HomeMy WebLinkAboutContract 57462��� ���p�
�rr� �'�� ���:��
t � � _ �,, �� �
������ �_ �
.��. . .� ���_ .�� � . i*, ��'
�� �� �����
. CSC N o, 57452
PROJECT NiANU�iL
FOR
TB� COI�TSTRUC'X'X4N OF
LAC��AI�I'D ROAD SID�WALI� II'VD.'ROVEIV +'I�TTS
. FRO1Vi
CAli/rP BOVf� BLVD '�D CAL1V�01�1T �1VEliTLIE.
Clty P��a,�ect Na 10,U637�
Mattie ParkeE•
Mayor
Da�id Coalce
City 1VTanager
William Jolu�son, P.E,
Directar, Traa�sportation and Public Works Department
Prepared for
The Ciiy of Fart Worth
Ti•anspa��a�ion and Public Works Depallment
2021
�
, ���
��o��,�z�..
A,1�.A. ConsvltRnts, LLC
�#0{)0 Thom�son Tenace
Cnfley�vil�e, TX �5034
TBPE Registerecl �lrm No. F 2Q
�����$�:� ,�'���
+�9� �f�.n7 , I
�`�e 9���t`� . ; ' •' �
��� -
�__ ����0
���
o��o
�t ��r�
� ]�
Standard Construct�on S ecificatio
p n
Documents
CI'I'Y OF FOR'I" WOR'I'H
STANBARD CONS.TRUCTION SPECIFICATION DQCIIMENTS �-ucldcutc� I�ond ,5'idemall' Irrlpl�vve�are�7ls
Revised December 9, 2D2I ('I'r5!� IOp(j7-3
Adopted Septernber 2p 11
0o ao 00
STAAI�IARD CONSTRUCTIDN SPGCIT'ICA'I'lON DOCUMENTS
nage 2 of 5
Techn.ical Specificat�ons which have been madified by the Engineer specifically fflr this
Pwojett; hard capies are included in the Project's Contract Documents
Division 33 - Utilities
33 OS 14 Adjusting Manholes, Inlets, Valve Boxes, and Oth�r Structures to 07/14/2021
Grade
33 12 10 Water Services 1-inch to 2-inch 07/1�12021
Technical Speci�ications listed belo�v are included for this Project by reference and can be
viewedldawnloadeci from the City's wehsite at:
hftn://fortwvrthtexas.govltnw/contractorsl
or
httns://apns.fortworthtexas.�OV/Pi'OjCCiRpS0l11•ces!
Division 02 - Existin Conditions
02 41 13 Selective Site Demolition
02 4i I4 LTtili Remova�/Abandonment
02 41 1 S Pavin� Removal
Division 03 - Concrete
Division 2G - Electrical
Divisian 31 �- Earthwork
Last Revised
12/2Q12p 12
i2I20/2012
U2/0212016
31 00 00 Site Clearin 03/22/2021
31 23 16 Unclassified Excavation 01/28/2013
31 23 23 Borrow 01128I2013
7 1� ���9 n i r���
31 25 00 Erosion and Sediment Control 64/29/2021
1 1� �. , �•'fr�r�arzvia
'2 1� 1 7 !'f�rz
Division 32 - Exterior Im rovements
32 Q1 17 Permanent As halt Pav:
32 O l 1 S Tem ora As halt Pav
r
12/20/2Q 12
12/20/2012
12/20/2012
12/2Q/2Q12
, � r��,-�,'�z
32 Ol 29 Concrete Pa�in Re air
32 11 23 Flexible Base Courses
�� r : ,, rr..,,..�,.a n.,,.,, r�,.,,..�,..,
CITY OF FORT Vs�ORTH
STANDARD GQNSTRiTCTION SPEC1rICA'I'lON DOCl1MENTS
Revised Decem6er 9, 20� 1
Laclrlonc! 12oud .Sideu zrlk linproren�e�Tls
CPrI': I 11063 7-3
ao ao ao
STANDARD CONSTAUCTION SPECIFICATION DOCUIvIEI�iTS
Page 1 of 5
s�crio� ao ao oa
TABLE OF C�NTENTS
Division 00 - Gen�ral Condifions
Last Revised
00 05 10 Ma or and Council Communication 07/01/20I 1.
OQ OS 1 S Addenda 07/01/2011
�0 1 I 13 Invitation ta Bidders 07/19/2021
00 21 13 Tnstructions to Bidders 11l02/20�.1
00 35 13 Conflict ofInterest 5tatement 02/24/202�
p0 41 �0 Bid Parrn 09/30/2021
00 42 43 Pro osal Form Unit Price O 1/20/2012
00 43 13 Bid Bond 09111/20I7
OQ 43 37 Vendor Com Iiance to Stat� Law Nnnr�sident Bidder 06/27120I 1
00 45 I 1 Bidders Pre ualifications 08/13/20I 1
00 45 12 Pre ualification Statement 09/30/202.1
00 45 13 Are ualification A lication 0$/I3/2021
0.0 4S 26 Cantractor Co�n liance with Workers' Cam e�isatian Law 0'7/01/20l 1
00 45 40 Business E ui Goal 10/27/2021
00 52 43 A reement 11/01/2021
00 61 3 3 Performance Band 07/Q 1/2Q l 1
00 61 14 Pa ment Bond 07/01/2411
DO 61 l9 Maintenance Band 07/01/2011
00 61 25 Certificate of Iiisuranc� 07/01/2011
Q� 72 00 General Coiiditions 08/23/2Q20
40 73 00 Su lementa Conditions 03/09/2020
Divisiaa O1- General Re uirements Last Revised
01 11 00 Sumina of Wark 12/20120] 2
Ol 25 00 5ubstitutian Praceduz•es Q7/01/2011
Ol 3I 19 Preconstruction M��tin D8117120] 2
O1 31 20 Pro'ect Meetin s 07/01/2011
Q1 32 16 Construction Schedule 08113/20ll
01 32 33 Preconstruction Videa 07/0]/2011
O1 33 04 Suhmittals 12/20/2012
O 1 35 13 S ecial Pro'ect Procedures 12/20/2012
01 45 23 Testin and Ins ection Ser�ices 03/09/2020
01 50 00 Tem or Facilities and Controls 07/Q]/2U1 l
O1 55 26 Street Use Permit and Modi�cations to Traffic Control 03/22/2021
O 1 57 13 Storm Water Pollution I'revention Plan 0 710 112 0 1 1
Ol 58 13 Tem or Pro'ect Si na e 07/O]/2011
O1 60 00 Praduct Re uirements 03/09/2020
O1 G6 OQ Praduct Stora e and Handlin Re uirements 07/01/2011
O1 70 40 Mobilization and Remobilization 11/22/2016
01 71 23 Canstruction Stakin and Surve 0211 4/20 1 8
01 74 23 Claaniti 07/01/2011
01 77 19 Claseout Re uirem�nts 03/22/2021
O1 78 23 O eration and Maintenance Data 12/20/20I2
O1 78 39 Pro'ect Record Documents 07/01/2011
C1TY bF FORT WpRTH Lt1ck1[rrrtl Ra[rc! Sreleu�ctlk Inryraremertis
STANDARL) CON5TIiUCTIOt�7 SPECIFICATION DQCUM�NTS C'PN; 10�(37-3
Revised December 9, 2021
0o ao 00
S'1'ANDAIZD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 o.f 5
3�-1�---.» � 7 M�r�v� vrt
�7T fl4l7�1l�3
�7
32 12 1G As halt Pavin 12/20/2052
32 l2, 73 As lialt Pavin Crack Sealants 12/2.�/2012
32 13 13 Concrete Pa�in 03/i912021
32 13 20 Concrete Sidewalks, Drivewa s and Barrier Free Ram s 12/09/2021
32 13 73 Concrete Pavin Joint Sealants 12/20/2012
32 14 16 Brick ilnit Pavin 12/20/2012
32 ] 6 13 Concrete Curb and Gutters and Va13e Gutters 12/0912p2I
32 17 23 Pavezne�rt Markin s 1 1122/20 1 3
32 17 25 Curb Address Paintin 11/�4/2013
32 31 13 Chain Fences and Gates 1 212 012 0 1 2
32 31 26 Wire Fences and Gates 12/2�/2012
32 31 29 Wood Fences and Gates 12/20/2012
32 32 l3 Cast-in-Place Coiicrete Ratainin Walfs 06/05120I8
32 91 19 To sail Placement and Finishin of Parkwa s 12/20/2012
32 92 13 H dro-MuIchin , Seedin & Soddin 05/13/2021
32 92 14 Non-Nati�e Seedin OS/1312�21
32 93 43 Trees and Shrubs 12l20I2012
Divisinn 33 - Utilities
���1_vi sv nrn��n�
21� nn Ih�T
7 2� 7 'T I'f-rrrzoTi�.i �
�/l 1'7!'1�z
tl
�7--d`i-�1_ (`,•••••�•�••,« l�..«*...,1 T..,�+ CE�+<.,,,� 1'I!'ITz�zvzo-iz
'2 2� t� 1�-rr:rr:vi zllvi i
�e n� rn�T
�3-��4,A m m�rn�n
�--�-�g i � i�-�,,.�::o; �.o; z
�-A3-�9 , , 9�,i8�{��21-
�� , � ��-��
'2 2� i � m�n !�T
�
33 OS 14 Adjusting Manholes, Inlets, Valve Baxes, and Other Shuctures to 49/20/2017
Grade
� 3--�S-�H r„�,,,.o+e ixr.,+e,. � r„., t�� i � r�T�,.�o; �o � z
�--8�-�� �e�e*�� ,�,���
�--9�-�9 , �,�,�;�
�-9�--�� 'r„„„e� r : e.. ni.,+o ,�����
�ZY � 7 Mrc�-zv�zvia
�� nC '•} 1'7!'1�i
J:j"tl7-7-.3
32� ��3
�L 1 '1 !'l�z
n
33 OS 30 Location of Existin iltil�ti�s 1 212 0/2 0 1 2
33 1 l QS Bolts, Nuts, and Gaskets 1212D12�12
33 11 10 Ductile Iron Pi e 12l2012Q12
33 11 11 Ductile Iroia Fittin s 09/2o/2D17
33 11 I2 Pol vin 1 Chloride VC Pressure Pi e 11/1612018
CITY OF FORT WQRTH Lacklurrd Road Srdeir�rlk lrtrprnreuiervls
STANDARD CONSTRUCT3QN SPECIF[CATIpN �OCUIVIENTS CPA?� lORG37-3
Revised Decemher 9, 2021
00 OD 00
STANDARD CONSTRUCT[ON SPECIFICATTON DOCUM�NTS
Paga 4 pf S
�� ,
�-1�4
33 12 10 Water Serviees I-inch ta 2-inch
��� �Y
33 12 20 Resilient Seated Gate Valve
��
33 12 25 Connection to Eaustin Water Mains
21� !''.,.,..1.:...,�:..., A :« [T.,1..o A .....,,,,1,1:.,., �
33 12 40 Fire H drants
33 12 50 Wat�r Sam le Statians
�9
i��
�
�� �t i c
��
��
F�����
C ��
�
�
�
� /
� �
� �
� � �
� �
, •�
�
�
�"C��
�� !!
� � 1
'. !
�' 1
�' 1
, � . �
�� - - ��,
, :.z�,s,��:s..�.�.�::.',. �...,.m
�}3�3ii35
Cast-in-Place Manholes and .lu«ction Boxes
Curb anci Drop Inlets
i���n���a;?o�i
, �,���
02/14/2017
17!'l��
OSIOb12015
nn ��o ��.�
02/06/2Q13
t � !1�-zrc; nl �v i r,
01/03120I4
12120/20I2
tulrol�nsz
l/41Z JI ,!r' O'!"�/
� � ��n�z.o� 40 � �
i � ���z
n���� ����
ntiti oII,-.-�� io � �
������
i � r��vis.u� �
1'lM�z
f1A f7Q ���
� '1 I�rs.rcviZviz
ti�r���
i �»�;«n��t
i � ���z
i7rh�z
n,+ r���
�l��ni�P_,�Lo��
i�����
t i r iz��
� �n��Y .�n.r�_
y 7 �7�annar�
n��n.r.,�;;��r
n�rno ���.
12f20120 X2
r2�zo��oia
n�Int�r. 1�T
CITY OF FORT WOATH Lcrclrla�zd Roar�Srrleircrlh fnrpr•orenre�zts
S7'ANDARI3 CONSTKUCTIpN SPEG[FICATION DOCUMENTS CPrV: !0(1637-3
Ftevised De�emher 9, 2021
T. _ , . � . ,.. . ,.
UO QO 00
ST.4N1]AAD CO3d5TRUCTIQN SP�CIPICATIOI�! Q(3CUMENTS
Page 5 af 5
Appendix
GG6.06.D Diversity and In�lusion — Business Equity Division
GC-6.07 Wage Rates
END OF SECTION
CITY OF FOIZT WORTH Luchlcurd Rnad Srclev�nik L�rproreineirls
5TANDARD CONSTRUGTIpN SPECIFiCA770N �qcU�vi�NTS C'PA�: Ir111G37-3
Aevised �ecemher 9, 2021
� 1North, 7e�c�s
��� a�d Cour���l �o�nm�n�c�tio�
,�A�E; 03J�9J22 M&� ��L� NUMB�R: M�,� 2�-���1
LO� �i1��1�: ���fl�EWALI{ IM�ROVEtvIEhfT� LA��k(LAM11D
$-UBJ��T
{�t7 3) A�thprize �xec�llon of a�onir�r,E vw�i+h �d Za�k �onCreie. �r�c„ I� kh� ,Ama�mR of �7�T,9��,�D �ar khe �or�air�i�ti�n of ���kewalks �fan,�
LackE�n[f Raad, Adopl AI#acF�ed A��rvpriation Q�di�anc�s, and A�rien�i R�e �Is�al Years 2Q��-��2� ��C}Ilel Impro+��rr�en! f'ragrem (��18 Bono
�'ro�ra�r)
EC f�MENI] 1'A I��J:
I[ �s focpm�endetl ihat �h� �tEy Caur�c�[;
1_ A��rk�orize execuiinn af a can[r�c� wllh '�i ��ck �or�c�e�e, Ir7�., �n #h� am,�unt �f ��87,9�9.�0 ror tl,� �,or�saruc€i�n �F s�dewa��s s�ong �ack�ar�,�
Road ��Ity P�o���� No, 10�E3T};
�, A�p�l ihe atE�chcd appr�prl�tip� ordln�nce r�d�r�sil�g appro�rrlafrpns in �ha �0�8 B�r7� Pr�g�arr� Fund rn ��e amount of $9{�U,OD�,DO �y
lo��r�asinr� appro�rlatrans ln !ha �fCt�,walk� FY�017 �:�Je�! ���ly Prof ect �1�. 10��;�7j, ��rQ d��;fe�sl�tg ap�rop�i��iotts ir� thc�
�idewalksfBicys;l� Lanes �rat�r�mmebfo proJecl (CI#y Prot�cl Nb, �$4D�2} �y �he s�rne arrfauni
3_ Ado�i il�e at��iched appro�ria9inn �rdlna�sce adJustin� �st�rn�ked recelpts ar7tE a�prapr�$lior�� In the {',ener�� G$s 1.eas$ ��}�Itel Pro�acts
Fund In !h� a�no��rs# of ��.O�O,��Q.OQ, by �eCreasir�� es�lrna�e[f r�cel��t� and appraprf�l�an8 ir� ihC� �9�ewalk Car�Slruclio:l�Rep�llr �fRywid�
program+r�ebE�+ prorecs {�:ly �ro�oc� hlo, ���O�iB}, and Ir��re�slr�� r�r�lp�s ant! a�P�P���l�ons in tf�e �Idewali�s �Y2�� T�fo�ect (�ily proJoct
N�, 1QQo37} by tk�� sem$ am�uni; and
�, �mend t�a F�sc�l Years 20�2-�D�B �spltal �rr7�roverne�f Pf�gr�m.
��CU9Si��+�- — —
Tl�is t�layor �nc� CouhGil �ommu�ic��lor� �NR&�j Is �o authprize a c�nslruction cc�r�lract �qr s��laxvaik Impr�v�rr�e:-�[s t��t vuli! consrsl of ��proxamafie�y
8.040 Ilr�ear #s�� �[ Cancreka s�dt�walk �rrd �� Arnerl�ar�s wlth �1sa�IlltkeS Acl barri�r iroe ramps alor�g LaCkland Ro�d f�oar C�rn� �owl� +Nest
��u�e�ard ta �a�mon� ,Avenue_
��� p���e�t w�s advertisr�d for bid rrr Ehe Forl War�h 5Car-�el��r��� on J�nuary f3. ���2 and ,fa��ary 2�. 2D��. On Fetrruery 10, ��22 !he
#�liawirly� �JdS were r�c���red;
�fdde�s I� A�o�nt � 7�me of
,1 �nrr�pletaon
�a�k �or�orele, inc. u $7B7,Q��,�Oi��B{1 Calan��r
Gor�s�rucl�on. LLC, � $84U,515,
�nrr�sconstruet�c�n, ���. Y �8�#�,3ss,
���,����;���� ,� ����,���
�a+��r�� � c�r�s�rucr��n, �nc, � s9�3,�47.�0
ln�. �I "��83,3�
C��R V $1,QQ3,f}BD.$1
Co�slruc�lqn, i�C II �1,QTp,
� Wine�, Inc_ � 51.�75,�SS.�
�p�n0�aup,lr��_ � �i.�98,6��,74
The t�ble beio+n+ sUmmae�xes �he f�ndl�rg hlslory iar khe �idew8�lks �Y�0�7 prr,Jec#;
— �x�st�ng � Adc�itEonal ' Rro�oct Tota�
F�and Furtd�r�g Fun�ling
�� - �a�� �a�a ������o�,o� ���o,000.oc
� rarr3 _
��a�a - �a�a ��na h �a��.�r��_oa'J ���o.c��.�a'���.���,as�.
ra m � -
i� • G$ner�Y �as g�,p00,�Op.�O $�,O�U,OOtJ,
�roJact7o�a1��3,7az,as5.00' $9Ro,oU�_no'��a,sasT4��.�ruJ
Aprrr�w21 pi recor�tm�ne��tson �1�_ 3 w�uld �d�us! appro�rl�,tl�il n�ls r�eedad as #u#�r� nding�orJihe SitVr�walk�rFlf�� 17�proFect {�i ���aJ�ct No.
��F#y Proaect No, 1{�0�3�) Inko � s�ilc c�ps�a1 �aro�ect, Thls ac
4006�7} Is �r�klcfaa#o� lr�m �lhGar fundin� sourt�s �nd t11� scop� of thi� ProJo�l �41ife�s �forn th�i o! khe curr�nt pr�gfam�l�i�1e proJack,
Th� �{}i ��ae�d Pa��gr��r+ fu��ln� Is cufrer�tly a��ra#riaEod in ih� Sidewa�ksl�ilcyctie 1.�,+es pragrsm�nable pro��ct P��O��. In o�i�r ko
a�irrl��sl�2��lve3y lr�c�c Ihe sper�ding af ail iunding s�ur�es in cs�e pra�ect, appr�prr�tian ar�G�3ance$ are naaded to mo�� a�pr��rkal�or�s frosn lhe
pro$r;�r�7�able �fo�eci t� k�'� 002#{�an��h� adapkson o� I�re'���Q Q�� 00 appr�pr� Ea�will rc�d�xcekihe�svaEl�ble amoun�t �o��i�3,�27 �rO�Ths� able
�rc,jecl (Clly I�roJ��t Na, ��� ��
�,��;o�r wHl ar�+�r�d �e ����-?U�� �apttal lmpro�+eme�i ���n as appro�+�d it� conneczian wlth �rdinan�e 25073-��`-��21.
Tt72s �tojeck will haue n� lrr��rpc� o�r I�+e 7rans�arlaGio� Pubtl� W�rks a�n�+sF operal�n� budget v�l7�n c�mplet�d.
ThEs pro�ecK is inpludad In ��e ��� � Band P�ogram. A+�$ila�ie resaurces wlkhin th� ��n�r�l �und w�ll I�e us�d k� �ro+�itie Inl�rim �nan��r�� +.intFl deb�
is is�uod. �ric� dobl essc�ckstl b� Is� ��ral�+ a1s �dko�ted �s par� qf�the ��E alln�ej a� �asssng ihe b�n�l e ect�'�un (�rdi ar�ce No.t2���9-U5-�01 Sj
�xp�essin� affi�lal lnker�� lo R�
a�d su traeq�an[ �ciior�s takae+ I�y the M�yor �nd Courral _
DVIN OFfi��-TI Z�ck �af�Cret�, In�, �s in ��m�llanco wlih ��� Clly's Bus��ess ���+ity C}rdlnance by commltting �o eMxke�r� p�rceni B��slness
�qu�ay perli�lp�tlon �n thfs p��Je�;t. 7he ��ly'� ��sln�ss ��Uily c�a�l on lhls prokeCl is #iite�n perCent.
Tk�ls slde�ti�al� prr�Ject lo local�d In �OUCw1�l� Df�7Ra�T 3.
FIS���Eo�� io J � c�a �
The Dire�kor o� E"-in�nce Cr;nafies lh$t �ur��s �f� curre�k�y av�olable �n the Sidewal�Cs��'scy�le �anes prngramrnsbla gro�ecl withir� �k�e �0'�S �a�d
Progr�m �4Grttl srrd u�on ��p�ov�1 ni li�� �b�ave reca�mon�aklons and �c1op#'or� oi kh� alEar.nad a��a�a��iasi�r� ord���ncos, iun�a wiiG b� av�llsat�ie ln
tfre 24�� �cn� Prcrgr�m �or the �ide�r�alks FY�O� 7�ro;eot kv s���or� ltro �ppra�+t�l a1 tk�� �ba+�� re�ammendatlons antk execut�an o� !he cos�ir���.
PrF[,r Eo �n expos�dlluro b�lr�� In[�urrcci. �he�r��GDorl�lic��� $� P:�hklc Wbrks D�ep�r��C��k has Ilte ��sp�nsablls�y of v�rli}rkng k�e $vaNab��ll� �f i��nt�s,
$ I��iE �d for �ik�+ M ri�goE's Offla� bv: D��a 8urghdalf �0"E�
O�J�Inat na Bu�ittess Unit He� W1111om Jahn�orr 7��1
g�it��nal_ nforro,atfor�i� �+lonty F�l�1G 6�6�
�
�
��
Cg'�'� OF F()R� WORT�
Transpor�a�ion and Public �orks
� I�ElV�YJM[ N�. 1
To the Specifcafions and Coniract I�ocuments For
LACKLAI�I� SII�EWA,LI� I1VIpROVEIV�EI�T�
C�ty Pt�o ject 1�10. 1OQ63i�3
Addendum No. 1: Issu�ed Monday 31, �02�
This Addendum, forms par� of the Plans, Co.ntract Documents & Spaci�ications #'or the abo�e re%renced Projeet
and modifies the origir�aI Specifications and Contract Documents. Bic�der shall acknowledge receipt of this
addendurra in ihe space provided below, in the proposal(SECTION 00 41 QO) and acknowIedge receipt on the
outer anvelape of your bid. Failure ta acicr�owledge receipt o.f this addendum couId subj�ct the bidder to
dis q ualification.
The plans and speaification documents forLACKLAI�ID SIDEWALK IMPROVEMENTS, Cit� ProjectNo.
l Op637-3 are hereby revised by Addendum No. 1 as follows:
1. The Construction lans have been revised as fallowin :
o Sheat 2: �eneral Nntes- updated with new Genei-al notes
� Sheet 3: General Notes - updaied w ith new General notes
� Sheei 18: Detail D528 — Revised driveway pay lirnits
• Sheet 20: Detail D534- Revised detail for curb anc! gutter adjacent to existing street
� Sheet 28: �idewaak Detai�- Added sidewalk details (Sheet 1 of 2)
2. The Contract Dacuments are revised as folIowin :
� Attaching a copy of section 01 31 �.0 Pro'ect Meetin s to the Contract Dacument.
• S+' TION 00 42 43 PROPOSAL FORM is deleted in its entirety and re}�laced via this
addendum with Specification Section QO 42 43, P2•aposal Form, Addendum No. ], attached.
3. Contractors/Bidders Uestions:
1. Who is responsible f�r remo��ng and rep�acin� tlie existing structures/shelters at tf�e bus stop
focations7 There is one at t}te location on p�an sheet 5 and one on plan sheet 1 I, The plans s.tate
the be�ches adjacent to these locations to be removed by others, but the siructure/sheIter is not
addressec[.
a T[iis w3ill l� done by ot��crs — City of FoE•t Worth 'rs coordinating with tl�e "T' for• tlie
removal and relocating of bus slaelters.
2• Are the bus stnp }�ads to be poured with the same section detai�s as the sidewal�< details7
� Yes.
3. The plans are missing the sheet i of tl�e Sidewa�k DetaiIs (32 13 20-D546), Sheet 2 of this
draw ing in inc luded but not sheet 1.
� This �aas laeen adclressed wit}i revised Sheet �S inciuc�ed ��veth Yhis addend�m.
Page I of 4
LACKI..ANiJ SIfJEWALIi IMf'ROVli117rNTS
City Prnjnec f�o, �UU(i37-3
Addendu m I
4. The driveway details indacate the curb and gutter sectian through the driveway will be paid as
curb and gutter, j assu�ne this is pay item #29. Please uerify wllich curb and gutter deta�l shown
on plan sheet 24 applies to this sectian, Existing Stfeet — Acijacent to Fave�nent l�npro�ements or
�xisting Street. I would assu�ne the Existing Street appli�s sincethe street is not being i�npraved.
If my assumption is correctwill all iche HMAC requu'ed to make the tie-in to the existing paving
be paid under HMAC Transrtion pay itein #18. The driveway detail sl�eet states the 9" HMAC
tie-in is subsidiary to the driveway but since there are no pa�ing i�n}�ro�ements be.ing performed,
! would assume the curb and gutter detaii woLild supersede.
m Tl�is has l�en addressedwi4h revisedSheet 18 include�with this addeiidum.
o The dri�ewa,y pay lfmrts is re�isec� ta incluc�e t�ie �utter section. Thc �" HMAC
tran�itinn tl�irougl� the driveway rvill l� subsidiary to the drivew�y {S� bicl item.
�. T�re c urb aitid gutter detail show�� for "Existing Street" has a co�aflict with the width oF the HMAC
transition. It states 24" minimu�n but is dimensioned as 14", Please clarify the rninimum wxlth
atld if the fu[1 w idth reyuired will be paid as HMAC Transitian.
� Tliis has �een addressed with revised Sheet �0 included wit� this addendum.
o T�tis de��il section �tias been revised to s1�Qw 4" minim�►►m HMAC transi�ion
subsidia�y ta tl�e curb ancl gutter bid item.
6. The curb ar�d gutter details call for either 6" CTB or Type A�'�ex Base to be mstalled under tt�e
curb and gutter and to 1' beyond the back of curb. Since there are no �a�ement im�aro�ements
being perfortr►ed is this going to be required? If so, I assuine it w ill be subsidiary to the curb and
gutter at na pay, correct.
o This has I�een addressed witl� revised Slfeet 2Q included witli fhis addeaidum.
D Detaif 53�4 has �en revised to address this questian, the curb and gutfer de#ail
a�plicable to tnrs prnject is "Existing �treet".'Tl►e revised eletail calls for the curb &
gutter andHMAC transition to l� insiaSled ak�ove t�ae existingcompacted subgs'ade,
anc� compactcd mater4�tl l�hind tlie back o�curbto be suhsid'rary.
7. Can you clarify the intent of pay item #30 Curb and Gtitter (Match Existing)? What is the
c3ifference in this p.ay itein and item #297
•'I1iis luid item is inYended to l� used foa• fl�e locations w�ere curb and guttet� are not
tlie standard b°' cua�b. We have a few locatiouswhere tl�e curb and gutter rvill nced
to b� greate�• t1�an 6", and ma,y vaiy in gutter wrdth. The installation will need �o
matcl� the ex�stuig curh and �utter dimensions. lan sheet 5& 6, It
S. "1'here are a cou�le of locations stated on the plans to adjust water service, �
a�pears the �ntent is to relacate the meter outside of the sidewalklramps. There �s no pay ite�n for
this work, and we need ta verify the scope. Can we just connect to the �xisting service and e�tend
it or is the intent to rep{ace tl�e serr�ice from the ma�n to the new location?
• Bid item 3� -- Mi$cellaneous S.tructure Adjustment (WIV� is included far the
pu�•pose of tl;e WM bax adjnst�nents.
� Any location on tl�e plans thatcalis forwater meter acljustments refers to vertical
adjust of the b�x, noY a service relocatin��. S�ci�cation item 33 Q514, }��•ovidas
clari�'ication re�arc3ing tl�e water meter adSiystmenk.
9. Pay item #44 Miscellaneous Adjustments (Irri�ation) typically is paid for on a cost-plus 1�asis
w ith a pre-bid a�r►ount estaUlished in the bid. � s the intent �or us to provide a lump sum 6�d for th�s
worl� or is t1�e pre-bid atnount just missing?
� The pro�asal form has Ueen r�vised rvith the pre-bid amaunt of $2�,000.
h C t tion Al[owance siated.
l0. There is no pre-b�d amaunt for t e ons ruc
� The l�ropasal form lins been revised to include the Construction Allowance amoant,
�r�s ��ao,aoo
1.ACKLnNI] SIDE1�lALK 1NiPItUVL'-MENTS
Cily k'rt)jet:l No. 10U637-3
Addenclum 1
Page 2 of 4
1 I. There are saveral bid items in the propasaj that are not shown on the plans. In order to pravide a
price, we wiil need same addil:io.nal information provided.
� Item 42 Remova & Repla�e Mai�box 1 each — Is this a post type mailbax o.r brick
maiibox?
� V4�e reviewed if there axe any mailboxes locafed along the projecf limi#s, and
there no mailbox re�lace wili be needed in this project. Item 4� —Remove
and Replace Mailbox has been rernoved
� Item 46 Concrete Flume �vith ADA approved Steel Plate 1 each -- need �o knaw what
Iength and width of flume and detail For steelplate ta use.
� This bid ifem has been removed from the project.
� Item 47 Remave and Replace Inlet Top 3 each —Need to know what size of top, Maybe
you can bid wi�h an up to size.
• The exisfing iulets are in good eandition, and sidewallz alignment wil� be in
conflici vvith the inlets, therefore no replacemenfs are required. We revised
thi� bid itenn to be 1 quantity, in the case that it is required +or fou�nd to be in
brokeu f paor condition by the time construction begins. The inlets located
alnng fhe pro�ect limits are 10' curb in�ets.
• Item 48 Cancrete Curb Repair as r�eeded 1 SO LF — Wk�at is the scope assaciated wi�tk� thzs
w ork.
� This is inciuded as a bid item becausa there will b� locations where the curb
wi�l need to be repaired (locations where the curl� i� oC� today but not by fhe
c.onstr�ction time). This item may �ae used or it may nat, dependiog on the
fielci findings.
12. Bid Ite� #15 Ut�.caassified �cavatian by p1an, is this for the exca�ation required to insta➢ ihe
sidewalk where there is none e�isting`t
• Correci, in some lacation excavationwill be required at or adjacent to the sidewalk
in order to insta[l the sidewalk.
13. 1Uhat is the praposed starE date for this project7
� We are planning to start the construction by end af Marchl early April �02�.
I4. Please clar�y what we need to he pr�qualif'ied for?
� Prequalifieation is not be required ior this �roject.
l S. Will the prequalified contractars on the Fart Worthwater and sewer list be eligible to bid this
praject?
e Prequalification is pot be required for this projeet.
16. Will we be allowed to close one lane for the Iength of construction phases`�
o Traffic control will need to be coordinated with Charles McLure. Confi•actor must
maintain a# least ooe lane open in each direction.
LACKLAND5IDEWALK [MPROVEMENTS
City Project Na. 100637-3
Addendum 1
Page 3 of 4
A signed copy oiAddendum No. 1 should be included 'm the sealed bid ezavelape at t1�►e time af bid submittal.
Failure tn acknowledge the receipt of Addendum No. 1 cauld cause the subject bidder to b� considered
"I�TONRESPONSIVE," resulting in disqual�'ication.
Addendum No. 1
RECEIPT ACKNOWLEDGEMENT:
� �,
- .-�,��� _
B�: -
�i-Za � a cre�,�nc.
Gompany:
Address: 39352 221 st A�e
City: Le Center �tate: MN
WilJ�arn Johnsan
Darectox, TP W
�� � : �f���
By: = �`
Mary Hanna, P.E.
Program Manager, TP W
LACKI.f�fD SIDEWAI�K IMPRQV�ML:NTS
Ciry Pmjeet Nn. I p0637-3
Adcl�ndU m 1
Page �4 of 4
4a1113
1NVITATION TO BIDDERS
Page l of2
SECTION 001113
INVITATIQN TO BIDDERS
RECETPT OF BIDS
Sealed bids for the construction of CPN 100637-3 Lr�cklaa�d Sidc s��alk Lr���°�ve��rc>>ats,�•or�a Cc��iap
Bo���ie I3h�c� lo Calntn�71.4verrare ("Project") will be received by the City of Port Worth Purcl3asing
Qifice until 1:30 P.M. CST, Thua•sday, Februaey l0, 2022 �s fi�i�ther desc�•il�ed below:
City af Fort Wortls
Purchasing Division
200 Texas Street
Fort Worth, Teatas 76102
Bids �vill be accepted by: US Mail,. Courier, F�dEx ar ha�id delivery at the address above;
Bids will bc opened publicly and read aloud at 2:00 PM CST in the City Council Chambers.
GENERAL DESCRIPTiON OF WORK
Tlie rnajor wark will consist of the (approximate) following: Pede,s���ia1� Side���alk h�rprover��e�ats
Lcrc�rlarad Roac�fi•o�7a Ccur�p I3ati��re Bl�td to Ca1n1o��1.4vet7a�e
• 30,2(1Q LF ofNei-i� Srdel��alk
� 1 G Ne�� Pec�estriar� Rc�mps
PREQUALIFICATION
Certain improvements sncluded in this project must be performed by a contractor or designated
subcontractor who is pre-yua�ified by the City at the time af bid opening. The procedures for
qualification and pre-qualification are autlined in the 5ection 3 of 00 21 13 — INSTRUCTIONS
TO BIDDERS.
DOCiTMENT EXAMINATION AND PROCUREMENTS
The Bidding and Contract Docuinents may be examined or obtained on-line by visifiing the City
of Fort Worth's Purchasing Division website at http:llwww.fortwortl�texas.gav/purchasin�/ and
cIicking on the link to tha advert�sed project folders on the City's electronic doc�ment
management anci colla6o�•ation system site. The Contract Docu�nents ma� be downloaded,
viewed, and printed by interested cantractors anci/or suppliers.
Bid Document Folder
https://docs.b360.autadesk.cam/shareslb6a5d 1 c8-9ca3-4d6e-9cic14-024571 d57463
Add�ndum Folder
l�ttps�lldocs.b36fl.autodeslc.coitl/sh�res/10433c2 I -e462-43a2-8044-S89d28052967
Copies aftUe Bidding and Cantract Documents may be purchased from AN.A. Consultants,
Which is as follows SQ00 Thompsan Terrace, Calleyville, Texas 75034
The east ofBiddij�g and Contract Documents is:
5et of Bidding and Contract Documents with fu11 size drawings: $I00
Set of Bidding �id Contract Documents with italf size (if available) drawings: $60
Please Contact ANA at least 8 haurs in advance to arrange for production of a paper set.
C17`Y OF FOR7' WORTH Lr�ckluiad Road Sir�eii'crlk Inr��roveirre�als
STAND�RD CONSTItUCTION SP�CIFICA'FjON DOCUMENT C'PAI: lOOG37-3
Re�ised 7/19l2021
00 11 13
INVITATION TO BIDDERS
Page 2 of 2
E�II'RESSION OF INTERSEST
To ensura potential bidders are kept up to date oFany new information pertinent to this projact, all
interested parties are r�quested to email Expressians of Interest in this procurement to the City
Project Manager and the Design Engineer. Th� �rnail should include the cor�-�pany's name,
contact person anr� that individual's email address a�ld plson� riumber. All Addenda will be
distributed directly to those who have expressed an interest in th� procurement and will also be
posted in the City of Fort Worth's purchasing website at http:l/fortwoi-�htexas.gov/p�u�chasing/
PREBID CONFERENCE — Web Canfereuce
A prebid conferance wilI be held as discussed in Section 00 2l 13 - INSTRLTCTIONS TO
BIDDERS at the foIlowing date, and time via a web conferencing �ppiica#ian;
DATE: Jra��uar�� 25, 2022
TIME: 2; (JO P. A�1 CS7'
Invitations with links to the web conferencing application will be distributed directly to thos� who
have submitted an Expressian of Interes#.
Invitations with links to tl�e web eonferencing applicatiou will be distrihuted directly to thase who
have submitted an Expression of Interest.
If a prebid conference is held, the presentation and any q�estions and answers provided at the
pre6id conferane� will be issued as an Adde�zdt�m to tlie call for bids. If a prebid canference is not
being held, prospective bidders� can e-mail questions or comments in accordance with Section 6
of the Instructions to Bidders reference.d above to the project manager(s) at the e-mail addresses
listed below. Emailed questians will suffice as "questions in writing." If necessary, Addenda will
be issu.ed pursuant to the Instructions to Bidders.
CITY'S RIGHT TO ACCEPT OR REJECT BIDS
City reser�es the riglit ta waive irregularities and to accept ar z•eject any ar all bids.
AWARti
City will award a contract to the Bidder presentin� the lowest price, qualifications and
competencies cansidered.
INQUIRIE�
All inquiries relative to this procurement should be addressed to the fallawing:
Attn: J�se A. Ot•ozco, I'.E„ City of Fn�•1 Cfi%�71�
Email: Jo,se.OroacnC,�,fvr��-i�aJ•tl�cea:crs,�;vt�
Phone: 817-.3 y2-b'78S
AND/OR .
Attn: Ma��k �4,s,scrad, P.E., AN� Cona�zrltcr»t,s, LLC
Email: Mnl•k.Asscrad cr NALLC', cvna
Phone: 817- 335-y9U0
ADVERTISEMENT DATES
Jcis7ucir}� 13, 2022
Juiz�acrry .20, 2022
END OF SECTION
CITY OF FDRT WOR1'H Lack/mui Roc+d Slcle�ralk Inrproi�ei��e�als
STANDAR_D CONS'CRUCTIOt� SPECIFICATION bOCUMENT C'PAf; Illli(�37-3
Revised 7119/2021
00 21 13
INSTRUCTIONS TO BID�ERS
Pagc 1 of 10
SECTION 00 Zl 13
INSTRLTCTIONS TO BIDDERS
1. Defined Terms
1. l. Capitalized tarms used in these INSTRUCTIONS TO BIDDERS are defned in Section
OQ 72 p0 - GENERAL CONDITIONS.
1.2. Certain additional terms used �n these INSTRUCTIONS TO BIDDERS l�ave the
meanings indicateti below which are applicable to both the singular and plural thereof.
1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting
directly through a duly auth.orized representative, submi�ting a bid far performing
the wark contemplated under the Confiract Documents.
1.2.2. Nonresident Bidder: Any persvn, �rrn, parCnership, company, association, or
corporation acting directly through a duly authoriz�d representative, submitt�ng a
bid for perforrriing the work contemplated under the Contract Documents whose
principa3 placa of business is not in �he State of Texas.
1.2.3. Successful Bidder: The lov�est responsible and responsive Bidder to whom City
(on the basis of City's evaluation as hereinafter provideci) makes an award.
2. Copies of Sidding Docurnents
2.1. Neitlier City nar Engir�eer shaZl assume any responsil�ility far errors or �nisinterpretatjnns
resulting from the Bidders use of incom�lete sets of Bidding Documents.
2.2. City and EnginEer in mal�ing copies of Bidding Documents available do so orily for the
purpose of abtaining Bids for the Work and do not authorize or confer a lzcense or grant
for any other Use.
3. Prequali�ication of Bidder� (Prirne Contractors and Subcontractors)
3.1. Bidders or their designated subcontractors are required to be prequaliii.ed for tlie wark
typ�s requiring prequalification as per Ssctions 00 45 11 BIDDERS
PREQUALIFICATIONS and 00 �L5 12 PREQUALIFICATION STATEMENT. Firms
seeking pre-qualifcation, must submit the docurnentation identified in Section 00 45 11
on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven ('�)
caleadar days prior ta Bid opening for review and, if qualified, acceptance. Th�
subcontractors listed by a Bidder on 00 4S 12 inust be prequalifed for the appropriate
work types. Subcontraciors must follow the same iimeliiies as Bidders for obtaining
prequalification review. Bidders or Subcontractors wh4 are not prequalified at the time
bids are opened and reviewed may cause the bid to be rejected.
Prequalification requirement work types and docurnentat�on are available by accessing all
requised �les through the City's website at�
I�tt �s:lla s.foc�r�ra��htexas. avlPro'ectResou�-ees/
CITY OF CORT WORTH L[rckland Rnad Sideirrrlk Inrproi>errreials
STANDARD CONSTRUCTION SPECIPICATIDN DOCUMENT CP�i�: 1f10637-3
RevisedlUpdated Novemher 2, 2021
oazi i3
I3V5TRUCTIONS 'CO BTDbEIZS
Fage 2 of 1 p
3.1.1. Paving — Requirements document located at:
htt s:1la s.Foi�twot�thtexas. o�/Pro�ectResources/ResourcesP/02%20-
%20Constr�iction%20DocumentslContractor°lo2pPrequali�catiof1/T1'W%20Pa� ing
%20Coc�tractor%fl20Preq uali�cation%201'ragramlPREQLJALIFICATfON%20R�;0
UIREM�NTS%20�'OR%20PAVINC'i%2QCONTRACTORS.pdf
3.1.2. ltoadway and Pedesirian Lighfiing — Requirements document lncated at:
https:llapps.fortworthtexas.go�lProjectResourceslResourcesP102%20-
%o20Constructian%20DocumentslContractor%a20Preqt�al ificatian/TPW%2�Roadwa
°/a20�rtd°/a20Peties#rian%2flLi htin °/o20Pre ualification�o20Pro rramISTREET%
20LIGHT%2pPREQUAL%20REOIVINTS.pdf
3.1.3. Water and Sanitary Sewer— Requirements document located at:
hitps;Jla�ps.foetwo��l�texas. og v/ProjcctR�sau�•ceslResn��rcesl'/02%20-
%20Consh�uction°1o20DocumetitslContr�ctor°/a20Peequa.l ification/Water%2aancf°/n2
OSai�ita� %24Se��er%20Con#ractor%20Pre tlalification%20Pro ram/VJSS°/o20 re
��al%ZOre uireinents. df
3.2. Each Bidder, unless currently prequalified, must submit to City at leas# seven (7)
caiendaw ciays priar to Bid opening, the documentation identified in Section 00 �}S 1 I,
BIDDERS PREQUALIFICATIONS.
3.2.1, Submission of and/or que�tions related to prec�ualification should be addressed to
the City contact as provided iz� Paragraph 6.1.
3.3. The City reserves flie right to rec�uire auy pre-yualified contractar who is the apparent low
bidder far a project �o submit sucl� additional infarmation as the City, in its sole
discretioii may require, including but nat limited to manpower and equip�nent records,
information about key persoiinel to be assigi�ed ta the project, and construct�on schedule
to assist tlie City in evaluating and assessing the ability of the a�aparent ]o�v bidder to
deliver a quality product and successful�y complete projects for the amount bid within
the stipulated time frame. Based upon the City's assessment of the submitted
information, a recommendation regarding the award of a contract wiIl be made to Yhe
Ciiy Council. Failure to subrnit the additio»al i�sformation, if requested, may be grounds
for rejecting the apparent low bidder as non-respan�ive. Affected contractors wi11 bc
notified in writing of a recommendation to the City Council.
3.4.In addition to prequalificatian, additional requirements for qualification inay be required
within �arious sections of th� Contract Documents.
4. Examinatian af Bidding and Contract Documents, Other Related Data, anc� Site
4.I. Before stabmitting a Bid, each Bidder:
CITY qF FORT WORTI-i LacklU»d R�rrd Sideirrrlk lnr��i�ovc<
STANDARD CONSTEZUCTION SPECIFICATIDN DOCUMENT �rrerzls
CI'A': I oofi37.3
Revised/Updated Novem6er 2, 2021
00 21 13
1NSTRiJCTiONS TO BIDDERS
Page 3 of 10
4.1.1. Shall examine and carefully study the Contract Dacuments and ather related data
identified in the Bidding Documents (including "technical data" referred to in
Paragraph 4.2. below). No infarmation given by City or any representative of the
Ciiy other than that contained in the Contraet Documents and officially
promulgated addenda thereto, shall be bindiug upan the City.
4.1.2. Should visit the site to become t'amiliar with and satisfy Bidder as to the general,
local and site conditions t�at may a�fact cast, progress, performance or iurnishing
of the Work,
4. I 3. Shall consider federal, state and local I,aws a�1d Regulations t!►at may affect cost,
progress, performance or furnisliing of the Work.
4. L�4. 5halI study all: (i} reports of explorations and tests of subsurface conditions at ar
eoiitiguous to. the Site and all drawings af physical canditions relatiz�g to e�sting
surface or subsurface structures at the Site {except Underground Pacilities) that
have been identiiied in the Contract Dacuments as containing reliable "iechnical
data" and (ii) reports a�id dra�vings of Hazardous Environmental Conditions, if any,
at the Site that have been identified in the Contract Documents as containing
reliabie "technical data."
4,1.5. Is aci�ised that the Contract Docunaents on file with the City shall constitute all of
the information which the City will furnish. AIl additianal uiformation and data
which the City will supply after prflmulgation of the formal Contract Documents
shall be issued in the form of written addenda and shaIj became part of the Contract
Documents just as though such addenda v�ere actually wri�ten into the original
Contract Docum�nts. No infarmation given by the City oth�r than that contained in
the Contract Daauments and ofiicial3y promulgated addenda thereto, shall be
binding updn the CiTy.
4.1.b. Should perform independent research, investigations, tests, borings, and such other
means as may 6e necessary ta gain a complete knowledge ofthe conditions which
vvi11 }�e e�acountered during the construct'ron of the praject. For projects with
restricted access, upan request, City may provide each Bidder access to the site to
conduct such e�aminations, investigations, explorations, tests and studies as each
Bidder deems necessary for submission of a Bid. Bidder must fi11 all holes and
cleau up and restore the site to its fanner conc�itioj�s ugon completinn of such
explorations, investigations, tests and studies.
4.1.7. Shall determine the difficulties afthe Work and all attending circumstances
affecting the cast of doing the Work, time required for its campletion, and obtain all
in�ormation required to make a praposal. Bidders shall rely exclusively and solely
upon tlieir own estimates, u�vestigation, research, tests, e�cplorations, and other data
which are necessary �or full and complete infornnation upan which the proposal is
to be based. It is understood that tlie submission of a proposal or bid is prima-facie
evidence that the Bic�der has made the investigatious, axaminatians and tests herein
required.
CI7'Y QF FORT WORTH l.achlaizd Rnud S'iden•alk Ir�rpi•oventc:nts
STANDARD CONSTRUCTION SPECIF'ICIITION DOCUMENT CPA�: 1!1(1G37-3
RevisedlUpdaied November 2, 202�
0021 i3
1NSTRUCTIdNS TO BIDbERS
Page 4 of lQ
4.1.8, Shall pz•omptly notify City of all conflicts, ersors, ambiguities or discrepancies in or
between the Contract Docu�nents and such other related documents. The Contractor
shaIl not take advantage of any gross error ar omission in the Cantract Documents,
a.nd the City sha11 be permitt�d to make such corrections ar itSterpr�tations as may
be deemed necessary for fulfillment of the intent of the Contract Dacuments.
4.2, Reference is made ta Sectian p0 73 OQ — Supplementary Gonditions for identification of,
4.2.1. thase regorts af explorations and tests of subsurface conditions at or contiguous ta
the site which have been utilized by City in preparafion of the Contract Documents.
The logs of Soi1 Borings, if any, on the plans are for general uYfarmation only.
Neither the City nar the Engineer guarantee that tlie data shawn is representative of
conditioris which actually exist.
4.2.2. thase drawings of physical conditions in ar relating to existing surface and
subsurface structures {eXcept Undergraund �acilities) which are at or contiguous to
the site that have been utilized by City in preparation of die Cotitract Docttments.
4.23. copies of such reports and drawings will be made available by City to any Bidder
an request. Those reports and drawings fnay not be part aftl�e Contract
Documents, but the "teahnical data" c�ntained therein upon which Bidder is entifiled
to rely as provided in Paragraph 4.02. of tlte General Conditions has beeii identified
and established in Paragraph 9C 4.02 oifihe Supplementary Conditions. Bidder is
responsible for any interpretation or conclusion drawn frorn any "technical data" or
any other data, interpre#ations, opinions or information.
4.2.4. Standard insurance requirements, coverages and limits,
4.3, The submission of a Bid will constitute an incontrovertible representation by Bidder: (i)
t�at Bidder has camplied witl� evexy require�nent af this Paragraph 4, (ii) that without
exception the Bid is premised upon performing and furnishing t�ie Wark required b� the
Contraci Docum.ents and applying the specific means, inethods, tecliniques, se.quences or
procedures of canstruction {if any) that ►nay be shown or indieated or expressly required
by the Contract Documents, (iii) that Bidder has given City written notice ofall
conflicts, errors, ambiguities and discrepancies in the Contract Documents and the
vvritten resolutions thereof by City are acceptable io Bidder, and vvhen said co»flicts,
etc., have not been resolved through the interpretations by City as described in
Paragraph 6., a�sd {iv) that the Contract Documents are generally sufficient to indicate
and can�ey und�rstanding of all terms and conditions for performing and furnishii�g the
Work.
4.4. The provisians of this Paragraph 4, inclusive, da not apply to Asbesfios, Polychlorivated
6iphenyls (PGBs), Petraleum, Ha�ardous Waste or Radioactive Material covered by
Paragraph 4,06, of the General Conditions, uniess specifically identifed in the Coiatract
Documents.
�. Availabilify af Lands for Work, Etc.
CITY OP TqRT WORTH l.creklancl Rnrrd Srcleircrlk lur�roveme�v,v
STANDAI�D CONS'TRUCTIQN SFECIFICATION DOCUMENT C'P�'• 1 f]OG37-3
Re�ised/Updated Navember 2, 2021
40 21 13
INSTRUCTI�NS Td BIDDERS
Page S of 10
5.1.. The lands upon which �l�e Work is tn be performed, rights-of-way and easennents for
access thereto and other iands designated far use by Contractor in performiqg the Work
are identified in th� Contract Documents. All additional lands and access thereta
cequired for temporary construct�on facilities, construction equipineiit nr storage of
materials and equipment to be incorporated in the Work are to be obtained and paid far
by Contractor. Easements for per�nanent structures or pertnanent changes in e�istis�g
faciIities are to be obtained and paid for by City unless otherwise provided in tlae
Contract Documents.
5.2. Outstanding right-af way, easeme��ts, and/or parmits to be acquired by the Ciiy are listed
in Paragraph SC 4..01 af the Supplementary Conditions. In the event the neces.sary ri�ht-
of-way, easem�nts, and/or permits are ndt obtained, the City reserves the right to cauncel
the award of contract at any time before the Bidder begins any eonstruction wark on the
project.
5.3. Tlie Bidder shall he prepared ta co.mmence eonstruction without al! executed right-of-
way, easements, andlor permits, and shall submit a�chedule to the City of how
construction will procaed in the other ar�as of the project that do not require permits
and/ar easemen�s.
G. Interpreiations and A[�denda
6.1. All questions abaut the mea�iing or int�nt af the Bidding. Documents are ta be directed to
City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions
received after this day may not be respond�d to. Interpretations or clarifications
considered necessary by City in response to sueh questions wiIl be issued by Addenda
delivered to all parties recorded by City as having received the Bidd'►ng Docunients.
Only questions answered by for�nal written Addenda v�+ill be hinding. Oral and other
interpretations or clari�cations will be without legal eff�ct.
Address questions to:
City af Fort Warth
2U0 Texas Street
Fort Worth, TX 76102
A1t�7; Jasc� Orozco, P.E., Ti•cr�as�vrteRin�� mzd Public Wr�r�ks D�par•tn�ef�!
Et77ail: Jose.Orozco cr fn��t���orll�teaas.gor
Phoiae: �?17-392-8785
6.�. Addenda may also be issued to rnodi�y fh� Bidding Documents as deemed advisable by
City.
6.3. Addanda or ciarifications may be posted via the City's electtonic docurnent maxiagement
and collaboration system at hitps:lldacs.b3G0.autodesk.comlprolectsl68968c38-02fa-
4a92-b9ca-
c28890391dadlfolderslurn:adsk.wi rod:fs.folder:co.wEDFHISRSV6 iaSe3 L A.
CITY q� P'ORT WORTH Lachkr+�d Rocrd Side�rcrlk Iu�proretse�zls
STANDARD CONSTRUCTION SP�CIFiCATION DOCUMENT CPrV: I pli637-3
Revised/Updated November 2, 2021
Ob 21 13
INSTRUCTIONS TO BIi]DERS
Page 6 of 10
6.4. A prebid canference may be lieId at the time and place i.iidicated in the Advertisement or
INVITATION TO SIDDERS. Representatives af City will be present ta discuss the
Project. Bidders are ey�cauraged to attend and participate in the canference. Clty will
tra�smit to all praspective Bidders of record such Addeiida as City considers necessary
in response to questiarls arising at the eanference. Oral statements may not be relied
upon and will not be 6inding or legally effective.
7. Bid Security
7.1. Each Bid �nust be aecornpanied by a Bid Bond made payable to City in an amount of �ve
(5} percant of Bidder's inaximu.m Bid price, an the form attached or equivalent, issued
by a surety tneeting the requirements af Paragrapl� 5.01 nithe General Conditions.
7.2. The Bid Bonds provided by a Bidder wijl be retained until the conditions of the Notice of
Award have been satis�ed. If the Suecessful Bidder iails to exeeute and return the
Contract Documents within 14 days after the Notice of Award coi�veying same, City
may consider Bidd�r to he in default, rescind the Notice of Award and act on the Bid
Bond. Such action shall be City"s exclusive remedy in the event Bidder is deetned to
haVe defaulted.
�. Contract Times
The number of days within which, or the dates 6y which, Mileston.es are to 6e achieved in
accordance with the General Requirements and the Work is to be completed and ready far
Final Acceptance is set forth in the Agreainent or incorporated therei�i by reference to the
attached Bid Form.
9. Liquidated Damages
Provisjons for liquidated d�tnages are set forth in the Agreement.
10.. Substitute and "Or-Equal" Items
The Cantraet, if awarded, will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or "or-equal" items.
Whenever it is indicated or specified in tha Bidd�ng Documents diat a"subsYitute" or "ar-
equal" item of material or equipment inay be furnished or used by Contraetor if acceptable to
City, application for such acceptance will nnt be considered by City until after the Effective
Date of the Agreement. The procedure for submission of any suoh application by Contractor
aud consideration by City is set for�h in Paragraphs 6ASA., 6.4SB. and 6.OSC. of the Generai
Coiiditians and is supplemeirted in 5ectioz� O 1 25 00 o.f ihe General Requirements.
I1. Subcontractors, Suppliers and Others
11.1. In accordance with the City's Business Equity Qrdinance Na.25165-10-2021 the Cit�
l�as gaals for the pariicipation of minarity business andlor women business
enterprises in City contracts $10Q,000 or gi•eater, See Section 00 45 40 for the
MIWBE Project Goals and additional requirements. Failure #o comply shal] render
the Bidder as nan-responsive.
Busin�ss Equity OrdinanceNo.25165-1Q-2021, as amencied {replacing �rdinance
No. 2�534-11-2020), codified at:
lltt s://codelibrar .amle a[.com/cades/fiworthllatesUftwoc�th t��-Q-4-22593
CITY OF PORT WORTH Lcrcklrrnd Ront! Srclen�ulk ln�p�•m�en�e��ls
STAtfpARD CONSTRUCTION SPECIFICA'1'IOt�! DQCUMENT C'PrV: 100637-3
Revised/Updated No�emher 2, 2d21
00 2l 13
INSTRUCTIONS TO 13IDDERS
Page 7 of I0
11.2. No Contractor shall be required to ernploy any Subcoutractor, Supplier, other person
or organization against wham Cantractor or City has reasanable objection.
I2. Bid Farm
12.1. The Bid Form is included with the Bidding Documents; additio�3a1 copses may be
obtained from the City.
12.2. All blanks on the Bid Fonn must be completed and the Sid Form signed in ink.
Erasures or alterations shall be initialed in �nk by the person signing the Bid Farm. A
Bid price shall bc indicated for each Bid item, ajternat�ve, and unit price item listed
therein. ln the ease of optional alternatives, ihe words "Na Bici," "No Change," or
"Not Applicable" may be enter�d. Bzdder shall state the prices for which tlle Bidder
proposes to do the work contemptated or furnisls materials required. All entries shall
be legible.
123. B�ds by corporations sha1S bs executed in the corporate name by the president or a
�ice-pre:sident or other cor}7oraie �fficer aceompanied by evidence of authority to
sign. The corporate seal shall be affixed. The corporate address and state of
incarporation shall be shown below ti�e signature.
I2.4. Bids by partnerships shall be executed in ihe partnership name and signed by a
partner, whose title must appear under the signature accompanied by evidence of
aut�ority to sign. The official address of the partnership shall be shown below the
signatUre.
12.5. Bids by limiteci iiahility compailies shall be executed in ihe name of the firrn by a
member and accompanied by �vid�nce of authority to sign. The state of fdrmation of
the firm and the off cial address of the firm shall be shown.
12.6. Bids by individuals shall show the Bidder's name and ofiicial address,
12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated
on the Bid Form. The ofiieial address of tlie joint venture shaIj be shown.
12.8. All names sl�all be typed or printed in ink below the signature.
12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, ttie numbers of
which shall be filled in on tlae Bid Farm.
12. ] Q. Pastal and e-maii addresses and telephone nurnher for communications regarding the
Bid sha11 be shown.
12.11, Evidence of aufhority to canduct business as a Nonresident Bidder in the state of
Texas shall be provided in accardance wi�h Section DO 43 37 — Vendor C.ompliance
to State Law Noi1 Resideirt Bidder.
CITY flF FQRT WORTH Lcrcklcutd Rocrd b'ide�rerlk Inry�rove�iie��ls
5TA3VDARD CONSTRUCTIQN SPECIFICATIOIr! DDCU]W1ENT ('PA: 1(10637-_i
12evisedfUpdated November 2, 2021
00 21 13
INSTRUCTIONS TO BIDOERS
Paga 8 of 1Q
13. Subrnission of Bids
Bids shall be submitted oi� the prescribed Bid �'orm, provided with the Bidding Doeuments,
at the tiime and place indicated in the Ad�ei�tisernent or INVITATI+DN TO BIDDERS,
addressed to Purchasing Manager of the City, anci shall be anclosed in an opaque sealed
en�elope, ma�•ked with the City Projecfi Number, Froject tit�e, fhe name and address of
Bidder, and accompax�ied by the Bid security and other required documents. If the Bid is sent
throUgh the mail or other delivery system, the sealed envelope shall be enclosed in a separate
en�velope with the notation "BID ENCLOSED" on the face of it.
14. Withdrawal of Bids
14.1. Bids addressed to the Purchasing Manager and filed with th� Purchasing Office may
be withdrawn prior to #he time set for bid opening. A request for withdrawal must be
made in writing and delivered to the Purchasing Of�ce ta receive a time stamp priar
to the opening of Bids. A timely withdrawn bid will be returned to the Bidder or, if
the request is vvithin one hour of bid opening, will iiot be read aloud and will
thereafter be returped unopened.
I4.2. ]n the event any Bid for which a withdrawaI request has been timely filed has bee��
inadvertently opened, said Bid a��d any record thereof will subsequently be inarked
"Withdrawn" and will be given no furthar consideration for the award of contract.
15. OPening of Bids
Bids will be opened and read aloud publicly. An abstract of ihe amounts of tl�e base Bicls and
rnajor ajternates (if any) wil] be made available to Bidders after the opening of Bids.
16. Bids to Remain Subject to Acceptanc�
A11 Bids will temain subject to acceptance for a rninimum of 90 days ar tl�e time period
specified far Notice �fA�ard and exeeutian and delivery of a cainplete Agreement by
Successful Bidder. City may, at City's sal� diseretion, release any Bid and nulliiy the Bid
security priar ta that date.
1'�. Evaluatian of Bids and Award of Contract
I7.1. City reserves the right to reject any or all Bids, including without ]imitation the rights
to reject any or all nonconfor�ning, nonr�sponsive, unbalanced or eanditioiia] Bids
and to reject the Bid of any Biddez• if City believes that it would not be in the best
interest of tlie Project to make an award ta that Bidder. City reserves the right to
waive informalities not involving price, contract time or chan�es in the Work and
award a contract to su�h Bidder, Discrepancies between the multiplication of units of
Work and unit prices will be resolved in favor of the unit prices. Discrepancies
between tl�e iiadicated su�n of any column of figures and the correct sum �l�ereof will
be resolved in fa�or of the earrect suzn. Discrepancies between words and figures
will be resolved i�� favor of the words.
CITY OF FORT WORTH I acklaFzd Koud 5ideirrrlk lirq�f•orerirei7ls
STANDA[2b GONSTRUCTION SP�CIFICATION �OCUMErIT ('1'N� I(1�G37-3
Revised/Updated Navember Z, 202]
DO 21 13
INSTRUCTIONS TQ BIDDERS
Page9of10
I 7.1.1. Any or all bids will be rejected if City has reasan to believe flaat collusion exis�s
amang the Bidc�ers, Bidder is an interest�d party to any litigation against City,
City or Bidder may l�ave a claim against the other or be engaged in litigation,
Bidder is in arrears on any existing contract or has defaulted an a previous
contract, Bidder has per%rmed a prior contract in an unsatisfactory ma�iner, ar
Bidder has uncompl�ted work which in the judgment of the City will prevent or
hind�r the prompt completion oiadditionai work if awarded.
17.2. In addition to Bidder's relavant prequaiification requirements, City may consider the
qualifications and experience of Subcontractors, Suppliers, and other persons and
organizations proposed for �hose portions of the Wark where the identity of such
Subcontrac�ors, Supp�iers, and other persons and organizations must be sub�nitted as
provided in th� Cantract Documents nr upon the requast of the City. City also may
consider the operating costs, tnaintenance requirements, performance data and
guarantees Qimajor items ofrnaterials and equipment proposed For incorporation in
th.e Work when such data is required to be submitted p.rior to the Notice of Award.
173. City may conduct such investigations as City deems nec�ssary to assist in ihe
evaluation af any Bid anc� to establish the responsibility, qualifications, and finar►cial
ability of Bidders, proposed Subcontractors, Suppliers and other persQns and
arganizations to perform and fumish the �Vork in accordance with the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contractor shall perfarm with his awn arganization,. work of a valuE not Iess tha�i
35% oithe vajue embraced on the Contract, unless otherwise approved by the City.
17.5. If the Contract is to be awarded, it will be awarde�i to lowest responsible and
responsive Bidder whose evaluation by City indicaies that the award wijl be in the
l�est interests of the City.
17.6. Pursuant to Tez�as Ga�ermnent Coeie Chapter 2252.D01, the City will not award
contract to a Nonresident Bidder unless the Nonresident Sidder's bid is lawer than
the lowest bid submitted by a responsible Texas Bidder by the same amount that a
Texas resident bidder waulc� be required to. underbid a Nonresicient Bidder to obtain a
camparable contract in the state in which the nonresident's principal place of
business is located.
17.7. A coniract is not awarded until formal Cit� Council authorization, If the Contract is
to be awarded, City will award the Contract within 90 days after the day of the Bid
apening unless extanded in writing. No other act of City or others will eonstitute
acceptance of a Bid_ [Ipon the contract award, a Notice of Award wi ll be issued 6y
the City.
17.7.1. The contractnr is requireci to fill out and sign the Certificate of �nterested
Parties Form 1�95 and the %rm must b� submi�ted to the Pra;ect Manager
before the cantract wi�l be p�•esented to the City Council. The form can be
obtained at htt sr//��wrr.etl�ics.state.tx.us/datalFornis11�9i/1�95. �df
17.8. Failure or refusal to comply with tlie requirements may result in rejection of Bid.
18. Signing of Agreemea#
CI7"Y QF' FpRT WORTH !_aclrlc�nd Iiorrrl3idn�rrrlk lrr�pr•oi'eu+eizls
STANDARD CONSTRUCTION SPECI�ICATION DOCUIvlENT CYA�: l011637-3
Revised/llpdated iJovemher 2, 2pzl
ao zi i3
I?�ISTRUCTiONS TO BIbbER5
Page 10 of 10
18.1. When City issues a Notice af Award to the Successful Bidder, it will be accoinpanied
by the requ�red nuinber of unsigned counterparts of the Ptoject Manual. Witl�in 14
days thereafter, Contractor shall sign and deli�er tiie required number of cou�rterparts
of tlie Project Manual to City with tha required Bonds, Gerti�cates af Insurance, and
all other required documentation.
18.2. City shall thereafter deli�er ane fully signed counterpart to Contrantor.
END OF SECTiON
CITY 01= T'ORT WORTH l,ncklrrncl l�ortd Siiletirplk lrrtprns�eiuer>!s
STANDARD CDNSTItUC�`IQN SPECIFICATION DOCUMENT C'PA? I110G37-.3
Re�isad/Updated I�lavemher 2, 2021
DQ 35 13
CONFLICT OF I�lTEREST STATEMENT
Page 1 of 1
S�CTIOR! 00 3� 13
CONFLICT O� INTEREST STATEMENT
Each bidder, offeror or respondent to a City af Fort Warth procurement is r�quired to camplete a
Conflict of Interest Questionnaire or cer�ify that one is current and on file with the City Secretary's
Office pursuant ta state law.
If a member of the Fort Worth City Council, any one or more vf the City Manager or Assistani
City Managers, or an agent of the City who �xercise discretion in the p[anning, recommendir�g,
seiecting or contracting wifh a bidder, offerar or respondent is affiliated with your campany, then
a Local Government Officer Conflicts Disclosure 5�atement (CIS) may be requi�-ed.
You are urged to consult with counsel regarding the applicability af these forms and Local
Go�ernment Code Chapt�r �76 to your campany.
The ref�renced forms may be downloaded from the links provid�d below.
Form CIQ fGc��fl�ct of lnterest Questic�naire)_(state.i�c.us1
hhus'►hnrww. ethics.siate.tx.usldatal`��ns�'�or�flict/ClS.p�
�
❑
❑
�
❑
❑
k31DD�R.
CIQ Form do�s no# apply
CIQ �orm is on file with City Secretary
C1Q Farm is being pro�ided ta the City 5ecretary
CIS F'orm does not apply
CIS Form is an File wiih City Secretary
CIS Form is being pro�ided to the City Secretary
�
Ti�Zack Concrete, Inc.
39352 221 st Ave
Le Center, MN 56057
END OF S�CTION
Signature:
Title:
Jeremy,Gibbs � ,
� `: � � V '�., \,r, _ _
-, -
� Vice prel��er�5�cretary
CITY OF FORT WORTH
STANDARD CONSTRUCTION 3PECIFICATION DQCUMENTS Lackland 5idewalk lmprovements Addendum^N1 Bid Proposal Workbook
Revised February 24, 2020 CPIV: 1D0637-3
oa at o0
Blb F6RM
Pape 1 af 3
sec-rEon� oo a� o0
aio FORrn
T0: 7he Purc4asing Manager
c1o: The f'u�chasing Division
PU6 Texas Streat
City of Fort Worth, Texas 781 o2
FbR: Lackland Road Sidewalk Irriprovetnents from
Camp 9awie 81vd. to Calmont Avenue
City ProJect No.: 10U637-3
Unitsl5ections: Lackland Roed Sidew�lk ]mprovements from Camp Bowle Blvd. to Cafmont Avenue
9. Enter Inta Agreement
The undersigned Bidder �araposes and agrees, if this Bld is accepted, to enter into an Agreement with City in the form
included in the �idding �acuments to perform and furnish aE] Work as specified or indicated In the Contract
❑ocumenEs for ihe Bid Price and wiihin the Contract Time indicated in this Bid and in accordance with the other terms
and conditions of the Contraot Documents.
2. BIdC1�R Acknouvledgements and Certificativn
2.1. In submitting this Bid, Bidder acaepts all of Ehe terms and condiilons of the INVITATION TO BIDaER5 and
INSTRUCTIONS TO BIOq�RS, Including wilhouE limitalPon those d�:aling with ih� dispnsition of eid Bond.
2.2, Bidder is aware of a!I cosis to provide the required insuranae, will do sa pending cantract award, and will
provide a valid ir�sufance certificate meeting all raquirements within 14 days of notlficefion of award.
2.3. Bidder certifies that this 6id is genuine and not made in the interest of or on behalF oF any undisclosed
individuat or entity and is not submitted in con#ormity with any co]lusive agreement ar rules of any group,
asspciatian, vrganization, or co�porailon.
2.4. Bidder has not directly or indirectly induced or salicited any other Bidder to submit a false or sham 8id.
2:5. 6idder has not soficited or inducecE any individual or entity ta refrain {rom bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for ti�e Gontract.
For tha purposes of ti�is Paragraph:
a. "corrupt practiee" means the ofiering, giving, receiving, or sollciting of any thing of value likefy to
influence ihe action of a pubEic o�cial in the bidding process.
b. "fraudulent practice" means an infentionai misrepresentation of facts made (a) to influence the
bidding process to the det�iment uf City (1�.) to establish Sid prices a# artificial non-aompetitive
leveEs, or (c} to deprive City af the bene(its of free and open compelltion.
c. "collusive praclice" means e scheme or arrangement between lwo or more Bidders, with or
withnui the knowledge of City, a purpase nf which is to establish Bid prices at arlificial, non-
campetitive levels.
d. "cnerci�e p.raclYce" means harming or tBreatening to harm, directfy or indirecEly, persons or their
property to Influence their paAlcipation in the 6ldding proc�ss or affect the execution ot the
Contrxet.
CIYY OF FQRT WOF2TH
STANPARp CONSTRUCF[ON SPECIFICATION �OGUMENY3
Revised 81391�621
Lackland Sidewalk Improvemersk _l4ddend�m"N1 8M Pmposel Work6oak
CPN:'106637J
��
OQ q1 00
910 F'ORM
Page 2 at 3
3. PrequaliYication
The 8idder acknowledges that the following work types must be pertormed on{y by prequalified contractors and
subcontractors:
a. -
b_ -
c. -
d. -
e. -
f. -
9, _
h. -
a. Time of CompleNon
(,� Mt..w' .
4.1. The Wark will be cornpi�te tor Final Acaeptance within 80 Calend; days after the data when khe
the ContracE Time cammences to run as provided in Paragraph 2.03 of tfie G�neral Conditions.
4.2. Bidder aceepts the provisions of the Agreement as lo Ilquldated damages in ihe event of failure to complete
tfne Work {andlor aehievemeni af Mifestones} wifhln lhe llmes specifred in lhe Agreement.
5. Attached #o th[s 6id
The foliawing documents are attached to and made a part of this Bid:
a. This Bid Form, Section OU A1 DO
b. Required �id Bond, Section 00 43 93 issued by a sur�ty meetlng the requirements of Paragraph
5.o1 aP the �erteral Conditions.
c. Propnsat Form, Section 00 92 43
d. Vendot Compliance to State Law Non Residenl Bidder, Sec�lon 00 43 37
e. MWBE Forms (optionel at time of bid)
f. Prequali(IcaHon Statement, Seciion 00 45 12
g. Conflictof InterestAffidavit, Seciion 00 35 13
•If necessary, CIQ or CIS forms are to 4e provided direcily lo City Secratary
h. Any additional documents tha! may be required by Section 12 of the IAstructions to 8idders
6. 7otal Bid Amount
6.1. B9dder will camplete the Work in accordanrz with the Coniraci �ncuments for tfie tollawing bid amount. In
the space provided below, please enter Ehe total bid amounf for this project. Only this figure will be read
puhlicly by the City at the bid opening.
6.2. ]t is understood and agreed by the Bidder in signing this proposal that the total krid amouni entered k�elow is
subject to verification andlor modi�oation by multiplying the unit hid prices for eacft pay item by the
respective estimated quantities shown in this proposal and then totaling aEl of the exEended amounts.
8.3.
Total Bid $787,959.50
cirY oF Fnwr vsritrrH
S7A�Fn7iRfJ GONSTRUGT[ON SPECIFICAIlON DDCLiMENTS I-ackland Sfdewalk [mprovema�s_Rddend�m"N1 8id Pmpnsal Work600k
Revi5ed 6�4ti021 CPN:1 Q0637-3
ao ai o0
a�o FartM
Page 3 oi 5
7. Bfd Submittal
This Bid is submitted on February 10, 2�22 by the entily named below.
� �
Respecttullysubmltted, � +
�� ' '
gY, k 1
(Signatu }
Jere Gihb � -- /
(Printe�)
Reoeipt is acknowledged of the Initial
followin Addenda:
Addendum No. i:
Addendum No. 2:
Addendum Na. 3:
Addendum Na. 4;
Title: Vice-President
Company: TI-Zack Concrete, Inc.
Corporate Seal:
Address: 39352 221 s! Ave
Le Cenfer, MN 56057
State of Incnrporation: Minn�sota
Email: admin(a�tizacEc.Com
Phane: (5Q7a 357-6463
ENp OF SECTION
CITYOF FORT WORTH
STANOARO CONSTftUC710N�SPECIFICATION ROCEIAAENTS�
Re�ised9$62027
Lacklend5ldewalkfmp[ovemonts_Addendum"N1 Bid Prapasal Werkhaok
CPN: 7006373
ao az a3
�m PRDPOSAL
Page ] aF I
s�crioN oa az as
PROP05ALFORM
U[�1T P�lC� �I�
Project Ilem Infonnation
�idder"� Applica�t�on
listitei3i Specification Unitof Bid
�o Descriplion SectionNo. Measure Quantiiy
1 0171A101 Construction Stakin 0171 23 LS 1
2 �241,41�0 RemoveSidewalk 024113 5F Z,1Z5
3 0241.0300 Remove ADA Rarn 02 41 13 EA 10
4 �241.4401 Remove Cancrete Drive 02 41 13 5F 5,895
5 0241.Q403 Remqve Brick �riva 02 4�; �3 SF 130
6 0241,0600 Remove Wall <4' 02 4113 LF 468
7 0241,1000 Remove Canc Pvmt Q24115 SY 30D
8 O�a1.144� Remove As halt Pvmt Q24115 5Y 2d0
9 0�41,13q0 Remov2 Conc Curb & Gutter OZ 4�.15 lF 455
10 311�.0101 5ite Clearin 3110 00 5Y 300
11 3110.01Q2 6"-12" Tree Remvval 3110 0� EA �.
