Manufacturer's data, giving fu11 information on products
1) Applicable standards
2) Chemical campositian
3) Details oiinstallation
b. Instructians for inspectian, maint�nance and repair
D. Manual for Equipment and Systems
1. Submit S copies of complete manual in fanal farm.
2. Cnntent, far �ach unit of equipnnent and systam, as appropriate:
a. Description of unit and component parts
1} �'unctinn, normal aperating characYeristics and lizniting caz�ditions
2} Performance curves, engineering data and t�sts
3) Ca�a��lete namenclature and cornmercial number of replaceabie parts
b. Operating procedures
I) Start-up, break-in, rautine and normaI operating instructions
2} Regulation, control, stopping, shut-down and emergency instructions
3) Surnmer and winter operating instruGtians
4) Special aperating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble s�ooting"
3) Disassembly, repair and reassembly
4) Aligntr;ent, adjusting and checking
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufaciurer's printed operating a�zd maintc��anc� instructions
f. Description of saquence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
h. Each contractor's coordination drawings
1) As installed colar coded piping diagrams
C1TY OI� FOAT WQRTH 2Q22 aridge Reha�ilitation Contract 2
STANDAI2D CONSTRUCTIQN SPECIFICAT[pN I)OCtTM�:N'I'S City F'rajeof no. ] 03456
Revissrl December 2Q, 2012
017823-4
OPERAT[pN AND MAINTENA�ICE DATA
['age a af5
i. Charts of valve tag numbers, with ]ocation and function of each valve
j. List of ariginal manufacturer's spare parts, manufacturer's current prices, a.nd
recommended quantities to be maintainad in storage
k. Other data as required und�r pertin�nt S�ctions of Speeifcatinns
3. Cantant, for each eiectric and elect�•onic sysYem, as appropriate:
a. Description of sysiem and coanpnnerat parYs
1) Func.tion, normal operating characteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical service
2) Conirols
3) Communications
c. As install�d eolor coded �iring diagrams
d. 4perating procedures
1) Routine and normaJ operating instructions
2) Sequences rec�uired
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checking
f. Manufacturer's pxinted nperating and maint�narzce instruct�ans
g, List of original manufacturer's spare parts, manufacturer's c.urrent prices, and
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of 5peeifications
�. Prepare and include additional data when the need for such data becomes apparent
during inst��uclion of City's personnel.
1.7 CLOSEOUT SUBMITTALS [NOT USEDj
1.8 MAINTENANCE MATERIAL SUBIVIITTALS [NOT USED]
1.9 QUALITY ASSIIRANCE
A. Provide operatian and maintenance data by personnel with the %ifowing criteria:
1. Trained and e�perienced in maintenance and operation af dascribed praducts
2. Skilled as technical writer to the extent required to eommunicate essential data
3. Skilled as draftsman competent to prepare required drawings
CITY OF PORT WORTH 2O22 Bridge Re3�a6ililation Cantract 2
3TAND.4RD CONSTRUCTIpN SPECIFICATION DOCUMEiYT5 City Prajeck na. 10345b
Re�ised December 20,2012
017&23-5
QPER�ITION AND MAINTENANCE I}ATA
Page 5 of 5
�.10 DELNERY, STORAGE, AND HANDLYNG [NOT U�ED]
l..l]. FXELD [SZTE] CONDTT�4NS [NOT USEDj
1.1� WARRAN'I'Y [NOT USED]
PART 2 - PRODiICTS [N�T US.ED]
PART 3 - E�ECUTION [NOT USED]
END OF SECTION
Revisian I,ag
DATE NAME S UMMARY OF CT�ANGE
8/31/2012 D. Johnson 1.S.A.1 --title ofsection rernov�d
C1TY OF FORT WbRTI-I 2Q22 Bridge Rehabilitation Coniract 2
STANDARD CONSTftUCTI�N SPECIFICAT[pIV DOGt]MENTS City Yrojeet no. 103456
Revised Decemlxr 2�,.2�12
Q l 78 39 - 1
PROIECT AECORD DOCUMENTS
Page 1 of 4
S�CTION O1 78 39
PR07ECT RECORD DOCUMENTS
PARTI- GENERAL
11 SUIVIlVIARY
A. Section Includes:
1. Work associated with the documen#ing tY�e project and recording changes to project
doeuments, including:
a. Record Drawings
b. Water Meter 5ervice Reports
c. Sanitary 5ewer 5ervice Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specification
1, No ne.
C. Related Speci�'ieation Sections include, but are not necessarily lizni#ed to:
t. Division 0— Bidding Requiremenfs, Contracf Forms and Conditions of the Conteact
2, Division 1— General Requirements
1.2 PRICE AND PAYMENT �ROCEDUR�S
A. Measurement and Payment
1. Work asso�iated with this Item is considered subsidiary to the various Iteins bid.
Na separate payment will be allowed for this Item.
1.3 REFERENCES [NOT U,SED]
1.4 ADMIIVISTRATNE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. �'rinr io subrnitting a req��est for Final Inspection, deliver Project Record Documents to
City's Project Representative.
1.6 ACTION SUSMTTTALS/�N�'ORMATIONAL SC7BMITTALS [NOT �[TS�D]
I..� CLOSEOUT SUBNIITTALS [NOT USED]
1.$ MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALZTY ASSURANCE
A. Accuracy af Records
1. Thorou�hly coordinate changes within the Record Documents, rnaking adequate
and ptoper entri�s on �ach page o� Specifications and each sheet of Drawings and
otlaer Dacume�ts where such entry is required to show the change praperly.
2. Accuracy of records shall be such that fiature search for items shown in the Contract
Docurnents may rely reasonably on inforination obtained froin the approved Project
Record Dacuments,
C[TY OP POKT WOATT3 2022 Sridge Rclia6ilitation Con#ract 2
STANDAi2D Cp1+1STRUCTION SPECIFICATIdN DOCUMENTS City Prajecf no. 103456
Re�ised luly I , 2011
017839-2
PROJECT RECORD DOCUMENTS
Page 2 of 4
3. To faciiitate accuracy of racords, inake entries within 24 hours after raceipt oi
information that the change has occurred.
4. Provide factual information regarding all aspects of the Work, both concealed and
visible, to enab]e future modiflcation of the Work to proceed without lengihy and
expensi�e site meas.urement, investigation and examination.
L10 STORAG� AND HANDL.iNG
A. Starage and Handling Requirements
1. Maintain the job sef of Record Documents completely pratected frotzz deterioration
and from loss and darnage until completion of the'�ork and transfer nf all recordad
data to the %nal Pro}ect Record Documents.
2. In ihe event of loss of recorded data, use rneans necessary to again secure the data
to the City's approval.
a. In such case, provide replacements to fhe standards originally required by the
Contract Documents.
1.11 FIELD j�ITE] CONDITIONS [NOT USED]
1.12 WARRANTI' [NOT USED]
PART 2 - PRQDUCTS
2.� OWNER-FIIRN[SHED [ox� OR'NER SUPPLIED PRODUCTS [NOT USED]
2.2 RECORD DOCUMENT�
A. 7ob set
1. Prorriptly following receipt of the Not�ce to Praceed, secure from th� City, at nn
charge to the Contractor, 1 camplete set o�alI Dncuments cnmprising the Contract.
B. Final Record Documents
1, At a time nearing the completian of the Work and priot to Final Inspection, provide
the City 1 camplete set of all Final Record Dravvings in the Cpntract.
2.3 ACCESSORiES �NOT U,S�D]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USEDj
3.3 PREPARATION [NOT U��D]
3.4 MAINTENANCE DOCUMENTS
A. Maizitenance of Jnb Set
1. Immediately upon receipt of the j ob set, identify each of the Documents with the
fiitle, "RECORD DOCUM�NTS - JOB SET".
CITY OF FOCtT W02TH 2O22 Bridge Reha6itifafian Contract 2
5TANI7ARD CONSTRLICTION SPECIFICA"110N DOCL1MEt�fTS City Projeci no. 103456
Revised 1uEy 1, 201 I
017839-3
PRO]SCT RECQRD DOCUMENTS
Page 3 of 4
2, Preservation
a. Cansidering the Contract completion time, the probab�e n.urnber of occasiozas
upon whicl� the job set must be taken out for new entries and fnr exaa�inati�n,
and the candttions under which these acti�ities vaill be performed, devise a
suitable method for gratecting the job set.
b. Do not use the job set for any purpose except entry of n�w data and for review
by the City, until start of transfer of data to final Praject Record Documents.
c. Maintain the job set at the site of vvork.
3. Coordination witll Canstructian Survey
a. At a minimum, in accordance with the inter�als set forth in 5ection O I 71 23,
clearly mark any deviations from Contract Documents associated with
installation of the infi•astructure.
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
U. LTse an erasabla colot•ed penci� (not ink or indelible pen.cil), claarly descrihe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a°cloud" dravan around fhe area or areas affected.
e. In th� e�ant of averlapping changes, use different colors for the overlapping
changes.
5. Conversion of schematic layouts
a. In some cases on the Dra�vings, axrangernents of canduits, cii�cuits, piping,
ducts, and simiiar items, are shown schematically and are not intended to
parteay precise physical layout.
1) Final physical arrangement is datermi�ed by the Contractar, subject to the
City's approval.
2) Hawever, design of fiiture modif cations �f the facility may reqttire
accurate information as ta the final physical layout of items wi�ich are
shown on.ly schematically on the Drawing5.
b. Show on the j ob set of Record Drawings, by dimension accurate to within 1
inch, the centerline of each run of items.
1) Final physical arrangement is determined by the Contracto:r, subject to the
City's approval.
2j Show, by symbol or note, tlie vertical location af the Item ("under slab", "in
ceiling p[anurn°, "expased", and the like).
3) Ma�Ce all identification sufficiently descriptive that it may be reiated
reliably to the Specificaiions.
c. The City may waive the requirements far con�ersion of schematic layouts
�where., in the City's judgment, conversion serves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by tl�e City.