12 3110.01D3 12°-18" Tree Removal 3110 00 EA 1
13 3� 10.p104 18"-24" Trae Remova! 3110 Dq EA 2
14 3114,0105 z4" and Lar er Tree Removal 3110 40 EA 6
15 312�,�101 lJnclassifed Excavation 6 PEan 3123 16 CY 7,D20
16 3124.d101 Em6ankrr�ent b Plan 3125 OQ CY 15D
17 3125.b101 5WPPP 2 1 acre 3125 00 LS 1
18 3212.0401 HMAC Transition 3� 1Z fl4 TN 20
19 32i3.4301 4" Conc Sidewalk 3213 20 5F 14,455
20 3213,03i1 4" Conc5idewalk, �4d acentto Curb 32 1� 20 5F 15,260
21 3213.fl321 Conc. 5idewalk Ad'acentta Retainin Wa1l 32 32 2Q 5F 7D0
22 3�13.03Z� Conc. Cur6 at Back of SEdewalk 33 32 20 LF 1,650
23 �213.04D1 6" Concrete Drivewa 3213 20 SF 7,A30
24 3213.04fl1 8" Concrete privewa 33 13 2o 5F �.,2Qfl
25 3213.0501 Barrler Free Ram ., T e R-1 3213 20 EA 1
�6 3213.0506 Barrier Free Ram , i e P-1 32 1B 20 EA 6
27 3213.0507 Barrier Free Ram T e P-2 3313 ZO EA 2
28 3217.0501 24" 5L� Pvmt Markin HAE W 32 17 23 l.F 85
29 3216.0101 6" Goncrete Curb and Gutter 33 1613 LF S00
3p 3216.b102 Con�rete Curb and Gutter Match Existin 3a 1613 LF 125
31 327:7.5001 Curb Address PainYln 3Z 17 2S EA 35
�2 3232A10� Conc. Ret Wall {Faeef Ad'acentto Sidewalk 32 32 13 SF 700
33 3291.0100 To soil 32 9119 CY �.,Q20
34 3292.010� Block 5od Placement 32 92 13 SY 6,720
35 3305.0108 Miscellaneaus5tructure Ad'ustment WM 33 a5 14 EA 14
36 3441.4110 Remoue and Reinstall Si n Panel and Pvst 344130 EA 13
37 3471AOd1 Traffic Control 34 7113 MO 6
3$ 9999.0001 Barrier Free ftam , T e MOD R-1A 3�, 13 20 EA 1
39 9999.DDD� Barrier Free Ram , T e MOI] R-1B 3Z 13 2p EA 4
�4� 9999,On43 Barrier Free Ram , T e Mflb R-1C 3213 20 EA 1
�41 9999.OD04 Barrier Free Ram , T e MOD P-1 3� I3 2� EA 1
42 9999.0006 Water Meter Box Re Iacement Concrete 331210 EA 14
43 9999.0007 Miscellarreous Ad'ustments Irri ationj 33 a5 1�4 LS 1
44 9999.0008 6" Fiexible Base T e A, GR-3 00 oa o0 5Y 50
a5 9999.0010 Remove and Re lace 10' InletTo 1 14 & 33 4 EA 1
46 9939.OD11 Cancrete Curh Re air as needed 321613 LF 1S�
47 9999.0012 6" 5LD Pvmt Markln Ta z Black- b64� 3217 23 LF 80
48 9999.00J.3 RemoveBrickSidewalk 424113 SF 124
49 9999.0014 Construction Allawance 00 00 00 LS 1
END OI' SECTlOn
Sidde�'s Propasal
Unit Price Bid V�ue
$io,aoo.aa io,000.o�
$2.50 5,312,50
$5��A0 5,OOOA4
$2,Od 11,79Q,QC
54,00 520.OQ
SQ0,00 500.D0
80d,00 800.00
654.00 3,300.U0
50d.00 15,OOd.40
$55Aa 56,104.Oa
$40.b0 6,OOOA4
000,00 1,QQQ.04
240.fl0 4,800.00
$7.00 141185.0[
$7.0� 1fl6,820.�[
$7.OD 4,90D.00
$23.00 37,950.00
$9.5� 70,585.00
$sa.00 iz,oao.oa
3Qd,00 1,300.Q0
3D0,00 7,8QO.Q0
3D4,00 2,600A0
$23.D0 1,955.00
$23.b0 11,500.OD
$30.Od 3,750.00
150.d0 5,25D,�0
,pQ0.00
750.00
,qa 84Q.00
,Oa 1,116.Qb
.no ioa,000.o�
BID 787.959.9
C1TY OF FORT W ORTH
STAN�ARD CONSTRUCTION SPGC[PICA7'EOtQ �DCl1MENT5 LacklantiSids�wlk Imptoremenls _Addendum 1V1 Hid Proposd Workbaok 2
Revised 9730f2021 CPN: I OOG373
00 43 3 �
B[� BOND
Paga 1 of 2
SECTIOH 00 43 93
B!D BO1VD
KNOW ALL BY THES� PRESENTS:
Thaf we, Ti-Zack Concrete, lnc. � known as
��Qlflf�e�" herein and Atlantic5pecially InsurancaCompany , 8 COr�01'atE &UFO�
duly authorized ia do business in lhe Siate af Texas, known as "Surety" herein, are held and firmly baund unto the City
of Fort Worth, a municipal corporation created pursuant to the laws of �exas, known as "City" hereln, in t3�e penal aum
of five percen# (5°�) of eidder's rnaximum hid price, in lawfui money af the Uniled 5tates, to be paid in Fort WorEh,
Tarrant Gaunty, �'exas for the payment af which sum well and truly to bs made, we bind ourselves, our heirs, executors,
administrators, successors and assigns, jointly and severalfy, firmly by these presents.
WHERERS, the Principal has submitted a bid or proposal ko perfarm Work for fhe following pro)ect
designated as -
Ciky Prujecl No. i0D637-3 - Lackland Ruad 53dewalk lmpeovements
NQW, THERE�ORE, lhe CandiGon af ihis obligatian is such that if fha Ciiy shall award
the Coniraci for the foregoing project to tf�e Principal, and tt�e Principal shall satisfy all requirements afld candiiions
required fer the execution of the Cnntract and shall enter into the Contrack in wrlting wlth the Clty in accordance with the
kerms of such same, then this obligeSon shall he and bacome null and void. If, however, the Principal fails to execute
such Contract in accordance witn the tarms of same ar fails to sat9sfy all requEremenks and conditians r�quired for the
executlon of tha Contract, this band shafl become the property of the City, without recourse of the Principal andl4r
5urety, nat ta exceed Ehe penafty heraof, and shall �e used to compensate Cily for the difference belween Principal's
total hid amount and khe next selected bidcter's total bid amount.
PROVip�l] FURTHER, tha! if any legaE aclion be fiked an this Bond, venue shall lie in Tarrant County,
7exas or the United 5tates Disfrlct Court for the No�tharn bistrict of Texas, Fort Worth Divisian.
!N WI7NESS WHEREOF, the Principal anti the Surety hava SIGN�.D and SEALED this ]nsfrument 6y
duly authorized agents and officers on khis the 281h day of January , z022.
A'["f E5T•
Witness as to Principal
CI]'Y OF FORT WORTH
STANDARD CONS7RUCTION SPECIFICA710N DOCl1MEN1'S
Revised 913U/202i
PEikNCIPAt:
TFZackCon rete In•
BY;
&ign re
� " r � . fl�
ame and Tifle
Lackland Road Sidewalk Improvemenls
CPN: '100637-3
p0 A313
BI� BONp
Pag9 2 of 2
. ��''" �/"
:
G itn ss as to Surety
Attach Power of Atiarney (Surety) for Attarney-in-Fact
Address; ,��5�- ��4� rn+t
Cew 5i� �
suREn:
kllentic Spaclelty Insuranee Campany
605 Hlghway 169 Norlh, Suile 800, Plymnulh MN 55q41
' BY: �•� -, �__�_
5—ign ure -- —�
7ray 5taples, A1lorney�ln-Facl •
Name and Title
Adciress: �z�s soutn Ro�n s+.
Wes! St. Paul, MN 55h 1B �,
7elephone Number: ae�-asr-seaz
'Note: lf signed by an officer of the Surety Company, Ehere must be on file a certifiad exEraci from the by laws
showing that ihis person has authority io sign such ab]igation. lf Surely's physical address Is different from
its mailing address, boif� must be provided. The date of lhe bnnd shall not he prlor io ti�e date the Contrac! is
awarded.
END OP SECTION
CITY 4F FOIiT WORTH
ST/W�AR� CONSTRI1C710N SPECIFICA710N D�CUiv1�NT3 Lacklend Road 5idawelk Improvements
Fiavised 9130�2a21 CPN: 100837-3
�,
State of
County of
ACKI�O1����GWi�NT OF �R����P�L (Indi�idu�l)
Dn this day of
� in the year before rne persanally come(s)
to me knnwn and known to me to be tf�e person(s) who (is) (are) described in
and executed Ehe foregoing instrument and acknowledge(s) ta me that he/she executed ihe same.
Notary Public
�Ci�N�1�1���C�N1ENi OF PD�gNG�P�L (1�artn�r�hip)
5tate of )
)
County of )
On this day of
in th� year before me personally come(s)
a member of the co-pa�tnership of
to me know� a.nd known to me to be the person who is described in and
executed the foregaing instrument and acknowledges tn me that he�she executed the same as for the act and deed of the said co-partnership,
�lotary I'ublic
�C�N016V���GMENT �F l�R���i�AL (C�rpor��ion}
State of 1'�llianeSo%� ) �
)
County of ��L�wtic.� )
Qn thLs � day of �C�,.�.,��� in the year ��� beFore me personally Come(s)
',� ts me lcnown, who, being duly swom, deposes and says that he/she is
the � r, of the
the corporation described in and which executed the Foregaing instrument; that he/she knaws ehe seai
of the said corporatlon; the seal afFixed to the said instrument is such cnrparate seal; t'hat it was so af�xed by the order of khe Board of Directors of said
corporation, and that he/she signed his/her name thereta by like arder.
a� -.
SUSAN LY�1#i 51�AON�7TF �
�"� � NoC�ry Publlc
t.�irrResata �.
My Canlmission Expires �.
X" J 3'! 2027
Notary Public
�"'�'� � ' .�' E1�irl�l'�!lP�JL�DGPN�N� OF aI�RETY
5tate oF MlnnesoC )
)
County oP Dakota )
On this 28th day of ]anua , in the year 2022, before me personally come(s) Troy 5taples, Attomey(s)-in-Fack of Atlantic S ecial Insurance
Cam an with whom I am personally acquainted, and who, t�eing by me duly swarn, says that he/she is (are} the Attomey{s}-in-Fact of Atlantic Specialhr
Insurance Com an oornpany described in and which executed the v�ithin instrument; that he/she know(s) the carpnrate seal of such company; and that
seal afFixed to the within instrument is such mrparate seal and that It was affixed by order af the Bnard of Directors of said company, and that he/she
signed said instru����'-;"_�"-� ^f rh� �i,� ''hmnany �y like order.
+- ,�, -
j • '�_
'��.�F+:��� � . . ,��A �� G Notary Public
t�
�
l�t�.��
- IWSIiitAt�C�
� �, _+..� r
., r. , �: ;�' _ � I � . -
KNOVV ALL MEN BY TCiESE PRF�SENTS, lba[ ATL.AN'I7C SPECIALTY INSURANC� COMPAN'Y, a Newv i'ork corparation with its principal office in Plymouth,
Minnesota, does herehy constitute and appoinl: Jonathan Pa[e, Zachary Pate, Jennifer Bayles, �fici�olas Hach6an, Ttsnmas Lahl,'I'l�omas Keinp,'TYny 5taples,
each individe�ally if diere be more tltan one named, its tnie and lawful Attorney-in-Eaet, to make, execute, seal and deliver, For and on ils behalf as surely, any and all bonds,
cecognlzances, contracts oE fndemnity, and all other writings oh[Igatory in the namre thereof; provided tha� no 6ond or undenaking executed under this authori[y sha11 exceed in
amnnnt !he sum of: unlimited and the execution of suctr 6onds, recogn�zanees, contracis of indemnity, and a!7 odier writings obligatory in the nawre thereoF in pursuance oi'
these presents, shall he as hinding upon said Cornpany as iE diey had heen fuIly signed by an autharized o[ficer of the Company a�td sealed with the Company seal. Tlus �ower
oi Attotney is made and execnted by authoriry nf fhe Eollowing resolutions adopted hy the Board oF flirectors oF ATLAPfTIC SPECIALTY INSURANC� COhJiPANY vn the
twenty-Eifth day of Se�item6er, 2012:
Resolved: 'T`hat the President, any Senioe Vice Peesident or Vice-President (each an "Authoritied Oifice�") may execute Evr and in behalf nf the Company any and
aA bands, re�ognizances, contracts oF indemnity, and all other wtitings obligatory in the nature ihereaF, and affix the seal of the Company tltereto; and that the
Autharized OfEicer may appoin� and autlinrize an Attarney-in-Facl to exeCute on beh�lf of the Company any and all such instruments and to aFfix the Company
seal thereta, and lhat the Authorized Officer may at anq time remove any such Artnmey-in-Fact and re�oke a!� power and authority given ta any such Attnrney-in-
Fact,
Resnlved: That the Attomey-in-Fact may he given Full power and authority to execute for and in the narrEe and on behalf of the Company any and all honds,
recognizances, cuntracts of indemnity, and all other writings ohligatory in Ihe nature thereaF, and any such instrument executed hy any such Att�rney-in-Fact shall
be as binding upon the Company as if signed and sealed by an Authorized Ofiicer and, fuctl�er, tl�e Atrorney-in-Fact is heeeby authorized lo veri[y any aFE`idavit
required [0 6e attached to 6onds, recognizances, contracts of indemnity, and aIl other wri�ngs obligatary in the nature thereof.
This power of attorney is signed and sealed 6y Eacsimile under the auEhority of the Following Resnlulion ado�ted hy Che Hoard of Direcfors of ATLANTIC SPECIALTY
INSURANCE COMPAI�CY on the twen[y-fiFtli day af Sep[ember, 2➢12:
Tiesalved: T3iat the sfgnature of an Autliorized QfFicer, the signanere nf tlte 5ecretu�y or the Assistant Secre[aey, and the Company seal may be afFixed hy
facsimile to any power of attorney nr tv any rertifieate relaung diereto appointing an Atton�ey-in-PacC For purposes only of execuung andsealing any b.oj�d,
undertaldng, recognizance or other wrltteu obligation in the naeure thereoF and any such signat�re and seal where so used, being herehy adopted by the Company
as the original sig[�amre of such ofFicer and the o��inal sea! of the Company, to 6e vaGd and binding upon the Company with the same force anc! eFfe�t as though
manualiy aFfuced.
IN WI'1NESS WHERF�QF, ATLANTIC SPECIALTY INSU[tANCE CO3vIPl�VY has caused these presents tu he signed by an Authorized DEfi�er and the seal of the Company
to he affixed this twenty-sevenYh day of April, 2020.
STATE QE MINNE50'TA
HE�TIV�PW COi3NT'Y
,'`M�i F1ni�l�ry���r
, ��,�� y4[tA R9 � p?,'-: .
=�: SEAL ''m: ��
����. f986 �o; By
�-�& ��W �a�'�'���'� Paul J. Beehm, Seniar Vice President
��'�+��i��u�wC,,s
On this twenty-seventh day of April, 2q2fl, hefore me personally came Paul d. Brehm, 5en[or Vice President oi ATLANTIC SPECIALTY INSiTRANCB COMPAIV�, to me
peesonally lrnown to he fhe individua] and aF£icer descrlbed in and who executed the pmceding instrument, and he acknowledged the execu[�on of che same, and Ueii�� 6y me
duly swom, that l�e is [lie said oFFieer of lhe Campany aforesaid, and that tlie seal affi�ced to the pre�eding instrument is the seal oF said Company and that the said seal and Che
signature as auch officee was duly affixed and su6scrihed to the said inst�•ument by che authority and at the direction of tlie Company.
����
�I.ISON pWA�I �ASH TROUT
wa�ra�raua�.ic • r��H��svrn
i�ly Com�nkssla� �xpires
,}anuary 31, 2428
�����
NaEary Public
I, the undersigned, Seeretary of A'I'LA.1�Fi'IC SPECTl1L"CY INSUI2ANCE COMPA�1'Y, a PTew Yark Corporation, da hereby cert'sfj+ that lhe Foregving power of attorney is in full
force and has not beeq revoked, and the resnlutlons set forth ahove are naw in force.
5igned and sealed. Dated 28th day of January 2022
TEiis Power n£ Attprney expires
January 31, 2QZ5
, ,,,,�W,�„�,,,,,�
� �Pi.��.. �N sU9 �a.
� q�''.G04P�%isFlF•'p��-,3:
--v,• S�L. ;m�
=�� 198fa �o;
`'r�b �FIY Y��'�,� � =
y,, � a ; '
,�� ���ii ;�����ht``1'���,
�'�-�"�.
KaraBarrow, 5ecretary
Please direct �or,� veriFicoiions [u .sG�.��ty,�9�f,��t;�,�s.�ir,���;�.1:�
00 A3 37
VENDOR COMPLIAhiCE TO ST/1T� LAUU
Page 1 of 1
SECTION 00 43 37
VENDOR C�M�LIANCE TO STATE LAW NON RESIDENT BIDpER
Texas Go�ernment Code Chapter 22�2 was adopted for the award of contracts to nonresident bidciers. This law
provides that, in order to be awarded a cantrac# as low bidder, nonresident f�idders (out-af-state contractors
whose corporate offices or principal place of business are outside the State of Texas) bid projects for
constructian, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in
order to obtain a comparabfe contract in the State which tf�e nonresider�t's principal place of business is located.
The appropriate blanks in Section A must be filled out by a{I nonresident bidders in order for your bid to me�t
s�ecifications. The failure of nonresident bidders to do so will automatically disqualify that bidd�r. Resident
bidders must check the box in Secfion B.
A. Nonresident bidders in the State of , our princi�al place of business,
are required to be percent lawer than resid�nf bidders by Sta#e Law. A copy of the
statute is attached.
I�onresident bidders in the State of Minnesota , our principal place of business,
are not required to underbid resid�nt bidders.
B. The principal piace of business of our company or our parent company or majorify own�r is
in the Stafie of Texas. ❑
BI�b�R;
ii-Zack Concrete, Inc.
39352 221 st A�e
Le Center, M�I 56d57
END OF SECTION
By: Jeremy Gibbs
�
,
/ '� � � , � _ _
- ig atur
� , J �
Title: ce-President
Date: 2/9/2022
C1TY OF FORl' WORTH
STANBAR� CONSTRUCTION SPECE�ICATION AOCl7MENT5 Lackland Sldewalk lmprovements _Addendum"iV9 Bid Proposal Workbook
ReVised 9I3072021 CPN: 9d0637-3
004511-1
BII]I3�RS PR�QlJAL1FICATIONS
Page l oF 3
I SECTTON 00 4� i1
2 BIDDERS PREQUALIFICATIONS
3
4 1. Summary. All contractors are required to be prequalified by the City prior to submitting
5 bids. To be eiigi6le to bid the contractor must submit Section 00 4S I2, Prequalification
6 Statement for the work type{s} listed witl� their Bid. Any caiitractor or suUcontractor who is
7 not prequalified for the vwork type(s) listed rnust submit Section 00 45 13, Biddc�r
8 Pr�qUalification Application in accordance with the requirements below.
�
10 The prequaliiication pracess will establish a bid limit based on a technical evaluation and
i 1 fnancial analysis ofthe cantractor. The infonnation must be subrnitted seven (7) days privr
12 to the date of �he opening of bids. For example, a contractor wishing to submit bids on
13 projects to be opaned an the 7th of April must file the information by t.�e 31st day of March
14 in order to bid on these projects. I.n order to expedite aa�d iacilitate the appro�al of a Bidder's
15 Prequalification Application, the following must accompa�ry the s�binission.
16 a. A complete set of audited or reviewed financial statements.
17 (1) Cjassified Balance Sheet
18 {2} Incame Statement
19 (3) Statement of Cash Flows
20 (4) Statement of Retained Earnings
21 (5) Notes to tl�e �'inaucial Statements, if at�y
22 b. A certified copy of the firm's organizational documents (Gotporate Charter, Articles
23 nf Incorporatian, Articles of Organizaiion, Certificaie of Formation, LLC
24 lZegulations, Certificate of Limited Partnership Agreement).
25 c. A complatad Sidder Prequalification Application.
26 (l ) The firm's Te�s Taxpayer ldenti�cation Number as issued by the Texas
27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Ic�e�tti�cation
28 number visit the Texas Compirojler o� Public Accounts online at the
29 following web address www.window.state.�.us/tax ermitl and fill out the
30 application to app3y for your Texas tax ID.
31 {2} The finn's e-inail address and f� number.
32 (3) The firm's DL1NS number as issuec� by Dun & Bradstrest. This number
33 is used by the City for required reporting on Federal Aid projects. The DLJNS
34 number may be nbtained at www.d�ib.com.
3S d. Resumes reflecting the cans#ruction experience af fihe prineiples of the firm for frms
36 submitting their initial preyualiftcation. These resumes should include the size and
37 scope of tlse wnrk perfonned.
38 e. Otlier inforrr�atian as requested by the City.
39
40 2. Prequalification Requirements
41 a, Fi�rarac.ial Staieme�ts. Financial sta�errient sub.rnissiot� mus# he pro�ided in
�2 accordance with the following:
43 (1) Tk�e City requires that the origir�al Fiyzancial Statement or a certified copy
44 be submit�ed far consideration.
CITY OF FOAT WORTH 1 crcklri+zd livud Sicleis�alk lur�u•ai�enxnls
STAI�DARD CONSTRUCTION SPECIFICATION DOCUNI�NTS C'P:Y: l00G37-.i
Rer+i.sed August 13, 2021
Q04511-2
BIDD�RS PR�QUALIF[CAT[DN5
I'age 2 of 3
1 {2) To be satisfactory, the financial statements must be audited ar reviewed
2 by an independent, cer�ified public accounting iirm registered and 'ui
3 good standing in any state. Gurra�rt Texas statues alsa require that
4 accaunting firms perfortning audits or reviews on business entities within
5 the State of Texas be properiy licensed or registered with the Texas State
6 Board o�Public Accou.ntancy.
7 (3) The accounting%rm should state in tha audit reQart or review whether
S the contrac�or is an iiidi�idual, corparation, ar limited Iiability company.
9 (�} Finaneial Staterneirts triust be presented in U.S. dollars at the current rate
10 af exchange of the Balance Sheet date.
11 (S) The City will not recognize any certified public accountant as
12 independent who is not, zn facf, ind�pendent.
13 (G} The accountant's opinion ou the fivaucial statements of the contracting
14 company should state tliat th� audit or review has been conducted in
15 accordance with auditing standards generally accepted in th� United
lb States af America. This must be sfiated in the accounting firm's opinion.
17 I� should: ( I) express an unqualified opinion, or {2) express a qualified
18 opinion on tlie statemeiits taken as a whale.
19 (7} The City reserves the right to require a new statement at any tijne.
20 (8) The �nancial stat�ment must be prepaj•ed as of the last day af aaay month,
21 not tnore tha�s one year old aiid must be on file with the City 16 months
22 fhereafter, in accordance with Paragraph 1.
23 (9) The Cify will det�rmiine a contractor's bidding capacity for the purpases
24 of awarding e�ntracts. Bidding capacity is detertnined by multiplying the
25 positive net warl�ing capital {working capital= current asse#s — current
26 liabilities) by a factor of 10. Only tlsose staternents refl�cting a positive
27 net working capital pos�tion will be considered satisfactory for
28 prequalification gurposes.
29 (10) In the case tl�at a bidding date falZs within #he time a new financial
36 stateinent is being prepared, the previo�s stateme�tit shall be updated r�vith
31 proper verificatinn.
32 b. Bidder Prequalification Applacation. A Bidder Prequaliftcatian Application must be
33 submitted along with audited or reviewed financial statemeiits by �rms wishing to 6e
34 eligible to bid on ail classes of constructioz� a�ad rr�ai.ntenance projects. Incam��ete
35 A�plications will be rejected.
36 (1) In those schedules where there is nothing to report, the notation of
37 "None" or "N/A" should be inserted.
38 (2) A minzmum of five (S) refarences of related work must be provided.
39 (3) Subinission of a�i equipment schedule whicl� indicates equipment under
40 the contral of the Coiltractor and which is related to the type of wark for
4I which the Contactor is seeking prequaliflcation. The schedule must
42 include the manufacturer, madel and general common description of
43 each piece of equipment. Abbraviations or means of describing
44 equipment other than provided above wi11 not be accepted.
45
46 3. E�igibility far Award af Contract
47 a. Tlie City shall be the so}e judge as to a contractar's prequali�catian.
48 b. The City may reject, suspend, or modify any prequalification for failure by the
49 contractor to demanstrate accepta�ble fnancial ability ar per%rmance.
50 c. The City will issue a letter as to the status af the prequalification approval.
CITY OF FORT WORTH Laehlurrcf Rond Sideirctlk 1mpi�o��er�reitLs•
STANDARD CDNSTRUCTTON SPEC[FICATION bOCUMENTS C!'�1': 10�G37-3
Revised August 13, 2021
U045 lj -3
BIDDERS PAEQUALIi'ICATIONS
Page 3 of 3
I d. If a contractor has a valid prequalificaiion lett�r, the contractor will be eligible to
2 perform the prequalified work types until the expiration date stated in #he letter.
3
8 END OF SECTION
C1TY OF FOl2T WORTH l,at�klattd RocrclSideirrdk furprot'euie��ls
STANi]ARD CiDNS7'RCICTION SPECCFICATION DOCUMENTS CPN: 1I1�1C37-3
Revised August 13, 2b21
po 45 12
PREQUALIFICATION STATEM�NT
Page i of 1
S�CTION 00 45 12
PREQUALIFICATION STAT�MENT
Esch Bidder for a City procurement is required to complete th� information below by identifying the prequalified
contractors andlor subcontractors whom they int�;nd to uiilize for the major woric type(s) listed.
Major Wark Type Gontractorl5ubcontraotor Company Name Prequalification
�xpiration Date
- Not Applicable
7'he undersigned her��y certifies that the eontractors andlor subcontractors described in the table above are
curr�ntly prequalified for the work types listed.
BIbDER:
Ti-Zack Concrete, Inc. By:�,]eremy Gibbs
� �
39352 221 st Ave , '" �
Le Center, MN 56D57 { i natur�,}` �
Q �
Title: � President
Date: -�� � i� ��—
EN� OF SECT[ON
CITY OF �ORT WORTH
STAN�AR� CaNSTRUC710N SPECIF[CATION �OCUMENTS Lackland Sicfewalk Improvements Addendum^Ni Bid Proposal V'Jorkbook
Re�ised 09130l2027 CPN: 100637-3
ooaszs-s
CONTRACf"OR COMPLEANCE WITH WORKER'S COMPENSATIOM LAW
Page ]. af 1
1
2
3
SECTIDN 00 45 26
CONTRACTOR COMPLIANCE WITN WOftKEki'S COMP�NSATION LAW
4 Pursuant ta Texas Labor Code Section 4g6.�96(aj, as amended, Contractor certifies that it
5 pro�ides worker's compensatinn insurance coverage for ali of its emp[oyees �mployed on City
6 Project Na. 100637'-.� . Contractor further certifies that, pursuant to Texas Labor Code,
7 5ection A�06.096(bj, as amended, it will provide to City its subcontractor's certificates af
8 complianc� w�th worker's compensatian coverage.
�
J
10 CONTRACTOR:
1�
Ti-Zack Concrate Inc.
Company
Acldress
Le Center, MN 56057
City/State/Zip
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
2i
�$
29
30
Minnesota
TH E STATE 0 F it��1�
Le Sueur
COUNTY OF ��lsDc6�
§
§
BY� Jeremy Gibb�
t� (Please Print) �
5ignature: _ - -
,'
� � �) ' �..
Title: Vice-President�& Secretary
(Please Printj
BEFORE ME, the undersigned authorify, on this day personally appeared
Jeremy Gibbs known to me ta be the person whose name is
subscribed ta the foregoing inst�ument, and acknawledged tfl me that he/she executed the
same as the act and deed af Ti-Zack Concrete, Inc. for Che purposes a��
consideration therein expressed and in the capacity therein stated.
GIVEN 11NDER MY HAND AND SEAI.OF OFFIC� this 9th day ofi
Fe.bruary , 2022.
��
" Si15AN LYNN 511AONETFE "
'��� NnYary Publlc
,�i�fl�soka
k�Vy �o��lssion Expires
� ,_ • Jefl 31, zaz7
,; ,-
==x4il.�� �%�rr����'.
fVotary Public in and for the State of ��X Minnesota
ENp o� s�crio�u
CITY OF FORT WORTH
STANpARD CONSTRUCTION SPECIFICATION �OCUNfENT5
Revised July 1, 2011
Lvcklarad lioad Sidewalk lmprovements
CPN: 1D0637-3
004540-1
6usiness Equity Gaal
Page 1 of 3
1
2
SEGiIDN 00 45 40
Business Equity Goal
3
4 APP�ICAiION OF POLiCY
5 If the total dol�ar value of the contract is $1 UU,000 or more, then a Business Equity goal is applicable.
6 A�usiness Equity �irm refers ta certified Minarity-, and/or Women-, awned Busine5s �nterpriSes
7 (M/WBES).
:
9 POLICY STATEf1!!fE!►'Y
10 It is the policy ofthe City of Fort Worth to ensure the full and equitable part'rcipation of Business Equity
11 Firms when applicable, in ti�e procuremenC of all goods and services. All requirements and regulation5
12 stated in the City's Business Equity Ordinance No.25165-10-2021, �rep4acing Ordinance No. 24534-11-
13 2020 {codified at: htt s: codelibrar .amle al.com codes ftworth latest ftworth tx 0-0-a-22593) apply
14 to this bid.
15
16 BUSIf�E55 EQUI�Y PROJECY GOAL
17 The City's Business Equity goal on this praject is 35% of the total bid value of the contract (Base 6id
18 applies �o Parks and Community ServicesJ.
19
20 fillEiWODS TO COfllIPI�Y WIYb ��iE GDAL
21 On City contracts where a Business Equity Goa1 is applied, afferors are required to comply with the City's
22 Business Equity Ordinance by meeting or exceeding the abo�e stated goai or atherwise comply wi�h #he
23 ordinance thraugh ane of the follawing methods: 1. Commercially useful ser�rices performed by a
24 Business Equity prime cantractor, 2. Bu$iness Equity subcontracting participaiion, 3. Combination of
25 Bus+ness �quity prime ser�i�es and �usiness Equity sul�contracting participation, 4. �usiness �quity
26 loint Venture/hJlentor-Protege participation, 5. Guod Faith Effort documentation, or 6. Prime
27 contrattor Wai�er dacumentatior�.
�
29 SU�MIlTAL �]F REQUIRED DOCUMEN�ATION
30 Applicable documents (listed belowj must be recei�ed by the Purchasing Di�ision, OR the offerar shall
31 EMAIb #he 8usiness Equity documentation to the assigned City of Fort Worth Praject Manager or
32 Deparfinent Designee. Documents are to be received no later than a:00 p.m., on the third City
33 I�usiness day after the bid opening date, exclusive of the bid apening date.
CITY OF FORT WORTH tacklond Road Sidewalk lmprovements
STRN�AR� CONSTRl1Cf10N SPECIFICATIDN DOCUNlENTS CPN: 300637-3
Revisad October 27, 2021
004540-2
Business Equity Goal
Page 2 pf 3
1
2 The Offeror must submit one or mare of the following documents:
3 1. Utilizatian Form and Letter(s) of Intent, if the goal is met or exceeded;
4 2. Gaod Faith Effort Form and Utilization Farm, including supporting documentation, if participation is
5 less than stated goal, or no Business Equity participation is accomplished;
5 3. Prime Contractor Wai�er Form, including supporting documentation, if the Offeror will perform all
7 subcontraeting/supplier opportunities; or
8 �. loint Venture/fiAentor-Protege Farm, if goal is met or exceeded with a Joint Venture or Mentor-
9 Protege participation.
10
11 These furms can be found at:
12 Business Equity Utilization Form and Letter of Intent
13 htt s: apps,fortworthtexas.�o�/PralectResources/ResourcesP/fiQ%420-
14 %20MWBE/NEW%206usiness%2QEquitV%200rdinance/Business%20Equity%20Utilization%20Form.pdf
15
16 Letter of fntent
17 htt s: a s.fortworthtexas. ov Pro'ectResources ResourcesP 6Q - MWBE NEW Business E uit
18 Ordinance/Letter of Intent-2021.pdf
19
20 Business Equity Goad Faith Effort Form
21 https://apps.fortworthtexa5.�ovlProlectResources/ResourcesP/60%a20-
22 %20MWBE NEW%20Business%20E uit %200rdinance Business%2QE uit %20Good.%2QFaith%20EfforC
23 %20Farm.pdf
24
25 Business Equity Prime Contractor Waiver Form
26 https://apps.fortworthtexas.�ov/ProlectResources/ResourcesP/60%a20-
27 %20MWBE NEW%2QBusiness%a2�E uit %2DOrdinance Business%20E uit %20Prime%20Contractor%20
28 Waiver.pdf
29
CITY OF FORT WORTH Lackland lioad Sidewalk Improvements
STANDARD C4N57RUCTfON SPECIFICATION �OCUMENTS CPN: IOOb37-3
Revised October 27, 2021
00 45 �44 - 3
Business Equity Gnal
Page 3 of 3
1
2
3
4
5
6
7
8
9
Business Equity Joint Venture Form
htt s: a s.fartworthtexas. ov �ra'ectResources ResourcesP 60%20-
%20MWBE �lEW%a20Business%2QE uit %a200rdinance Busin�ss%20E uit %20�oint%2QVenture. df
FAILURE YO ACF�IEVE �'�iE GDAL OR QTF;ERWISE CONiPl,Y WIYi� �bE ORIQNINACE WILL RESULi IIV 7i�E
BID�ER/OFFEROR �EIIVG Q�CLARED NOf1!-RESON5IVE Af�D YbE BID REJEG`1"ED.
7.D FAiLURE TO SUBM17 7'bE RE U�RED BUSINESS E UTY DOCUMEf��ATION O� O�'HERWISE COMPLY
11 WITF; THE ORDIiVA�lCE WILL RESUL� IIV �'F6E BID BEIi�G. DECLARED NOR!-RESPON5IVE, TH� Blb
12 REJECiED AfVD MAY SUBJECT T�iE BIDDER/OFFEROR �O SAIVCTIOf1l5 A5 DESCRIBED IR! SEC. 20-3/3 OF
13 ^ TF�E ORDINANC�.
�4
15
16
17
18
Far Ques#ions, Please Contact The Business Equity �ir►ision of the �epartment of ni�ersity and
Intlusion at (81i) 392-2674,
Ei�ED OF S�C710fV
CITY OF FORT WOR7W
S7ANDARD CONSTRl1CT14N SPECIFICATION DOCUMEN75
Revised Qctober 27, 2021
Lackland iiond Sidewalk lmprovements
CPN: 1DQb37-3
Q052A3-1
A$reement
Page 1 of 9
S�C�ION 00 i� 43
AGREEMENT
�FiIS A�R��M�N�', avfihorized on March 2�th 2Q22, is made by and between the City of
Fort Worth, a Texas home rule municipality, acting by and through its �uly authorized City
Manager, ("City"), and Ti-zack Concrete Inc. , authorized to da business
in 7exas, act9ng by and througi� kts duly authorized representative, ("Contractor'j. City and
Cantractor mayjointly be referred to as Parties.
City and Contractar, in consideratfan of the mutual co�enants hereinafter set farth, agree as
follows;
Article 1. WQR�f
Cantractor shap complete all Wark as specified or indicated in the Ca�tract Documents for the
Project identified herein.
Article Z. PRUJ�Ci
The project far which the Work under the Contract Dvcuments may be the whole or only a�aart
is generaliy descr9bed as follaws:
Lackland Road Sidewalk �mprouement5 from Camp 8awre Blvd. to CalmontAvenue
CPN: Y00637-3
Arqicle 3. CONTRAC7 PRICE
City agrees to pay Contractar far parFormance af the Work in eccordance with the Contract
Documents an amount, in current funds, of _seven hundred eighty seven thousand nine
hundred fift nine and 50 1.00 �oflars ($_787,959.50 ), Contract price may �e adjusted by
change orders duly autharized by the Partfes.
Article 4. CO�TRACT iIME
4.1 Final Acceptance.
The Work shall be complete for Final Acceptance within �,�80 calendar days after the
date when the Contract Time coinmences to run, as provided in Paragraph 2.02 of the
General Conditions, plus any extension thereof allowed in accordance wfth Art9cle 7.2 af
the General Conditions,
CITY OF F4RT WORTH tacklund Rovd Sidewalk Improvements
STANDARD GONSTRUCTION SPECIFiCATION �DGUMENT5 CPN: YOOS37-3
Revlsed 11./23�2021
00 52 43 - 2
Agreement
Page 2 of 9
4,2 Liquidated Damages
Contractor recognlzes ti�at time is of the esserace for completion of Milestones, if any,
and to achie�e Final Ar.ceptance of the Wark and City and the public will suffer fram loss
of use if the Work is not completed within the time{s) specified in Paragraph 4.1 above,
The Contractor also recognizes the delays, expense and difficu�ties involved in praving In
a legal proceeding, the actual lass suffered by the City if the Work is not completed tin
time. Accardingly, instead of requiring any such proof, Contractor agrees that as
liquidated damages for delay (but not as a penalty), Contractor shall pay Cify <5ix
Nundred Fiftv and Op/300 Dollars ($650.o0j for each day that expires after the time
specified in Paragraph �4,1 far Final Acceptance until the City issues the Final Letter nf
Acceptance,
Article 5. CON�RACT pOCUM�NTS
5.1 CaNTENTS:
A. The Contract Documents w�ich camprise the entire agreement betw�en City and
Contractor eoncerning the Work eonsist of the follawing:
1. This Agreement.
2. Attachments to this Agreement:
a, Bid F'orm
1) Proposal Form
2) Vendor Compliance to S#ate Law Non-Resident Bidder
3j Prequalification 5tatemenC
4) 5tate and Federal dacuments (projectspecific)
b. Current Prevailing Wage Rate Table
c. Insurance ACORD Form(s)
d. Payment Bnnd
e. Performance Bond
f. Maintenance Bond
g. Power of Attorr�ey for th� Bnnds
h. Warker's CQmpensat3on Affidavit
i, MB� and/orSBE Util9aation Form
CITY DF FORT WOft�H Lackland Raad 5ldewalk Impravements
S7qNpARD CDNSTRUCTION SPECIFICA710N bDCUMEN i5 �p�; �pps�7_�
Revised 7.1/Z3/2021
OOS243- 3
Agreement
Page 3 of 9
3, General Conditlons.
4. Supplerrtentary Conditions.
5, 5pecificatfans specifically made a part ofi the Contract Documents by attaehment
or, if not attached, as incorporated by reference and described in the Table of
Confients of ti�e Project's Contract Rocuments,
6. Drawfngs.
7. Adder�da.
8. Documentation submitted by Contractor prior #o Notice af Award.
9. The following which may be delivered or issued after the Effecti�e Date of tf�e
Agreement and, if issued, becorne an incorporated � part of the Contract
Documents:
a. Notice to Proceed.
i�. Field Orders,
c. Change Orders,
ci, Letter of Final Acceptance.
Article 6. IfVD�MNI�ICATION
6.1 Cantractor covenants and agrees ta indemnify, hold harmless and defend, at its nwn
expense, ihe city, its officers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services ta he perfarmed by
�he contractor, its afficers, agents, employees, subcontractars, licenses or invitees under
thia contract. This indemnification provision is specificallv intended �o operate and_be
effec�iive even if it is alle ed or roven that all or some of the dama es bein sau hf
were caused in whole or in art b an aci omission or ne�li�ence of 4he citv. 7his
indemnity pravision is intended to incfude, without limitatian, indemnity for costs,
expenses and legal fees incurred by ti�e city in defending against such claims and causes
of actions,
6.2 Contractor co�enants and agrees to indemnify and hold harmless, at its own expense,
the city, its officers, ser�ants and emplayees, from and a�ains� any and all loss, damage
or destruction of praperty of the city, arisin� out of, or aileged fo arise out af, the wortt
and services to be per#ormed by the contractor, its afficers, agents, employees,
subcontractors, licensees ar in�itees under this contract. �his indernnificatian �ravisivn
CITY QF FORT WORTH Lackland Hoad 5ldewalk Improvemer�ts
STAN�ARD CONSTRUC3'ION SPECIFICATIO�V �OCUMENT5 CPN: 100537-3
Revised 11/23/2021
005Z43-4
Agreement
Page 4 of 9
is specificallY intended to operate and_be effectiv� e�en if it is allesed or pro�en that all
or some of the dama�es h�in� sou�ht were taused. in whale or in part, bv anv act,
omissian or ne�li�ence af the citv.
Article �. M15C�l.LAN�0U5
7.1 Terms,
Terms used in this A�reement which are defined in Article 7. of the General Condition.s wi[I
have the meanings indicated in the General Conditions.
7,2 Assignment of Contract,
This Agreement, including all of the Contract Documents may nok be assigned by the
Cantractar wlthout the advanced express written consent of the City,
7.3 Successors and Assigns,
City and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other pariy hereto, in respect to aU covenants, agreements and
obligatians contained in the Cantract Documents. �
7.4 Severabili#y/Nan-Waiver of Clairns.
Any provision or part of the Contract Rocuments held to be uncanstitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
rernaining �rovisians shall cnntinue to be �alid and binding upon City and Contractar.
The failure of City or Contractar to insist upon the performance af any term or pro�ision of
this Agreement or to exercise any right granted herein shall not constitute a waiver of
City's or Contractor's respective right to insist upon appropriate performance or to assert
any such right on any future occasion.
7.5 Governing l.aw and Venue.
This Agreement, including all of the Contract Documents is p�rformable in the 5tate of
Texas, Venus shall be Tarrant County, i'exas, or the United States pistrict Court for the
Northern District of Texas., Fort Wor�h Division.
7.6 Auihority ta Sign,
Contrac#or shall attach evidence af authority to sign Agreement if signed by someone
other than the duly authorized signatnry of the Contractor,
CITY OF FORT WORTFi Lackland Rood 5ldewalk irnprovements
STANOAR� CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 10�6.37-3
Revised 11/23/2b21
005243-5
Agreement
Page 5 of 5
7.7 Nan-appropriation of Funds.
In the event no funds or insufficfent funds are apprapriated by City in any fiscal period far
any paym�nts due hereund�r, City wilf notify Vendor of such occurrence and this
Agreement shall terminate on the last day of the fiscal period for which apprapriatior�s
were received without penalty or expense to City of any kind whatsoever, except as to the
portions of the payments i�erein agreed upan for which funds hav� been eppro�riated,
7.8 Prohibition On Contracts With Companies Boycotting Gsrael.
Contractor, unless a sole proprietor, acicnowl�dges that in accordanc� with Chapter 2271
ofi the Texas Government Code, if Cantractor has 10 or more full time-employees and the
contract value is $1fl0,000 or more, the City ls prohibited from entering into a contract
with a company #or goods or services unless the contract contafns a writter� verification
from the campany that it: (1) does not boycott Israei; and (2j w111 not boyeott Israel during
the term of the contract. The terms "boycott Israel" and "company" shall have the
meanings ascribed to those terms in 5ection SO8.p01 of the Texas Government Code, By
signing this contract, Contractor certifies that Contractar's signature pra�ides written
�erification to the City that if Chapter 22i1, Texas Go�ernment Code applies,
Contractor: (1) does nat boycatt Israel; and (2j wil{ not baycott Israel during the term of
the contract.
i.9 Prahibition on Boycotting Enargy Companies,
Contractor acknawledges fhat in accordance with Cf�a�ter 2274 of the Texas Government
Code-{as addad by Acts 202�., 87th Leg., R.S., S.B, 13, § 2j, the City is prohibited fram
entering into a contract for goods or services that has a �alue of $1QO,OOfl ar more, which
will be paid wholly or partly from public funds o# the City, with a cornpany (writh 10 or
more #ull-time employeesy unless the contract cantains a written �erificatian fram the
campany that it: (1j does not boycott energy campanies; and (2J wip not boycott energy
companies during the term of the cantract. 7he terms "boycatt energy company" and
"company" have the meaning ascribed to those terms by Chapter 227�+ of the Texas
Go�ernment Code (as added by Acts 2�21, 87th Leg., R.S., S.B. 13, § 2). To the exfent that
Chapt�r �2/� of the Gavernment Code is applicable to ihis Agreement, by signing this
Agreement, Contractor certifies that Cantractor's signature prov�ides uvritten uerification
to the City that Coniractor: (Zj does not boycott energy campanies; and (2j will not
boycott energy companies during ihe term af this Agreement.
7.10 Prohibitian on Dkscrimfnation Against Firearm and Ammunitian Industries.
Contractor acknowledges that exeep# as otherwise provided by Chapter 2274 of the iexas
Government Code (as added by Acts 2027., 87th Leg., R.S., 5.�. 19, § S), the City is
prohibited from entering into a contract for goods or services that has a value of $100,000
CI7Y OF FORT W4RTF! zackland Ropd Sldewafk Pmprnvements
S7ANpARD CONSTRUCTIQN SPECIFICATION DOCUMENTS CPN; 100fi3.7-3
HeVised 11/23/2021
OOS243-6
Agreement
Page 6 of 9
or more which will be paid wholly or partly from public funds af the City, with a company
(uvith 10 or more full-time employees) uniess the contract contains a written verification
from the company that it: (1J does not have a practice, palicy, guidance, or directi�e tF�at
discriminates against a firearm entity or firearm trade association; and (2) will not
discriminate during the term of the contract against a firearm entity or firearm trade
assoclation. The terms "discriminate," "firearm entity" and "flrearm trade association"
have the rneaning ascribed to those terms by Chapter 2274 �f the Texas Governmenfi
Code (as added by Acts 2021, S7th Leg,, #t.S., S.B. 19, § 1), 7o the extent tha4 Chapter
2z�4 of the Gnvernrnent Code is applicable ta this Agreement, by signing this
Agreement, Cnntractor certifies that Contracior's signature pro�Edes written �erification
to the City that Contractor: (1} daes not ha►►e a practice, policy, guidance, or directi�e
that discriminates against a firearm entity ar firearm trade associatian; and (2) will not
discriminate against a fir�arm entity or firearm trade assaciatian during the terrn of this
Agreement.
7,11 Immigration fVatlonality Act.
Contractor shall verify the identity and employment ellgibility of its em�loyees w�a
perform worit under this Agreemertt, incl�ding completing the EmpEayment Eligibility
Verification Form tl-9). Upon request by City, Gontractor shall provide City witht copies af
all ]-9 forms and supparting eligibili�y documentation for each emplayee who perfdrms
work under this Agreement. Contractor shall adhere t4 all Federal and Stat� laws as well
as establish appropriate procedures and controls so that no services will be performed 6y
any Contrac�or emp3oyee who is not legally eligible to perform such servlces.
CONTRACiOR ShiA�� INnEMNIFY CIT1f AIVb H�LD CIiY �AFiML�SS FROM ANY
P�NA�71ES, LIABILIiIES, OR LOS5�5 DU� TO VIOLATI0IVS OF �'NIS PARAGRAPb BY
CONiRAC70Ft, CON�'RpC��R'S �MPLOYEES, SUBCON7RAC�OftS, AGENi'S, OR LICENSEES.
City, upon written natice to Contractor, shall have the right to immediately terminate this
Agreement for vialations o� this provision by Contractor.
7,12 No Third-Party Beneficiaries.
�his Agreement gives no rights or benefits to anyone other than fhe City and the Co�iractor
and there are no third-parry be�neficiaries.
7,13 No Cause of Action Against Engineer.
Contractor, its suhcantractors and equipment and materials 5uppliers on the PROJECT or
their sureties, shall maintain na direct action against the Engineer, its officers, em�loyees,
and subcontractors, for any claim arising aut of, in connection with, or resulting from the
englneering services perFormed. Only the City will be ihe beneficlary of any undertaking hy
the Engineer, The presence or duties of the Engineer's p�rsonnel at a construction site,
cirr o� Foar waaTt� Lcrckland Road Sidewolk lmprovements
STAN4]ARp C4N5TRUCTION SPECIFICATION pOCUMEN75 CPN: 1C0637-3
Reulsed 7.1/23/20T1
005243-7
Agreement
Fage 7 of 9
whether as on-site representatives or otherwise, do not make the Engineer or iCs
personne{ fn any way responsi�le for those duties that belong to the City and/or the City`s
construction contractors or oti�er ent9ties, and do not relie�e the construction contrac�ors
or any other �ntity of their obifgations, duti�s, and responsibifities, Including, but nat
19mited to, all canstruciian meihads, means, techniques, sequences, and procedures
necessary for coordinating and completing all portians of the construct9on wo�k in
accordance with the Contract Docum�nts and any health or safety precautions required
by such construction work. 7he �ngir�eer arid its personnel have no authority to exercise
any control over any cnnstruction contractar or other entity or their employees in
connection with their work or any health or safety precautions,
CITY OF FORT WOR7hi i.ackland Road 5ldewalk Impiau�ments
STAN�AR� CONSTRUCTION SP�GIFICATION �dCUMENTS CPNr 100537-3
Revlsed 11/23/2�21
005243-8
Agreement
Page 8 af 9
!N WITN�SS WMEREOF, Clty and Cantractor have each executed this Agreement to be effective
as of the date subscrlbed by the City's designated Assistant Clty Manager ("Effective Date"},
Contractor:
By:
City of Fort Worth
By:
� ��-�
- .-� �---�
SI ure Dana Burghdoff
Assls#an# City Manager
r----
��� ��.
(Printed Namey Apr 18, 2022
V � � C 51��1V� � .._..�
Tltle
Date
Attest;
��sZ 22 l �� �� .
Addr�ss
LE �.c���. � �� 05
City/StateJZip
��`! ��? _
Date
CITY OF FORT WORi'M
STAlVaARO CONSTftUCTIpN SPECIFICATION �OCUMfN7S
Ravised 1�/23/2021
..�.�.::sr• ..�i���'
Jannette Goodall, City 5ecreiary
(Seal)
M&C: ������I
Da#e: 03-29-2D22
���fi �"��,����-`�[
. �:� i:y=�
I" 4, r��rr� ���, I�� il.
6"� � F
g : ..1� 1
7-i r,' � ' �ey ��l
� � - {
� ��.°��-��� 1,�`'�
���`�°,...�� _�.�:,�,
Form 1295 Na.: 2022-853362
����$��j � rovements
1D0637-3
CA� t � `_ "�a �=� -
F�. i}�"' ry 9 1_ ��►
DOSiq3-9
Agreement
Page 9 of 9
Cnniract Compllance Manager:
By slgning, I acE<nnwledge that 1 am the persan
responskhfe for the monitarin� and
adminlsEratlon ofthls cantract, inciuding
er�suring all performance and reporCing
requiremen�s,
Tdse A p�n�r.v
lase A, Orozca, P. �,
Sr. Praject Mar�ager
Apprnved as fa Form and Legallty;
�
CJouglas W. Black
5r, Asslstant City Attorney
APPROVA[. R�COMMEfVD�R;
�-
Wflllam lohnsan, plrector
Transpartatlan & Publlc Worlcs Department
F=
i
' i
;
E
CITV Op FflR7 WDRTH
5TANDARD �ONSTRUCTfON SPECIFICA'fION DOCUMfiVTS
Revlsed 11J23f 2Q21
tacR�n�K �ed�+�'&1Sc�kG�!��^ �'.;�,,.
cvN: �od�.a� a
1!�
.�
��
i�
CORPORATE RE�OLUTZON
OF
TI--ZACK CONCRETE, ]NC.
We, the unde�rsigned, being all the Di.�reciors of T�-Zacic Co�crete, Inc., orga�►ized and exis�ng
�nder i�he laws of Minnesota, and �.a��g its pr�nci�al place o�business at 39352 22J,st Avenue, Le
Center, Nxi�esota 56057 (the "Corporation"), �aezeby certi.fy �at the follow7ing is a t�ue atad
caixect copy a�' a resoluiion duly adop�ed at a meetin.g af the Directoxs o� tbe Co�poration duly
held and convened on August D7, 2420, at whick� a quorum o� ihe Board of Di�:ectoxs was p�esent
and �ofang throughoui, and that such xesolution has �at b�e�, madified, zesci�ded or revol�ed, and
is at present in. iull foi•ce an�. effeet:
The�refore, it is reso�ved:
�i-Zacl� CQncrete, Inc.lzsts the following as its cuxrent Cnrp�rate Offieers:
Treasurer - �teven �oseph Rutt
Presidezxt - C�ristnpher Thomas Hariw�g
Vice President & Secretaiy - reremy Pau1 Gibl�s
Vice P� esident - Jasnn Ray Eager
By af�umatzve votes noted as signatu�es belaw, a�najoriiy �ot� af the Membe:rs of Ti�Zack
Co�cret�, Inc, w.tt� authority io b:ind the Company appxoves the fox'm and content of this
reso�uiion, to be effect�ve �m�mediateiy.
DXRECTORS
Steven Rut� '
Treasur��
Gbrisiopher Hartwig
President
� 7 �o
Date
�� 7120
Date
This is a RackatLawyer,caFn document.
,rL�,ild'Ilrr��
�`zA� ��' ���'�
�,`' ,,�.J,' �/� "� �: ' ',, `�`
ti ,�,±ti y � �'J'�~�°�' 'u�
� � � � �r
- ,`� � : L�I f�' ��c�' / � ��-� 'V� � .
� � [CORP�RATE SEAL� � � w :t .• � �,- ,. �� �; «
' ��� •,�.��,-�,��� ,=�\i,
'a��h�• .Oi�L��,{'i ��
, y�� �Cfi��". f�e1`f1�'1,y
1!!lt{i'1l
. .�
CERTIFICATE OF SECRETARY
Tl�e �ec�re�ary o� the Co�oration hereby ce� tifies �at hel�he is the duly elected and quali�Zed
Seereta�y of Ti-Zack Concrete, I�c, and certifies ��aat the above is a tr�.e and coi�ect zecord of the
re�olutio� that was duly adopted by the Directozs of the Corpo�-ation on Augusi 07, 2020.
Ieremy Gi bs
S �cret
,�,�„�__.._,_.�
o, =ryy SUSAN LYi�h� SlMQNETi�
�*'' ' °a hlatary PubiiC
� � 5tate or Minnesata
My Comtriisslbn �xPEres
.._ i , r ,lenupry 31, 2Q22
�'� ,�...� �� r�.�-'��
��
This is a Rac1€etLawy�r.aam document.
Carporations Section
P.O.Bax 13697
• Austln, Texas'18711-3697
i
�
� �;: ;�;
�l�;s� 0� r
�c;y � ,`i
� ,�1� ,r���•
y 4ry�;;.
O£�c� of �h� ��creta� of Sta��
�erh%cate of Fac�
Rolando B, Pa.blos
Secrstary of State
The undersigned, as Secretary a£ Sfat� af Texas, does hereby certify that the documant, Application� far
Regisiration far Ti-Zack Concrete, Inc. {file number 801284a39), a MINNESQTA, USA, Foreign Forw
�'ro�xi Corpor�tiox�, was filed �in this off'tce on ,Tune 1:8, 2�1Q,
xt is further certi�ied that khe entity s#afius in Texas is in existence.
In tastimany whereof, I haue hareunto signed my narne
nff'icially and caused to be impre�seci hereon the Sea! Q£
State at my a�ce in Austin, Texas an February 12, 2Q18.
Y , `
- .l1,�T'�;
�
�
�
���
�
��
Rolanda B. Pabin�
SBc�retary of State
Colfre visit us on the lnteinet af http.//�vtivtiv,sas.s�ate.hr,us/
Phoi�e: (512j qG3-5555 �a�c: (512) 9�G3•57U9 Dial: 7-1-1 forRelay Services
�repareciby: SOS WEB TID; 1.0264 ,�:,.,,,,. � Document:743'124'�8QQQ3
V��
Sond No, 609129834
on si" «- i
PERFORiv1A]�CE BQND
Faga 1 nf 3
1
2
3
4
5
6
�
8
9
10
ii
THE STATE �F TEXAS
COUNTY OT TARRANT
S�CTION 00 Gl 13
PERPORMANC� BOND
§
§
§
KNOW ALL BY THESE PR�SENTS.:
That We, Ti-Zack Concrete Inc. 39352 - 221sf Ave Le Center MN 56457 , knpwn as "Prlitcipal"
herein and Atfantic Specialty Insurance Company , a cprporate sureiy(sureties, if mare
than one) duly authorized to do business in the State of Texas, known as "Surety" here�n (whether an� ar
more), are held and firmly bound unto tl�e City of Fort Worth�, a municipa! corporation created pursuant to
�.2 the laws 4f Texas, known as "City" herein, in the penal sum ot;
13 FiUIVD ED FI�7 Y�NINE AND SO/N6pHpU5AND NINE ❑a�1�E,S ($���fg59.50 ), lawful
14 money of the United States, ta be paid in F'ort Worth, Tarrant County, Texas for the payment of which
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Tt]
31
sum well and tr�tly to be mada, we bind ourselves, our heirs, executors, administrators, successors and
assigns, jointly and severally, firmly by these presents.
V1'HEREAS, the Principal has entered into a certain written contract with the City awarded the
29th day of rvtarch , 20 z2 , which Contraet is hereby referred to and made a part hereof for
all purposes as if fully set fortF� herein, to furr►ish all materials, equipment labor and nther acc�ssories
defined'by law, in the prosecution of tlle Work, incl�Eding any Change Orders, as pra�ided for in said
Contract designated as Lacklar�d Roacl Srdewalk Im rnvcmer�ds �nns Cuns Bowie Blvc� !a Calmont
.�,��,����.; cPN 100d37-3,
NOW, THEREFORE, the condition of this obligatinn is such that if the said Principal shall
faikhfully perform it obl.igations under the Contract and shall in all respeets duly and faithfully perform
the Work, including ClZange Orders, under the Contract, accarding to the plans, specifications, and
contraet documents therein referred to, and as well during any period af extension of the Cankract that
may be granted ai1 the part of the City, then this obligatian shall be and b�come null and vaid, otherwise
to remain in full force and efFect.
PR�VIDED �'URTHER, that if any lega! actian be filed on this 6ond, venue shall lie in Tarrant
County, Texas or the United States District Court for the Northern District of T'exas, ForE Wor�h Dkvision.
*transportation and Public Works Departmenf, City Hall - 2nd Floor 200 Texas Street, Farf Worth, TX 76102
ClTY 01' FQRT WORTH Lackland Raad Sideivalk lrrrp� over�tenfs
S`CANC�ARD CDNSTRUCTION SPEC[FICA'PION DOCUMEiJTS C.PN.� 10U637-3
Revised ]uly I, 201 I
1
2
3
U061 13-2
P�RCORMANCE BOND
Page 2 of 3
This ba�d is made and executed in compiiance with the provisions of Chapter 2253 af the Texas
Government Code, as amended, and all fiabilities on this bond shall be determined in accordance with the
pravisions of said statue,
4 IN WITN�SS �VHEREOF, the Principal and the 5uraty have 51GNED and SEALED this
5 instrumer�t by duly authorized agents and officers on this khe 29th day of March
6 , 20zz .
7
PRINCIPAL;
ATTEST:
�
� —
(P inc al} r� ry
.
'- �1` r �rn� �
�T�
Witness as ta Principal
Ti-Zack Concrefe, Inc _�.
BY: ��
�., • ` - . -
�' . Signature
�.,��o�,� r�k��,�.. V iCE �2�5��F-� ;
Name and Title
Address;
39352 - 221 st Ave
Le Center. MiV 56Q57
Sl1RETY:
Atlantic Specialty Insurance Company
ATTEST;
b05 Mi�hway 169 Nor�, Suite 500, Plymouth, MN 35441
BY: . � _- - ` F --
S i gnature
�� ' _`�
Cl�'Y Of FQRT WpRI'Fi Laeklcrnd l�nad Srde�valk G��prore�nenas
STANDAR� CON5TRUCTION 5PGCIFICAT10i�1 DOCUMENTS CPN: lOOG37-3
Itevised July I, 3Ql 1
1
z
3
4
5
6
7
8
9
1Q
11
1z
13
14
15
16
17
is
19
20
21
22
(S��rety) Secretary
\ ��'
, �
l ,
- � - r�:�.��. � �
�
Witness as ko 5urety ` '
{952}852-2431
*Note: lf signed by ail officer of the Surety Company, there must be on file a certif ed extract from t�e
6y-laws showing that this person has authority to sign such obligation. [f Surety's physical
address is difFerent from its maiiing address, both r�ust be provided. The date of the bond shall
not be prior ta the date the Contract is awarded.
CITY OP FQRT WQRTH
STAHDAftD CQNSTRUCTION 5A�C1P[CAT1�iJ I��CUNE�NTS
Revised ]t31y I , 2011
o��i i3-3
!'ERFO[ZMANCE sOND
Troy SEaples, Atlnrney-in-Faci PAge 3 of3
Name and Title
Address:
6D5 HigF�way 169 North, Suite 800
Plvmoufh, MN 58441
Telephone
Number:
Lncklnnd Hoad 3id�wulk Ir��pro��e�aenrs
Cf'N: 100637-3
A�K�Ov�L���N9ENT �F �RINCaPA� (ind�didu�l)
State of )
)
County of 1
On this day of
� in the year beFpre me pe�rsonally come(s)
to me knawn and knqwn to me to be the person(s) who (Is) (are) described in
and executed the foregoing instrument and acknowledge(s) to me that he/she executed the same,
Notary Public
A�KN��'L�CDG�N�R�'T O�' P�t%N�Y��L (���r�ership)
State of )
)
County of ]
Dn this day of
in the year ^ befare me personally came(s)
a member of the co-parinership of
to me known and known to me to be the person who is described in and
executed the foregoing ins�rument and acicnowledges to me that he/she executed the sams as far the act and deed of the said co-parinership,
Notary Public
���tN�VV����R+�E1�T �F PR%����dL (Corpor��iar��
s�atie or �1r�- >
}
County of Evf . )
On this `Zq day of f��cAt+r� , in the year 2o't�� , before me persanally come(s}
- �L En me known, who, being duly swom, deposes and says that he/sfi�e is
the —_ �� L �E ��'l.�.D� lu� _ of th2 S �- i�c�L c, v rrc �i.r ~c-�e`� 3- �v�
the corporatlon descri6ed In and which exetuted the foregoing instrument; f[hat he/she knows the seal
of the said corporatipn; the seal affixed to the said instrument is such corporate seal; that it was so affixed by the order of the Board of Directars of said
[arparatlon, and ti�at he/she signeri his/her na e theretio by like order.
�s. SUSAN I.YNN S1MOh1ETT�
��� � Notary Puhlic
Minnesota
�' - z My Commission Ex¢ires
�-� Jan 31, 2027
: c
Notary Public
1��iZIV�1�ILl�DG�N�N� �F �U��'T'Y
State of Minnesota )
)
County of Dakota )
On this 29th day of March, in the year 2Q22, before me personally mrrse(s) Trov 5ta I�es, Attorney(s)-In-Fact of Atlanti[ 5 ial Insurance
Company with whom I am persflnally acqualnted, and who, being by me duly sworn, says that I�/she is (are) the Attnrney(s}-in-Fact of Atlantic Soec�altv
Insurante CorrEpanv company descrihed in and which executed the within instrument; that he/sfle know(s) the corporate seal of s+�sh company; and that
seal affixed to the within instrument Is such oprporate seal and that it was afFixed by order of t�e Board of Direcbors of said coni[,�ny, and that he/she
signed said instrument as Atkomey(s}-in-Fact of the said company by like order, •
' - - - ~- � � �
Notary Publlc ''
�25' i
i �
��.ct
- �,..�awarr
�vw�r �fi ���arney
ICi�iOW ALL MEN BX'I'I-�65E PRESEN'I'S, that ATLAIVTTC 5PECTALTY I�VSURANCE COMPANY, a iVew York ea�rporativn with ils principal offiee in Plymouth,
1Vlinnesota, does herehy constitute and appoinr. Jonathan Pate, Zachary Pate, .Tenniier Bnyles, Nicholas T�achban, T`homas Lahi, Thomas Kemp, Troy Staplea,
each individi�ally if thern be more than one named, its true and lawful A.ttoirnney-in-Fae[, ta make, e�cecute, seal and deiiver, for and on its behalf as surety, any and all bonds,
recognizances, contracts of indemnity, and all other writirtgs obligatory iu the nature thereof; provided that Qo hond or undertaking e�cecuted under this authority shall exceed in
amount the sum of: unliittited and the exec�tian af such 6onds, rncognizances, wntracts nf inde►rcnity, and al! niher writings obligatary in the nature thereof zn pursuance af
these presenCs, shall4e as 6inding upon said Company as iF they had been fully signed 6y an authorized officer of the Company and sealed with the Company seaL This Power
of Attorney is made and executed 6y auEharity of the following resolufions adopted hy the Boazd of Directors nf A1`LAN`TIG SPECIALTY INSIJRANC� CQNIPA1�fY on the
twenty-fifth cEay of 5eptember, 2p].2:
Resolved: That the President, any 5eninr Vice President or Vice-President (each an "Aufhvrized OfFicet") may execute for and in behalf af the Comgany any and
all bnnds, ]ECOgI11Z�lC2S, conh�acts of i►tdemnity, and all othe� writings ohligatoey in the natuce thereof, and afFix the seaf o£ [he Company #hereto; and that the
Authorized Officer may appoint a►id autharize an Attorney-iu Factto execute an hehalf af ti�e Company any and all such instruments and to affix the Company
seal theretn; and that the Authorized Officer may at any time remove any sucM Attorney-in Fact and revoke all power and authority given ro any such Rttorney-m-
Facl.
Resolved: That the Attorney-in-Fact may 6e given full pnwer and aulhority to execute for and in the name and an hehalf of Ehe Comgany any and a1I bonds,
recvgnizances, cnntracls of indemnity, and all otlier wriCings ohligatory 9n the nature thereaf, and any such insuument exe[vted by any such Attorney-in-Fact shall
be as hinding upon the Company as if signed and sealed by an Authorized O€ficer and, further, the Attomey-in-Fact is hereby authorized ta verify any affidavit
required to be attached to 6onds, recogGuzances, �ontracts of indemniry, and all other writings o6ligaYory ir► the nature thereof.
This power of atromey is signed and sealed 6y facsimile under the authority of the fallowing Resalution adapted hy the Board of pirectors of ATLAIVT[C SPEG�ALTY
IN5URfLT�GE COMPAIVY on the twenty-fiflh ctay o# Septemher, 2012:
[xesalved: That the signature of an Aathorized dfficer, the signature of the Secretary or the Assistant Secretary, and the Company sea] may 6e affixed by
facslmile to any power of attorney ar ta any eertificate telating thereto appointing an Attorney-in-Fact For purposes only of executing and sealing any bond,
undertaking, recognizance or other wrltten oh4gauon in the nature thereof, and any such signature and seal where so used, heing here6y adopted by the Company
as the ariginal signature of such ofFicer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as thnugh
manually affixed.
IN WTFNESS WHEREDF, ATLANTiC SPECIl�LTY INSURANCE GOMRANY l�as caused these presen�s to be signed by an Authorized Officer and Ehe seal nf the Campany
to 6e affixed this twenty-seventh day of April, 2020,
STATE OF MiN1�3ESQTA
HEIYNE�IN COUN i'Y
`"��y„�NS�9 s
�`P�.... ....
p 4t�G.• GpRP a9,qT�;.�2�'•;
�y; SEAL `m5 ��
-.,��
sY=., 1966 �o " By �
=•Z-�.�FW Y�?�' a�.°�
•c�, � -a , Paul J. Brehm, Senior Vice President
19�yni�i�i�ii�H F'`,,.
On this [wenty-sevenkh day of April, 2020, Uefore me personally came Pau17. 8rehm, Senior Vice President of ATLAI@'i'IC �PECIAT,'T'Y Ii�TSURANCE COMPANY, to me
persunally known to 6e the individual and oEficer deseri6ed in and who executed the preceding insuvment, and he acknowledged the executivn oi the same, and 6eing by me
duly swam, that he is [he said officer of the Company aforesaid, and that the seal affixed tv the preceding instrument is the seal vf said Gompany and that the said seal and the
signatune as such af#icer was duly a€fixed and subs�ri6ed to the said insuumenE hy ihe authority and aE the dire�tion of the Company.
°� ALISON DWA�I NASH T�OUY
t�OTkfiY PU9i.{C • MINw�SQTk
,:� My Commisalan �xplres
January 91, 2025
� A/ I
' 1� �?14�r�,/r..�
�
Notary Public
I, che uadersigned, 5ecretary nf EiTLAI�'TIC SPEGIALTY 1N51?RANCE CONTYANY, a New York Corporation, cEo hereby cettify that the foregoing power of aitorney is in fuli
force and lias not been revoked, and the msolutions set forth a6ove are now in fnrce.
5igned and sealed, Dated 29th day of �arch 2022
� This Power of Attomey expires I
danuary 31, 2U25
, ��„Y��IN���'%
•'\PVK •.' -• s!'q" :
rrQra .S�ElPnl�,��j�j74�i.
:�,: S�R'� � ���=
`Y•,, 1958 ic�i;
�sy�;��w voP�.y���•s
I''' �•�n n� ;: � i � �"�",,
P[ease direct bond verificatitins to �
��_
Kara Barrow, Secretary
f � " 1 H
Bond Na. 8d0129834
no6i ia- �
PnYMEN'r anN�
Page 3 of3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
is
16
17
].8
19
20
zz
TH� STATE OF TEXAS
COUNTY OF TARRANT
SECTION 00 61 ] 4
PAYMENT BOND
§
§
�
KNOW ALL BY THESE PRCSENTS:
Th3Y We, 'I'i-Zack ConCrete Inc. 39352 - 221sf Ave Le Center MN 56U57 , ki7ow11 as
"Principal" herein, and Atlantie 5 ecial [nsurance Com an � a
corporate surety (sureties), duly authorized ta cio business in the State of Texas, knawn as "Surety" narein
(whether one or more), are held and frtnly� bound unto the City of Fork Worth, a i�aunicipal eorporation
created pursEiant to the laws af the State of Texas, known as "City" herein, in the penal sum
SEVEN Hl1iVDREl7 EIGHTY SEVEN THOUSAND NINE Doilars �� 787,959.50 ), 1RW�U1
Of Ht INfIRFT3 F1FTY NWF AN17 .5(1/10f1 -
money of the United States, to be paid in Fort Wo��h, Tarrant County, Texas, for the payment of which
suin well and truly be made, we bind ourselves, our heirs, executors, administrators, successors a��d
assigns,�jaintly a»d severally, finnly by these presents:
WHEREAS, Principal has entered into a ceriain written Contract with City, awarded the zg�
day �f March , 20 22 , which Contract is hereby referrad ko and macie a part hereaf
for alf purposes as if fully set farth herein, to furnish all materials, equipment, labor and other accessaries
as deiined by law, in the prosecution af the Work as provided f�r in said Contract and designated as
Lcrcklca�zc� Road S"icl�walk Inz rove�rr�ent.s rortz Cerin 13o�v�e Blv� lo Calrraon! r�venue. • CPN 100637-3.
22 N4W, THEREFORE, THE CONDITION OF TH[S OBLIGATION is sueh that if Principal
23 shall pay all monies owing to any {and all) paylnent band benef[ciary (as defined in Chapter 2253 of the
24 T�xas Government Cade, as a�nended) in the prosecution of the Work under the Contract, then this
25
26
27
28
29
ohligatio» shall be and become null and void; otherwise to remai» in full farca and effect.
This bond is rnade and executed in compliance with the provis�ons of Chapter 2253 of the Texas
Government Code, as amended, and all liabiiities on this bond shall be determined in accardance with the
provisions af said statuta.
*Transportation and Puhlic Works Depariment, Cily Hall - 2nd FInor 2DD Texas Street, Fort Warth, TX 761fl2
CITY OF FDRT WORTH Lackland Road Sideurulk fiupro��enrenls
STANDARD CQhiSTRUCTION SFECIFICATTON DOCUMENTS CAN; 10�637-3
Revised .fuly I , 201 I
00 6l l4 - 2
PAYMENT HOND
Page 2 of 3
� � IN WITNE5S WHEREOF, the Principal and Surety have each SIGNED and SEAI.�U �his
2 instrument by duly authorized agents and offcers on this the 29th day of March ��,
3 2022 .
PRWCIPAL:
Yi-�ack Concrete, Inc
ATT�ST:
F ��
BY: - -
. -
�
, Signature
(Prir�c'pa!) S�cr a � �
� , � �
� w
�A�+J �.�4�h. � : c..�� '�L�-�a..�:�`�
Name and Title
Address:
39352 - 221 st Ave
5 �Jk-�•r,� c} {�vt'r:.'i��
Witness as to Principal
Le Genter, MN 5fi057
SUI�ETY:
ATTEST:
, �
, �- � � ---
{Surety} Secretary
CiTY OF PORT WORTH
STArfDARD CQNfSTItUCTION SPECIFICAT[dN DOCUM�NTS
Revised July 1,2011
_�
1
C
Address;
Atlaniic 5 ecialty [nsurance Cnmpany
b05 Hi wa 1b9 North Suite 800 PI mxruih� A4� 554�!
/ J
� �.� -
�� C
Sigttature
Tro S#a les, Attorne -in-Fact
Name and Title
605 Hi hwa 169 NorEh, 5uite $04
PI mouth, MN 55441
Lncklanc� Haa�15'rde��°alk Irnfn•overrr�nls
CPN: IQQ631-3
�,� ,.
�(/ r _
�r �
��� �
Witness as to Surety
Telephone
Nwnber;
(952)852-2431
1
2
3
�
5
6
R061 14-3
PAYMGNT BOND
Page 3 of 3
Note: If signed by an officer of the Surety, tl�ere must be an file a certified extract from #he bylaws
showing that this person has authority to sigi� such obligaYion. if Surety's physical adriress is different
from its mailing address, both tnust be pE•o�ided.
The date of the bond shail not be priar to the date ihe Cantract is awarded.
7
END OF SECTION
0
C1TY aF FORT WORTI�I Lackland ftoad Sir�efralklr�rprovexrenls
STANDAF�D CaN5TfZUCTION SPGCIFICA'C[ON DaCL1MENT5 Cl'N: 1�a637-3
Revisr.dJuly 1,2Q11
�C�NOl�!l���faM�R1i O� ���i��i��L (Ir�diVid�a1)
.5tate of )
)
County of , )
t]n this day of
1 in the year before me personally come(s)
to me known and know� to me to be the person(s) who (is) (are) describeci in
a.nd executed the foregaing instrument and atknowledge(s) to me that he/she executed the same.
Notary Pu�llc
A�KRlO'l�LED�[�N�NT OF ���I��I�A� (Partn�r�hip)
State of )
)
County of )
On t�'iis day of
in the year . before me personafly come{s)
a member of the co-partnership of
tn me known and known to me to be the person who is described in and
executed the foregoing in�trument and acknowledges to n'3e that he/she executed the sama as for the act and deed oF the said co-par#nershlp.
Notary Public
ACKfVOVIt����R�E�T OF i�Rgfd�i�A6 (�or�vr��i�n)
State of 1'� 1 n-' )
r �
County of �E J��� � �
On this �.-� day of W"1���-� fn the year �- �- befor� me persanally come{s)
�� Pc�'J�� �R[ E� , to me knawn, wha, Geing duly swor'n, deposes and says that he/she is
the __ � lLE � 5.(�E� _ of the
�� y 1 AG��"i [ Ohk .�1�, the corporation described in and whlch e�cecuted the Poregoing instrument; that hershe knows the seal
of the said �rporation; the seal afiaed to the said instrument is such corporate seal; that it was so a�ixed by the order af Yhe Board of �irectors of said
carporation, and that he/she signed his/her name thereto by like order.
� SUSAN LYNN SIMONEI"TE
�'��`-' Notary Pubtic
� T � l�innesota
Riy Commissinn ExpEres
�r ' . ° .)
`�- - y}-
• � �A MAti n s .[.I�a _
Nntary Public T
--`a.w an 31, 242� ��iZ�i�i��,�����i�� �� �����
State of Minnesota }
}
County of Dakota }
On this 29th day of March, in the year 2D22, before me personally come(s) Tro__v 5taples, At�orney(s)-in-Fact of ANantic S ialty Insurance
Com an with wham I am p�rsonally acqualnted, and who, being by me duly swom, says that he/she is (are) the Attorrmey(s)-in-Fact of Atlantic 5 ial
Insurance Com � company described irt enci which executed the wi�hln instrument; that he/she knor��s� the corporate seal of such t�npany; and that
seal affnced to the within ins#rument is such oorporate seal and that It was affixed by order of the Boakd of Directors of safd company� �nd that he/she
, ..
signed said instrument as Aitomey(s)-in-Fact of the said campany by kike arder,
-.. _._. . ._.` _ �
WANflA�_, � NotaryPublic � .W_—�
NO7ARY PU�' '". �
�v Cnmmiaainr I'�-' ,� •- �
����
1NSURANC!
�'nwer a�i �i i�rn�y
KNOW ALL iVIE1V BX THE5E pRESENTS, that ATLAIVTIC SPECIAI.TY IN5IURA�fCE COMP113�f1', a New York corporation with ils principal otfice ia Plymouth,
Mipnesota; does hereby consti[ute and appnint: ,ionathan Pate, Zachary Pate, 3ennifer Boyles, l�Fichplas �Tochbao, Thomas I.ahl, T'homas Kemp, Troy Staples,
eacir individually if there be mom titan nne natued, its true and lawful Attarney-in-Fact, ta make, rxecute, seal and deliver, for and on its behalf as surety, any and all bonds,
recognizances, cont�acts nf indemnity, and all other wriGngs abligatory in the nacure thereof; provided that no bond or undenaking exeeuted under this authority shall exceed in
amount the sum of: �nlimited and the execution oF such bonds, recognizances, contracts of indemnity, aud all other writings o6ligatary in the nature thereof in pursuance af
these presents, shall be as bniding upon said Company as if they had been folly signed by an authorized officer of the Campany and sealed with the Company seal. This Power
of Attorney is made and executed by authority of the following resolu[ians adop[ed by [he Board of Directots of ATLANTIC SPECIAL'I`Y IIVSURANCE CONIPANX an the
twenEy-fifth day vf September, 2012:
Resolved: That the President, any Senior Vice President or Vice-President (eaclY an "Authocized Officer") may execuke for and in hehalf oF the Gompa�iy any and
all honds, recognizances, conlracts of indemnity, and all other writings obligatory in the naturn thereaf, and aifix Uie seal of [he Company thereto; and ihat the
Author�zed Officer may appoint and authnrize an Attoruey-in-Fact to execute an behalf of the Company any and all such insuvmen�s and to aFfix the Company
seal thereto; and [hat the Authorized OFficer may at any time remove any suc[i Attorney-in-�'aet and revo[ce all pawer and authority given to any sucl� Attpmey-in-
Fact.
Resaived: That the Attorney-in-Pact may he given ful! power and author�ty to exerute for and in the na►ne and on behalf of the Campany any and all bonds,
recognizances, contrac#s of indemnity, and all other u+ritings o6ligatory in the nature thereo% and any suth instrument executed hy any such Attorney-in-Fact shall
be as 6inding upon the Company as if signed and sealed by an Authorized Of6cer and, further, the Attomey-in-Fact is hereby authorized to �erify any affjdavif
required to be attached to 6onds, recop,�izances, comracts of indemnity, and all olher writings ohligarory in the nature thereaf.
This power of attomey is signed and sealed hy facsimile uudee the autitiority of the Eollowing Resalution adopted by the Sqazd of Directors of ATLANTIC SPECIALTY
IT�SUI�ANCE COMPAIVI' on the twenty-fifth day of September, 2Q12:
Resulved: That the signa[ure af an Authorized Officer, the signa[ure of the Secre6ary or the Assistant Seceetary, and the Company seal may be aff'viced hy
facsim9le to any p.ower of attorney or to any certificate relating theretu appointing an Attamey-in-Fact for purposes o�ily of executing and sealing any bond,
undertaking, recognizance or other written obligation in the nature thereof, and any such signature and seal where so used, �eing herehy adopted hy the Gompany
as [he priginal signature of such nfficee and the original seal oF tite Company, to be valid and binding upan the Company with the same fnree and effect as though
manually affixed.
IN WITNESS WHEREOF', ATLANTIC SPECIALTY iN5UI2ANCE COMPA.[VY has caused these presen�s to be signed hy an Avthocized Officer and the seal nf the Gampaay
to he affixed this twenty-seventh day of April, 2620.
S'TATE OF MINNESOTA
xsNrr�p�r� cavrrr�r
.�`���p,`( u�,i4jrn�qr,4
,� �'� -• -.si/ w,
f;'`rvG� GO4lPPR,ql��2�,�'%
_�: SEA.L ''�ms
z`=�•., i98G :'o� 18y
'sr26 .MFw vo`��•�� a���
a� paeil7, Brehm, Senior Vice President
''+,�� nn, �iii�sl"?,,'
On this twenty-seventh day of April, 2020, before me perso�ally camePaulJ, Brehm, Senior Vice President of ATLAN'I'IC 5PECIALTY INSURANCE COMPAI�FY, to me
personalEy tutown to he khe individual and officer descri6ed in and who executed the preceding iQstrument, and he acknowledged the execution of the same, anti 6eing by me
duly sworn, that he is the said offieer nf the Company aforesaid, and that the seal afFixed to the preceding instrument is the seal of said Gompany a�ad that the said seal and the
signatuxe as such officer was duly afFixed and suhscri6ed to the sald insmiment hy the authority and at the direcuon af tlie Company.
� A�CSON DWAN HASb TROU�
NOTARY PU�I{C • MlNfif�SDiA
t� My Com�nis�lon �xpires
January 91, 2025
'�-
���../, j�•
a� _ �. ��
�r�, �
�
Natary Pu61ic
I, lhe undersigned, 5ecretary af ATLAN'ITG SPECIAL.TY INSiJRA1VCE COMPANY, a New York Corporation, do hereby cerCi#y that tiEe foregoing power of attorney is in Eull
force and has not 6een revoked, and lhe msolutions set forth ahove are now in force.
5igned and sealed. Dated 29th day of March 2022
� This Power of Attorney expires I
7anuary 3J, 2025
_ �
�,,.�,,,�����,,,,,,,
," qY INg ,
�•,P4 ,.......Uq'•,,,.
^ WU•� 4RED�,� . .4�,s,:,
��+� �'SEAi.� • n3
5�.' i'�8�7 :�Dy
�'t,y� ��FW Y4'Q'�'' ��d�''
�j� �inr�n.,r'`'��,.
�Q�-�
Kara Barrow, Secretary
Please direct band verificatinns to •�
Bond �lo. 800129834
OU6! 19- I
MAINTENANCE BQND
Page l a£4
1
2
3
4
5
6
7
8
4
so
11
�z
13
14
15
16
17
18
19
2D
21
zz
23
24
25
26
THE STATE O� TEXAS
COUNTY dF TARRANT
SECTION 00 �il 19
MACNTENANCE BOND
§
§
§
KNOW ALL BY THE5E PR�SENTS:
That we Ti-Zack Cancrete, Inc., 39352 - 221sE Ave, Le Center, MN 56U57 , 1cr1�Wn as "Principal"
herein and Atlantic 5 ecialt insurance Com an , a corparate surety (sureties, if more
than one) duly a��thorized to do bu5iness in the State of T�xas, known as "Surety" herein (whether one ar
more), are held and firmly bound unto the City of Fart Worth, a munieipal corporation created �urstiar�t to
the iarr+s oF the 5tate of Te�as, known as "City" h�rein, in the sum
3EVEN HUNDRED EIGHTY SEVEN THOUSAND NINE po��ars 7II7,959.50 , lawfu]
Of HUNDREi7 F1FTY NWE AND 50l1U0 ��
money of the United 5tates, ta be paid in Fort Worth, Tarrant County, Texas, far payrnent of which sum
well and truly be made Linto the City and its successors, we bind ourselves, our heirs, exeeutors,
admi�3istrators, successors and assigns, jointly ar�d sev�rally, firmly by these presents,
WHEREAS, the Principal has �ntered inko a certa�n writken contract wikh tl�e C�ty awarded
the 29th day of March , 2022 , which Gontract is hereby referred to
and a made part hereof for all piirposes �s if fully set forth herein, to furnish al] materials, equipment
labor and other accessaries as defined by law, in the prosecut�on of the Wor�, including any Work
resulting from a duly autharized Change Order (col�ectively herein, the "Work") as provided for in said
contract' and designated as Lacklund Rvacl �id�ti•slalk I��a ro>>er��ents rona Cam I3a�vie J3Ivc1 ro Cabnont
�lvenue.; CPNIOUG37-3.; and
WHEREAS, I'rinci�al binds ikself to use such materials and to so construct the Worfc in
27 accordance with the pians, specifications and Cantract Documents that the Work is and wiil remain free
28 from defects in mater'ials or workmanship for and during the period of two (2) years after the date of
29 Fir►al Acceptance of the Work by the City ("Maintenance Period"}; and
30
*Transportation and public Works Department, City HaEI - 2nd Flaor ip0 Texas Street, Fort Worth, TX 75102
C17'Y OF �QRT WpRTH Lacklarad Ro�d Sid��i�alklr�apros�er+tenls
STA13�Al2� CO]VSTRUCTlpN SE'EC[FlCATIQN DOCUMGNTS C!'N: !0(J637-3
Revised July 1, 201 I
aobi i�-z
MAlNTENANC� 130N�7
P�ge 2 of 4
1 WH�REAS, l'rincipal binds itself to repair ar reconstruct the Work in whole or in part upon
2 receivi��g notice from the City of the need therefor at any time within the Maintenance 1'eriod,
3
4 NOW THEREFOR�, the candition of this obligation is such that if Principal shall remedy any
5 defecti�e WoE•k, for which timely notice was provided by City, ta a completion satisfactory to t17e City,
6 then this obligation shall become null and �oid; otherwise to remain in fufl force and effect.
7
8 PROVIDED, HOWEVER, if Prineipal shall fail so to repair or reconstruct any timefy noticed
9 defeetive Work, it is agreed that the Cify may cause any and all such defective Work ko be repaired andlor
10 reconstructed with all associated costs therea.f being �orne by the i'rincipal and the S�Erety under this
11 Maintenattce bond; and
12
13 PROVIDED FURTHER, that if any legal action be �led on this Bond, vern�e shali fie in Tarrant
14 Coui�ty, Texas or the lJnited StaCes Diskrict Court for the Northern District of'fexas, �'ort Worth Division;
15 and
i6
17 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive
18 recoveries may be had hereon for successive 6reaches.
19
20
21
C1TY OF r012T WORTH LnckhTnd l2aatlSa�etirulk l��tprroee�irenls
S'!'nNDAR17 CQNSTitUC'I'lON SPECIFICATION QOCUMENTS C'PN: !011h37-3
Reviscd July l, 201 I
00G1 19-3
MAINlTC1VANCE BOAlD
I�age 3 of4
1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
2 instrui�ent by duly authorized agents and officers ori this the 29th day of March
3 , 2Q z2 .
4
PR[NCIPAL:
7i-Zack Concrete. Inc
A1'TEST:
�� � -! ��,� -
{Pr' �ci 1} S r e ary�
,
BY; �' _ ,,�� —
r
- , ignature
� .����� t: 4�� � � �.: �� �
Name and Title
Address:
39352 - 221 st Ave
� ' - =,il�-
Witness as ta Principal
Le Center, MN 56057 ,
SllRETY:
Atlantic Specialiy Insurance Cnmpany
605 Hi�hway 169 North, Saite SOp, Plymooth�, MN 554Q�1
ATTE�T,
0
I
� `
i.
� `
�, ' t'
y..-� -- -,��
._, _-
BY: � _ _ J
,
(Surety) Secretary
Signature
Troy Staples, Attomey-in-Faci
Name and Title
Address:
605 Highway 169 North, Suite SOU �_
CITY Or rqR"[' WCllt'1'M
3TANDARD CONSTEiUC'I'!QN SPECIFICATION DOCi1MENT5
Revised July 1, 20� I
Lac•kl�tnd l�oa�f 5ideivalk IuTprareu�enls
CPN: l04437-.3
OUbI 19-4
. MA[EVTENA3JCE BpND
- Plymouth, MiV 5544t Page 4 ofa
i j
� _
Witness as to Surety Telephone
N um ber:
c9s2}asz-za��
�
2 *Note; If s�gned by an of#icer of the 5urety Campany, there roust be on fila a certified extraet from the
3 by-laws showing that this person has authority to sign sucM obligation. If Sure.ty's physical
4 address is different from �ts rnailing address, both must ba pro�ided. The date of tl�e bond shall
5 not be prior to the date the Contract is awarded. �
C:�
CITY OP FORT WC7RTH Laekland Roud Srdesrrtlk l�irprnverit�rtts
STANDAR� CdNSTRUCTION SP�CIF[CATIOIV DOCUMENTS CPN: l0�637-3
Revised July 1, 201 I
��KN��'LED�MIENi OF Plz�l��%PAL (�n�1i�i�ual)
�z�t� of
County af
�
On this day of In the year hefore me pe�rsanally Come(s)
.�o rtte known and known to me to be the person(s) who (is) (are) desor+bed in
and e7ceeuted the foregoing instrument and acknowledge(s) t� me ti�at he/she executed the same.
Notary Public
�1c1�f�o�►�������Vi �� �it�l�c%��1� ��a�n��Sill�)
State of _ )
)
County of )
On thi5 day of in the year before me personally come{s)
a member of the co-partnership vf
to me known and known to me to be the person who is described in and
executed the foregoing instrument and acknowledges to me that he/she executed the same as for the act and deed of the said ca-partnership.
Noiary Public
��KN01fV�����➢�IVT OF PR%i��Y��L (C�rp�ra�i�n)
State of _� �� )
)
Caunty of I.-� �►��v�-- )
dn this Z°, day of J"` ��G�k In the year rGo�=L_, before me personally come(s)
�, j A�3ur.s �f� �1 to me known, who, being duly svvom, deposes and says tt►at he/she is
-� . ,
!he �[ ► c.� ,�R.� s.1�E�v : of the Tti — 2 c.1� L� �.� � o � .�E .r � .
the cor�oration described in and which executed the foregoing instrume�+t; that he/she knows the sea[
ot'tMe said corporation; the seal affixed to the said fnstrument is such corporate seal; that it was so affixed by the order of the Board af Directars of saEd
cor�oration� and that he�she signc�cl his/her name thereto by Ilke order,
SUSAN LYNN SIIAONETiE � ��
�'=- �• iJotary Publlc
� Minnesota Notary Publi�
��.�, AAy Cornmission Expires
�.; ,' ��`'� Jan 31, 2a27
�������������Y 8� �����
State of Minnesota )
)
County of Daketa )
On thi5 2.9th day of March, in the year 2022, befare me personally come{s) Tro�ta�, Attorr�ey(s)-in-Fact of Atian ic S ecial Insuranee
Comnanv with whom I am personally acqualnted, and wha, being by me duly sworn, says that he�she is (are} the Attomey{s)-in-Fact oF Atlantic Specialtv
Insurance Gompany mmpany described in and which executed the within lnstrument; that heJshe lcnnw{s) the corporate seaf of suck�+�mpany; and that
seal affixed to tne within instrument is such corporate seal and that It was affixed by order of the 64ard of Directors of said camp�n�, ar�d that he/she
signed said instrument as Attorney(s)-in-Fact of ti�e said company by like order. _ ,
. .... . ._ _ - ---�_ ,---
� .. Notary Public� _ I
- �.t�.�� �
- IN�U,iAIICt
�ow�r oi� ����rney
KNOW ALL Iw9EIV BY THESE FRESEI�'TS, that A`1'LAIVTIC SPECIALT'Y INSURANC� COMFANY, a New Yprk corparation with ats prin�ipal office in Rlymouth,
Ivlinnesota, does herehy eonstitute and appoint: 3onathan Pafe, Zachary Pate, Jenni€er Boyles, Nicholas Hnchban, Thomas Lahl, Thomas Kemp,'I�oy Staples,
each individuafEy if there 6e more Ihan one named, its true and lawful A[[o�ey-in-Fact, to make, exe�ute, seal and deliver, for and on its behalf as surety, any and all bvnds,
recognizances, contraets of indemnity, and ali otF�er writings ob�igatory in che nature thereof; p�rovided that no bond or underCaking executed unrler this authurity shall exceed in
amount the snm oE unlitvited and [he exeeution of such bonds, recognizantes, contracls of indemnity, and all ather wriGngs obligatory in Ehe nature thereof in pursuance of
these presents, sha11 he as binding upon said Cumpany as if they had 6een fully sigrted 6y an autharized officer af the Company and sealed with the Company seal, This Power
oE Attorney is made and executed hy authoriry oF the following resolutions adapted by the Soazd of Directors of ATLANTIC 5PECIALTY INSiTIiANC$ GQNIPANX on the
twenty-fifth day of 5eptem6er, 20I2:
Resolved: That the President, any Senioe Vice President or Vice-President {each an "Authotized Officer") may execute for and in behalf of the Cnropatty any and
all bonds, recognizances, contracts of indemnity, and ali other writings o6ligakory zn the nature thereof, and affix the seal o# �he Cumpany theretn; and that the
Authorized Officer may appoint and authorize an Attnrney-in-Faet ta execute on 6ehalf of the Gompany any and all such instruments and to a£fix the Compauy
seal thereto; and that tlie Authorized OFficer may a[ any time remove any such Atmrneyan-Eact and revoke ai! pawer and authorlty given to any such At[omey-itt-
Fact.
Itesntved: TTiat the Attorney-in-Faet may be given foll power and authority ta execute far and in the name and on behalf of [he Campany any and all bonds,
recQgnizances, contracts of indemnity, and 211 pther writiqgs o6ligakory in che nature thereof, and any such instrument executed by any such Atcoruey-in-Fact shall
6e as binding upon the Company as if signed and sealed by an Authorized Officer and, fnrther, the Attumey-in-Eact is hereby authorized to verify any affidavit
required to be attached ta 6onds, recognizances, wntracts of indemnity, and all other writings obligatory. in the nature thereof.
This power of attorney is signed and sealed by Facsimile under the auihorily of ihe following Resolution adopted by the Boazd of Directnrs of ATLANTIC 5RECIALTY
INSURANCE COMPAIVY on Ihe twenty-fifth day of Septemher, 2012:
Resolved: That the signature of an Authorized Officer, the signature of the 5erretary or the Assistant Secretary, and che Company seal may 6e afFixed hy
facsunile to any power of attorney or to any cettiticate relaung thereto appointing an Attqrney-in-Fact fpr purposes only of executing and seaiing any 6ond,
undertaking, recognizance or other written obligation in the nature t[�ereai, azid any such signature and seal where so used, being hereby adopted 6y the Company
as the original signature of such of£icer and the original seal oE the Company, ta be valid and binding upon the Company with the same Eorce and eEfect as though
manually affixed.
IN WITNES5 WFTEREQF, ATLA.NTIC SP�GIAI.1'X INS[TLtANCE GOMPANY has caused these presents En be sigued by an Authorized Officer and fhe seal af the Company
to he affixed this twenty-se�enth rlay of April, 2020.
ST'A'T'E QP MllVi�fE30TA
HEP€NEPIN COUNTY
,tlra�� ���n n . w
=a4�G*�pRP Rq ���2�:,
`�': SEAL :m� �
=�Y'., 1986 Fo' SY
`� a•'� �'Fw vo?�db��:
Paul J. Brehen, Seniar ViCe Presiden[
, ,�b;•..�..��`,
'"nnamniwna
Dn this.twenty-seventh day of April, 2�2p, before me persona4y came Paul J. Srehm, 5enior Vice President of ATLANTIC SPECIALTY INSUIiANCE COMPANY, to me
persanally known to be Ihe individual and officer described in and who executed the preceding instrument, �nd he acknowledged the execution of the same, and being by me
duly sworn, that he is the said officer of the Company aforesaid, and Ihat the seal affexed to the preceding instrument is the seal vf said Compa�ay aud chat the said seal and ihe
signature as such afFicer was duly afFixed and subscribed lo the said insE►vment 6y khe autharity and.at Ihe directian of Che Company.
� � k�ISON OWAH NASH����41T
NOTA�tY PU�I.IC . A61N�"�SOTI�
My Can9rnlsslon �xpires
January 31, Z02S
�f �� 1 I
1 `� �' M�" " � "�
�
Notary Pu6lic
I, the undersigned, Secretaty of ATLAIV1iC 5PECT1II,TY INS'C1RAIYGE COMP111VY, a New'iiark Corporation, do hereby certify� that the forngoing power of attorney is in full
Force and has not been revo[ced, and the resolutions set forth ahove are now in force.
5igned and sealed. Dated ��h day nf M�rch 2fl22
� This Power af Attorney expues j
danuary 31, Z025 �
,,,�„�����„��,,,
: �P��Y � � N�V,y'••,
: ¢�U G�RP ORqTF F2�,� :
=�� SF�L =n'`:
cU', �.Q.�W .�t73
Lr'�
',�a;.,�+G'� y�?`�',ya�,`
;• a.
�'' ` � ..,�.�,,,,,����'' •,
Flease direct 6pnd verifications to
� ���
Kara Barrow, Secretary
�}�r�tinr��,..n.� .-�.��f
�i,�:.1��IaI3 ��EI�1�E1� C�I�TDIT�IO�TS
�F �'�I� ��I�TS'�R�J�'I`��� C�I�'�C'Y'
CITY OFFORT WORTH Lcrcklancl l�ocrd Sic1c»ralk Jnqn��veure��ts
STANDAR.DCON57RUCTfON SPECIFICA710N D�CUMENTS C'f'N: lOOG37-3
Revision: 82.�/10Z1
STANDARD GENERAL COND�TI�NS OF THE
COrTSTRUCTI4N CONTRACT
TABI�E QF COI�TTEl�TTS
Page
Article 1— Definitions and Terminology ..........................................................................................................1
1.01 Defined Terms ...............................................................................................................................1
1.02 Termiriolo�y ..................................................................................................................................6
Article2— Preliminary Matters ......................................................................................................................... 7
2.01 Copies of Documents ....................................................................................................................7
2.02 Commencernent of CantractTnne; Notice to Proceed ................................................................ 7
2. 03 Start�ng the Work .. .. .. ..... ... .. ... .. ... .. ... ..... ......... ... ..... ... .. .. ... ... .. ... ... .. .... ........ ..... ... .. .. . .. ... .. .... .. ... ... .. .. 8
2.a4 Before Startmg Construotion ........................................................................................................ 8
2.05 Preconst�'uction Canference .......................................................................................................... 8
2.06 Public Meeting .............................................................................................................................8
2.07 Initia.l Acceptance of Schedules .................................................................................................... S
Article 3— Contract Docwnents: Ir�tent, Amending, Reuse ............................................................................ 8
3. O 1 Intent . .. ... .. ..... ..... .... .... .... ..... ... ..... .. ... .. ... ..... ............ ..... .. ... .. ... ... .. ... ..... ............ .. ................ ..... .. ... .... 8
3.02 Reference �tandards ...................................................................................................................... 9
3.03 Reporting and Resolving Discrepancies .......................................................................................9
3.04 Arrxending and Supplernenting Contract Docwnents .................................................................10
3.Q5 Reuse ofDocuments ...................................................................................................................10
3.06 Electronic Data ............................................................................................................................ ll
Axticle 4-- Availability of Lands; Subsurface and Physieal Conditions; Ha7ardaus Environmentai
Conditions; Raference Poir�ts ........................................................................................................... 11
�. Ql Availab�ity of Lanc1� .... , . .. � .... ..... ...... ..... ..... ............................. ...... .......... ..... ...... ..... ........ . .... . .....11
4.02 5ubsurface and PhyszcaX Conditions ..........................................................................................12
4.03 Differing Subsurface or Physical Conditions .............................................................................12
4.04 Underground Facilities ...............................................................................................................13
4.05 Referenee Points .........................................................................................................................14
4.Q6 Hazardous Environmental Condition at Site ..............................................................................14
Article5— Bonds and Insurance .....................................................................................................................16
5.01 Licensed Sureties and Insurers ................................................................................................... ] 6
5.02 Performanee, Payment, and Maintenance Bonds .......................................................................16
5.03 Certificates of Ir�urance .............................................................................................................16
5.04 Contractor's Insurance ................................................................................................................18
5.05 Acc�ptance o�Bonds and Insurance; Option to Replace ...........................................................19
Article b — Contractor's Responsibilities ........................................................................................................19
6.01 �upervision and Superintendence ...............................................................................................19
CITY OP FQRT WORTH Lcrcklcrrrd lioad Srde�ralk huprm�:�nents
STAIVDARDCaNSTRUCTIUN SPEC[F[CATION DQCUNI�NTS CP<h�: lOOG37-3
Revisian: &rL�i"1i121
6.02
6.03
6.04
6.05
6.06
6, 07
6.08
6.09
�.�a
6.11
6,12
G.13
G.14
6.15
6.16
6.17
6.1$
6.19
6.2Q
6.2I
6.22
6.23
6.24
Labor; Working Hours � ...............................................................................................................20
Services, Materials, and Equi�pment ...........................................................................................20
Proj�ct Sc�edule.....� ....................................................................................................................21
�ubstitutes and"Or-Equals" .......................................................................................................21
Concernitig Subcontraciars, SuppIiers, and Others ...........................�.�............................,....,....24
WageRates .................................................................................................................................. 25
PatentFeesandRoyalties ...........................................................................................................26
Permitsand Utitities ....................................................................................................................27
Lawsand Regulatinns ................•--�.............................,.........,..............................,......................27
Taxes...........................................................................................................................................28
Useof Site and Other Areas .......................................................................................................28
RecordDocuments ......................................................................................................................29
Safetyand Protection ..................................................................................................................29
SafetyRepresentative ..................................................................................................................30
Hazaz•dCommunication Programs .............................................................................................30
Emergenczes and/or Rectificatian .....................�........................................,..,.............................30
Subrnittals......................................................................�............................................................. 31
Continuingthe Work .. . . . . . . . .. .. . .. ... .. ... . .... ... . ..... ... .. ... .. . .. .. . .. ... .. ... . .... . ... .. ... .. ..... .... .. ... .. . .. .. . ..... ... .. ... 32
Contractor's General Warranty and Gua.rantee ..........................................................................32
Indernni�cation .........................................................................................................................33
Delegation of Prafessional Design Services ..............................................................................34
Rightto Audit ..............................................................................................................................34
Nondiscrimination............................................. ... .......... ................... ..... ..................................... 35
Article7 Other Work atthe Site .........................................�..,.....................,......,.........................................35
7.01 R�la.ted Work at Site ...................................................................................................................35
'7.02 Coordination ................................................................................................................................36
Article$ - City's Responsbilities ...................................................................................................................36
8.01 Communications to Contractor ...................................................................................................36
8.02 Fwzxish Data ...................................................�..,.,......................,..................................,...,.........36
8.03 Pay WhenDue ............................................................................................................................36
8.04 Lands andEasements;Reporis and Test� .................�.........,....,..................,......,....,...................36
8.05 Cl�ange Ordexs .............................................................................................................................36
$.�6 Inspections, Tests, and Approvals ......................................................... ..............,.36
$.07 Limitations on City's Responsibilities .......................................................................................37
$.08 Undisclosed Hazardous Environmental Condition .................................................................... 37
8.U9 Compliance with Safety Pro�am ..........................................................�.,..............,........,..,.....,.37
Arkicle 9- Ciry's �bservation Status During Canstructioz� ........................................................................... 37
9A1Ciry's Project Manager ............................................................................................................37
9,02 Visi�s to Site ................................................................................................................................37
9.03 Author�zed Variations in Work ..................................................................................................38
9.Q4 Rejecting Defective Work ..........................................................................................................38
9.Q5 Deterzxiinations for WorkPerform�d....... ...................................................................................38
9.06 Dec�ions on Requirements of Contract Docurnents and Acceptability of Work .....................3$
CITYOP P012T WORTH 1_crcklp�tclRoacl Sicleu�a/& Ir�y�r•m�e��rertls
STANDARDCONSI'Rl1CTI0N SPECIFICATION bOCUMENTS CPA'� lI10637-3
Revision: SQ3J1021
Article 10 - Changes in the Work; Claims; Extra Work ................................................................................38
10.01 Authorized Changesint�e Work ...............................................................................................38
10.02 Unauthorized Changes in the Wark ............................ ...... ........ ........................ .........................39
1 �.03 Exeeution o� Cl�ange Orders ....................................................................................................... 39
10.04 Extra Work ..................................................................................................................................39
10.05 Notification to Surety ..................................................................................................................39
10.06 Coniract Claims Pracess ............................................................................................................. 40
Article 11 - Cost ofthe Work; Allowances; Unit Price Work; Plans Quantity Measurement ......................9�1
11.01 Cost of the Wark ....... .............. .... . .. ... ..... ........ ... .............. ................ ....................... ........... .......... 41
11.02 Al�owances .................................................................................................................................. �3
11.43 Unit Price Wark ..........................................................................................................................44
11.04 Plans Quanfity Measurement ......................................................................................................45
Article 12 - Change of Cantract Price; Change of Con#ract Tinne ................................................................. 46
12.01 Change of Contract Price ............................................................................................................ 46
12.02 Change of C�ntractTime ............................................................................................................47
12.03 Delays ..........................................................................................................................................47
Article 13 - Tests and Inspections; Correc#ion, Rezxa.aval or Acceptance of Defective Wark ...................... 48
13.01 Notice of Defects ........................................................................................................................48
13.02 Access io Work ...........................................................................................................................48
13.03 Tests and Inspectiar� ..................................................................................................................48
13.a4 Uncovering Work ........................................................................................................................49
13.05 City May Stop the Work ............................................................................................................. 49
13.06 Correetion or Removal of Defective Work ................................................................................54
13.07 Correction Period ........................................................................................................................ SO
13.08 Acceptance ofDefective Wark ...................................................................................................51
13.09 City May Correct Defective Work .............................................................................................51
ArticIe 14 - P ayments to Contractor and Cornpletion .......................................................... ................. ..... .... S2
14.01 Schedule ofValues ....................................................................................................................�.52
14.02 Progress Payrnents ...................................................................................................................... 52
14.03 Contractor's Warranty of Title ...................................................................................................54
14.04 Partial Utili7ation ........................................................................................................................ SS
14.05 Final �nspection ........................................................................................................................... 55
14.06 Final Acceptance ......................................................................................................................... SS
14.�7 Finai Payment .............................................................................................................................. S6
14.08 Final Completion Dela�ed and Partial Retainage Release ........................................................ 56
14.09 Waiver of Claims ........................................................................................................................ 57
Article 15 - Suspension af Work and Terrnination ........................................................................................57
I5.�1 City May Suspend Wark .............................................................................................................57
15.02 City May Termit�ate for Cause ...................................................................................................58
15.03 Ciry May Terminate For Convenience ....................................................................................... 60
Artic�e 16 - Dispute Resolution .....................................................................................�................................ 61
16.01 Methods and Procedures ............................................................................................................. bl
Cl'f Y OF FORT WQRTH Lrrcklui�d l�nctd 5'icleu`a1h I�r�pra��enae�rls
5TA3+]�ARBCO�}STRllCT[ON SPECIF'ICATfON DaCUMENTS ['pn': !(70(37-3
Revision: 8232QZ1
Article 17 Miscellaneous ............................................................................
17.Q1 Giving Nofice ............................................................................
1'7.02 Computation o�'Times ..............................................................
17.03 Cumulative Remedie,s ... .. ... . . .......... ...................... ............ . ... .....
17.04 Survival af C}bligations . . . ... .. .... ........................ .... .... ...... .. .... .....
17.05 Headings ....................................................................................
CITYqF FORT WORTI-I
STANDARDCDNSTRUCT[ON SPEC[FfCATION DOCUNIEi�ITS
Revision: 8/1320Q1
................................................ 62
................................................ 62
................................................52
......................................�.,....,..b2
................................................ G3
. ... . ..... ... .. .. . .. . .. .. ... . .... . ... .. ... .. . .. . 63
f.�rcklun�l l�ocrr� Sir�eivtrlk h�rpr•oi�en�e.��ts•
C'P,+V: Il1pG.�7-3
OD7200-1
GENERAI.CQNDITION S
Page i of 63
ARTICLE 1-- DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Whereverused in ihese General Condations ar in other ConfixactDocuments, tlae tern�s list�d below
have the meanings indicated which are applicable to both the singular and pIural thereof, and
words denoting gender shall include the masculine, feminine and neuter. Said �erms are generally
caprtalized or written �n italics, bu� not always. When used in a conte� cons�stent with �he
defmikion of a listed-defined term, the term shall have a meaning as defir�ed below whether
capitaliz�ed or italicized ar otherwise. In addition to terms speciffcally defined, ter�xas with initial
capital letters in the Contract Documen#s include referen�e� to ic3entified articles and paragiraplis,
and the titles of otiler documents or forms.
1. Addenda--Written or graphic instrurnents issued prior to the opening of Bids which clarify,
correc#, or change the Bidding Requirements or the proposed Contrac# Documents,
2. Agreenzent—The written instrument w4uch is evidence of the ag�reement between City and
Contractar covexmg the Work.
3. Application for Payment—The form acceptable to C�ity which is to be used by Contractox
dur�g ihe course of the Wark in requesting progress ar final payments and which is to be
accompanied by such supporting documentation as �s requir�d by the Contract Doc�ux�:ents.
4. Asbestos Any material that contams more than one percent asbestos and is friable or is
releasing asbcstosfibers into the a�r above current aciion levels established bq the Unit�d States
Occupational Safety and Health Administration.
5. AwaYd — Authorization by the City Council for the City to enter into an Agreement.
6. Bid—The offer or proposal of a Bidder submitted on the �rescribed farm setting forth the
prices �ar the Work to be performed.
7. Bidder--T`he individual or entity who submits a Bid directly to City.
8. Bidding Documenis—The Bidcling Requirements and the praposed Contract Documents
(including all Addenda}.
9. Bidding Requirenaents--T`he advertisement or Invitation to Bid, Instructions to Bidders, Bid
security of acceptable form, if any, and the Bid Fo:rm with any supplements.
10. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, e�cept for federal or sta�e holidays observed by the City.
11. Calendar� Da�y —A day cons�sting of 24 hours measured from uudr�ight to the ne� midnight.
CITY DF FORT WORTH l,pcklct»d RnarJSiclearrrlk lui��roreiueuls
STANDARDCONSTRUCTION SPECIFICAT]QN DOCUM�NTS CPA�: !00(37-3
Revisian: 82�I1A21
OD7200-1
GENERALCONDITION S
P age 2 of 63
12. Change Order A docume�t, which is prepared and approved b� the City, which is signed
by Contractar and City and authorizes an addition, deletion, or revisinn in the Work or an
adjustment in 'the Contraet Price ox the Contract Tune, issued on or after the Effective Date
of the Agreement.
13. City-- The City of �'ort Worth, Texas, a home-rule munieipal carporation, authorized and
chartered under the Texas Sta#� Statutes, acti�xg by its governing body through rts City
Manager, lvs designee, or ag�nts autharized under his behalf, each of which is required by
Ch�rter to perforrn spec�c duties with responsibility �ar final enforcement of fihe contract�
invoiving the City of Fort '1Vorth is by Charter vested m the City Manager and is the entity
�rrith whorzi Contracior has entered into the Agreezxzent and for whom the Work is to be
performed.
14, City Attorney — The afCcially appo�nted City Attarney of the City af Fart Warth, Texas, nr
his duty authorized representati�we.
15. City Council - The duly elected and qua.li�'ied governira.g body of the Ciry of Fort Worth,
Te�s.
16. City Manager — The offzcially appointed and authorized City Manager of the City of Fort
V4�orth, Texas, or his duly authorized xepresentati�e.
17. Gont�act Claim—A demand or assertion by City ox Contracfor seel�ing an adjustment of
Contract Price or Cozxtract Time, or both, or other xe�ief with xespect to the terrrms of the
Contract. A deman�d for money or services by a flvrd party is not a Contraci Claim.
18. Contract—The entire and integrated written document between the City and Contractor
concerning the Work. The Contract contains the Agreement and all Contract Documents and
supearsedes prior negotiations, representations, or agreemenis, whether written or oraL
19. Cantract Documents—Those items so designated in the Agreemez�t. All items listed in the
Agreement are Contract Dacu�nents. Approved Submittals, other Contracfior submittals, and
the reports and drawings o� subsurface and physical conditions ar� not Cantract Documents.
20. Cont�act Price—The moneys payable by City to Cantractor for completion of the Work m
accordance with the Contract Documents as stated in the Agreement (subject to ihe pravisions
of Paragraph 11,03 in the case of Unii Price Work},
21. Con�act Time—The number of days or the dates stated in the Agreement to: (i) achieve
Milestones, if any and (ii) camplete the Work so that it is ready far Fir�al Acceptance.
22. Contractor=The individual or entily with whom Ciiy has entered into the Agreement,
23. Cost of the Work—See Paragraph 11.01 of these Genetal Condiiions for definition.
G1TY DP FORT WORTH l.acklcri7d Road bYdetircrlk f�rrprove�uer�la
STANDARDCONSTRUCTION SPEC[P[CAT10N pOCL1MENTS
Revision:8232(�2.1 C'PA?� 1(10637-3
oo�aao-i
GElVERAL CONoiTION S
P age 3 af 63
24. Dc�mage Claims — A demand for maney or services ar�sing from the Praject or Site from a
third party, City ar Con�ractor exchasive af a Contract Claim. �
25. Day or day -- A da.y, unl�ss otherwise defined, shali mean a Calendar Day.
2b. Drrector o,f'Aviatiora — The afficiaIly appointed Di�•ector of the Aviation Department of the
City of Fort Worth, Texas, or his duly appointed representaiive, assistant, or agents.
27. Directo� of Pa�ks and Comn�auniry Servaces — The ofiicially appainted Director of the Parks
and Community Services Department of the City of Fort Worth, Te�s, or his duly appointed
representative, assistant, ar agent�.
2$. Dfrector of Planning and Development— The ofiicially appointed Director oi the Pl�nning
and Developrnent Department o� tkze City of Fort Worth, Texas, or his duly appainted
representative, assi�tant, or agents.
29. Director of Traraspartation Public WoYks — The offLcially appointed Directar of the
Transportation Public Works Departmeni of the City of Fort Worth, Texas, or his duly
appo�ted representarive, assis#ant, or agents.
3�. Direetor af Wate� Department — The afficially appoirfted D�rector of ihe �+V'ater Department
of the City of Fort Worth, Texas, ar his duly appain�ted representative, ass�stant, or agents.
31. Drawings—That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, exteni, and character of the Work to be performed hy Cantractor.
Submittals are not Drawings as so deiin�d.
32. Effective Date of ihe Agreement The date indicated in the Agreement on which it becomes
effective, but if no such date is indicated, it means the date on which the Agreement is signed
and delivered by the last of the twvo parties to sign and deliver.
33. �ngfnee� The Iicensed professional engiz�.eer or eng�neering firrn registered in the State of
Texas performing professional services far the Ciry.
34. Extra Work — Additional wark made n�cessary by changes or alterations of the Contract
Doeuments or of quantities or far other reasons for which no prices are provided in the Contract
Doc�unents. Extra work shaIl be part af the Work.
35. Field Order —A written order issued by City which requires changes in the Work but which
does not involve a change in t.�e Contract Price, Contx�act Time, or tbe intent of the Engineer.
Field Orders are paid from Field Order Allowances incorporated inta the Contract by funded
work type at the tune of award.
36. Fina� Acceptance — The written notice given by the City ta �ie Contractor that the Work
specified in the Contract Documents has been completed ta the satisfaction of the City.
CITYQF 4�ORT WORTH Lackfand l�oud Side�rcrll,' lu��ar'o+�nrnervs
STAM7ARDCOM3TRUCT[ON 5PEC1FICATIOM DOClJME7�[TS CPA?• Ifl(1G37-3
Revisian: 8�1.�2p21
00 72 b0 - l
G�fdERAL CpND iT10 K S
Fage 4 oFfi3
37. Final Inspection — Tnspection carried out by the City to verify that the Contractoar kxas
camp�eied the Work, and each and every paxt or appurtenance thereof, fully, entirely, and in
canformance with the Contract Documents,
38. General Requirements—Sections of Divisian 1 of the Contract Documents.
39. Haac�rdous Environmentai Conditio�a The presence at the Srte of Asbestos, PCBs,
Petroleum, Hazardous Waste, Radioactive Material, or other materiais in. such quantities or
circumstanc�s that rnay present a substantial danger to persans or prapexty exposed thereto.
40. Haza�dous Waste Hazardous wast� is de�'iried as any solid wasie listed as ha�ardous or
passesses one or more hazardous characteristics as defined in the federal waste regulations,
as amended from time to iitne.
4I, Laws and Regulations—Any and alI applicable laws, rules, regulations, ordinances, codes,
and arders oi any and aI� governmental bodies, agenci�s, authorrties, and courts ha�ing
jurisdictian.
42. Liens—Cbarges, security interests, or �ncumbrances upon Project funds, real prop�rty, or
persanal property.
43. Maj or Item-- An Item af waxk included in the Con�ract Documents tk�at has a total cost equal
to or greaier than S% of the original Contxact Price or $2�,000 whichever is less.
44. Milestone—A principal event spec�ed in tbe Cnntract Documents relating to an intermec�iate
Contract Time pxiox to Final Acceptance of the Work.
45. IVotice of'Awar�d Th� written notice by City to the Successful Bidder statin:g that upon
timely carnpliance by thc Successful Bidder with the conditions precedent listed therei.n, City
wi11 sign and deliver the Agreement.
46. Notace ta Proceed—A writ�en notice given by City to Contractar fi�aing the date on which the
Contract Time will ca�ez�ce to run and on which Contractar shall start to perform the Vi�ork
specif'ied in Co�tract Documen.ts.
47. PCBs Polychlorinated biphenyls.
4$. Petraleum—Yetroleum, including crude oil or any fraction tl�ereof which is liquid at standard
conditions of temperatuxe and pressure (60 degrees Fahrenhe� and 14,7 pounds per square
inch absalute), such as oi1, petroleum, fuel oil, oil sludge, oil reiuse, gasoline, kerosene, and
oi� mixed with other na�-Hazardou� Waste and crude oils.
49. Plans — See definition of Drar�vings.
CITY OF FORT WORTH Lacklaia�t Rouc! Sicle7rulk l�rtproi�eurei7ls
STAIVI7AR➢CONSTRUCTION 51'ECIFICAT[ON DOCUM�NTS CPf4': 1110G37-3
Revision: 823�20Z1
oo�aoo-�
GENERAL CON�ITION 5
Pag� 5 of 63
50. Project Schedu2e—A schedule, prepared and rr�aintained hy Gontractor, in accordance with
ihe Genera] Requirements, describing the sequence and dwration of the activities campr:�ing
the Contractar's plan to accomplish the Work withm the Confract Time.
51. Project—The Work to be performed under the Cantract Docutnents.
52. PNojectManager—The authorized representative of the City who wi11 be assigned to the
Site.
53. Public Meeting — An annauneed meeting canducted lry �he City to facilitate pubiic
participation and to assist the public in gaining an inforrned view of the Praject.
54. Radioactive Material�nurce, special nuclear, or bypraduct material as defined by the
Atomic Energy Act of 1954 (42 USC 5ection 2011 et seq.) a� amended from tirne to time.
S5. Regular Wo�ki�g Hours --Hours beginning at 7:00 a.m. and enciing at 6:00 p.m., Monday
thru Fxiday (e�cluding l�gal holidays).
SG. Samples—Physical examples of xnaterials, �quipment, or worl�.aaz�ship that are
representative of som� portion o�the Work and which establish the standards bp which such
portion of the Work will be judged.
57. Schedule of Submittals—A schedule, prepared and main#ained bp Contractor, af required
subrnittals and the tirne requirernents to support scheduled performance of related construction
activities.
58. Schedule of T/alue5 A schedule, prepared and mait�tained by Contractor, allocating portions
of the Gontract Price tv various portions of the Work and used as the basis for reviewing
Contractor's Applications far Payment.
59. Site—Lands ar areas indicated ica the Contract Documents as being fiunished by City upon
which th� Work is to be pe�'arzned, including rights-of-way, permifis, and easements for access
thereto, and such other lands funvshed by City which are designated for ihe use of Contractor.
64. Specifications—That part of the Contract Documenfis consi��ng of written requirements far
materials, equiprne�at, systems, standards and work►nanshi.p as applied #o the Work, and certain
adminisirative requiremenfs and procedural matters applieab�e thereto. Specif"ications may be
specifically made a part of the Contract Documents Uy attae�iment or, if not attached, may be
incorporated by re�erence as indicated in tl�e Table of Con#ents (Division 00 00 00) of each
Project.
61. SuBcontractor An indi�idual or entity ha�ing a direct contract wifih Contractor ar with any
other Subcontractar for the performance of a pari af the VL�ork at the Site.
CITY OF FORT WQRTH Lrrckl�uac� Hvrrd Sidetralk h�r�aroserrrettts
STAN1lARDCQNSTRUCTIUN SPEC[F[CATION bOCUMENTS C'f':V: 1R0G37-3
Revision: &�1Q21
ao�2oo-�
GENERAL CON�ITION S
Page 6 of 63
62. Su6mittals—All drawings, diagrarns, illcastratians, schedules, and other data or informatioz�
which are specifically prepared ar asseinbled by or for Contractar and submitted by Contractor
to illustrate some portion af the Work.
63. 5ubstantial Completion — The stage in the progress af the Project when tha Work i�
sufiici�;ntly complete in accordance with the Contract Docur�aents for Final Inspection.
64. Successfi�l Bidder The Bidder submitting the low�st and rnnst responsive Bid to whom City
makes an Award.
�S. Superintetzdent— The representafive a�%he Contractor who is availabl� at all times and able
to receive instructions from the Cit� and to act for fihe Contractor,
6C. 5upple�rae�atary Condirions—That part of the Contract Documents which amend� ar
supplements these General Conditions.
67. Supplier Amanufacturer,fabricator, supplier, disiributor, materialman, orvendor having a
direct contract with Contractar or with any �ubcontrac�or to furnish materials ar equipment
to be incorporated in the Work by Contractar Qr �ubcontra�tor.
68, Undergrou�d Facilities—All underground pipelines, conduits, ducts, cables, wir�s,
manhales, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements
contain�ng such facilities, includang but not limited to, those that eQnvey electricity, gases,
steam, liquid petraleutn products, telephone or other commutucation�, cable television,
water, wasiewater, storm v�ater, othex �;quads or chemicals, or traffic or other cantrol systems.
�9 UnitPrice Work—See Paragraph 11.03 of these Genexal Conditions for definition.
7fl. Weekend YYorking Ho��s — Haurs beguuung at 9:00 a.rn. and ending at 5:00 p.m., Saturday,
Sunday or legal hQliday, as approved in advance by the City.
71. Wor�k The entire construction or the various separately identifiable part� thereof required to
be provided under the Contract Documents, Work includes and is the result of performing or
pro�iding all labar, services, and documentation necessary to produce such construction
including any Change Order or Field Order, and furnishing, installing, and incorporating all
ma.terials and equipment inta such construction, al� as required �y the Coantract Documents,
72, Working Day — A working day is defined as a day, not including Saturday�, Sundays, or lega]
holidays aufihorized by the City for contract purposes, in which weather or other condxtians
not undex the control of the Contractor will permit the performance of the principal unzt af
�w�rk underway for a continuous period of nat less than 7 hours between 7 a.m. and 6 p.m.
1.02 Te�^minology
A, The words and terms discussed iti Paragraph 1.02.B �hrough E are not defined but, when used in
the Bidding Requirements ar Contract Dncuments, have the indicated meaning.
B. Intentof Certain Terms orAdjectives:
C1TY OF FORT WORTFI Lacklrriir!l��crd S'ide�s•rrlk 11rrWt•ni�errre��ls
STANDAI2DCON5TRUCT[DN 5PEC1CICAT[ON DOCIJMENTS ['PN: l�11637-3
Revision: 82311fl2I
oonoa-i
GEN�RAL CONDITION S
Page 7 of 63
1. The Cant�act Docl�rnents include the terms "as allowed," "as approved," "as ordered," "as
directed" or terms of lil� effect or irnport to autY�orize an exercise of judgment by City. In
addition, the adjectives "reasonab�e," "suitable," "acceptabie," "proper," "satisfactary," or
adjec#ives of like effect or import are used to descri�e an action ar determinaiion of City as to
the Work. It is intended that such exercise af professional judg�raent, action, or determination
will be solely to evaluate, in general, the Work for compliance wiih the information in the
Cantract Documents and with the design concept af the Project as a funetioning whole as
shown or indicated in the Contract Documents (unless there is a specific statement indicaiing
otherwise).
C. Defective:
1, The ward "defective," when modifying the word "Work," refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does nat conform to the Contract Documents; or
b. does not rlaeet the requirements of any applicable inspectian, refer�nce standard, test, or
approval referred ta in the Contract Documents; ar
c. has been damaged prior to Ciry's vWrit#en acceptance.
D, �'urnish, Install, Perforr� Provide:
1. The word "Furnish" ox the word "Ins#aIP' or the word "Perform" or the word "Provide" ar
the word "Supply," or any combination or similar directive or usage thereaf, shall mean
fi�rnishing and incorpnrating it� the Work including all necessary labor, materials, equipment,
and everyth'vng anecessary ta perform the Work indi.cated, unless speciitcally limited in the
context used.
E. UnIess stated oth�rwise in the Contract Documents, words or phrases that have a well-knawn
technacal ar construction industry or trade nrxeaning are used in the Contract Documents in
accordance with such recognized mearung.
ARTICLE 2 — PRELIMINARY MATTERS
2.01 Co�ies of Docurnents
Ci#y shall furnish to Cantractor one (1) original executed copy and one (1} electronic copy of the
Contract Documents, and faur (4} additional copies of fhe Drawings. Additional copies will be
furnished upon request at the cost of reproduciion,
2.02 Cor�zrnencement of Contract Tirrae; Notice to PYoceed
'The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to
Paroceedma� be given no earlier than 1�4 days after the Effective Date ofthe A�eerz�.ent, unless agreed
t� by' both parties in writing.
CITY OF L'ORT WORTH 1_rreklcrrac! Road Sirleu�alk Inr�ir�i�enrenfs
STAI+lDARDCONSTRUCTIDM SPEC[F[CATION T70CUMENTS i'P,V: !(10�37-3
Revision: 82�1D21
q47200-I
GEN�RAI. COND ITION S
Page 8 of 63
2.��
2.04
2.Q5
2.06
2.07
S'tarting the Wo�k
Contractor shall start to p�rform the W�rk on t�e date when the Contract Time commences to �un.
No Vdork shall be done ai the Site prior to the date on which the Cantract Time commenc�s to run.
�efore Star�iingCanstruction
Baseline Schedules: Submrt in aceordance with the Contract Documents, and prior to stai� the
Work
Pr�econstruction Conference
Befor� any Work at ihe Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Cont�act Documents.
Pul�lic M�eting
Contractar may not mobilize any equipment, materials or resaurces to the Site prior to Contractor
att�nding the PubIic Meeting as scheduied by the City,
Initial Acceptc�nce ofSchedules
No progress payment shall be made to Contractor until acceptable schedules are submitted to City in
accordance wikhthe Schedule Specification as provided m the CanbcactDocuments,
ARTICLE 3-- CONTRACT DOCUME1tiTS: INTENT, AMENDING, REUSE
3.01 Intent
A. The Contract Documents are complementaz-y; what is required by one is as binding as if required
by all.
B. It is tk�e intent of the Contract Documents to describe a functianally complete project {or part
thereo� to be constructed in accordance withthe Contract Documents. Any labor, docutnentation,
servic�s, materia�, ox equipment that reasonably rnay be inferred from the Contract Documents
ar from prevailirig custom or trade usage as being requir�d to produce the indicated result will be
pravided whetl�er or not spec�cally called for, a� no additional cost to City.
C. Clarifcations and interpretations of the Cantract Dacurnents shall be issued by City.
D. The Speeifications may vary in form, format and style. Some Speciiication sec�ions may be written
in �arying degrees o� stream�ined ar declarative style and some sections may be rela,ii�ely
narrative by campari�on. Ornission af such words and phrases as "Ehe Contractnr shall," "in
conformity �1%�1," "a.S S�lOWI1," OI' "75 specifred" �T'� lllieritilU1731 iz� strearnlined sections.
Omitted words and phrases shall be supplied by infer�nce. Similar types ofprowi�ions may appear
in various parts of a secfiion or articles within a part depending a� fhe format of the
CITY OF FORT WORTH L,acTrlcrtrcl 1Zvucl Sicleiralk Lv�l�rai�errrerils
STANDAI2BCD1�5TRUCTION SPECIFICATION DOCUMENTS
Revision:811,312p21 CPn': lfJO(37-.3
007200-1
GENERAL CON�lT10N S
Page 9 oF 63
section. The Contractar shall noi take advantage of any variation of iarrn, format or style u�
ma�Cing Contract Glaims.
E. The cross referencing of spec�catian sections under the subparagraph heading "Rela#ed
Sections include but are not necessarily Sim�ed to:" and e�sewhere wikhit� each Sp�cification
section is provided as an aid and convenience to th� Contractar. The Contractor shall not rely on
the cross referencirig provided and �hall be responsbl�; to coordinate the entire Work under the
Contract Documents and provide a corr�plete Project whether or not the cross referencing is
provided in each section or whether or not the cross referencing is complete.
3.02 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standa�'ds, specifieatians, manuals, or codes of any technical socie#y, organi�a.tion,
ar assacaatio�n, or to Laws or Reg�alations, whether such reference be specific or by �rnplication,
sha11 rr�ean the standard, spaciffcation, manua�, cade, or Laws or Regulations in, e�`fect at the
time a� o�ening of Bids (or on the Effective Date of the Agreement if there were no Bids),
except as may be otherw�ise specifi�ally stated in ihe Contract Documents.
2. Na provision of any such standard, specif'ication, manua.l, or code, or any instruction of a
Supplier, shall be effective to char�ge the duties ar responsibilifiies af City, Contractor, or any
of their subcontraciors, consuItants, agents, or empiayees, fram those set forth in the Contract
Docwnents. No such provisian or instruction shall be effective to assign to City, or any of rts
offe�rs, directors, members, partners, employees, agents, co�nsultants, or subcontractors, any
duty or authority to supervise or direct the performance of the Woxk or any duty or authority
to undertake responsibility incoz►sisYent with the provisions of the Coniract Docutnents.
3,03 Repo�ting and ResolvingDiserepancies
A. Repo�tingDisc�epancies:
1. Cant�actoN's Review ofContractDacunzents Before 5tarting YVark: Before undertaking each
part of the Wark, Contractor shall carefully study and compare the Con�ract Documents anci
cheek and verify pertinent fgures therein against all app�icable field m�asurements and
conditions. Contractor sha�l promptly r�port in writing to City ar�y conflict, error, ambiguity,
ar discrepancy which Contractor diseavers, or has acivall�owledge of, and shall obtain a
vvritten interpretation or clarifcation from City before proceeding with any Work affected
thereby.
2. Cont�actor's Review of Caniract Docum�nts Du�ing Pet�formance of Worlc: If, during tk�e
performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy
withit� the Contract Dacuments, ar between the Caniract Doeuments and (a) any applicable
Law or Regulatian ,(b} any standard, specification, manua.l, or code, or (c) any u�siruction af
any Suppfier, then Contractor shall promptly report it to City in writing. Contractor shaIl not
proceed with the WoxIc affected thereby (except in an ennergency as required by Paragraph
C1TY OF FORT W012'T'H l.ackl�rricl Rraad Sirleic�rrlk I+ri��ro7�enre���s
STANDARDCONSTRUCTION 5PEC1PiCATIDN DOCiJN1EI�iTS C'Pr1': 10f1G_?7-3
Revisian: l3IZ32(1�1
aa �2 00 - i
GENERAL CON� IT 10 N S
P age l 0 aF 63
6.17.A) until an amendment or supplement to the Contract Documents has been issued by
one o� the methods indicated in P aragraph 3.04.
3. Contractor shall not be liable to City far faiiur� to report any conflict, error, ambiguity, or
discrepancy in the Cnnt�ract Documents unless Contractor had actual Irnowledge thereof.
B. Resolving Disc�epancies.•
1. Except as znay be atherwise specifically stated in the Contract Documents, the provisions of
the Contract Docurnents shall take precedence in� resolving any conflict, error, arnbiguity, or
discrepancy between the pro�isions of the Con�ract Documents and the provisions af any
standard, specification, manual, or the it�truction af any Supplier (wheth�r or not speGifically
incorporated by reference in the Contract Documents).
2. In case af discrepancies, figured dimensions shali govern over scaIed dimensions, Plans shall
govern over Specif'ications, Supplementary Conditions �hall go�ern avez General Conc�itions
�z�d S�ecifications, and quantiti�s shnwn on the Plans shall go�ern aver those shown in the
propasal.
3.04 Amending and 5'upplementing Cantr^act Docut�tents
A. The Contract Doeuments may be amended to provide for additians, de�etia�, and revision� in
the Wark or to modify the tern�s and conditioras thereof by a Change Order.
B. The requirements af the Contract Documents may be supplemented, and minar variatinns and
deviations in the Work nat invalving a change in Cont�act Price ox Contract Time, may be
authorized, by one or more o�'the following ways:
1. A Fie1d Order;
2. City's review af a Subrnittai (subject to the provisions of Paragraph 6.18, C}; or
3. City's written interpretation or elarification,
3.05 Reuse ofDocuments
A. Cantxactor and any Subcontractor or Supplier shall not:
1. �ave or acqu�e any title to or ownership rights in any of the Drawings, Specif'icatzo�, or
other docwnnents (or capies of any thereo� prepared by or bearing the seal a� Engimeer,
including electranic media edition�; or
2. reuse any sueh Drawings, �peci�fcations, other docutnents, or capies thereof on axtensians of
the Project ar any other project wi�thout written cansent of City and specific written verification
or ada�tation by Engineer.
CITY OE F�RT WQRTH Ltrcldcrnd Roc�rl Sicfe�rulk hitj�rarerrte�rts
STANDAR.DCONSTRUCTION SPECll�ICATION DOCUMENTS ('Ph; /ppG37-3
Revision; 8rJ.3I�1
aa�zoo,�
G�NERAL COND]T10N S
Page 11 of 63
B. Tk�e prohibiiions of this Paragraph 3.05 will survive final payment, or termizxation of the
Contract. Nothing h�rein shall preclude Contractor from r�taining copies of the Cantract
Documents far record purposes.
3.06 Electranic Data
A. Unless otherw�ise stated in the Supp�ementary Conditions, the data furnished by City or Engineer
to Cantractor, or by Contractor io City or Engineer, that may be relied upan are limited to the
printed copie5 iricluded in the Contract Document� (also known as hard capies) and other
Specifications referenced and located an th� Cily's on line electronic dacument management and
collaboration system site. Files � eiectxonic rnedia format of texi, daia, graphics, ox oth�r types
axe fiurnished anly far �he convenience of the receivmg party. Any conclusion or information
obtained or derived from such elec�ronic files wi�i be atth� user's sole risk. Ifthere is a discrepancy
betwe�n the electronic files and the hard capies, th� hard eopies govern.
B. When transferring documents in electronic media format, the trans�erring party makes no
representations as to long term compatibiliiy, usability, or readabili�ky of documents resulting from
the use af software application packages, operating �ystems, or campuier hardware differing from
those usezi by the data's creator,
ARTICLE 4— AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
HAZARDOUS ENVIRONMENTAL CONDY'1"�ONS; REFERENCE POINTS
4.01 Availability ofLands
A. City shall furivsh the Site. City sha.�l not�y Contractor of any encumbrances or restrictions not of
general application but specifically related to use of the Site with which Contractar must com�ly
in perforrning the Work, City will obtain in a timely maruier and pay far easem�nts for permanent
structures or permanent changes in existing facilities.
1. The City has obtained or anticipates acquisition of and/or access to right-of way, andlc�r
easemenis, Any outstanding right-of-way andlor easements are anticipated to be acquired in
accordance with the sched�ale set forth in the �upplementary Conditions. The Project Schedule
submitted by the Contrac#or in accordance wrth the Contract Documents must considex atay
outstanding right-of-way, andlor easemen,ts.
2. The City has ar anticipates removing and/or relocatmg utilities, and obstructians to the Site.
Any outstanding removal or relocation of utilities or obstructions is anticipated iu accordance
wi�i the schedule set forth in the Supplernentary Conditions. The Project Schedule submitted
by the Contractor in accordance with the Contract Docwnents must consider any outstanding
util�tyes or obstructions �o be rernoved, adjusted, andlor• relocated by others.
B. Upon reasona.ble written request, City shaIl fiu•nish Gontractor with a current statement of record
legai title and legal description of th� lands upon wluch the Work �s ta be performed.
C1TY OP FORT WORTH Lctcklcaul Ro[rd .Side+rnik lnrprorNurcrtf.r
S1'ANDARDCONSTRUCT1flN 5PECIF'1CATION DOCUMENTS CNRr: l0063T-3
Revision: 8J23/1Q21
00720U-1
GENERAL CONOITION S
Page ]Zofb3
C. Contractor shall pro�ide for all additional lands and access thereto that may be required for
constructian facilities ot storage of materials and equipment.
4.02 Subsurface candPhy.sical Conditions
A. Reports and Dratvings: The Supplementary Canda�tions id�ntify:
1. those reports known to Ciry of explorations and tests of subsurface conditions at or
contiguous to the Site; and
2. those drawiug� known to City of physical eonditions relating ta eaci�ting surface or
subsurface structures at the Site (except LTnderground Faciliries}.
B. Limited Reliance by Contt�actor on Technical DataAuthorized: Contractor may r�ly upon �he
accuracy o� the "technical data" containea in such reports and drawings, bui such reports and
drawings are not Contract Docurnents. Such "technical data" is identified rn the Supplementary
Conditions. Conl�actor may nat rnake any Contract Cla�m against Ciiy, or any of their officers,
directors, mernbers, partners, employees, agents, eonsultants, or subcontractors with respect to:
l. the cozxipleteness of such reports and drawings for Contractar's purposes, including, but not
limited to, any aspects of the means, methods, techniques, sequences, and procedures of
conslruction to be emp�oyed by Contractor, and safety precautions and pragrams inc�dent
thereto; or
2. other data, interpretations, apini.ons, and informaiion contained in such reports or shown or
indacated in such drawings; ar
3. any Conh�actor imterpreta.tion of or conclusion dra�n fro�n any "technical data" or any such
other data, in#erpretations, opinions, ar informa.tzon.
4.Q3 DifferingSubsurface or P�tysfcal Conditions
A, Notice: If Contractor belie�es ihat any subsl.�rface or physical condition that is uncovered ar
reveakd eith�;r:
1. is of such a nature as to �stablish that any "technical data" on whicb Contracfiar is enfitled ta
rely as pravided in Paragraph 4,02 is materially inaccurate; or
2. is of s�ch a zlature as to require a change in the Contract Documents, �r
3. differs materially from ihat shown or indicated in the Contract D�cuments; or
4. is of an unu5ual nature, and differs materially from c.onditions ordinar�y en�ountered and
generaily recognized as inherent in waxk of the character pro�id�d for in the Contract
Documents;
C1TX OF FORT WORTH Lcrckland Rarrcl SSdetralk l�upf•ni�u�e��ls
STAI�DARD.CONSTRUCTION SPEC[F[CAT[ON DOCLIMENTS C!'A?• lC1f1G.37-�3
Revision: 8rL"iCX121
0�7200-I
G�NERAL CDNDITION 5
Page l3 of 63
then Contractor sl�all, promptly after becomulg aware thereof and before fiuther disturbing tke
subsur�ace or physical conditions ar performing any Work in connection therewith {except in an
emergency as required by Paragraph 6.17.A), notify City ii1 writit�g about such condition,
B. Possible Frice and Time Adjustments
Contractar shall not be entitled ta any adjustment in the Contract Price or Contract Time if
1. Contractor knew of the existence of such canditions at the time Cor�tractor made a final
comTnitment to City with respect to Contract Pric� and Contxact Time by the suhmissian of a
Bid or becoming bound unde:r a negotiated contract; or
2. the existence of such candrtion could reasonably have been discavered ar reveal�d as a result
of the examination o� the Cantract Docutnents or the Site; or
3. Contractor failed to give the writien notice as required by Paragraph 4.03.A.
4.Q4 UndergrounclFacilities
A. Shown or Indicated.� The information and data shown or indicated ixz the Cantract Documents
with respectto ex�stiing Underground Facilities at ar contiguous to the Srte is based an information
and data furnished to City or Engineer by the owners of such Underground Facilities,
including City, or by ot,hers. Unless it is otherwise expressly provided in the Supplementary
Conditions:
1. City and Engineer shall not he responsible for the accuracy or campleteness of any such
information or data pro�ided by others; and
2. the cosi of all of the following will be included in the Contract Price, and Contractor shall
have full respons bility for:
a. reviewin� and ehecking all such information and clata;
h. Iocating aIl Un�erground Facilities shawn or indicafed in the Contract Documents;
c. coardination and adjus�ient af Y1ie Work with the owners of such Underground
Facilities, including City, during construction; and
d. the safety and protection af all such Underground Facilities a�d repairing any damage
thereto resuiting frorn the Wark.
B. NotShown orlrtdicated.•
1. I� an Underground Facility whieh conflicts with the Work is uneovered �r revealed at or
cantiguous to the Site whi�h was not showm or indicated, ar not shown or indicated with
reasonable accuracy in the Contract Documents, Cantractor shall, prornptly after becoming
aware thereof and �efore further disturbing conditions affected th�reby ar perfoi-ming any
C1TY QF FORT W012TH l.at�d•lartd R�rtd Sideu'Cll�i IN7jJl'Ol'GJFlG'7?1S
STANDARDCONSTRUCTION SPECIFICATION DOCUMEiVT3
CPfV: l00637-3
Revision: &23/1021
007�00-�
GENERAL G4NDITION 5
Page l4 of 63
�]L�ork in com7ectian thexewith (except in an emergency as r�quired by Paragraph 6.17.A),
identify the owner of such Underground Facility and give notice to that �v�rner and to City.
City w�l review the discovexed Underground Facility and deterrnine the extent, if any, �o
which a change may be requiured in the Contract Dacuments to reflect and dacument the
consequEnces of the existence ar locaiion of the Undergraund Facifity. Contractor shalI be
respansible for the safety and protec�ion of such discovered Underground Facility.
2. If City concludes that a change in the Contract Documenis is required, a Change Order ma.y
be issued to reflect and document such consequenees.
3. Verification of e�ting utilities, struetures, and service lines s}�ll itaclude notification af a11
utility �ornpanies a minimuam of 48 hours in advance of construction including exploratory
excavation i� necessary.
�.QS Refe�ence Points
A. City shall prov'rde engineering surveys to establish reference paints far construction, which in
City's judgment are necessazy to enable Cantractor ta proce�d with the Wark. City will provide
construction stakes or other customary method of markin� to estabIish line and gades for roadway
and utility eonstruction, centerlines and benchmarks far bridg�work. Cnntractor sk�all protect and
preserve tha establishad reference po�ts and property rnonuments, and shall make no changes or
relocations. Contractor shall report to City whenever any reference point or property mnnument is
lost or desiroyed or requires relocation because af necessary changes in grades or locations. The
City shall be respansibl� for the replacement ox �re�ocation of reference points or prop�rty
znonument,s not carelessly or willfully destroyed by the Contractor. The Contractor shall notify
City in advance and with sufficient tirne ta avoid delays.
B. VVhenever, in th� opinion of t1�e City, any reference point ar monument has been carelessly or
willfully destroyed, disiurb�d, or removed by the Contractor or any of his employeEs, tbe fixll cost
for replacing such points plus 25% urill be cI�arged against the Contractor, and the full amount will
be deducted from payment due the Coniractor.
4.06 Hazardous EnviYonmentcal Condition at Site
A. Reportsand D�awings: Th� �upplementary Conditions identify those reports and drawings known
to City relating to Hazardous En'vironmenta.I Conditions that have �een idantif'i�d at the Site.
B. Limited Reliance by Cont�actar on Technical Data Autha�ized: Con.tractQr may rely upon the
accuracy af the "technical data." contained in such reports and drawings, but such reports and
drawit�gs are zzot Contract Documents. Such "technical daia" is identified in the Supplementary
Conditions. Contraetor rnay not make any Contract Claim against Czty�, ox a�ny of their offcers,
directors, rnembers, paz�ariers, ernployees, agents, consultants, or subcqntractors with respect to:
1. the campletene�s of sueh reports and drawings for Contractor's purposes, including, but nat
limited to, any asp�cts of the means, znethods, techniques, sequences and procedures af
CITYOF f ORT WORTH 1 acklcrrttl Rocrc! 3icleirulk lr�rl�rm�emerals
STNVDARDCONSTRUCTION SPECIFICATION I)OCUIv(ENTS
Revision: 8232(]Zl CPn': IOlJG37-3
OOi2�0-I
GEIdERAL CON�ITIpN S
Page 15 nf 63
constructian to be employed by Contractar and sa�eiy precautions and �rograms incident
thereto;ar
2. other data, interpretations, opizaians and information contained in such reports or shown or
indicated in such drawings; or
3. any Contractor interpretation o� or canclusion drawn from any "techni�al data" or any such
other data, interpretatians, opinions or information.
C. Contractor shall not be responsible for any Hazardous Environmental Condition un�avered or
xevealed at the Site which was not shown or indicated 'm Drawings or Spec�cahons or identifie d
in the Co�iract Documents to be within the scope of the Work. Contractor sha11 be resporisible for
a Hazardous En�ironmental Condition created with any mater�als brought ta the Site by
Gonlxactor, Subcontractoxs, Suppliers, ar anyone else far whom Contractor is responsble.
D. If Contractor encouni�rs a Hazardous Environmental Condition or � Contractor or anyone for
wham Coni�actor is responsible creates a Hazardou� Env�ronmental Condition, Contractor shall
immediately: (i) secure ar otherwise isolate such condition; (az} stop all Work in connection with
such condition and in any area affected thereby (except � an emergency as requir�d by Paragraph
6,17,A); and (ui} notify City (and promptly thereafter confirm such notice in writing). City may
consid�r the nacessity to retain a qualified experfi to evaluate such condition or talce correctrve
action, if any.
E. Contractor shall not be required to resume VVork in connection with such conditio�. ar in an�
afFectedarea until afterCity has obtained any requir�d permits relatedthereto and delivered written
notice to Contraetor: (i) spec�ying tha� sueh conditian and any affected area is or has been
rendered suitable for the resumption af Work; or (u) specifying any special canditions under which
such Work may be resumed.
F. If after receipt of sueh writt�n notice Coniractar does not agree to resunr�e such Wark bas�d on a
reasonable belief it is unsafe, or does not agree to resume such Work undex such special conciitions,
then City may order the portion of the Wark thai is in the area aifected by' such candition to be
de�eted from �e Warlc. City may have such deleted portion o� the Work pexfarmed by City's own
forces or athers.
G. To the fullest extent permitted by Laws and Rsgulataons, Cantractor� shall indemnify and hald
harmless City, from and against aIl ciainxr, casts, lasses, and d�mages (ineluding but not lirnited
to all fees and charges of engineers, architects, atto�-neys, c�nd othe� professionals and all cou�-t
or arbitt•ation or atheN dispute resolution casts) arising out af or relating t�o a Hazardaus
Environmental Condition created by Corat�actara�by anyoneforwhomCnnt�acto� is responsible.
Nothing in this Paragraph 4. 06.G shall obligate Cont�actar to indemn� any indivtdual or entaty
f�om and against the consequences of that individual's or entity's oyvn neglfgence.
H, The pro�isions of Paragraphs 4.02, 4.Q3, and 4.44 do noi a�ply to a Hazardous Environmental
Condition uncovered or revealed at the Site.
GI`['Y OF FORT WORTH Lcrcl�la+ac� 12oad Siclebrnik Aippre�venrerrls
STANDARDCDNS'CRUC'CION SPECIFICATION DOCUMENTS
C!'N: 1110G37-3
Rer+ision: 8232021
067200-I
GENERAL CON7ITION S
Page 16 af 63
ARTICLE S— BONDS AND rNSURANCE
5.01 Licensed Sureties and Insure�s
All bonds and insurance requ�ed by tbe Contract Documents to ba purchased and rnaintauied by
Contractar shall be obtained fr�m surety or insurance companies that are duly licensed or autharized
in the Siate of Te�as to issue bonds ox insurance policies for the limits and coverages so required.
Such surety and insurance cornpanies shall also meet such additional requ�rements and qualifications
as may be provided in the �upplementary Conditions.
5.02 Pe�formance, Payment, andMaintenance Bonds
A. Contractor sha�l furiYish pexfox�nance and paymeni bonds, in aecordan.ce with Texas Government
Code Chapter 2253 ar successor statute, each in an amount equal fo the Contract Price as
security for the �'azth�ul perfoxrr�ance and payment of all o�' Contraetor's obligations under the
Contract Documents.
B. Cantractox shall furnish maintenance bonds in an amount equal to the Contract Price as security
to protect the Ci�ty against any defects in any portion a� the Work described iri the Contract
Documents. Maintenance bonds shall remain in effect for two (2) years after the data of Final
Acc�ptance by the City.
C. AlI bonds shall be in tha form pr�s�ribed by the Contract Doeuments except as pravided otherwise
by Laws or Regulations, and shall be executed by �uch sureties as are named in the list of
"Compaxaies Holding Certificates of Authority as Acceptable Sureties on �'ederal Bonds and as
Acceptal�le Re�suring Companies" as published ia C�rcular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Departrnent of the Treasury. All bonds signed by
an agent or attorney-in-fact must be accompanied by a sealed and da�ed power of attorney which
shall shaw that it is effectrve on the date ihe agent or attorney-m-fact signed each bond.
D. If the surety an any bond furnished by Contractor is declared bankrupt or becomes insolvent or its
right to do business is teiminat�d in the State of Texas or it ceases to meet the requirernents of
Paragraph5.02.C, Contractor sY�alI promptly notify City and shall, within 30 days afterthe event
giving arise to such notification, provide annther band and surety, both of which shall complq with
the requirem�enfis of P ara�aphs 5.01 and 5. Q2. C.
5.03 Certi�cates of Insurance
Contractor shall deliver to City, with copi�s to eachadditionaI insured and loss payee zdentif'ied in the
Supplementary Conditions, certif'icates of insurance (other evidence of insurance requested by City ar
an� other additional insured) in at least the 1�in�u�zum amourit as spec�ed in the Supplementary
Conditions which Contraetor is required to purchase and maiu�fain.
1. Th� certif"icate o� insurance shall docutnent the City, and all identified entities named in the
Supplementary Conditioz� as "Additional Insured"' on all liability policies.
CITY OF FORT WOi2TI-1 Lrrcklcnad l�vrrr! Sideirmlk hrrproi�errrerrls
STANDARpCONSTRUCT10Tf SPECIF1C�TfON DOCUMI:N'CS C']'.V: lOOC37-3
Revision: 823f1021
007200-1
GEN�.FZALCONDITION 5
Page 17 of b3
2. The Contractor's general liability insurance shall inc�ude a, "per praj�ct'' or °`per location",
endarsement, which shall be identifed in ihe certificate of insurance provided to the City.
3. The certif'icate shall bc signed by an agent authorized to bind coverage on behalf of the insure d,
be complete i� its �;ntirety, and show complete insu�rance carrier names as listed in the current
A.M. Best P:roperty & Casualty Cruide
4. The insurers for all policies must be licensed andlor appraved to do business in the State ai
Texas, Except for workers' compensation, all insurers must have a minimum ratulg of A-:
VII in the curreni A. M. Best Key Rati�g Guide or ha�ve reasonably equivalent f�nancial
strength and solvency to the satisfaction of R.isk Management. If the rating is below that
xequired, written approval of City is requ�ed.
5. All applicable policies shall in�iude a Waiver af Subrogation (Rights of Recovery) in favor
of the City. In adclit.ion, the Cont�rac#ar agrees to waive a�l rights of subrogation against the
Engin�er (if applicable�, and each additianal insured identified in the Supplementary
Conditions
6. Failure of the City to demand such certificate� or other evidence of fiill compliance with the
in:5urance requiremenfis ar failctre af the City to identify a defi�iency from evidence tk�at is
provided sl�ail not be construed as a waiver of Contractor's obligation to mair�tain such lirie s
of insurance coverage.
7. I� insurane� poficies are no# written fox specif'�ed coverage limits, an Umbrella or Excess
Liability insiaxance for any difFerences is required. Excess Liability sha.11 follov� form of the
primary coverage.
8. Unlass oi�herwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims-made basis, the retroactive date shali be caincident with
or prior to the date of the effective date of the agreement and ihe certificate of iu�surance shall
state that the coverage � claitns-made and the retroactive date. The insurance caverage shalj
be maintained for the duration of the Contract and far three (3) yeaxs fallowing Finai
Acceptance provided undex the Contract Documenfs ar far the warranty period, whichever is
longer. An annual cert�cate o� insurance submitted to the City shall evidence such
insurance eoverage.
9. Po�icies sha� have no exclu�ions by enclorsements, which, neither nullify or amend, the
required lines a� ca�erage, nor decrease the limits of said coverage unless such endor5ements
are approved in writit�g by the City. In the event a Contract has been bi� ar executed and thc�
exclusions are determined to be unacceptable or the City desires add'ztional insuranc� coverage,
and the City desires the contractorlcngineer to obtain such coverage, the contract price shall
be adjusted by the cost of the preix�iuni far such addit�onal cavera�e plus 10°fo.
10. Any self-insured retention (SIR), in excess of $2S,OOO.QO, affecting required insurance
coverage sha�l be approved by the City in regards to asset value and stockho�ders' equity. In
CITY OF FORT WORTH l.�reklarTd Raud Srdeu�aNc Iniprai�emeials
STANDARDCDNSTIiUCT1UN SPECIFICAT[ON bpCUMEAlTS Cp�r. J��J�,j�_;
Revision: &�Lil2(1�1
Oq7200-1
GENERALCQN�ITION 5
Page 18 of fi3
lieu of traditional insurance, alterna.tive caverage maintainad through insurance pools ar risk
retention groups, must aLso be approved by City.
11. Any deductible in excess of $5,000,00, for any palicy that does not pro�ide coverage on a
firs�-dollar basis, must be accept�.ble to and approved 6y the City.
12, C�iy, at ifis sole discretion, reserves the right to revaew tk�e msurance requirements and to
malce reasonable adjustrnents ta insurance coverage's and their limits when deemed necessaty
and prudent by the City based upon changes in statutory Jaw, court decision or the cla.ims
history ofthe industzy as well as of the contracting party to the Ciiy. The City shail be required
to provide priar notice of 90 days, and the insurance adjustments sha.11 �e incorp�rated inta the
Work by Change �rder.