B. �inal Project Record Documents
L Transfer of data to Drawings
a. Carefully transfer chan�e data shown on th� j ob set of Record Drawrngs to tha
corresponding final docuznents, coordinating the changes as required.
b. Glearly indicate at each affected detatl and other Drawing a fuil description of
changes made dttring canstruction, and the actual location of items.
C1TY OP PDAT W�RTH 2O22 Bridga Relaabilftation Contract 2
STANDARD CONSTRUCTIdN 3PECIFICAT[DN I]OCUMENTS City Projeet no. ] 03456
lZevised July 1, 2011
01 78 39 - 4
PROJ�CT R�C�EtD DpCl1MENTS
Page 4 of 4
c. CaII attention to eaeh entry by drawing a"claud" around the area or areas
af�ected.
d. Make cnanges neatly, consistently and with the proper media to assure
Iongevity and clear reproduotion.
2. Transfer of data to other pocuments
a. If the Docurnents, other than Drawings, have been kept clean during progress of
the Work, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents., athej� than Drawings, will be accepted as final
Record Documents.
b. If any such Document is not so approved by the City, se�ure a new copy of that
Document from the City ai the City's usual charge for reproduction and
handling, and carefully transfer the change dat� to the new copy to the approval
of the City.
3.5 REPAIR / RESTQRATION [NOT USED]
3.6 RE�INSTALLATION [NOT USED]
3.7 FIELD [ar�] S�TE QUALITY CONTROL [NOT USED]
3,8 SYST�M STARTYJP [NOT USEDj
3.9 AD,TiTSTING [1VOT USED]
3.�U CLEANXNG [NOT USED]
3.11 CLOSEOUT ACTN�T�ES [NOT USED]
3.12 PROTECTION [NOT TTSED]
3.1.3 MAII�TTENANCE [NOT USED]
3.14 ATTACHMENTS [NQT USED]
END OF SECTION
Revision Log
DATE NAME Si_JMMARY OF CHANGE
Cl`I'Y OF' �ORT WOR'TH 2O22 Bridge Rehabilitation Contract 2
STANDAR.D CONS"FRUCTION SPECIFICATIaN DOCUMENTS City Projecf no. ]0345G
Revised 7uly l, 201 ]
347113-1
TRAF�IC CO�ITROL
Page 1 ofG
2
3 PART 1 - G1+:Nf+:FtAT:
sEc�zoN �4 �� x�
TRAFFIC CfONTROL
4 1.1 SUMMARY
5 A. SectionIncludes:
6 1, Installatian of Traffic CantrolDevices ar�d preparation of Traffic Control Plans
7
S
9
1�
11
12
13
14
15
16
17
i�
19
20
21
22
23
24
25
26
27
28
29
3a
31
32
33
34
35
3b
37
38
39
40
41
42
B. Deviations fram ihis City of Fort Worth Standard Spec�icatidn
l. FOR THIS PROJECT, TRAFFIC CONTROL SECTION 34 71 13 SHALL BE
C�NSIDERED SUBSIDIARY WORK, NO SEPARATE PAY.
2. TRAF'FIC CONTROL IMPLEIVIEN'I'ATION, INSTALLATION,
MAINTENANCE, ADJUSTMENTS, REPLACEIVIMENTS, AND REMOVAL OP
TRAFFIC CONTROL DEVIC�S SHALL BE CONSIDERED SUBSIDIARY
WORK, I�O SEPARATE PAY.
3. PREPARATEION OF TRAFFIC CONTROL PLAN DETAILS, ADHERENCE
TQ CITY AND TEX,4.S IVIANUAL ON [1NIFORM TRAFFIC C�NTROL
DEVICES (TMLTI'CD), QBT'AINING SIGNATLTRE AND �EAL OF A
LICENS�D TEX,AS PR�k'E59IQNAL ENGINEER SHAI,L BE CONSIDERED
SUBSIDIARY WORK, NO SE�ARA'I'E PAY.
C. Related Specif'ic ation Sections include, but are nat neces s arily iimited to:
1. Division 0-- Bidding Req�aire�xaents, Contract Porms and Conditio.ns of the Cantracl
2. Di�ision 1— General Requirements
1.2 PRICEAND PAYNIE�IT PROCEDURF�
A. Measuremeiit and Payinent
1. Installation ofTraffic CantrolDevices: SUBSIDIARY NO S�PARATE PAY
2. Partab�e M�ss.age 5igns
a. Measurement
I) Measurement %r this Iiem shallbe p�r week fnr theduraiion o�use.
b. Payment
I) The work performed and tnateriais furnished in accordanceta this Item and
measured as provided under "Nieasurement" shallbe paid for at the �anit
pric � bid per w ee�C for "Partable Mes s age Sign" rental,
c. Thepricebid shall include:
1) Delivery of Portable Mes sage Sign to Site
2) M�ssageupdatir�g
3) Sign movement throughout construction
4) Return ofthePortableMessage5i�n post-construct�on
C1TY(7PFORT WORTH 2�22 BridgeRehabilitatianContract 2
S'1' ANDAl2D C ONS'I RUCT ION S PECIFiCATION DOCUFvIENTS C ity Project no. 103aSb
Revised Mazclt 22, 2021
34 71 l3 - 2
TRAFFIC COIVTROL
Page 2 af G
I
�
3
4
5
6
7
8
9
10
ll
12
13
3. PreparationafTraffic ControiPlanDeta.iLs
a. "�
b. $a�e�
1 � �rxe,,.,...+> �.a�. �aa�n�.,�tio,.t.,��_�,rh,��,da ; ,...�.,n,.os.�;�-k�-t,y,. :
LL ' �7
��.
c. .
1) r
[n�
21 n.tko���nr_+,��„n�a.��� _��n��.n��ns_r ;�_ ,.f.., �r,.���;� r� . v.tN�i no,..;�_
1
�B)
3)
4)
14 1.3 REFERENC E�
15
16
17
l$
l9
20
21
22
A Reference Standards
1. R�ference stand�rds cited in this Specification refer to the currentr�ference
standard published at the time of the latest revis ian date Iogged at the end of this
Specification, unless adateis specifically cited.
2. Te�as Manua� on Uniform Traffic ControlDevices (TMiTTCD).
3. Item SQ2, Barricades, 5igns, and Traffic Handling of the Texas IIepartment of
Transportation, Standard 5pecif'ications f�r Construction and Maintenance of
Highways, Streets, andBridges.
23 1.4 ADMINISTi�ATIVEREQLTIRIII'iIIV15
24
25
A. General
1. Contractar slaallminimize lane closures and impact ta vehicular/pedestrian taaffzc.
2d B. Coardinatian
27 1. Coniact Traffic Serviees Divisian (817-392-7738) a min'unurn of 48 hours priar to
28 implem�nting Trat'fic Control witivn 50� feet of a�raffic signal.
29 C. Sequencing
30 1. Any deviations to theTraffic ControlPlan included in the Drawings must befirst
31 appro�ed by the City and design Engineer before implementation.
32 1.� SiTSMITTALS
33 A. Provide the City with a current list af qualifed flaggers before beginning flagging
34 activities. Useonly flaggers onthequalified list.
35 B. Qbtain a Street Use Permit from the TPVd Department's Transportat�on Divis ian. The
3G Traffic ControlPlan {TCP) for the Project shall be as detailed on the Traffic Control
37 Plan Dekail sheets oftheDrawing set. Acopy afthis Traffic CantrolPlan shallbe
3 8 submitted with the 5treet Use Permit.
39 C. Traffic CantrolPlans shall be signed and sealed by a licensed Texas Professionai
40 Engineer.
CITY OF FORT WORTH 2O22 Bridge Rehahilitation Conlract 2
ST ANDARDCONSTRUCTIQN SP�CIFICATION DOCUM�NTS City Project no. 10345fi
Revised March 22, 2021
34 71 13 - 3
TT2P.�FIC CQNTROL
P�e 3 oP 6
l
2
3
4
5
6
7
8
9
10
D. Contractor shalIprepare TrafF'ic ControlPlans if required by tha Drawings o�'
Specification�. The Contractor will be responsible for ha�ing a licensed Texas
PrafessionalEngineer sign and seal the Traffic ControlPlan sheefs.Atraffic control
"Typical" published by City ofFort Worth, theTexas ManualUnif'ied Traffic Control
Devices (TMZ.ITCD) or Texas Department ofTransportation (TxDOT} can beused as
an alternative to prepari�g project/site specifac traffic contz�]plan if the typica] is
applicable to thesp�cific project/site.
E. Lane closures 24 hours or longer shallrequire a site-specif'ic traffic controlplan.
F. Cantractor responsiblefor having a lieensed Texas T'rof�ssianalEt�gineer sign and seal
changes to the Traf�'ic ControlPlan(s) developed by the Design Engineer.
l I I..G ACTI�NSLTBNIITTALS/INFORMAT[ONAL �UBNIITTALS [NOT USIDI
12 1.7 CLQSFAUT SUBMITTALS [NOT IISID]
13 1.8 MAINTINANCE MATERIAL �UBIVIITTALS [NOT i15ED]
14 1.9 QUALITI' AS�iTRANCE [NOT USID]
15 1.10 DELIVERY, STOR�G'� AND HANDLING [NOT USID]
L
17
I.11 FIII1D [SITE] CONDITIONS [NOT USID]
i.1� WARRAIV'i'Y [NOT USID]
18 PA.RT 2 - PRODUCTS
69 �.I OWNEEtWFi]RNiS�IED [ax] OWNIIZ-SUPPLYID PRODUC'I� [NOTUSID]
2a �.2 ASSENYBLIES AND MA.TERIALS
2l A. Descriptio�l
22 1. Regulatory Requirements
23 a. Prowide Traffic ControlDevices that eonform to details shown on the
2� Dra�vings, the TML1'I'CD, and TxD�T's Compliant Work Zone Traffic Contral
25 Device List {CVVZTCDL).
2b 2. Materials
27 a. Traffc CantrolDe�vices tz�.ust meet a113•e#�ectivity requirements included'm the
28 TMUTCD and TxD�T 5pecifications — Item 502 at all times during
29 cnnstruct[nn.
30 6. Electronic message boards shallbe prnvided in accordanc� with the T'MUI'CD.
CITY pF FORT WORTH 2�22 Sridge Rehabilitakion ConYracY 2
ST ANDARD CONS TRiICTIDI�! S PECIF ICATTON DOCUMI:NT5 City Project no. 10345fi
Re�ised March 22, 202i
3A7113-4
TR,hI'FIC CC3NTRDL
Paga4of6
1 �.3 ACCFSSORI� [NOT USID]
2 �.4 SOURC� QUALITY CONTROL [NOT USID]
3 PART 3 - EXECUTIOIV
4 31 EXANIINATION [NOT USID]
5 3.2 PREPARA'I�ON
6 ,A, Prot�ction of In-P�.ce Conditions
7 1. Protect existing traffic signal equipment.
S 3.3 INSTALLATION
9
10
�
12
13
14
A Follow the Traf'fic ControlPlan (TCP) and install Traffic ControlDevices as shown on
theDra�aings and as ciirected.
B. Install Tra.ffic ControlD�vices straight and plumb.
C. Do not makechanges to thelocation of any device or i�mplement azly other changes io
the Traffic ControlP�an without t�ae approvalofthe Engineer.
l. Minoradjustmentstomeetfieidconstructa6iiityandvisib.ility areallowed.
15 D. Maintain Traifc ControIDevices by taking correctiveaction as soon as possible.
16 1. Correctivea.ctionineludes but is not limited to cleaning, replacing, straightening,
17 co�vering, or removing Devices.
1 S 2. Mair►tain the Devices suchthat they are properly positioned, spaced, and legible,
19 and that retroreflective characteristics meet requirements during darkness and rain.
2 U E. If the Inspectar discove�s that the Contractnrhas failed to comply with applicable federal
2 i and state law s(by faiIing to furnish the neces sary flagmen, w aznning devices, barric ades,
22 lights, s igns, or otherptecautiar�ary rrieasures for the protection af persons or property), the
23 Inspectormay order such additionalprecautionary measures betaken to protectpersons
24 and property.
25 F. Subject totheapprovalaftheInspector, partions ofthis Project, whicharenot affected by
26 or in conflict with the prap� ed method of handling traffic or utility adjustments, can be
27 constructed during any phas e.
28 G. Ba.rricades andsigns shall6eplacedin suchamannerastanatinterferewiththesight
24 distance of drivers en#ering ihe highway from driveways or side streets.
30 H. To facilitate shi£tirig, barricades and signs used in lane closures or traf�ic staging may
31 be erected and mounted on partable supports.
32 1. The support des ign is subject to the approval of the Engineer.
33 I. Lane closures shallbein accordancewith theappra�edTraffic ConirolPlans.
34 J. If at any time the existing traffic s ignals becnme inoperable as aresult of constructian
35 operations, theCantractorshallprovideportablestop signswith2 pt-angefTags, as
36 approvedbythe �ngir►eer, to beusedforTraffic Control.
CI1'Y OF POitT WQRT H 2D22 8€idge Aehahilitation Contract 2
5T ANDARD CpNS TRUCTIdN SPECIFICA7'IQN DQCUMFNTS Ciiy Project no. I Q345fi
Revised March 22, 2fl21
34 71 13 - 5
TRAFFIC CpNTRQL
Page 5 of 6
l
�
3
4
5
6
7
8
9
10
11
12
13
14
lS
I6
[7
48
19
20
2l
22
23
24
K ContractorshalImakearrangementsfarpoIice�ssistancetadireet�raffieiftrafficsignal
iurn-ons, street [igh� pole installation, or other canstruct�on willbe done duringpeak traffic
times (AM: 7 azaa — 9 azr.i, PM: 4 pm - 6 prn).
L. Flaggers
1. Pra�+ide a Contractor repi�esentati�vewho has bee.n certifzed as aflagging instructar
through courses offered by the Te�as Er�ginee�rirzg E�tension Service, tf�e American
Traffic S�fety Services Association, theNational Safety Council, or ather approved
organizations.
a. Provide the certif'icate indicating course completion when requested.
b. This representative is r�sponsible for training and assurin.g that alI flaggers are
qualified to perform flagging duties .
2. A qualified flagger must be independently certified by 1 of the organizations listed
aho�e or irained by the Contractor's certi%ed flagging instructor.
3. Flaggers must be courteous and able to effectively communicate u�ith the public.
4, When directing traffic, flaggers mustusestandard attire, flags, signs, and signals
and follow theflagging procedures set forth in theTM[_TTCD.
5. Provide and mainiain flaggers at such goints and for such periods af time as may be
required fo prflvide far the safety and convenience af public travel and Contractor's
personnel, and as shown ontheDrawings or as directed by theEngineer.
a. Theseflaggers shall be located at each end of the lane closure.
M. Removal
l. Upon completion of Work, removefrom theSiteall barricades, signs, canes, lights
and otY�er Traffic ControlDavices us.ed for work-zone traf�ic handling as soon as
practica[in atimely manner, unless otherwise shown on the Drawings.
25 3.4 R�PAIR /RESTORATION [N[)T USID]
26 3.5 R�INSTALLATION [NOT USED]
27 3.6 F'IEI,D �ou] SITEQUALITY CONTROL [N�T USID]
28 3.7 SYSTFM START[IP [NOTUSEU]
29 3.8 ADJUSTING [NOT USID]
30 3.9 CLFAIVING [NOTUSID]
31 3.1Q CL05EOUT ACTTVITIES [NOT LTSID�
32
33
3.11 PROTECTION [NOT USID]
3.1� MAINTINANCE [NOTUSID]
3�4 3.13 ATTAC�'iS [NOT USID]
35 IND OF �ECTION
36
37
CITY OF PORT WORT H 2O22 Bridge Rehabilitation ConCraet 2
ST ANDAI2D CONST RIICTION SPECIFICAT ION DOCLTMENT S Ci[y Proj ect no. 103�+56
Revised Marcii 22, �D21
34 71 13 • fi
TIZAFF'TC CQIdT'120L
Page b of 6
Rer�ision Log
DATE NAME SUMMARY OF CHAN.GE
11122/l3 S. Arnoid Added police assistance, requirement forwhen a site speci�cTCP is required
1.4 A. Added Ianguage to ejnpllasize minimizing of lane closures and 'unpact to
traffic.
3/22/2021 M Owen
1.5 Clarifie.d submitlal requirements
3.3 M. Clari�ed ramnval rec�uirements
ClTY OF FORT WORT N 2022 Bridge Rehabititation Contract 2
ST ANDARD CQNSTRUCTIpN S PECIFICATION DOCi ]N1�N'I'S City Prpjeet no, 103456
Revised Ivl�ch 22, 2�21
���6.06.� l�uiority and Women Ov�ned �u�iness
]Enterpri�e Compliance
'�'�I�S �'A�� �L��"I' �1�1'�']El�'�'��l�TAI.rI�� �]L�I�
2022 BridgeRehabilitation Contract2
City ProjectNo.103456
City of Fort Worth ATTACHMENT 1A
F� T WDRTH Busfness �quitv Utilization Form P�ge 1 of4
Disadv_antaaed Bus[ness_�nterArlae Ukilizakion Form IAppllcahfe lf FederaliY-Fuededl
PRiNfElOFFEROE710W N�R�+
COMPAFIYNAM�C: VIbSOn � ASSOC�t`3�e'S� �nC.
PRo���rNA��:2022 Bridge Rehabilita�ion Confiract 2
PR�.iECT HUMg�K: 6!I] �ATE: Clty's Business Equity Goal: • dfferor's Busfness Equity (or UBE}
1 D3456 0� r� �i�o2� �✓ (Checic iiaddress9ng bBF Goal� 23 �a Commitmcnt: 23.67 %
Ci7eCk all applicab�e boxes th descffbe � Not Cerl�ed �MBE � W9E �[38E � NUB �VOSB �Section 3
PrimelO�fererl�wner's ClassiFlcatian:
Certifying Agency: ❑NCTRCA �bIFW MSOC �7X db7 �WBCS �Qaser.
�thrliGlty: ❑��nAmeriran �}lispenic �Caucesian �Aslaa ❑Nalivellrnerican Gendel: ❑Mele ����p��e �Non-Binary
pefErtltians: Business Equify Firm: Cerfifed IViBE Mlnority Business Eoterprise or WBE Worr�en Busihess Enterprise �BE: Dlsadvantaged Buslness �nlerprise
HEiB: HistvricaEly Under Utilized Huainess VQSB; Veteran �wned Srrtall Buslness Sectian 3: Certi6ed Housing Urban Qevelapment Vendors
ALI. Bl1SRN�SS �(aUl7Y F1Ri4lS 14�UST �� C�FtTIFtEp B�FOitE CQNTF2AC7 AWAR[]
Fafiure ta camplete fhis farm, in Its entlrely, and r2celved by the Purchasing Dlvision no leter th�n.2:60 p.m, nn the seGond City kwsiness day atter hid opening, exdusive of bid npening
data, wiff result in tha 61d 6eing consldered oan-respanslve to bld apecilicallans. ExcenE3on: CFA. ICA, and C[38G oroiecis. dacuments will be submllted !o the Gity Proiect Manauer ff
publlclY bid ortalhe Da„v,ebper if pris+ately bid,
The undersigned PrimelOfierur agreas lo ertler into a fonnel agreement wilh 1he Buslness Equity firm(sj Ilsled in lhls utqlzailon schedula, conditioned upnn execuUon of e contracl wlth ihe
City of Fort Wprth fExceplion• �e�elaper uraiecisl. The intent�onal andlor knowing. misrapresentallun af facts Is grounds for cansiderallon af disqualifrcaGan and wlfl result in Iha bid being
considered nan-rssponsive !a bid specificallons.