13. Ciry shall be entitled, upon written request and without expense, to receive copies of policies
and endorsernents thereto and may make azry reasonable requests for del�tion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endarsernents to tke requirements of the Contract. Deletions, revisions,
ar modifications shall not be required where policy provzsiozzs are established by law ar
regulatians binding upon either party or the under�writer on any such policies.
14, City shall not be respansible �ox the direc� payment of insurance premium costs for
Contractor's insurance.
5.04 Cont�actor's I�asurance
A. Workers Compensation crnd Emplaye�s' Liabality. Contractar shall purchas� and rnaintain such
insurance coverage with lirnits consistent with statutory benefits outlined in t�e Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended}, and inuumum �imits for Employers'
Liability as is appropriate far the Work being performed and as will pro�ide praiection from claims
set forth below which may arise out of or result from Contractor's performance of the Work and
Contractor's other obligations under the Contract Docurnents, whether it i� to be performed by
Contractor, any Subcontrac�or or Suppiier, ar by anyone directly or indirectly employed by any of
them to per�arrr� any of the Work, or by anyone for whose acts any of them may be lia�le:
I. clairns under workers' compensation, disability benefits, and oih�r similar empl�yee benefit
acis;
2. clairns far da�naages because of bodily injury, occupational sickne�s or di�ease, or death of
Can�ractar's employees.
B. Cor�atraercial Ge�eralLiability. Coverage shall include but not be limited to cover�g I�a.bility
(bodily injury or property daz�nage} arising frnm: premisesloperations, independent cox�tractoxs,
products/compl�ted aperations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services
Office {ISO} poIicy. Tlvs insurance shall apply as prirnary insivance with res�ct to an� other
CPI'Y OF FORT WORTH Lacklcriar! litxrd .5i�letrulk I�irproremerrts
STANDARDCONSTRUCTION SP�CIF1CATlpN DOCLIMI;N1'S
C"Pr1', 1 D0G37-3
Revision; 6Q3/1(}21
oo�aao-�
GENERAL CON� ITION 5
Page 19 af 63
insurance or self-iiv�wrance programs afforded to the City. The Commexcial General Liability
policy, sk�all laave no exclusions by endorsements tha.t woul�i alter of nullify premises/npera#ions,
products/campleted operations, contractual, personal injury, ar advertising injury, w�ich are
nom�.11y conta�ned with the policy, unless the City approves such exclusions in writuig.
For construction projects that present a substantial completed operation exposure, fhe City may
require the cantractar to rr►aintain compl�ted operatioris coverage for a minimum of no less than
�ree (3) years follo�ving the comp�etion af the project {if identified in the Supplementary
Conditions).
C. Autamobale Liabaliry. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non own�d and provicle indemnity for clanns far damages
because b�dily snjury or death of any person and or praperty dam�ge arising out of the work,
nnaiurtena�nce oz use of any motor veIucIe by the Contractar, any Suhcon�ractor or Supplier, ar by
anyone directly or indirectly emplo�ed by any of thern to perform any of the Wark, or by anyone
for whose acts any of them may be liable.
D, R�ilroad Protective Liability. If any of �he work or any warran.ty work is vvithin the lunits of
railroad right-of-way, the Contractor sha11 eomply with the requirements identified in the
Supplernentary Conditions.
E. Noti�cation of Policy Canceldatia�a.' Contractor shall irnmediately notify City upon cancellation
or other loss of insuz�ance coverage. Contractor shall stop work until replacement insurance has
been procured. There �hall be no time credit for days not worked pursuant to this section.
5.05 Acceptance ofBondsandlnsu;�ance; Option ta Replace
If City has any obj�ction to the coverage afforded by or other provisions of the bonds or insurance
required io �e purchased and maintained by the Cantractar in accardance with Article � on the basis
of non-conformance with the Contract Docurnents, the City shall so notify the Contractor in writing
within 10 Business Days after receipt of the certificates (ar ather evidence requested}. Contractor shall
provide to the City such adclitional information in respect of insurance provided as the City may
reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required
by #he Contract Documents, the City shai� notify the Co�tractar in writing af such failure prior to the
start of the Work, or of such failure to miaintain p�'iar to an� change in the required coverage.
ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES
6.01 Supervision andSuperintendence
A. Cpntractor shall sup�rvise, inspect, and clireet the Wark competently and efficiently, devoting
such attention thereto and a�plying such skills and expertise as nn�ay be necessary to perfarrn the
Work in accordance with the Coniract Documents. Contractor sk�ll be solely responsib�e for the
means, methods, techniques, sequences, and procedures of construction.
GI�'YOF F'ORT WORTH Luchlarrcf Road SicJc:irnik Intpr•oi'e�iieizfs
STAI�IDARDCONSTRUCTIOM SPECIF[CATIOM dOCl7MCNT5 C'Pd': 1!)0(�37-�3
Revision: 823i1(ti2!
0072D0-I
GENERAL CflNDITION S
Aage 20 of 63
B. At all times during the progress of the Work, Contracior sha.11 assigtl a cornpeten.t, English-
speal�ing, Superintendent who shall not be r�pla,ced without written natice to City. The
Superintendent will be Contractor's representative at the Site and shall have authoriry ta act on
behalf of Cantractor. All communication given to or r�ceived from the �nperintendent shall k�e
binding an Contractar,
C. Contractor sl�all not�y tl�e City 2� hour� prior to moving areas during the sequence of construction.
6.02 Labor; WorkingHours
A. Cantractor shall provid� competent, suitably c�ualified personnel to perform con�tructinn a�
required by the Conlract Documents. Contractor shau at all t'rmes maintain good discipline and
order at the Site.
B. Except as atherwise required for the sa%ty or pro#ectian of persans or the Work or property at
the Sit� or adjaeent thereto, and except as atherwise stated in the Contraci Documents, all Work
at the Site shall be performed during Regular Warking Haurs. Contractor will not perrnit the
performance of Work beyond Regular Working Hours or for Weekend Warkiz�g Hours without
City's written consent (which will not be unreasonably withheld). Written xequest (by Ietter or
electronic communication) to perforrn Work:
1. for beyond R�gulax Warking Houxs xequest must be ma.de by noon at least two (2) Business
Days prior
2. for Weekend Waricing Hours request must be rnade by noon of the precedirig Thursday
3. for legal holidays request rnust be made by noon two Business Days prior to iht� Iegal
1�olida�.
6.03 Services, Materfals, and Equipment
A. Unl�ss atherwise specif'ied in the Contract Doeuments, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labar, transportation, construction equipment
and machinery, tools, appliances, fue�, power, light, heat, te�ephone, water, sanitary facilitie s,
temporary facilities, and all other �acilities and incidenta� necessary for the performance,
Contractar requir�c� testing, start-up, and completion nf the Woark.
B, All materia]s and equipment incorporated into ihe Work shall be as specified or, if not specif'�ed;
shall be of good quality and new, except as otherwise �rovided in the Cantract Documents. All
special warrant�es az�d guaxax�tees required b� the Specifcations shall e�ressly run to the benefi�
of City. If tequiu�ed by Ciry, Cflntxactor shall furnish sati�factory evidence (ineluding reports of
required tests) as to the souree, kind, and quality of materials and equipment.
CiTY OF FORT WORTH L[rcklcu�c! l�oud Sicle�ralk lr��pr'nven7er�t.s
STANDARDCONSTRUCTION SFECIFICAT[ON DOCUM�NTS
C'1'A': II1I1637- 3
Revisian; 823/Z021
oa�aao-�
GENERAL CON6ITION S
Page 2i of 63
C. All materia�s and equip�xient to be incorporated into the Work shall be stored, applied, instal�ed,
connected, erected, protected, used, cleanec�, and conditioned in accordance with �tructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documenfis.
D. AIl items of standard equipment ta be incorparated into the Work shall be the latest madel at the
time af bid, ur►less otherwise specif'ied.
6.U4 ProjectSchedule
A. Cantractor shall adhere to the Project Sched�e established ira, accordauce with Paragraph 2.D7
and the General Requiremexrts as it may be adjusted from time to time as provided belo�v.
Contractor shall submit �o City for acceptance (ta the extent indicated in Paragraph 2.07 ax�d
the General Requirements) proposed adjustanents in the Praject Schedule that will not result
in changing the Contract Time. Such adjustments will comply with any proVisions of the
General Requirements applicable thereto.
2. Contractor shall submrt to City a monthly Project Schedule with a monthly progress paymeni
for the duratian of the Contract in accordance with the schedule specification 01 32 16.
3. Propased adjustrn�nts in the Project Schedule that will cha�ge the Contract Time shall be
submitted in accordance with the requirements of Article 12. Adjustments in Contract Time
ma.y only be made by a Change Order.
6.05 Substitutes and "Or-�quals"
A. `iVhenever an itezn. of material or eyuipment is specirFi�d or described in the Contraet Documents
by using the e�ame af a proprietary itern or the narne of a particular Supplier, the specification ar
description is intended tn es�ablish th� type, fiulction, appearance, and quality requued. Unless the
specification or description contains or is fol�Qwed by words readir�g that nr� 1ike, equivalent, or
"or-equaP' item or na substitution is permitted, other items of material or equipment of other
Suppliers nnay be submitt�d ta City for review under the circumstances described b�low.
"Qt�-Equal"Items: Tf in City's sole discretion an item af rnater�al or equipment proposed by
Contractar is fitnctionally equal to that named and suffzciently similar so that no change in
related Work will be required, it may be considered by City as an "or-equal'" item, in which
case review and approval of the proposed item may, ir� City's sole discretion, be accomplished
without compliance with sorne or all of the requirements for approval of proposed subsiituie
ztems. For ihe purposes of this Paragraph 6.OS.A.1, a prnposed item of mater�al or equipment
wiIl be cansidered functionall� equal to an iterrz so zaarz�ed i#:
a. th� Ciry determines that:
1) it is at least equal in materials of construction, qua�ity, durabili�y, appearance,
sirength, and design characierisfics;
CITY OF FORT WORTI-1 Lacklui�d Roarl.side�rnik lirrpror�c�nrc��zts
STAN17AlZI7COM3TRUCTIDN 51'ECIFICRTION DOCUMENTS
CNi�': l00637-3
Revision: 8�13I20Z)
oo7xoa-t
G�N�RAI. CONRITIDN S
Page 22 of G3
2) it will reliably perforrn ai least equally well the func�ion at�d achie�e the result�
impased by the design concept ofthe comp�eted Project as a functioYiing whole; and
3) it has a prov�n record of perfarznance and availa.bility of responsive ser�ice; and
b. Contractar certifies that, if approved and incarporated into the Work:
1) there will be no increase in co�t to the City or increase in Contract Time; and
2} it will conform substantially to the detailed requirem�nts o� the item nanaed in tl�e
Contract Documents.
2. Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or-equal" item under 1'aragraph 6.OS.A.1, i� may be submuited as a
proposed substitute item.
b. Con#ractor shall submit sufficient infarn�at�on as provideci below to allow City to determine
iif the item of material or equipment proposed is essentially equivalent to that named and
an acceptable substit►�te therefor. Requests for ;revievcr of proposed substitute items af
matexial ox equipment will not be accepted by City from auyone ot,her than Contractor.
c. Contractor shall rnake written appIication to City for re�iew of a propos�d substitute item
of materia� or equipment �hat Contractor seeks to furnish ar use. The application shall
comply with Section 01 25 00 and:
1) shall cext�fy that the proposed su�stitute item will:
a} perform adequately the functions and achie�e the results called far by the general
design;
b) be si�nilar iun substance to that specified;
c) be suited to the same use as that spectfied; and
2} will state:
a} the extent, if any, ta which the use of the proposad substitute item will pxejudice
Contractor's achievement of f�nal completion an time;
b} v,�hether use of the proposed substitute item in the VVork will require a change in
any of the Contract Documents {or in the provisions of any oiher direet contract
with City for oiher work on the Project) ta adapt the design ta fihe propased
substit�e item;
Cl7'Y OF FORT WORTH l.acklarrd Xnca[1.��1fI251'GIIP IlIlj71'OVClNG17lS
STANDARI3CONSTRUCT1flN SPECIFICATfON I}�CIIM�NTS
Revision: 8JZ3J�a(i�l CPrV: 1 �(7G.i7-3
oo�zoo-�
GENERAL CONDITION 5
Page 23 af 63
c) whethex iz�coxporation or use of the proposed subs�iiute item in connect�on witiU
the Work is subject to payment of any license fee or royalty; and
3) will ideniifiy:
a) all variations of the proposed substitute rtem from that specified;
b) available engineering, sal�s, mainten�.nce, repaiur, ar�d replacement services; and
4} shall contain an itemized estimate of a]� costs or credits that w�ll result directly or
indirectly from use of such substitute item, i�t�cluding costs of redesign and Damage
Clauns of other contractars affected by any resuiting change.
B. Substitute Constr�uctionM�thodsarP�-ocedures.• If a specif'ic means, method, technique, sequence,
or proced�re of canstrucfiion is expressly required by the Contract Documents, Contractor ma�
furnish or utiIize a subsiitute means, znetY�ad, technique, sequence, or proeedure of construction
approved by City. Contractox shall submit sufficient inforrnation to allow City, in City's snle
discretion, to determine that the substitute proposed is equivalent to that expressly called for by
the Contract Doeuments. Cantractar shall make written applicaiian to City %r revzew in the same
manner as those provided in Paragraph b.Q5.A.2.
C. City's Evalucatian: City will be allowed a reasonable time wi�tkain which to evaluate each
praposal or submittal made pursuant to Paragraphs 6.OS.A and 6.OS.B. City may require Coniractor
to f-urraish additianal data about the proposed substitute, City wil1 be the sale judge of acceptab�ity.
No "or-equal" or substitute will be ordered, installed or utilized until City's review is complete,
which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal
%r an "or-equaL" City will advise Contractor in writing of ifi� determination.
D. Special Guarantee: City may requ�re Contractar to furnish at Contractor's expense a special
performance guar�ntee, warranty, ar other surety with respact to any substitute. Contracto� shall
indemnify and hold harmless City and anyone directly or ir�directly emp�oyed by themfrom and
agafnst any and aIl claims, damages, losses and experr�es (including attorneys fees) ai"ISIYdg Otd� O.%
the use of substituted mutet�ials pr equipmerat.
E. City's CostRQirnbursement: City will record City's costs in evaluating a substitute proposed or
subnutted by Contiractor pursuant to Paragraphs 6.OS.A.2 and 6.OS.B. Whether or not City
approves a substrtute so propased ar subm�.ted by Contractor, Cont�ractor may �e required to
reimburse City fox evaluating eachsuch proposed substitute. Contractor may a�so l�e requir�d to
reimburse City for th.e ch�rges far making changes in the Contract Documents (or in the provisions
of any other direct con#�act with City) result�g from the acceptance of each praposed substiiute.
F. Contractor's Expense: Contractar shall provide all data in support of any proposed substitute or
"ar-equal" at Contractor's e�ense.
CITY OF FORT WORTf3 Lacklru�d Road Srdesrcrll� Inapr•o��er�len�s
STANfaAR.bGQNS'fRUCTION SAECIFICATIDN DOCUM�NTS C'PA!• 1110(.37-.3
Revision: 8�73/li�ll
ao �2 00 - �
GENERAL CON� IT 10 N 5
P age 24 of 63
G. City Substitute Reimbursement: Costs (savings or charges) aitributable to acceptance of a substitute
shall be incorporated to the Contract by Change Order.
H, Time Extensions: No additional iime will be granted for substitutions.
6.06 Concerning Suhcontractors, Supplaers, and Qthers
A. Contractar shall perform with his own arganization, work of a value not lf:ss than 35% of the
value embraced on the Contract, unless oiherwise apprnved try the Ciiy.
B. Contractor sball noi em.ploy any Subcontractor, Supplier, or other individual or entity, whether
initially or as a replacernent, against whom City may have reasonable objection. Contractor shall
no� be xequired to emplo� any Subcantractor, Supplier, or other individual or entit� to fiunish or
perfarm any of the Wnrk against wk�om Cantractor has reasonable objection (excluding those
acceptable to Crty as iudicated in Paaragraph 6.06.C).
C. The City xnay from time to time require the use of certain Subcontractors, Suppliers, or oth�r
individuals or entities on the project, and will pro�ride such requirements in the Supplementary
Conditions.
D. Minority Business Enterprise Campliance: It �s City policy to ensure �lie fu11 and equi�able
participatian by Minority Business Enterpxises {MBE) in the procurement of goods and services
on a contractual basis. Yf the Contract Documents provide for a MBE goal, Contraetor is require d
to comply with th� intent of thc City's MBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, pro�ide complete and accurate infqrmat�on regarding
actual work performed by a MBE an the Contract and payrnent therefar.
2. Cantractor will not malce additions, deletians, ar substitutions of accepted MBE withaut
written consent of the City, Any unjusiif'ied cbange or deietion shall be a rnaterial breach of
Contract and nnay result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon requ�stby City, allow an audit and/or examination of any boaks, recards,
or file� in the passession of the Contractor tha# will substantiate the actual work perf�rmed by
an MBE. Material misrepr�sentatian af any nature will be grounds for terminatinn of the
Contractin accordancewithParagraph15,02.A. Any suchmisrepresentatian may b� grounds
for disqualification of Con�ractor to bid on fufure contracts �vith the Ciry for a period of
nai less than three y�ars.
E. Contractor shall be fully responsible to City far all acts and omissians of the Subcantractors,
Suppliers, and other individuals or entities performnlg or furnishing any of the Wor�C just as
Contractor is responsible for Contractor's own acts and ornissi�oans. Nothuig in the Contract
Docutn�nts:
CITY OF FORT WORTH I acklnnrt l�oacl5icleircrlk Inr��ro»eixe7v,s
STANi]ARpCONS:TRUC'f10N SPECIFICATION DQCiJMENTS CYA%: IC10637-3
Revision: 623f1Q21
oo�z.00-�
GENERAL COND{TION S
Page 25 of 63
1. shall create for the benefrt of any such Subcantra�tor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier ar other
indi�idua I or entity; nor
2. shall create any obligation an the part of City to pay or to see to the payment of any moneys
due any such Subcont�actor, Supplier, or other indivic3ual ar entaty except as may o1'herwise be
required by Laws and Regulations.
F. Contractor shall be solely responsible for scheduling and coordinating the Woxk of Subeontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct
or indirect contracfi with Contractor.
G. All Subcantraetors, Suppliers, and such other mdividuals or en#ities performing or furnishing any
of the Work sha�l communicate with City through Contractor.
H. All Wark perfortned for Contractor by a Subcontractc�r or 5upplier will he pursuant to an
appropriate agreernent between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and candi�ions of the Cax�tract
Documents for il�e benefit of City.
6.07 Wage Rates
A. Dury to pay P�evailing Wage Raies. The Contractor sha�l comply with al1 requirements of
Chaptex 2258, Te�s Governtnent Code (as amended}, including the payment of not less than the
rates deternlined by the City Council of the Ciiy of Fort Warth to be the prevailing wage rates in
accorda�ce with Chapter 2258. Such pre�ailing wage rates are i�eluded in these Contract
Docuz�a.ents.
B. Penalty for Vfolation. A Contraetor or any Subcontractor who does not pay the prevailing wage
shall, upon dernand made by the City, pay #o the City $60 far each worker employed far each
calendar day or part of the day that the worker is paid iess than the prevailing wage rates stipulat� d
in these contract documents. Th�is penalty shall be retainad by the City to offset rts adnair�istrative
costs, pursuant to Texas Governn�ent Code 2258.023.
C. Complaints of Violations and City Determination of Goad Cause. an receipt of information,
including a camplazn�t by a worker, concerning an all�ged violat�oz� of 2258.023, Texas
Government Code, by a Contractor ar Subconiractor, the City sh.all �ake an initial
determir�a�ion, befoxe the 31st day after the date the City receives the inforrn�.tion, as to whether
good cause exists to believe that t,�ie vialation acc�red. The City shall natify in rvri#ing the
Contractor or Subcontractar and any affeeted worker of �s initial determination. Upon the City's
deiermination that there is good cause to b�lieve the Cantractor or Subcontractox has �violated
Cl�apter 2258, ihe City shall retain the full amounts claimed by the claimant ar cl�imants as the
difference between.�vages paid and wages due under the prevailing wage rafes, such amounts being
subtracted from successive progress paym�nts pending a final determinafion of the viola�ion.
CIT Y OF FORT WORTH l.ucklurtd Road Sirleu•ulk L�r���•ai�etiterNs
STANQ1�RbCONSTRUCTIDN SPECIFICATION DOCUMENTS CP,'V: I(1f1G37-3
Revision: 8�3�.621
oo�aoa-i
GENERAL coNo IT Io N s
P age 2b of 63
D. Arbit�ation IZequired if Violation Not Resalved. An issue relating to an a�ieged violation of Section
2258. �23, Te�as Government Code, including a penalty owed to the Cit� or an affected worker,
shall be subznitted to binding arbitration in accordance wiih the Texas General Arbitration Act
(Article 224 et seq., Re�ised Statutes) if the Contractor ar Subcontractor and any affected warker
does not resolve the issue by agreement befor� the I Sth day after the date the City makes its initial
deterr�inafion pursuant io Paragraph C above. If the persons required to arbitrate urider this
section do not agree on an arbitratar before the l lth day after the date that arbitration is required,
a district cnuri s�all appoint an arbitrator on the petition o� any of the persons. The City is not a
party in the arbitration. The decision and award of the arbitrator is fi�a1 and binding on all parties
and may b� enforced in any court of competent jurisdiction,
E. Reco�ds to be Maantained. The Contractor and each Subcontractor sha.11, for a period of three (3)
years following th� date o�' acceptance of the worlc, maintain recards that show (i) the name and
occupatian of each worker emplayed by the Contractor in the construction of the Vi�ork pro�id e d
far in this Contract; and {ri) tl�e actual per diem wages paid to each worker. Th� r�cords shall be
open at a�l reasonable hours for inspection by the +City. The provisions of Paragraph{.�3, Right
to Auciit, shall pertain to this itispection.
F. �rogress Payments. V4�ith each pragress payment ar payrall period, whichever is less, the
Contraetor shall subrnit an af�davit stating t.hat the Contractor has complied w�th tkze requ�rements
of Chapter 2258, Texas Government Cade.
G. Posti�ag of Wage Rates. The Contractor shall post preva�ling wage rates in a conspicuous place at
all times.
H, Suhcon�ractor Cor�rpliance. The Confractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to con�ply with Paragraphs A thraugh G above.
6.0$ Patent �'ees and Royalties
A. Cnntractor shall pay all license fees and royalties and assume alI costs ineident to the use in the
performance of the Work or the incarporafiian in the Wark of any invention, design, pracess,
produet, or device which is the subject af patent rights or copyrights held by others. If a particuIaz•
invention, design, process, praduct, or device is specafied in the Contract Dacuments for use in the
pexforrnance of the Work and if, to the actual knovvledge of City, its use is subject to patent rights
or copyrights calling for the payment of ai�y license fee pr royalty to others, the existence of such
rights shall be disclosed by Ciiy in the Contract Dacurnents, �ailure of the City to di�close such
infarrnation daes not relieve the Contractor from its abligations to pay for the use af said fees or
royaities to others.
B. To the fullest extent permitted by Laws and Regulatfans, Contr�c�ctor shall indemn � and hald
ha�m�ess City, from and against all claim,�, costs, losse�, cznd damages (including but not Iirnited
to rxll fees and charges of engineeYs, architecis, attorneys, c�nd othe�professionals and all court
or� a�bitt�ation o� other daspute �esolution costs) aYising outof o� relating ta any infringementof
patent �ights or copyrights incident to the use in the peYfor�mc�nce ofthe Wor�lt or resultingfram
CITY OF FORT WDRTH l.ac!•lnra�' Ractd Sideirulk Inrprm�er�te�tls
STAIVDARI�CONS7RUCT[ON SPECIFTCAT[dN DdCUMENT5
C"PrV: 100G37-3
Revisifln: 82?2fl21
00720D-I
GEIVERAL CONOlTIO N 5
Page 27 oF 63
the incorporation in the Wor�k of any invention, de,sign, process, p�oduct, or devace not specified
in ihe Cont�actDocunaents.
6,09 Pe�mits and Utilities
A. Cont�actor obtained per�mits and iicenses. Cantractor shall obtain and pay for all construction
permits and licenses except those pravided For in the Supplernentary Conditions or Contract
Docutnents. City shaIl assist Contiractor, when necessary, in obtaining s�tch permits and licenses.
Contractor shall pay alI governrnental charges and inspection fees necessary for the prosecution of
�the Work which are applicable at the time of opeivng of Bids, or, if there are no Bids, on the
Eff�c#ive Date of the Agreement, except for perrnits provided by the City as specified in b.09.B.
City shall pay aIl charges nf utility awners for ca�ections for providing permanent service to the
Work.
B. City abtainedpermits and licenses. City will obtain and pay for all pern�its and licenses as pravide d
for in the Suppiementary Conditions or Contract Documents. It will be tl�e Cantractor's
responsibility to carry aut the pxovisions of the permit. If the Coni�racfor irut�ates changes to the
Contract and the City approves the changes, ihe Contractor is responsible for obtaining clearances
and coordu�atir�g with the appropriate regulatory agency. The City wilI npt reimburse the
Contractor for any cost associated with these requirements of any Giry acQuired permit. The
followirig az�e permits the City will obtair� if reyuired:
1. Texas Departrnent of Transpartation Permits
2. U.S. Army Corps of Eng�eers Pexmits
3. Texas Cornnlission. Qn En�ironmental Quality Permits
�. Railraad Company Permits
C. OuEstanding pe�rnits and licenses. The City anticipates acquisition of andfor access to pernnits
and licenses. Any outstand�g permits and licenses are anticipated to be acquired in accordance
with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by
the Contractor in accordance with the Contract Dpcuments must consider any outsta.nding perrnits
and licenses.
6,10 Laws and Regulations
A. Contractor shall give all notices reqiaired by and shall com�ly wrth all Laws and Regula�ians
appiicable to the pexfnrmance of the Work. Except where otherwise expressly requir�d by
applicable Laws and Regu�tions, the City shall not be re�ponsible for monitoring Contractor's
compliance with axry Lar�s ar Regulations.
B. If Contractor performs any Work knawuig or havizag reasan to know that it is contrary to Laws ar
Regulat�ons, Contractor shall bear all claims, costs, lasses, and damages (including but not limited
to all fees and charg�s of engineers, architects, attorneys, and other profassionals and all
CITYOF FD12`C WORTH 1.odrlcr��d Road Sirlemrrlk l�xpruveinenls
STANDARDCONSTRUCTf�N SPeCIFICATION DOCiJMENTS C'f'A!: 1(1DC37-3
Revisian: 8�L3IZ(121
oa�zao-i
GENERALCQN�ITIONS
Page z8 of 53
caurt or arbitration or other dispute resolution costs) arising out of or relatin� to such Wark.
Ho�rever, it shall not be Contractar's responsibility t� make certain that the Specif'ications and
Drawings are izx accordance with Laws and Regulations, but this shaII not relieve Contractar of
Conh•actar's obligations under Paragraph 3.02.
C. Changes in Laws nr Regulations not known at the time of apening of Bids having an effect on
the cost ar time of performance of the Work may be the subject of an adjustrnent in Contract Price
or Contract Time.
6.11 Taxes
A. On a contract awarded by the City, an organization wluch qualifies for exemption pursuant to
Texas Ta� Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase,
rent ar lease aIl materials, supplies and equipment used or consumed in ihe performance of this
eontract by issuing td hzs suppIier an exemption certif�cate in lieu af the tax, said exemptian
cert�icate to comply vaifh State Coa�xiptxo]Ier's Ruling .007. Any such exemption certificate issued
ta the Contractor in lieu
Comptraller's Ruling .I
Subchapter H.
of the ta� s�aIl be subject ta and shall camply with the pravision. of �tate
11, and any other applicable rulings �ertainir�g to the Texas Ta� Code,
B. Texa.S Taxpermits azid inforrnation may �e obtained from:
1. Camptrollar of Public Accounts
Saies Tax Division
Capitol Statian
Austin, TX 78711; or
6,12
2, http:l/www.wii�dow.state.tx.usltaxiilfo/ta�'oi•msl93-tornas.htr��l
Use of Site and'OtherAreas
A. Limiiatian on Use of S'ite and OtherAr�as:
Contraetox shall confine construction equipment, the storage of materials and equipment, and
th� operatians of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably enc�mber the Site and other ar�aswith canst�rruction equipment or other
materials or equiprnent. Contaractor shall assutne full responsibility for any damage to any such
land or area, or to the owz�,er or occupant thereof, or of any adjacent land or areas resulting
from the per�ormance o� the Work.
2. At any tnne when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement gr�ater than is
necessary for proper e�ecution of ihe Warlc, the City znay require the Contractor to finish the
section on which operations ar� in progress before wark is commenced on any additional
area of the Site.
C1TY OF FORT WORTH Lcrcklcrfrd Rnn�l Side�rcrlk hr�prnve���ertls'
STANbARDCONSTRUCTfON SP�CICICAT[ON DOCUNIENTS
Revision: 82.320Z1 C!'Al: 10l1G37-3
oo�zoo-�
GENERAL COND ITI ON 5
Page 29 of 63
3. Shou�d any Damage C1aim be made by any such owner aar accupant because of the performance
af the Wark, Contractor shal� promptly attemp� to resa�ve �ie Damage Cl�irn.
4. Pursuant to Pa�ag�aph 6.21, Contracto� shall indemnify and hold har�snless City, from and
against all claims, costs, losses, and damages arisingaut ofor relating to at�y claim or aciion,
legal ar equitable, brought by any such awner or occupant crgainst eity.
B. Remaval of Deb�is Du�ing Performance of the Wa�k: During the progress of the Work
Cantractor sha.11 keep the Site and other areas free from accumulations of waste materials, rubbish,
and other debri�. Removai and disposal of such waste materials, rubbish, and other debxis shall
conform to appiicable Laws and Regulations.
C. Si�e Mainter�crnce Clecanfng: 24 hours after �ritten notice is given to the Contractor t�at the
clean-up on the job site is proceec�ing m a manner unsatisfactory to the City, if the Co�trac�or fai�s
to correct the unsatisfactory proceduxe, t�e City rnay take such direct actian as the City deems
appropriate to correct the cIean-u� deficiencies cited to the Contractor in the wr�en notice
(by letter or electronic commuzucatian), and the costs of such direct action, plus 25 °10 of such
costs, shall be deducted from the morues due ar to become due to the Contractor.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
ihe Work and znake i� ready fox utilization by City or adjacent property owner. At the completion
of the V�7ork Contractor shall remove from the �rte aD too�s, appliances, construction equipment
and machinery, and surplus materials and shall restore to ozi�ai condition ar better all property
disturbed by the Work.
E. Loading Structu�es: Contractor shall not Ioad nar pern�it any part of any structure to be loaded
in any manner that will endanger the structure, nar shall Cantractor suhject any part af the Work
or adjacent property to stresses or presswres tl�at will endanger it.
6.13 Record Docu�aents
A. Contractor sk�a�l maintain in a safe place atihe Site or in a place designated by the Cantractor and
approved by tl�e City, one (1) record capy of aIl Drawings, Specifications, Addenda, Change
Orders, Fie� Orders, a�d written interpreiations and clarif'�catians in good arder and annotated to
show changes made during construction. These record docwnents together with a11 approved
Samples and a count�rpart of all accepted Submitt�ls will be available to Ci�+ for reference. Upo�
completion �f the Wark, thase record documents, any aperation and ma.i�ntenance manuals, and
Sulamittal� will be de�ivered to City prior to Final Inspection. Cantractor shall include accurate
locations for huried and imbedded items.
6.14 Safety and Pr�atectian
A. Contractor shall be solely responsible for initiating, maintaining and supez'vismg all saf�ty
precautions and prograrns in cannection with the Work. Such responsibilifiy does nat refieve
�ubcontractars of their responsbili�y for the safety of persons or property in the perfarrnance af
their wark, nor for compliance with app�icable safety Laws and Regulations. Contractor shall
C1TY QF FORT WOI2TH L,ucklrrnd Iioctd Sideircr�k lnrprarerircr�ls
STANDARDCDNSiRUCT]ON SPECIF[CATIqI� bpCUMENTS CPrY: 1�Ofi37-3
Revisian: 823C2(}21
007200-1
GENERAL COND ITION 5
Page 3fl af b3
6,15
6.16
6.1'1
take all necessazy precautions for ihe safety of, and shall provide the necessary protection to
prevent damage, i�jury or loss to:
1. all persons on the Site or wha z�y be affected by the Wark;
2. all the Work and materials and equipment to be incorporatad therein, whefher in storage on
or off the Site; and
3. other property at the Site or adjacent tYiereto, includitag trees, shrubs, ]awns, wallcs,
pavements, raadways, structures, utilities, and Undergrnur�d Facilities not designated for
removal, relocation, or replaeement in the course of construction.
B. Contractor shall comply with aSl applicable Laws and Regu�atians r�la.t�ng to the �afety of
persons or property, or to the protection af persons or property from damag�, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Cantractor shall
n.otify owner� of adjacent property and of LTnde�gxound Facilities and other utility ovvners when
prosecution of ihe Work may affect them, and shall cooper�te with them in the protection,
rernoval, reiocatinn, and replacement of their property.
G. Contractar shall comply wit.b the applicable requirements of City's safety prag�rams, if any,
D. Coniractor shall inform Ciry of the specif'ic requirements of Contractor's safety program, if any,
with whzch Ciry's employees and representatives must comply while at the Site,
E. All damage, injury, or Foss to any pr�operty referredto in Paragraph 6.14.A.2 or 6.14,A.3 caused,
directly or indirecily, in whole ar in part, by Contracior, any Subcontractor, Supplier, or any other
indi�idual or entity directly or indirectly employed by any of them to perform any af the Work,
or anyone for whose acts any of them rnay be ]iable, shall be remedied by Contractor.
F. Contract�r's duties ar�d responsibilities far safety and for pratection of the Work shall continue
until such tirne as all the Work is completed and City has accepted the Woxk.
Safety Representatfve
�ontractor sha�l inform Ci�ty in writing of Contractor's designated safety regresentaiive at the Site.
Hazard Cornmunfcation P�ogrc�nas
Contractor shall be responsible far coordinating �n� exchan.ge af material safety data sheets or other
haza:rd communication information required to be made available to ox exchanged between or arnong
ernplopers in accordance with Laws or Regulations.
En�ergencies and/ar Rectificatian
A. In emergencies affecting tlle safety or proteetion of persons ar the Work ar praperty at fhe Site or
adjacent thereto, Contractor is obligated to act to prevent threatened dama.ge, �njuty, or loss.
Contractor shall give City prompt written notice � Contractor believes that any Sl�]1f1C111t
C1T Y OF FQRT WORTH Lrrcklcuad RorreJ S'idetii=crlk l�u�rovemerars
STANDARbCONS1'RUCTI�N SPECIFICATION DOCUMENTS C'P,Af: TO(1d37-3
Revision: 823/2021
oo�zoo-i
GENERAL CON�I710N S
Page 31 of 63
changes in the Work or varia��ans from fhe Contract Documents have been causedthereby ar are
r�quired as a result thereaf. If City deternvnes that a change in the Contract Documents is require d
because of �he action taken by Caz�tractor in response to such an emergency, a Change Order may
be issued.
B. Should the Contractor iail to respond to a request from the Ciiy to rect�fy any discrepancies,
omissions, or correction necessary ta conform with the requirernents of the Contrac# Documents,
the City shall give the Contractor written notice that such work or changes are to be perforrned.
The written notice sha]I direet attention to the discrepant candition and request the Contractor to
take remedial action to correct the canditian. In the event the Contrac�or does �ot take positive
steps to fulfill �his written request, or daes not show jus# cause for not talflng the proper action,
w'rthin 24 hours, the City ma.y take such remedia� action with City forces or by contxact. The City
shall deduc� an amaunt equal fio the entire costs for such remedial action, plus 2S%, from any
funds due or become due the Coniractax an the Project.
6.18 SuBrraittals
A. Contractor shall subrnit required Submittals to City for review and acceptance in accordance
with the accepted Schadule of Submittals (as required by Paragraph2.07). Eachsubmittal vdiIl be
identified as City tnay require.
1. Submit nurnber of copies spec�ed in the General Requirernents.
2. Data shown an the 5ubmittals will be complete with re�pectta quantities, dirnensions, specifie d
performance and design criieria, materials, and sursi�ar data to show City the services,
materials, az�d equipment Contractar proposes to provide and ta enab�e City to review the
information for the limited purposes required by Paragraph 6.18.C.
3. Submitta3s submitted as herein provided by Cantractor and re�iewed by City �or
conformance with the design can�ept shall be executed in conformity with the Caniract
Documents unless otherwise requiced by City.
4. When Subalittals are submitted for th� purpose of shawing the insfallation in greater detail,
their review shall not excuse Cantractor from requirements shown on the Drawings and
Specifications.
5. For-Informatian-Only submittals upon which the City is not expected to conduct review or
take responsive action rnay be so identif'i�d in the Contract Dacuments.
6. Submii required number of Samples specified in the Speeifications.
7. Clearly identify each Sample as to material, �upplier, pertinent data such as catalog n.tu�nbers,
the use for which intended and other data as City may require to enable City to review the
submittal %r the limited purposes required by Paragraph 6.1$.C.
C1TY OF FORT WORTH I.acicland 12ourl 3ide�+'ulk Iniproveu�ert�s'
STANI]ARDCONSTRUCTIDN 3PEC[FIC.ATION DOCiJ1V1ENT5 C'PA7: lODG37-�?
Revision: 8rZ3I1021
00720Q-1
GENEFiAL CO�ID ITION S
I'age 32 of 63
B. Whexe a Subrnittal is required by the Coni�act Documents ar the Schedule nf Submittals, any
related Work performed prior io City's review and acceptan.ce of the pertinent submittal will be
at the snle expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Subrnittals in accordance with the Schedule of
Submitta�s acceptable to City. City's review and acceptance w�l be only to deterrnin� i� the
items cavered by the submittals will, after mstallation or incarporation in the Work, conform
to the information given in the ContractDocuments and be compatible with the desigm concept
of the completed Project as a functioning whole as mdicated by the Cantract DacumEnts.
2. City's review and acceptance will not extend to m�ans, methods, technique,s, sequences, or
procedures of construction (except where a particular rneans, method, fiechnique, sequence,
or procedure of eonstruction is specifieally and expressly called far by the Gontract
Documents} or to safety precautia� or programs incident thereto. The r�view and acceptazace
of a separate item as such will nat indicate approval of the assembly in which the rtenn
functions,
3. City's review and aceeptance shall not relieve Contractor frarn responsibility for any
variatiar� fronr� the requirements of �ie Contract Documents unless Cantractor has complied
with the z�equarements of Section �1 33 00 and City has given v,���tten acceptance of each
such varia�ion by specific written notation thereof incorporated in or accampanying the
Submittal. C�.y's review and accep�nce shall not relieve Contractor from respansbility for
complyin� vvith the requirements af the Contract Doctunents.
6.19 Conti�uingthe T�ork
Except as otherw�se provided, Cantrac#or shall carry on the Wor� and adhere to the Project Schedule
during all disputes ar disagreements with City. No Work shall be delayed or postponed pending
resolution of any disputes or disagreements, except as City and Contractar may otherwise agree in
writing.
6.20 Contractor's General War�ranty and Guar�antee
A. Contractor warrants and guarantees to City that all �Vork will be in accordance with the Cont�ract
Documents and will not be defective. City and its officers, directars, memhers, partners,
employees, agent�, consultants, and subcon�ractors shall be entitled to rely on repres�ntation o�
Contractor's warranty and guarantee.
B. Cantractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modifica�ian, or imprflper maintenance or operation by p�rsons other th�n Contractor,
Subcontractor�, �uppliers, or any other individtaal or entity for vcrhom Contractor is
responsible; or
CITY OF FORT l�lORTH LucklcrncJ Rncr�15'icic tirrrlk l�riprvveuierzr,r
STANDAI2pWN5TRUCT]QN SPEC[FICAT[4N D4CUMENTS
Reaision: 823f1A21 C'P;V: IOOG37-3
OD7200-I
GENERAL CQNDITION S
Page 33 of 63
2. normal wear and tear under normal usage.
C. Con#raetor's obligation to perform and compiete the Work in accoxdance with the Cont�act
Documents shall be absolute. None of the following wil3 constitute an acceptance of Work that �s
nat in accordance wiih the Contract Documents or a release of Contractor's obligation to perform
the Work in accorda�ce wi�i� the Cantract Doc�arrients:
1. observatians by City;
2, recommenc3ation ar payment by City of any pxogress or �nal payment;
the issuance of a certificate of Fi�r�al Acceptance by Ciiy ar an� paymenf related thereto by
Ciry;
4. use or oceupancy of the Wark or any part thereof by City;
5. any :review and accepta.�ce of a S�bmittal by City;
6, any inspection, test, or approval by others; or
7. any correction af defective Work by City,
D. The Contractar s�all remedy any defects or damages in the Work and pay for any tlama.ge to
other work ar property r�sulting therefrom which shall appear within a p�riod of two (2) years
from the date af Final Acceptance of the Work unless a longer periad is specified and shall furnish
a good and suffzcienf rnaintenance bond, complying with the xequirements of Article
5.02.B. The City will give notice ofobserved defects wrth reasanable promptness.
G.2] �ndemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense,the City, its o�cers, seiwants and employees, fram and against a�ny and all c�aims
arising out o� or alleged to arise aut o� the work and se�ices to be performed by th�
Contractor, its o�cers, agents, em�loyees, subcontractors, license�s or invitees under th�
Contract. AT � T
OR �OMF OF HF nAMAGF� BELNG SOU(�HT .RF CA SFD. iN WHnLF, nR iN
PART. B AN�' AC'T. nMTS�inN [lR NEC'rL GENCE OF AE C'TTY. Tkuis ir�demnity
provision is intended fo include, without limitation, indemnity for costs, expenses and legal
fees incurred by the Ci�y in defending against such claims and causes of actions.
B. Contractorcovenants and agrees to i�demnify and hold harm�ess, at its awnexpense, the City,
its officers, serv�uts and emplayees, from and against any and all loss, damage or destrvction
of property of �he City, �rising aut o£, or alle�ed to aris e out of, the work and services to be
performed by the Contractar, its officers, a�ents, employees, subcontracta�s, licensees or
invitees under this Contract.
CITYOF FDR7' WaRTH Lacklalad lioucl3id�u'crlk I��tproti�er+ienls'
STANI3ARI]CONSTRUCT[OiJ SPEC[FICATION DOCUMENTS ('P�l': 1l1�JG37-3
Revision: 8rZ3/i0Z1
oo�zoa-i
GENERAL CONDITION 5
P age 34 af 63
' 31 \ __►1_1 _ � �'_::__ ._�►1 :_ -�-- �
� _ 1 1 : ' ' i < < I ._ 1 ►�_ I . 1 : ►I : : ► 1 !l.II
►1__: 1 ` .l�_1 1 :- -� ': : - - ' =-� � 1/_�_ 1 ! ;
► 1 _ � - - - -
6.22 Delegation ofPYofessional Design Services
A. Contractor will nat be required to provide professiQnal d�sign services unless such services are
specifically required by the Contraet Documents for a portion of th� Work or unless such services
ar� required to carzyout Contractor's respons��ities for construction rneans, methods, techniques,
sequences and procedures.
B. If professional c�esign servic�s or certifcatians by a design profe�sional relaied to systems,
materials or equipment are specif'icalty required of Contractor by the Contract Documents, City
will specify all performance and design criteria that sucb s�rvices zx�ust satisfy. Contractor shal]
cause such ser�ices or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear an all drawings, calculations, specifcatior�s, certifications, and
Submiita�s pxepared by such professionaL Submittals related to the Work designed or certified by
such professiozaal, if prepared by others, shall bear such professior�al's written approval when
submitted to City.
C. City shall be �ntrtled to rely upon the adequacy, accuxacy and completeness of the servic�s,
certifications or approvals perform�d by such design pxofessionals, pravided Gity has specif�ed
to Confiractor performance and design criteria that such services must safiisiy.
D. Pursuant to this Paragraph 6.22, City's review and aeceptance of design calculations and design
drawings will be only for the �imited purpose of checking for conformance with performance and
design criteria given and the design concept expxessed in the Contract Documents. City's r�view
and acceptance of Submittals (��eept design calcuiations and design drawings) will be only for
the purpose stated in Paragraph 6.18.C.
6.23 Right to Audat
A. The Contractar agre�s that the City shall, uzatil the expiration of three (3) years after final
payment under tivs Contract, have access ta and the right to examine and photocopy any directly
pertinent books, docurnents, papers, and records of the Contractox involving tran�actians relating
to tk� Contract. Contractor agrees that t�e City shall have access durn�g Regular Working Hours
to all necessary Contractor facilities and shall b� provided adequate and appropriate work space
in order io conduct auc�its in eompliance with the pravisinns of this Paragraph. The Gity skall
give Coniractor reasonable advance notice of intanded audits.
B. Contractor further agrees ta �alude in all its subcontracts hereunder a pra�ision to the effect that
the subcontractor agrees tl�at the City shaIl, until the expiration of �hree (3) years after final
pa�ment und�r this Contract, have access to and the right to examine and photacopy any directly
pertinent books, documents, papexs, and records af such 5ubcontractar, invol��ng transacfions to
tha subcontract, and further, that City shall have access during Reg�ular Worl�ing Hours to all
CITY OF FORT WOR'lti Lac�Icurcl ltoud 5ide�rulh l�z�larni+en�ents
STANDARDCONSTRUCTION SPCCIPICATIQN DOCUMENTS C'1'A': 1l1f1637-,?
Revision: 5�32(i2.1
aoazoa-i
GENERALCONUITION 5
Page 35 of 63
�ubcontractor facilities, and shall be pravided adequate and appropriate work space in order to
conduct audits in compliance with the provisio�s of this Paragraph. The City shal� g'rve
Subcontractar reasonable advance notiee af intended audits.
C. Contractor and Subcontractor agree to phatocopy such docutnents as may be requested by the City.
The City agrees to reirnburse Contraetox far the cost of tke copies as follows at the rate published
in #he Texas Administrative Code in effect as of tha tirne c�pying is performed.
6.24 Nondiscrinzinatian
A. The Ci�tsr is responsible for operating Public Transportation Prograrns and implementiug transit-
related projects, which are fiarided in part with Federal fmancial as��tance awarded by the U.S.
Department of Transpartation and the Federal Transit Adrnirais�ratxan (FTA), without
diseriminating against any per�on in the United Sta.tes on the basis of race, colox, ox na�ional origin.
B. 2'itle VI, Civil Kights Act of 1964 as amended.� Coz�t�actar shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Condirions for any project
receiving Federal assistance.
ARTZCLE '� -- OTHER WORK AT THE SITE
7.Q1 Related T�York atSate
A. City inay perfortn other work reiated to the Praject ai the Site with City's employees, or other
City contractors, or through other direct contracts there�ar, or have other work performed by ufility
owners. If such other work is not noted in the Con�ract Documents, tl�en written notice thereaf
will be given to Contractor prior �o starting an.y such other work; and
B. Contracior sha�l afford each otber cantractor who is a party to such a direct contract, each utility
owner, and City, if City is perfoz�ing ather work with City's employees or other City cantractors,
proper and safe access to the Site, provide a reasonable opportunit�y for the introduction and storage
of materials and equipment a.nd the execution of such other work, and properly coordinate the
VVork with theirs. Contractor shall do all cutting, frtting, and patching of the Work �t may be
requireci to properiy coru�ect or atherwise make its several parts come together and properly
integrate with such ather �vork. Contractor shal! not encianger any work of others by cutting,
excavating, or otherwise alkering such work; providec�, however, that Con.tractar may cut or alter
others' work with the written cansent of City and the others whose work will be affected.
�. If the proper execution or results of any part of Contrac#or's WQrk depends upon work performed
b� o�hers un:dex this Article 7, Contractar shall inspect such other work and promptly report ta
City in writing any delays, defects, ar deficienci�s in such other work that render it unavailable
or unsuitable for th.e proper e�ecution and results of Contractor's Work. ContY'actor's failure to so
report wilI constitute an acceptance of such other work as fit and praper for integration with
Contrac#or's Wark e�cept for latent defects in the wark provided by athers.
CITY OP FORT WORTH LucklUrul Road ,5rcic +rrrlk Inrprnvenac�rfs
STANDARDCqNS1kUCT10N SPECIFICAT[ON DOCUMENTS C'PA': 1OR637-3
Revision: RQ3IZ(�Ll
OD7200-I
GENERAL CONDITION S
Page 36 of 63
7.�2 CDOYC.�iJ2LZ$lDY!
A. If Ci[�y intends to contract with others for the performance o� other work on the Project af the
Site, the followu�g will be set forth in Supplementary Conditions:
1. th� individual or entrty who vvill have authority and responsibility for coorclination of the
activities amang the vaxious contractars will be ident�ed;
2. the specific m�tters to be covered by such authority and responsibility wiil be itemized; and
3. the extent of such authority and responsibilities will be pravi�ded.
B. Unles� otherwi�e provided in the Supplementary Conditions, City shall have autboriry %r such
coordmation.
ARTICLE S — CITY'S RESPONSIBILITIES
8.O1 Communications to Cont�actar
EXoept as otherwise provicied in the Supplementary Conditions, City shall issue all eommunications
to Contractor.
8,02 �'urnish Data
8.03
8.04
8.05
8.06
City shall timely fi�nish the data required under the Contract Documents.
Pay YVhen Due
City shall make payments to Contractor in accardance with Article 14.
Lands and Er�sements; Reports atzd Tests
City's duties witla respect to providing lands and easements and providing �ngineering surveys to
establish referenc� points are set forkl� arx Paragraphs 4.OI and 4.05. Paragraph 4.02 refers to City's
ideniifying and rnaking available to Contractor capies of reports of exploration� and test� of subsurface
condrtions and drawings of physical conditions relatiug to e�isting surface or subsurface structures at
or contiguous to the Site that have been utilized by City in preparing the Contract Documents.
Change Orders
City shal� exeeute Chang� Orders in accordance with Paragraph 10.03.
Inspections, Tests, andApprouals
City's resporisibility with respec� to certain inspectiar�s, tests, and appxavals i� set forth in Paragraph
13.03.
C1TY QF FORT WORTH Lacklmrd Rr�Ud S'rcletiralk lni�r•oti�eat�eirla•
STANDARDCflMSTRUCT]ON SPEC[F[CAT]O�I DOCUMENTS
Revisinn: 823I1.021 C'PAI: IIJOG37-3
oo�aoo-�
G�NERAL C.ON�ITION S
Page 37 of 63
8.07 Limitations on City's Responsibilities
A. The City shall not super�ise, direct, ar have contrai or authority over, nor be responsible for,
Contractor's means, rr�ethods, techniques, sequences, ar procedures of construct�on, or the safety
pracautions and prograrns incident thexeta, or for any failure of Contra�tor to carnply with Laws
and Regulations applicable to the performance of the Work. City will not be resporasibie for
Contractor's failure to perform �he Work in accordanc� with ihe Contract Documen.ts.
B. City will notify the Cantractor af applicable safety plans pursuant to Paragraph 6.14.
8.08 Undisclosed Hazardous Envira�mental Conditian
City's responsibili�y with respactto an undisclosed Hazardc�us En�ironmental Conciition is set fortb
in Para�raph 4.Q6.
8.09 Complrance with Safery Prog�am
While at the Site, City's emp�oyees and representatives shall comply wi�h �he sp�cific applicable
requiremen� of Contractor's safety programs of whieh City has been informEd pursuant to
Paragraph 6.14.
ARTICLE 9— CITY'S OBSERVATION STATiJS DURING CON�TRUGTION
9.Q1 City'sProjectMc�racrge�
Cily will provide one or more Project Manager{s) during the constructian period. The duties and
responsibilities and the limiiatians nf authority of City's Pro}ect Manager during construction ara set
forth in the Contract Documents. The Ciiy's Project Manager for this Cantract is identif�ed in �he
Supplementary Condition�.
9.0� Visat�� to Site
A. City's Project Manager will make visits to the Site at intezvals appropria.te to the various stages
of constructinn as City deems necessary in order fio obse�rve fhe progress that has beenmade and
ihe quality o� the various aspects of Contractor's executed Work. Based on information
obtained during such visits and observations, City's Project Manager will determine, in general, if
the Work is praceeding in accordance with #he Contract Documents. City's Project Manager will
not be required to rnake exhaustive or continuous inspections an the Site to check the quality or
quantity of the Wark. City's Project Manager's e#'forts wiI1 lae directed toward providing City a
�reater degree of confidence that the completed Wark wilI confoxm generally to the Contract
Documents,
B. City's Project Manager's visits and ab�ervatians are subject to all the limitations an authority and
respo:ns�bility iti the Contract Documents i�cluding those set forth in Paragraph
8.07.
CITYOF FO1ZT WORTH f uCldrntd Rnad 5rdeiralli Ir�rpravenrenls
STANDARDCDIVSTRUCTiON SPCCIF1CATfON DOCUMENTS CPN: 1�1f)C37-3
Revision: 8232U21
oo�zao-i
GENERAL CON�ITION S
Page 38 af 63
9.03 �lutharized Ycrriations in Wor�k
9.04
� E V
G�iI'7
City's Praject Manager may autharizze minor variations in the Work from the requirernent� of th�
Contract Documents which do not involve an adjustment in the Conh•acf Price or the Contract Time
and are compatr`b�e with the design concept of the completed Project as a functioning whale as
indicated by the Contract Docutnents. These rnay be accornplished by a Field Order and will b�
b�nding on City and a�so on Contractor, who shall perForm the Work �vol�ed promptly.
RejectingDefective YWor�k
City will have authority to reject Work which City's Project Manager believes to be defective, or vcrill
not pxaduce a completed Project that con%rm:� fio the Contract Documents or that will prejudice the
integrity of the design cancept of the completed Praject as a functioning whole as indicated by the
Con�ract Docuzrkent�. City will have autharity to eonduct special inspection or testing of the Work as
pravided in Artic�e 13, whether or not the Wark is fabric�ted, instal�ed, or completed.
Determinationsfor YT�orkPe�fnr�med
Contractor will. deterrnine the actual quantitie� and classif'ications of Work performed. Ciiy's Project
Manager will review with Contractor the prelirninary detez�aiz�ations on suchmatters befare rendering
a vcrritten recommendation. City's written decision will be fwal (except as modified to reflect changed
factual conditions ar more accurate data).
Decisions on Req�rirer�ents ofContractDocuments and Acceptability of YYo�k
A. City will be the initial interpreter of the requirernents of the Contract Documents and judge of the
acceptability of the Work thereunder.
B. City will render a written decision on any issue referrec�.
C. Ciiy's written decision on the issue referred will be final and binding on the Contractor, subject
to the pra�visions a� P aragraph 10, Ob,
ARTICLE la — CHAI�GES IN THE WORK; CLAIMS; EXTRA WORK
10.01 Authorized Changes in ths Wot-k
A. Without invalidating the Cantract and without nntice to any surety, City may, at any time or from
time to time, order E�ra Waark. Upon notice of such Extra Work, Contractoz• shall promptly
proceed with the Wark involved vvhick� will be performed under the applicable conditions of the
Contract Documents (except as otherwise specifically provided). Extra Work s�all be
memorialized by a Change Drder vvhich may ar may not precede an order ot�Extra work.
B. For miunor changes of V1War1� not requiring changes to Cantract Time or Contraet Price, a Field
Order xnay be issu�d by the City.
CITY OF FORT WDRTH I_acklrrnd Rocrrl.5'icle�rCdk hltpi'nt�erirer7ls
STANDARDCONSI'&UCT[ON SPECIFICATIDN bOCUM�NTS ('P:�',- IfJ0633-3
Revisinn: 823/Z021
007200-I
GENERAL CDNDITION S
Page 39 af 63
10.02 Unauthorazed Changes in �he Work
Contractor shall not be entitled to a.� increase in tne Contract Price or an e�iension of the Contract
Time with respect to any work performed t$at is not required by the Contract Dacuments as amended,
modified, or supptemented as provided in Paragraph 3.04, except in the case af an emergency as
provided in Paragraph 6.17.
10.03 Execution ofChange O��'e�s
A. Czty and Contractor shall execute appropriate Change arders covering;
1. changes in the Work which are: (i) ordered by Ciry pursuani fo Paragraph1�.01.A, {u`� recluired
because of accepta.nce of defective Wark under Paragraph 13.08 or City's coxirection of
de�eeti�e Work under Paragraph 13.09, or (iii7 agreed to by tlie parties;
2. changes in the Contract Price or Cantract Time which ara agreed to by the parties, including
any uncl�sputed sum or amow�t of iime for War[c actually performed.
1Q.04 Extra Work
A. �hould a difference arise as ta wha� does or does not constitute Extra Work, or as to the payment
thereof, and the City insists upon its performance, the Cantraetor shall proceed with the wark after
malcing written request for written orders and shall keep accurate aecount of the ac�ual reasoxaal�le
cost thereof. Contract Clauns regarding Ex1ra Work shall be made pursuant to Paragraph 10.06.
B. The Contractor shall furnish the City such installation records of all deviatio�s from the original
Gontract Documents as may be necessary to enable the City to prepare for permanent record a
corrected set of plans shc�wing the actual installation.
C. The compensation agreed upon for Extra Work whether o�r not initiated by a Change Order shail
be a fia11, complete and fmal �ayment for aIl costs Cnr�fractor incurs as a resuh or relating to the
change or E�tr'a Work, whether said costs are knowm, u��knovvn, foreseen or unforeseen at that
time, includ'mg without limitation, any costs for delay, extend�d overhead, ripple or impact cost,
or any o�her effect an ehanged ar t�nchanged wark as a result of th� change or Extra Work.
10.05 Notification ta Surety
If th� provisions of any bond require natice to be given to a surety of any change affecting the general
scope af the Work or the provisipris of the Contract Documents (includ�ir�g, but not lirnited to;
Contract Price or Cantract Time), the giving of any such notice will be Cantractor's responsibility.
The amount of each app]icable bond will be adjusted by the Contr�ctox to reflect the effect of any
such change.
C1TY QF FORT WORTH Lacklu�rd Itoad .Sicletiral6' l�t�pi'ovei+re�ats
STANDA,A.bCON5'fItUCTfON 51'ECIFlCA7'[ON DOCUMIENTS CP.A+: I(1(1(37-3
Revision: SIL31lUZ1
0072DO-1
GENERALCONDITIONS
P age 40 of 63
10.06 Contract Clcai�zs Proce,ss
A. City's Decisio� Requirea': All Contract Claims, e�cepf those vaai�ed pursuant to Paragraph
14.09, shall be referred to the City far decision. A decision by City shall be required as a condition
precedent to any exerci�e by Con�ractor of any rights or remedies he may otherwise have under
the Contract Documents ar by Laws and Regulations in respect oi such Contraci Claims.
B. Notice:
1. Written notice stating the g�neral nature a� each Contract Cla,im shaIl be deliver�d by the
Contractor to City no later than 15 days after the start af �lie event �iving rise thereto. The
responsibility to substantiate a Contract Claim shall rest with the party malang the Cont�act
CIaim.
2. Notice of th� amount ar extent of the Contract Claim, wiiY� supporting data shall be delivered
to the City on or before 45 days fi•om the start of the event giving rise thereto (uzlless the City
allaws additional time for Cantractax to subrnit additional or more accurate data in �uppart o�
such Contract Claim),
3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with
the provisions of Paragraph 12.01.
4. A Contract Claim for an adjustment in Contract Tirne shall be prepared in accordance with
the prov�sions of Paragraph 12.02.
S. Each Contract Claizn shall be accampanied by Contractar's written statement that the
adjustment claimed is the entire adjustment ta which the Contractor believes it is entitled as a
result oF said event.
6. The City shall subrnit any response to the Cantractor within 30 days after receipt of the
claimant's ]ast submittal {unless Cantract allnws additional time).
C. City's Aetion: City will re�iew each Contract Claim and, witivti 30 days after receipt of the ]ast
subrnittal of the Cantractor, if any, take ane af the following actians u� writing:
1, deny the Contract Clairn in whole or in part;
2. apprnve the Contract Claim; or
3. noti�fy the Contractor that the City is uz�able to resolve the Cantract Claim if, in the Ci�ty's
sole discretion, it would be inappropriate for ihe City to do so. Far purposes af further
resolution of the Contract Claim, sueh natice shall be deemed a denial.
CITY OF PdRT WbRTH Lucklcrrrr! liacrd Side�rrafk 1nr�coi�eruerN,s
STAN�ARDCON51'RUCTION SPEC[FfCAT[ON DOCUM�N7'S CPrl1: 100(37-3
Revision: 8+?32Q21
00 72 oa - i
GENERAL CONDITION S
Page 41 of 63
D. City's written action under Paragraph 10.06.0 will be fmal and binding, unless City ox
Contractox invoke the dispute resolution procedure set forth in A.rticle 16 within 34 days of such
action a� denial.
E. No Contract Cla.im for an adjustment u� Confiract Price or Cantract Time will be valid if not
subnutted in accordance with thi� Paragraph 10.06.
ARTICLE 11— COST OF THE WORK; ALLOWANCES, Ui�IT PRICE WORK; PLANS
QUANTITY MEASUREMENT
11.01 Cnst of the C�ork
A. Costs Included: The teml Cost of the Work means the sum of all costs, except tho5e excluded in
Paragr�ph 11.O1.B, necessarily incurred and paid L�y Coniractor in the proper perfarmance of the
Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to
Contractor will be only thase additional or incremental costs required because of the change in the
Work. Such costs shall not include any of the costs itemized in Paragraph 11.D1.B, and shall
include bufi not be limited to the following items:
1. Payroll casts for employees in the direc# employ of Contractor in the perforn�ance of the
Wark under sch�dules of job classifications agreed upon by City and Contractor. Such
employees shall include, without limitataon, superintendents, faremen, and other personnel
employed f�ll time on tha VlTork. Payroll costs far em�loyees not employed full tune on the
VLTork shall be apportioned on the basis af their tim� spent on the Work. Payroll costs shall
include;
a. salaries with a 55% markup, or
b. salaries anci wages pius the cost of fringe benefits, which shall includ� social security
cotatributians, unemployment, excise, and payroll taxes, workers' compensation, health
and retirement beneiits, bonuses, sick �eave, vacatian and holiday pay applicable thereto.
Tk�e expen�es of performing Work outside of Regular Working Hours, Weekend
Warkiung Hours, or legal holidays, shali be included in the above to the axtent authorize d
by City.
2. Cast of all materials and equipment furzaished and incorparated in the Work, includ`n�.g costs
o� transportation and storage thereof, and Suppliers' fi�ld services required in connection
therewith.
3. Rentals of all construction equipment anci machinery, and the parts tkzereaf whether rent�d
from Contractor or others it1 accordance with rental agreements appro�ed by Czry, and the
costs of transportation, load'mg, unloading, assemhly, dismantling, and removaI thereof. All
such costs shall he in accordance with tihe terms of said rental agreements. 'Tb.e rental o� any
such equipment, machinery, ar pa�ts shall cease when the use thereof is no Iongex ttecessaty
for the �V�rk.
CITYOF FORT WORTFE I.uchlai�d Roced Sideiretlk Irrtproicnte�afs
STA3�IL7�IRDCONSTRUCTION SPEC[FICATiQN DOCUMENTS CPN: JO(1C37-3
R ev i s i on: 82'iI1.D3.1
oa�zao-i
GEN�RAL COND 1710N 5
Fage 42 of 53
4. Payments made by Cantractor to Subeontraetars for Work perfaxmed by Subcontractor5, If
required by Ci�ty, Contractor shall obtain competitive bids fram subcontractors acceptable to
City and Contractor and shall deliver such bids to Ciry, who will then determine, which bids,
if any, will be acceptable. If any subcontract provides t1�at the SubcontracYor is ta be paid on
the hasis of Cost of the Work plus a fee, the Subcontrac#or's Cost af the Work and fee shall
be determined 'm the sa�ne manner as Contractor's Cost of the Work and fee as provided in
this P aragraph I 1, O 1.
5. Costs of special consultants (rncluding hut not limited to engineers, archit�cts, testing
laboratories, surveyars, attorneys, and accauntants) employed for services specifically related
ta the Work.
6. Supplemental costs ineluding the following:
a. The proportion of necessary trar�portation, travel, and subsi�tence expenses o�
Contractor's employees incurred in discharge of duties connected with the Work.
b. Cnst, includ'mg fransportation and maintenance, of all znateriaLs, supplies, equipment,
machinery, appliances, offiee, and temporary facilities at the Site, and hand tools not
owned by the workers, which are consumad in the �erfarrnance of the Work, and eost, less
mark�t value, of such ifierns ussd bui not consumed which remain the praperty of
Contractor.
c. Sales, consumer, use, and other similar taxes reJated to the Woric, and for which
Contractar is liable not covered under Paragraph 6.11, as imposed by Laws and
Reg�atiozis.
d. Deposit5 lost fbr causes other than negligence of Contractor, any Subca�tractoz•, or
anyone directly or indirectly employed by any of tl�em or for whose aets any of them �ay
be liable, and rayalty payments and fees �ar permit� and licer�es,
e. Losses and ciamages (and related expenses) caused by darnage to the Work, not
compensated by iraisur�nce or otherwise, sustained by Contractor � co:nnection with the
perFormance o� the Work, provided such losses and damages have resuIted from causes
other than the negligence o� Gontractor, any Subcontractor, or anyane directly ar indiarectly
ernployed by any of them or %r whase acts any af �hern may be liable. Such lasses shall
include settlements made with the written consent and approval of City. No such �osses,
damages, and exp�nses shall be included in the Cost of the Work for t�ie purpose of
determining Contractor's fee.
£ The cost of utilities, fuel, and sanitary facilities at �he Site.
g. Mirior e�penses such �s telegrams, lon� distance t�lephone c�lls, telephone and
communicatian se:rvices at the �ite, e�ress and courier serviees, and similar petty cash
items in connection wzth the Work.
CITY OF FC?RT WORTH 1.ueklcu�rl I�ocacl Sideircrllr G�r��ravenretars
STANDARDCdNSTRUCTI4M SP6CIFICATIDN DOCUM�t�iTS CPAr: I(1(J437-3
Revisian; R/23/2(1�1
oa�zao-�
GEN�RALCON�IT14N5
Page 43 of 63
1a. The casts af }�remiums far all bonds and insurance Contractor is required by the Cantract
Documents to purchase and maintain.
B. CostsExcluded.• The termCost ofthe Work shall not �clude any of the following items:
1. Payroll costs and other compensation af Contractar's officers, executives, principals (af
partnerships and sole proprietorships), general managers, safety managers, engineers,
architect�, estimatars, attorneys, audita�rs, accountants, purchasing and contracting agents,
expedit�rs, timekeepers, clerks, and o#her personnel emplayed by Contractor, wheiher at the
�ite or in Contractar's principal or branch o�fice �or general adrninis�ration of the Work and
not specif�ically included in the agreed upon schedule of job cla.ssiiications referred to in
Paragraph 11.O1.A.i nr specifically covexed by Paragraph 11.O1.A.4, all of which are to be
considered acinv�vstrative costs covered by the Contractor's fee.
2. Expenses of Contractor's principal and branch oifices other than Cantracior's office at the
Site.
3. Any part of Contractor's capital e�enses, includitig interest on Contractor's capital
employed for the Wark and charges against Contractor for delinquent payments.
4. Casts due to the negligence of Cantractor, any Subcontractor, or ar�yone directly or �ndirectly
employed by any of them or for whose acts any of them rnay be liable, iricluding but not
limited to, the correciion of defecti�e Work, d�spasal of materials or equipment wrongly
supplied, and making good any damage to praperty.
5. Other overhead or general expense costs of any kind.
C. Cont�-actor's Fee: When all the Work is performed on the basi� of cost-plus, Contractox's fee
shall be determ�ned as set farth in th� Agreement. When the value of any Work covered by a
Change Order �or an adjustment in Contract Price is deterrriined on the basis of Cost of the
Work, Contracfior's fee shall be determined as set forth in Paragxaph l 2.01,C.
D. Documentation: Whenever fi,he Cost of the V4'oxk for any purpose is to be determined pursuant to
Paxagiraphs I1.O1.A and 11.01.B, Cantractor will establish and maintain records thereof in
accordance wi�h generaIly accepted accoun#ing pracfiices and submit iu a form acceptable to City
an itemized cost breakdowi-i to�ether with supporting data.
11.02 Alrowances
A. Specified Allowance: It is understood that Contractor ha� included in the Con�aet Price a�l
allowances so named ir� the Contract Docutnents and shaII cause the Work so cavered to be
performed for such sums and by such persons flr entities as may be accepfiable to City.
B. Pre-bidAllowances:
1. Contractor agr�es that:
CIT Y OF FORT WORTH L�rrkJcrrrr! liocrd Srdesrrrlk ln�provenre�zrs
STAI�I[)ARDCONSTRUCTION SPECIFICAT[ON bOCUl1�NT5 C'P,�',- 1(1OG37-3
Revision: 8�L3/1,021
00 72 00 - I
GENERAL COI�DITION S
Paga 44 of 63
a. the pre-bid alIowances include the cos�to Contractar of materi�ls and equipment required
by the allo�ances to be delivered at the Site, and all applicab�e taxes; and
b. Gontractor"s costs for unload'mg and 1�andling on ihe Site, ]abor, installation, overhead,
profn, and other expenses contemplated for the pre�bid allowances have been included in
the allawances, and no dernand �ar additional payment on account of any of the
foregoing will be valid.
C. CantingencyAllowance: Contractor agrees that a contingency allawance, if any, is for the sole use
of City.
D. Prior to final payment, an apprapriate Change Order will be issued to reflect actual amount� due
Contractor on account of Woxk covered by allawances, and the Contract Price shall be
correspondingly adjusted.
11.03 UnitPrice Work
A. Where the Contract Docutnents pravxde that aIl ar part of the Wark is to be Unit Price Work,.
initiaIly the Contract Price will be deemed to 'vnelude for all Unit Price Work an amount equal to
the sum of the unit price for each separately identified item of Unit Price Work titnes the estimated
quantity of each item as indicated in the Agreernent.
B. Th� esti�ted quantities of items �f Unit Price Work are not guaranteed and are soIely %r the
purpose of campari�on of Bids and determining an u7itial Contract Price. Determinatians of the
actual quantities and classif'xcatioans of Unit Price Work perfortned by Contractor will be made by
City subject to the provi�ions of Paragraph 9.OS.
C. Each �,uut price will be deemed ta include an amount cansidexed by Contractor to be adequate to
cover Contractor's overhead and profit for each separately �dentified item. Work described in the
Cantract Docunrients, or reasona.bly inferred as required for a fimctinnally caznplete installation,
but not identified in the li�tan.g of unit price items shall be considered incidental io unit price work
listed and the cost of incidental work �ncluded as part of the unit price.
D. City may rnake an adjustm�nt in the Contract Price u�. accordance withParagraph 12, D 1 if:
1, the quantity of any item of L3nit Price Work performed by Can�ractor di�fers materially and
significantly fro�m the estimated quantity of such item indicated 'm the Agreement; and
2. there is no corr�spanding adjustment with respect to any other item af Work.
E. Increased or Decreased Quantfties: The City reserves the right to order Extra Work in
accoxdance with Paragraph 10,01,
l. If th� changes in quantities or the alteratians do nvt significantly change the character of
v�ork undez the Contract Documents, the altered work will be paid for at tk�e Contract uxiit
price.
CITYOF FDRT WORTH Laclrlrrild Road Sideircrlk lnrpr•ui�e�ue�rls
STANDARDCON57'RUCTION 3PECIFICATION DOCUMENTS CP11': 10lJG37-3
ftevision: S1�3lJ0�1
0072DO-I
GENERAt coNo ITION 5
Page 45 of G3
2. If the changes in quaz�tities or alterations significantIy change the character of work, the
Contracf will be amended by a Chang� Order,
3�. If na un�i.t prices exist, this will be considered Extra Work and the Contract will be amended
by a Change �xder in accordance with Article 12.
�4. A si�cant cl�ange in the character af work occurs when:
a. the character of wark for any Item as altered differs materially in kind ar nature from that
in the Contract or
b. a Major Item of work varies by moxe than 25°/a fram the original Contract quantity.
S. When the quantity oi woxk ta be done undex any Major Item of the Contrac� is more tl�an
125% of the orig�al quantity stated in the Contract, then either party to the Contract m�ay
r�quest an adjus�ment �o the unit price on the portion of the work that is above 125%.
6. When the qua.ntit�+ of work to be done under any Major Itern of the Contract is less than 75%
of the original qttantity stated in the Contract, then either party to the Contract rnay request
an adjustment to the unit price.
11.04 Plans Qacantity Mea�xa�errtent
A. P1ans qUantities may or �nay not representthe e�act quantity of work performed or material moved,
handlec�, or placed during the execution of the Contraci. The est�nated bid yuantities �.re
designated as final payment quantities, unless revised by the governing Section or this Article.
B. If �he qvantity measured as otxtlined under "Price and Payment Procedures" varies by more than
25% (flr as stipulat�d under "Price and Paymen� Procedures" �OT 5]3eC1f1C Items) from the total
estimated quantity for an individual Item originalf}r 5hown in the Coniract Docwnents, an
adjus#.�nent may be made to the quantity af authorized work done for payment purposes. The party
to the Contract requestin� ihe adjustment will provide field nneasurements and calculations
shoe�ving the final quantiry far which payment wilI be made. Payment for revised quantiiy will be
rnade at the unit pric� bid for that Item, except as pro�ided for in Axtzcle 10.
C. When quantities are re�ised by a change iun design appraved by the City, by Changc� Order, or to.
correct an �rror, or to correctanerror on the plans, tl�e plans qu;antiry will be increasedor decreased
by the amount invalved in the change, and the 2S% variance will apply to the ne�v p�ans quantity.
D. �f the total Contract quantiry znultiplie d by the unit price bid for an individual Item is less than
$250 and the Item is not a�iginally a plans quantity Item, then the Item rnay be paid as a plans
quantity Item if the City and Contra ctor agree in writing to fix the fina l quantity as a plans quantily .
CITY OP PORT WORTH Lac•kJrmd l��rd S'icleu�ulk lav�lJt•orerrrents
STA�IDARDCDNSTRUCTiON SPECIFICATION DO�U[vIENTS
CPN: lOOC37-3
Rwision: �1
oo�zoo-i
GENERALCONDlTIONS
Aage 46 of 63
E. For callout v�rork ar non-site specific Contrac�s,the plans quantity measurementrequirements are
not applicable.
ARTICLE 12 — CHANGE OF C0�ITRACT PRICE; CFIANGE OF CONTI2ACT TIME
12.d1 Change ofContj-actPrice
A. The Gontract Price may only be changed by a Ghange Order.
B. The �alue of any VlWork covered by a Change Ordex wiJl be determined as follows:
1. where the Work in�ol�ed is cavered by unit prices canta.ined 'ua� the Contract Documsnts, by
appiicatian of such unit prices to the quantities of tha iterns involved (subject to fihe provi�ions
ofParagraph 11.Q3}; or
2. wher� the Work invalv�ed is not covexed by unit prices contained in the Contra�ct Dacuments,
by a mutually agreed lump sum or uzlit price (which may include an allowance for overbead
and profit nat necessarily in ac�ordance with Paragraph 12.O1.C.2), and shaIl include the cost
of any secondary impacts that are foreseeable at the tirarie of pricing the cost of Extra Work;
or
3. where the Wox�C iineolved is not covered by unit prices contained in the Contract Documents
and agreement ta a Iump surn or unit price is not reached under Paragraph 12.O1.B,2, on �ha
basis of the Cost of the Work (detertnined as provided in Paragraph 11A1) plus a Contractor's
fee for overhead and pro�'it (deterrnined as provrded in Paragraph 12.01.C}.
C. Contractor's Fee: The Conlractor's additional fee for overhead and pro�'rt snaIl �e detexzx�ined as
follpws:
1. a rnuivally acceptable fixed fee; or
2. if a fixed fee is not agreed upon, then a fee bas�d on the �ollowing percentages of the various
portiar�s af the Gost of the Work:
a. for costs incurxed under Paragraphs 11.O1.A.1, 11.O1.A,2, and 11.O1.A.3, the
Contractor's additional fee shall be 15 percent except for:
1) renta.I fees for Contractor's own equipment usirig standard rental rates;
2) bonds and insurance;
b. far casts incurred utader Paragraph 11.Q1.A.4 and 11.O1.A.5, the Contractor's fee shall be
five percent (5%};
1) whexe one or more tiers of subcontracts are on the basis of Cast of the Woark plus a
�ee and no fixed fee is agreed upon, the intent of Paragraphs 12.O1.C.2.a and
12.OI.C.2.b is that the Subcontractor who actually performs the Woxk, at whatever
Cl'I�Y OF FUR"I' WORTH Lacklcnrd Raad Sicletiralk Irrrpi�oi�er�re+r�ls
STANDAI2.bCQNS7RUCTION SPECIF[CATIflN DOCU3vIENTS
Revision: &23/1D21 C'PA�': I[J�(37-3
QQ72OD-I
CENERAL COIVDITION 5
Page 47 af 63
tier, will be paid a fee o� 1 S percent oi the casts incurred by such Subcontractor under
1'ara�raphs I1.O1.A.1 and 11.O1.A.2 and that any higher tier Subcantractor and
Contractor wiil each be paid a fee of five pexcent (S%) of the amount paid to the next
lower tier �ubeontxactor, however in no case sh.all the cumula�ave total of fees paid be
in excess of 25%;
c. no fee shall be payable on t�e basis af costs itemiz,ed under Paragraphs 11.O1.A.6, and
11.01.B;
d. the amount of credit to be allo�nred by Contractflr to Ci#y for any change vviiich results in
a ne# decrease in cost will be the amount of the actual n�t decrease iri cost plus a ded�uctian
in Cantractor's fee by an amouu�t equal ta �rve percent (5%) of such net decrease.
12.02 Change ofContract 2'ime
A. The Contract Time may only be ehanged by a Change Order.
B. No extension of the Gontract T�ne will he al�owed for E�ra Wark or for claimed delay unless the
E�ra Work contemplated or claimed del�y is shown to be on the critical path of the Project
Schedule or Contractor can show by Critical Path Method �nalysi� h�w the Extra Work or claime d
delay adversely affects the critical path.
12.03 Delc�ys
A. Where Contractor is reasonably de�a.yed in the performance or comp�etian af auy part of th�
Work within the Contract Time due �o delay i�eyond the confixol o� Contractor, the Contract Time
may be extend�d 'm an amaunt eq�aal to the time lost due to such delay' if a Cantract Claim is made
therefor. Delays beyond the control of Contractor shall include, but nat be limited to, acts ar
neglect by City, acts or neglect af utility aw�aers or othex cantracfors performing other wark as
contemplated by Articl� 7, fires, floods, epidemics, abnozmal weather conditions, or acts of God.
Such an adjustment shall be Contractor's sole and exclusive remedy for the de]ays described in
this P aragraph.
B. If Contractor is delayed, City shall not be lia.ble to Contractor far any clauns, costs, losses, or
damages (including but not limited ta all fees and charges of engitieers, architects, aitorneys, and
o�her professionals and all court ar arbitration ar ather dispute resolution costs} sustained by
Contractor on or in connection wrth any ather project or anticipated project.
C. Contractox slaall not be eniitled ta an adjustment in Contract Price or Contract Time fox delays
within the con�arol of Contractor. Delays attri�utable to and within the control of a Subcantractor
or Supplier shall be deemed to be delays within the control of Contractor.
D. The Cantractor shall receive no compensation far delay� or hindrances ta the Wark, except when
direct and unavoidable e�ra cost to the Contractor is cau�ed by the fa�lure of the City to pravide
infarmation or material, if any, which is to be furnished by the City.
CISYOF FORT WOATIi l,ueklunc! RoacLSide�rc+Ik h�r�lroverttenl,s
STANIIARDC0I�5TRUC7'ION 5PEC1FiCATIOM DOCUMENTS CI'A'.• IR�G37-3
Revision: 8R3�2021
oa�zoo-i
G�NERAL CONbITfO�I 5
Page 48 of 63
ARTICLE 13 -� TESTS AND �NSPECTIDNS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTTVE WORK
13,01 �otice ofDefects
Na#ice af all defective Warl� af which City has actuaI knowledge will be giw�n to Contractior.
Defective Work rnay be rejected, corrected, or accepted as provid�d in thss Article 13.
13.02 Access to Work
City, independent testing laborataries, and governmental agencies vaith juri�dacdonal interests will
have access ta the Site and the Work at reasonahie times for their obser�ration, it�spection, and testing.
Cantractor shaIl provicie them proper and safe conditions for such access and adv�se them of
Contractor's safety procedures and programs so that th�y rnay comply therevvith as applicable.
13.03 Tests and Inspectaons
A. Contractar shall �ive City timely notice of readiness of the Work for all requiared inspections,
tests, or approva}s and shall cooperate with inspection and testing personneI to facilitate required
inspections ar tests.
B. If Contract Documents, Laws or Regulatior�s of any public body ha�ing jurisdic�ion require any
of the Work (or part therea#� tn be inspected, tested, or appro�ed, Cont�actar sha�l assume fu17
respons�bility far arrang�ng and obtaining such independent inspectivns, tests, retests or approvals,
pay all costs in connection th�rewith, and fumish City the required certif'icates of inspection or
appraval; excepting, however, those fees specifically identif"ied in the Supplementazy Co�cl�tion.s
or any Texas Department of Licensure and Regulation (TDLR) insp�ctions, t�vhich sl� ll be pazd as
described in the Supplementary Conditians.
C. Contractor shall be responsible for arranging and obtaining and shall pay all co�ts iri conn�ctian
with any inspections, tests, re-tests, or approva]s required for City's acceptance of maierials or
equipment to be incorporated in the Wark; or ac�eptance ofmaterials, mpc designs, or equiprnent
subirutted for appro�al prior to Contractor's purchase thereof for incorparation i� the j]klork.
Such inspections, tests, re-tests, or approvals shall be performed by organiza.tions acceptable to
City.
D. City may arrange far the se�rvices of an independent testing ]aboratory (``Te�ting Lab") to
perform an� inspectior� ar tests ("Testing") for any pari of the Work, as determined solely by
City.
1. City will coardinate such Testing to the eartent possible, wrth Cantracfior;
2. Shauld any Testing under this Section 13.03 D result in a"fail", "did n�t pass" ar other
sinvlar negaiive result, the Contrac�or shall be responsble for paying for any and all retesfis.
Contractor's cancellation without cause of Ciry initiated Testing shall be deemed a negative
result and requi�e a retest.
C1TY OF FOAT WUKTH I.ncklcrrrd RoaclSideircrlk li�rprovertle�ils
STANDARDCbNSTRUCTION SPECIFfCATIOM D�CUMENTS
Revision: 8JZ3II�OZ1 CI'A': 1 �UG37-3
OD72Q0-]
GENERAI. CONDITIQN 5
Page 49 of 63
3. Any amounts owed for any retest under tivs Section 13.03 D shall be paid directly to the
Testing Lab by Contractor. City will forward all mvoices for retest� to Contractor.
4. If Contractor fazls to pay the Testing Lab, City will not i�su� Final Payment until the Testing
Lab is paid.
E. If any Work (or the work of other�) that i� to be inspected, tested, or approved is covexed by
Cantractar without written concurrence o� City, Contractor shall, if requested by Cily, uncov�r
such Work for observation.
F. LTncovering Work as provided it� Paragraph 13.f)�.E shall be at Contractor's expense.
G. Contractor shal! have the right to make a Contract Claun regard�xg any retest or invoice issued
under Sec�ion 13.03 D.
13.04 Uncavering Work
A. If any Work is covered cantrary to the Contract Documents ar specific instructions �y the City, it
must, if requested by Gity, be uncovered far City's obser�ation and replaced at Contractor's
expense.
B. If City considers it necessaty or advi�able that covered Work be observed by City or inspected or
tested by others, Contractor, at City's request, shall uncover, expose, or atherwise make ava�7able
for o�servataon, inspection, or testiing as Crty may require, that parkian of the Work in quastion,
furnishing aIl necessary �abor, material, and equipment.
If it is found that the uncovered Work i� defective, Contractor shall pay all claitns, cflsts,
lasses, and damages {including but not li�nruted to a�l fees and charges of engineers, architects,
attorneys, and other professionals and all caurt ar other dispute resolutinn costs) arising Qut o�
ar relating to such uncovering, exposure, observation, inspection, and test�ng, and of
satisfactory replacement or reconstruction (iricluding but not limited to all costs of repai� ar
replacement of work of others); or City shall be entitled to acceptdefective Work im accardance
with Paragraph 13.08 in which case Contractor sl�a.11 still be responsi�le for aIl costs associated
wxth exposing, observing, and testing the defective Work.
2. If the uncovered Work is not found io b� defective, Contractor shall be allowed an increase
in the Contract Price or an e�ension of the Contract Time, or both, directly attri�utable to such
uncovering, expasure, observation, inspection, testing, replacement, and reconstruction.
13.05 City May Stop the Work
If the Woark �s defecti�e, or Contractor fails to supply sufficient skilied warkers or suitable rnaterials
or equipment, or fails to perform ihe Work in such a way tkiat the completed Work will conform to
the Contrac# Documents, City may order Coniractor to stop �ie Work, or any portion thereof, until the
cause for such order has been eliminated, however, this right of City to stop the �+Vark shall not give
rise to any duty on the part of City to exercise this xigla.t for the benefit of Contractor, any
CITYOFFORT WOI2TH l.ucklund IdanrlSrdeirr�Ilc l��rproi�en�cfe�s
STAIII]ARI]CONSTRUCTION SPECIF]CAT10N DOCUIvI�3VTS CP,V: 1�(7�37-3
Revision: 8�2�1
oo7zao-i
GENER,4L CQND ITION S
Page 50 of b3
Subcontractor, any 5upplier, any other individual or entity, or any surety for, or employee or agenfi of
any of the m.
I3.Q6 Correction orRemoval af Defeetive Wo�k
A. Prornptly after receipt of written notice, Cantractor shall correCt all defective Work pursuant to
an acceptable sehedule, whether ar not fabricated, insta�led, or corzapleted, or, if the �Jork has been
rejected by Ci�ty, rernove it from the 1'roject and replace i� with Vdork that is not defective.
Cont�•actor sk�all pay all cla.ims, casts, additional tes#ing, losses, and dannages (including but not
limited to all �ees and charges of engineers, architects, attorneys, and other pro�essiona�s and a11
court or arbitration or other dispute resolu�it3n costs) arismg out o� or relatmg to such carrection
or removal (includ�ir�.g but not limited to all costs of repair or replacement of work of aihers}.
Failure to require the removal of any defective Work shall not canstitute acceptan.ce of such Wark.
B. V�7hen correcting defective Work under the tetms af this Paragraph 13.06 or Paragraph 13.07,
Cont�•actor shall take na action that would void or otherwi,�e impair City's special warranty and
guarantee, if any, on said Wark.
13.47 Cart�ection Period
A. If within two (2) years after the date of Final Acceptance (or such �onger period of time as �nay be
prescxibed by the terms of any applicable special guarantee required by the Contract Documents},
any Work is found to be defective, or if the repair of a�y dannages to the land or areas made
a�ailable for Contractor's use by City or pern7itted by Laws and Regulataozas as cantempla.ted in
Paragraph 6.1 p.A is found to be defecti�e, Contractor shall promptly, without cost to City and in
accordance with City's written it�tructions:
]. repair such defective land or areas; or
2. correct such defectNe Work; or
3. if the defective Wark has been r�jected b�y City, remove it fram the Project and replace it
with Work ihat is not defective, and
4. satisfactorily corz•ect or repair or r�move and replace any damage to otlner Work, to the t�vork
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply wi� the terms of City's written instructions, or in ar�
emergency where delay would cause serious risk of Ioss or damage, City may ha�e the defective
Work conected ar repaired or ma,y have the rejected Wark removed and replaced. AlI claims;
COS$5, 1055e5, and damages (inc�uding but not limited to ali fees and charges of engineexs,
architects, attorneys, and other pxofessionals and aU. court or other dispuie resolution cost�) arising
out ofi or relating to such correction or repai� or such removal and replacement (includin� but not
limited to all costs of repair or replacement oFwark o� other�) will be paicl by Contraetar.
CITY�F FORT WORTH Lackla�ir! RoarJSidrircrlk lniprm�enieiala
5TATIDARDCONSTRUCT[DN SPEC[F[CATION 170CiTMENTS
CI'r1f: 1(1�G.�7-3
Revision: $23I2(]Rl
D47200-)
GENERAL COId�171DN 5
Page S1 af 63
C. In speeial circumstances where a particular item of equipment is pla.ced in cont�uous s�rvice
before Final Acceptance of aIl the Wor.k, the correction period %r that item may start to run from
an ear�ier date if so provided in the Contract Documents.
D. Where defective Work (and darnage to other V�ark resultir�g therefrom} has been corrected or
removed and replaced under this Paragraph 13.07, the correction period hereunder with respect
to such Work may be requued to be extended for an additional period of one year after the end of
the initial correction period. City shall provide 30 days written notzce ta Con�ractor should such
additional warranty coverage be required. Contractor may dispute this requirement by iiling a
Contract Claim, pursuant to Paragraph 10.06.
E. Contractor's obligations under this Paragraph 13.07 axe in addition to any other obligation or
warranty. The provisions of this Paragraph 13.07 shall not be canstrued as a substitute for, or a
waiver of, the provisions of any applicabie statute af lau�rnitatian or xepos�.
13.08 Acceptance a.fDefective Work
If, instead of requiring carrection or removal and replacement of defective Work, City prefers to
accept i�, City may do so. Contractor shall pay all claims, cosis, losses, and damages (including but
n�t limited to all fees and charges af engineers, architects, attorneys, and other prafessianals and all
court or other dispute resolution costs) attributabl� to Ciiy's evaluation of and determination to accept
such defective Work and for the d'unuushed value of the Work to the exient z�at otherwise paid by
Contractor. If any such aceeptanee occur� prior to Final Acceptance, a Change Order will be issued
mcarporating thE necessaryrevisions in ihe Contract Documents with respectto the Work, and City
shall be entitled to an appropriate decrease in the Contract Price, reflectir�g the diminished ualue of
Work so accepted.
13.09 Cityll�lay Cor�rectDefective Work
A. If Contractar fails within a reasonable tume after written notice from City to canrect defective
�7Vork, or to remove and replac� rejected Work as required by Ciiy in accordance wzth Paragraph
13.06.A, ox i� Cantractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails ta comply with any other provision of the Contract Docuznents, City may,
after seven ('� days written notice to Contraetor, correct, or remedy any such defciency.
B. In exercising the rights and remedies under this Paragraph 13.(f�, City shall proc�ed
expeditiausly. In cormection with such eorrective or xemedial actian, City may exclude Contractor
fram all ar part of the Site, take possession of au or part of the Wor� and suspend Contractor's
services related thereto, and incorporate iu the Work all materials and equipment incorporated in
the Wark, stared at the Srte or for which Ciiy has paid Contractor but which are stored elsewhere.
Cantractnr shal� allow City, City's representatives, agents, consu,ltants, employees, and City's
other contractors, access to tile Site to enable City to exercise the rights and remedies ur�der this
Para�raph.
C. All claims, costs, losses, and damages (includin.g but nat limited to all fees and charges of
engineers, architects, attarneys, and o�her professianals and all catu� ar other dispute resolution
CTTY OF PORT V�ORTH Laclrlcrrrd ltoa�l5'ieleu�alh G�ip1•arerlrerr�s
STANDARDCONSTRUGT[ON 5PECIFICATf01Y I70CUMENTS ['f�Af; IROfi37-,?
Revision: 823/1.D21
oo��ao-i
GEN�RALGONQITIDfVS
Page 52 of 63
costs) incurred or sustained by City in exercising the righ�s and remedies under thi� Paragraph
13.09 will be charged against Contractor, and a Chan�e Ord�r will be issued incoxpoxating fihe
necessary revisians �n ihe Contract Docurnents �aith respect to the Work; azxci City shall be entitled
to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extensian of the Contract Time becau�e of any dela.y in the
perforrnance pf the Woxk attributable to the exercise of City's rights and rem�dies under this
Paragraph 13.09_
ARTICLE 14 — PAYMEli'TS TO C�NTRACT�R AND COMPLETION
14.01 Scheduie of Values
The Schedule of Values far lump swm contracts established as provided in Paragraph 2.07 will serr�e
as the basi� �or prngress payments azid w:�l be �ncorporated intv a form of Application for Paymer�
acceptable to City. Progress payments on accaunt of Unit Price R�ork will be based on the number of
uniis completed.
14.02 Progress �'ayments
A. Applications far Payn�aenis'
1. Contractor is responsible far providing all information as required ta becorne a �endor of the
City.
2. At least 20 days befare the date established in the General Requirements for each progr�ss
payment, Contractor shall submit to City far review an Application for Payment filled out and
signed by Gantractor covering the Work completed as of the date of the Application and
accompanied by such supporting documentation as is required by the Contract Documents.
3. If paymen� is requested on tl�e basis of materials and equipment not incorporated in the Work
but delivered and suitably stored at the Site or at anather locaiian agreed to in writing, the
Application for Payment sha.�l also be accompanied by a bill of sale, in�oice, or other
documentation warranting that City l�s recei�ved the materials and equipm�nt fiee and clear of
all Liens and evidence that the materials and equipment are covered by appropriate insurance
or other arrangements to proteet City's �terest therein, all of which must be satisfactory to
City.
4. Beginning with thesecondApplication forPayment,eachAppl�cation 5hall include anaffidavit
of Contract�r stati�ng that previous progress payments received on account of the Work have
been applied on account to discharge Contractor's legitimate obfigations associa.tedwithprzor
Applications far Payment.
5. The amount of reta�ge with respect to progress payments will be as descrbed in
subsectian G. unless otherwise stipulated in the Contract Documents.
CITYO�' FOk2T WQR7'H Luciclrmc! Rorrd Sicleirallc Irn��i•oti�n�rrer�rs
�TANDARDCONSTRUCTiON SPECfF[CAT10N DOCiI11�1ENT5
Revision:823l2021 CI'A�: J00637-3
00724D-1
G�NERAL CONDlTION S
Page 53 of 63
B. Review afAppli�cations:
1. City will, after receipt of each Application far Payment, either indi�ate in writing a
recommendation of payment or refurn the Applzcation to Contractor indicating reasons for
refusmg payrnent. In the latter case, Contractor may make the necessary corrections and
resubmit the Application.
2. City's processing of ariy payrxient requested in an Application for Payment will be based an
Ciry's observations of the execu#ed �ork, and on City's r�view of the Application for Payment
and the accompanying data and schedules, that to the best of City's knowledge:
a. the Work has pragressed to �lie point in�licated;
b. the qualit� of the Work is generally in accorciance with the Contract Dacurnents (subject
ta an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, tY�
results of any �ubsequent tests called for in the Contract Documents, a final determination
of quantities and cla:ssif'ications far Workperformed under Paragxaph9,QS, and any other
qual�'ications stated in the recommendation}.
3. Pracessir�g any such payment will not thereby be deemed to have represented thai:
a. ins�aectians made to ck�eckthe quality or the quantity of the Work asi� has beenperformed
have been exhaust.ive, extended to every aspect of the Work in progress, ar invalved
detailed inspectio�s of the Work b�yond the responsibilities speeifically assig�ed to Ciry
in the Contract Dacwnents; or
b. tY�ere may nat be other matters or issues between the parties t�at might entitle Contractor
to be paid addikionally by City or entitie City to wi�hold payrnent to Con#raetor; or
c. Contractor has complied with Laws and Regulatians applicable to Coniractor's performance
of the Work.
4. City may refuse to process the whole or any part of any payment because of subsequently
discovered evidence or the results of subsequent inspections or tests, and revi�e nr revoke
any such payrnent previausly made, to such exient as may be necessaary to protect City fram
loss hecause:
a. the Wark is defective or campleted Work has been damaged by the Contractor or
subcontractors requiring correction or repiacement;
b. discrepancies in quantities con#ained m previous applications far payment;
c. the Contract Price has been xeduced by Change Orders;
d. City has been required to cor�rect ciefective Work or complete Work in accaxdance with
P aragraph I 3. 09; or
CITY (7F' FOR'T WORTI-1 1_wckland Rntrd Siden�ulk Grrpraren�ert�s
STANDAfLDCONSTRUC7'TON SPEC[FICATION QOCUiVIENTS CPA-: IO�C37-3
Revision: 823/2021
00�2oo-i
GENERAL CONaITION 5
{'age 5�# of 63
e. Ciry has actual knornr�edge af the aceurrence of any of the events enumerated in
Paragraph 15.02.A.
C. Retainage:
1. For contracts less tl�an $400,000 at the time of execuiian, retainage sball be ten per�ent
(10%).
2, For eantracts greater �an $400,0�0 at the time of execu�ion, retainage shaIl be five perc�nt
{s�iaj.
D. Liquidated Damcrges. For each calendar day that any work �hall remain uncompleted after the
firne specified in the Contract Dacuments, the sum p�r day specif'�d in the Agreernent will be
assessed against the monies due the Contractor, not as a p�nalty, but as damages suffered by the
City.
E, Payment: Contractor will be paid purst�ant fio the requ�ements of this Article 14 and payment
wi� become due in accordance with tl�e Canttact Documenis.
F. Reduction in Payment.•
1. City may refus� to make payment o� the axnouzi� requested because:
a. Liens have been filed in conneetion v�ith the Work, exceptwhexe Contractor has delivered
a specific bQnd satisfaetory to City to secure the satisfaction and discharge of suck► Liens;
b. there are other items entitling City fio a set-off against the amount recarnmended; or
c. Ciry has actual lrnowledge of the occurrence of any of the events enwnerated in
Paragrapl�s 14.O�..B.4.a through 14.02.B.4.e or Paragraph 15.02.A.
2. If City refus�s to rriake payrnent of the amount requested, City will �ive Contractor written
notice stating the reasons far such ac�ion and pay Contractor any amount remaining after
deduction af the amount so withh�ld. City aha.11 pay Cont�actor the amount so withhelcl, or any
adjustmen� ihereto agreed to by City and Contractor, when Contractor remedies tbe reasons
Fox such action.
14.03 Contractor's Warranty of Title
Contractor �varrants and guarantees t�at titte to all Wark, materials, and equipment cavered by any
Application for Payment, vvhether incorparated in t1�e Prajeet or not, will pass to City no ]ater than the
time of payment free and clear of all Liens.
CITYOF FQRT WORTH I,GCIfIp17CI IZULf(I S1LjL'71'Lf��( IlliJ�!'01'C71iL'17IS
STi1NDARDCONS'FRUCT[ON SPECIPICAT[DN bQGUMENTS
Revision:8n3/2(�Ll CPA�: l�i1G37-3
Q07200-]
GENERAL CON�ITION S
Page 55 of b3
14.04 Partral Utilization
A. Priox to Final Aceeptance af all the Work, City may use or occupy any part o� the Work which
has specifically been identified in the Contract Documents, or wnich Ci�ty deterrnines canstitutes
a separately functioning and usable part of the Work that can be used for its intended purpose
without significa�t interference with Contractor's performance of the remainder of the Wark. City
at any time may no�ify Contractor �n writ.�ctg to perrnit City to use or occupy any such part of the
Work which City determines tn be ready for its intended use, subject ta the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended us�.
2. Within a reasonal�le time after notif�cation as enumerated it� Paragraph 14.OS.A.1, City and
Contractor shall make an inspection of that part of the Work ta determirte its status of
cornpletion. Tf City daes not consider that part of fihe Work to be substantially camplete, Gity
will notify Cantractor in writing giving the reasons therefor.
3. PartialUtilization wi� not caansiiiute Fit�al Acceptance by City.
14.05 Finallnspectian
A. Upon writtten nafice from Contractor that the entire Vi�ork is S ub s ta nt ia Lly Camplete in
accardance with the Contract Docutnents:
1. Withirti 10 days, City will schedule a Final Inspection with Contractar.
2. City will notify Contractor in wrii�g of aIl particulars in which this inspection reveal� �liat
th� Wark is iricomplete or defective ("Punch List Items"). Contractor shall immediately take
such measures as are necessary to complete such Work or rernedy such deficiencies.
B, No time charge wili be mac�e against the Cantractor between said date of notification to the City
of Substantial Completion and the date of Final Inspection.
1. Should the City determine that the Work is not ready for Fina1 Inspection, City will notify the
Contractor ul wrikmg af the r�asons and Contract Time will resume.
2. Should the City concur that Substaritial Completion has been achieved vvith the e�ceptian of
any Put�ch List Items, Contraet Time wi�l resume %x the duratian it takes for Contractor to
achieve Final Aceeptance.
14.06 Final Acceptance
Upon complet�on by Contractar ta City's satisfaction, of any additional Work identifieci ul the Fu�ai
Inspection, City vvill issue to Cantractor a letter of Final Acceptance.
C1TY OP FORT WORTH I,crrtilui7d Rnerd Srefetircrlk If+rprm�eixeiTl.s
STANDARDCONSTRl7CTI0N SPCCIPICATION I]OGiJMEN7'S CY,�': IOOG37-3
Revision: 8r23CL{]�1
oa�zoo-�
GENERALCONDITSON S
Page 56 of G3
14.07 Finc�l Payment
A. Applicataonfo� PaymenC.•
1. Upon Final Aceeptance, and iti the apinion of Ciry, Contractor may make an. application for
final payment following th� procedure for progress payments im accordance with the
Contract Docurnents.
2, The final Applicaiion for Payment shall be accompanied {except as prEv'rously d�li�v�re�l) by:
a. all doc�unentation called for in the ContraGt Document�, including but nat limited to the
evxdence of inst�rance required by Paragrapk� 5.03;
b. consent of the surety, if any, to fina� paym�nt;
e. a list of all pending or released Damage Clauns against Cit� that Contractor beiieves ait
u�asettled; and
d. affidavits of payments and cornplete and lega�ly effective reIeases ar waivers
(satisfactory to City) of all Lien rights arising out of or Liens filed in connec�ion with the
Work.
B. Pa�mentBecomes Due:
1. After City's acceptance of the Application for Payment and accampany�►g docu.rnentation,
requested by Contractor, less previous payments rnade and any sum City is entrtled,
including but not lirnited to liquidated damages, will become due and payable.
2. After ail Damage Claims hav� been resol�red:
a. directly by the Contractor or;
b. Contractor provides evidence that the Darnage Claim ha.s been reported ta Contractor's
ins�xrance provider for resolution.
3. The mal�ing of the final payment by the City shall not relieve the Cantrac#or of any
guarantees or other requirement� of the Contract Docurnents which spacif'xcally continue
thereafter.
14.08 Fincrl Co»apletian Delayed and Pariial Retaincrge Release
A. If final completion of the Work is signif'�cantly delayed, and � City so confi�ms, City rnay, upon
receipt of Contractar's final Application for Payment, and without termu�a.ting the Contract, m�a�e
paymenf of the balance due for that portion af the Work �ully cornpleted and accepted. If the
remaining balance to be held by City for Work not fully completed or corrected is less #�an the
retaina:ge stipulated in Paragraph 14.02.C, and if bonds have b�en furnished as required in
Paragraph 5.02, the written consent of the surety to the payment of �e balance due for that
CITY pF FqRT WOIiTH 1_aclrlm�d Ror��! Side�c�t�llc lnrpl•ovc�»renls
STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS �-Pn.. 1�?r��37_�
Revision: 8�L32Q21
D0720D-I
GENERAL CON�ITION S
Pa�� 57 of 63
partion of the Vi�'ork fully completed and accepted shall be submitted by Contractor to Ci�ty wi�h
the Application fflr such payment. Such pay�n�nt skaa.11 l�e made under the terms and condifiians
governit�g final paymeni, except that it s1�a�i not constihxte a waiver of Contract Claims.
B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment
and maintenance, and test and per%rn�ance periods followin� ihe completion of all other
construction in tiie Contract Documents for all Work locations, the City may release a po�rtian of
the arnount retained pro�ided that all othex work is completed as determined by the City. Before
the release, all suhmittals and final quantities rnust be cornpl�ted and accepted for all other wark.
An amount sufficient to ensure Contract compliance will be retained.
14.09 Waiver° of Claims
The acceptanc� of final payment will constitute a release of the City from all claims or liabilit ie s
under the Contract for anything done or furnished or relating ta the wark under th� Contract
Docurnents ar any ac� or neglect of City relafied to or connected with tlie Contract.
ARTICLE 15 — SUSPENSIOIiT OF WORK AND TERMINATIUI�T
1S.a1 City May Suspend Wark
A. At any time and without cause, City may suspend the Work or any port'ron thereof by written
notice to Contractar and which may f�c the date on which Work will be resutned. Contrac#or shall
resume the Waxk o� the date so f�ed. During temporary suspension o£�he Work coveredby these
Contract Documents, for any reasan, t�e City will make no e�ra payrnent for stand-by time of
construction equip�nent anci/or construction crews.
B. Sbould the Contractor not be abie ta complete a portion of the Projeet due to causes beyond the
contral af and without the fault or negligence of �.he Cantractor, and should it be determined by
mutual consent af the Contractor and City tl�at a solution to allow construction to praceed is not
available withui a reasonahle period o� time, Contractor may request an extension in Contract
Time, directly attributable to any such suspe�sion.
C. If it should become necessarryto suspend the Work for an indafinite period, the Contractor shall
store all materials in such a mazaner thai they will not obstruct or irnpede the pubfic uz�necessarily
nor become damaged in a�n.q way, and he shall take every preeaution to prevent damage or
deteriaration of the wark pexformed, he shall provide suitable drainage about the work, and erect
temporary structures where necessaty.
D. Contractor may be reirnbursed for t�e cost of moving his equipnnent offtlie job and returning the
necessary equipment to the job when it is determined by the City tl�at constructian may be
resumed. Such reimbursement shall be based on actual cast to the Cantractor of moving the
equipment and no pra£'� will he allowed. Reimbursement may nat be allowed if the equipment is
moved ta another construction project far the City.
CITY OF PORT WORTH I_ac�kln��c! Roru7Srcleircrllr I�trpr•o�-enre�als
STAIdDARDCflNSTRUCT[pN SP�CICICAT[ON DOCUMENTS C'P,�': lOOG37-3
Revision: 8rZ3I2Q2.1
00 �z oo - �
GENERAL CONDITION S
Page 56 of b3
15.02 City May Terrninate for Cause
A. The occurrence of any one ar mare of the following events by way of e�arnple, but not of limitatian,
rnay justifiy term�nation far cause:
1. Contractor's persistent faiture to perform the Work in accordance with th� Contract Documents
(including, but not linnited to, failure to supply sufficient skilled workers ar suitable z�aterials
or equipment, failure ta adk�ez•e to the Project Schedule �stablished under Paragraph 2.Q7 as
adjusted from time ta tirane pursiaant to Paragraph 6.04, ar failure to adhere to the City's
Business Div�rsity Enterprise Qrdinaz�ce #20fl2Q-12-2011established under Paragraph
6.06.D);
2. Contraetor's disregard of Laws or Regulatiflns af atxy pub�c body having jurisdictian,
3. Cor�tz�actox's arepeated disregard of the authority of Gity; or
4. Contractor's violation in any substanti�l way af any provisions of the Contract Docurnents;
or
5. Cantractar's fai�uxe to promptly rnake good any defect in mat�rials ar workrmanship, ar
defects of any nature, the correction of which has been directed in writir�g by the City; or
6. Substantial indication fihat tbe Contractar kaas made an unauthorized assignment of the
Contract or any fun�ls du� therefrom for the benefit of any creditox or for any other purpose;
ox
7. Substantial �vidence that the Con�ractoar has become insolvent or bankrupt, or atherwise
fmancia.Ily unable to carry an the Wark sati�factorily; or
S. Contractor commences legal action in a court of competent jurisdiction against the City.
B. If one or more of the e�ents identified in Paragraph 15.U2A. accur, City wi11 provide written notice
io Coniractor and �urety to arrange a co�erence with Contractor and �urety to adclr�ss
Contractar's failur� to perform the Wflrk. Conference shall be held not ]ater than 15 days, after
receipt of notice,
l. If the City, the Contractor, and ihe Surety do not agree to allow the Cant�ractor to praceed to
perfonm the construction Gontract, the City rnay, to the ea�ent pezmitted by Laws and
Regulatians, declare a Con�ractor default and formally ternunat� the Contractor's right to
complete the Contract. Contractor default shall not b�� declared earliei• than 20 days after the
Contractor and Surety have received notice of conference to address Contractor's faiIure to
perform the Work,
2. If Con�ractor's services are terminated, Surety shalI be abligated to take over and p�rform the
Work. If Surety does not comrnence performance thereof wifhin 15 consecutive calendar days
after ciate of an additional vc�ritten notice demanding Surety's performance af its
C1TY�F F�RT WQRTEI I.nckluia�l Roud Srdcirulk Inzpr•orenrerT�s
STANDARDCO?JSTRUCT[ON SPECIFICA'fION I?OCUMENTS
Revision: $23�2(r21 CYA'.• �O11G37-3
aa�zoo-i
C,ENERAL CQNDITION 5
Paga 59 of 63
obligations, then City, without process or action at law, rnay take over any portion of the
Work and complete it as d�scribed iaelow.
a. If City completes the Woric, City may exclude Contrac#ar and Surety fram th� site and
take possession of the Work, and all materials and equipment in�orporated into the Work
stored at the Site ar for wluch City has paid Con�aetor or Surety but which are stored
elsewhere, and finish the Work as City may deem expedient.
3. Whether City or Surety completes the Worlc, Contractor shall not be entitled ta receive any
further payment until the Work is finished. If the unpaid balance af the Cantract Price exceed�
all claims, costs, losses and damages sustained by City ari�ing out of or resulting from
completing the Wark, such excess will be paid to Cont�actor. If such cla�ns, costs, losses and
damages exceedsuch unpaid balance, Contractor shall pay the di�ference to Cily. Such claims,
costs, losses and damages incurred by City will be incorporated in a Charzge �rder, pravided
Yhat when e�ercising any rights or remedies under this Paragraph, City shaIl nat be required to
abtain the lowest price for the Work perfortned.
4. Neither City, nor any of its respective consultants, agents, officers, directars or employees
shall be in any way liable or accountable to Cantractor or Surety for the method by which the
eompletion of the said Work, or any portion thereof, may be accornpiished ar for fihe price paid
therefor.
5. City, natwithstanding the method used in completing the Coniract, shall nat for%it the �right
to recover damages from Can�ractor ar Surety for Contractor's failure to timely conaplete tkze
entire Contract. Contractar shali not b� entitled to any claim on accflunt of the me�hod u�ed
by City in coxnpleting tkae C�n1racti.
(. Maintenance af �the Work shall continue to be Gontractor's and Surety's rr;sponsibilities as
provided for in the bond requirements of the Contract Documents ar any special guarantees
provided for under the Conlract Documents or any ather obligations atherwise prescribed by
law.
�C. Notwithstanding Paragraphs 15.02,B, Caniractor's ser�vices will not be terminated if Contractar
begias wit}vn seven days of receipt of nptice of intent to terminate to correct its failure to perform
an� proeeeds diligently to cure such faiiure withiu no more than 30 days of receipt of said notice.
D. Where Contractar's ser�vices have been so terminated by City, the termination will not a�fect any
rights or remedies of City against Contractar fihen existing or which may thereafter accrue. Any
retention or payrnent af maneps due Contractor by City wi11 not release Contractor from liabiliry.
E. If and to the e�ent that Contractor has provided a performance bond u,r�der the provisions a�
Parag�raph 5.02, the termination procedures of that bond shall nat supersede the provisions af this
A.rtacle.
CITY OF FORT WdRTH 1 ackletnd Ratrd 5ftleii'afk Inrp�•m�eirrerTls
STANDARDCOI�STRUCTION SFECIFIC�ITION bOCUMENI'S Cl':�'.• l00C37-3
Revision; S/Z3/�(121
oo�2oa-i
GENERAL CONb1TI0N S
Page b0 of63
15.03 City May Terminate For CoYrvenience
A. City may, without cause and without prejudice to ar�y other right or remedy of City, terminate the
Coniract. Any termination �hall be effectedb� �nailing a n,otice of the terminatian to the Contractor
specifying tha ��ent to which per�orrnance af Wark under ihe contract is terminated, and #he date
upon which such termination becomes effecti�e. Receipt of the notice shall be deemed
conclusively pre5umed and established when the l�tter is p]aced in t1�e United States Posial Service
Mail by the City. Further, it �hall be deemed cnnclusively presur�:aed and established that such
termination is made with just cause as therein stated; and no proof u� any cJau�, de�nand or suit
shall be required of the City regarding such discretionary action.
B. After receipt of a notice of termina.tion, and except as otherwise direct�d by the Ciry, tihe
Contractor shall:
1. Stop work und�r the Contract on the date and to the extenfi specified in the notice of iermination;
Z. pla.ce no further orders or subcontracts for rrmaterials, services or facilities except a� may be
necessary for completion of such portion of the Work under the Cantract as i� not terminat�d;
3. terrninate all arders and subcontracts to the extent that they relate to the performance of the
Work terminated by notice of'telY�ninatian;
4. transfer title to the City and deliver in the manner, at the times, and to th� extent, if any,
directed by the City:
a. the fabricated or unfabrieated parts, Wark in progress, completed Work, supplies and
other material produced a5 a part of, ar acquired in coz�ection with the performance of,
ihe Work terminated by the notice af the termination; and
b. the coznpleted, or partially completed plans, drawing�, information and other properry
whi�h, if �he Cantz�act had bee:n completed, would ka�e been required ta be furnished to
the City.
5. complete performance af such Wark as shali not have been terminated by the notice of
terrnination; and
6. take such actian as may be necessary, or as the City may direct, for the protection and
preservation of' the praperty re�a.ted to �ts contract which is in the possession of the
Contractor and in which the awner l�as ox may acquire the rest.
C. At a time not later fihan 30 ttays after the termination date specified in the no�ice a� terminatian,
the Contractor may submit to the City a Iist, certrfied as to quantity and qualiry, af any or all i�tems
of terminaii�n in�entory not previously disposed of, exclusive afitems the dispasi�tzoz� ofwhich
has been directed ar authorized by City.
CITY OF FORT WORTH Luclrlcuzrllzoad S'irl�u�a!!r Ii�ryx•oti�eure�zl,s
STANDAItDCONSTRUCTIOM SPEC[C[CATION DOCUM�NTS CI';�!• I�IOG,i7-3
Ravision: 82312D21
oo�zav-�
GENERAL CQN01710N 5
Page 61 of 63
D. Not later than 15 days thereafter, the City shall accept title to such �tems pro�vided, that the list
subrnitted shal� be subject to ver�'ication by the City upon rernoval of the items ar, if the it�ms are
stored, withm. 45 days fram the dat� of submission of the list, and any necessar� adjustments ta
correci the list as submi�ted, shall be mad� prior to fmal settlement.
E. Not Iater tk�n 60 da�s after the notice of termination, the Contractor shall submit his termination
ciair�a to the City in the form and with #he eertiftcation prescribed by the City, Unless an extensian
is made in writing within such 60 day period lay the Contra�tor, and granied by the City, any and
all such clairns shall be conclusively deemed waived.
F. In such case, Contractor shall b� pa�d for (without duplication of any items):
1. completed and acceptabl� Work executed in accordance with th� Contract Documents prior
to the effective date of terminaiion, including fair and xeasanable sums for overhead and profrt on
such Work;
2. expenses sustained prior to the effective date of termination in performing searvices and
furnishing labor, materia�s, or equipment as required by the Contract Documents in connection
with uncompleted Work, plus fair and reasonable si.uns for overhead and profrt an such expenses;
and
3. reasanable expenses directly attributable to terrnination.
G. In �e event of the failure of the Coniractor and City to agree upon the �vhole amount to be paid
io the Contractar by reason of the termina.tion af the Work, the City shall determine, on the basis
of information avai]able to it, the amount, if any, due to the Contractor by reasonof the termination
and shall pay to the Contractor the amoun#s determined. Contractor sl�all not be paid an account
of loss of anticipated profrts or revenue oar other economic loss arising aut of or resulting fxom
such termina.tion.
ARTICLE 16 — DISPUTE RESOLUTION
16.01 Methods and Procedures
A. Either City ar Contrdetor may request media.txon of any Contraci Claim submitted for a decision
under Paragraph 1Q.06 before such decision becomes final and bind�g. The request for rnediahon
shall b� submitted to the other party to t�e Cantraet. Timely submission of the request shall stay
the effect of Paragraph 10.06.E.
B. City and Contraetor shall participate in the mediation process in good iaith. The process shall be
commenced wi�hin 60 days af filing of the request.
C. If the Contracfi Claim is not resolved by medi�tion, City's action under Paragraph 10.06.0 or a
d�nial pursuant fo Paragrapl�s 10.Ob.C.3 or I0.06.D sha.11 become final and hinding 30 da�s after
termination of tl�e mediation unless, within that time period, City or Ccantractor:
CTI'Y OF FORT WORTH Lac•klc��acl 1Zarrcl,9ideircrlk l�srprove�aFe�zls
STANDARDCONSTRUCTIQN SPECIFICATION DOCUNIEN'1'3 CYJI�': I(JOG37-3
Revision: &23�1f121
ao�zoo-i
GENERAL COH�ITION 5
Page 62 of 63
1. elects in writing ta invoke any other dispute resolution process prnvided for in the
Supplementary Conditions; or
2. agrees with the other party to su�mii tha Contract Claim to another dispute resolution
process; or
3. gives written notiee to the other party of the intent to submit the Contract Claim to a court of
competent jurisdictzan.
ARTICLE 17 — MISCELLANEOi7S
17.01 GivingNotice
A. Whena�er any provisian of the Contract Documents requires the giving af written notzce, it wiIl
be deemed to have been validly given if:
1. delivered in person to the indi�idual ar to a me�ber of the firm or to an officer of tlie
corporation for whom i� is intended; or
2. dElivared at or sent by xegi.stered or certified mail, postage prepaid, to the last business
address known to the giver ofthe notice.
B. Business address changes must be �romptly made in writing to tl�.e other parry.
C. Whenever the Con�ract Documen�s specifies giving notic� by electronic means such eIectronic
notice shall be deerned suf�ici�nt upan confi�mation of receipt by the receiving party.
17.02 Computation ofTimes
When an� period of tune is referredto in the Contract Documenfs by days, it will be computed to
excl�ude the first and includ� the Iast day af such period. If the ]a.st day of any such periad falls an a
Saturday or Sunday or on a day made a Iegal holiday tk�e ne� Working Day shall b�come the l�st day
of the periad,
17.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies ava�able
hereunder to the parties hereto are in addition ta, and are not ta be construed in any way as a limitation
of, any rights and remedies available to any ar all af tl�em which are otherrvise impos�d or available
by Laws or Regulations, b� special warranty ax guarantee, or by other provisions of the Can�ract
Documents. The provisions af this Paragraph will be as effeetive as if repeated specifically in the
Contract Documents in conneetion �vith eacb particular duty, obligation, right, and remedy to which
they apply.
CITY pF FORT WORTH I.r�ck(a�ad Rond SYde+ralk 1rrry�ro��eu��rzl,r
STANDARDCQI�STRUCTfON SPECIFICATION i]OCUMENTS
Revision: 8/23/2Q21 C'PAr: 100G37-3
OQ7200-I
GENERALCOI�QITION5
Page 63 of 53
17.04 Survival of �blzgations
Ali representations, iradenrm�caiians, warranties, a�nd guarantees made in, required by, or given in
accordance with the Con�act Documents, as well as all continuing obligations indicated in �he
Contract Docuanents, w�71 survive final payment, completi�on, and acceptance of the Work or
tertnination or completion of the Contract or termination of the services of Contractar.
17.OS Heddings
Article and paragraph headings are inserted for convenience only and do not consti�tute parts of these
General Conditions.
CTTY OF PORT WORTF3 Lacklaixl I�acid ,Srrlvu�ulk Impr•a��e�rni��.s
STANDARDCONSTRUCi'[ON SPECIF[CATI�N DOCllMENTS
[,P.�V: IO(Jfi37-3
Revision: 8�3/.�02,i
DO 73 00
SIIPPLEMENTARY COI�[DITIONS
Page 1 of 5
SECTION 00 73 00
SUPPLEMENTARY C�NDITIONS
TQ
GENEIZAL CONDIT`IONS
Su�►Plement�ry Canditiotts
These Supplernentary Canditions modiij+ and supplement Section QO 72 00 - Geaeral Conditions, and other
provisions of the Contract DQcuments as indicated below. A11 provisions of the Gen�ra� Canditions that are
modified or supplemented ramain in full farce and effect as so modified or supplemented. All provisions
vf tkye General Conditions which are not so modified or supplemented remain in full force and effect.
Defined Terms
The terrr►s nsed in these Supplementary Conditions which are defined in the Genera] Conditions have the
meaning assigned tv t�am in the General Conditions, unless sp.ecifically noted herein.
Modifications and Supplements
The following are instructions that modify or supplement specific paragraphs in the General Conditions and
other Cantract Docuitaents.
SC-3A3B.2, "Resolvin� Discrepanc'res"
Plans govern over Specifications.
SC-4.UlA
Easement limits shown an the Drawing are approximate and were pravided to establish a basis for bidding.
Upan recei�ing the fina! easements dascriptions, Contraetor sha11 compare them to th� iines shawn on the
Contract Drawings.
SC-4.01A.1., "Availabilify nf Lands"
The following is a list af l�c�vwn outstanding right-of-way, and/or easements to be acquired, if any as of
J�rly 1, 2021:
Outstanding Right-Of-Way, and/ar Easements to Be Acyuired
PARCEI., O WNER
NUMB�R
TARG�T DATE
OF POSS�SSION
IV ONE
The Contractor understands and agrees ihat the dates. listed abov� a�e astimates only, are nat guaranteed,
and do not bind the City.
If Gontractor considers the final easements provided io differ materially fram the representations an the
Contract Drawings, Contractor shali witt�in fi�e (5) Business Days and before proceeding with the Work,
nokify City in writing associated with the differing easement liae locations.
SC-4A1A.2, "Availability of Lands"
Utiliiies ar obstructions to he remaved, adjusted, and/or relocated
CTTX OF FOR'I' WORTH
3TAAlbARD CONSTRUCTION SPECIFICATION TJOCUM&7VTS
Revised March 9, 2020
Lcrcklruzd linacl S1cleiralk Inlpro++eaueizls
CPrll: 1 R�G37-3
00 73 OD
SUPPLEMENTARY CONDITIONS
Page 2 af 5
The following is list of utilities and/or obstructions that have nat been removed, adjusted, and/or reEocated
as of Jail}� 1, 20� 1
EXFECTED UTILTTY AND LOCATION
OWNER
TARG�T DATE OF
ADJUSTMENT
Oi�cor Guy Wire at the soutllwest corner of Lackland and
Elizabeth Lane intersectian
........___ ...................�.....___......_______----------------.........-�--------------............._....----��----.._...._..................................._._....._..._......_____........._.�...�......___............................................._...........
Ur7en�• Power Pale and Guy Wire at the narthwest cam�r af
Lackland and Elizabeth Lane intersection
_....----��--��-----�-- .............................................�------._.._................_....__....__......._...............................-�--- —�--.......__......_......................................______________.................._..
The Confractor understands and agrees that the dates listed aba�e are estirnates oniy, are not gnaranteed,
and do not bind the City,
SG4.O�A., "Subsurface and Physieal Conditions"
The following are reports of explorations and tests of subsut-face canditions at the site of the Work:
�VUNE�
The follawing are drawings of physical canditions in or relatirag to existing surface and subsurface
structures (except []nderground Faeilities) whieh are at or conkiguaus to the site af the VJork:
NONE
SC-4.OGA., "Hazardous En�ironmental Cond'rtions at 5ite"
The follawing are reports and drawings of existing hazardous environmental eonditions known to t�e City:
NONE
SC-5.03A., "Certi�icates of Insurance"
The entiti�s listed below are "additional insureds as their interest may appear" including the�r respective
officers, directors,. ag�nts and employees.
{1) City
{2) ConsuItant: NONE
{3) Okher: NONE
SC-5.04A., °LContractor's Insurance"
The ]imits of liability for the insurance required by Para�raph GG-5.04 shal] pro�ide the following
coverages for not less than the following amounts nr greater where required by laws and regulations:
5.04A. Workers' Compensation, under Paragraph GC-5,04A,
.Slatarlor�> Ir»�rls
Ei�7plc�vet•'�s liabrlil�,
$100,�(�(1 each accrdc�nUnccur�r�r�ce
�'!l1i1,O(1U Disc�ase - eucla erzapJr�i'ee
�'SO(J, D00 Diserise - pvlicy llra�rt
SC-5.04B., �`Contractor's Insurance"
5A�[B. Commercial General Liability. , under Paragraph GC-5.04B. Contractor's I.iability Insurance
under Paragraph GC-5.04H., which shall he on a per project basis cavering the Contractor with
minimum ]imits af:
CITY OF FORT IVORTH Lucklaiu! RoctclSidetirrrlk l�rrpr•oreuie��Is
STANDARI7 CONSTRUCTION SP�C1F]CATlON DOCUNIENTS C'PN: lR0G37-�3
Revised March 9, 2Q20
DO 73 00
SUPPLEMENTARY CONDIT1pN5
nage 3 of 5
�'I,�Of1,OUO eaeh occar�•r��j�cc�
$Z,000.00� aggr•e�ale li�raif
The palicy sx►ust have an endorsemenk (Amendment — Aggregate i,imits of [nsuranca} making the
G�neral Aggragate Limits apply separately to each job site.
The Cpmmercial G�neral Liability Insurance palicies shall pro�ide "X", "C", and "U" coverage's.
Verificatian of such coverage must be showr� in the Remarks Article of tlse Certificate oi Insurance.
SC 5.04C., "Cantractor's [nsurance"
5.�4C. Automo6ile Liability, und�r Paragraph GC-5.04C. Contractor's Liability Insurance Under
Paragraph GC-5.04C., which shall be in an amount not less than the following amounts:
(1) Automobile Liability - a cpmrnercial business pvlicy shall provide covera�e on "Any Auto",
defined as autos awned, hired and non-owned.
$I,OOD,D00 eaeh accident on a cambined single litnit 6asis. SpGt limits are acceptahle if limits are at
least:
f 2�C1,U00 13orlily 1�?j�r�y pe�� per�sor7 /
�SOO,OOD 13oc1ily Ir�jur�� per• crecrcle�zt /
�510�, 000 I'1-o�e1^�j� Da��aage
5C-5.04D., "Contractor's Insurance"
The Contractar's constructian activities wiil require its employees, agenks, subcontrac#ors, equipment, and
material deli�eries to cross rai3road properties and kracks NONT'
The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with,
hinder, or obstruct the railroad company in any manner whatsoever in the use or oQeration of ifs/their trains
ar other property. 3uch operations an railraad praperties may require tl�at Contractor to execute a"Right of
Entry Agreem�nY' with the pa��ticular railroad eompany or companies involved, and to this end the
Contractor should satisfy itself as to the requirements af each railroad company and be prepared to execute
the right-of-entry (if any} requared by a railroad company. The requ.irements specified herein likewise re�ate
to the Contractor's use of gri�ate andlar constr�etion access roads crossing said railroad company's
propertias.
The Contractual Liability coverage required by Patagraph 5.04D oFthe General Conditions shall provide
coverags for not less than the fallowing amounts, issued hy companies satisfactory ia the City and to the
Railroad Company for a term that continu�s for so long as the Contractor's operations and work cross,
occupy, or touch railroad property:
{1) General Aggregate:
(2) Each Occurrence:
Reyirir•ed �or• rlais Ca�arr•uct
�N/,4
�N/A
.Y Nat r�eCl2ll!'L'GI,%O!' !I1l.S CD1111'ClC1
With respeet to the above ou.tlined insurance requuements, the following shall govern:
1. Where a single railroad campany is inr+olved, khe Contractar shall pro�ide one insurance p.olicy in
the name of the railinad co�npany. However, if more than one gade separation or at-grade
CITY DF FORT WORTH Lcrckluncl iioud S'ide�i°r�lh lntpr'ovenrerr�s
STANDARD C�1�ISTRUCTIaI�# SPECIFICATIpN DOCUM�NTS CPA7; l011G37-3
Revised March J, 2020
00 73 OD
9UPPLEMENTARY CONDITIONS
Page 4 of 5
crossing is affected hy tha Project at entirely separate loeations on the line or Iines of khe same
railroad eompany, separate co�erage may be requ.ired, each in the amount stated abo�e.
2. Where more than ona railroad company is operating on the same right-of-way or where several
railroad companies are invalved and operated on their own separate rights-of-way, the Contractor
may be required to provide separat� insurance polisies in the name of each railroad company.
3. If, in addition to a grade separation or an at-grade crossiag, other work or activity is propased on a
railroad company's right-nf-way at a lacation entirely separate from the �rade separation or at-
grade crossing, insuranee coverage for this work must be ineluded in the policy covering the grade
separation.
4. If no grade separation is invalved but other work is proposed on a railroad compan�'s right-of-
way, all such other work may he covered in a single policy for that railroad, e�en though the work
may be at two or more separate locations.
No work or activities on a rai�road cnmpany's prnperty to be perfo�ned by the Contractor sha11 be
connmenced until the Contractor has furnished the City with an original palicy ar polacies of the insurance
for each railroad cornpany named, as required above. All such insurance must be approved by the City and
each afFected Railroad Company prior to the Cantractor's beginn�ng work.
The insuxance spe.cified above must he carried until all Work to be performed on the railroad right-of-wray
has been compjeted and the grade crossing, if any, is no longer used by the Contractor. In addition,
insurance must be carried during all maintenance and/ar repair wnrk performed in the railroad right-of-way,
Such insu�-ance must name the railroad company as the insured, tagether with any tenant or ]essee of the
railroad campany aperatiaig o�er tracks involved in the Project.
S�-b.04., "Praject Schedule"
Pro�ect scheduIe shall 6e tier 3 for the project.
SC-6.07., "Wage Rates"
The following is the prevailing wage rate table(s) applicable to this project and is provided in the
Appendixes:
1�11ps: /lcrpj�s; f orhva��lh1 ��'rrs, ga��/l'rn jeclResoi rr•ces/Res��rrcesP/02% 7(1-
%2UC'or�,slrircliott'%20Uoctr�rr er�1s/SpecrficaiiQlzs/Dii�%2000-
Ce�aera(`%,20C'o�2dilinn,slC�' �?�%2 UNc�ri� oratcrl %201d��rgc %�ORu�e%2 pTahl e.��clf .
A copy of the table is also a�ailable by accessing the City's website at:
https :11an ps. fo rtwortht�xas. �o v/Praj e ctReso urcesl
You can access the fiie by folIowing the directary path:
02-Canstruction DocurnentslSpecifications/Div00 — Geil.eral Conditions
5G6.09., "Permits and Utilities"
SC-6.49A., "Cont.ractor obtained permits and licenses"
The fotlowing are kno�+n permits and/or licenses required by the Coniract to be acquired by the Contractor:
NONE.
SC-6.U9B. "City obtained permits and licenses"
The following are kno�+n permits and/or licenses required by the Contract ta be acquired by the City:
NONE
CITY OP FORT T�VORTH Lr�c•klarTd Road 3'iden�nik lntf�f•oreirie�r�s
STANDARD COAlSTRUC"I'ION SPECIFiC/1TIQN DOCUM�NTS C'PA�: JOtJG37-3
Revised Marclt 9, 2020
00 73 DO
SllPPLEMENTARY CO%lDITIONS
Page 5 of 5
5C-6.09C. "Outstaading permits and licenses"
The follovving is a list of known ouistanding permits andlar licenses to be acquired, if any as of �I1a�� 1,
2oza:
Outstanding Permits andlor Licenses to Be Acquired
OWNER 1'ERMIT OR LICENSE AND LQCATION
NONE
SC-7.02., "Coordinatiun"
TARGET DATE
O�' POSSESSION
The individuals or entities listed below have contracts with the City far the pe.rformance of other work at
the Site:
Vendor Sco e of Work Coordination Authnrit
NONE
SC-8.01, "Communicafions ta Contraetor"
NONE
SC-9.01., "City's Prnject Manager"
The City's Project Manager for this Cantract is Jase A. Or�o�co, P.E. (Jose.Ql��zco�.rr��fa�t���or�tFitexc�s.cv»�),
or his/her succe.ssor pursuant to written notification from khe Director of Ti•al�spo,��atio�a c�rad PuGlrc
l�f�r�rks.
SC-I3.03C., "Tests and Inspections"
NDNE
SG16.O1G1, "Meihods and Procedures"
NONE
END OF SECTION
Revision Lqg
DATE NAME SUMMARY OF CHANGE
1 12 212 0 1 6 F. Griffin SC-9.01., "City's Project Representative" wording changed to City's Project
Manager.
3f9J2020 D.V. Magana �C-6.07, l�pdated the link such that files can be accessed via tha City's
website.
CITY DF FORT WORTH l.neklcu�d Ff�trd3ideiealk Jrr�p�•orcurettls
STANDARD CON5TRl1CTION SPECII'ICATIpN DOCUMENTS CPAr: lODC37-3
Re�ised March J, 2Q2.0
Ol 114D-I
SUMMARY QF WQRiC
Yage 1 of 3
1
2
SECTYON Ol 11 00
SUMMARY OF WORK
3 PART1- GENERAL
4 L1 SUIVIIWIARY
S A. Section lncludes:
6 1. Summary af Work to be performed in accordance with the Cantract Dacuments
7 B. Deviations from tl�is City of Fort Workh Standard Specification
8 1. None.
9 C. Aelated Specification Sections include, but are not necessarily limited to:
10 1. Divisian 0- Bidding Requirements, Gantract Forms, and Conditions of tt�e Contract
11 2. Di�isian 1- General Requirements
12 1.� PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Paymen#
14 1. Work associated with this Itein is considered subsidiary to the �arious iterns bid.
15 No separate payment will be ailowed for tiiis Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
]8
14
20
21
22
23
24
25
2b
27
28
29
30
31
32
33
34
35
36
37
38
A. Work Cavered by Contract Do.cuments
1. Work is to include furnishing all lahor, materials, and e�uspment, and performing
all Work necessary for this canstructian project as cietailed iii the Drawings and
5peci�cations.
B_ St�bsidiary Worlc
1. Any aud all Work specifically govetned by documentary requisements for the
project, such as conditior►s int�posed by the Drawings ar Contract Documents ul
whicli no specific stem for bid has been provided for in the Peoposal and th.e itern is
not a typical unit bid item included nn the standard bid it�m list, then t�e item sha1S
be considered as a subsidiary item of Work, the cost of which shall be included in
the price bid in the Proposal for �arious bid items.
C. LTse of Premises
1. Coordinate uses oF premises under direction of ths City.
2. Assume full responsihility for protection and safekeeping ofmaterials and
equip�neilt stared on the Site.
3. Use and occupy on�y portions of the public streeis and alleys, or oiher pu6lic places
ar other rights-of-way as pravided for in the ardinances of tlte City, as shown ui the
Contract Documents, or as may be specifically authorized in writing by the City.
a. A reasonable amount of tools, materials, and equiprneni for construction
purposes may be stor�d in such space, but no more than is necessaay to avaid
delay in the constructian vperatians.
CITY OF FORT WORTH
STANDARD CONSTRUCTIOA! SPECIFICATION DOCUMENTS
Revised December 2�, 20f2
Lucklai�d Roar�.4ide�rcrlk I�xproi�en�erus
C!'.�1%: I �OG37-3
a� ii o0-2
5UIVIMARY OF WORK
Page 2 of 3
i b. Excavated a.iid waste materials shall be stored in such a way as not to interfere
2 with the use of spaces that may be designated to be left free and unobstracted
3 and so as not to inconvenience occupants of ad�acant property.
4 c. If the street is occupied by railroad tracks, #he Work shall be carried on in such
S manner as not to interfere with the operatioj� of the railroad.
6 I) All Work �hall be in accordance with railraad requireanents set fortl� in
7 Di�ision 0 as we11 as the railroad permit.
8 D. Work within Easements
9 l. Do not enter upon private property for any purpase withauY havirig previously
10 obtained permission frotn the ownar of such property.
11 2. Do not stare equiprr�ent or material on private property unless and unti� the
12 specified appro�al of the property owner has been secured in writing by the
13 Contractor and a copy funiished to the City.
14 3. Unless specifically pro�ided otherwise, c18ar alI rights-af way ar easements of
15 obstructions which must be removed to make }�ossible proper prosecution of th�
16 Work as a part of the project const.ruction operations.
17
18
19
2a
2I
22
�3
24
2S
26
27
28
29
30
31
32
33
3�4
35
36
37
38
39
40
41
4. Preserrre and use every precautian to prevent �amage to, all trees, shrubbery, plants,
jawns, fences, culverts, curbing, a��d all other types of structux'es ar improvements,
to all water, sewer, aiid gas linas, to all conduits, overhead pole lines, or
appurtenances thereof, including the construction of tempora�y fences and to all
ath�r public o.r private property adjacent to the Wnrk.
5. Notify tl}e proper representatives of the owners or occupat�.ts of the public or private
lands of int�rest in laiids which might be affected hy the Work.
a. Sucli notice shall be made at least 48 haurs in advance of tlie beginning of tiie
Work.
b. Notices shall be applioable ta both pubtic aa�d private utility companies and any
eorparation, company, individual, or o�l�er, either as owners or occupants,
whose land or interest in land might be affected by t11e Work.
c. Be respansi6le for all damage ot injury to property of any character resulting
frorn any act, omissian, neglect, or misconduct in the manner or metIiod or
execution of the Wark, ar at a�iy tiene due to defective. wark, xnaterial, o.r
equipment.
Fence
a. Restdre ail fences encountered and removed during construction of the Project
to the or�ginal or a better than original condition.
b. Erect temporary feneing in place of tl�e fencing removed whenever the Wark is
not in progress and when the site is vacaYcd avernight, andlor at all times to
provide site security.
c. The cast for alI �ence work �t+ithin easements, including removal, temporary
closures and replacement, shall be subsidiary to the va�•ious it�ms bid in the
project proposal, unless a bid item is specifically provided in the proposal.
CITY OP FORT WORTH
STANbARb CONSTRUCTION SPECIPICAT[ON IaOCUM�NTS
Revised Decemher 2D, 2012
Lac•klprrc! IZaad S'icleircrllti Ia�p1�r•o>>enrerrls
C'P�i': 1 110637-3
0111D0-3
SUMMARY OF WORK
Page 3 af3
1 1.� SUBNIITTALS [NOT USED]
2 1.b AC1"TON SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT iTSED]
3 l.'� CLOSEOUT SUBMITTALS [NOT USED]
4 1.8 MAINTENANCE MATERIAL SUBMTTTALS [NOT LTSED]
5 1.9 QUALTI`Y ASSURANCE [NOT USED]
6 1.10 DELYVERY, STORAGE, AND FIANI)LING [NOT USED]
7 111 FIELD jSITE] CONDITIONS [NOT USEDj
S 1.12 WARR�NTY [NOT U5ED]
9 PART 2- PRODUCTS [NDT USEDj
10 YART 3- EXECiTTION [NOT IISED]
11
12
END OF SECTiON
Revision Log
DATE NAME SUMMARY O�' CH�NGE
l3
CITY OF I"ORT WORTN l.rrc!•la�zd I{oocl,5reletirc�lh Iuiproi�er�renls
STANDARD CpNS'I'RUCTIQN SPECIFICATION DOCL[MENTS C'PA': 1 Dfl(37-3
Aavised becember 20, 20j2
012500-I
5U6STITUTIOi�i PROC�Dl1RES
Fage i of 4
�
SECTION 0125 00
SUBSTITUTIQN PROCEDURES
3 PART1- GENERAL
4 1.1 SUMMARY
5
6
7
S
9
10
S1
12
13
14
15
A. Section Includes:
1, The procedure fnr requesting the appravaI nf substit�kion of a product that is not
equivalent to a product which is specified by descriptive or performance critaria or
defined by reference to 1 or more of the fojlowing:
a. Nam� of manufacturer
b. Name af vendor
c. Trade name
d. Catalog nunnber
2. Substitutions are not "or-equals".
B. Deviations froiii this City of Fort Worth Standard 5pecif cation
l. None.
16 C. Related Specifcation Sections include, but are nat necessarily Iimited to:
17 1. Divisian 0— Bic�ding Requirements, C.ontract Farms and Concii�iqns of the Contract
I 8 2. Division 1— General Requir�anents
19 1.� YRICE AND PAYMENT PROCEDURES
20 A. Measurement and Payment
21 �. Work associated with this Item is considered subsidiary to the various items bid.
22 No separate payment rvil� be alloweci for this Item.
23 1.3 REFERENCES [NOT USED]
24 �.4 ADMIN�STRATIVE REQi]IItEMENTS
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A. Request for Substitution - General
l. Wi�thin 30 days a#�er award of Co��tract (unless noted otherwise), the City will
consider formal requests from Contractor for substitution of products in place oi
those specifiad.
2. Certain types of equipmant and kinds of material are described in Specifications by
meatis of references ta names of manufacturers and vendors, trade names, or
catalag numbers.
a. When this method of specifying is used, it is not inteiided to exclude from
consideration other products bearing other manufacturer's ar vendor'� names,
trade names, or catalog numbers, pra�vided said products are "or-equals," as
determined by City.
3. �ther types of equipment and kinds of material inay be accepfable substitutions
under the followuig conditions:
a. Or-equals are unavailable due to strike, discontinued production of products
meeting specified requirements, or other factors heyond control of Contractor;
or,
CITY OF PDRT WORTH
STANDARI] COidSTRUCT10�1 SI'�CII'ICATION �OCi7ME.NTS
Tievised ]uly [, 2D11
Laeklcriicl Sfdeiralk Irrrprorenrenls
CP11�': lOf1G37-3
oizsoo-2
SUBSTITU7'ION PROCEDUR�S
Pagc 2 nf4
b, Contractoz• propases a cost and/ar titne reduction incentive to tl�e Ciiy.
2 1.� SUBMITTALS
3 A. See Request far Substitution Form (attached)
4 B. Procedure far Requesting Substitution
5 1. Substitution shall be considered on1y:
6 a. After award of Confract
7 b. Under the conditions stated l�erein
8
4
10
11
12
13
14
15
16
17
18
19
2p
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
2. Submit 3 copies of each written request for substitution, includrng:
a. Documer►tation
1) Coinplete data substai�tiatitlg compliance of proposed substiti�tion with
Contract Documents
2) Data relating to changes in constrttction schedule, when a reduction is
proposed
3) Data relating to changes in cost
h. For products
1) Praduct identification
a) Manufacturer's iiame
b) Telephone number and representative eontact na�ne
c) 5pecificatian Section ar Drawing raference of originally specified
product, uicluding discrete name or tag numher assigned to arigi��al
product in the Contract Documents
2) Manufacturer's literature clearly marked to show compliance of proposed
product with Contract Documents
3) Itemized comparisan af original and proposed product addressing product
characteri�tics including, but not necessarily limited to,
a) Size
b) Co�nposition or materials af construction
c) Weight
d) Electrical or m�chanical requirements
4) Product experience
a} Lacatioyy af past projects utilizing product
b) Name and telephone number ofpersozis associatad with referenced
projects knowledgeable concerniiig proposed praduct
c} Available field data and repoi�ts associated with proposed product
5) Samples
a) Pravide at request af City.
b) Samples become the property of the City.
c. For construction methods:
1} Detailed deseription ofproposed method
2) IllUstration drawings
C. Appra�val or Rajection
Written approval ar rejection of substitution given by the City
43 2. City reserves the right to require proposed product t� comply t�ith color and pattern
44 of specif ed product ii necessary to secure design intent.
45 3. In the event tI1e substitution is approved, the resulting eost andlor time reductian
46 will be doeumented by Change Qrder in accordance w+ith the General Conditions.
CITY OF FORT WORTH LacGlancl Sideiralk l�xproverrietrls
STANI�ARD CONSTRUCTIOi�1 SPECIF[CATION D�CLTMEIdTS CPrI': 1�OG37-3
Revised luly 1, �011
OIZSOU-3
5UBSTITUT}ON PROCE�UR�S
Page 3 of 4
t
2
3
4
5
6
7
8
4. No ad�iitional conkract time v�+ill be gi�ven for substitU#ioi1.
5. Substitution wilj be rejected if:
a. Submittal is not throu.gli the Contractor witli his stamp of approval
b. Request is no� made in accordance with this Speciftcation Section
c. In the City's opinian, acceptance will require substantial revision of tha original
ciesign
d. In the City's opinion, substitution will not perform adequately the function
cansistent with t1�e design intent
9 L6 ACTION SUBMITTALS/INFORMATIONAL SUSMITTALS [NOT USED}
10 1,7 CLOSEOUT 5UBMITTALS [NOT U�ED]
11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
12 1.9 QiTALITY ASSiTRANCE
13
14
15
16
17
18
19
20
21
22
23
24
A. In making request for substitution or in �asuig an approved prod�act, the Contractor
represents that tlie Contraetor:
1. Has inv�stigated proposed praduct, and has cietermined that it is adequate or
superior in all respects to that specified, and that it will perform function for wl�ich
it is intended
2. Will provide same guarantee for substitute item as for product specifieci
3. Will coordinate installation of accepted substitution into Work, to include b�ilding
modifieations if necessary, making such changes as fnay be reyuired for Work to be
coraplete in all respects
4. Waives all claims for additianal costs related ta substitution whicli subsequently
arise
1,10 DELIVERY, STORAGE, AND FiANDLING [NOT USEDj
2S 1.11 FIELD [S�TE] CONDITIONS �NOT USED]
26 1.12 W�RRANTI' [NOT USED]
27 PART ti- PRODUCTS [NOT USEDj
28 PART 3- EXECUTION [NOT USED]
29
30
END OF SECTIQN
Revision Log
DATE NAME 5UMMARY OF CHANGE
31
CITY OF FORT WORTH
STANDARD CQNSTRUCTION SPECjF`ICA`I'ION DOCUMENTS
Revised 7uly 1, 2011
L[rckluitd 5r[�e�rall' lutpravenre�sf.c
Cf'AC• lOflG37-3
0125OQ-4
SUBSTITUT[C?N PRaCEpURES
Page 4 of 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
IS
I6
I7
rs
14
20
21
22
23
24
25
z�
27
28
24
30
31
32
33
34
3S
36
37
38
39
40
�} 1
42
43
44
45
�b
47
48
49
EX�IIBIT A
REQUES'�' FOR SiTBSTITUTION FORM:
TO:
PR0IECT: DATE;
We her�by submit for your consideratioi� fhe following product instead of the speci�ed item for
tlie abo�e project:
SECTION PARAGRAPH SPECIFIED ITEM
Proposed Su4�stitutian;
Reason for Substitution:
Include complete inforin�tion on changes to Drawin.gs and/or S.pecifieatians �trvhich proposed
substitution will require for its proper instaljation.
Fill in Blanks Be1ow:
A. Wil1 the undersigned contractar pay far changes ta the building design, including engineering
and detailing costs caused by the raquested substitution?
B. What effect does substitution have on other trades?
C. Differences between praposed substitution a.nd specified item?
D, Differences in product eost or product delivery time7
E. Manufaeturer's guarantees of the propos�d and specified items are:
Equal Better (explain c�n aftachinent)
The undersigned states �hat the function, appearance and quaIity ae•e equivale�it ar superior to the
specifed item.
Submitted By: For Use by City
Sign ature
as noted
Firm
Address
Date
Telephone
For Use by City:
A�praved
City
C1TY QF FORT WORTH
STANDARD CONSTRUCTIqN SPEG[FICATION []OCUNfENTS
I�evised Iuly 1, 241 l
� Recammended
_ Nof recommended
By
Date
Remarks
Date
Rejected
Recominended
Reeeived late
Larhla�rd 3izleirc�lk J��rprarc�uaer�ls
C'1'A': 1 fTf1G37-3
O1 31 19 - 1
PR�COi�fSTRUCTION MEETING
Page i of 3
1
2
3 PART1- GENERAL
4 1.1 SiJMMARY
SECTION 0131 I9
PR�;[:ONSTRUCTION MEETING
5 A. Section Inclucies:
6 1. Provisions for tlie preconstruction meeting to be held prior to the start of Wark to
7 cIarify construction contract administration pracedures
8 B. Der�iations from this City af Fort Worth Staudard Specification
9 l . None.
10
11
ra
13 1.�
C. Related Specification Sections include, but are iiot necessarily iimited ta:
1, Division 0— Bidding Requirements, Contract Forms and Con�iitions o�the Contract
2. Division 1— GeneraL Requirem�nts
PRICE AND PAYMENT PROCEDURES
14 A. Measureinent and Payment
15 1. Work associated with this [tem is considered su�sidiary to the various items bid.
16 No separate payment will be allowed for this Item.
17 1.3 REFERENCES [NOT USEDJ
l8 1.4 ADMINISTRAT�VE REQ�.JIItEMENTS
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
A. Coardination
1, Attend preconstruction meeting.
2. Representatives of Contractor, subcontractors and suppliers attending sneetin�s
shall be qualified and authorized to act on behalf of t�e entity each represents.
3. Meeting administered by Gity may be tape recoeded.
a. If recorded, tapes will be used to prepa�re minutes and retained by City for
future reference.
B. Precanstruction Meeting
1. A preconstruction meeting will be held within 14 days after the �xecution of ihe
Agreement and before Work is started.
a. Tha meeting wi�l be scheduled and administered by the City.
2. The Praject Represeutative wijl preside at the ineeting, prepare ihe notes of the
meeting and distribute copies oisame to all partrcipants wha so request 6y fully
completing the attez�dance for�n to be circulated at the beginning of the meeting.
3. Attendance shall include:
a. Project Representative
b. C�ntractor's project manager
c. Contractor's superintendent
d. Any subcontractor or supplier representati�es whom t��e Co�itractor may desire
to invite or the City rnay request
CITY OF FQRT WORTH Lracklafrd 5ideiralk Inlprmeriren�s
STANDARD CONSTf2UCTI0I�f SP�CIFICATION DOCUM�NTS CPA': !(1�G37-3
Re�ised August 17, 2012
Qi 31 79 - 2
PRECON5T12UC'TID2�! M�ETING
Page 2 of 3
1
2
3
4
5
6
7
8
9
10
1]
]2
13
14
IS
16
17
18
19
20
z1
22
23
24
25
26
27
28
29
3Q
31
32
33
34
35
36
37
38
39
40
41
42
�}3
44
45
46
47
48
49
50
e. Other City representatives
f. Otners as apprapriate
4. Canstruction ScheduXe
a. Prepare baseline coi�struction schedule in accordaiice with Section 0 i 32 1 G and
provide at Pr�construction MeefiiiYg,
b. City will notify Contractor of any schedule changes upon Natice of
Preconstruction Meeting.
5. Preliminary Aganda may include:
a. (ntroduction of Project Persannel
b. General Descriptian of Project
c. Status of xight-of way, utility clearances, �asements or ather pertineut permits
d. Cantractor's work plan and schedule
e. Contract Tirne
£ Notice to Proceed
g. Constructinn Staking
h. Progress Paymenfs
i. Extra Work and Chaiige Order I'rocedures
j. Field Orders
k. Disposal Site Letter ior Waste Material
1. I�isurance Renewals
m. Payroll Certification
n, Material Certifications and Quality Control Testing
o. 1'ublic Safet� and Can�enience
p. Documentatian of Pre-Constructian Canditions
q. Weekend Work Notificatiois
r, Legal Holidays
s. Trench �afety Plaus
t. Confined Space Entry Standards
u. Coordination with the City's representative for operations of existing water
sysieins
v. Storm Water Pollution Pre�ention Plan
w. Goordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Su.bmitYa] Procedures
cc. Substitution Procedures
dd. Co�•respondence Routing
ee. Record Drawings
ff. Temporary construction iacilities
gg. M/WBE or MB�/SBE procedures
hh. Final Acceptance
ii. Final Payment
jj. Questions qr Comments
C1TY OP FORT WOATH
STANDARD GONSTRUCTiaN SPECIF]CATION QOCUM�NTS
Revised August 17, 2012
Lcicklaiad S7de�i�ulk li�aproreu�e�z�s
C'I'A': !(N1G37-3
O1 31 19-3
PTtEC03VSTRUCTION N3EETING
Page 3 of 3
1 1.5 SUBMiTTA.LS (NOT USED]
2 1.G ACTION SUBMITTALS/INFORMATIONAL SUBNIITTALS [NOT USED]
3 1.7 CLOSEOUT SUBMITTAL� �1VOT USED]
4 1.� MAINTENANCE MATERIAL SUBNIITTALS [N�T USED]
5 I,9 QiTALITY ASSURANCE [NOT USED�
6 1.1U DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 111 FIELD [SITE] CONDITIONS [NOT U,SED]
8 l.i� WARRANTY [NOT USED]
9 PART � - PRODIICTS [N�T USED]
10 PART 3 � EXECUTION [NOT USED]
IS
12
END OF SECTION
Revision Log
DATE NAM� SUMMARY OF CHANGE
r�
CI'I"Y C7F �pRT WORTH l.acklcrnclSideircrlk Iutpro��eiue�ils
STANDARD CONSTRUCTION SPECiPICATION DQCUMENTS C'P.V: lO�b37-3
Revised August 17, 2012
013120-1
PROIECT ]ufEETiNG5
Page l of 3
1
2
SECTION O1 3I 2U
PROJECT MEETINGS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Frovisions far pro�ect meetings throughout the eonstruction periad to enable orderly
7 review of the progress ofthe Work and to provide for systematic discussion af
8 patential problems
9 B. Deviations this City of Fort Worth Standard Specification
10 1. Nor�e.