Bustness Equity firms listed toward meating Ehe prcject goal musl he localed in 1he Cil�s markelplsce ai the Gme pt hid nr Ihe bus�ness has a Signi(can! Business presence in the
Marketplace. The matketplace is the Citv oF Fort Worth Inc[udln4 parlions of �enlon, Parker. Wisa, and all ot Terrant. Oallas. and Juhnsan cvuntles,
Certified means those firms, locaied within the Ma[ketglace, thal have 6een determin$d to be .e'6ana-fida minorily ar women 6usiness enterprise by Iha NoRh Cenlral Texas
Regional GerliHcalion Agency (NGFRCA), �a11aslFort Worth Niinority Suppl[er DeveEapmehi Countil (I7lFW MSDC) and Women's 6usinass Cnunci[-SauYhWest {YUBC3).
Ifi hauling serv€ces are utilized, the PrimelQiferor will he glven credlt es long as Ihe Business Equ3ty tlrm listed owns and operates at least one (uliy Ilcensed and operatianai truck ta he
used on the conlract The Business Equity firms rnay leasa lrucks from anothar Business Equity firm, incfuding Husiness Equky owner-nperatad, and recefve full Businass Equily
credit. The Buslness Equity iirrrt may leasa #rucks from non-Business EquHy firms, including owner-opereted, hut will only receive ccedit for Ehe tees and commissions eamad by !he
9usirtes5 �quiry as ou111nad In the lease agraement. Note: Far OHE Gaals, 6U% of tfTe servlces eaunt towards the gaal. Pleasa �ee helow.
Cdunting DB� PartEeipatian: If materia[s or supplies are obfained fmrn a f�BE manufaciurer, aaunt 1R0 perceni of ihe cosi af lhe maledals or supplles towards lhe gval. fF lfte meterisls ar
supplies ere purchased fmm a i]BE reguier deeter, count 60 pertent of lhe cost af the meterlale and supplies toward tbe a6� goal. When materials ar supplies are purchased irorn e nBE
rtefther a manuFecturer nor a regular dealer, counl ttie anilre amnunt of fees or commissions charged lar assistence ia the prncurement af the meterleis and supplles or fees or
transporlation charges fnr the delivery of the metarials or supplies delivered fo the job site. In afl cases, Ihe PrlmelOfferor is respons161e to idenlify ti�e amnuht� to 6e used toward the
cammitted E3BE goal.
EBedive U1lOt12021
llRdaled 05f26f2421
nrrncr-�n�Errr ��
FQRT WORTN P�a 2� 4
`---�er��� �usiness �quity Utilization �arm
Please nate t�ai nnly cerlifted 6usinesa �quity firms �rill be caunted to meet the e�sinass �qulty goal,.Prirr3efptfar�ra.a�e .raquired fo ide�iify_, ALL , su�cont�actarslauppliers, -: -.
regardless b1 sfa{us; i.e.; 8usiness � Equity � ilrms end non=Business Egulty frms.'Ps3�9elqf�a�ors must Idantrfy by Uer.level all su6r.ontraCtorslsuppllers: `Fler means iha fevel,vf ',
subcontracting.6eloiN.Rha PrilnelOticr`ur i.e, � dirGct Fayment �rom ths Ptime/Offeror to a suGcont�aatar.Es:considered,ist tier, a payi�ten� by a suf�contractor to:iRs supplier€s considered ',
2nd iler.'Busi�ess �quHy firins a�e ta be Elstad before nan-8[islne�s Equity Trins; The Primel[7ffervrls respqnsible to'pirovid "e prvaf of paymant.Qf ell iiaTed.'suh-�ntreclorslsupplters' ,
,. - . . .: <:
iclentf�ed as'a susine
ss Equiry,firm and counUng lhose.dollars.kowards meeting #he,aonva�t comml�ted gaal, :• " � `,' ''
Certitiad Bus'ine�s Equ�fg PnmelOf€eror Goniractars counfing thelr seiF per{afmance towa;ds.meeEing ths contrac� gaal must be cbrkitied withlri'those NAtCS commndity q9des=wifh �a_.
certKying agency;acceptable by',the:Cfiy,af Fort Worth: _CerlmetS Businese,_Equliy P.rltitelOt(erc� _cot�nting sel3 pertnRning senllces tow�Ms:khe Aoel,';iie'sen�lce(sj to He;perfohrsatt
sl7nuld !se listed flrst on t�e Ukr[izadyri ioi�m, '
Check this box�if certitled Prime Contractor services vr11I be caunting tawards the Business Equity conEracting gaal. Please Ilst serviaes first beEow.
P�ease fist eertiff�d BusF�ess Equitv flrm names as Ilsted an thef� cerflfication� includ�n��BA names.
NANI�5 AND ADDRESSE5 OF TYPE OF SERVICE9f5UPPLIES Speclfy 7ier �$rtiricatian Agenny Genderaod Ethnicity:
CONTRACiOitSlSLIpPlI�i2S Pi20VlC7Ea {FfAlCS �3eyuiredJ �xme 7at Tier
�. � �: :, ;� � _ _ t �.,::�..
h� �' s��` r� r�� �-:{ Tvoe af Servlcel5uoalies: �" CBI'tlflBd 6
Bu51ne55 Nelme' F,,..�.�.,� �r6ci ,�y Gonrraritn9, -� . � Y� � Mala � Female � �1an-Binary
Address; ��.�' + L:�nCt�t6 f�pSiY �^d �IFW MSOC
�'�� �"'�'$���� �u�''*��w�� �%`t�V�iuV}!fl� �NCTRCA ❑AfricanAmerican �Hispanic
phnne: Grrt�rd I'r�!ri�. 7}{: 7�^53 �As�an
�mau: &��-����ag+3 NAIC&Code'����fOI���11U [�xoor ❑+�vacs ❑ca��9�en [JNat�ve
a�(C?7n'aBGie?SpaCl8lt'�.�Cm 04�her.
Gontact Persun: AE;� ,lack"ari $ AN[411�FT:
,� ��,� ��.�� Americstt
-- �----- —'. rype o{Servine/Suppltes: CertlFled By:
Buslness Name; C3�� fpv,rr� Re;;i M1� �Un�efe � Male � Female � Non-Binery
Address: P�. �ox I G"�327 C4flEfatE fP�i Cfifx ❑pFW MSf3C
Fort.L;'afth,T}� 76�fit � �AfricenAmerican �Hlspanie
�/ NCTRCA
Phone: 6�7-7!�9-'t91B � �C5 �Asian
y ��n NA1C9 Coda:� 7X�pT
Emau: ma„t;c�.,.�n�r��yah.aa.r,�;,� ��73�0
nOther: � Caueasian � Native
Contact Rersan. h"4�x �l;�ir�11 5 AMOUNT. ,��'��� �� I �_',;f Amerlcatt
.�� ii�q f��Sarv�[�P1�i11�r��PC'. �' {�iBit111eC� �Y�
gUai4ess NOme; ' — � MaEe � Femafe ❑ Non-9fnary
�pFW MSOC
Addresa: �AfricanAmeritan �Hispanic
�NCTRGA
Pho�e: MAICSCode; �Tx�DT ❑NBCB ❑Ag�an
�maif; �
nOt�ter: � Caucasien � Nativa
Cnntact Person;
$ AMQIfNT� — - American
El(ectfve 01101j1021
Upda[ed D6f2812021
FoRT Wox��H
ATTACHAhENi 1R
Page 3 ot4
�usiness �auitv Utilization Forrr�
PEea9e lnclude m�a[tip[e copies of this page �F needed to list all contrackors and suppliers.
NAhAES ANU AD�RESSES OP iYPE OF SERVICE&�SUPPLIES g ' 7-
.�
pecify �er �ertifieation Agenpy Gender anti Ethniafty;
CONTRAG7pR51SUPPLIER& PROVIDE�] (NAICS Requlred} Name ist l7er
-' Tvoe of Servicel5uonlit�s• '"''� rertifled B
B�sir�ess Name:= . - +` y� �Male �Female QNao-sinary
Address: j ipIFW isASQC
Phone:
Emaf1:
Contact Person:
Business Name:
Address:
phone_
���ir:
Contact Psrsan;
8usiness Name:!
Address:
Phone: 3 .
Ernail:
Cantast Persort:? .
Business Name::
Address:
Phane:
Emall: �
CorEtact Person:•
NAIC9 Code;
$ AMOUNT: =
�
� � ��runfCoWErglR�vnnllge�
[+tA�GS Cade;
�t AMOUN7::
'fvne of ServicsfSunelias�
NAICS Cntle-
S A1y�pUNT:�
" " 'jLnnnfRawir_.n!_^,un�liaee
Gode:;
; AMDUNT:
❑Airican American � Nispanic
❑WBeS �Asian
�Caucasian �Na{Iva
American
i:srtiiied By: � PAale �Female ❑Nnn-Binary
�uFW MSOC
� ❑Atrir�n Amerlcan �Hlspanic
JNCTRGA
]T7C�OT ❑yy+g�s �Asian
�pther. �Caucasien �Nailve
I Amariean
CertifiedBy, �Male �Famale �Non-8lnary
�]n�wr�snc
� =i:TRCA ❑Africen Americen �Hispanic
�`
�TXCIOT �WBCS ❑�sian
�Other, �Caucasian �Native
� American
Certf�sdBy: �Male �Female �Non-Binary
oFw�soc
NCl'RCA �AfricanAmerican �Hispanic
TXDDT �WBCS ❑Aslan
Other. �Caucasian �Nafive
I Americ�n
6NerJiva 011Ri12021
Updaled �128l3D21
FORT �VORTH
�usiness �quity Util9za#fon Form
A1�TACHMENT 1A
Raga A af A
Tofal Dollar Amount of Cerkifiled primel04ieror Serrrices towards contract gaal � Q.pO
7otal C}allar Amaunt nf Business Equity (or D6E if applicable) SubcontractorslSuppliers $ 16D,934.90
7otal l]allarAmountof Nan-Buslness EquEty Subcontractorsl5uppliers � 3p,Q0�,qp
TO'iAl. DOLLAR ANEOEJNr dF CERTIFIEQ PR1iVlEIALL SUBGOI�TRAC7'DftSlSUpPLI�RS ��g0,934.90
The Prime/Offeror will not make additions, deietions, qr substitutions to i�is cesti�ed list without the prior approval of the Busirsess Equity i3ivision
fhrough the submittal of a Requesi %r Approva! nf ChangelAddfflon online. Any unjustified change or deletion shall be a material breach of
cantract and may result in deharment in accord wlth the procedures autlined in the ordin�nce, The PrimelOfferar shall submEt a detailed explanation of
haw the requested change/addition or deietion wlll a€#ec# the cammifted Business �quity goal. If the detail explanakion is not suhmitted, it wil] affect
the final compflance datermination.