11 C, Related Specification 5ections include, but are not necessariIy limited to:
12 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
i 3 2. Division 1— General Requirements
14 1.� PRICE AND PAYMENT PROCEDiJRES
15 A. Measuremeni and Payment
16 1. Work associated with this Item is cansidered suhsidiary to the various itenns bid.
17 No separate payment will be allowed for this Item.
18 1.3 REFERENCES [NOT USED]
19 1.4 ADMINISTRATIVE REQIIIREMENTS
20
2l
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
A. Coordanation
1. Schedule, attend and administer as specified, periodic progress meetings, and
specially called meetings throughou� progress ofthe Work.
2. Represeutatives oi Contractor, sUbcontractors and suppliers attending meetings
shall be qualified and autharizad to act on behalf of #he entity each represents.
3. Meetings adtninistered hy City may be tape recorded.
a. Tf recorded, tapes will be used to prepare rninutes and retained by City for
future reference.
�4. Meetings, in addition to those specified in this Section, may be held when req�ested
by the City, Engineer or Contractor.
B. Pre-Constructiou Neighborhood Meeting
1. After the executian af the Agreement, but before constr�ction is ailowed to begin,
attei�d 1 Public Meeting with affected residents to:
a. Present projected schedule, including cons#ruction start date
b. Answer any constru.ction related questions
2. Meeting Lacation
a. Location of ineeting �o be determinec3 by the City.
3. Attendees
a. Contractar
CITY OF FORT WORTH
STANDARD CONS'TRUCTI�N SPECIFICr1TTON I70CUMENT5
Revised .Fuly 1, 2011
l.ackland RarxrSidetralk l+trpi'ot�en�eiHs
C'PA�; 1(10G37-3
O13120-2
PROJECT MEETINGS
Page 2 af 3
1
2
3
3 4. Meeting Schedule
4 a. In general, the n�ighborhood maeting will aecur within the 2 weeks following
S the pre-construction conference,
6 b. In no case wi1] construction b� allawed to begin until this meeting is held.
7 C. Progress Meetii�gs
8 1. Formal project caorditiation meetings will be he�d periodically. Mee�ings will be
9 scheduled and administered �y Froject Representative.
10 2. Additional pragress meetings to discuss specific topics will be conducted an an as-
11 needed basis_ Such additional zneetings shall include, but not be limi#ed to:
12 a. Coordinating sh�tdowns
13 b. Installation of piping az�d equipment
14 c. Coordination between other constructian projects
15 d. Resolution of canstruction issues
16 e. Equigment approval
I7
18
19
za
21
22
23
2�4
25
26
27
28
29
3D
31
32
33
34
35
36
37
38
39
40
41
42
d3
44
�S
46
47
�}8
4.
5
b. Proje.ct Representative
c. Other City representatives
The Project Representative will preside at progress meetings, prepare tlle notes of
the meeting and distribute copies of the same to all par�icipants wlio so request by
fully coznpleting the attendanc� form to be circulated at #he beginning of each
meetiiig.
Attendance sliall iiiciude:
a. Contractar's project manager
b. Contractor's superintendent
c. Any su6contractor or supplier representatives whorn the Contractor may desire
to invite or the City may request
d. En.gineer's representatives
e. Ciiy's representatives
f. Others, as requested by the Project Representative
Preliminary Agenda may include:
a. Review of Work progress since previous me�ting
b. Field abservatio��s, problems, CO11fl1C�.5
c. Iterns which impede construction schedule
d. Re�iew of off site fabrication, deliv�ry schedules
e. Re�iew of construction interfacing and sequepcittg requirernents with other
construction eantracts
f. Corrective measures a��d procedures to regai�i projected schedal�
g. Revisians to canstruction schedule
h. Progress, schedule, during succaeding Work periad
i. Coordination of schedules
j. Revie�u submittal sel�adules
k. Maintenance of quality standards
1. Pending changes and substitu�ions
m. Review proposed changes for:
1} Effect on construction schedule and an completion date
2} Effect on otl�er cantracts of the Project
n. Review Record Documenfs
o. Review mnnthly pay request
p. Review status af Requests far Information
CITY OF F�RT WORTH
STANDARD COIVSTRUCTION SPECIFICAT]DN DOCUMENTS
Revised July 1, 2011
Lacklanc! Rau�f �SrrJeiralk Ini��a•nreuienls
C'f',�,': lOqG37-3
4.1312D-3
PR03ECT ivI�ET1NGS
Page 3 of 3
1
2
3
4
S
6
7
8
9
]0
11
12
13
ra
6. Meeting Schedule
a. Pragress meetings wiil be held periodically as determined hy t11e Project
Representative.
1} Additional meetings may be held at the request of the:
a} City
b) Engineer
c) Contractor
7. Meeting Location
a. The City wi11 establisii a meeting location.
1} To th� extant practica�le, meetings will be held at the Site.
1.� SUBNIITTAL� [NOT USED]
1.6 ACTION SUBNIITTALS/INFORMATIONAL SUBNIITTALS [NOT USED]
I.'� CLO5EOUT SUBNIITTALS [NOT U�ED]
1.� MAINTENANCE MATE1tIAL SUBMITTALS [NOT USED]
15 1.9 QUAL�TY ASSURANCE jNOT USED]
16 1.1U DELIVERY, STORAGE, AND AANDLING [NOT USED]
i7 1.11 FIELD [SITE] CONDTTIONS [NOT USED]
18 1.13. WARRANTY [NOT USED]
1.9 PART 2- PRODUCTS [NOT USED�
20 PART 3- EXECUT�aN [NOT USED]
21
zz
END OF SECTION
Rev.ision Log
DATB NAME SUMMARY O� CHANGE
23
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIPICATIQN D�CUMENTS
Revised July 1, 2011
Lctc•h�lruzcl Itaud SrrJntirnik lnrprm�en�errls
CPA�: !0(1G37-3
Ol 3216 -1
CQT�lSTRUCTION PROGRESS SCHLbULE
F' age l af l0
2
sECTTON ai �� i6
CONSTRUCTION SCHEDULE
3 PART 1 - GENERI�L
4 1.1 SiJ11�IMARY
S A. �ection Includes:
6 1. General requirements for the preparation, submittal, updating, status reporting and
7 management oftha Construction Progress Schedule
8 2. Specific requirements are presented in the City of Fart Wairth ScheduIe Guidance
9 Doeument
SO B. De�iations from this City af Fart Worth Standard 5pecification
11 l . None.
12 C. Related S�aecification Sections include, but are not necessarily limited to:
l3 1. Divis ion 0— Bidding Requirements, Contract �'orm s and Conditions af the Contract
14 2. Division 1— General Requirements
15
16
17
18
19
20
2S
22
23
24
25
26
27
2$
29
3Q
D. Purpose
The City oiFort Worth (City) is cornrnitted to deli�ering quality, cost-effecti�+e
infrastructure to its citizens in a timely manner. A key tool to achieve this purpose is a
properly strucfured schedule with accurate updates. This supports effective monitoring
af grogress and �s input to critical decision making by the praject manager througt�out
the life of the project. Data from the updated project schedule is utilized in status
reporting ta various lev�ls of th� City organization and the citizenry.
This Document camplements the City's Standard Agreement to guide the construction
contractar (Contractar) in preparing and submittir►g acceptable schedules for use 6y the
City in project delivery. The expectation is the performance of the wo.rk follows the
accepted schedule and adhere to the contract�aI timaline.
The Gontractar will designate a qualified represen�ati�e (Project Sc�eduler} respansible
far developing and updating the schedu�e and preparing status reporting as required by
the City.
31 1.� PRICE AND PAYMIIVT PROCIDURES
32 A. Measuretnent and Payment
33 1. Vtrork associated with this Item is considered. subsidiary to the various iterris bid.
34 Na separate payment will be allowed far this ltem.
35 2. Non-�ompliance wi�h this specification is grnunds for City to withhold payment of
36 the Contractor's in�oices until Contractor achieves said compliance.
37 1.3 RII'ERENCFS
38 A. Projeci 5.chedules
C1TY OPFOR7" WORTH
STANDARD CONSTRi1CTIqN SPEG�ICATION DQGUM�NTS
Revised August 13, 242k
Lcrcldarrd Itoad Sicle�i�aJh Irirp+�orenrerzls
['Pr1': IOl1G_�7-3
O1 321b-2
CONSTRUCTIONPROGRE55 SCHEDULE
Page 2 of 10
2
3
�
6
�
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
�o
31
32
33
34
35
Each project is represented by City's mastex project schedule that encampasses the
entire scope of activities envisianed by the City to properly deliver the work. When the
City contracts with a Gontractorto perfarm construction af the Work, the Contractar
will develop and maintain a schedule far their scope of w oric in alignment with the
City's standard schedule requirements as defined herein. The da#a and infarmation of
each such schedule will be leveraged and become integral in the master project
schedule as de�med apprnpriate by the City's Praject Control Specialist and approved
by #he City's Praject Manager.
1. Master Project Scheduje
Tha mastar project schedule is a holistic representation of the schedu�ed activities
and mi�estones for the tota! project and be Gritical Path Method (CPM) based. The
City's Proj�ct Manager is accountable for o�ersight of the developrnent and
maintaining a master project scheduIe far each praject. When the City contrac�s for
tha design andlor construction of the project, the master project schedUle will
incorparat� elements of the Dasign and Construction schedules as deemed
appropriate by the City's Project Control Specialist. Thc assigned City Project
Control Specialist creates and maintains the master project schedule in P6 (Crty's
scheduling softwar�).
2. Construction SchedUle
The Contractor is responsible for develUpin� and maintaining a schedule for the
scope of the Contractor's contractual requaements. The Contractor will issue an
initial schedule for review and acceptance by ihe City's Proj�ct Controi Specialist
and the City's Project Manager as a baseline schedule for Contracto.r's scope of
work. Contractorwill issue current, accurate updates aftheir schedule (Progress
Schedule) to the City at the end of each tnonth throughout the tife of their work.
B. ScheduIe Tiers
The City has a portfolio of projects that vary widely in size, complexity and content
requiring different scheduling to effecti�ely delivet each praject. The City uses a
"tiered" approaeh to align the proper sohedule vvith the criteria for each project. The
Ciky's Project Manager determinas the approgriate schedule tier f�r each projeci, and
includes that designation and the associated requirements in the Cantractor's scope of
wark. The following is a summary of �he "�iers".
3& ]. Tier I: Small Size and Short Duration Project (design not required)
37 The City develops and mamtains a Master Froject Schedula for the praject. No
38 schedule submittal is required frorn Contractor. City's Project Control Specialist
39 acquires any necessary schedule status data o.r information through discussions w ith
40 the respective party on an as-needed basis.
41
42
43
44
45
46
47
48
�}9
2. Tier 2: Small Size and Short to Me�ium Duration Project
The City d�velops and maintains a Master Project Sch�dule for the project. The
Cantractar identifies "start" and "finish" milastone dates on key elements of their
work as agreed w iCh the City's Project Manager at the kickoff of their work effort.
The Contractor issues to the Gity, updates to the "start" and "finish'' dates for such
milestones at the end of each month thtoughouf the life of thei� work on fhe praject.
3. Tier 3: Medium and Large �ize and/or Complex Projects Re�ardless of Duration
ciTY or ro�z�r woxrx
STATIDARD CONSTRUCi'IOI� SP�CIFICATION DOCUMENTS
Revised AugusC 13, 2021
Larhland Raad 5'ideiralk lnrprr�i�cnrerTl.s
['Pn': I (70fi37-3
U1 32 f6 -3
CONST12L1C'I'ION PROGRESS SCIiE�ULE
Page 3 of 10
6
7
10
ll
12
13
14
15
16
l7
I8
19
20
21
22
23
24
25
26
27
The City develops and maintains a Master Project Schedule for the project. Tha
Contractor de�elQps a Baseline Schedule and maintains the scheduie of th�ir
respective scope of work on the projeot at a le�el of d�tail {generally Le�e13) and in
alignment �uith the WBS struc#ure in Section 1.4.Has agreed by the Project
Manager. The Contractor issues to the City, updates of their respective schedule
(Prograss Schedule) at the end of each month throughout t�,e life Qf their wark qn the
proj�ct.
C. Schedule Types
Project delivery far the City utilizes t�vo types af scheaules as noted below. The City
develops and maintains a Master Project Schee�ule as a"baseline" sched�le and issue
rnonthly updates to the City Project Manager (end af each manth) as a"progress'°
schedule. The Contrac�or prepares and submits each schedule type to fulfill their
contractual requirements.
1. Baselin� Schedule
The Contractor develops and submits to the City, an initial schedule for thesr scope
of work in aGgnment �vith this specifieation. Once reviewed and accepted by the
City, it becomes th� "Baseline" sch�dule and �s th� basis against which all pragress
is me�sured. The baseline schedule wili be updated when there is a change or
addition to the scope of work innpacting the ciuration of the work, and only after
receipt of a dUly authoriz�d change order issued by the City. In the event pr�gress 's
significant�y behind schedUla, the City's Project Manager may autharize an update
to the baseline schedule to iacilitate a more practical evaluation of progress. An
example of aBaseline Scheciule is pravided ir� 5pecification O1 32 16.1
Construction Project Schedule Baseline E�ample.
2. Pragress Schedule
28 The Contractor vpdates �heir schedule at th� end of each month to reprasent the
29 progress achieved in the work which includes any snnpact from aut3�orized changes
30 in the work. The updated schedule r►�ust accurateiy reflect the current sta#us of the
31 work at that po.int in time and is referred to as the °`�rogress Sehedu�e". The City's
32 Project Manager and Froject Control Specialist reviews and accepts each progress
33 5ehedule. ln t�e event aprogress schedule is deemed not acceptabie, the
34 unacceptable issUes are identified by the Cit}r within S working days and the
35 Contractot rnust provide an aeceptable progress schedule within 5 working days
36 after receipt of n�n-acceptance notification. An example of a Progress Schedul� �s
37 pravided in 5pecification Ol 32 16.2 Construction Projeet Schadule Progress
38 Example.
39 D. City Standard Schedule requirements
40 The follow ing �s an overview of the m�thodology f4r developing and maintaining a
41 schedule for delivery of a project,
CITY OF FQRT W ORTH l.erckla��d Roud Sicleirrifk lurproremcn�s
STANDARD CONSTRUCTTON SPECIFIC�,`I'[QN DOCUMENTS CI'N: 1DOG37-3
Revised Angetst 13, 2U21
O1 3216 -4
CONST1tUC1�lON PROGRE55 SCHE�ULE
P age 4 of ] 0
i
2
3
4
5
6
7
S
9
1�
11
12
13
14
15
16
17
18
19
�0
21
22
23
24
25
2G
27
28
29
3�
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Schedule Framework - The schedule will 6e based on the definad scope Qf work
and follow the (Cr�tical Path Methodology) CPM method. The Contractor's
schedule wil] align with the requirements of this sp�cificatian and will be cost
lorrded ta reflect their plan for ex�cution. Compliance with cost laading can �
provided with traditional cost loading oiline items OR a pro,jected cost �r
month for the project when the inifial schedule is submitted, u�tlated on a
quarterly 6asis is significantc�tange is anticipated. Qverap schedule duration
wil� align w ith the contractual requirerr�ents for the respective scope of work and be
ref�ected in City's Master Project Schedule. The Project N�amber and Name of the
Project �s required on each schedule and must match the City's project data.
E. Schedule File Nam�
All schedules submitted #o the City for a project wilI hav� a file name that begins with
the City's project number followed by the name of theproject followed by b�selin.e (if
a baseline schedule) or the year and �rtontlx (if a progress schedule}, as shown below.
� Baseline Schedule Fi1e Name
Format: Cit}F Project Number_Project Name Baseline
Example: 10 � 376 North Montgomery Street IIMAC Baseline
� Progreas SchedulePileNarne
Format: City Pro�ect Number Project Name YYYY-MM
Example: l O1376 North Montga�nery Street IIMAC_2Q 18_O1
� Prpject S.chedule. Progress Narrati�e File Name
Format: City Project Number_Project Name_PN 1'YYY-MM
Example: 101376 North Montgoinery Street IIMAC PN_20l S_Ol
F. Schedu�e Templates
The Contractor will utilize the rele�ant sections fram #he City's templat�s provided in
the C.ity's document management system as the basis for creatin� their respective
project schedule. Specificapy, the Contractor's schedula will align with the layout of
the Construction section. The templates are identi�ed by type of project as notad
below .
o Arterials
D A�iatian
e Neighborhood Streets
• 5idewalks (later}
• Quiet �ones (later)
+ Sireei Lighfis {later)
� Intersectian Impr�vements (later)
o Parks
o Starm water
o Street Maintenance
• Traffic
• Water
48 G. Schedule Calendar
C1TY Ol� FORT WORTH
STE1I�fDARD CONSTRfICI'ION SPECIFICATION DOCUMEIQTS
Revised 1�ugust l3, 2021
Lacklarrd Idocrct Sideiralk Inrprovemrrals
CPA': 1 �f16.3 7-3
Q13216-5
COISSTRUCTION PItOGRESS SCHEDUI.�
Page 5 oi i0
6
7
8
9
]0
11
I2
l3
14
15
lb
17
1$
19
2Q
21
22
23
24
2S
The City's standard ealendar for schedule development purposes is based on a 5-day
r�orkweek and accounts for the City's eight standard hnlidays (New Years, Martin
Luther King, Memorial, Independence, Labor, Thanksgiving, day after Thanksgiving,
Christmas). The Contractor vvillestablish a schedule calendar as part af the scheduie
development process and pro�ide to the Project Con�rol Specialist as part nf the basis
for their schedule. Variations between the City's calendar and the Contractor's
calendar must i�e resolved prior to the City's acceptance of their Base�ine project
schedule.
H. WBS & Milestone Standards far Schedule De�elapment
The scope of wark to be accorr�p�isheci by the Con�ractor i� eeptesented in Y.he schedule
in #he form of a Wark. Breakdown Structure (WBS). The WBS is the basis for the
develapment afthe schedule activities and shall be imbedd�d and depicted in the
schedule.
The following is a summary of the standards to be followed i� preparing and
maintaining a schedule for project delivery.
1. Contractor is required ta utilize the City's WBS strUcture and respective
project type template fnr "Construction" as shown in Section 1.4.Hhelow.
Additianal activities may be added to Levels 1- 4 to accommvdate the needs
of the organization e�ecuting the work. Specifically the Contractor will add
activities under WBS XXXXXX.$0.83 "Construction Execution" that
delineates the activrties associated with the various components of the work.
26 2. Contractor is required to adhere to the City's Standard Milestones as shown
27 �n Section 1.4_I below. Contracfior�villinclude additianal milestones
28 representing intermediate deliverables as required to accurately reflect their
29 scope o�woric.
30
31
32
33
34
35
36
37
38
39
40
41
42
43
I. Schedule Activities
Activikies are the discrete elements of work that make up t11e schedule. They will be
organized under the umbrella of the WB�. Activity deseriptions should adequately
describe the activity, and in some cases the extent af the activity. All activi�ies ara
logically tied w�th a predecessar and a successor. The only exception to this ruie is for
"project start" and "praject finish" milestones.
The activiry duration is based on the physical amount of work ta be performed for the
stated acti�ity, with a maximum duration of 20 working days OR a continuous acfivity
in one location. If the work for any one activity exceeds 20 days, break that actii�+ity
dQwn incrementally to achieve this duration constraint. Any exception to this requires
review and acceptance by the City's Project Control Specialist.
44 J. Change Orders
45 When a Chxnge Order i� issued by the City, the unpact is incorporated into the
46 previousZy accepted baseline sehedUle as an upciate,. to clearly show nnpact to the
�7 project timeline. The Contractor submits this updated baseline schedule to the Crty for
CITY OF FORT VV ORTH La�klmtd Rand.Sicleiralk hraproreute+rls
STANDARD Cpt�STRUC'1'IOi�i SPECIFICATION DOCi1MENTS CYA': 1�(YG37-3
Revised Aagust 13, 2021
01 321b -6
CONSTRUCTi0�1PROGRES5 SCM�DUL�
Page 6 of (0
1
2
3
4
5
6
7
S
9
10
11
12
13
1 �}
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
�}3
44
4S
46
47
revie�v and accep�ance as deseribed in Section l.5 below. Updated baseline schedules
adhere to the following:
1. Time extensians associated with approved contract modifiaations are Wnitedto the
actual amaunt of tune the project activities are antic ipated ta b� delayed, unless
otherwise approved by the Pragram Manager.
2. The re-�aselined scheduie is subtnitted by Yhe Contractor witltix� ten workdays after
the date of receipt ofthe appro�ed Change Order.
3. The changes in Iog�c or durations appraved by the City are used to analyze ihe impact
of the change and is included in the Change Order. The cading for a new activity(s)
added to the schedule for the Change Order includes the Change Order number in the
Activifiy ID. Use as many acti�ities as needed to accurataly show the work of the
Change Order. Revisions to th� basel'u�e schedule are not effecti�a until accepted by
the City.
K. City's WorkBreakdown Structure
WBS Code WBS Name
��L Projec� Name
XXXXXX.30 Design
XXXXXX.30.10 D�sign Contractor Agreement
XXXXXX.34.20 ConceptuaIDesign (30%)
XXXXXX.30,30 PreGminary Design (60%)
XXXXXX.30.40 Rinal Desigz�
XXXXXX.30.50 Environmentaj
X�XXXX.30.60 Permits
XXXXXX.30.60.10 Permits - [dentification
XXXXXX.30.60.20 Permits - Review/Approve
XXXX.XX.40 ROW & Easements
XXXXXX.40.10 ROW Negotiatians
X�XXXX.40.20 Candemnation
XXXXXX.7Q Utilify Relocation
XXXXXX.70.10 Utility Relacation Ca-ordinatian
I��XXX.80 �onstruction
XXXXX�.80.81 Bid and Awatd
XXXXXX.8Q.83 Construciian Executian
XXXXXX.$0. $5 Inspection
XXXXXX.80.86 Landscaping
XXXXXX.90 Closeout
XXXXX3�.90.10 Canstruction Contract Close-out
XXXXXX.90.40 Design Contract Closure
L. City's Standard Milestones
The following rnilestone activities (i.e,, important events an a project that mark critical
points in tima) are af particular interest to the City and must be reflected in the project
schedule far all phases af work.
CITY OF FORT �WORTH
STANDARD CONSTRUGTION 5i'EC�ICATZON BOCUMENTS
Revised A�gust 13, 2021
.f�crcklrurc! Roucl,Sideirctl� ln�pro»e�u���ls
CPA1: I OOb37-3
O1 3215 - 7
CONSTRUCTIQNPitOGRESS SCHEDULE
Page 7of 10
1
2
3
4
5
6
7
$
9
]0
ll
12
13
14
rs
S6
17
18
19
20
21
22
23
2A
25
26
27
28
29
30
31
32
33
34
3�
36
37
38
Activity ID Activit_y Name
Design
3020 Award Design Agreement
3040 Issue Natice to Proceed - Design Engineer
3100 Design Kick-off Meeting
3120 Submit Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water,
Water & Sewer
3150 Peer Review MeetinglDesign Re�iew meeting (technical)
3160 Canduct Design Public Meeting #1 (xequired)
3170 ConceptualDesign Complete
3220 Submit Preliminary Plans and S�ecifications �o Utilities, ROW, Traffic,
Parks, Starm Water, VWater & Sewer
3250 Conduct Design Public Meeting #2 (reguired)
3260 Prelimizaary Design Complete
33l 0 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water,
Water & Sewer
3330 Conduct Design Public Meeting #3 {ii required)
3360 Final Design Camplete
ROW & Easements
4000 Right of Way Start
4230 Right o� Way Complete
Utility Relocation
7000 iJtilities Start
7120 iJtilities Cleared/Complete
Cnnstraction
Bid and Award
8I 10 Start Advertiserrient
S 150 Conduct Bid Opening
8240 Award Construction Contract
Construetian L�ecutian
8330 Conduct Constructzon Public Meeting #4 Pre-Constructtnn
835� Construction Start
8370 5ubstantial Completian
854� Construction Campletion
9130 Notice of Completian/Green Sheet
9150 Construction Contract C�osed
9420 Design Contract CloSed
39 1.4 SUBNIITTALS
40
41
42
G3
�
45
46
A. Schedule Submittal & Review
The City's Project Manager is responsib�e fnr reviews and acceptance afthe Contractor's
schedule. The Ci�y's Project Control Specialist is responsible far ensuring aligrur►ent of
the Contractor's baseline and progress schedules with the Masfer Project Schedule as
support to the City's Project Manager. The City reviews and accepts or rejects the
schedule witlein ten workdays of Cantractor's submittal.
C11' Y OF PORT W ORT H
STt1IVDARB CONSTRUGTIOt+] SP�CII=ICATION DOCUM�NTS
Revised August 13, 20Z1
f.acldrrird Rancl Shle�ralk l��rprore�rrerr�s
['PN: lOf1G37-3
O13216-8
COI�STRUCTIONPROGRE55 SCHEDULE
Paga 8 nf 10
1 1. Schedule Format
2 The Cantractor will submrt each schedule in twa electranic farms, one in native file
3 format (.xer, .xrrtl, .xxtpx) and the second in apd,J'%rmat, in the City's document
4 management system in the location dedicated for fihis purpose and identified by the
5 Project Manager. In the evant the Contractor does not use Pricnavera P6 or MS
6 Project for seheduling purp.ases, the schedule information must be subm�tked in .xlsar
7 .xlsx format in compliance with the sample layaut (See Specification O1 32 16.1
S Construciion Project Schedule Baseline Examp.le), including activity predecessors,
9 successors and totaIfloat.
10
1 I 2. Initial & Baseline Schedule
12 The Contractar wil1 develop their schedule for their scape of wark anci su.bnnit their
13 initial schedule in electronic forrn (ir� the file farmats noied above), in the City's
14 document management system in the location dedicated for this purpose rct ler��t 5
15 warking days prior to Pre Co�structian Meeting.
I6
I7 The City's Project Manager and Pcoject Controj Specialist review this initial schedule
18 to determine alignment with the City's Master Project Schedule, including format &
19 WBS strvcture. Follo�ving the City's review, feadback i� pravided to the Gontractar
20 for their use in finalizing their ini�ial schedule and issuing {within five wo�kriays} their
2l Basalitte Schedule far final review and acceptance by the City.
22
23 3. Progress Schedule
24 The Contractar will update and issue their projeet schedule (Pragress Schedule} by tlie
25 Ca�t drry of errch montlx throughout the life oftheir work on th� project. The Progress
26 Schedule is submitted in electronic form as noted abo�e, in the City's docurnent
27 management system in the location dedicated for this purpose.
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
+�5
47
4.8
44
The City's Project Control team reviews each Progress Schedule for daia and
information that sup�ort the assessmentof the update to the schedule. In tha event
data or information is missing or incomplete, the Pro�ect Controls Specialist
communicates directly wi�h the Contractor's scheduler for provid'u�►g same. The
Contractor ra-submits the carrected Pro.gress Schedule within 5 workdr�ys, following
the submittal process noted above. The City's ProjectManager and Praject Control
Sp�cialist review the Coniractor's progress schedule for acceptance and to monitor
performance and progress.
The following list of items are reyuired to ensure proper status infortnation is
contained in the Progress Schedule.
� Baseline Start date
� Baseline Finish Date
� °/a C.omplete
� F1oat
o Activi�y I�ogic (d.ependencies)
� Critical Path
o Activities added or de�eted
o Expected Baseline Finish date
o Variance tfl the Baseline Pinish Date
CIT Y OF F ORT W ORT H
STANBARb CONSTRUCTION Sl'EC�'ICATTON TIOCUMENT5
Revised August 13, 2021
l.c�cklcritd lio<rd Siclei�rrlk Inrprorernzr9ls
C'PN: 1(1OG37-3
Ql 32 i6 -9
GONSTRUCTIO�IPROGRESS SCHET3ULE
1' age 9 of I 0
1
2
3
4
S
6
7
8
9
10
11
12
13
3�
15
B. Monthly Construction Status Report
The Contractor submi�s awritten status repart (referred ta as a pragress narrative) at the
monthly progress meeting (if monthly meetings are held) or at the end of each mortth to
accompariy the Progress Schedule submi�tal, using the standard format provided in
Specification Ol 32 16.3 Construetinn Project Schedute Prngress Narrative. The content
of ihe Construction Project Schedule ProgressNarrative should be eoncise and complete
to �nclude only changes, dela.ys, and anticipated probleins.
C. Submittal Process
� Schedules and Mon�hIy Construction Status Raporis are submitted in in the City's
document managemant system in the lacatian dedicated for this purpose.
� Once the project has been cnmpleted and Final Ace�ptance has heen issued by the
City, no furiher progress schedules or eonstruetion status reports are reqUired from
the Contractor.
l.
16 1.5 ACTIQN SUBNIITTALSlINFORMATIONAL SUBMITTALS [NOT USID]
17 1.6 CLOSEOUT SUBNIITTALS [NOT USID]
18 1.7 MAINTENANCE MATERIt�I. SUBNIITTALS [NOT USID]
19 1.8 QUALITY ASSURANCE
20 A. The person preparing and re�i�ing the constructiar� Progress SchedUle shall be
21 experienceci in the preparation of schedules of similar complexity.
22
�3
�F
25
B. Schedule and supparting documents addressed iri thi� Specification shall be prepared,
updated and re�is.ed to accurately reflect the performance nf the construction.
C. Contractor is responsible for the quality of a1I submittals m this sectian meetuag the
standard of care for the cpnstruction industry for similar projects.
26 1.9 DELIVIItY, STORAGE, AND HANDLING [NOT USID]
27 1.10 FIELD [�ITE] CONDITIONS [NOT USED]
28 l.11 WARRANTY [NOT USID]
29 1.12 ATTACfIlVIENTS
30 Spec O1 32 16.1 Consfruction Project Schedule Baseline Example
3l S.p�c O 1 3216.2 Coastruction Project 5chedule Progress Example
32 Spec 01 32 16.3 Canstruction Project 5chedule Progress Narrative
33
CITY Or FORT WORTH Lacklcrr7r! NoculSideire�Nr Irirpr�ot�einc��vl.s�
STANDARD COi�ESTRi1Ci'iON SPEGIFICATION DQCUMENTS CPr1': I �1TG37-3
Revisetl August 13, 2021
o� 3� i� - ia
CQTISTRUC'1"IONYI20G1�S5 SCFiEbUL�
Page 10 of 10
2 P.A.RT 2- PRODUCTS [NOT USID]
PART 3 - EXF.CUTTON [NOT iTSID]
A
5
IIVD OF SECTION
Revision Lag
DATE NAME SUMMARY OF CHANC�
8113I2021 Michael Ov�n evised to update specificatian requirements and eliminate duplicate schedu[e
pecifieations.
Cl'TY Or rOR'f WOR'CH l,r�cklurtic! ka�rrl Sicleirrrlk Jm��t•oi�erne�rls
5'�EINDARD CONSTRUCTION SPLCIC'ICATIOI�! DOCUiv[�NTS ('P.1': 100637-3
Revised t�ugust 13, 2021
D I 32 33 - 1
PRECONSTRUCTION V1DE0
Page 1 of2
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION D13� 33
PRECONSTRUCTION VIDEO
5 A. Ssctioj� lncludes:
6 1. Administrative and procedural requirements for:
7 a. Preconstruction Videos
8 B. Deviations from this City flfFort Worth Standard Spec.ification
9 1. None.
10 C. Related Specification Sections include, but are not necessarily 3imited to:
11 l. Di�ision 0— Bidding Requireme�rts, Contract Fnrnts and Conditions ofthe Contract
12 2. Divisian 1-- General Requirements
13 1.� PRICE AND PAYMENT PROCEDURES
14 A. Measurement and Payment
S� 1. Work associated with this jtem is considered subsidiary to the various item� bid.
16 No separate payment will be aIlowed %r this Item.
17 1.3 REFERENCES [NOT USED]
18 1.4 ADMINISTRATIVE 1t�;QU1REMENT5
19 A. Precanstruction V ide.o
20 l. Produce a preconstruction video of the site/alignrnent, including all areas in the
21 vicinity of and to be affected by construction_
22 a. Provide digital copy af video upon reqUest 6y the City.
23 2. Retain a copy of tl�e preconstructioi� videa until the end of the mau�tenance surety
24 period.
25 1.� SUBMTTTALS [NOT USED]
26 1.6 ACTION SUBNIITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
27 1.7 CLOSEQUT �UBMITTALS [NOT iTSED]
28 L8 MAINTENANCE MATERIAL SUBMITTALS [NOT T1SED]
29 1.9 QUALITY ASSURANCE [NOT USED]
30 1.10 DELIVERY, STORAGE, AND I�ANDLING [NOT USED]
31 1.11 FIELD [S1TE] CONDTTIONS [NDT USED]
32 1.12 WARR1�►NTY [NOT U5ED]
33 PART 2- PRODUCTS [NOT IISED]
CITX OF F'017T WORTH Lcrclrlarrrl ltoad Srzleiralh h�rpi•ni�eurerrl,s
STANflAAD CONSTRUCTION 3PECIFICATIQN DOCUMENTS C�'!1': !O(1C37-3
Revised July 1, 2011
01 32 33 - 2
PRECpNSTRUCTION VIDEO
Page 2 of 2
PART 3 - EXECIITION [NOT USED]
END OF SECTTON
Re�ision Log
DATE NAMB SUMMARY QF CHANGE
CTTY OF FORT WORTH Lcrcklul�zl Roucl Side�ralk Inrpr•m�cnrc��ils
STA3dDARb CONSTRUCTION 5P�CIFICATION DOCUM�NTS C"PAr: I�q(37-3
Revisad July i, 20ll
013300-I
SUBMITTALS
Page l of 8
1
2
3 PART1- GENERAL
���r�►� i►� r�;���
5
&
7
8
9
l0
11
l2
]3
7�
15
15
17 1.�
SECTION 0133 00
SUBMITTALS
A. Section Inclur3es:
1. General metl�ods and requirEsnents af submissians applicable to the fal�awing
Work-related subnnittals:
a. Shop Drawings
b. Product Data (including Standard Product List subinittals)
c. Sajnples
d. Mock Ups
B. Deviations from this City of Fort Worth Standard Specifcation
1. None.
C. Ralated Speci�catian Sections include, but are not necessarily Simited to:
1. DivisiQn p— Bidding lZeqnirements, Contract Forms and Canditions of the Contract
2. Division 1— Generaj Requirements
PRICE AND PAYMENT PROCEDURES
1 S A. Measurement and Aayment
19 1. Work associated with this Itern is considered subssdiary to �lie various items bid.
20 No separate payment will be allowed far this Item.
21 1.3 REFERENCES [NOT USEDj
22 1.4 ADMINISTRATIVE REQUIREMENTS
23
24
25
2fs
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A. Coor�ination
1. Notify the City in writing, at the time of submittal, of any de�riations in the
submittals from the requirements oithe Contracfi Documen�s.
2. Coordination of Submittal Times
a. Prepaxe, prioritize and transmit each submittal sufficisntly in ad�ance of
perf4rming the related Work or a�lier applicable activities, or within the time
specified in the individual Work Sections, of the Specifications.
b, Cairtractor is responsible such that the installation will not be delayed by
processing times including, but not limited to:
a) DisapprovaI and resubmittal (ifrequired)
h) Coordination with ather submittals
cj Testing
d) Purchasiilg
e) Fabrication
fl Delivery
g) Similar sequenced activities
c. No extension of kime wiIl be authorized beeause of the Contractor's failure to
transmit submittals sufficieutly in advance of the Work.
CITY OF FORT WOI2TH l.creklai�r� l�oacJ Siclesralk IuiE�r�i�enrenrs
STANQARD COi3STRUGTION SPCCI�'ICATION bOCIJM�AfT5 CPA?• Jf1(1637-3
Revised becemUer 2.0, 2012
01 33 00 - 2
SUBMITTALS
Page 2 of 8
]
2
3
4
5
6
7
S
4
�a
rr
12
13
14
15
l6
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
3'7
38
39
40
41
42
43
44
45
46
d. Make submittals promptly i� accorda�ee with approved scl�edule, and in such
sequence as ta cause no delay in the Wark ar in the work of any athe�•
contractor.
B. Submittal NUinbering
1. VF�hen submitting shop dra�vings or samples, utilize a 9-character submittal cross-
reference. identification numbering system in tlae foljowing man�7er,
a. Use the first G digits of the applicable Specification Section Number.
b. For the next 2 digits number us� numbers 01-99 to sequentially number each
initial separate item or drawing submitted under each speciiic �ection number.
c. Last use a latter, A-Z, indicating tha resubrnission of the same drawing (i.e.
A=2nd su6missia�s, B=3rd submission, C=4tk� subinissian, etc.). A typical
submittal number wouid be as follows:
03 30 00-O8-B
1) 03 30 OQ is the Specification Sectian for Cancrete
2} 08 is the eighth initial su6mittal under this Specifieation Section
3} B is the third submissian (second resubnr�ission) of that pa�ticular shop
drawing
C. Confractor Certifieation
1. Review shap drawings, product data a�d satnples, incl�ding those by
subcontractors, prior to submission ta determiiie and verify the fallowing:
a. Field zneasurements
b. Field coxisteuction criteria
c. Catalog nUmbers and siinilar data
d. Conformance with the Contract Documents
2. Provide each shap drawing, sa�nple and produci data submitted by the Contractor
wit�i a Certification Stateinent affixed including:
a, The Contractor's Company name
b. Signature of submitta] reviewer
c. Certification StatemenC
1) `By this suhmitkal, I hereby represent tl�at I have determin�d and verified
field measurements, field construction eriteria, materials, dimensions,
catalog numbers and similar data and I hav� checked and coordinated each
itein with other applicable approved shop drawings."
D. Submittal Pormat
1. Fa1d shop drawings larger than 8'/Z inches x 11 inches to S'/z inches x 11 inclies.
2. Bind shop drawings and product data sh0ats together.
3. Order
a. Gover Sheet
1) Description of Packet
2) Contractor Certification
b. List of items / Table of Contents
c. Product Data /Shop Drawings/Sampjes /Calculations
�. $ubmittal Content
1. The date of su6mission and the dates of aiiy previaus submissions
CITY �F FORT WORTH
STAN[7ARD CQI�STRUCT]ON SP�CIFICA'C]ON DOCUMENTS
Revised December 20, 2012
Lucklri�ld Rc�crd Sideirrrlk Iny�rnti�errrenl:ti•
C'PA': IIJ0637-3
Ol 33 UO - 3
SUBMiTTALS
Page 3 of S
2
3
4
S
6
Z. The Project title and number
3. Contractor identification
�. The names af:
a. Coj�tractor
b. Supplier
c. Maj3ufacturer
7 5. Identification of the product, with the Specification Sectiou nurnber, page and
8 paragraph(s)
9 6. Field dimensions, clearly ideartified as such
i D 7. Rel$tian to ad,jacent or critical features of the Work or rnaterials
11
12
13
14
15
lb
I7
l8
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
8. Applicable standards,. such as ASTM or Federal Specification numb�rs
9. Identification by highlighting of de�iatinns from Contract Documents
10. Identifcation by highlighting of revisions an resubmittals
11. An 8-inch x 3-inch blank space for Cantractor and City stamps
F. Shop Drawings
1. As specifiad in individual Work Sections includes, but is not necessarily limited to:
a. Custom-prepared data such as fabrication and erection/installation (working}
drawings
b. Scheduled information
c. Setting diagrams
d. Actual shopwork manufacturing instructions
e. Gustom templates
f Special wsrin,g diagrams
g. Caordination drawings
h. Individual system or equipnnent inspection and test reports including:
1} Perfarmanca curves aiid certifications
i. As applicable to the Work
2. Details
a. Relatioii of tlle �arious parts to the main memUers and lines of the struct�re
b. Where correct fabrication of the Work depends upon field measuremen#s
1) Provide such measureinents and note on the drawings prior to submitting
for approval.
G. Product Data
1. For submit#als of product data for products included an the City's Standard Praduct
List, clearly identify each item selected for use on the Froject.
2. For submittals afproduct data for products not inciuded on the City's Standard
Froduct List, submittal data may inelude, buY is not necessarily limited to:
a. Standard prepared data for manufactured products (sometimes referred to as
catalog data)
1) Such as the manufacturer's product specificatian and installation
instructions
2) A�ailability of colors and patterns
3) Manufacturer's printed statements af compliances and applicahility
4) Roughing-in diagrams and templates
5j Catalog cuts
6} Product photngraphs
CITY OF FORT WORTH
STA[�I7ARll CONSTRUCTION SPECIFICATION DOCUMENTS
Revised December 20, 2012
Lacklant112oc1d Sicle�rcrlk litr]�rvv4�ne��ls
('A,1�: 1!1O437-3
01 33 00 - 4
S�IBMITTALS
Fage 4 nf 8
1
2
3
4
5
6
7
8
9
1D
Il
12
13
14
15
16
17
7) Standard wiring diagrams
$) Printed performance curves and operational-range diagrams
9) 1'roduction or guality control inspection and test reports and certificafions
l 0) Mi11 reports
11) Product operatiilg anci maintenance instructions and recointnended
spare-par�s jisting and p�•inted product warranties
12) As app�icable to the Work
H, �amples
I. As specified in individual Sections, include, hut are i�at neeessarily ]imited to:
a. Physical exampl�s of the Work such as:
1) Sectians of manufactured or fabricated Work
2.) Small cuts or containers of materials
3) Complete units af repetitively used products colar/texture/pattern swatches
aiid range sets
4) Specimens for coordination of visual effect
5) Graphic symbols and units of Work to b� used by the City for indapend�nt
insp�ction and testing, as applicable to the Work
I8 I. Do not start Work requiri��g a shop drawing, sample or prodvct data nor any material to
19 be fabricated ox installed priar to tlse appro�al or qualified appraval af sucl� item.
20 1. Fabricatian performed, znaterials purchased or on-site construction accamplished
21 which does not confarri-� to approved slaop cirawings and data is at the Contractor's
22 risk.
2�
24
2S
26
27
28
29
30
�i
32
33
3�
35
36
37
38
39
4Q
4I
42
43
44
45
46
47
2, The City vvill not be liable for any expense or delay due to corrections or remedies
rec�uired to acconiplish confarmity.
3. Cornplete praject Wark, materials, fabrication, and installations in conformance
with approved shop drawings, applicable samples, aild praduct data.
.�. Submiitaj Distribution
1. EIectronic Distribution
a. Confirm developmezrt of Project darectory %r electronic subrnittals tn be
uploaded to City's Buzzsaw site, or another exteriial FTP site approved by the
c��y.
b. Shap Drawings
l) Upload submittal to desi�natad project directory and notify appropriate
City representatives via email of sub�nittal posting.
2) Hard Copies
a) 3 copies far all submittals
b) If Cantraetor requires more than 1 hard copy of Shop Drawings
returned, Contractor shall submit rnore than tl�e �lumber o�copies listed
abo�e.
e. Product Data
l) Upload submittal to designated proje.ct directory and raotify appropriate
City representatives via email o� submittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Samples
1) Distributed to the Project Representative
2. Hard Copy Distributian (if required in lieu of electronic distribution)
CITY QF FQRT WORTH
5TA3VDARD CQNSTIZlICT10N SPECTF'ICATIqN DOGIIMENTS
Revised December 20, 2012
l.nchland Rnad Srdetralk liupr�i�exrerTls
CP�': 10l1637-3
01 33 OD - 5
SUBNiITTALS
Page 5 of 8
1
2
3
4
5
6
7
S
9
ia
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
a.
�
c.
5hop Drawings
1) Distributed to the City
2) Copies
a) $ copies for mechanical submittals
6) 7 copies for all other submittals
c) If Contractor requires moxe than 3 copies of Shop Drawings returned,
Contractor shall submit more than the nu�nber of copies listed above.
Product Data
1} Distributed to the City
2) Copies
a) 4 copies
Samples
l) DistriUuted to the Project Representative
2} Copies
a) Submit the number stated in the respective Specification Sections.
3. Distribute reproductio.ns of approv�ed shop drawings and copies of approved
product daCa and samples, where reyuired, to the job site ii�e and e�sawhere as
directed by the Ciiy.
a. Provide number of copies as directed by the City l�ut not exceeding the number
previously speciiied.
K. Su6mittal Review
The revi�w of shop drawings, data and sarr►ples wil� be for general conformance
witls tl�e design concept and Contract Docui�ent�. This is not tn b� construed as:
a. Permittuig aiiy depar�ure froin the Contract requirements
b. Reli�ving the Con�ractor of respansibi�ity for any errors, including detai.ls,
dimensions, and materials
c. Approving depar�ures from details iurnished by the City, except as otherwise
provided herein
The review and approval of shop drawings, samples or product data by the City
do�s not relieve the Coa�tractar fram his/her responsihili .ty with regard to the
fulfillment of the terms of the Contract.
a. All risks of errar and omission are assumed by the Contractor, and the City vvill
have no responsibility therefore.
The Cantractor remauis responsible for details and accuracy, for coordinating the
Work with a�l other associated work and irades, for seZectii�g faba•ication pracesses,
for teehniques of assembly and for performing Work in a safe manner.
If the shop drawings, data or samples as subm itted describe variations and show a
degarture froin the Confract requirements which City finds to be in the interest af
the City and to be so m inor as not ta involve a change in Cantract Price or time �or
performance, the City may returi� the reviewed drawings witliout noting an
exception.
Submittals will be returned to the Cantractor under 1 af the following codes:
a. C�de 1
i) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or
cornmearts on t�1e submittal.
a} When returned under this code t��e Gontractor tnay release the
equipment andlor mate�•iai for manufacture.
b. Code 2
29 2.
30
31
32
33
34 3.
35
36
37
38
39
40
41
42
�43
44
45
�6
47
a8
4.
E
C1TY QF FORT WORTH
STANDARb CpNS'1'RUCTION SPECIFICATIiON DOCUMENTS
Itevised beeember 20, 2012
l.ucklund Raac! Sideu�rrlk G�ipt•oi�erraeri�s
CPN: lflOG37-3
O1 33 DO -6
SUBMITTALS
Page 6 of 8
i
2
3
4
5
6
7
S
9
IO
11
12
13
14
15
16
17
I8
19
2Q
2I
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
c.
Q
1) "EXCEPTIONS NOTED". This code is assi�ned when a confirmation of
the notations .and coinments IS NOT required by the Contractor.
a} The Contractor may release the equipment or material for manufacture;
l�owever, alI notatians and comrnents inust be incorporated irno the
iinal product.
Code 3
1) "EXCEPTIONS NOTED/RESUBMIT". Tl1is combination of codes is
assign�d when notations and comments are extensive enough to require a
resubmittal of the package.
a) The Contractor may release the equipment or material far manufacture;
l�owever, all nntations and comments must be incorporated into the
final product_
b) This r�subrnittal is to address all co�nments, otnissions and
iion�ca��formiiig items that were noted.
c) Resu6miital is to be received by the City within 15 Calendar Days of
t��e date of the City's transmittal requiring the resubmittal.
Code 4
1) "NOT APPROVED" is assigned when the suhmittal does not meet the
intent of tl�e Contract Documents.
a) The Contractor rnust resubtnit the entire package re�rised to brii�g the
submitta� into conformance.
b) It inay be necessary to resubmit usii�g a diiferent manufacturerlvendor
to meet the Contract Documents.
6. Resubmittals
a. Handled in the sazne man�7er as �rst submi�tals
1) Corrections other than requested by the City
2) Marked with revision triangle or other similar rnethod
a) At Contractor's risk if not inarked
b. Submitta3s for eacli item will be reviewed no more than twice a� the City's
expense.
1} All subsequent r�views will be per%rtned at times convenient to the City
and at the Contractor's expense, based on the City's or City
Re�reselrtative's theii pre�ailing rates.
2) Provide Contractar reimbursement to the City within 30 Calendar Days for
all such fees in�oiced by tlie City.
a The need for more than 1 resubmission or any other delay ui obtaining City's
revie�v of submittals, will not entitle the Contractor to a�} extension of Contract
Tim�.
7. Fartial Submittals
a. City reserves the right to iiot re�iew submitfials deemed partial, at the City's
di�eretion.
h. Submit�als deemed by the City to be not complete will be returned to the
Contra�.tor, aiid vvill be consid�red "Not Approved" until resubmitted.
c. The City may at its optian provide a list or mark the submiital directing the
Contractor to fhe areas that are incomplete.
8. If the Contractor considers a�iy correctian indicated an the shop draw�ngs to
constitute a change to the Contract Documents, then written notice must be
provided thereof to the City at leasi 7 Calenc�ar Days priar to release for
manufacture,
CIT'Y OF' 1�ORT'WORTH
STANDARD CONSTRIICTIOIV SPECIPECATION DOCUM�NTS
Ravisad December 20, 2012
Lac;4lar�d l�oad Sidetrnik h�rpi•oi�enrertis
C'P.�1�: 1!}��37-.3
013300-7
SUBMIT'1'ALS
Page 7 oF 8
�
q
�
�
10
When the shop drawings have been compjeted to the satisfaction of the City, the
Contractor may carry out the construction in accordance therewith and ��o further
clianges therein except upon written instructions from the City.
Each submittal, appropriately coded, will be returned within 30 Calendar Days
following reeeipt of s�abmittal by the City.
6 L, Mock ups
7 I. Mock Up uniis as specified in inciir+idual Sections, include, but are not neeessarity
8 limited to, complete units of the standard of acceptance for that type of Work to be
9 used an the Pro�ect. Remove at the comptetion of the Wark or when directed.
1 D M. Qualifications
11 l. If specifically rec�uired in other Sections of these S.pecif cations, submit a P.E.
12 Certification for each item required.
13
1�
15
lb
17
r$
19
2Q
21
22
23
24
25
26
27
28
29
N. Request for Information (RFI)
1. Contractor Request for additional informatian
a. Clarifieation or interpretation of the contract dacuments
b. When the Cantractor believes thera is a conflict 6etween Contract Documents
c. When the Contractor helieves there is a conflict bet�vveen the Drawings and
Specifications
1) Identify the confliet and reyuest elarification
2. Use the Request for Information (RFl) form provided by the City.
3. Numbering of RFI
a. Prefix with "RFI" followed hy series i�umber, "-xxx", beginning �+ith "O 1" and
increasing sequentially with each additional transmittal.
4. Sufficiex�t information shall be attached to permit a writtan response without further
informatian.
5. The City will log each request and will review the reyuest.
a. If review of the project information eequest indicates that a change to the
Contract Documents is required, the City will issue a Field Order or C1lange
Order, as appropriat�.
3Q 1.� SIIBMITTALS [NOT USED]
3 i 1.6 ACTIQN SUBMITTALS/INFORMATIONAL SIIBMITTALS [NOT iTSED]
32 1.7 CLOSE�UT SUBNIITTALS [1vOT USED]
33 1.� MAINTENANCE MATERiAL SUBNIITTAL� iNOT U�ED]
34 1.9 QUALITY ASSURANCE [NOT IISED]
35. t.10 DELNERY, STORAGE, AND HA.NDL�NG LNOT USED]
36 1.11 FIELD [SITE] CONDITIONS [NOT USED]
37 1.12 WARRANTY [NOT IISED]
Ci'TY Oi' FORT 4VORTH I.ncklrrr�d Rocrd Sideirr�N{ IlllfJl'41'L'711C1TI.S
STANDARD CONSTRUCTIOI�! SPECIFiCATION AOCUMENTS CI'A-: l00637-3
Revised December 2Q, 2012
01 33 QO - 8
SLTBMITTALS
Page 8 of 8
1 PART 2- PRODiTCTS [NOT USED]
2 PART 3- EXECUTION [NOT USED]
3 END OF SECTION
Revision Log
DAT� NAME SUMMARY OF CHANG�
12/2d12012 D. 7ohnson 1.4.IC.8. Working Days modifiad to Calendar Days
CITY 4F FqRT WbRTH l.crcklarrd l�oncl Sidev�crlh� lfn��rovenrenls
STAAlDARD CONSTRUCTION SPECI�'ICATTOA] llOCUMEI�TS CNh:� If1(}G37-3
Revisad December 20, 2012
013513-f
SP�CIAL PROJECT PROCEDURES
Page f of 8
SECTION Oi 3� 13
7
SPECIAL PR�JECT PROCEDURES
3 PART1- GENERAL
4 Ll �UMMARY
5
6
7
8
9
10
11
12
13
14
1S
I6
17
18
19
A, Section Includes:
The procedures for special project circumstances that inctudes, but is not limited to:
a. Coordination with the Texas Deparlment of Transportation
b. Work near High Valtage Lines
c. Coniined Space Entty Program
d. Air Pallutian Watch Days
e. Use of E�tp4osives, Drop Weight, Etc.
f. Water DeparYment Notification
g. Puhlic Notification Prior to Beginning Construction
h. Coordination with United States Army Corps of Engineers
i. Caordination within Railroad permits areas
j. Dusf Contral
k. Employee Parking
B. Deviatinns from tihis City of Fort Worth Standard Specification
I. None.
20 C. Related Specificatian Sections inelude, but are not necessarily limited to:
21 1. Division D— Bidding Requirements, Contract �orms and Conditions of the Contract
22 Z. Division 1-- Generai Requit'ements
23 3. Section 33 12 25 — Connection to Exis�ing Water Mains
24 1.� PRICE AND PAYlVIENT PROCEDURE�
25
26
27
28
29
3Q
31
32
33
3�4
35
36
37
38
39
40
41
42
A. Measurement and Payrnent
1. Coordination within Railroad permit areas
a. Measuremertt
1) Measurement for this Item will be by Iump sum.
b. Payment
1) The work performed and materials furnishec� in �ccordance with this Item
wilI be paid far at the lump sum price bid for Railraad Coordination.
c. The price bid shall inciude:
1) Mo6ilization
2) Iiispection
3) Safety training
4) Additionallusurance
5) Insurance Cert�cates
6} Other requirements associated with general coordination with Railroad,
including additional e;nployees required to protect the rigl�t-of-way and
properry of the Railroad from damage arising out of andlor from the
construction of the Project.
2. Railroad FIagmen
CITY OF FORT WORTH
STAI�lDARD CON5TRUCTION SPECIF�CAT�ON DOCUNfENTS
Revised December 20, 2U12
Lcrcklaft[l l�oud .5idei�'[�!k lfrrpt•oreii�en7s
C'P:V: 1 �0<3 7-3
013513-2
SPECIAL PROJECT PRdCEDURES
Page 2 nf 8
1
2
3
4
5
6
7
8
9
IQ
11
12
13
a. Measurement
1) Measureman� for this Itetn will be p�r warking day.
b. Payme��t
1} The work perfarmed and mafierials furnished in accardance with this ltem
will be paid for eacls warking day that Railraad Flagxnen are present at the
Site.
c. The price bid shall i�iclude:
1) Coordination for scheduliiig flagmen
2) Flagmen
3) Other requirements a�sociated with Railroad
3. Al] other items
a. Work associated with tllese Items is considered subsidiary to tlie various Items
bid. No separate payment will be allowed far tliis Item.
14 1.3 REFERENCES
I S A. Reference Staudards
16 1, Reference standards cified in this Specification refer to the current reference
17 standard published at the tiine of tl�e latest revision date logged at the end of t17is
18 Specification, unless a date is specifically c�ited.
19 2. Health and Safety Cade, Title 9. SaFety, SubtitIe A. Public Safety, Chapter 752.
20 High VoItage Overl�ead Lines.
21 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction
22 Specification
23 1.4 ADIVIINISTRATIVE REQiJIIiEMENT�
24 A. Coordination rwith the Texas Department of Transportatioi�
25
26
27
28
24
30
31
32
When. work ui the right-of-way which is under the jurisdiction of the Texas
Department of Transportation (TxDOT);
a. Notify the Texas DepaMmeut of Transportation priar to commencing any work
therein in accordance with the provisions of tlie perrnit
b. All work per%rmed in the TacDOT right-of-way shall be performed in
campliance with a�id subject to approval froin the Texas D�partment of
Transportation
B. Work near High Voltage Liues
33 I . Regulatory Req�irements
34 a. All Work near High Voltage Lines (more tlian 604 volts �neasured betvveen
35 conductors or betw�en a canductor and the graund} shall be in accordaiice with
36 Health and Safety Cade, Title 9, Subtitle A, Chapter 752.
37 2. Warning sign
38 a. Provide sign of suf�cienY size meetin� alI �SHA r�quir�ments.
39 3. �quipment operating within 1 p feet of high voltage lines will require the following
40 safety features
41 a. Insulatzng eage-type of guard about the baom or arm
42 b. Iusulator liiilcs on the lift l�oak connectioi7s for back hoes ar dippers
43 c. Equipment must rne�t the safety requirements as set forth by OSHA and the
44 safety requiremeuts of the owner of the higl� voltage liues
45 �. Work within 6 feet of high voltage electric lines
C1TY DF FORT WflRTH Lacklnnd RoacTSideiralk lt�rprovernenls
STA3�DARD CONSTRUCTION SPECTPICATI4N DOCUMENTS CPh: I f10637-3
Revised becemher 20, 2D 12
o� 3s i� -a
SPECiAL PROJ6CT PROCEDiJR�5
Page 3 of S
�
2
3
4
5
6
7
8
9
10
11
iz
13
14
15
1G
17
18
19
20
21
22
23
24
2S
2G
27
28
29
30
31
32
33
34
35
36
37
38
39
�40
4l
4z
43
44
45
F.�
b
c.
Notification shall be given to:
1) The }�or�ver company (example: ONCOR)
a) Maintain an accurate log of a11 such calls to power company and record
action taken in eacn case.
Coordination with power compauy
1) After noti�cation coorduiate with the power compairy to:
a) Erect �emporary mechanical barriers, de-energize the lines, nr raise or
lower the linas
No personnel may work within 6 feet of a high voltage line before the above
requirements have been met.
C. Confined Space Entry Program
1. Provide and follaw approved Canfi�ied Space Entry Program in accordance with
OSHE# requirements.
2. Coniined Spaces include:
a. Manholes
b. All other confined spaces in aecordance with OSHA's Permit Reyuired far
Confined Spaces
D. Air Pollution Watch Days
1. Generaj
a. 06serve the fallowing guideliiles relatiug to working oii City construc�ian sites
on days designated as "AIR POLLUTION WATCH DAYS".
b. Ty�zcal Ozone Season
1) May 1 through October 3 I.
c. Critical Emission Tirne
1) 6:OQ a.m. to 10:00 a.m.
2. Watch Days
a. The Texas Commissiazs on En�ironaxaentaI Quality (TCEQ), in coordination
with the National Weather Service, will issue the Air Polluiion Watch by 3:OU
p.m. on tha aft�rnaan prior to the WATCH day.
b. Requirements
1) Begin work after 10:Q0 a.m. r�vhenever construction phasing requires the
use of motorized equipment for periods in excess of 1 i�our.
2) However, the Conkractar may begin work prior ta I0:00 a.m. if:
a) Use of motorized equipment is less than 1 hour, ar
b) If equipment is new and certif ed by EPA as "Low Emitting", or
equipment burns Ultra Low Sulfur Diesel (�[7LSD), diesel emulsions, or
alt�rnative fueis such as CNG.
E, TCEQ Air Permit
1. �btair� TCEQ Air Permit for construction activities per requirements of TCEQ.
F. Use of Explosives, Drop Weight, Etc.
l. When Contract Documents permit on the project ihe following will apply:
a. Public Notificatian
1) Submit notice to City and proof of adequate insurance coverage, 24 hours
prior to com�nencing.
2) Minimum 24 hour public notifcatian in aecordanee vvith 5ection O1 3l 13
46 G. Water Department Coordinatian
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised Decamber 20, 2D12
Lac•X•Icr+rd Road �'ide�rulk Inrprorcurerals
CYri�'; 100637-3
O1 35 13 - 4
SPECTAl, PROJ�CT PRQCEDUR�S
Page 4 of $
1 1. During tl�e construction of this project, it will be necassary to deacti�aie, for a
2 period of time, existii�g liiies. The Contractor shall be required to caordinate witl�
3 the VVater Department to determuie �l�e best times far deactivaiing and activatin�
4 those lines.
5 2. Coordinate any event fhat will require couilecting to or the operatian af an existing
6 City water line system with the City's representative.
7 a. Coordinatioii shall be in accardance with Sectian 33 12 25.
8 b. If needed, obtain a hydrant water meter from tl�►e Water Department for use
R during the life of named project.
10 c. In the event that a water valve on an existing live system be turned off and on
1 t to accocnmodate the construction af ihe project is required, coordinate this
12 activity througli the appropriate City representa�ive.
1� 1) Do not operate water line valves of a�istiiig water system.
14 a) Failure to camply will render the Contractor in violation ai Texas P�nal
IS Code Title 7, Chapter 28A3 (Criminal Mischie� aiid the Contractor
l6 will be prosecuted to tl�e full extent af tl�e law.
17 b) In addition, the Contractor will assume all liabilities and
18 responsibilities as a result of these actions.
19 H. Publia Notification Prior to Beginning Construction
20 1. Prior to beginning construction on any block in the project, on a blocic by block
2] basis, prepare and deliver a notice ar flyer of the pending construction to Yhe front
22 door of each res�dence ot busi�iess that will he impacted by construction. The jsotice
23 shall be prepared as fallows:
24 a. Post notice or flyer 7 days prior to heginning any constructian activity on each
25 block in the praject area,
2b 1) Prepare flyer on the Contractor's letierhead and inelude the following
27 infor�natian:
28 a} Name of Project
29 b} City Project No (CPN)
30 c) Seope of Project (i.e. type of construction activity)
31 d) ActuaI construction duration within the block
32 e) Name of the coniractor's foreman and plsone number
33 f� Name of tl�e City's inspector and phone number
3�t g) City's after-hours pho�se number
3S 2j A sample of the `pre-consiruction notification' flyer is attached as Exhibit
36 A.
37 3) Submit schedule showing the construction start and finish time for each
38 block ofthe praject to the inspeetar.
39 4) Deliver flyer to the City Inspecior for re�iew prior to distribution.
40 b. No canstruction will be allowed to begin an any block until the flyer is
41 deli�ered to all residents of the bloek.
42 I. Public Norificatios� of Temporary Water Ser�ice Interruption duruig Coiistruction
43 1. In the event it beeornes necessary ta temporarily shut down water service to
44 residents or businesses during construction, prepare and deli�er a noiice or flyer of
45 the pending interruption to the front daor of eacl�► affected resident.
46 2. Prepared notice as follo�vs:
47 a. The natification ar flysr shall be posted 241�ours prior to the temporary
48 interruption.
CITY OF FORT WORTH Lackla�zd Rocrc]5'rc�e�i�cdk h�rp1•oi�rnrer��s•
STAI*IDAAD CONSTRUCTIOA! SPECIFICATIpN DOCUk4ENT5 C"PA'; 101J63'7-3
Revised Decambar 20, 2012
Q13513-5
SPECTAL PROl�CT PROCEi7tIl2E5
Page 5 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
I8
19
za
21
22
23
24
2S
26
27
28
29
30
�r
32
33
34
35
36
37
38
39
40
41
42
43
44
b. Prepar� flyer on the contractor's letterhead and include the following
information:
i) Narrje of the project
2) CiTy Praj�ct Nurn6er
3} Date of the interruption of service
4) Period the intarruption will take place
S) Name of the contractar's foreman and phone number
6) Name of the City's inspector and phone number
c. A sample of the temporary water service interruption notificatinn is attached as
Exhibit B.
d. Deliver a copy of the temporary interru�tion notificatian to the City inspector
for review prior to being distributed.
e. No interruption of water service cau occur until the flyer i�as been delivered to
alI affected residents and businesses.
f. �lectronic versions afthe sampla flyers can be obtained from the Project
Constructian Inspector.
J. Coordination with United 5tates Army Corps of Engine�rs (USACE)
At lncations in the Project wl�ere consfiructiou ac#ivities occur in areas where
USACE permits are required, meet all requirements set forth in eaeh designated
permit.
K. Coordination within Railraad Permit Areas
1
2.
3
Af Iocations in the project where constx-ucfion activities occur in areas where
a•ailroad permits are required, tneet all requiresnents set forth in eacli desiguated
railroad permit. This includes, but is not limited to, provisions for:
a. Flagmen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certif cates
f. Other ecnployees required to protact the right-af-way ai�d praperty of �he
Railroad Company from damage arising out of andlor fro�n tlie constr�ctioli of
the project. Proper utiIity clearance procedures shall be usec� in accordance
with the permit gu.ideli»es.
abtain any supplemental information needed to compl�+ with the railraad's
requirements.
Railroad Flagmen
a. Submit receipts to City for verification of working days �hat railroad flagmen
were present an Site.
L. Dust Control
]. Use acceptable measures to contral dust at tl�e Site.
a. If water is used to eontroI dust, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
M. Employee Parking
l. Provide parking for employees at locations appraved by the City.
CITY OF FORT 15rORTH
STANTIARb CQNSTRUCTION SPGCIFICATION DOCUMENTS
Revised Deeember 20, 2D12
Lacklarrrl Raad ,5rdeiralk Improneme�vs
C!'A�: 100C37-3
013513-6
SPECIAL PIZOJECT f'IZOC�I]U1�5
Page 6 af S
1 1.� SUBMITTALS [NQT USED]
2 LG ACTIQN SUBMITTALS/INFORMATIONAL SU$MITTALS [NOT U�ED]
3 1.9 CL05EOUT SIIBM�TTALS [NOT USED]
4 1.8 MAINTENANCE MATERIAL SiTBMITTALS [NOT USED]
5 1.9 QUALITY ASSURANCE [N�T USED]
b 1.1Q DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 1.1I FIELD [SITE] CONDTT'TONS [NOT USED]
8 1.1� WARRANTY [NOT U5ED7
9 PART 2- PRODUCTS [NOT USED]
i a PART 3- EXECUTION [NOT USED]
11
12
END OF SECTION
Revisi�n Lng
DATE NAME SUMMARY OF CHANGE
1.4.D — Added requirement af comp[iance with Health and 5afet}+ Code, Title 9,
8/31/2fl12 D. ]oh�iso�z 5afety, Subtitle A. Public Safaty, Chapter 752. High Voltage Overhead Lines.
1.4.E — Added Contractor resporssibility for obtaining a TCEQ Air P�rmit
13
CIT�' OF FORT WORTH Laekfru�d Rocrr! S'�cle�rrrlk l�t�prat�eitre��l.t�
STANDARD CON�TRUCTION 5PECiF1CATION DOCUMEHTS C'1'.�': !f)(]C37-3
Revised becemUer 20, 2D l2
01 35 13 - 7
SPECIAL PR03ECT PR4CEBURCS
Page7of8
2
3
4
5
6
7
s
9
to
11
�2
13
14
i5
16
��
18
�[ 9
20
2l
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
EXHIBIT A
(To be printed on Contractar's Lett�rhead)
Date:
CPN Na.: 100637
Project Name:
Mapsco Location:
Limits of Construction:
' 'I
- - �- - - - -
' � 1
�
I
i � � i I �
�ra�s is �o r����w� v�u ��+�Y u���� �► eor���c� rn�i�� ��� c��v �� �o�T
1f�ORTF;, OUR COf�V�QeiVY 1N{�� 1�18RFZ OA6 llil�l7'Y �1P3�S �R� �R AROI�idD Y�UR
�R���RTY.
C�[�S�RUCiI�IV 16�1�� ��GIR� APP�OXI{RflAi�LY S�V�h! DAYS �ROIVY 7Fi� �E��'�
OF iblS i�OilCl�,
I� Y�U bAV� QtJ�SiIO�'S A�OUi ACGESS, SECURI�Y, SA�'��Y OR AIVY �}iF1�R
I�SU�, PLE�SE C�LL:
IVYF. <CONTRACTOR'S SUPERINTENDENT> A� <TEL�PHON� NO.�
��
{�Ir. CCITY 1NSpEC70R� AT � TELEPHONE NO.�
A� f�R �:30 ��9 4R OiV lfi���F��f���, PL�AS� CdLL {��7) 39� �306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITY OF FORT W QRTH
5i'ANI]ARI7 CONSTRUCTIDN SPECIF'1CAT10N DOCUMENTS
Revised December20, 2012
Lnc�land Rond Srdeirc�lk Inr��•ore�frnnls
['P;V; !�(�G37-3
013513-8
SPECIAL PROJ�CT PROCEDUR�S
Pa�e 8 af 8
1
7
I �/.�:11:� Y 1�:�
�O�'T �V�RTI�
�:
- ,,,.,,,
�TO'�°I�� O� `��M����� W1�1��� SE�`/Il��
���E�������
DUE TO UTII.ITX IM�RO'VEMENTS IN YOUIi NEI�I�BORHQQD, YULIR
WA,'E'ER SERVICE WII.L BE IIVTERRUPI'�D ON
BETWEEN T�E HOURS OF p.Nri
IF YQU HAVE QUESTIONS ABOU'1' THi6 SHL7T-OUT, PLEA,SE CALI.:
IV1R. AT
(CONTRA�TORS 5UPERII�TENDEN'� ('1'�+LEPIiOIUE NUMBERj
�7
M1t,
(CI'i"Y I{�iSPECTQR)
AT
(TELEY�tONE NUMBER)
TiEiS Ii�iCQNVENiE1VC� WILI. r3E AS S�IORT AS PQSSIRLE.
THAIV?� XUU,
3
4
ci�Y or roxT wo��rx
STANI]ARD CONSTRIICTI�N SPECjFICATIOI� i�OCUMENTS
Revised Decemher 20, 2O12
rKi ]►` i I l� ,7�[�i C�J� 3
1.ackla�zcl Roacl Sicletr[r!k Irripr•os�en7enls
CPrI'; It10(37-3
o i as z3 - i
TESTTI+IG AND INSPECTION SERVICES
Page 1 of 2
1
2
3 PARTI- GENERAL
SECTION Ol 4S 23
TESTING AND INSPECTION SERVICES
4 1.1 SiTMMARY
5 A. Section Includes:
6 l. Testing and inspection ser�ices procedures and coardination
7 B. Deviatians from this City of Fort Worth Standard Speci�ieation
8 1, None.
9
l0
11
12 1.�
13
14
]5
16
17
1$
19
20
21
22
23
24
C_ Related Specification Se¢tsons include, but are not necessarily limited to:
1. Division p— Bidding Requirements, Contract F'ornts and Conditions aithe Contract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURES
A. Mea�ureinent and Payment
1. Work associated with Yhis Item is considered subsidiary to the various Items bid.
No separate payment will be ajlowed for this Item.
a. Contractor is respansible for performing, caordinating, and payment af all
QuaIity Control testing.
b. City is responsible for perfonning and payment for first set of Quality
Assurance testing.
1) If the first Quality Assurance test performed by the City fails, the
Contractor is responsibi� far payment gf subsequen.t Quality Assurance
testing unti3 a passing test occurs.
a} Final acceptance will not he issued hy CiLy until all required payrnents
for tesfing by Contrac#or liave been paid in full.
25 1.3 REFERENCES [NOT USED]
26 1.4 ADMINTSTRATIVE REQiTIREMENTS
27
zs
29
30
31
32
33
34
35
36
37
38
A. Testing
I. Completa testing in accordance with the Contract Documents.
2. Goordinatian
a. When testing is required to he performed hy tha City, natify City, sufficiently
in advance, when testing is needed.
b. When testing is required #o be completed by the Contractor, notify City,
sufficiently in advance, that testing wi11 be performe�.
3. Distributian o.f Testing Reports
a. Eleetronic Distrihution
1) Confirm development of Project director}� far elactronic subrr�ittals to be
uploaded ta City's document management system, or another externai �TP
site approved by the City.
CITY OF FORT WORTH Lrrcklnird Rnat�Siclen•olklurprrn�euten�s
STANDARI7 CQNSTRUCTION SPECiFICATION DUCUMENTS CPAf: 10(1Cr3J-3
Revised March 9, 2020
014523-2
TES1'ING AI�D INSP�CTIDN SERVICES
Page 2 of 2
1
2
3
4
5
6
7
8
9
IO
11
12
13
]4
2) Upload test reports to designated project ciirectory and notify appropriate
City representatives via ernail of submittal postiiig.
3) Hard Copies
a) 1 copy for all subini�tals submiffied to the Project Representafiive
b. Hard Copy Distribution (if requixed in lieu af electrouic distribution)
1) Tests performed by City
a) Distributie 1 hard copy io the Contractor
2) Tests performed by the CQ�ztractor
a) Distribute 3 hard copi�� to City's Project Repres�nta#ive
4. Pra�ide City's Project Representative with trip tickets for each delivered load af
Concrete or Lime material including the following information:
a. Name of pit
b. Date of delivery
c. Material delivered
1S B. Inspection
16 1. Inspec#ian or �ack of inspection does tiot relieve the Contractor from ohligation to
17 perform work in accordance with the Contract Documents.
18 1.5 SiTBNIITTALS [NOT i7SED]
19 1.( ACTION SUBMITTALS/INFORMATIONAL SIISMITTALS [NOT USED]
20 1.7 CLOSEOUT SiTBMITTALS [NOT USED]
21 1.8 MAINTENANCE MATERIAL SiIBMITTALS [NOT USED]
22 1.9 QiTALITY ASSURANCE [NOT i]'S�D]
23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT US�D]
24
25
26
27
28
29
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
P�1RT 2 - FRODiTCTS [NQT USED]
PART 3 - EXECIITTON [NOT VSED]
END OF SECTION
Revision Log
DATE NAME SUMMARY O�' CHANGE
3/912020 D.V. Magana Removed reference to Buzzsaw and noted thak electronic su6mittals be uplQaded
through the Ci#y's dacument management system.
30
C1TY OP' PaRT WaRTH
STANDARp CQrlSTRUCTION SPECIFICATION IaOC[JMENTS
12evised March 9, 2020
Lucklartd Rr�acl �ide�i'c1!!� I11P17f'OVe717011�5'
CP,�V: ]OOG37-3
oi sooa-i
TEMPORARY I'ACILITI�S AND CpNTROLS
Page 1 of 4
2
SECTION 01 �0 00
TEMPORARY F`ACILITIES AND CONTR�LS
3 PART 1- GENERA►i,
4 11 SUMMARY
5
6
7
S
9
10
11
12
13
14
A. Sectian Ineludes:
Pro�ide �emporary facilities and controls needed for the Work including, but not
necessarily limited to:
a. Temporary utilities
b, SanitaryF facilities
c. Stnrage Sh�ds and Buildings
d. Dust control
e. Temporary fenciug afthe construction site
B. Deviations fram this City of Fort Worth Standard Specifieation
1. None.
15 C. Related Specification Sections include, but are not necessarily limi�ed to:
16 1. Divisia» 0— Bidding Reyuirements, Contract Forms and Conditions of the Contract
17 2. Division 1— General Requirements
18 1.2 PRICE AND PAYMENT PROCEDURES
i 9 A. Measurement and Pay�nent
20 l. Work associated with this Item is considered subsidiary to tlie various Items bid.
21 Na separate payrnent will be allowed for this Item.
22 1.3 REFERENCES [NOT USED]
23 1.4 ADMINISTRATIVE REQUIREMENTS
24
25
26
2'1
28
24
30
31
32
33
34
35
3b
37
38
34
40
A. Temporary Utilities
] . Qbtaining Temporary Service
a. Make arrangements with utility service companies for teanparary services.
b. Abide by rules and regulations af utility service companies or authorities
having jutisdic�ion,
c. Be responsible for utility service costs until Work is approved for Final
Acceptance.
1) Included are fuel, power, light, h�at and otlaer utility services necessary for
execution, complction,. testing and initial operatian of Work.
2. Water
a. Contractor to pro�ide water required for and in connectian wi�l� Work to be
performed and for specified tests ofpiping, equipment, devices or other use as
required for tlie completion of the Work.
b. Pro�ide and maintain adequate supply of patable water far damestic
consumption by Coa�tractar personnel and City's Project Representatives.
c. Coordination
1) Contact Ci .ty l week before water iar construction is dasired
C1TY OF FORT WORTH
STRNDARD CONSTRUCTION SPECIPICATION DCICUMETVTS
Revisad July 1, 2011
Lackluiad lzorul Sidc�rulk Inrpraveure»1s
C'PA': 1710G37-3
01 50 DO - 2
TEMPORARY FACILITIES AND C�NTROLS
Page 2 of 4
1
2
3
4
5
6
7
8
9
10 4.
11
12
13 5.
14
15
]6
1'1
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
3$
39
4Q
41
d. Contractor Paym��rt for Construction Water
1) Obtain construction water meter frarri City for payment as billed by City's
estab�ished rates.
3. Electricity and Lighting
a. Provide arrd p�y for electric pawered service as required for Work, including
testing of Work.
1} Provide power far lighting, operation of equipment, or other use.
b. Electric power serwice includes temporary power service or generator to
maintain aperations ciuring scheduled sl�utdown.
Telep.hone
a. Pravide emergency telephone service at Site for use by Contractor person�el
and athers performing work or furnishing servicas at Site.
Temporary Heat and Ventilation
a. Pro�ide temporary l�eat as necessary %r protection or completion of Work.
b. Provide te�nparary heat and ventilation ta assure safe working conditions.
B. Sanitary Facilities
1. Pravide and maintain sanitary facilities for persons on 5ite.
a. Coinply �ith regulations of State aiid local departments af health.
2. Enforce use of sanitary facilities by construction personneI at job site,
a. Enclose and anchor sanitary facilities.
b. No diseharge will be allowved from these facilities.
c. Collect and store sewage and waste so as nat to cause nuisance or health
problem.
d. Haul sewage an.d vwaste off-site at no less than weekly intervals and proper3y
dispose in accordance with applicable regulatioil.
3. Locate faciliti�s near Work Site and keep clean and maintained throughout Project.
4. Remove facilities at cotx►p�etian af Project
C. Storage Sheds and Buildings
1. Provide adequately ventilated, wa#ertight, weatherproof storage facilities witl� flaor
above graund level far materials and equipment suseeptible to weather damage..
2. Storage of inaterials not susceptible to weather damage may be oii blocks off
gro.und.
3. Store materials in a neat and orderly manner.
a. Place materials and equipment to permit easy access for identificatio��,
inspection and in�entory.
�. Eguip bui�ding wi�h lockable doors and lighting, and pro�ide electrical service for
equipment space heaters aud heatiug or veutilation as necessary to provide storage
environments acceptahle ta speci�ed inanufacturers.
5. Fill and gtade site for temporary st�•uctures ta provide dxainage away from
ternporary and existing buildings.
5, Remove building from site priar to Final Accepta�tce.
42 D. Ternporary Fenciiig
�}3 1. Pro�ic�e and maintain for the duration or construction vvhen requirad in contract
44 docuin�nts
45 E. Dust Contro]
CITY OP FOR`1' WQRTH
STANDARD CONSTRUCT3QN SPECfFICF1TION DOCUMENTS
Revised July I, 2011
Lcrck�aricll�oacf S'ide�ralk Irn��r•oue�rrerrls
C!'n': 1 nbG31-3
1
2
3
4
5
6
7
8
9
IO
ll
12
13
I4
15
Di SOU�-3
TEMPORARY FACILITICS .41�1D CONTROLS
Page3 af4
1. Contractor is responsible for maintaining dust contro� through the duration of the
project.
a. Contractar remains on-call at all times
b. Must respvnd jn a timely niauner
F. Temparary Protection of Construction
1. Coratractor or subcontraetors are responsible for protecting Work irom damage due
to weather.
1.� SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT iTSED]
1.7 CLOSEOUT SIIBMITTALS [NOT IISED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDiTYONS [NOT USED]
11� WARRANTY jNOT USED]
16 PART � - PRODUCTS [NOT USED]
17 PART 3- EXECUTION [NOT USED]
18
19
20
2]
31 INSTALLERS [NOT USED]
3.2 EXAMINATiON [NOT II5ED]
3.3 PREPARAT�ON [NOT USED]
3.4 INSTALLATION
22 A. Temporary Facilities
23 1. Maintain aIl temparary facilities for duration of constructioii activities as needed.
24 3.5 [REPAIR] 1 jRESTORATION]
25 3.6 RE-INSTALLATION
26 3.i FIELD [ox] SITE QUALTI'I' CONT`ROL [NOT U�ED]
27 3.8 SYSTEM STARTUP [NOT USED]
28 3.9 ADJUSTING jNOT USED]
29 3.10 CLEANiNG [NOT USED]
30 3.11 CLOSEOUT ACTIVIT��S
31 A. Temporary Facilities
CI�Y OF �'ORT WOR'CEj
STANDARD CO3dSTRiICTIQN SPECIFICAT[ON DOCUMENTS
Revised lufy l, 20i 1
Lt�cklcrrzr� linutl S'ideu�[lIk lntp�•m�c�i�e7�ls
CPi\': !00(37-3
ai soon-4
THMPORl�RY FACILITI�S AIVD CQN`I'I20L5
Page 4 of 4
1 1. Remove all temparary facilities and restore area after completian of the Work, to a
2 condition equa[ to o.r better than priar to star� of Work.
3 312 PR�TECTION [NOT USED]
4 3.13 MAINTENANCE [NOT iTSED]
S 3.14 ATTACIiMENTS [NOT USED]
6 END �F SECTION
7
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT W�RTH LUcklr�nr! Road Sideircrlk Ina�»'oue�rre�als
5'I'ANbARD CpNSTRUCTION SPECIFICATIOI*! DOCUMENTS CPN: I�OG37-.3
Revised July 1, zar i
01 55 26 - L
STREET USE PERMIT AI�I�]N[OI3IFTCAT{ONS T07'RAFFIC CONTROL
Page 1 of 3
1
2
SECTION 01 55 �6
STREET USE PERMIT AND MODIFICt�.TIONS TO TRAFFIC CONTROL
3 PART 1 - GENFRAT.
4 1.1 SiIMMARY
5 A. Sec#ion Inclucies:
6 1. Administrative proeedures for:
7 a. Street Use Fermit
8 b. Modificatian of approved traffic eontrol
9 c, Removal of Sfireet Signs
I0 B. Deviations fr�m ihis City of Fort Worth Standard Specificatian
11 1, None.
12 C. Related Specifiaatian Sections include, but are not necessarily limited to:
13 1. Division 0—Bidding Requuem�nts, Contract Forms and Conditions af the Contract
14 2. Divisian 1—General Requirements
15 3. Section 34 71 13 — Traffic Control
16 l.2 PRiCE AND PAY�I�NT PROCEDLIRES
I7 A. Measurement and Payment
18 l. Wark assaciated with thi� ltem is considered subsidiary ta the various Items bid.
I9 No separa#e payment will be allowed for this Item.
20 1.3 R�:E+ +LL" tL+"NC FS
2l A.Reference Standards
22 1. Reference standards cited in this specification refer to the currentreference standard
23 published at the time oithe latest revision date �agged at the end ofthis
2� specification, unless a date is specifically cited.
25 2. Texas Manual on Uniform Traffic Control Devices (TMLJ'TCD).
26 1.4 ADNIIIVISTRATIVE REQi1IRIIVIFNTS
27
28
29
3Q
31
32
33
34
3S
36
A. Traffic Control
L General
a. Contractor shallminimize lane closures and impact to vehicularlpedestrian
traffic.
b. When traffic contro� plans are included 'uy the Drawings, provide Traffic
Cantral in accardance wi�h Dravuings and Section 34 71 l3.
c. Vdhen traifc control platts are not included in the Drawings, prepare traffic
control plans irt accordance with Section 34 71 13 and submit to City for
reviet�v.
1) Allow r�ninimum IO working days for re�iew af proposad Traffic Contro�.
CITY OF F�RT WORTH
ST�INDARD CONSTRLICTIOI�I SPECIF'ICATION DOCUM�NTS
Revised M�ch 22, 2021
Lackla��d Raad Sidewalk Improvements
CPN: I OD637-3
O1 552G -2
STREET IIS E P�RMlT' AI�D MQbTFtCATIbN5 TO TRAFFIC CONT RQL
P age z oT 3
1 2) A traffic control "Typical" published by City of �'ort Worth, the Texas
2 Ma�ual Unif"ied Traffic Control Devices (TMUTCD} or Texas Depariment
3 of Transportatian (TxDO'� can be used as an aIternati�e to preparing
4 praject/site specific traffic contral plan ifthe typical is ap�licable to the
S spec�ic pro�ec�/site.
B. Street Use Perinit
10
11
12
13
14
15
16
17
18
19
aa
Prior to installatian df Traffic Control, a City Street Use Fermit is required.
a. To obtain Street Us� Permit, submi� Traffic Control Plans to City
Transpartation and Public Works De�artment.
1) Allow a mitlimum of S working days for permrt re�iew.
2) It is the Contractor's responsibility to coordinate review af Traffic Contral
plans for Street Use Permit, such that construction is not delayed.
C. Modif'ieatian ta Appraved Taraffic Control
1. Priar to ins#allation traffic control:
a. Submit revised traffic control plans to City Department Transportation and
Public Worics Department.
1) Revise Traffic Controlplaris in accordance with Sect�on 34 71 13.
2) Allot�+ minimum S working days for re�iew of re�ised Traffic Control,
3} It is the Contractor's responsi6ility to coortlinate review of Traffic ControI
plans for Street Use Permit, such that construction is not delayed.
21 D. Removal af Street Sign
22 1. I� it is determined that a street sign must be remov�d for construction, then contact
23 City Transportation and Public Works Department, Sig�s and Markir►gs Division to
24 r�mnve the sign.
25 E. Temporary Signage
26 1. In the case of regulatory signs, replace permanent s ign with temporary sign meeting
27 reyuirements of the Eates# edition af the Texas Manual on Uniform Traific Cantrol
28 Devices (MUTCD).
29 2. Install temporary sign before the removal of pernnanent sign.
30 3. When constructian is camplete, to the extent that the permanent s ign can be
31 reinstalled, contact the City Transportation and Public Warks Department, Signs
32 and Markings Divi�ion, to reinstall the permanent sign.
33
34
35
F. Traffic Cantrol Standards
1. Traffic Control Standards can be fnu�d on the Cit�'s website.
1.5 SUBNIITTALS [NOT USID]
36 A, Submit all requ�red dacumentation to City's Praject Representative.
C]TY OF FORT WORTF3
STANDARD CONSTRUGTION S!'EC7F1CATiON DOCIJM�NTS
Revised Mazcl� 22, 2021
Laekland Road 5idewalk ]mprovemenls
CPN: 100637-3
01 ss zb -�
5T REET US E PEAIvI]T AND MODIFICAT IONS T O T RAFFIC C�NT ROL
Page 3 of 3
1 1.6 ACT'ION SUENIITTALSIINFORMATIONAL SUBMITTALS jNOT USID]
2 l.i CLOSEOUT SUBMITTALS �NOT iTSID]
3 1.8 MAINTEI�TANCE MATERIAL SUSNIITTALS [NOTUSID]
4 1.9 QUALITY ASSURANCE [NOT iTSID]
5 1.10 DELIVERY, STORAGE, AND IIANDLING [NOT USID]
G 1.11 FIELD jSITE] CONDITIONS [NOT USIDj
7 1.1� WARRANTY [NOT USID]
8 PART 2- PRODUCTS [NOT USF.D]
9 PART 3- EXECUTION [NOT USID]
10
li
II�iD OF �ECTION
Revision Log
DATE NAM� SZ.JMMARYOF CHANGE
l.4 A. Added language to emphasize minimizing of lane closures and impact to
tr�fFic,
3/22/2021 M Qr�n �•4 A. i, c. Added �anguage to allow for use ofpub�ished traffc contral "Typicals" i
applicahle to speci�c proj�ct/site.
1.4 F. 1) Removcdreference ko Buzzsaw
1.5 Added Ianguage re: submittal of permit
12
CITY OF FORT I�VORTH Lacklandltoad5idewalklmprovemenis
STANDARD CONSTRUCI'fON SPECIC'ICATION DOCU[vIENT5 CPN: 100637-3
Revised March 22, 2021
015713-1
S`1'pRM WA'1'ER POLLUTION PREVENTIOi�
Page ] af3
1
2
SECTION Ql 5713
STORM WAT'ER POLLUTION PREVENTION
3 PART 1- GENERAi,
4 l.l. SUMMARY
5
6
7
8
A. Sectian Includes:
1. Frocedures for Stvrm Water PaIlu#ion Preventioii Plans
B. Deviations from this City of Fort Worth Standard S�eeiiication
1. None.
9 C. Related 5pecification Sections include, but are nat necessariiy limited to:
10 1. Division 0— Bidding Requirements, Cantract Forms and Conditions of the
11 Contract
12 2. Division 1— General Rey�irements
13 3. Section 31 25 00 — Erosion and 5ediinent Control
14 1.� PRTCE AND PAYMENT PROCEDURES
15
16
17
18
14
20
A. Measurement and Payment
1. ConStruction Activities resulting in Iess than 1 acre of disturbance
a. Work associated with this Item is co.nsider�d subsidiary ta the variaus Items
bid. No separate payment will be allowed for this Item.
2. Construction Acti�ities resulting in greater than 1 acre o€disturbance
a. Measurement and Payment shall be in accordance with Sectian � 1 25 00.
2l 1,3 REFERENCES
22 A_ Abbreviatioiis and Acronyms
23 S. Notice oflntent: NOI
24 2. Notice of Termination: NOT
25 3. Storm Water Pollution Prever�tion Plan: SWPPP
26 4. Texas Cammission on Environmental Quajity: TCEQ
27 5. Notice of Change: NOC
28 A. Aeference Standards
24 I. Reference standards cited in this Speaificatioi� refer to the current reference
3D standard published at the time of the latest rev'►sion date logged a# th� end of this
31 Specification, uniess a date is specifically cited.
32 2. Integrated Storm Management (iSWM) Technical Manual for Construction
33 Controls
34 1.4 ADMINISTRATIVE REQUIREMENTS
35 A. Geneeal
36 1. Contractor is respon�ible for resolution and payment of any fines issued associated
37 with compliance to Starrnwater PoIlution Preventian P1an.
CITY DF FORT VVORTH L�rcA•lcrrrd 12oerd Srcfeircrlk Inrproverrie�rls
STAI�4�ARD COI�ISTRUCTIOI� SPECIFICATION bOCUMENT3 CPr1�': lAl}G37-3
Revised July 1, 2U1 I
01 57 13 - 2
S'fORM WATER POLLUT]ON PREVENTIOM
Paga 2 of 3
B. Constructian Activities resulting in;
2
3
4
5
6
7
8
9
i0
11
ra
l3
14
15
16
17
18
19
20
21
22
23
24
25
2b
27
28
29
30
31
32
33
34
35
36
37
38
39
2.
3.
40 1.5 SiTBMITTALS
41
42
43
44
45
46
47
A. SWPPP
1. Less than 1 acre of disturbance
a. Provide erosion and sediment control in accordance wi#h Section 31 25 OQ and
Drawings.
1 to less tl�az� 5 acres of disturbance
a. Texas 1'ollutant Discharge Elimination System (TPDES) General Constz•uction
Permit is r�quired
b. Cornplete �WPPP in accordaisce with TCEQ requirements
1) TCEQ Small Construction Sifie Notice Required under general permit
TXR150400
a) Sign and post at job site
b) Prior ta Preconstruction Meeting, s�nd 1 capy to City Department of
Transportation and Publie Works, Environmental Division, (817) 392-
6088.
2) Provide erosion and sediine�st contral ii1 accardance with:
a) Seetion 31 25 �0
b) The Drawings
c) TXR150Q00 General Permit
d) SWFPP
e) TCEQ requirements
5 acres or more of Disturbance
a. Texas Pallutant Discharge Elimination System (TPDES) General Co�istruction
Permit is required
b. Complete SVIrPPP in accordance with TCEQ requirements
1) Prepare a TCEQ N�I form and submit ta TCEQ alnng with required fee
a) Sign and post at job site
b} Send copy to City Department of Transportation and Public Works,
Environmental Divisioez, (817) 392-G088.
2) TCEQ Notice of Chan�e required ifmaking clianges or updates to NO�
3) Provide erosion ai�d sediment control in accordance with:
a) Section 3] 25 DO
b) The Drawuigs
c) TXR15400D General Permit
d) SWPPP
e} TCEQ requirements
�4) Once the praject has been completed a��d all the closeout requirements af
TCEQ have beeii met a TC�Q Notice of Termination can be submitted.
a} Send copy to City Department of Transp.nrtati�n a�id Public Works,
�nvironmental Division, (817) 392-6488.
1. Submit in accardance with Section O1 33 0�, except as stated herein.
a. Prior to the Preconstructioil Meeting, submit a draft copy of SWPPP to the City
as %llows:
1) 1 copy to th� City Project Manager
a) City Project Manager wiIl foY�ward to the City Depafinent af
Transportatioii and Public Works, Environmentat Division for review
CI'TY Ol� PQR'�' WqRTH
STANDARi� CONSTRUCTION SPECIFICATION b.00UMENTS
Revised 7uly 1, 201 f
Lcr�klcrrlcl Road 9rcle3rallr Irei�>rovenr�nls
C'!',�'; 10�G37-3
01 57 13 - 3
STORM WATER POLLUTION PREVETITION
Page 3 oF3
1 B. Modified SWYPP
2 1. If the SWPPP is revisad during construction, resuhinit modified SWPPP to tha City
3 in aecordance with Seetion O1 33 Q0.
4 1.6 ACTION SUBMITTALS/INFORMATIONAL SiJBMITTALS [NOT USED]
5 1.7 CLOSEOUT SUBMITTALS [NOT USED]
6 1.8 MAINTENANCE MATER�AL SUBMITTALS [N4T iTSED]
7 1.9 QUALITY AS5[JRANCE [NOT US�D]
s I.la DELIVERY, STORAGE, AND HANDLING [NOT LTSED]
9 k.l l FIELD [STTE] CONDITIONS [N�T USED]
la 1.12 WARRANTY [NOTUSED]
11 PART 2- PRODUCTS [NOT USED]
12 PART 3- EXECIITTON [NOT USED]
13
l4
END OF SECTIOIrT
Revision Log
DATE N�ME SUMM�RY OF CHANGE
15
C1TY OF FORT WORTrI 1_rrckleir7cl lioud Srdeircalk lntprrn�ctiterzls
STANDARD CONSTRUCTIp3d SP�CIFICATION oqCUMENTS c'PA': IOOG37-3
Revised Iuly I, 2Dl 1
01 5� 13 - 1
TEMPORARY PROJECT SIGNAGE
Page 1 af3
1
2
SECTION 01 5813
TEMP�RARY PROJECT SIGNAGE
3 PART1- GENERAL
4 1.1 Si7MMARY
5 A. Sec#ion Includes:
6 1. Tem�orary Project Signaga Rec�uirements
7 B. Deviations from this City of Fort Worth Standard S.pecificatia��
S 1. Nane.
9 C.. Related Speci�cation Sections include, but are not nece�sarily limited to:
10 1. Division D— Bidding Requiraments, Contract Forms and Conditions of the Contract
11 2. Divisian 1— General Requirements
12 1.2 PRICE AND PAYII�NT PROCEDURES
13 A. Measurement a�id Payment
14 1, Wark associated with this Item is consiciered subsidiary to the various Items bid.
15 No s�parata payment wili be allowed for this Item.
16 1.3 REFERENCES [N�T U�ED]
17 1.4 ADNIINISTRATNE REQUIItEMENTS [NOT USEll]
18 L� SUBNIITTALS [NOT i�SED]
19 1.6 ACTION 5UBMITTALSIiNFORMATIONAL SUBMiTTALS {NOT USED�
20
21
1.7 CLOSEOIIT SUBMITTALS [NOT USED]
1,� MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
22 1.9 QUALTI`Y ASSURANCE [NOT USED]
23 1.10 DELIVERY, �TORAGE, AND �IANDLING [NOT USED]
24 1.11 FIELD [SITE] CONDITIONS [NOT USED]
25 L1� WARiL4NTY [NOT USED]
26 PART 2 - PRODUCTS
27
28
29
36
31
2.1 OWN.GR-I+'iJRNISHED [on] OWNER-SiTPPLIEDPRODi]CTS [NOT USED]
�.Z EQUIPMENT, PRODIICT TYPES, AND MATERIALS
A. Design Critaria
1. Provicie free standing Projec# Designation Sign in accordance with City's Standard
Details for project signs.
CiTY QF FORT WORTH
STANDARD CONSTRUCTION SPECIFIGATION DOCUMENTS
Revised July 1, 201 i
l,crcklurrd Rnrr�l3ideirulk I�irprt�vc:��renls
C'PA�: I00(37-3
D15813-2
T�MPDRARY AROJECT SIGNAGE
Page 2 of 3
1 B. Materials
2 I. Sign
3 a. Coi�structed of 3/a-inch fir glywood, grade A-C {exterior} or better
4 2.� ACCESSORIES [NOT USED]
S 2.4 �OURCE QLIALITY CONTROL [NOT USED]
b PART 3 - EXECUTION
7 3.1 INSTALLER5 [NOT USED]
8 3.� EXAMINATION [NOT USED]
9 3.3 PREPARATION [NOT USED]
1 fl 3.4 INSTALLATTON
11 A. General
12 1. Provide vertical installation at extents of project.
13 2. Relocate si�n as neecied, upon request ofthe City.
14 B. Mounting optians
15 a. Skids
16 b. Posts
17 c. Barricade
1 S 3.� REPAIR 1 RESTORATION [NOT USED]
19 3.6 RE-INSTALLATTON [NOT USED]
20 3.7 FIELD [oR] SITE QUALTTY CONTROL [NOT USED]
21 3.8 SYSTEM STARTUP [NOT USED]
22 3.9 ADJUSTTNG [NOT USED]
23 3.10 CLEANING [NOT USEDJ
24 3.11 CLOSEOUT ACTIVITIES [NOT USED]
25 3.1� PROTECTION [NOT TISED]
26 3.13 MAINTENANCE
27 A. General
28 1. Maintenance will include paitrtivg and repairs as needed or directed by the City.
29 3.1� ATTACHNIENTS [NOT USED]
30
31
END �F SECTION
C1TY OF FORT WORTH ! acklcrrzcJ Roacl Srdeu�al& hrr��roroenxnls
STANDARD CQNSTR4ICT]ON SFECIFICATION DOC[JMENTS CPrV: 1 f}fJG3i-.3
Revised 7uly 1, 2011
415813-3
TEMPQRARY PROJECT SIGNAGE
Page 3 of 3
Re�isian Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Lrrcklrrnd Rnud S7rle7relk li��pr-rz��eriic rr1s�
�TAIV�ARD CDNSTRUCTION SPECIFICATION I]OCUMENTS C'PA': 1170f37-3
Revised July 1, 2011
oi�000-i
F'RObUCT 1ZL'•QUIREMENTS
Page 1 af 2
9
3 PART1- GENERAL
4 L1 SUMMARY
5
6
7
8
SECTION Q1 60 00
PRODUCT REQLJIREMENTS
A. Sectian Includes:
1. Refereiices for Product Requirements and City Standarci Product� List
B. Dev�ations from this City of Fort Wortli Standard Spec.ifcatian
1. None.
9 C. ReIated Specification Sections include, but are not necessarily limited to:
10 1. Divjsion 0— Bidding Requirements, Con#ract Forms and Conditions of the Contract
11 2. Divisioii 1— Genaral Requirements
12 1.2 PRICE AND PAYMENT PROCEDLTRES [NOT USED]
13 1..3 REFERk:NCE� [NUT USED]
14 1.4 ADMINISTRATIVE REQUIItEMENTS
15 A. A Iist of City approved p.raducts far use is availabie tl�rough fhe City's website at:
16 https_Il�ps.fortwo�-thtexas.gov/Pi•ojectResour•cesl and following the director path;
17 02 - Construction DocumentslStandard Products List
18 B. Only products specifically included an City's Standard Produ.ct List in these Contract
19 Documents shall be allawed for use on the Project.
20 1. Any suhseguently approved products will only be allowed for use upon specific
21 appra�al by the City.
22 C. Any specific product requirem�nts in the Contract Documents supersede similar
23 produefs incIuded on the City's �#andard Product List.
24 1. T1ie City reserves the right to not allow products to be used for ceriain projects even
25 though the product is listed on th� City's Standard Product I,ist.
26 D. Although a specific product is incIuded on City's Standard Product List, not all
27 products frorn that manufaeturer are approved far use, including but not limited to, that
28 ma.nufacturer's standard product.
29 E. See Section Q 1 33 UO for submi�ta] requirements of Product Data included nn City's
30 Standard Product List.
31 1.� SUBNIITTALS [NOT USED)
32 1.6 ACTION SUBMITTALS/INFORMATIONAL Si1BMITT�I.S [NOT USED�
33 I.'� CLOSEDUT �UBMITTALS [NOT USED]
34 1.8 MAINTENANCE MATERIAL SUBNIITTALS [NOT USED]
35 19 QiTALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH !_rrcklaJrd R�ad iide�rrrlk I+wproveurc�,ars
STANBP.RD CONSTRUCTION SPECIFICATION ppCUMENTS CPAf: IO�G:37-3
Revised March 9, 2020
oi 600a-z
PROBUCT REQU7R�M�NTS
Page 2 of 2
1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
2 1.11 FIELD [SITE] CONDITI�NS [NOT USED]
3 1.12 WARRANTY [NOT USED]
4 PART 2- PRODUCTS [NOT USED]
PART 3 - EXECUTTON [NOT USED]
b
7
END OF SECTION
R�vision Log
DATE NAME SUIVIM�RY OF CHANGE
1QI12112 D. Johnson Mqdi$ed Location of Gity's 5tandard Araduct List
3/9I2a2D b.V, Magana Removed reference to Buzzsaw and noted titat the City's approved product list is
accessible tF�raugh the City's website.
C17'Y O�' r4I2T V�ORTH I,acklarsc! Road Sicletirrrlk lrrryra��elrrc rrts
STANDAAD CONSTRUCTTON SPECIFICATION DOCUMENTS ('I'fV: IO�fi37-3
Reviscd March 4, 2Q20
03G6U.Q-I
PRODUCT 3TORAGE AND HANDLING REQUIREMENTS
Page L of4
]
2
SECTION Ol 6G OQ
PRODUCT STORAGE AND HAIVDLING REQUIREMENTS
3 PARTI- GENERAL
4 1.1 SLTNIlVIARY
5 A. Sectinn Includes:
6 1. Scl�eduling of praduct delivery
7 2. Packaging of products for delivery
8 3. Protection of praducts against damage from:
9 a. Handluig
3 Q b. Exposure to elements or harsh environments
11 $. Deviations irom this City of Fart Worth Standard Specification
12 1. None.
i3
14
15
16 1.�
C, Ralat�d Speci�cation Sections include; but are not necassarily limited to;
1. Divisian 0— Bidding Requirements, Contract Farms azsd Conditions of the Cantract
2. Division 1— General Requiremenfs
PRICE AND PAYMENT PROCEDURES
S 7 A. Measurement and Payment
18 1. Work associated with tliis Item is considered subsidiary tn the �arious Items bid.
19 No separate payment will be allowed for this Item.
20 1.3 REFERENCES [NOT USED]
2i 1.4 ADMINI�TRATIVE REQi]IRE11iE1rITS [NOT USEDj
22 1.5 SUSMITTALS [NOT LTSED]
23 1.6 ACT14N SUBMITTALS/INFORMATIONAL SUBNIITTALS [NOT LTSED]
24 l.i CLOSEOUT SUBMITTALS [NOT LTSED]
25 1,8 MAiNTENANCE 1WIATERIAL SUBMITTALS [NOT USED]
26 1.9 QUALTTY ASSURANCE [NOT IISED]
27 110 DELIVERY AND HANDLING
28
29
3Q
31
32
33
A. Delivery Requirements
1. Schedul� d�livery of products �r equipment as required ta allow timely instaIlation
and to avoid prolonged storage.
2. Provide appropriate personnel and equipment to receive deliveries.
3, Deliv�ry trucks will �}ot b� permitted to wait extended p.eriads of time o�i tlie Site
far persannel or equip�nent to receive the delive�y.
CITY OF FORT WORTH Lcfrkland Itocrd 5icleu�erlk Irriprro��enre n!s
STANDARb COIVSTRUCTIDN SPECIFICATIdN DOCUMENTS CP.A': I(1!)G:37-3
E2evised July 1, 20ll
016600-2
PRODUCT STORAG� AND f-l11NDLING REQUIREMENTS
Page 2 of 4
1 4.
2
3
4 S,
5
6 6.
Deliver proclucts or equipment in manufacturer's original unbroken cartons or other
contai��ers designed and constructed ta protect the cantants from physieal or
enviromnental damage.
Clearly and fully mark and identify as to manufacturer, item and installation
loc�tian.
Provide manufacturer's instructions for storage and handling.
7 B. Handling Requixements
8 1. Ha�dle products or equipment in aceardance with tliese Contract Documents and
9 manufacturer's recoinmendations and instructions.
ia
ll
12
�3
1�
15
16
l7
1$
i9
20
21
z2
23
24
25
26
27
28
29
3Q
31
32
33
3�
35
36
37
38
C, Storage Requireznents
1. Store materials in accordance with manufacturer's recommendations and
requiraments of ti�ese Speci�cations.
2. Make neeessary provisions for safe storage of materials and eqtupment.
a. Place loose soil materials and materials to be incorporated into Work to pre�ent
damage ta any part of Wark or existing facilities and to maintain free access at
al1 times to all parts of Work and to utility ser�ice campany installations in
�icimty of Work.
3. Keep materials and equipment neatly and compactly stared in loeations that will
cause minimum inconvenience to other contractors, public trav�eI, adjoining owners,
tenaz�ts and occupants.
a. Arrange starage to provide easy access for inspection.
4. Restrict starage to areas available on constructinn site fnr storage nf inaterial and
equipment as shown on Drawings, ar approved by C.ity's Project Representative.
5. Provide aff site storage and protec�ion when on-site starage is not adequate.
a. Provide addresses of and access to off-site starage locations far inspectian by
City's Pro3ect Representative.
6. Do not use iawns, grass }�lots or other private property for storage purposes without
written permission of owner or other parson in possessian or control of premises.
7. Store in manufacturers' unopened containers.
8. Neatly, safely and coznp.actly stack anaterials delivered anci stored along line af
Worlt to avoid inconvenience and damage ta property owners and general public
a��d ma�ntain at least 3 feet from �re hydrant.
9. Keep publie and private drivev�ays and street crossings open.
I D. Repair or replace damaged lawns, sidewalks, streets or other improvements ta
satisfaction of City's Project Representative.
a. Total length whicl� materials may he distributed along route of eonstruction at
one time is 1,000 linear feet, unless oiherwise approved in writing Uy City's
Project Representative.
C]TY OF FORT WOR'TH
STAN[]AE2ll CONSTRUCTION SP�CIFiCATIpN qpCUMENTS
Revised July 1, 2016
Lacklcutd Road 5ide+ralk Irn��rat�enienls
Cf'.�J.• I �OG37-.�
Oi GG00-3
PRODUCT STORAGE AND HANDLING R�QUIREMENTS
Page 3 of 4
1 1.11 FIELD �SITE] C�NDITION� [NOT USED]
2 I.12 WARRANTY [NOT USED]
3 PART � - PRODUCTS [NOT USED]
4 PART 3 - EXECUTION
5
6
7
8
4
10
ll
3.1 INSTALLERS [NOT USED]
3.� EXAMINATION [NOT USED]
3.3 PREPAItATION [NOT USEDj
3.4 ERECTION [NOT USEDj
3.5 REPALR / RESTQRATION [NOT USED]
3.6 RE-INSTALLATION [NOT i1SED]
3.7 FIELD [oR] SITE QUALITY CONTROL
12 A. Tests and Insp.ections
13 1. Inspect all produc#s or equipment delivered to the site prior to unloading.
14 B. Non-Conforming Work
15 3. Reject all produets ar equipment that are damaged, us�d ar in any otlier way
16 unsatisfactary for use on the project.
17 3.8 SYSTEM STARTUP [NOT iTSED]
l8 3.9 ADJUSTING [NOT USED]
19 3.10 CLEANING [1vOT USED�
20 3.11 CLOSEOUT ACTIVITIES [NOT USED]
21
22
23
24
25
26
27
28
29
Ti7
3.12 PROTECTION
A. Protect all products or equipment in accordance witli manufacturer's written directians.
B. Store produc#s or equipment in location to a�oid pIiysical damage ta items while in
storage.
C. Pro#ect equipment froin exposure to elem�nts and keep tharoughly dry i�'reyuired by
the ma�iufacturer.
3.13 MAINTENANCE [NOT USED]
314 ATTACAMENTS [NOT U�ED]
END OF SECTION
C1TY OP FORT WORTH
STANDARiI CQNSTKUCT�qN SPECIPICATION I]QCUMENTS
Revised .Tuly I, 2011
L[rcklrurc! Roud Srdeu�nik lnrpt•oi�et��erfls
CI'�': 1(1f)fi37-.i
o� 66oa-a
PRODUCT STORACE AND HANI)LING 1�QUI12�MENTS
Page 4 of 4
Revision Log
DATB NAME SUMMARY DF CHANGE
CITY aF PORT WORTH Lereklcrr7�llZoarl Sidetii n!k lm��r�rn�elrienls
STANI]ARD CONSTRiTCTIqN SPECIFICAT[ON DOCIJMENTS CYh'.• I/J0G37-3
Revised July I, 20ll
oi�aoo-i
MOBILEZATION AND REMOBILIZATION
Page 1 af4
2
sECTYoN o� �o a0
MOBILIZATION AND REMOBILIZATION
3 PART 1- GENE�tAi,
4 1.1 ST.TMMARY
5
6
7
8
9
14
11
l2
13
14
15
16
17
18
19
20
21
22
23
2�
25
26
27
28
29
30
31
32
33
34
35
3b
37
38
39
40
41
42
43
�4
4S
A. Section IncIudes:
1. Mobilization and Demobilization
a. Mobilization
l) Transpartation of Contractor's personnel, equipment, and operating supplias
io the Site
2) Establishment of necessary general facilities far the Contractor's nperation
at tlxe Site
3) Pre�niums paid for per%rmance and payment bonds
4) Transportatian af Contractor's personnel, equipme�it, and operating supplies
to another location within the designated Site
S) Relocation of necessary general faciIities for the CQntractor's operat�an
from 1 location to another location on the Site.
b. Demnbilizaiion
1) Transportation of Contractar's personnel, equipment, and operating supplies
away from the Site u�cluding disasseinbly
2} Site Clean-up
3) Removal of all buildings and/or other facilities assemb�ed at the Site for this
Contract
c. Mobilization and Demobilization do not include activi#ies for sgecific items of
work that are for which payinenfi is provic�ed elsewhere in the contract.
2. Remobilizafion
a. RemabiIization for Suspension of Work specifically required 'ui the Contract
Documents or as re�quired by City includes:
1 } Demobilization
a) Transportation of Contractot's persannel, equipment, and operating
supplies frorn the Site including disassembly or tempararily securing
equipment, supplies, and other facilities as designated by the Contract
Documents necessary to suspend the Wark.
b) Site C1ean-up as designated in the Contraet Dacuments
2) Remobilization
aj Transportation af Contractor's personi�el, equipment, and operating
supplias to the Site necessary to resume tlie Work.
b) Establishment of necessary gen�ral iacilities for the Contractor's
operation at tha Site necessary. to resume the Work.
3) No Payments will be made for:
a} Mobilization and Demobilization from one locafion ta annth�r on the
Site in tl�e normal pragress af perforining the War(c.
b) Stand-by or idle time
c) Lost pro�ts
3. 1Vlobilizatians and Damobilization far Miscellaneous Projects
a. Mobilization and Demobilization
CITY OF FORT WORTH
STAI�DARD CON�TRUCTIOIV 5PECIFICATIOI�i DOCLIMENTS
Revised Navember 22, 2016
!_a.c'�Clm�d f�oeid Srrleiralk Itirprot>eurervs
('P,A�, IOOG37-3
017000-2
MDBILIZATION AND R�MOBfLIZATION
Page 2 af 4
1
2
3
4
S
6
7
8
9
I�
I1
12
13
14
15
I6
17
18
I9
20
l} Mobilization shall cansist of the activities and cost on a V�7ark Order basis
necessary for:
a) Transportatio�� of Contractar's personnal, equipment, and aperating
supplies to the Site for the issued Work Order.
b) Estahlishment of necessary general fac.iIities for the Contractor's
operation at the Site for the issued Work Order
2) Demobilization shall cansist of the activities and aost necessary for:
a) Transportation af Gontractor's personn�l, equipment, and operating
supplies from the Site including disassembly �or eaeh issued Work
Order
b) Site Clean-up far each issued Work Qrder
c} Remaval of all buildings ar other facilities assarnbled at th� Site for
each Work Oder
b. Mobiiization and Demobilization do not inclt�de activities for specific iteins of
work %r whicla paym�nt xs pravided elsewliere in the cantract.
4. Emergeiscy Mobilizations and Deinobilization for Miscellaneous Prolects
a. A Mobiliaation %r Miscellaneous Projects wh�n directed by the C�ty and the
mobilization occurs w�thin 2A hours of the issuvice of the Wark Order.
B. Deviations from this City of Fort Worth Standard Specification
1. None.
2l C. Related Specification Seefions incIude, but are not necessarily limited to:
22 1, Division Q— Bidding Reqvirements, Contract Forms aiid Conditions of the Contract
23 2. Division l— General Requirements
24 1.� PRICE AND PAY1ViENT PROCEDUItES
25
2(
27
28
29
30
3I
32
33
3�4
3S
36
37
38
39
40
41
42
43
4�}
4S
�}6
A. Measureme�it and Payment �Cansult City Depa��tmant/Di�isiori for direction on i�
Mobi�ization pay ite�n ta be included or the item should be subsidiary. Include the
appropriate Section 1.2 A. 1.]
1. Mobilization aild Demobilization
a, Measure
1) This Item is coi�sidered subsidiary to the various Ite�ns hid.
b. Payment
1) The work perforined and materials furnished in accnrdance with this Item
are subsidiary ta the various Items bid and no other compensa#ioi� wilI be
allowed.
2. Ramobilization for suspea�sion af Work as specifieaily required i�� the Cantract
Docum ents
a. Meas�rement
1) Measurement far this Item shall be per each remohilization performed.
b. Payment
I) The work perfornied aild materials furnished iu �ccordance with this Item
and measured as provided under °`Measurement" will be paid for at the unit
price per each "Specified Remobalization" ia� accardance with Cantracf
Docuinents.
c. The price shall include:
1) Demob.ilizatioil as described in Section 1.1.A,2.a,1)
2} Remohilization as described in Sectior► 1.1.A.2.a.2)
CI'1'Y qr C012'I' W012TH
STAN�ARD COIVSTRUCTION S!'HCIFICATION DOCUMEN 1 �
Raviscd November 22, 2016
l.rrcklcfnd l�acrcl Sirle�rcdk Iruprpverr�enFs
C'f'A': 10(}G37-3
0170D0-3
MOBILIZATION AND REMOBILIZATION
Page 3 of4
1
2
3
4
5
6
7
8
9
ro
11
12
13
14
15
16
17
38
19
20
21
22
23
24
25
2b
27
28
29
30
31
32
33
34
35
36
37
38
d. No payments will be made for standby, idle time, or lost profits assaciated tliis
Item .
3. Remobiiization for suspension af �Vork as required by City
a. Measurement and Paymerit
1} This sha11 be submitted as a Coutract Claizn in accordance wsth Articie 10
of Section 00 72 00.
2) No payinents will be made for standby, idle tirne, or lost profits associated
with this Item.
4. Mobilizations and Demobilizations for Miscellaneous Projects
a. Measutement
l j Measurement for this Item sha116e for each Mobilization and
Demohilization required hy the Contract Docurneirts
b. Paym�nt
1) The Work performed and materials furnished in accordance with this Item
and measured as pro�ided under "Measurement" wi11 be paid far at the unit
pric�; per each "Work Order Mobilization" in accordance with Contract
Docume�rts. Demobilization shal� be considered subsidiary to mobilization
and shall not be paid for separately.
c. The price shall include:
1) Mobilization as described in Sectinn 1.1.A3.a.1)
2) Demobilization as described in Section 1.1.A3.a,2)
d. No payrr�e�its will be made for standby, idle time, or lost profits associated this
Item.
5. Etmergency Mobilizatians and Demobi�izations for Miscellaneous Projects
a. Measuremer�t
1) M�asurement For this Item shall be for each Mabilization and
Deinobilizatian required by the Contract Documents
b. Payment
1) Tkze Work pexfor�ned and materials furnished in accordance with this rtem
and measured as pravided under "Measurement" will be paid for at tlae unit
price per each "Work Order Emergency 144�Iobilization" in accordanee with
Contract Documents. Demo6ijizatson shall be considered subsidiary to
mabilization and shall not be paid for separately,
c. The price shall incluc�e
1) Mobilization as described i�� Section 1. 3.A.4.a)
2) Demobilization as described in Section 1.1.A3,a.2)
d. No payments will be made for standby, idle time, or lost profits associated Y1iis
Item.
39 1.3 REFERENCES [NOT USED]
40 1.4 ADMINI�TRATIVE REQUIREMENTS [NOT USED]
�41 1.5 SLTB1VlITTAL� [NOT USED]
42 1.6 INFORMATI�NAL SUSMITTALS [NOT USED}
43 I.7 CLOSEOUT SUSNIITTALS �NOT USED]
44 1.8 MAINTENANCE MATERIAL SUBNIITT�LS [NOT USED]
CITY OF FORT WORTH l.ucklrux! Rnr�dSrcic�rrrlk lm��roveamrrrs
STANpARD CONSTitUCTION SPECIPICATION DOCUMENTS CNR'.• ID�G37-3
Revised i�ovemher 22, 2D16
�i�ooa-a
MO$ILIZATtON AAFD REMOBILIZATION
Page �} of 4
1 1.9 QUALITY ASSURANCE [NOT USED]
2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
3 1.11 FIELD [SITE] CONDITIONS [NOT USED]
4 I.13� WARR.ANTY [NOT USED]
5 PART 2- PRODUCTS [NOT USED]
6 PART 3- EXEC.UTION [NOT USED]
7
S
END O� SECT�ON
Re�ision Log
DAT'E NAME SUMMARY OF CHANGE
S 1122116 Michael d�ven ��2 price and Payment Procedures - Revised specification, including blao text, to
make specifieation flexible for either subsidiary or paid bid item for Mobilizati�n.
9
CITY O�' rORT W012TH Lacklarld Rncrd .5idezi n!k M���roti�enic�nr,ti•
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CI'rl'.• I!)OG37-3
Revised November 22, 2016
017123-1
CONSTRUCTION STAKIt�G AND SURVEY
Page ] ofT
1
2
3 PART1- GENERAL
4 l.l SUMM�iRY
5
6
7
8
9
io
11
12 1.2
13
14
i5
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
3S
36
37
SECTION 01 �1 23
CONSTRUCTION STAKING AND SURVEY
A. 5ection includes:
1. Requirements for eonstruction staking and construction survey
B. Deviations frorn this City of Fort Worth Sta.�idard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to.:
1. Divisivn 0-- Bidding Reyuireine�rts, Contract Forms and Cnnditians of the Contraet
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDiTRES
A. Measurema�it and Payinent
1. Construction Staking
a. Measuremeni
1) Measurement for this Item shall be per LUMP SUM (LS) "CanstrUctian
Staking"
b. Payment
l) The work performed and the rna#erials f�arnished in accordance with this
Item and measured as provided under "Measurement" will be paid for as th�
lump sum price for "Construction Staking".
2. Construction Survey
a. Measureinent
1) Measurernent far this Item sha116e per LUMP SUM (LS) "Canstructzon
Staking-Water improvements ONLY"
b. Payment
I) The work performed and the materials furnished in aecordance with this
Item and measured as provided u;ider "Measurement" will be paid for as the
lump sum price for "Construction Survey-Wat�r Improvements ONLY".
3. As-Built Survey
a. Meas�rement
l) This �tezt� is consid�red subsidiary t� the "Construction 5ur�ey-Water
Improvements ONLY" Item bid.
b. Payment
1) The work performed and the materials furnished in accordance with fhis
ltem are subsidiary to the "Constructioi� Survey-Water Improvements ONLY"
Item bid and no other compensation wiI1 be allowed.
38 1.3 REFERENCES
39 A. Definitions
C1TY OF FORT WOR'i'H Lack(afrd IZocrd Siclejralh� I�rlprota nx>rv.a•
STANDARD COIriSTRUCTl0�1 SFSCIFICATION DDCUMENTS C'PA: 100(37-.i
Revise� February 14, 2018
01 71 23 - 2
CONSTRUCTI�I�! STAKCNG AND 5LlRVEY
Page 2 of 7
] 1.
2
3
4 2.
5
6 3.
7
8
9
1� 4.
11
12
13
14
IS
16
17
18
19
Za
2i
22
Construction Survey - Tl�e survey measurements inade prior to aY• while construction
is i�1 progress to control elevation,llorizontal �osition, dimensions and confguration
of structures/impra�ements includec� in tlie Praject Drawii�gs.
As-built Survey —The measurements made after the construction of the improvement
features are complete to provide position coordinates for t11e feat�res of a project.
Construction 5takin� — Tlie placement of stakes and markings ta provide afFsets and
elevations to cut and fill in order to locate oti the ground the designed
structureslitnprovements iricluded in the Projact Drawings. Cozlstructian staking
shalI include staking easements and/or right of way if indicated on the plans.
Survev "Field Checks" — Measureinents made after coiistruction staking is
completed and before eonstruction work begins to ensure that s�ructures marked on
the ground are accurately located per Project Drawings.
B. Technical References
2
3.
4.
Cit� of Fort �Varth — Construction Staking Standards (availabl8 on City's Buzzsaw
website) — 01 7I 23.16.01 Attacl�ment A_5ur�ey Staking Standards
City of �ort Worth - Standard Survey Data Collector Library (�1) files (available on
City's Buzzsaw website) — Q 1 71 23.16.Q2 Attacl�ment S_Survey Data Gollector
Library.�l.
Texas Depar�ment of'I'ransportation (Tx.DOT) Survey ManuaI, latest re�vision
Texas Society ofProfessional Lai�d Surveyars (TSPS), Manual ofPractice for Land
Surveying in the State o� Texas, Category 5
23 1.4 ADMINISTRATIVE REQiJIREMENTS [NOT LTSED]
24 1.5 SUBMITTALS
25 A. Submittals, if required, sha�l he iu accordance wi�h Sectian O1 33 Q0.
26 S. AZI sub►nittals shall be received and reviewed by the City prior to delivery of work.
27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS
zs
29
30
3I
32
33
34
35
36
37
1. Documentation verifying accuracy of field engineerii�g work, including coordinate
conversions if pla�is do not indicate grid ar grouxid coordinates.
2. Submit "Gut-Sheets" conforming to the sta�idard template provided by the CiTy
(ref�r to O1 71 23.16.01 -- At�achm�nt A-- Survey Staking Standards. Contractar
shall submit an updated Construction As-built Spreadsheet witl� the second partial
paym�nt re�u�st �ach inanth.
3. Submit As-Built Survey Radiine Drawings documenting the locations/elevations of
constructed improveinents during ti�e progress of the constructian signed and
seal�d by RPLS respansible for tlte work.
38 1.7 CLOSEOUT SUBMITTALS
39 B. As-built Redline Drawing Submittal
40 1, Submit As-Buiit Survey Redline Drawings dacumenting the locations/ele�ations of
41 constructed improvements after the constructian is com�leted signed and sealed
42 by RPLS responsible for the work.
A. Field Qualiiy Control Submittals
CITY QF FORT WORTH 1_acklcurc! Rand 57cleu�alk lmf�rove�rrenrs
STANDARD CONSTRUCTION SPECIFICATION D�CUPAENTS C'PN: 1flFlfi37-.3
Revised Fc6ruary i4,2018
Ol 7 i 23 - 3
CDNSTRUCTION STAKING AND SiTRVBY
Paga 3 of 7
1 2. Cantractor shall submit the proposed as-built and completed redline drawing
2 submittal 1 vveek prior to scheduling the project final for City review and comment.
3 Revisions, if necessary, shall be made to the as-built redline drawings and
4 resubmitted to the C'rty prior to scheduling the constructian final.
5 1.$ MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
6 1.9 QIIALITY ASSURANCE
7 A. Construction �talcing
8 1. Construction staking will �e performed E�y th� Coutractor.
9 2. Coordinatian
10 a. Contact City's Project Representative at least one week in advance notifying
l 1 the City of when Constructinn Staking is sch�duled.
12 b. It is the Contractor's responsibility ta coordinate staking such that
13 construction activities are not delayed or negatively impaeted.
I4
15
1�
I7
l8
19
2D
21
22
23
24
2S
26
27
28
29
3U
31
�z
33
34
35
36
37
38
39
40
41
42
43
44
45
3. General
a. Contractar is responsibie f4r presenring and maintaining stakes. If City
sucveyors are required ta re-stake for aj�y reasoii, the Contractor will be
respnnsible far costs to perfornn staking. �f in the apinion qf the City, a
sufficient numher of stakes or markings have been lost, destroyed disturbed or
omitted that the cont�racted Work cannot take place then the Gontractor will be
required to stake or re-stake the deficient areas.
B. Canstructian Survey
2
3.
1. Construction Survey wiil be performed by the Contractor.
Caordination
a. Contractor to verify that horizontal and vertical control data established in �he
design survey and reyuirec� for construction survey is available and in place.
General
a. Construotion sur�ey �vill �e performed in arder to construct the work shown
on the Construction Drawings and specified in the Contract Documents.
b. For construction methods ather than open cut, the Cantractor sha(1 perform
canstructian survey and verify control data including, but not limited to, the
following:
1) V�rification that established benchmarks and cantrol are aceurate.
2) Use ofBenclvnarks to furnish and maintain all reference lines and grades
for tunneling.
�) i1s.e af line and gradas to establish the location of the pipe.
4} Submit to the City copies of field notes used to estahlish all lines and
grades, if requested, and allow the City to clieck guidance system setup prior
to beginning each tuz�neling drive.
5) Provide access for the City, if r�quested, to verify the guidance sy�tem and
the line and grade of the carrier pipe.
6) The Caitractor remains fially responsible for the accuracy of the work and
correctian of i#, as required.
7) Monitor line and grade continuously during construction.
8) Record deviation with respect to design line and grade once at each pipe
jo.int and submit daily records to the City.
CITY dF F�RT WORTH
STAI*IbARU CONSTRUCTION SPECIFICATI�N DOCUMENTS
Rcvised Febre�ary S4, 20i8
I,crckluru! Raad 5ideircdk hrtpr•m>eir�errfs
CPr�'.• 1 �0G37-3
017123-4
CONSTRUCTION STAKING AND SURVEY
Page 4 of 7
j
2
3
4
5
6
7
S
9
10
11
12
13
14
15
]6
17
r8
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
c.
C
9) If the instal�ation does not maet t�ie specified tolerances (as outlined in
5ections 33 QS 23 and/or 33 p5 24}, im�nediately �iotify tk�e City and correct
the installation in accordance with the Contract Docuinents.
As-Built Survey
1. Required As-Built 5urvey will be performed by the Contractor.
2. Goordination
a. Contractor is to coordivate with City to confrm which features require as-
built surveying.
b. It is �li� Contractor's responsibilily to coardinate the as-built �urvey aud
required meastirements for itezns th.at are fo be buried such that construction
activities are not delayed or negative�y impacteci.
3. Genera]
a. The Gontractar shal� pravide as-built sur�ey including tlae eIevation and
lacation (and provide writfen documenfiatiou to the City) of construetion
features during the pro�ress of the conatru�tion incIuding the following;
I ) Water Li»es
a) Top of�iEae e{evatia��s and coarclinates for waterfi��es at the tollo��rii�g
Ic�cations:
( I) Hnrizc�nt�l and ve��tical poi�lts of inflectio��, cur��ature,
etc. {All f�ittin�s}
(2) Meter �ax�s/vaulks (All sizes)
(3) Fire ]ines
{4) Fire hydrants
(S) Gate valves
(6) Plugs. stub-outs. de�cl-end lines
(7) Clcaning �����es
{8) Cas�n� pi�e (each end)
2) Stormwater — Not Applicahle
b. Tlie Contractor shall provide as-built survey iricluding the elevatiaYi and
location (and provide written documentation to the City) of construction
features afier the construction is completed including the following:
1) Water Lii�es
a} Top nt'pi�Se elev�itic�ns r�izd eaorclinaYes f�or ���aterlines at the Follc����in�
locatiails:
(]) Horizontal a«d vercical points of intlecti�n. cu���ature,
ctc. (A[I l�ittin�s)
(2) Meter lioses/va��lts (All sizes)
(3) Fir'e lines
(�4) Tire hydrants
(5) Gate valves
(6) I'iugs. sii�b-outs, de�id-end 1i37es
(7} Cleai�iEig r����es
(&? Casin� pi��e (�ach end}
2) Stormwater — Not Applicable
48 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH
STANDARI7 CQNSTRUC'1'14N SPECI�ICATIqt�i DpCUM�T�TS
Revised February 14, 2018
l.ucti�lcuid Rocrr�Sideirulk liripro��eure��ls
C'Ph': I fJf1 �37-3
017123-5
C�NSTRiICTION STAKING AND SURVEY
Page 5 of7
1 1.11 FIELD [SITE] CONDITYONS [NOT USED]
2 1.1� WARRANTY
3 PART � - PRODUCTS
4 A. A construction survey will produce, but will not be Iimitec� ta:
5 1. Recovery of reIe�ant control poin#s, poir�ts of curvature and points of infersection.
6 2. Establisli temporary horizontal arid vertical control eleva#ioiis {benchmarks)
7 suificiently permanent and lacated in a manner to he used throughout construction.
8 3. The locatio�� of planned facilities, easetnents and improvements.
9 a. Establishin.g final line and grade stakes for piers,. floors, grade beams, parking
1p areas, utilities, sireets, highways, tunnels, and other construction.
11 6. A record of revisions ar corrections noted in an orderly manner for reference.
I2 c. A drawing, when required by the client, indicating the horizontal and �ertical
13 location of faci.lities, easements and improvements, as built.
14 4. Cut sheets shall be provided to the City inspecfor and Survey Superintendent for all
15 construction staking peojecfis. These cut sheets shall be on the standard city template
16 which can be obtained from the Survey St�perintendent (817-392-7925).
17 5. Digital survey files in the following formats shall he acceptable:
18 a. AutoCAD (.dvvg}
19 b. TeXt Fi�e (,txt)
20 c. ESRI Shapefile (.shp)
21 d. CSV file (.csv)
22 6. Survey files shall include verticai and horizomal data tied to ariginal project cotxtral
23 ar►d benchmarks, and shall include feature descriptions
24 PA R.T 3- EXECUTION
25 3.1 INSTALLERS
26 A. Toleraiiees:
27 1. The staked lacation of any improvement or faciliiy should be as accurate as prac�ieal
28 and necessary. The degree o.f precision required is dependent on many factors all of
29 which must remain judgmenta�. The tolerances listed hereafter are based on
30 generalities and, under certain circumstances, shall yietd to sp�cific requirements.
31 The surveyor shall assess any situatian by review af the overall plans and throug�i
32 cansultation with respansible parties as to the need %r sgecific tolerances.
33 a. Earthwork: Grades for earthwork or rough cut sho�ld not exceed 0.1 ft. vertical
34 #olerance. Horizontal aGgnment for earthwork a.nd rough cut should not exceed
35 1.0 ft. tolerance.
36 b. Horizontal alignment on a strucfiare shall ba witllin A.1 ft tolerance.
37 c. I'a�ing or concrete fflr streets, curbs, gutters, parlcing areas, drives, alleys and
38 walkways shali be locat�d within the confines of the site boundaries a�id,
39 occasionally, along a 6oundary or any other restricti�e line. Away from any
40 restrictive line, these facilities should be staked with an accuracy producing no
41 tnore than O.OSf�. tolerance from their specified locatinns.
CITY OF FORT WORTH Lucklcute! Iiorrcl5(clesrr�lk l��r�r'oi�e.ruerNs
STAI�iDARD CONSTRUCTION SPECIFICATION DQCUMEN'I'S C'Ph': 1RO(37-3
Re�ised Fe6ruary 14, 2018
�17123-6
CONSTRUCTION STAKING AND SURVEY
Page 6 of 7
7
2
3
4
5
6
7
8
9
l�
ll
12
13
14
15
16
I7
1$
I4
2�
21
d. Underground and overhead uti�ities, such as sewers, gas, water, telephane and
�lactric lines, shall be located horizo��tally with.in their prescribed areas or
easeinents. Within assigned areas, these utilities should be staked wi�l� au
accuracy groducing no mare than 4.1 ft taleranee from a specified Iacation.
�. The accuracy required for the vei�tical location of vtilities varies widely. Many
underground utilities require on�y a minimum cover and a tolerance of 0.1 ft.
should be maintaiued. iJnderground and overhead utilities on planned prafile,
but not dependin.g on gravity flow for performance, should iiot exceed 0.1 ft.
to3erance.
B. Sur�eying instruments s1�a11 be kept in close adjustrnent accordin.g to znanufacturer's
speeifications ar in compliance to standards. The City reserves the right #o requast a
calibration report at any time and recommends r�gular �naintenance schedul� be
�rerformed by a certifed technician every 6 months.
I, Field measurements of angles and distances shall be done in such fashion as ta
satisfy the clasures and tolerances expressed 'rn Part 3.1.A.
2. V�rtical Iocations shall be established from a�re-established benchinark and
checked by closing to a different bench mark on the same datum.
3. Canstruction survey f eld work shali correspond to the client's plans. Irz•egularities
ar conflicts faund sl�al! be reported promptly to the City,
4. Re�isians, eorrections and other pertinent data shall be logged for future reference.
22 3.� EXAMINATTON [NOT USED]
23 3.3 PREPARATION [NOT USED]
24 3.4 APPLICATTON
25 3.� REPAIR / RESTORATYON
26
27
28
29
30
31
32
33
34
A. If the Contractor's work damages or destroys on� ar mnr� of the controI
monuments/points set 6y the City, the monuments shall be adeyuately referenced far
expedient restoration.
1. Notify City if any control data needs to be restored or replaced due to damage
caused during cons�ruc�ion operations.
a. Cont�•actor shall perform repIacernents andlor restorations.
b. The City may require at any tirne a survey °`Field Check" of any monument
or benchmarks that are set be verified by the City surveyors before further
assaciated work can move forvvard.
35 3.6 RE-INSTALLAT�ON [N�T USEDj
36 3.7 F�ELD (oR] SITE QIIALITY CONTROL
37 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the
38 City in accordauce with this Specification. This includes easements and right of way, if
39 noted on the plans.
40 B. Do nnt change or r�locate stalces or control data without appraval from the City,
CITY aF FORT WORTH Lacklunr! RacrcJS'icleis•aJh Inapi�ovcirac�itls
STANDARI] CONSTRUCTION SP�CIFICATION DOCUMENTS CTPA-; IOD(37-3
Revised February 14, 2018
D17123-7
CONSTRUCTION S'FAKING AND SURVCY
Page i of 7
1 3.8 SYSTEM STARTUP
2
3
�
5
6
7
8
9
]0
11
12
13
14
1S
A. Survey Cliecks
1. The City reserves the right io perfarm a Survey Check at any time deemed
necessary.
2. Checks by City personnel or 3�� party contracted surveyor are not intended to relieve
the cantractor of hislher responsibility for accuracy.
3.9 ADJUSTING [NOT USED�
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACT1i�ITIES [NOT USED]
3.1� PROTECTION [NOT USED]
313 MAINTENANCE [NOT IISED]
3.14 ATTACAMENTS [NOT USED]
END OF SECTION
Re�ision Log
DATE NAME SUMMARY OF CHANGE
8/31/2fl12 D,7ohnsao
Added instruction and modified measurement & payment under 1.2; added
813I12017 M. Owen definitinns and references under 1.3; modified 1.6; added I.7 closeout suhmiital
requirements; modified t.9 Qaality Assurance; added PART 2— PRODUCTS ;
Eldded 3.1 jnstallers; added 3.5 RepairlRestoration; and addeci 3.8 System Startup,
16
CITY OF FORT WORTH
STANDARD CONSTRUCTION 3PECIFICATIQi�1 DOCUMENTS
Revised �'ebruary 14, 2D18
1.urltJc+rrd Road iicJeiPulk I��rprqreu�en�s
['PAr• l00C37-3
�
� - � �. �
Se��ion 017� �3.01 � �������,��,� �
��rv�y St�kir�� �t�rrd�rds
February 2017
J:�16ASOS�Specifications�Div 01-General Requirements\017123.16.01_Attathment A_Survey Staking
5tandards.docx
CITY OF FORT WORTH Page 1 of 22 I.aeklcnad Road 5'ideirrrlk Ir��prorerr�e��ls•
5TANDARD CONSTRUCTION SPECIFICATION DOCUMENTS C f'N: I00637-3
REVISED: REBRAEtY 2D.17
These procedures are intended to pro�ide a standard method for construction staking services
associated with the City af Fort Worth projects. These are not to be considered all inclusi�e, but only as
a general guideline. Forprnjecfs orr TXDOT rrght-af-way or thraugh jnint TXDD�' participatian,
adherence to the '�XDO�Survey Manual shaf! he foIlowed and if a discrepancy arises, the '�XDO►
manual shol! prevail. (http://onlinemanuals.txdot.�ov/txdotrrtanuals/ess/ess.pdfJ
If you have a unique circurnstance, please consult with the project manager, inspector, or survey
department at 817-392-7925.
Tab{� Of COr�t�r�tS
I. City of Fort Worth Contact Informatian
II. ConStrwction Colors
III, Standard Staking Su��lies
IV. Sur�ey Equipment, Control, and Datum Standards
V. Water Staking
VI. 5anitary Sewer Staking
VII. Starm Staking
VIII. Curb and Gut#er Staking
IX. Cut 5heets
X. As-builC Survey
J:�160505�5pecifications�Di� 01-General Requirements�0171 23.16.01�Attachment A�5ur�ey Staking
5tandards.docx
CITY OF FORT WORTH Page 2 of 22 LcrrltJa�acJ Jiaac! Sicle�urrlk hul�rore�rlenfs
S'I'.ANbAl2D CONSTRL�CTTC7N 5PECIFICATION DQCUM�NTS C'P,�': �OI1G37-3
REVISED: REBRARY 2617
l. �urr�e�+ �epartr�ne�t Confia�t Ir�forrnation
Physical and mailing address:
5851 Camp Bowie West Boulevard
Suite 300
Fort Worth, Texas 76116
Office: (817) 392-7925
5urvey Superintendent, direct line: (817j 392-8971
II. �ons�r�rc�i�n ��I�rs
The �ollowing colors shall be used for staking or identifying features in the field. T�is
includes flagging, paint of laths/sfakes, paint of hubs, and any identificatian such as pin flags
ifi necessary.
Utility Color
PROPOSED EXCAVATIDIV WHITE
ALL ELECTRIC AND CDNDl11T5 � �
POTABLf WATER
GAS OR OIL Yk�L�J�nJ
TELEPHfJNE/FIBER OPTIC �RAN�i�
SURVEY CONTROL POINTS, BENCHMARKS,
PROPERTY CORNERS, RiGhIT-QF-WAYS, AND PI(VK
AL� �AVING INCLUDiNG CURB, 51DEWALK, BUILDING CORNERS
SAIVI7ARY SEWER �
IRRIGATkON AND RECLAEMEp WATER ' " __
I�i. �tandard Stakin� 5upplies
Ifem iV�inimum size
Lath/Stake 3fi" tall
Wooden Hub (2"x2" min. square pre�erredj 6" tall
Pin Flags (2.5" x 3.5" preferred) 21" lang
Guard Stakes Not required
PK or Mag naiis 1" long
Iron Rads [1/2" or g�eater diametery 1$" lang
Survey Markir�g Paint Water-based
Flagging 1" wide
Marking Whiskers (feathersj 5" lang
Tackcs (for marking hubsj 3/4" long
J:\i64S05�5pecifications�Di� 41-General Requirements\O1 71 23.16.01_Attachment A 5urvey Staking
5tandards.docx
CITY �F FOR'1' WORTH Page 3 of 22 LrrckJurrcl liuud SFdeu�nik lin��rrn�en7erus
STANDARD CONSTRUCTION SPECiFICATTfliV �QCUM�N'f5 C P�r" ����37-j
REVISED: REBRARY 2D:17
I1/. ��rVe ��i r�er�� Ca��rol and �a�um S�andards
A, City Benchmarks
All city benchmarks can be found here: htt�://fartworthtexas.�ov/itsolu�ions/G�5/
Look for'Zoning Maps'. Under'Layers' , expand 'Basemap Layers', and check on
`Benchmarks'.
B. Con�entional or Rohotic Total 5tation Equipment
I. A minimum of a 10 arc-second instrument is required.
II. A copy of the latest calibratian report may be requested by the City at any time.
It is recommended Chat an instrument be calibra#ed by certified technician at
least 1 occurrence every 6 monChs.
C. Networ44/V.R.S, and static GP5 Equipment
I, It is critical that the surveyor verify the correct horizontal and vertical datum
prior commencing work. A site calibra#ion may be required and 5hall consist af
at least 4 control points spaced evenly apart and in varying quadrants.
Additional fiield checks of the horizontal and �ertical accuracies shall be
completed and the City may ask for a copy of the calibration report at any time.
II. Network GPS sucl� as the Western Data Systems or SmartNet systems may be
used for staking of property/R.O.W, forced-rnain water lines, and rough-grade
anly. I�o GPS_stakin� for concrete, sanitary sewer, stnrm drain, final �rade, or
anythin� that needs vertical �radin� with a tolerance of U.2�' or less is
allowed.
D. Contral PaintS Set
I. Alk tontral points set shall be accompanied by a lath with the appropriate
Northing, Easting, and Efevation (if applicable) of the point set. Control points
can be set rebar, `X' in concrete, or any other apprapriate item with a stable
base and of a semi-permanent nature. A rebar cap is optional, but pre�erred if
the cap is marked 'control point' or similar wording.
II. Datasheets are required for all control points set.
Datasheet should include:
A. Horizonta� and Vertical Datum used, Example: N.A.D.83, f�orth Central Zone
4202, NAVD 88 Ele�ations
B. Grid or ground distance. — If ground, pro�ide scale factar used and base
point coordinate, Example: C.S.F.=0.999125, Base point=North: 0, East=O
C. Geoid model used, Example: GEOIDI2A
J:�160505\5pecifications�Di� 01-General Requirements�01 71 23.16.01_Aftachment A_5urvey 5taking
5tandards.docx
CITY �P FORT WOR'Tl[ Page 4 of 22 l,t�ciclrnrd Road Sicle�i�alh ln�pru��eurer��s•
STp.NDARD CONSTRUCTfON 5PECIFICATION DOCiIMENTS CPh': IOOG37-3
REVISED: R�BRARY 2017
E. Preferred Grid �atum
A4though many plan sets can be in surface coordinates, the City's preferred gri� datum
is listed belaw. Careful consideration must be taken ta verify what datum each project is
in prior to beginning work. 1t is essenCiai the surveyor be familiar with coardinate
transformations and how a grid/surface/assumed coordinate system affect a project.
Proiected Coordinate
System: NAD_1983_5tatePlane �exas_North_Central_FIPS a202_Feet
Projection: Lambert_Conformal_Conic
False_Easting: �9685DQODD00000
False_Northing: 6551666.6666fi667
CenCral Meridian: -98.50000000
Standard Parallel 1: 32.13333333
Standard Parallel 2: 33.96666667
Latitude_Of_Origin� 3�.66666567
Linear Unit: Foot US
Geographic Coordinate System: GCS_North_American_19$3
patum: D North American 1983
Prime Meridian: Greenwich
Angular Unit: begree
lVote: Re�ardle:�5 of what d, 3 i�artic:ular prc}��ct is in, deliverahles to tl�e uity
must h� convert�d/trai�slat� ,his �referred �r-id datum. 1 copy of the deliverable
s1�ould be in the project datur wh 3tev�r it may he) and 1 copy shnu[d he in the NADt33,
TX IVoF�th Central 4202 zone See Pt�e err��' File Na�7�it�q "�r�ventior� i�elow
F. Freferred deiiverable Format
txt .cs� .dwg .job
G. Preferred Data Fnrmat
P,I�,E,Z,Q,I�
Point Number, Northing, Easting, Ele�ation, Description, Notes (if applicab4ej
H. Preferred File Naming Convention
7his is the preferred format: City Pro}�ct Number_Description�Datum.csv
Exarr�ple for a proiect that has surface coordinates which must foe translated:
File 1: C1234 As-built af Water on Main Street Grid NAp83 7XSP 42p2.cs�
J:�16D505�Specifications\biv 01-Gen�ral Requirements\01 7123.16.41_Attachment A_Survey 5taking
Standards.dpcx
C1TY QF FORT WORTH Page 5 of z� Lcrddand liucrd Sidetrulk lnrproreu�eivs
5'�ANDARb CpNSTRiICT10N SPECIFICATION DDCUMENTS C'Pr1': 1 fJt)G37-3
REVIS�b: Ii�B12ARY 2017
File 2: C1234_As-built vf Water on Main Street_Project Specific Datum.csv
Exar�pl� Control 5tak�s
J:�160505\Specifications�Div 01-General Requirements�0171 23.16.�1_Attachment A_Sur�ey Staking
Standards.docx
C1TY OF FORT' WORTH Page 6 of �2 l.acklcrncl l�oar! 5ide3rcrlk I�r��rc�1 el�rei�l,s
STANDARD CQNSTRUCTIOts SPECIFICATION DOCUMENTS C"PA': IORb37-3
REVISSD: REBRARY 2017
�
�
�
�
�
w
i��
F-
E;
�L
i�'
.:_T
Z
(�t
:-;
�
i.;-�
w
�
�
���
�=
�
r-z
��
_,
�
1 lJ� � EL. ^ ] U�. ��r
1�
�I
'. �_s
� �.
— .:� I--
I
'} I .
��
i
—; �'-,I
�
I
�
�
�
�
�
L�
L=C _
r-'•
i_ }
CP �1 j � �v=�oaa.oa �=�aaa.oa
ti�J
u �
� W
� �
'�J i 'i
C_L
`-�' f'�
= f_;I
� �
_ �
�� � _
�� f ��
� �
� W
� ' _
LL7
L�J �
i� t`
�
11. IAlat�r Sfiakin� Stand�rds
J:\160505�Specifications�Di� 01-General Requirements�017123.16.01_Attachment A 5urvey 5taking
Standards.docx
CITY OF FORT WORTH P�ge 7 of 22 Lnc&�ularl Rvrrd Side�rrilk l�riy��r�ve�i�erats
STAI�DA1tll CqNS�"12UC'I'IOAf SPGCIFICATION DOCUh+lEMT'S C'PAr: II1f1G37-3
REVIS�D: R�BRARY 2Q17
A. Centerline Staking — Straight Line Tangents
I. Offset lath/stakes e�ery 200' on even stations
II. Painted blue lath/stake only, no hub is required
III. Grade is to top of pipe (T/P} for 12° diameter pipes or smaller
IV. Grade to flow line (F/L) for 16" and larger diameter pipes
V. Grade should be 3,50' below the praposed top of curb line far 10" and smaller
diameter pipes
VI. Grade should be 4.00' below the proposed top af curb line for 12" and iarger
diameter pipes
VII. Cut Sheets are required on all staking and a copy can be received fram the
survey superintendent
Optrdnal: ACtual stakes sholl consrst of a 60D nQi! or hub set with a whisker
B. Centerline 5taking - Gurves
I. If art length is greater than 100', POC (Point of Curvature} offset stakes shauld
be set at a 25' interval
II. 5ame grading guidelines as above
III. Staking of radius points of greater than 1qa' may be omitted
C. Water Meter Boxes
I. 7.0' perpendicular offset is preferred to the center af the box
II. Center of the meter should be 3.0' behind the propos�d face of curb
III. Meter shou4d be staked a minimum af 4.5' away from the edge of a driveway
IV. Grade is to top of box and should be +0.06' higher than the proposed top of
curb unless shown otherwise on the plans
D. �ire Hydrant5
I. Center of Nydrant should be 3.0' behind proposed face of curb
IL Survey offset stake should be 7,0' from the center and perpendicular to the curb
line or water main
III. Grade of hydrants should be +0.30 higher than the adjacent top of curi�
E, Water Val�es & Vaults
I. Offsets should be perpendieular ta the proposed water main
II. RIM grades should only be provided if on plans
�xar�ple �41a�er 5takes
J:�160505\Specificafions�Div 01-General Requirements�0171 23.16.01_Attachment A_Sur�ey Staking
5tandards.docx
C[7'Y pP F'pRT WpRTH Page 8 of 22 Ltrcklatid I��rrd Sideii ulh lrnproti�esten�s
STANDARD CONSTRUCTIOI�! SPECIFICATION DOCUM�I+fTS CNA'.• lORG37-3
REVISED: REBItARY 2017
�
� �
� �
� �
�
�
� �
a
�
"ti/
�' o/s � w/�
� �rry
V
� �
��
�
� �
� �
�
111
�
�
W
CL'
�
i.L.�
G-'
�
�:�
�
�
J
�
6
Z
7' p f s� 4k+%L
� �
�
� �
f_h
�
f-
Lil "_
w �=�
, •-�
��
n�
I 1 $aJ
���JF
�_ � ~1
� �-��
� � f �F}
��J� �1
W �1 .x �
�F-L7�J
� C-3,62
�
�
�; ;-
��
��� �
i(i
t '
I
7 d �.�—�
4 �
�
��
y
1 � 7���'
�TA=1+72_8�€ F �-3_g1 �
� � �
o � r
�� �
��
1a17 El.,- �ol.1s'
I'
i
rN
w�
� � —
SY;
l.�! � � F
� � �
t �� � h-
.� _ ' V.
v [] /�� �. W%�_- ::srk=s
�
1y
1
��
� �
� �
� �
�
��
� W
❑
C17
v
�t
� �
�
LL
il �
L� �
C 1
� I,
C3 �
� i�
�r ' �Fl �-
G1 �
� � �
� ��
W �
C � �
3
a
Y �
c�
� � �fot�� �:�._ 100.44�
m w ��. -
w r- {� i�
e��,n n ' I
c �
kal
111. Sanitar�+ ��►r�er Stakin
t-
.r
� iy
V"� _J
� f13
�
i� R
�:•
�I L
F �
0. �-�'
��
� t�
�i}
ti�
�
7�
4 �
�` h y
�e��.r-t�' 4� �
7.}' l- _ '
S,'�
="�4
__W
�L S�o
� i� �;
,�-�.
r� � �
-� r�.�I �.,� �
'L F- L'7 �
�� f ? �
i�
�� `
tr -
� J J
���'
J:\16�505�5pecifications�Div 01-General Requirements\0171 23.1fi.01_Attachment A 5urvey Staking
Standards.docx
CITY OF FQRT WORTH Page 9 of 22 Luck&�rrr1l?nrrd Sirfeiralk Inrprurentenl.s
57'ANdARD CONSTRUCTION SPECIF3CATiON DOCUMENTS (�Nh': ]0(]G37 ;
IZEVISED: R�HRARY 2U17
A. Centerline Staking — Straight �.ine Tangents
I. In�erts shall be field verif�ed and compared against the plans before staking
II. Painted green lath/stake Wl�b hufa and taek or marker dot, no flagging required
III. 1 offset stake between manholes if man�oles are 400' or less apart
fV. Dffset s�akes should be located at even distances and perpendicular to the
V.
VI
Vfl.
Vfll.
center'line
Grades will be per plan and the date of the plans used should be noted
If multiple lines are at ane manhole, each line shall have a tut/fill and direction
nated
Stakes at e�ery grade break
Cut sheets are required on all staking
Optional: Actua! stakes shall consisr of a 60D nar! ar hub set wrth a whisker
B. Centerline Staking — Cur�res
I. If arc length is greater than 100', POC �Point of Curvature) offset stakes shauld
be set at a 25' inter�al
II. Stalcing of radius poir�ts ofgreaterthan 10D' may be omitted
C. 5anitary Sewer Manholes
I. 2 offset stakes per manhole forthe purpase af providing alignment to the
co ntra cto r
II. Flowline grade should b� on the iath/stake for each flowline and direction noted
III. RIM grade should only be on the stake when pro�ided in the plans
J:\160505�5pecifications��iv 01-General Requirements�0171 23.16.01_Attachment A_Survey Staking
5tandards.docx
CITY OF FORT WORTH Page 10 of 22 I.ac•l;lrr�icl l�oad Srd�+rcrlk lnipl•ove�rienrs
5TANbAl2U CONS'T1Z1JCT10I+! SPECIi�1CATlON T}QCIIMENTS C"!'r�': IOI1G37-3
I�VISED: REBRARY 2017
�xarv�ple Sani�ar� 5ewer 5��l��s
r
� �����
�_� �
� - f_
� �+�� Cl, �,3
_ ��,f�y,�
? � �5 �y54
� ui f,
�� �_
� �� ' � I �
� F� _. . � j �'
In i f:, f �
� � �I.? '�l
� � � u_ I
�� '�' k� f 5� SS II � j� s7a�a+�°� I�v� c-a°� I�z e-a� ll � C-vg'
� � w
Ft F- � r� � �
V7 �
��i �
,� �
�� Z
/\ w c7
� �� U..