8y afflxing a signatur� to this forrrE, the PrimelOfferor further agrees ta provide, directiy to the City �pon r�quast, complete and acCurate infamiation
ragarding actual wark perfarmed by aN subcontractors, including non-Business Equity flrms, The I'rimel0lfieror also agrees to allow an audi� and/or
exetnination of any books, records and flles held by th�ir company. The PrimelOfferor agrees ta ailow the transmissian of interviews with owners,
principafs, nffcers, employees and appllcable sui�coniractorslsuppliers part3cipa#ing on the contract th�t wi�l sutrstantiate Ehe actual work
perior�-ned by the Business �quity firms on this aontract, by an aufhorized officer oe employee of fhe City, A PrimelOfiferer who Infentianally andlo�
knowingly misrepresenEs material facts ahall be bebarred for a periad of time of nat less than three {3) years.
�� ��� �f
Authorized Slgnature
Vice President
Tltle
Glbson & Associates, Inc,
CompanyName
11210 �tyliecrest Dri�e
Addres9
Sal�h Springs, Texas 75�80
CItylStatelZip Cbde
�eparimeni af Diversity and Indusion - Business Equlty �Iv)5ion
�mail: [IVIN_BEO�ce�fortworfhtexas.gov
Ph: 817-382-2674
Alan C, Meador
Pdnted Stgnature
Conkaci Neme and TiYle (ff dffferenfj
972-657-1 '[ 99
Phone �ium6cr
ireym @g i bson assoc. n et
EEnai! Address
o���a��o2z
Rate
ENective 071tl112031
lJpdated 08I281i021
-o�m �o����
� �u��n�� ���i�y ��isl��
. ' ���� � i��� .
k < < ti. � j�,� .. , t, , � � .
",`4.1� 4�v;,kac���:1.:.4�1 _--a¢��. ..���...r!:�".��F" ,�,� ..r-:��_i .P.=�„� -F
[P�ts��tt f� tlhs �Ity ��t Wo�'s �t�s�ness Equi� Q�nanoe� c�iit€ed �usir�e �qc�ity fi,r�ns. �tic�atin� ur�ler the ��nust be
c�f�d pEs�r. 60 �ndat�m nf �+�+d in ar�er �O 6� t�rstec� �aw�s t� �usiness �vi#y aanC�i �oal. G�tifyin9 sg�d�
apoe� hf" i�e Citjr,� I�aai� C,e�tra9 Texas �InnaE Cer��lcai� Agancy {I+1C'iRG��, O�asl�o�t W�h !N'�m�i#yY 5upp�er
�m�t Ca�c�, Inc. (��W k�S�Gj.. Women's �us�ness Counr�6 �°SAuthw�st (�ffEiGlj� � f�s t'e�s �� of
��.(TXp��, t� �or F�er81�y-�uRded projects f�a flrm must bs cerliiied a9 e�1�+ra�ia�ed �usiness Ente�pt�e iC�� bY t#�e
NCtRCA �rrd'la�`i'?(�t�T.onfy,j � �S �re ��r�1- Lu t�#?satr� bi�t� '
fi, t�ame at �ec� ��� Je €��hab�lit�tion Cnnt�a 2 - ---
�. Mame af Q�ero�lPri�a Gontra�lar: ���350n & NS50�18f�S, Irl�. _
�. �r� or eus�ess ��u�y s�r�con�accor�coasu�,� Cow Yown Redi Mix ��ncet� . - ,
Adt�s; �".�. �x iez3z�, �o�1t Worth, �?C 76�i�1 �nn �ntackNamelFhar�e: #Nax Ul�i�i't $17-��2��1
4� 'i�te uttd�rsk,�ed is pr�arcec! lv pettorr� the fc�lowing d�cdiyeed w�rlc andlarsupplythe mat,eriai �slecf fn a�n�lon r�ih �e abaMe p�ct
{where ap�tc�le sp�c:ify "�uppty�' ar'itu�ii ar ha#hj: � -
Car�crets eedi mix -
, , , . ,, ,
Pt�vcs: Cocte(�s 3�7324 � .�n t�e amount af S��,OUD,�Q _� ' :
" ' Cow Tawn R�di �!!ix Ccinrx�te
� �� � d
7�+pot�F�rto�kl�(0�,�'1V�n�d a�Cer�ife�i�s�yRim) f�a�Ce+tEli��Equqy
r ���'�Ar��� _ _
�p�ur�(O�m�,rl�nairaed �C��Gql�ty�m) (!klal
� l�rtaXca�tOwr4�yaf1Q�.ConT . 89i�5�4-2379 _ "
{fs� p�a�ej (P��,� Flwnber� - , .
t 4L 4��� '4? ri ' s, -r � Y t s. i.c , s! _ 1 �. s.s: _ � t t{� x� 4t.. z t E.+Va t r� T- � +a � �- -
,���!!!_���- 3 ,_- ......;�.. �.9 ' ��+•�Sz. �� �- -..r .,i.tr 2 fl F -y i �j -'kr��• �'ir i---� -�`y � ..
. . ! . n F.. 7 � - � _l . � i �.-5 .� i. 5 . YV 4. \�.�.:.F,,. yt S.sk. S, � �,.1.N. .,
I NEItESY DECLAREANp A��1FllUE th� r��� C• �lleador __ am 1he duly au�ha�d repre�nfa�ve ai � �
�a�ns��+o��e�
C�ItiS�Dn �e A3SOCi��S, RttC: -- — a�ci ihat I�h�re �anaR�+reviswed ihe m�6eria� �d ta�s
- jNerisa a! olueforh�rt�,►e)
�,
set forfh � Ihis Lefte,r of IM�it TO kl�e best of �r �Iedge, lnforrm�tiort ettd b2�f.lhe f�ES tn th� �Ortn are bu�. 6� 1io
m�e�� iads have #�ert otrtifted.
P€d�suartt tn ihe Cfiy of Fat Warth`s Buslr�s �qu'�r 4�d'm�oe� �y persaNesttily that ma[ces a ialse rx fr8udtt�nt s�ern��
� aann�ion +�h amrli�pativrr af a qerb'fied 6m� in �y Ci� ai Fatt VY�th rronlrr�cct may he �red � d�nt
praced� under #he Clfy aFFext Wtplh's Busl�ess �quHyr 0¢dinartce.
I dn saierirr�j► svr�ar a� �t'imt that ihe sk,�►a�ure� aaa�fain� !i� and the inf�rsetkx� prnvkled.by fha O�rcrF�ime are tn►e geid
�, au� � I�n av�n�fzed � I�ha� oF iha Offe+nrff�lrne � make t�e aifidara+�.
��Cl i.'+. i�►i�dOi' 1't21Q EZyliectest i�.; Bek�i �rfirtgls. l'exas T�1$D: .
— ar (
� `�. -r C?9l141�02� . —
(� � � � � -
#�eyr��a gib�nas�.n�t 9��-��7'4q'�99
��1 : l��t� ,
LT�ome�4 a#'Uivasi�y � Inaesiori
�� F.quiiq Uiv�ian
�. - .
��� ����� ,�� . �
������
�� ���
Efl'octiat41f0t12021
��RT�QRTH�
R�a.��cr# �03456 ej�� -
(IF�kccs�e rl�ae Ch�ck ane}
M�endme�� Girange4rdst�
�1��1�t��S ��Ui�]I d�!lI�IB�!
� L���'�R 8� INi�id�'
, .... .. .,.; , . . .
A::��r�.�u�d.���i!r�t�Rrl�rt�sutt�n� �i�rrii�ir.;:. � ... . :. - : .
...-•. ..,,:...:� .... ,.., _. ..:. .....:.. :. . .: . .... . ... . _ ......
. . .. .
A c�ti�ed Busin�sss Feaultv fitr+� is our�ad_�r a t�n� acW�nan €�uslness �6ar»riae {M�W��j
�'�rsuank to i�e Glky oi Fnrt WoriM's Businass Equliy Ordlnar�ce, cer�Fed Bttsiness Equity fi�s �articipai?ng under khB Ordinanrs mus! de
ceri'�fiad prior Ea recnmmendaElon nf eward in o�er to be cuur�ed towards !he Business Equfty conlract goal, Certitying 8gensies
�cct�tab�a 6y tha City, Narth Gentral 7exas Regia�al Certificat+an Agency {NGTRCA}, Qaflssl�a�t Warth tul�arity Suppl�er
�?�velagrner�t Gnuncll, Inc. (Q�W MS[lC), WORfER�3 �usiness Councll - Soufhwesl (W8C5), or �h� 7exas Oeparfinenl o!
Transport�tion {TX��'F). Hpte: Far FederaHy-Fur�ded pro��cls the firm musi he certi�ied as a f7isadvantagad �usiness En�er�xise (�BE} by Iha
NCTRCR endlar TXDOT only.] All �ields �f�e fi�qUl�d - DD qqt i�Ve b[�r'ik,
�. Nameaiproject; 2022 BricE�e Ref�abilitation �or�tract 2 - —---
2. Name of pf�rarlPrime Contractar Gtbsbn & AssoCiates, lrte.
3. i�ame of 6usiness �quiry Sub-Cant�actorlCnnsultant: �����S ��]ecl�lty COfitr2Ctil�g LLC _
Address: P��• s�� 530609 Grand Prair�e, �exas 75053 ��� Contact Name�JPhone; Ab�,������ �� 7"��s'�'�56
4. The undersEgned is prepa�ed to perfarrn ihe Follawing describecf wark andlor supply the metarial iist�cl in connection with the abave projecl
(whare appllcable specHy °suppEy" ar "install" or bokhj:
Cancrefe re air and uardrail cnnatructian
NAfCS Code(s1: 2373'10 / 23$'T'E 0
�����
Ty jsa yr prlM �ame Autt�o�ized A�snt of CeftiAed Buslns�a ��fty F'im+}
� 1�
9tgeature ut Agent a1 Certlliad �ess EquMy Firm�
aj�maciasspecial cam
.
w ,..,,�.. .,,_.... . ..� , ,. , . — —
s�� ��
�n the smount af $ '� �9,934.917 - —
Macias Specialfy Gantrac�ing, LLC
(Ham� qf Ce�tified 6u61nesa Cquit�r St�Can,wNenNCort9ultarr{1
V � I �'4�LVCL, ` _
[�iltC}
$17-3�$�$456
�P4nnalJumherj
,..:,:. :: . . . .
, ..
:��:; y �et�� �f ����� . . - , . . . . . � � .. .. . . . .
I H�R�&Y Q�CIAR� ANQ AF�IRiN �hat Alar� C_ Meador am the duly+a�tfio�izad representaii�e af
{OwnerlAuthort:ed AAenl�
C�l�San & A550CIat�S, I I�G. �� t}�� I heve personally revfewsd the materi�l and iacls
i�llllAf Gf{6[Oii��iM4�
set forth in th€s Lettef U! lnteni. T� ihe �si af my knowledge, ir�Farmatian and hefief, the facts in thi5 fomt a�e �'ue, and Ao
material facts have haen omitted. '
Pursuant to ihe City o[ fart Worth's Busir�ess �quity cJrdlnancs, any persnnfenfity that makes a talse at �r��dul�nt statement
in cannection wii� parHcipation of a cerfiFied fir�'i in sr�y CIly of Fnr� Warth cbntrac# �nay be �eferrsd [or debarment
procedur�s under the Clty af Fnrt Warth's Buslness �quity Ordinanr,e.
I do sn�emt�ly swear ar aifirm fhat fhe s9gnatures Gontained hereln and the Information provided by t�e OifarorlPrime are l►ue �d
pnrrect, and that 3�m aukhoriz�'1 on hehalt ot t�e O�erarlPrime !o make ths a�davit,
Al�n C. Meadc�r
OweerlAut�o►Fxed Aganl} Ty{se �r r e
� ��'
� nakura DrP AulhnrixedAgantJ
#reym�a gEbsonassoc.net
(�mall Actdresa]
1 i21f3 Ryliecreat f}r,, Bafch SArings, Taxas 75'[�Q
( erar me f
Oi/1412422
{Rste)
97Z-rJrJ��� 499
�Phone Num6arj ^
DepBiimen€ vf Uiversily pnd 1RClusioil
flusiness Equity Bsvisian
Emuil: DVIN Ri:Ofiieclu;fonws�rlhtexa5g��v
Ph:B t 7-342-2674
Efteclive OklDIl�Z�
Aevised 07lO111A31
G��6.07 Wage R.ates
'TI-�][S P��E �]E�"I' �T'�'�El�TROl�T�I�Y�]LAl`TI�
2022 BridgeRehabilitation Contract2
City ProjectNo. 103456
201� pREVAILING WAGE RAT�S
(Heavy and Highway Canstruction Projects)
CLASSIFICATfOI� DESCRIPT[�N
Asphalt Qistributor Opsrator
Asphalt Paving Machine Operator
Asphalt Raker
Broom or Sweeper Opera�or
Concrete �inisher, Paving and Structures
Concrete Pavement Finisf�ing Machine Operator
Concr�te 5aw Operator
Crars� Operator, Hydraulic 80 tons or less
Crane Operator, Lattice Boorr� SO7ons or Less
Crane Operator, Lattice B�om Over SD Tons
CrawlerTractor Operaior
Electri�ian
Exca�ator OperaYot-, 50,000 pounds or less
Exca�ator Operator, Over 50,000 pounds
Flagger
Forrn Builder/Setter, Structures
Forrn Setter, Paving & Curb
Faundaiion �rill Operator, Crawler Mounted
Foundation Drill Operatar, Truck Mounted
Front End Loader Operator, 3 CY or Less
�ront End Loader Operatar, Over 3 CY
Laborer, Common
L�borer, Utility
Loader/Backhoe Operator
fVi�chanic
Niilling.Machine Operator
Motor Grader Qperator, Fine Grade
Motor Grader Operaivr, Rough
Off Road Waulet-
Pavement Marking Machine Operator
Pipelayer
Reclaimer/Puiverizer Operator
Reinforcing Steel Warker
Roller Operator, Asphalt
Roller Qperator, Other
5craper �perator
5ervicer
5mall 5lipform Machine Operator
Spreader Box Operator
Truck Driver Lowbay-Float
7ruck briverTransit-Mix
Truck Driver, Single Axle
Truck Driver, Single or"fandem Axle Dump Truck
Truck Driver, Tandem Axle 7ractor with 5emi Trailer
Welder
WorkZone BarricadeServicer
Wage �ate
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
15.32
13.99
12.69
11.74
14.12
16.05
J.�1.48
J.8, J.2
17.27
20.52
14.07
19.80
17.19
16.99
i�.p6
13.8�
13.16
17,99
21.07
13.69
14.72
10.72
sz.�z
15.1$
1.7.68
1�4.32
17.19
�6.Q2
12.25
13.63
13.24
11,01
16,15
13,d8
11.53.
12.96
14, 58
55.96
14, 73
16,24
14.14
12.31
12.52
12.86
14.84
11.68
The Davis-Bacon Act prevaiiing v�age rates shown far Heavy and Highway construction projecYs u5rere determined 6y
the United 5tates Department of Labor and current as af September 2013. The titles and descriptions fbrthe
classifications Iisted are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway,
Heavy, lltilities, and I�dustrial Canstruction in Texas.
Page 1 of 1
Gl�T-1.0 �eneral�To�e�
TI�S P.A.�]E ]L�F'�' �1�7C�T�7['I���L]L���L�T�
2Q22 Bridge Rehabilitation Canttact2
City ProjectNo, �03456
General Notes
Division 01— General Requirernents
General:
l. The Contractor sl�all be responsible for locating all utili�ies, wh�ther public ar private, prior to
excavation. THe inforrnation and data shown with respectto existing undarground fa.cilities at or
cantiguous to the site is approximate and based on mformation furnish�d by the nwners of such
under�nund facilities or on physical appurtenances observed in the �ield. The Cit}� and Enginaer
shaIl not be responsible for the accuracy or corr�pleteness af any such �formatian or data. Tha
Contractor shaIlhave full responsibility for reviewing and checking al] such int'ormation or data,
for locating all Under.ground �acilities, for coardinatian ofthe �uork with the owners of such
underground faciiities during constructiota and for the safety and protection thereof and repa�ring
any damage thereio resulting from the Work. This Work shall be considered as a subsidiary iLem
of Work, the cost of which shall be included in tEae price bid in the Proposal for various bid items.
The Contractor shall notify any affected owner� (utility companies} or agencies in writing at least
4$ hours prtor ta canstruction.
a. Notiify TEXAS 811 (1-800-DIG TESS or www, texas811. org) to loc ate existin.g utilities
prior to canstruction.
b. Caution! �uried electrie lines may exist along this project. Contact electricai providers 48
nours prior to excavation :
• ONCOR Will Riegler 817-215-6707
� Tri County Kevon Maoney 8T 7-752-8160
c. Caution! Buried gas Lines may exist alang this projsct. Cantact Atmos Energy 48 hours
prior to excavation, and within two {2) hotars of encountering a gas line (.Tohn Crane:
817-207-2895�
d. Caution! Buried communication cables 3nay exist along this project. Contact
communication companies 4$ hours prior ia excavation:
• Spectrzcrn/Charter Communication ,Shetri Trahan 817-27I-8108
• AT&T Gary Tilory 8.I7-338-6202
• �ne Source Communications .Iererray Hewood $17-745-2243
e. Caution! When doing work within 2p0 feet of any signalized interseciion, tha Contractor
sha[1 notify Tr�fic Management Division of City of Fart Worth T/PW, 72 hours prior to
excavation (817-3928742}. The Contractor si�all proiect existing signal hardware, graund
boxes, detection loops, and underground conduit at signalized intersections. Any damages
at signalized intersections shall be replaced at the e�pense ofthe Contractor. The
Cantractar shall contact the City at 8l 7-392-5 IOQ to perfnrm conduit ]ina locates at
signalized 'mtersections 72 hours prior to commencing work at the interseetion.
f. The Coz�tractor sha11 notify the Ci�y oiFort Worth Praje�t Manager 48 hours prior ta the
start af any excavation (Iretamiw� Otuyelu: 817-392-6747).
2. Contractor's personnel sI�all have identifying clathing, hats or badges at all times �c+hich identif�
the Contractar's name, [ogo ar company.
3. Protect concret� curb and gt�tter, dri�eways, and sidewai[cs that are not designated for r�moval.
Removal and replacement ofihese items shaIl be as designated in the drawings.
CITY aF FORT WdIiT�-I
STANDARJ7 COI�[STRUCT [QN GENERAL NOT ES
Versio�� Release Deceinher l8, 2017
Divisian 3� — �cterior Improvements
General:
1. At locations where the cur� a�id gutter are to be repla.ced, thre Contractor shall assume all
responsibility for the reTestablishment of existir�g street ar�d guiter grades. Establishment of
grades shall be considered as a subsidiary item af Work, the cos� of which shali he included in the
price bid i.n the Proposal fnr various bid items.
2. All driveways, which are open cut, shall have at least a temporary driving surface at the end of
each day. The temporary surface shaIl be considered as a subsidiary item of Work. The cost of
which shall be included �n the price bid in the Praposal for various bid it�ms.
Bike Lanes and Shaz-ed Pavement Markings:
1. Proposed b�ce ]a.�es should mainiain a minimum ef%ctive �vidth of 4 feet {measured from edge of
gutter to center of stripe).
2. Bicycle pavement markings shouid be located 20 feet from the curb return, stop bar, or cross wallc
(whichever is a�plicable) unless denoted otherwise in the drawings.
3. Combined width of bike lane and on-street parking should nni be less than 13 %et.
4. If travel lane is greater than 14 feet wide, shared pavement markings shalj be placed 4 feet from
face af cui•b ar edge of an-street parking (whichever is applicable).
5. If tra�vel lane �s less than or eqUal to 14 feet wide, shared pavement markings shall be placed in
the middle of ihe travel lane.
3. Bike �ane symbol, arrow, and shared pa�ement markings sk�ould be repeated at the beginning of
each intersection.
4. On unint�rrupted sections of roadway, bike lane sym.bol a�nd arrow s.hauld not be spaced more
than 330 feet apart and shared pavement markings should not be spaced rnore ihan 250 feet a.part.
5. Bike lane symbol, arrow, and shared paverrient markings should not be pfaced at private
driveways ar puhlic intersections.
6. Bil�e lane striping should be 4 inches solid white, hot-applied thermoplastic unless specifred
otherwise in the drawings. Ail other biice lane pavement markings shall also be white, hot applied
thermoplastic unless otherwise specified in the drawings.
7. All dimensions are from face af curb and are to center aftYis pavarnent marldng.
8. Shared p�avement markings should not be used on facilities with a posted s�aeed greater than 35
mph.
Sidewalks and Curb Ramps:
1. The curb ramp standard details are intendedto show typical Iayauts far the construetion ofthe
curb ramps. The information shown on the standard details rneet tI�e requ.irements shown in the
"2012 Texas Access�biIity Standards" (TAS) and the "2014 ADA Standaxds for Accessible
Design" by the Depariment af Justice.
2. City of �'ort Worth Standard Details are only intended to indicate pay Iimits fqr each type of
ramp, the Engineer is responsibfe for the de�elopment and design af the sidewallc axic� curb ramp
layout, includ�ng actual dimensions and slape percentages.
3. The Cantractor may not make ck�anges to the sidewaIk and curb ramp layout without approval af
the City. The Contractor may propase changes to the sidewalk and curb ramp layout due to field
conditions, but any proposed cl�anges must be approved by the City.
4. Curb ramp runnir�g slopes shall not b� steeper than $.3% (12:1). Ad}ust curb ramp length or
gtade oiapproach sidewaIks as directed by the City.
5. G�rb ramp flare slopes shall not be steeper than 10% (1a:1) as measured along back of curb.
6. Maximum allowable cross sla�e an sidewalk and curb ramp sur�aces is 2%.
7. The minimum w�idth of sidewall�s and curb raznps shall be 4 fe�t.
CIT�OF FORT WpRTH
S'CANDAl2D CONSTRUCTION GL•7+IGRAL NOTES
Version Release becember [8, 2017
8. Landings shall be provid�d atthetnp af curb ramps. The [anding clear length shall 6e 5%et
minimum from the end of ramp, The landing clear tvidth shall he at least as wide as the curb
ramp, excluding fla��es. The landing shall have a maxit�num sIope of 2% in any d�rec#ion.
9. In alterations where there is no landing at the top of the curb ramp, curb ramp flares shall be
pro�vided and shall not be steeper than 8.3% ( I2:1).
10. Where turning is requ�red, maneuvering space at the top and botinm of curb ramps shall be 5 feet
by 5 feei minimum. The space at the bottom shall be vrholly contained vsTithin the crosswallc
markings and shall not project mto vehicular traffic lanes.
11. Curb ratnps with returned curbs may be used only where pedestrians wauld normally walk across
the ramp, either because the adjacent surface is planting or other non-walking suriace or because
the side approach �s substantially abstructed.
12. Whet•e curb ramps are provided, crosswalk markings shall be required and ramps shall be aI�gned
with the crosswallc.
13. Counter s�opes of adjoining gutt�rs and road surfaces immediately adjacent to the curb ramp shall
not be steeper than 5% {20:1) in any direction.
crrY or �or�•r wo�zTx
S'I'ANT�ARB C ONST iZUCTIQI�i GENE1tAL NOT &5
Version Release DecemUer 18, 2017
Division 33 - Utilities
General:
1. For utility work wiihin utility easements, ance pipe or appurtenances have bee�i installed ar
rehabiGtated, immediately commence temporary sur#'ace restoration. Complete surface resioration
to th� own�r's satisfaction within seven (7) days of work finishing an-site. Failurre to tnaitatain
surface res�oratEon, as noted abave, may result in susp�nsion of work untii resioration is
complete.
2. Existing vertical deflections ar�d pipe slopes shown on the drawings are approximate and have not
been field veri�ed, unless otherwise noted. Rim elevations, flow lines, and horizontal locations of
existing manholes vvere det�rmined from feld survey. If field conditions �ary from thase shown
on dravwings Contractor shall notify City.
3. Maintain all existing water and sewer connections to c�astn.mers in working order at all times,
except for brief interruptians in servic.e for water and sewer services to be reinstated. In no case
shaIl services be aIlawed to rezxzain out af service overnight.
�. Establish and maantain a trench safety system in accordance with fihe excavatian safety plan arid
Federal, State nr loc�l safety requ�ements.
S. Provide and foIlow approved Confined Space Entry Frog.ram in accordance with OSHA
requirerr��nts. Confined Spaces shall iriclude manholes and all atl-�er confined spaces in
accordance with OSHA's Permrt reguired for Can�ned Spaces.
b. Oniy City prequalified Cantractors, by appropriate Vi�aiar Department work caiegory, shall be
allowed to adjust valve boxes, manholes, ring & covers, etc.
Water:
1. Provide thrust rest-rau►t by means of restraining joints at fittings anc3 concrete blocking. When
sp�cif'ically indieated on the Drawings, provide thrust restraint at designated joints beyond the
fittings. Each method sha[1 be capable of khrust rest7rainf independent ofthe other system. The
Contractor shall refer to City Standard DetailS for area required to irrstall c oncrete blocking.
2. All ductile uon mechanical joint fittings shall be restrained to pipe u�ing retainer glands.
3. Proposed water mains sha.11 have a minimum c over of 48-inches cover abave tha top of pipe,
uzaless shovvn otherwise on the drawings or details.
4. All water services shali be installed above storm sewers, except where shawn othervwise inthe
drawings.
5. Elevation adjustment at connections may be made w ith bends, nffsets, or joint deflections. Joint
deflectior►s shall nat exceed fifty percent (50%) of manufactw�er's recommendations.
5. Temporary pressure �lugs required for s�quencing of construction and testing of prap�sed water
Iir�es shall be considered subs.idiary to the work and shall be included in tk�e price bid in the
1'ropnsal%r various bid items.
Sanitary Sewer:
1. Verify that aIl connections to th� sanitary sewer systern are for sanitary sewer only. Notify City of
any discovered illicit connectians.
2. The Cantractor shall be liable for all damages to properties, homes, and basements frQm backup,
which may result during the installation of new pipe and/ar abandontx�ant of existing pipe. The
Contractor will be allowed to open cIean outs where available. The Contractor will be responsible
for all �Iean up associated w ith opening clean outs.
3. For all san�ary sewer service sonnections at manholes, prar+idE a hydraulic slide in accordance
with the details.
CITYOF FORT W�RTH
STANI]AR17 CpNSTRUGTIOiY GENERAL NOTES
Version ReleaSe December 18, 2017
Stori�n Drain:
1. Maintain the existing storm drainage systern untilthe �roposed system is in service. in no case
should the Cantractor l�a�e the existing storm drain aut of service whereby runoffwould cause
damage to adjacent properfy.
2. Cons#ruct all drainage rmprovements from the dawnstt�eam end to the upstream end to allow
continued storm drain service. If the Cniltractor pro�aoses to conslruct the system otherwise, the
CQntractor shall submit a seq�aencing plan to the City. for approval.
3. Take appropriate measures to preserve wildlife in accordance with applicable federal, state and
local guidelines,
CITY OF FOIiT W ORTI-I
5T AN3�A RD CONS TRUCTIflN GENERAL NqTES
Version Release December 18, 2017
Division 34 - �an�portation
Ge�eral:
I. Prior �o activating traf�c signa�s with new or revised signal timing, the contractar shou�d e-mail
Aziz Rahman, �r. PrnfessionaI Engineer,. at Aziz.Rahinan(c�fortworthte�as.�ov (and copy Kassem
Elkhalil, Prafessional Engineer, at Kassem.ElKhaW fortworthiexas. ov) at least three (3} weelcs
in advance to schedule that.
2. If new cabin�ts and controllers are being installed and the cantrollers need to be programmed and
tested by City Forces; the cantractor should d�tNer them to the City of Fart Worth, Signal Shnp at
5001 James Ave., at least three {3) weeks in advance �o schedule that.
3. Unless there is a comgelling reason, a new traffzc si�aI will be put on flash on Thursdays and
working. colors the following Tuesday.
4. 5witching fram old traf�c signal ta a new one, this should be done on Tuesdays onIy.
5. Nafify Traff'ic Management Divisian (817-392-7738} Project Representaiive at Ieast 24-hours in
advaz�ceofall concretepours.Inspectormustbepresentwhenconcreteisplacedontheprojectsite.
6. If applicable,, equipment supplied by tiie City will be available for pick up from the
Transportat�onlPublic Warks (T/PW) Warehouse at 5001 James Avenue andbr t�ae V'�.lage Creek
Pole Yard (SOOQ MLK Freeway). The Projeet Representative must authori�e all equiprnent
pickups.
7. Design consultant shall $ubmit electronic frle in CAD �ormat as �vell as PDP (11" X 17") flf final
signed and sealed plans to the City.
8. Contractor sha,ll provide a 5-year manufacturer warranty on APS systems. The warrarzty
documentatzon shall include the start date {when material �s delivered to job site} and the end date
of the warranty and the serial number of the equipment.
�-affic Signals:
�. The City will notprovide traffic signal cabinet or traffic signal cantroller to the Contractar. The
cost for these items rnusi 6e included in the City project budget, or for all privately t'unded projects,
the cast must be included in the bid package for purchase from the vendor.
2. The Contractor shall provide alI materia�ls neec{ed to construct a fully aperational traffc sigz�aI as
called out for in the plans and specifications.
3. All ex�st�ing signal equipment shall remain in place and operating until new equipment is in place
and ready to operate.
�. The Contractor is responsible for hauling and properly clisposing of salvaged material from the job
site to a disposal site of their choasing. The Contractorwill not be allowed to drop off salvaged
materiaLs at the City yards.
Foundation5;
CTI'I' OF FORT W ORTH
5TANDARD CDNSTRUCTION GEIJ$RAI, NOTES
Version Release December 18, 2017
I. Dimensions shown on plans f'or locations of signal foundations, conduit, ar�.d att�e�• items may vary
in arder to �neet loca] conditions. A[] locations af foundations, conduit, and ground boxes shall be
approved by the Traf�'ic Signal Inspector or the City Enguleer.
2. Cnntractor sha11 contact the City �r�.f�ic signal inspector prior to pouring eaf�inet faundatioz� io be
sl.u�e that tempiate and bolt patterns are correct for type of cabinet being supplied. Foundation shall
be installed per City Specification and City Detail.
3. Pier Foundations slaallhe poured together in ane pi�ce.
4. No signal goles shall be placed an foundations prior to t"ive {5) calendar days fallowing pouring of
c oncrete.
5, Contractor shall clean up and remove all loosa material resu]Ling irom eonstruction operations each
day priar to the war�C is being suspended.
6. Controller cabinet concrete apron shall be subsidiary to the bid item for the contraller eabinet
foundation. Cabinet foundation and apran shall be poured tagether in one piece.
Contr�[ler and Cabinet:
1. Contractor shall install controller cabinet and connect all associated field wiring.
2. City wilI install signal timing and program control3er.
Conduit:
1, A cantinuaus grounded system sk�all be provided in PVC condurt by rur�ning 1-#8 bare copper wffe
in canduit between foundations and grounding at each foundation ground rod.
2. A11 conduits shall be Schedule 80 PVC.
3. Electrical service shall be installed per City Speci��ations and City Detail in separate 2" condurt
from th� meter to the signal cabinet.
Signal Heads:
I. All s�gnal heads shall be McCain'`'�, Econoli#eTM, or approved eautvatent style and dimensions.
2. All signal heads shall be cavered with burlap or other approved material from ihe tirne of
iristallation until the signaf is plaeed in operation.
3. A[] signal head attachments shall be designed such that the wiring to �ach signal head sha1l pass
from the mas# arm through arain tight cont�ector to the signa] head bracing or attachment hardware
to the signal head. Asmall amount of expnsed signal cable shall form adrip loap.
�. All L�D signal und'tcations shail be General Electric (GE} GelcoreTM or equi�alent and shall meet
the latest ITE standards.
5. �ignal heads (ali displays) and pedestrian Walk and Don't Walk heads with eountdown displays
shall have LED ins�rts.
6. Clam-5hell mounting assemb[ies shall be used for pedestrian indica�inns.
CITY OF FORT WpRTYI
STANDAkD C�llS'iRTICTIQN G�IV�R�L NpTES
Version Release December 18, 2017
7. All LED sig.nals shall be of the incandescent appearance.
8. All signal heads sha11 h�ave black aluminum, louvered, single piece b.ack. plates compatible vwith
McCainTM, ECOIl0�1ti�TM� or approved equivalent signal head ha.usiz�gs.
'IYaff�c Signs andPavementMarkings:
1. All traffic signs and mounting hardware shown on the plans will be furnished atld installed by the
contractor including the r�aetro sireet name signs. The contractor shallprovide a detail sheet �or the
metro street name signs �vith block numbers to the CiEy for approval prior to fabrication and
installation.
2. Existing stop signs and posts will be rerr�oved by the contractor upon, or before, tne signal turn-on
DetectYon System.:
1. The Contractor shall furnisk� and install ihe IterisTM Vantage Veetor Hybrid Detection System and
cable.
2. The Contractor shall install, aim and program a�l detectars as per City Standard Specifications and
City Detai�s.
3. The Contractor shall refer to and City Standard Details and project plans for deteciioza zones
placement.
Emergency VehiclePreemption Equipment (EVP):
1. The Contractor shall fiarnish a�d install the OpticamT'" EVP (detectors, cable, and discriminator
units).
2. The Contractor shall install the EVl' detecinrs an fihe mast arm as shown an the plans and
apprapriate City Detail, atad run one continuous EVP cable from the detector to th.e cabinet
InstaUation of the EVP system w ill be paid for per bid item.
Accessible Pedestrian Signal (APS):
l. AI'S units with audible message shalI b� installed on all TxDOT locations or at the direction afthe
City Engineer.
2. .APS units shall comply with the latest versio.n of the Texas Manual on Unifarm Traffc Control
De�vices (TMU'I'CD).
3. AP5 units shall be installed per City Standard Specification and City Detail.
Sattery Backup:
1. If called out fnr in the plans, hattery backup units su�apl�ed shall comply with �he City 5.tandard
Speci�ications. InstalIation shall be completed per City Standard Specifications and City Detail.
Traffic Control:
1. The Contractar shall submit a Work Schedule, Traiiic Control Flan, and acquire a Development
Permit from Develapznent Departmant, at 200 Texas Street. Contact Chuck McLure (817-392�
7219).
CTTY OF FORT WdRTH
STAIVDARD COAiST12UCTION f'rE1VERALNOTES
Versiott Re3ease Dece�nher 1 S, 2017
2. The Contractar shall be respansible for the safety of pedestrians and motorists in the area of tlle
#raffic signal construction site.
3. Roads and streets shall be kept apen ta iraffic at a1I times. Contractat• shal[ arran�e construct�on so
as to close only ane lane of a roadway at a time.
4. AlIconstruetionoperationssha[lbeconductedtoproviderninimaiinterferencetotraffic. Alltraffic
signal equiprrzent instaliatians shall be arranged so as to permit continuous maveinent af traf�ic it1
all directions � all times.
5. Contractor shall he responsible for any signage necessary during canstruction.
6. Unless otherwise noted, it �s the cantractor's responsibility ta ensure that signa] indications and
timing are adjusted and maintained tn ensuz'e safety in work zone at all times.
7. Any tra�'�c signal modifications during construction are subsidiary to t1•affic controlp�an (TGP)
pay item.
8. Any tt•affic signal madif'ications should be in compliance wifh tl�e latest version of the Texas
Manual on Unifoz'zn TrafFic Contral Devices {TMC)TCD) and the C[ty of Fort Worth Standards.
9. The contractor shall subznit any propased traffic signal madif'ications to the Traffic Signal Section
for their approval ten (1 Q) days prior to any changes.
IIectric Service:
1. Install the required electric services and ob#ain an electrical service permit in each instance, cost of
which will be pa�d by tfie Cnntractor.
2. The electrical service sl�all be I00 amps with 120124q voltage branch circuit and shall com.p.iy wrth
City Standard 5pecifications and City Details as applicable per plans.
Luminaires:
Z. The City wiil not furnish luminaire material to the coniractor. Th� Cantractor shall furnish and
install LED lumicaaires fortraffic signals m accordattcewiththelatestCity 5tandardSpecificatior�,
City Details, and plans.
2. A[1 new streetlight pale types sl�al� match those of the surrounding area of Fort Worth for which
they are being instaIled in. �ontactthe City Traffic Management, StreetLight Section at {$17) 392-
7738 for direction on ]ight pole types allowed areas. The same poles shall be cansistently used
thraughout subdivisions.
CITYbF FORT Wd12TH
STANnARl7 CODISTRUCTION GENERAL NOTES
Version ELelease December I 8, 2017
�L1�1.00 S�andard �onstruction �e�ail�
'�']EI�� PAG�E ]LE�T ��T7CEl�']['��l�T��Y�I.�.A1\I�
2D22 Bridge Relxabilitation Cantract2
City Project No.103456
4'
� —� �
4'
� 1„
} 4
— — � 3��
3"� ��o��c� ����� „
� 1
— f
4��� � �� � �� � �
e,�--�r ,_ ��� s � . `�_�� -��
� �� h'" -=.
62
$2„ � � f� � 0 C�
�
1�" Contractor.
22..__ �on�r��t�r'� ��r��
� ���
12„ --
� 2��
�i1 " 7YP.
— �uestions on this Proj�ct �all: -
_ (817) 39� � xxxx
After �iours Call: {81 i) 392 - XXXX
FQM1iTS:
FORT WORTH LOGO IN CHELTINGHAM e�LD
ALI, OTHER LETTERING IN ARIAL �OLD
COLORS.
F4RT WORTM - PM5 288 - BLUE
LONGHORN LOGO - FMS 725 - BROWN
LETT�RING - PMS 288 - BLUE
BACKGROIJN� - WHITE
BORD�R-BLUE
1" TYP.
3"
i„
2
11 �s
2
i"
1n
2���
2
NOTES:
1� APPLICABLE TO THE PROJECT,
CONTRACTOR SHALL OBTAIN VINYL
STICKEf7 "CITY GAS LEASE REVE�lUE
lN ACTION" 1 LOG4 AT CDR S1GN ANb
ENGRAVING, $311 EAST LANCASTER
AVE (817-451-4684), P�ELAHD PLAC�
IN FUNDING SECTION.
PROJECT DESIGNAiION S�GN