� y �
� m $ i�`
� � r L. G^
� � � 7'';�
� w
� �
�
't✓
t + W � K � �� 5 '--'[ �
� �`J �{/� �`� W i � '
� �r t, -1 Li ��fJf r , �_ !/) I[� 4 � �
� I + � � G
� � ��a ' "y°��� � t
�� '^� I I ti+ _n := i � 1
L,�� r y��� df ��� II � II STA�3+71� II �.tra C-3� ��� C-3� II a('r6� f f ;?��� J�}t
� f� p �l � �7 U —' � � } + .
�Lli �'�Rj I lJ -� i� �y, � (i
� W � �7" I } t� � � ,� � .y f� 5
� � G -�; 5 �F
� :` t} � ' I�il L�il :'' F l ��4�
f � � � � m � �. . I ' �
F�._ C} ¢/
�ik-'� � Q ]' I��S � $S '=�JA=Itfffi�` ��4➢� tir
��� � II —�- ��- f
���
G�� � �
�:� r} �F�5
L+ � � `
� 't.��
�
� �
� �,1
� w
�
� W
0
�
�
�
� !�
� �
V± �
L'4
�C �
�
�- F
�� �
i
�J
F
f�
��
lJ
�.
�
� �
c
ur � �
C� ��
� LJ �'� �`
G7�- �n �F
WQ lfl
�� �"
��
I, �,
l L
5
�5
�
�
�
a
a
� �
c
z� ,s
Y y� I
o� �-�E
E
r� ���
„ a ��� -i
V] R lyl
� C -�
_ 7 � �,
;�Q
j r O
r, � i a fs ��s I� II �:srnea+oo��l � c-s� ,� �� � s�� � c-o�
ltl F {IL UI I.�
Y_ �,
-3 �� Y
WS ' �' �Y �
�
I-�i _
F LI
��� zL.
�, � F �
��� E.�O
fk 4 �
;� r_
��„'-
�
w �
U
a.
� I�
� � i�
fL !T�-�
Ui "7 '�' ��
W [a_J =
F �J�
� i
��I} V
�
��
Q�
�
�
� �� �
!� � �.
6
� i .:
�'��1,_ ''
�3 �
_-.J�
W �
i� �
� ~
[� i"+
��
i c,_-
��
�,5
�
i �
s �
f,'�;
j� -.
ft•�'J � . � �ry
u�
=" ia 1
�
�G�
n�W �.
� U,
�L��W
�-
� � J
� � � �� � �
`���5
R�r
m � Z
J:�160505�Specifications\Div 01-General Requ'trements\01 7123.16,01_Attachment A_5urvey Staking
Standards.docx
CITY OF FOKT WORTH Pdge 11 of 22 Lacklrn7d l�oad 5ich�ts'r�lh Intpro��eurrizls
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS C!'A: !!10(,37-3
l2�VISED: IZEBRARY 20i 7
1111. Storr� Se►�rer � Inle� S���i�
A. Centerline Staking — Straight Line Tangents
I. 1 offset stake every 200' on e��n stations
II. Grades are to flowline of pipe unless atherwise shouvn an pEans
III. Stakes at every grade break
IV. Cut sheets are required on all staking
Optional: Actua! stakes shall consist of a 60D nail or hub set with a whisker
B. Centerline Staking—Cur�es
I. If arc length is greaier than 100', POC (Point of Curvature} offset stakes sl�auld
be set at a 25' inter�al
41, 5taking of radiu5 points ofgreater than 100' may be omitted
C. 5tarm Drain Inlets
I. Staking distances should be measured firom end of wing
II. 5#andard 1D' Inlet= 16.OQ'total length
III. Recessed 10' Inlet = 20.00' total iength
IV. 5tandard double �0' inlet = 26.67' total length
V. Recessed c�auble 10' inlet = 30.67'total length
D, Starm Qrain Manholes
I, 2 ofiFset stakes per manhole forthe purpose af providing alignment ta the
contractor
II. Flowline grade should be on the lath/stake for each flowline and direction nated
lll. RIM grade should only be on the stake when pro�ided in the plans
J:�160505�5pecifications�Div 01-General Requirements\D171 23,16.01_Attachment A_5urvey 5taking
Standards.dacx
CITY OF FORT WORTH Page 12 of 2z Laekla�rcl Rnad S7deiralkl�r:prnvemeiNs
STANDARD CONSTRUCT[ON SPEGIFiCATI0�1 I]OCUMk;NTS C'Prl�: !(10G37-3
REVE5Eb: REBRARY 2017
Exar�pl� Storm Inl�t Stakes
FF��NT �R�C�T
��i�� �,�c�r�c r�� (�ia� ��,�i�v� ��
I +� al
���I �:'� �It;__ i14 i",' r' •�i.:�i�'�' � 47
i
� I � .
� b
m i � ,
!o '�
, �
� i � �
� r r
� �
8��� � Z ���� 2
(g0E FkdhlC ii.Q.W.� I,G71 {5OE FAL7NG R.Q41_j '�*5
f f ' i�iEMT1FlES tiiHlC�-I � � � IC1tlJllnc.<'�SYiIC�H
vcs�a'[ # r`�� ��� �;C� OF Il-IE ti1SNG �.R�r �;f Q� � END OF 171E YdtJC•
� BEIM{; ,STr�}';:EC7 �ty n�4 Y, 9�NG STr.YED
I{�11 '' �� �I�� I � -�pi
WIk7 t].E�'AllCt! � � II �� - i ST,z�fI.�IJ H!�C� aE•�hllnN e�� 1
�.-��' t s,ff�n nra r-u,ras) I' � �
�'�9'i I � �'L�'� �
� -'F� �1F1E�. ::ft.4C�
i�T��' �� - e� Ci.3�9 'T�
'�1� i �I
O O
_. � _� _ �
_ -- th.�.� IpEP1T1FlE4 6RADE — � �
��- FLD4rLJNE
. ��� �i
� � �
ry j__ �I�'TAHGES FOR INLEiS __� �
sTkNOARa 10' — i�' -�
REC£53Ed 10t — 2�d'
5ThNDPRO Pd.16LE 10' — 25.5Y
HIJG ','r1T'E-i Trh.l:. � I -' — — — !�CE55E6 p01JBlE 1D' � 3Q 6Y — ^ — — — — — — — '.
1 ��'. --�- _�y
_ 1
� �r
I i
I BqC1i �7F (tdLET F�
I•V, 1� 1�''�I.. .�.. f. _ 7 . �1. �Sa� ��
�� �+, � ❑�
�I - h1�b�MHQLE �� oi
b� •+ Ftl�l
ol ` " I
� `a� { �
BiACf: fSF CURB � i� � Ei.NGh: OF C'IIRB
--------- ..r.. ..+.:� �. ••. . ,r'.i.f.RAHG . ---------
. Vi1NG�� ,'4 �'i.�.'.i y� �.. .p�.. !,,. ..S f +,�,ry: �
— — — �a�r�i�� — — ��c� c�� iN�.er ��c� �e*ir�� e�r � � �wuraE _ .._ _
--E17� OF PAVEblENT ET��E OF PA�iAE7JT EUC� 3.i� p�,1�C}AENT [ClGE �+F FA'�rEMENT� —
J:�16Q505\5pecificatians�Div 01-General Requirements�01 712�.16.0]._Attachment A_5urvey Staking
5tandards.docx
CITY �F FOR`� WORTH Page 13 of 22 Lcrcklcuad Rncrc! Srdei¢trlk In�p�•m�eu�enlx
STANDARD CONSTRUCT�ON SPECIFICAT[ON DC}CUMENTS C'I'r1'.• lOfIG37-3
REVISED: REBRARY 2017
l�III. �urb and Gu�fer S��kin�
A. Centerline 5taking — 5#raight Line Tangent5
V. 1 offset stake e�ery 5p' on even stations
VI. Grades are to top of curb unless ath�rwjs� shawn on plans
�111. Stakes at every grade break
VIII. Cut sheets are requir�d on all staking
Optional: Actua! stcrkes shal! consist of a 60D nai! or hub $ez with a whisker
B. Centerline� Staking — Curves
III. If arc length is greater than 100', POC (Point of Curvature) offset stakes should
be set at a 25' interval
IV. 5taking of radius points of greater than 100' may be omitted
J:�160505\Specifications\Qiv Dl-General Requirements�01 73. 23.16.�1 Attachment A_5urvey Staking
5tandards.docx
C1TY Or r012T WOR1'H Page 14 of 22 1_r�chlalzcl ltoc�d Sideirulk lri�provemerars
STANDARD CQI�ISTRUCTION SPEGIFICATION DOCLTMENTS C"1'n': 1�OG37-3
REVISED: AEBRARY 2DE7
�xam�l� Curb �a �utt�r Stak�s
FR�NT
�s��E F,aci�c r�)
,_:_.
0
o FR�NT � �,�nF:, �x.
F[7 �} � I T � {SDE FAOINC ¢� � ��itai SlF
� ti�1,}� � � c FRONT ��i r�r�c�a�
(51QE F'ACING �� tu.:r�t�F�ikfs-r,:n�� p�, (SipE FACING �} ;�, f
� �' Ev� 9C ' a
I
p � I � � o I �PTf �
L3�1�i� � iQa.mF r.�rFs�T c i � � r
[�e,.'�t' �. .` �'` f�f! ' � �, 4, �ca
(SIDE Fk�IMG R.O,W.) .I ��� " rfca � �
4
�-� �i' ,�y � � `��' � � [ I I I
f'�=aNT �' I,l`�I � � g�� � ( I I I
� N � � � �
N � � � � �
� �I r-. ICk7
�i � � r7P '—L'— � � � � �
I�Y,i GRPl7E i��l ;�I o I
11�IH FLE�'An :,, o + ' •�.�,-�s P�IraTsl i '—��-- —� I t I
4 � � �` '�i � I 1 ''�
+s'' � ; --� ��� � � ti 1
� . �,� -, :�; ; -
`_,_-��� f � I ti
'�a =�. I�l� { � �
I
�_ 1� �,�� �$ � f f•, �� lf +�
I __ uJ ��.✓ l f f j
� � i �' � ! 1 f
' Q�x � / ,. , �� ��� f f
- �_ � � �'�� , • �
_ se}. : `' r
� r' � fr �
I � rl
�'� �_s`' f` i ` �J
— -� -- — � TO P �F r LI fc B - - � � ' „' � '�
� � ` �� _ y �f,���- `f
_ �— --` � ,.,, � � - ,.�.-Y � , � - i
� ��
a �r = { Y - _ �
���~ y �� 1
� �, _ - - � r - �-- y
�Ai,1C, (�F `�'�Uh'L �.. Y - - Y .. �
�rf
�—"1`�f _ �
. Y�� �
I � ���- _ _ r �i"l��a� � F
F,�C� OF �LIRF� k I -' Y~ �� �,�c^�� �'�
� ---�- ����
��������
EG�E �F PAUEME7^JT
�ttarr�ple ��rb � �u��er 5�a�es a� lr��ersec�ion
J:�160505�5pecifications\Di� 01-Generai Reguirements�0171 23.16.01_Atiachment A Survey 5taking
Standards.doex
C1TY QF PORT WORTH Page 15 of Z2 Lrrcldr�t�d lt�ud Sidetiral6� lmpr•ovenre�als
STANDARD CONS7'RUCTIOt� SPECIPICATION �OCUMENTS C'Pr1': 1 �OG37-3
1�V�S�D: REBF2ARY 2617
�
�--� W LM �
� Ly
r
���a
„ � � � ��dl�
LL (� �'
��� 1 f�� 0%S II m�f STR=2+6P II F Ft 0�
� W
�
�
v
���' ,a�
Ll � �
rn !,' �r. j e-i � �. _
tJ l9 �
�. It1
i �
� .a:
�
L]
I°i�"--
w
�
<<,
L'
u
�:.
�� ---
IJ
1�
¢ ---
�
�
w
� — — '
1
i,= _
y � C
�= F
"�� I I
„ i �', � �
ICl LR.'_ 1� •'
��� - =;����
_ _ _ � - r �
�,� ,
IJ �- �� ��
� lJ
V1 L
''J �' 12
i � �
C! � �.
Q �
li
-,� � A
.� � �
v� i� �4f r
=-:J' � `�"' J `��7.
r � �v:� _ - ��},'
.S.,V�
�
�J
f �l' w G ��:
/ `�� �� � q �
_ r ;'� �-�
� ` ; �� ��~
r
�. �'
_ �tW
y���
� �.� �: ;.
m
�
�
�
�
�i ti
`��.V.1Ji� 1
lJ �j ai Li
L"1 � � �i'.� �
v �
�i
1�
.n� �l:i'YI � �; I C�
� I —.. ._ _ , „ �a � o
�,.,
�I I�
�`��' d d
_.,s
�� n
-t
. "`"' _ r c,
�, � �=
�� w .,
.���
,�rt :r ; � �`�
p`�, ,
�,, �,� _ ��.
� i,li c? � �'�. �, > w
. �
�` �
_ ,_ .7 i-
:t,�-�i `���
�lJ �- \
— iw I b
w
t,,i �'�
�� �� �- �
.; ;'
iLL Lr ' ;�.
� t.
't -
., i'wwY
-�1-
� .�� j � i W
,o� � _�-.
���I
!:\26D505�5pecifications�Df� 01-General Requirements\D171 23.16.01_Attachment A_Sur�ey Staking
Standards.dacx
C�TY OP'FOAT WDATH Page ifi of 22 I.acldcrnd Road 5idemulklri�prore�uer��s
STAND.4RD CONSTRUCTION SPECIFICATEON POCi1M�N'1'S C Pr1?' lOf1G37-3
REVISED: REBRARY 2017
IX. Cu� 5hee�s
A. Date af field work
B. 5taking Method �GPS, tatal station)
C. Project Name
D. City Project Number (Example: C01234)
E. Location (Address, cross streets, GPS coordinate)
F. Survey company name
G. Crew chief name
W. A blanlc tempEate can he obtained from th� �ur�e_y s�perintendent (see i�errt I abo�ej
St�ndard �i�v �ut Sheei
Date:
City project
Wumber:
�poject Rlame:
❑ TOTAL
Staking fVllethod: ❑ GPS STATION ❑ OTHER
LOCATION:
COT�SULT,tlNTICOWiRRCiOR
SURV€Y C��1� INIiIALS
ALL GR.��I�S A�� f0 �L016�I�INF O� f0� O� CU�f� UNL�SS OYb�RWIS� NO���.
�
PT# STATION OFFSET p�SCRIPTION �ROP. STAKED _CUT +FILL
-LTI+RT GRADE ELEV.
J:\16QS05�5petifications�Di� D1-General Requirements�01 7123.16.p1_Attathment A_Survey 5taking
Standards.docx
CITY OF FQRT W�RTH Page 17 of 22 1.carkluf�c! Roc+d Sldeiralk h�rprorenperds
STANDARDCONSTRUCTIONSPECIFIC,�TIONDOCUMENTS �Pr,' �«���j7-3
RCVISED: REBRAi2Y 2Q17
X. As-bu�l� Sur�ey
A. Definition and Purpose
The purpose of an as-built survey is to verify the asset was insCalled in the proper locatian
and grade. Furthermare, the information gathered will be used to supplement the City's GIS
data and must be in the proper format when submitted. See seciian !V.
As-built survey should include the fal4awing (additional items may be rEquested):
Manholes
Top of pipe elevations every 250 feet
Horrzontal and veriical points of rnflectron, curvature, etc. (AI! Fittingsj
Cvthodre protection testsiations
Samplrng stations
Merer boxes/vaults (A!1 sizes j
Fire lines
Frre hydrants
Gate valves (rim and top of nutJ
Plugs, stub-outs, dead-er�d lir�es
Arr Release valves (Manhole rim and vent pipeJ
Blow off valves (Manhole rim and valve IidJ
Pressure plane valves
Clearting wyes
Clean outs
Cnsing pipe (eath endJ
lnverts of pipes
Turbo Meters
J:�1fi0545\5pecifications\Div 01-General Requirements�Q171 23.16.01_Attachment A_5urvey 5taking
5tandards.docx
C1TY QF F�RT WORTH Page 18 of 22 Laclilarrrl ltnud 5'ideirrdk hrtproi�c�r7te�al.s
STANI7AR1� CONSTRUCTION SPECIP�CAT[ON DOCUMENTS C'P�V: 1�OG37-3
R�VIS�b: AEBRARY 2D17
B. Example Deli�erable
A hand written red line by the field surveyar is acceptable in most cases. This should be
a copy of the plans with the point number noted by each asset. If the asset is missing,
then the sur�eyor should write "NOi f=OU�IU" to notify the City.
J:�1605D5\Specifications�Div 01-General Requirements�Q1 7123.15.01_Attachment A_Sur�ey 5fiaking
Standards.docx
CITY Of PORT WDRTH Page 19 of 22 Lacklarzd Rocrd ,SYdeiralk Irrrprrn>eme�rls
STANDARI3 CONSTRUCTION SPECIFICATiON AOCUMENTS C�Ph'• !0(1G37-3
REVISEQ; REBRAIZY 2U17
�
�
K`µ
$4' �^ �s
�� sy��a a!
§ Eb�& a�`�Y$tl 4�
�i � � a@5 �6
�� � ��� � � �� �
�� �
� � ��n ' � � �� �g
� a Q ef
e
� � �€ � �� � � ����. �d��
`-' � -- +�-►•��„ ��r.�� �. r,�Y+� _ . .
�- � , _ .,
• , --T.. . .._. _._._.... .
� i �r rt,�--f .���,.
, {4��1•y . �'� -
` ��1.'��.T ' I I
II�I� � I �F � �I� I ' — �
i , �, �
�� � �I+r
� . ._�t �' . . T, ,
' � I��
F:�
� � ..
. . . .;� ' .�{, _ .__.. � . �
� � � � �.�:�
� �.
� I r tJ� *! _ � ' " "' " ' i
1 �c 4� i. 'i� _ 'J'. �
3 y �� 1
�y � I . I .�;' `�'� J
�.� � _ . � ._ . �.—?. :.�#''�� .. �
8� — � .._ �+� ����i;
_.�.
i —, . -
. . :�, r �{.�
�— I , �_ [r ;�+r;
- .��_�.,,��,,� r . , , ... y
� � �••.�i,� - - ' -.� u, �,
'{ LL J�� f I� 7_ ��:
�-
I � �'"".-,t i' . � �—�? j �. .
� _..Fal�l 7�' -� ;f�.�� '�
� � � . aiii —.. *
I � �`�4.*'�YCrPd r�'� ��'�' d .. .
.f�� � . i i �
� - .-,i�'�Me�� ���,� --- , . , -'I�
�d9�L4���� : i :: a � 0C si���d � ���. _ - ' - --'
' r � �� p � ;o' d
� � - -' ` , . . . I,,..I-- �`_ I
_� '!:tl�.Vl, ":1 _l � ,� . f.(5 �I 1- ti � � 1
�
�
3
�
k
9
�
�
✓, .
Ci9 S
EF �'
M'&fOnN 3N'Jd �.1f.� 'i� 5M 11G.: ...,%H1NU7 /l3A3�717d371 lf3M35
s �- � °
�� ���� � �� � a�;���,
�, � � � 6 �� ���������
�en� � �I�'F a �� �p ��ad�ntr.��
�p
�a .�$' g� ��;�����,�'�
� � `� � a � x a. Rr
���� � �� � � �������
�'{� � ��€€; $ � 3
J:�16Q505�Specifications�Div 01-General Requirements�al 7123.16.01_Attachment A_Survey 5taking
5tandards.docx
CITY �F P'ORT W�RTH Page 20 vf 22 l,creklafad Rocrd Sidetralk hupros�cnre»i.s
STANDARP COI�ISTRUCTIpN SPECIFICATTpN DpCUM�NTS
CYA-: 100G37-3
I�VTS�T3: R�BRARY 2017
- !� IpL A::C1,4T01! I4a!
� - lSW� f�[�D 1Yt1
12' WrVER
E
x eFxo
3 FF?
.` \
ei.a' s �
mr z
]q9 IT.YIyI&Y ftdFtrfllaM
/dd�»l i+.��RieNr tAd
YSL• OffiISEN�
� O�
�
O
l�� . i
5TA Ub71a0 - l,ffWL !FlpYO OR1
AfL10VE d SkYACE EX15T.
DRE Vl�A�E 6� REDf1qFA
OG�'N£Cf TO �XIST, tr wAiF.R
fN5!'Alff 1-125Tk1A Sl�V�'
rlez a�nenu���r
!-IE'dAT� Vf�IUE r=��{
Nf'�i34J095B.94d I 1
E•?.'c56.73i/734 ;-.�
!nr rc '
6ftl !li14L' iF0.
fwl Nvlh
/�� �t wo-
� ���
����
��'
d
h12'�V� BJlD { STAU�&ST5 - B'162
MdS�/7lk715123 S lNSTALL
�...nJ
�
���
���ae a sur,�
er�sr. aa� va�v�
- i2WL !OI" A
• g�fD C_"J GbW o..l. irfd.rrrvarn
1� 1:�•!/�
STA o�oG1AiD -!P N'L (FlDYD GVJ �T� �'`�� "
(FiSrkfL 1WSlAlla
f-IP'1.LE qu�.ro S[.EEYF h 12' 9n�YfRT �
p' 1f' OF 12W�4EA P1PE x'�7u55SAfi
IXMINECT TO ENIST !P INIPFJt E?29G3U37�f.
k�11�59Dg
E-22�30991'„G
r-�ex e,�a�a� r�
1 te�'4iE VhlVE` � -
h Flit�' M'44�aT< -
� 111f BFA'AR�W1' !�
� h 12' p�PE Vl,�E
M49u7o30�(M199
fsl74+P69?3BB
fl7T 1
CP. •!3 �uw,m Rr w.e�rr,�r.�
:Y'Cflf ++av��m ft Ewr A:rn R
b'�e(l038B7(b r+p.• oa �se��a
E�97pp
F7FV, 725.30
�
���r �
1��
�
~ l, 1
i�'
�....",'�_-_ '�' h
�-c� ..�..�� .�__._.
� F PROPOSEp
� � SANII'Af7!' :
� '� �' s�, SE�" SiP��
4�
�
S7A 0�6R5B - 12W �
fMSTA�1�
F IE' �F3'YE7i� BFJVD
H%9i70ST�,53
J:�160505�Spetifications�Div 01-General Requirements�0171 23.16.01 Attachment A 5urvey Staking
5tandards.docx
CITY OF FORT WORTH Page 21 of 22 Lurklcmcllioad Sicleicalk Inqn•orc�nae�rt.s
STAN�ARD CONSTRUCTION SPECIFiCATION DOCiJME�17'S CPh': fOpC37-3
REV15E�: RESRAI2Y 20i7
y 8
�� e$ ��. b��" �� �
�� S� �3 e.4 ntl
���� ����s� . ���� ���
5 ��o s �n�a t� � ���� ��� �
��� �� �� �e � �k � � � �
-��� � � � � � � �� ,
'���� ���. � a � „� � � ��
��iK�� �'$� � ��� � � �� a�� °�g
, ���� �� � �� � �. � � �� � e � �§ �
� �5 � �b � ���P� � ��� � ����� �H��
��
��
��
��
m
�
� dOF�d 05•0't�15 �NR N�1VW
1. ;, � r�-r.. ,._... .�...,....
I 55
� -- '=�'vr_�u� ' �
� I� E•��1' at
I �. ��� � �
�€j� i' i� ���,��� �� ;f
�)r . =. _ � ��a
�
- - �� � �� :�a� s�-
•"�..� ��� � ���,��
�'_;.� �'f � � 1 � �,�%��` ����'�:�
�� jc� , ��� �.,� :\.
�� ��.
s � � �� R� s ' a\. •„
gl �.: 4 � ' , �
$i � � %��
� � �[ � � �� ' ��4f
u �� � �� f8
� � a�.,
� ,� � � 6;. :di�
i ll r' ��
``� m i. � n.-
r}�. i � � �.� � �
�_..�1 � �`� J c . y ..
�g� �. EI� �.��I ����, "
��E� --_—� B - -;f. I� � f�,
t `�/
5���� �;ik� � � ` �
� }. ' , ��l,�
�`� ?� �pt �, + ,',
/1"�' )� I I ` I'
'��� tti7 ,�' P i!, ��
�.��w� � ,_ � %i./ �4 .
56��, `:��.~'wa.
4 ., bOOrp��°�/
fp) �
��'i, y\
� }t F���� ��
5F w
� ���� �a r
�� K\l�_
�a � a5� L
Yq� e �$a_�i
��� � �� t.
��t � ��
��� �
�@� � �������a
A5 � �
��
a�
��
��
o �
a 4 �
��a$-��
�C
�a� a a �
�od �5�
�
, I _ .. .. . -. - ' hF��tl�kB'q,Mh��11I"�
?,i!� , � '..�'l!.���,,�Jir.r.'� i�. = ii,
'I.� I.. �, '
� �-�_� r i � �r'�� - ' rn
.il:ii' �i � i'i� I�;�I�;I:IIi ii�f.��l;; i�9�li;'���i'i�l' ,
�'ry� ' --�=-- ]jI -_.__. 1,'�'�. ?� . — 'I„I���
��� �I`IC`31�I�I�II� li���'�'���I� . .���FI j���''il�l��.l�'I :.
�3� ii-- �i .�...T.�� ,i�l�.,l �...�7;, .�.--��.;y.�
i�—�'.�T� •iI. . 1..... I- �il � �—
��i i:! � i� � _= �,• : ;'�i � .. .. ... .., .
' I` ' �} , � I
I� i I r�f r3 ' �I �+++ �.����,''�..JlSaji� i�
��� ���������'� �� ;� �d! ,I„�M.r_ �-a:
E I ' 'I�i...���. . � � ,' ,I
IiI'I il i' — 4. �!�i r {��� � �'. �� �,l '_j��,�r p
" i 'I i ; . : ; : �: �-�_ ,,�i:�. � �� 1��'-� � � �E
�._ � � ��'P � �' ���r;'�S ''� �� I ,I�{
� � ''�� � 'j�L. � I I I I� I�' �
� �I1__�'..'� 'i ��'I I'��� ..
�. a � , � I` I ; �,� ,. +.� _ . _r,.�,_ . r .
�3+u1; � �4 r�l � �Y � sr'� r ����
�p a � I„ �� . . i i� , '�a � -l-. ;�.
�w l . � I '� ' ' ' 'It ' ���i,,
��� ,Q � , �i'� �. � ': � , 7'
p� � - � ' '�'�'.Il�.i. i' '�1Ti-'' � , ".rv,�
� � �� .1.a: �.. � � � �+�.. � , .
�� . r,��C;'�I;�.� ��,I� ; ��;,�'
�,�..i ..i I f �,
� � .'�.�� . � .i i�� .. ., I
� ' nj �
'I ....: --- ��i--' � ��� � Ci ��¢ ' IJ� . li�
V a �' ; �—... � ..�.,
,I . ,- F� ' � r � �s� 'I �I
�� i � i ,II' �I� �� _ �I��.�.:�IY4�I
, � , � . �,i.�':i. -��„�--��- -� �I �„���� �
I ' � � �u��
, : ;:. ; , :�;, ' i ,r , ...+;.. . � .. . �}
_ j'�„�r+r�. f�: � ' f;� � II.
, ,
, . ...:-:� . �.� . h
. . . � �
x�,.'k''J,b�59 ���T:-, ii;m�ii:'..
� '_��."�' „ .I� _....,�'_,., , :.L ��.,
. I� i ' i i � �,�kti � f `.; I I' � � �rF�.�µ�i ,�.itr,�. �+el I '�' �,I I
� i i , '� � ���� � .��, ,'J1�adh.� '
' ,Li �F�,4.1,'.� � f . I.�rl�� I� �j ,,,�:;I , '^' i �
, �,ir���j , .}+ ,. ,..;,_.
' : :'!j�lal4}'F4511 �, _:.._���F��...'�-+'{��-'.
, �� `�' I ' ��'� � ,. � , �� . ! ' � , ��Ilfl'��
.i'����!'�� ,I � i �,�I�'i 'lµ'� _I��_—
� i� � � r� ` `��'-' . - --•-' —
� i_`� � , -- � � � ''
�� _� �I ��I 'I��L
I
I
!
��. ,�
y�f�i
� �
Standards.docx
CITY OF FORT WORTH Page 22 of 23 l.c�cklai�d Rv�rd Sideiralk In���r�ti�enre�als
87'ANDARD CONS'PRL3CT10N Sf'6C1�'iCATION bOCUMEN'T5 C!'A-: IO(1G37-3
REVISED: REBRARY 2017
Staking
CITY OP PORT WORTIi
STANDARP CQN5TRi7CTI0I�i
AEVISE�: REBRARY 2617
Standards.doex
Page 23 of 24
Laclii(f17Lf I�RdCI S1CIC'll'RIIi L77]Jf'OVL�lNL'77LS
['PN: � �n637-3
SPECIFICATIOI�i DOCUMENTS
Obviously the .csv ar .txt file cannot be signed/sealed by a surveyar in the format
requested. This is just an example and all ti�is information should be noted when
delivered to the City so it is ciear ta what coordinate system the data is in.
paiN-r No.
1
Z
3
4
5
6
�
8
9
ia
].1
12
13
�a
�s
16
17
18
19
2D
za
22
23
24
25
2b
27
zs
29
30
31
3Z
33
34
35
36
37
3$
39
4�
41
42
43
411
45
4&
NOiITHING
694fi257.189
694626U.893
69�16307,399
G946220.SB2
fi946195.Z3
690.6190,528
694613G.{l12
6946002.267
6946003.056
69459B4.G77
69454B6.473
6945845.077
�94589G.591
69k5934.286
6945936.727
fi945835.678
6945&17.488
5945759.776
6945768.563
G945743318
G945723.219
6945682.21
G945fi21.402
6945643.407
6945571A59
6945539.498
fi945519.834
6945417.879
690.5A56.557
6945387.356
690.537D.688
5�J453'83.53
6945321.228
G945319,365
G945242.289
6945Z33.&24
6945206,483
6945142.015
E9A5113.445
6945049.02
59ASQ41,024
6945038.678
fi945006397
6944944.782
69<t49A3,432
69448:60,416
EASTIfdG ELEV
2296079.165
22960fi2.141
22�36p38.306
2296011.025
Z296015.116
2296022.721
2295992.115
2295919.133
2295433,a1S
ZZ95$80.52
2295859,892
229586D.962
22958&2.188
2Z95841.925
2Z95&30.441
2295799.707
2Z958Z7.�11
2295758.643
2Z95778.424
2295768.392
2295'759.394
2295744.22
2295fi69.471
2295736.43
2295655.195
2295 G67.803
2295G14.49
2a955a0.27
2295643.1A 5
2�95597,Ip1
229560.6.793
2295610.559
Z295551.105
2295539.728
2Z95570.715
22955A4.626
2295529305
2295557.6fi6
2295520.335
2�95527.345
2295552.675
2295552.147
2295518.135
229552p,G3S
2295536.479
2295534.397
�ESCRIP710N
726,a9 SSMH RIM
725.668 GV Rlf�l
726.85 GV RIM
723.358 55MH RIM
722.123 GV RIM
72z.325 FH
719.448 WM R1M
713333 WM RIM
713.65Z CO RIM
711.6fi2 SSMH RlM
71U.046 WM R1M
707.72 WM RIM
7pS,Zo5 WM NIM
7�9.A57 WM RIM
��a.asn co niM
707.774 SSMH R!M
708392 SSMFi REM
711.Z18 SSMH R!M
716.fl8G GV RIM
71�.631 GV RIM
712.849 GV RIM
716.686 Wfvl HIM
723.76 WM RIM
719.737 CO RIM
7Z7.514 SSN�H RIM
7a4.1Z3 4iVM RIM
732.689 WM RIM
�aa.szi wM �iM
735.q51 CO RIM
74p.756 GV RIM
740976 GW RIM
740.4�8 FH
746.34 WM RIM
746.777 CO RtM
748.454 WM RIM
749.59 SSMH RIM
751.058 W{VI RIM
75D.8S3 WM RIM
75S.B71 WiVI RIM
752.257 SSM13 RIM
751.7R WM RIM
751.88 41JN1 R1M
752.615 WM RIN�
752,8D1 WM RIM
752.156 WM RIM
752.9$b 55MH filM
. d-1 s.� � r �-
._ � � ��-
�,-��- f �•-
' � I 1�-
1 l� J
y
_,-I i 1� � �
�' I' L '�t•'
�������
�/ ''�
� �f.;w
1�'i S���r�
1 L.RJ�. -f��
��
/
J:�16D505�5pecifications��i� O1-General Requirements�D17123.16.01_Attachment A_Survey 5taking
5tandards.docx
CITY OF FOEZT WORTH Page Z4 of 25 !_ackla�rd Itot+clSYdc�rulk Irriproveirrerrls
STAt�fI]ARb CdI�ISTI2UCTlOtd 5PECIFICATION DOC[�MENTS C.'PA': lOU�37-3
REVISED: REBRARY 2017
C. Other preferred as-huilt deliverable
Some r�endors have indicated thaC it is easier to deliver this information in a different
farmat. Belaw is an example spreadsheet that is aiso acceptable and can be obtained by
request from the survey superintendent.
J:�160505�Specifications�Div 01-General Requirements�p171 23.16.01_Attachment A Survey Staking
Standards.docx
CITY OP FORT WORTH Page 25 of 26 LacRlund Roud S'icle3rrrlk Inrpro��etne�Ns
STANDARD CONS'iRUCTION SPECIFICATI4N DOCUMENTS C'PA': I!1(Jfi37-3
AEVISED: REBRARY �017
J:�160505�Specifications\Di� 01-Gen�ral Requirements�0171 �3.16.a1_Attathment A_Survey Staking
Standards.docx
Ci'I'Y OF' I'ORT WOl2TH Page �6 nf 26 f.uchlancl Road 5ideu=alk hrrpr•oveirrefats
STAIVDARD CONSTRUCTIDN �YECIFICATION DOCi1iv[ENTS � ���' ���«��'�
REVISED: REBRARY 2U17
O17423-1
CI.�ANI[+!G
Pege 1 of 4
1
2
SECTION 0174 23
CLEANING
3 PART l - GE1�T�R,AL
4 1.1 SUMMAKY
5
6
7
8
9
10
11
12
�3
14
A. Section Includes:
1. Intermediate and fnal cleaning for Wnrk not including specia.l cleaning of closed
systems speci�ed elsewhere
B. Deviations from this City of Rart Worth Standard 5peci�catioaa
I. None.
C. Related Speci�cation Sectioiis inc3ude, but are not necessacily limited to:
1. Division 0— Bidding Requirements, Conirac� Fonns and Conditions oi the Contract
2. Di�isiQn 1— General R�c�uirements
3. Section 32 92 13 — Hydro-Mulching, Seeding and 5odding
1.2 PRICE AND PAYMENT PR�CEDiTR.ES
15 A. Measurement and Payment
16 1. Work associated vuith this Item is considered subsidiary to the various Ttems bid.
17 No separate payment will be allowed f�r this Itein.
18 f .3 REFERENCES [NOT IISED]
19 1.4 ADMINISTRATIVE REQCTIltEMENT�
2o A. Schedulin.g
21 1. Schedule e1ea�Ying np�rations so that dust and other contaminants disturbed by
22 clean�ng process wi11 not fall on newly painted surfaces.
23 2. Schedule finai cleauing upou cornpletion of Worlc and immediately prior to final
24 inspection.
25 1.5 SUBNIITTALS [NOT USED]
2G 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMiTTALS [NOT USED]
27 1.'� CLQ�EOUT 5UBNIITTALS [NOT USED]
28 1.8 MAINTENANCE MATERIAL SUBMTTTALS [NOT USED]
29
30
3]
32
33
1.9 QUALITY ASSLTRANCE [NOT U�ED]
110 STORAGE, AND HANDLING
A. Stora�e and Hai�dling Requirements
1. Store cleaning products and cleaning wastes in containers speci�cally designed far
those materials.
C1TY OP FORT WORTH
STANDARp CONSTRUCTION 5PECIFICATION bOCUMENTS
Revised July 1, 201 I
l.aeklruad Razicl S'rdesraJk L»��ros�curer�P.r
['PA': IORf37-.i
01 74 23 - 2
CLEANING
Page 2 of 4
1 1.11 FIELD [�ITE] CUNDITIONS [NOT USED]
2 1.12 WARRANTY [NOT IISED]
3 PART2- PRODUCTS
4 2.1 OWNER-FURNI�f�D �oRj OWNER-SUPPLIEDPRODUCTS [NUT iTSEDj
5 2.2 MATERIALS
6
7
8
9
10
��
12
A. Cleaning Agents
1. Coxnpatible with surface being cleaned
�,. New and uncontaminated
3. �'or manufaeiured suriaces
a. Material recommended by manufacturer
2.3 AccEsso�s �NOT usEn�
2.4 SOURCE QUALITY CONTRQL [NQT USED�
T3 PART 3 - E�CUTION
I4
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
3D
31
32
3.1 INSTALLERS [NOT USED]
3.� EXAMiNATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION [N�T USED]
3.� REPAIR 1 RESTORATION [NOT TlSED]
3.6 RE-INSTALLATION [NOT USED]
3,'� FIELD [oR] SITE QilALITY CONTROL [NOT USED]
3.$ SYSTEM STARTUP [NQT USED]
3.9 ADJUSTING [N�T USED]
3.10 CLEANING
A. General
1. Preve�rt aecumulation of wastes that create hazardous condit�ons.
2. Conduct cleaning and disposal operations to comply with laws atZd safety orders of
governing authorities.
3. Do nat dispose of volatile wastes such as mineral spirits, oil or paint thinner in
storm or sanitary drains or sewers.
4. Dispose of degradabl� debris at an approved solid waste disposal site.
5. Dispose af nondegradable debris at an appro�ed s�lid waste disposal si#e or in an
alternate manuer appro�ed by City and regulatory agencies.
CITY OF FDRT WORTH
STANDARD CONS'iRUCTION SPCCIPICA'I'ION DOCUMENT3
Re�ised luly 1, 20I ]
Lackluizd Rattcl Side�rcdk In�pr•o>>ernerats
C'I'rl': 1 �J0637-3
Ol 74 23 - 3
CLEAAIING
Page 3 of 4
1
2
3
4
5
6
7
8
6, Hancile materials in a cpntrolled manner with as few liandlings as possible.
7. Thoroughly clean, sweep, wash and polisl� all Work and aquipment associated with
this project.
8. Remove aIl signs of temporary construction and activities incidental to construction
of required permanent Wark.
9. If project is not cleaned to the sa#isfaction of the City, the City r�serves the right to
ha�e the cieaning completed at the expense of the Contractor.
1 D. Do not burn on-site.
9 B. Intermediate Claaning during Construction
10 1. Keep Work areas cl��n sa as not to hinder health, safety or convenience of
11 personnel in exis�ing facility operations,
12 2. At m�imum weekly intervals, dispose of waste materials, debris and rubbisl�.
I3 3. Confine construction debris daily in st�raiegically Iocated container(s);
14 a. Cover to prevent blowing hy wind
15 b. Store debris away from consiruction or operational acti�ities
16 c. Haul fronn site at a minimum of nnce per week
17 �. Vacuum clean interiar areas when ready to receive finish painting.
18 a. Continue �acuum cleaning on au as-needed basis, until Final Acceptance.
19 5. Priar to stonn events, thoroughly cleail site of a�l loose or unseceared items, which
20 may become airborne or transported by flowing water during the storm.
2I C. Tnterior Final Cleaning
22 1. Remove grease, mastic, adhesives, dust, dirt, stains, �ngerprints, labels and other
23 foreign materials from sight-exposed surfaces.
24 2. Wipe all lighting fixture reflectors, lenses, lamp.s ai�d trims clean.
25 3. Wash and shine glazing and mirrors.
26 4. Polish glossy surfaces to a clear shine.
27 5. Ventilating systems
28 a. Clean permanent filters and replace disposable fiIters if units were operated
29 during construction.
30 b. Clean ducts, blowers and coils i�units v�ere operated without filters during
31 construction.
32 6. Replace ali burned out lamps.
33 7. Broom clean process area floors.
34 S. Mop office and control room floors.
35
36
37
38
39
40
41
42
D. Exterior (Site or Right of Way) Final Cleaning
1. Remove h•a�h and debris containers from sit�.
a. Re-seed areas disturbed by location of trash and debris containers ii� accordance
with Section 32 92 l3.
2. S�veep roadway to re�nove all rocks, pi�c�s af asphalt, conerete or any other object
that may hinder or disrupt the flow of traffic along the roadway.
3. CIean any interior areas including, but not limited to, vaults, manha�es, structures,
junctian boxes and inlets.
CITY OF FORT WORTI3
STANDARD CONSTRUCTI�N SPECIFLCATION DOCUMENTS
Ravised July 1, 2011
i.achlu�zr! Roud Srdesralk lu��n•ua��nrents
C'Ph': l��G.i7-.�
D 1 74 23 - 4
CLEA3VING
Page 4 of 4
1 4. If no �onger requir�d for rnaintenance of erasian faciliti�s, and upan appro�al by
2 City, remove erosion control from site.
3 5. Clean signs, lights, signals, etc.
4 3.11 CLOSEOUT ACTIVITIE5 [NOT USED]
5 3.12 PROTECTION [NOT USED]
6 3.13 MAINTENANCE [NOT USED]
7 3.14 ATTACHIVIENTS �NOT USED]
8
7
END OF SECTION
Revision Log
DATE NAME SUMMARY �� GHANGE
1D
�1TY OF FORT WQRTH Lacklanc( Road S'idemalk IniE�r•nvenrenls
STAI�lDARD CONS7'RUCTION SPECIFICATION DOCUMENTS C'F'A�: ! fJ0G37-3
Revised July 1, 2Q11
oi �� �� - i
CLQSEOUT REQUIREMENTS
Page 1 oi3
1
2
3 PART 1- GENERAI�
4 11 SUMMARY
5
6
7
8
9
10
11
I2 1.�
SECTION 017719
CLOSEOUT REQU�REMENTS
A. Sectian Includes:
1. The procedure for closing aut a contract
B. Deviations from this City of Fork Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division Q— Bidding Requiremea�ts, Contract Fo.rms and Canditians of the Contract
2. Division 1— General Requirements
PRICE AND PAYMENT PROCEDURES
13 A. 1l�Ieasurement and Payment
14 1. Wor�t associated with this Item is cor►sidered suhsidiary to the various Items bid.
1S Na separate payment wi�l he allowed for this Item,
16 1..3 REFERENCES [NOT U,SED]
17 1.4 ADNIINISTRATIVE REQLiIItElVIENT�
18 A. Guarant�as, Bonds and Affidavits
19 1. No application far iinal payment wilI be aecepted until alI guarantees, bonds,
20 certificates, licenses and affidavits reyuired for Work or equipment as specified are
ZI satisfacfioriIy filed with the City.
22 B. ReIease of Liens or Clairns
23 1. No �pplication for final yayment will be accepted until satisfactory evidence of
24 release of l�ens has been submitted to the Cifiy.
25 1.� SUBNIITTALS
26 A. Submit aIl required documentation to City's Project Representative.
C1TY OF FORT WQRTH l.nckla�aci Rorrd .Sideirrrlk 1ri�pi�averr�e�rPs
$TI�AIbAFtp CONSTRUCTION 3PECIC'1CATION bOCUMENTS CY,�Ir: 1(1UG37-3
Revised March 22, 2p21
01 77 19 - 2
CLOSEQUT REQUIREMENTS
Page 2 of 3
1 l.b INFORMATIONAL SUBMITTALS [NOT USED]
2 I.7 CLOSEOUT Si1BMITTALS [NOT USED]
3 PART 2- PRODUCTS [NOT USED]
4 PART 3 - EXECUTION
5 3.1 INSTALLERS [NOT USED]
6 3.3� EXA1V1iNATYON [NOT USED]
7
8
3.3 PREPARATION [NOT USED]
3.4 CLOSEOUT PROCEDURE
9 A. Prior to reyuesting Final Inspection, submit:
1Q 1. Project Record Documents in accordance with Section O] 78 39
11 2. Operatian and Mainteiiance Data, if required, in accordance with Sectioii O 1 78 23
12 B. Priar to requesting FinaI Inspection, perform final cleafiing in accordance with Section
13 O1 74 23.
14
15
16
�7
ra
l9
20
21
22
23
24
25
25
27
28
29
30
31
32
33
34
35
36
37
38
C. FinalInspectian
1. After final cleaning, pro�ide notice to the City P�•oject Representative that tize Work
is complefied.
a. The City will �nake an initial Fina1 Ins.pection with the Contractor present.
b. Upon completion of this inspection, the City will natify the Cantractor, in
writing within 10 business days, of any partieulars in which this inspection
re�eals that the Work is defective or incomplete.
2. L7pon r�ceiv�n� written noiice fronn fhe City, imm�diately undertake the Work
req.uired to remedy deficiencies and complete the Work to the satisfaction of the
City.
3. The Right-of-way slaall be clear�d of all constructian material, barricades, and
temporary signage.
4. Upon cnrnpjetion of Work associated with tI�e items Iisted in the City's written
notice, infarm the City, that the required Work has been completed. Upon receipt
of this notice, the City, in the presence of the Contractor, wi11 make a subsaquent
Final Inspection of the project.
5. Provide all speeial accessories required to place each item af equiptnent iu full
operati�n. These special accessory items include, but are not limited to:
a. Specified spare parts
b. Adequate oiI and grease as required for the first lubrication af the equipment
c. Initial fill up of all chemical ta�lks an� fuel tanks
d. Light bulbs
e. Fuses
f. VaU1t keys
g. Handwheels
CITY OF FQRT WQRTH
STANDARD COAlSTRUCTION 3PECIFICATION DOCUMETIT3
R,evised March 22, 2021
I.uck%rnd l�r�crd S'icle�rcrlk lrnprv��enlei�ls
C'PA': 1(lOG3 7-3
01 77 l9 - 3
CLC}5EQUT RE(�LTIREMEt�1TS
Page 3 oF3
1
2
3
4
5
G
7
8
9
10
11
12
13
14
15
16
17
18
19
20 3.�
h. 4ther expendable itams as required for initial siart-up and operatian of all
eyuipmeiit
D. Natice oF Project Compleiion
1. Once the City Project Representat�ve finds the Work subsequent to Final Inspectian
to be satisfactoxy, the City will issue a Notice of Project Completion (Green Sheet).
E. Supportiug Documentatinn
1. Coordinate with tlae City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement af Cantract Time
c. Affidavit of Paymen� and Release of Liens
d. Consent of Sur�ty to Final Payment
e. Pipe Report (if rec�uired)
f. Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
1. Upon review and acceptance af No#ice of Praject Completion and Supporting
Documentatian, in accordance with General Conditions, City will issue Letter of
Final Acceptance and reiease the Fnial Payment Reyuest for payment.
REPAIR 1 RESTORATION [NOT USED]
2i 3.6 RE-INSTALLATIDN [NOT USED]
22 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED]
23 3.8 SY5TEM STARTUP [NOT USED]
24 3.9 ADJUSTING [NOT USED]
25
26
27
28
29
3Q
END OF SECT��N
Revision Lag
DATE NAME SUMM�RY OF CHANGE
3/2212Q21 M Owen 3.4 C. Added Language to alarify and emphasize requirement to "Clearing ROW"
31
3.10 CI.EANING [NOT USED]
311 CLQSEOUT ACTIVITIES [NOT USED]
312 PROTECTION �NUT USED]
3.13 MAINTENANCE [NOT IISEDj
3.14 ATTACHMENTS (NOT USED]
CITY OF rOR'I' WDRTFi
STANDARD CDNSTRUCTION SPECIFICATTON DOCUMENTS
Revised Mazch 22, 2021
I.rrehlanrl Ror�d Sicleireilk Improi�e�t�c�rr�.s
C'!'Rr; IOIJ(37-�
n��s��-i
OPGI2A'E ION AND MAINTLNANC� DATA
Page 1 of 5
i
2
3 PART1- GENERAL
4 l..l SUMMARY
sECT�oN oi �rs Z3
OPERATION AND MAINTENANCE DATA
5 A. Section Includes:
6 I, Prac�uct data and related infbrma#ion appropriate For City's maintenance and
7 operation of products furnished under Gontract
8 2. Such products may include, but are not limited to:
9 a. TrafFic Controllers
10 b. Irrigation Controllers (to be operated hy the City)
l l c. Butterfly Valves
12
13
14
15
16
17 1.�
I8
19
20
B. De�iations from this City afFort V[�orth Standard Specification
1. None.
C. Related Specification Sectians include, but are nat necessarily limited ta:
I. Division 0— Bidding Requireinents, Coi�tract Forms a��d Canditions of the Contract
2. Division 1— General Reguiremen�s
PRICE AND PAYNiENT PROCEDURES
A. Measuremen� and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No. separate payment will be allowad for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADIVIINISTRATIVE REQLIIREMENTS
23 A. Schedule
24 1. Submit manuals in final form ta the City within 30 calendar days of product
25 shipment to the project siie.
26 1.� SUBMITTALS
27 A. Submittals shall he in accordance with Secfion Ol 33 00 . All submittals shall be
28 approved hy the City prior to delivery.
29 1.6 INFORMATIONAL SUBNIITTALS
30
31
32
33
3�F
35
36
37
A. �ubmittal Farm
1. Prepare data in form of an ins#ructianal manual far use by City personn�t.
2. Format
a. S ize: 8'/� inches x 1] inehes
b. Paper
1} 40 pound mini�num, white, for typed pages
2) Holes reinforced with plasiic, cloth or metal
c. Text: Manufacturer's priuted data, or neatly typewritten
CITY OF FqRT WQRTH Lrrckland Rocrd 5'ide���alk Impros�c��re�tls
3TANDARD CONSTRUCTION SPECIFfCAT10N I]OCUMENTS C!'A': IOOfi37-3
Revised Decem6er 20, 2012
U17823-2
OPEC2A'1"ION AND MAINTENANCE DATA
Page 2 of 5
1
Z
3
4
S
6
7
8
9
10
11
12
13
14
15
ci, Drawings
I) Provide reinforced puneheti binder tab, bind in with text
�) Reduce larger drawuigs and fold to size of text pages.
e. Provide fly-leaf for each separate product, ar each piece of operating
eyuipment.
1} Provide typed description of product, and majar co�npoiient parts of
equipment.
2} Pro�ide indexed tabs.
f. Cover
1) Iden�ifj+ each voiume with typed or printed title "OPERATING AND
MAINTENANCE 1NSTRUCTIONS".
2) List:
a) Title af Project
b) Identity of separate structure as applicable
c) Identity of ger�eral subject rnatter covered in th� manual
16 3. Binders
17 a. Commercial quality 3-ring binders with durable and cleanable plastic cQvers
18 b. When multiple binders are used, correlate the data �nta reIatad cansistent
I9 groupings.
20 �. If available, pro�ide an electronic fortrt of the O&M ManL�al.
21
22
23
24
25
25
27
28
29
3a
3Z
32
33
34
35
3 fi
37
38
39
�40
41
42
43
4�
45
46
47
48
B. Manual Cantent
1, Neatly typewritten table of con#ents for each valume, arranged in systematic order
a. Contractor, name of resgonsible principal, address and telephone number
b. A list af each praduct required ta be included, iiid�xed to content af tl;e �oluine
c. List, with each product:
1) The ilame, address and telephane number of the subcontractor or installer
2) A list of each product required to be included, indexed to content of the
volume
3) Idexitify area of responsibility of each
4} Local source nf supply for parks and replacement
d. Identify eacl� praduct by product name and other identifying symbo}s as set
fotth. in Contract DoCuments.
2. Product Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotaie each sheet to:
1) Clearly identify specific product or par� installed
2) Clearly identify data applicable to installation
3) Delete references to inapplicable information
3. Dz•awings
a. Suppleinent product data with drawings as necessary to clearly illustrate:
1) Relations of component parts of equipment and systems
2) Control and flow diagratns
b. Coordinate drawings wi#h information u� Project Record Documents to assure
correct illustratioii of completed u�stallation.
c. Do not use Project Record Drawings as maintenance drawings.
4. Written text, as required to sugpleinent product data fa�• the particular installation:
a. Organize in consistent format un.der separate headings for different procedures.
b. Provide logical sequezice of instructions af eacl� procedure,
CjTY OF FORT WORTH
STANbAItb CONSTRUCT[ON SPECIFICATION DOCUMENTS
ReVised Decem6er20, 2012
Lcreklcriu112nUc! 5'rdeu=u�k Irnpr��verrte�rls
C'PA': IfJ(��3� 3
Ol 78 23 - 3
OAERATION AND MAINTENANCS �ATA
Page 3 of 5
1 5. Capy nf each warranty, bond and service contract issued
2 a. Provide informatian sheet for City personnel giving:
3 1} Proper procedures in e�ent of failure
4 2) Instances which mighi affect validity af warranties ar bonds
5 C. Manual for Materials and Finishes
6 1. Subinit 5 copies oicomplete manual in final form.
7 2. Content, for architectural produc�s, applied materials and finishes:
8 a. Manufacturer's data, giving full infor�nation on products
9 1} Catalog number, size, compvsition
l0 2) Color and texture designations
11 3) Information reqvired far reordering spacial manufactured praducts
12 b. Instructions for care and main�enance
13 1) Manufacturer's recommendatian for types of cleaning agents and methods
l4 2) Cautions against cleaning agents and methods which are detrimental to
15
16
product
3) Recommended schedule for cleaning and maintenance
17 3. Content, for moisture protection and weather exposure products:
18 a. Manufactur�r's data, giving full informatian on praducts
19 1} Applicable standards
20 2) Chemical composition
21 3) Details of installation
22 b. Instructions for inspectinn, maintenance and repair
23
24
2S
26
27
2$
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
�6
47
48
D. Manual for Equipment and Systems
1. Submit 5 copies o� c�mplete manual in %nal form.
2. Content, for eaeh unit of equip�nent and system, as appropriate:
a. Description of unit and component parts
I) Functian, narmal np.erating chaeacteristics aud limiiing conditinns
2) Performance curve�, engineering data and tests
3) Complete nomenclature and commercial number of'replaceable parts
b. Operating procedures
1} Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stnpping, shut-down aud emergency instructi�ns
3} Summer and winter operating instructions
�) Special operating insiructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassernbIy
�) Alignment, adjusting anc� checking
d. Servicing and Iubricatian schedule
l) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Descriptinn of sequence af aperation by cantrn� manufacturer
l) Predicted life of parts subj ect to wear
2) Items recommended to be stockec] as spare parts
g. As installed control diagrams by contrn�s manufacturer
h. Each contractor's coordinatiou drawings
1} As installed color coded piping diagrams
CITY OF FORT WORTH
STANDARb CONSTRUCTION SPECIFTCATIDt`f DOCUM�N'I'S
Revised becember 20, 2012
Lacklaisc! IdourJ Siderrctlk httpr'oi�ureirts
C'PN: 111�b37-3
01 78 23 - 4
OFERATIQN AND MAINTENANC� DATA
Page 4 of 5
i
2
3
4
5
6
7
8
9
10
�1
12
13
14
15
16
17
18
19
2a
21
22
23
24
25
26
27
28
�9
i. Charts of val�e tag numbers, with location and function of each va�ve
j. List of originai manufacturer's spare parts, manufacturer's current prices, and
recommended quant�ties to he maintained in storage
k. Qther data as required under peitinent Sections of Specificatioiis
Content, for eaeh electric and electranic systein, as apprapriate:
a. Description aF system and compo�ient parks
1} Function, normal operating eharacteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Coznplete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical servic�
2) Controls
3) Comrnunica�ions
c. As installed eolor coded wiring diagrams
d. Operating procedures
1) Routine and narmal operatang instructions
2} Sequei3ces raquireci
3) Spacial operating instruotians
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checkijsg
f. Manufacturer's print�d operating and nnaintenance i�istructions
g. List of original manufacturer's spare parts, mauufacturer's current prices, and
recoinmended quantities to be maintained in storage
h. Qther data as required under pertinent Sections of Specifications
�. Prepare and include addetional data when the need %r s�.�ch data b�comes apparenf
during instruction of City's persannel.
30 1.7 CLOSEOUT SUBMITTALS {NOT iTSED]
31 1.8 MAINTENANCE MATER.IAL SUSMITTALS [NOT USED]
32 1.9 QUALITY ASSiTRANC�
33 A. Pro�icEe operation and maintenance data by personnel tvith the following criterja:
34 1. Trained and experienced in maintenance and aperation of described products
35 2. Skilled as technical writer to the �xient requirad to communicate essential data
36 3. Skilled as drafksman campetent to prepare required dr�wings
3
C[TY OP FpItT WORTH Laclrtmarlliaad Sidefi�rrfk lntp�•oretiter�ts
STANDARD CONSTRUCTION SPECIFICATIDN DOCUMENTS C'7'N: il70G37-3
Revised Decembcr 20, 2012
01 78 23 - 5
OPCRATION ANb MAINTCNANC� DATA
Page 5 nf 5
1.1Q DELIVERY, STORAGE, AND HANDLING [NOT USED]
111 FIELD [SITE] CONDITIONS INOT USED]
1.1� WAItRANTY [NOT USED]
4 PART � - PR�DUCTS [NOT i]SED]
5 PART 3- EXECiTTION [NOT USED]
6 END OF SECTION
Revision Log
DATE NAME SUMMARY OF CI�ANGE
8/3112Q12 D, Johnson 1.S.A.1— title of section a•emaved
CITY OF FORT WORTH l.ackln�rrl knacl5'ideira7l; lu���r»vemeials
STANDARB CDNSTRUCTION SPECIFICATION DOCUIvlETfTS C!'r1': !0(1G37-3
Revisad Dece�rber 20, 2012
a��ss9-�
PROJECT RCCORD DOCUMEN'f5
Page 1 of �}
l
2
SECTION Ol 7� 39
PROJECT RECORD DOCUMENTS
3 PART1- GENERAL
4
5
6.
7
8
9
10
11
12
l3
14
15
16
l7
1.1 �UMMARY
A. Section Includes:
1. Work assoc.iated with the documenting the project and recording eha��ges to project
documents, inc(uding:
a. Recard Drawings
b. Water Meter Ser�+ice Reports
c. Sanitary Sewer Sarvice Reports
d. Large Water 1Vleter Reports
B. Deviations from this City of Fort Worth Standard Specification
l. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditiot�s of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDiJRES
18 A. Measurement and Payment
19 l. Work associated with this Item is considered subsidiary to the various Items bid.
20 No separate paym�nt will be allawed for this Item.
21 1.3 REF'ERENCES [N�T LTSED]
22
23
1.� ADNIINISTRATIVE REQLTIItEMENTS [NOT i]SED]
1.� SUBMITTALS
24 A. Prior to submitting a request for Final Inspection, deliver Project Reenrd Doeuments to
25 City's Project Representati�e.
26 1.6 ACTION SUSMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
27
28
29
30
31
32
33
34
35
36
1.7 CLOSEOUT SUBMITTALS [NOT i]SED�
1.8 MAINTENANCE MATER[AL SUBMITTALS [NOT USED]
1.9 QZTALIT� ASSiJRANCE
A. Accuraey of Records
1. Thoroughly coordinate changes within the Record Documents, making adequate
and pra�er entries on each page of Specifications and each sheet of Drawings and
of.laer Dacuments where such entry is required to sliow �he ciiange properly.
2. Accuracy of records shall be such that future search for items shown in the Contract
Documents may rely reasonably on information obtaiiled frnm the approved Praject
Reca.rd Docu�nents.
CITY OF PORT WORTH
STANDARD CONSTRUCTIOA# SPECIFICATION DOCtiMEI�1TS
Revised July 1, ZD1 I
Laclil�nad Raad 5ideiralk ln�pi•ai�eruerrls
CPA: I �JOG37- i
OL7839-2
PR07ECT R�COAD DOCUM�NTS
Page 2 of 4
1
2
3
4
5
�
3. To facilitate accuracy of records, make entries within 24 hours after receipt of
informatian that the change has occurred.
4. Provide factual infarmatian regarding all aspects of the Work, both concealed and
visible, to enable future modifcation of the 1No�•k to proceed without lengthy and
expensive sit� measurement, investigation and examination.
1.10 STORAGE AND HANDLING
7 A. Starage and Handling Requirements
8 1, Maintain the job set of Record Documents completely protected from deterioration
9 and from loss and damage until completion of the Work and transfer of all recdrded
l0 data to the final Project Recard Documei�ts.
11 2. In t11e event of loss af recorded data, use means necessary to again secure tl�e data
12 to fihe City's approval.
13 a. In such case, provide replacerneuts ta the standards arzgi.nally required by the
14 Contract Documents.
15 1.11 FIELD [SITE] CONDITIONS [NOT USED]
16 1.1� WARRANTY [NOT USED]
17 PART 2 - PRQDUCTS
I8 �.1 OWNER-Fi]1tNISHED [oR] OWNER-SUPPLIED PRODUCTS [NOT U�ED]
19
20
21
za
23
24
25
2b
27
�,.3� RECORD DOCCJMENTS
A. Job set
1. Promptly following receipt ofthe Notice to Proceed, secure from tl�e City, at »o
charge to the Contractar, 1 complete set of all Documeiits comprising the Contract.
B. Final Record Dacumen�s
1. At a�ime �tiearing the completior� of tlie Work and prior to Final Inspectiot�, pro�ide
the City 1 complete set af al] Final Record Dtawings in the Contract.
�.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
28 PART 3 - EXEC�[7TION
29
3D
31
32
33
34
35
3.1 TNSTALLERS [NOT USED�
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 MAINTENANCE DOC[TMENTS
A. Maintenance of .lab Set
1. Irnmediately upon receipt of the �ob set, identify each af the Documents �vith the
title, "RECORD DOCUMENTS - JQB SET".
CITY QF FORT WQRTH
STANDARD �ONSTRUCTION SPECIFICATION DOCUMENTS
Reviseci July 1, z011
Lac&Imzd Roacf,5idetiralk Girpz•o��enre�aPs
C'PA': 1 nOfi3 7-3
017839-3
PROJECT RECORD DOCUMENTS
Page 3 af4
1 2. Preservatia�s
Z a. Considerin� the Contraet completion time, the probable number of occasions
3 upon which the job set must ba taken out f4r new ezrtries and far examination,
4 and the conditions under which these activi#ies will be performed, devise a
5 suitable method %r protecting the job set.
6 b. Do not use the jab set for any purpose except entry of new c�ata and for review
7 by the Ciiy, until start of transfer af data tv final Project Record Documents.
8 c. Maintain the j o6 set at the site of work.
9 3. Coordination with Constructiori Survey
10 a. At a muiimum, in accordance with the intervais set forth in Section D1 71 23,.
1 l clearly mark any deviations from Contract Documents associated with
12 installation of th� infrastructure.
13
14
1S
I6
37
l8
19
20
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
b. Use an erasaY�le color�d pencil (not ink or indelible pencil), clearly describe the
change hy graphic line and no#e as req�ired.
c. Date a�l entries.
d. Call attention to the entry by a"cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
cha�iges.
21 5. Conversion of schematic layouts
22 a. In some cases on the Drawings, arrangements of conduits, circuits, piping,
23 ducts, and similar items, are slyor�n schematically and are not intend�d to
24 partray precise physical �ayaut,
25 1) Final physical arrangemeiit is determined by the Coniractor, subject to the
26 Ciiy's appro�al.
27 2) However, design of future modifications of the facility may require
28 accurate information as to the final physical layout af items which are
29 shown only scl�ematically on the Drawings.
30 b. Show on the job set of Record Drawings, 6y dimensioii accurate ta within 1
31 �nch, the centerline of each run of items.
32 1) Final physica� arrangement is determined by the Contractor, subject to the
33 City's approval.
34 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in
35 ceiling plenuin", "exposed", and the like).
36 3) Make all identification sufficiently descriptive that it may be related
37 reliably to the Specifications.
38 c. The City may waive the requirements fQr cnnversion oF schematic layouts
39 where, in tl�e City's judgment, canversion serves no useful purpase. However,
40 do not rely upoii wai�vers being issued except as specifically issued in writing
41 by the City.
42 B. Final Pi•oject Record I7ocuments
43 1. Transfer of data to Drawings
44 a. Carefully t�•ansfer change data shvwn on the job set of Record Drawings to the
45 corresponding final docurnei�ts, cooedinating the changes as required.
46 b. Clearly indicate at each a�ected detail at�d otl�er Drawing a fitll description of
47 cl�aixges made during coustruction, and the actual location of items.
CITY OF FORT WORTH Lacldmrd Rnad S'iden�ulk ln�prnveitterr�s
STANDARD CONSTRUCTION SPCCIFICATION DOCUMENTS C'P:��: �00G37-3
Revisad 7uly 1, 2011
017839-4
PAOJECT RECQAD �OCUMENTS
Page 4 of 4
1
2
3
4
5
6
7
8
4
l0
]1
]2
]3
14
15
16
17
18
19
20
21
z2
23
24
25
a. Call aftention to each entry by drawing a"claud" aroe�nd the area or areas
affected.
d. Make changss neatly, consistently and with the proper media ta assure
longevity and clear reproduetion.
2, Transfer of data to other poctiments
a. If the Docu�nents, other tha�� Dravwings, liave been kept clean during progress of
the Wark, and if entries thereon have been orderly to the appro�a] of the City,
the jo6 set afthose Documents, ather than Drawings, will be accepted as finaI
Record Documeiats.
b. If any sucis Document is r►ot so approved by tha Ciiy, secure a nevv copy af that
Document from the City at #he City's usual charge for reproductian and
handling, and carefully traiisfer the change data to the new copy to the appro�al
of the Gity,
3.� REPAIR / RESTORATZON [NOT USED�
�.6 �-nvsTa�TioN �NOT usEn�
3.'1 FJELD [o�] SITE QUALTI'Y CDNTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUS'TING [NOT USED]
3.1Q CLEANING [NOT LTSED]
3.1I CLOSEQi1T ACTIV�TIES [NOT USED]
3.12 PROTECTION [NOT USED]
313 MAINTENANCE [N�T USED]
3.14 ATTACAMENTS [NOT USED]
END OF S�CTION
Re�ision Log
DATE NAME SUMMARY OF CHANGE
26
C1TY OP FORT VYO1tTH
STANDARD CONSTRUCTION SPECiFICATION DOCUMENTS
Kevised July 1, 2.01 l
f.crckland Roacl Srde�rulk liiiprol�euiern.s
C'PA': !lJ(Jb37-3
33 OS 14 - 1
ADJUSTING MANHOLES,INLETS, VALV� BOXES, AND OTHER STRUCI'URE3 TO GRAB�
Page 1 af7
1 SECTYON 33 0� 14
2 AD.NSTING MANHOLES, INLETS, VALVE B�XES, AND OTHER STRUCTURES TO
3 GRADE
4 PART1- GENERAL
5 1.1 SUNIlIZARY
6 A. Section Includes:
7 1. Vertical adjustments ta maiiholes, drnp inlets, vaIve 6oxes, cathodic protection test
8 statians and other miscellaneous structures to a new grade
9 B. De�iations #'rom this City of Fort Worth 5tandard Specification
10 1. None.
11
l2
13
14
15
!6
17
18
19
20
21
22
23
2�
25 1.�
26
27
2&
21
�a
31
32
33
34
3S
36
37
38
39
40
C. Related Specification Sections include, but are not necessarily limited to:
1. Division D— Bidding Requirements, Contract Forms, and Conditi.�ns af the
Contract
2, Division l— General Reyuirements
3. Section 32 O 1 17 — Permanent Asphal# paving Repazr
4. S�ction 32 al 29 — Co.iicrete Paving Repair
S. Section 33 QS 10 — U#i�ity Tre�nch E�cavatian, Emhedment anti Backfill
6. Section 33 05 I3 — Frame, Cover and Grade Rings
7. Section 33 39 l�l -- Cast�in-Place Concrefie Manholes
S. Section 33 39 2�i — Precast Cancrete Manholes
9. Section 33 12 20 — Resilient 5eated (Wedga) Gate Valve
1 d. Section 33 12 2I — AW�VA Rubber-Seated Butterfly Valve
1 I. Section 33 04 1 l— Corrosion Control Test Station
12. Section 33 04 12 — Magiiesium Annde Cathodic Protection System
PRYCE AND PAYMENT PROCEDURES
A. Measureme��t and Payment
1. Manhole — Minor Adj ustment
a. Measurement
1) Measurement for tliis Item shall be per each adjustment using only grade
rings or other tninar adjustnaent devices to raise or Iower a nnanhole to a
grade as per caordination with city inspector based on final grade of
sidewalk.
h. Payment
1) The work perfonned and the materials furnished in aecordance wi#l� this
Item will be paid for at the unit price bid per �acli "Manhole Adjust�nent,
Minor" cainpleted.
c. Tlie price 4sid shall inelude:
1) Pavement removal
2} Excavation
3} Hauling
CITY OF FORT WORTH Luekland Rorrcl SYdeiralk 6upr•nrente�at.s
STANDARD CONSTRUCTION SPECIFiCATION DOCUMENTS C'NR'.� l�f1G37-3
Revised July 17, 2a21-M Assaad
33OS 14-2
ADJUSTING MANHOLES, INL�TS, VALV� BOXES, Aidla aTHHR STRUCTURES Tq GRAD�
Page 2 of 7
l
2
3
4
5
6
7
S
9
10
11
I2
I3
14
15
I6
i7
18
19
20
21
22
23
24
25
26
27
28
29
3Q
31
32
33
34
35
35
37
38
39
40
41
42
43
44
45
46
47
48
49
2
3
�4) Disposal of excess material
S) Grade ri��gs or ather adjustment device; for AT&T and ATMOS manhales
grade rings v�+ill be provided by franchise uiilitie� (AT&T and ATMOS).
Conb•ac�or wi11 cbordinate delivery, installation, and inspeciior� af grade
ring or ather adjustment devices.
6} Reuse oithe existing manhole frarna and cover
7) Furnislling, placing and campactioz� of em6edment and backfill
S) Concrete base material
9) Permanent asphalt patch or concrete pa�i�sg repair, as required
10) Clean-up
Manhole - Major Adjustment
a. Measurement
rt) Measurement for t�iis ltein shall be per eacii adlustinent requiring structura�
modifications to raise or lower a manho�e to a grade as specified on the
Drawings.
b. Payment
1} The work pei�ormed and tlie rnaterials furnished iu accordance with this
Item wili be paid far at the unit price bid per eac�� "Manhole Adjustment,
Major" completed.
c. The pt-ice bid shall inelude:
1) Pavement removal
2) Excavation
3) HauIing
4) Disp�sal of excess material
S) Structural modifcations, grade rings or atl�er adjustment de�ice
6) Reuse of the existing manhole Fraine and cover
7) Furnishing, p�acing and campaction of embedment and backf'iil
8) Concrete base material
9) Permaaaent aspl�alt patcl� ar conorete pavuig repair, as required
] 0) CIean-up
Manhole - Major Adjustment with Frata3e and Cover
a. Measurement
1) Measurement for t17is Item sl�all be per eacl� ad�ustnnent requiring structural
modifications to raise or lower a manhole to a grade specified on the
Drawings or structural modifications for a manhole requiring a new frame
and cover, often far changes to eflver diameter.
b. Paymenfi
I) The work performed and the �natarials furnisl7ed in accardance with this
Item will be paid for at the unit price bid per eacit "Manhole Adjustment,
Major w/ Cover" corapleted.
c. The price bid shall include:
1) Pavement remoaal
2} Excavation
3) Hauling
4} Dispasal af e�cess material
5) Structura� modifications, grade rings or other adjustrnent de�ice
6) Frame and cover
7) Furnishuig, placi�lg and compaction of embedment and backfill
8) Concrete base material
CITY OP FOAT WORT�I
STANDARD CONSTRUCTION SPECIF[CATIpIV DOCUMENTS
Revised Iuly l7, 20z1-M Assaad
Lacklcr�zd RoaCl Side+tiralk In�proreruerv,s
C'Pr1': 100C37-3
33 03 14 - 3
ADJUSTING MA3VHQLES, I[�fLETS, VALVE SOXES, AND QTHER STRUCTURES TO GRADE
Page 3 af 7
1
2
3
4
S
6
7
8
9
10
11
12
l3
14
l5
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
3S
36
37
38
39
�a
43
�2
43
44
45
46
47
48
49
�
E
�
9) Permanent asphalt patch or concrete paving repair, as required
10) Clean-up
Inlet
a. Measuremant
1) Measurement for this Item shall be per each adjustment requiring structural
modifications to inlet to a grade specified on the Drawings.
b. Payment
1} The work performed and the materials furn�shed in accordance with this
Item wi13 be paid for at the unit price bid per each "In1et Adjustment"
completed.
c. The price bid shall include:
1) Pavement remo�al
2) Excavation
3) Hauling
Q�) Disposal of excess material
5) Structural modifications
6) Fur�aishing, placing and compactian of ernbedment and backf'iil
7) Con�rete base material, as required
S) SurFaee restoration, permanent asphalt patcli ar concrete paving repair, as
require.d
9) Cl�an-up
Valve Box
a. Measurerne�it
1) Measur�ment for this Item shall be per each adjustment to a grade specified
an the Drawings.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item will be paid for af the unit price bid per each "Valve Box Adjustment"
compl�ted.
c. Tlie price bid shajl include:
1) Paveinentremoval
2) Exeavation
3) Hauling
4) Disposal of excess material
S) Adjustment device
6) Fumishing, placsng and compaction of embedment and backfill
7) Concrete base material, as reyuired
8j Concrete colar labor and material, as required
9) Surface res�oration, p�rmar�ent asphalt patch or concrete paving repair, as
required
10) Clean-up
Cathodic Protection Test S.tation
a. Measureinent
1) Measurement for this Item shall be per each adj ustment to a grade specified
on the Drawings.
b. Payment
I) The work performed and the snaterials f�rnished in accordance with this
Item will be paid for at tha unit price bid per eaeh "Cathodic Protectiol�
Test Station Adjustment" completed.
CITY OF FORT WORTH
STANDARD CDNSTRUCTION SPECIFICATION DOCCTMEiVTS
Revised 7uly 17, 2D� 1-M Assaad
Lncldutrrl Rau�! Srde�rc+lh Impr��i�e�xe�71a•
f'!'A�: 1lJOt3l-.3
33 as ia-a
AD]USTING MANHbLES, IAILETS, VALVE BQXE$, AND OTHER STRUCTURE3 Tp GRADE
Page 4 of 7
1
2
3
4
5
6
7
S
9
10
11
12
13
I4
15
16
17
18
I9
20
21
22
23
24
25
26
27
2$
29
30
31
32
33
34
35
36
37
38
39
40
�1
42
43
44
45
46
47
�S
49
c. The price bid shaIl include:
1) Pavemerrt remaval
2) Excavaiion
3) Haulang
4) Disposal of excess inaterial
5) Adjustment device
6) Furnishing, placing and compac#ion of embedment and baekfil!
7} Concrete hase material, as required
8) Surface restoration, perrnaneilt asphalt patcl� or concrete paving repair, as
required
9) Clean-up
7. Fire Hydrant
a. Measurement
1) Measurement for this Itein shall be per each adjustmeiit requiru�g stem
extensions to meet a grade specified by the Drawings.
b. Payment
1) The work performed and the materials furnished in accordance witl� this
�tem vuill be paid for at t�e unit price bid per eac�i "Fire Hydrant Stein
Extensioii" completed.
e. The priee bid shall inc[Lide:
1) Pavement removal
2) Excavation
3) Hauling
4) DisposaI of excess material
5} Adjustmeiit materials
6} Furnishing, placing and compaction of embedment and backfill
7) Concrete base rnaterial, as required
8) �urface restoration, permanent asphalt patclti or concr�te pa�ing repair, as
required
9) Clean-up
8. Miscellaneous Structure
a. Measurement
I) Measurement for this Item shall be per each adjustme��t t�sing only rninar
grade adjusfinenfi to raise or lawer a water meter box to a grade as needed
in th� fie.ld the City Inspector.
b. Payment
1) The warlc performed and the materials furnishad in accordance with this
Item will be paid for at the unit price bid per each "Miscellaneous Structure
Adjustment" complet�d.
c. The price bid shall inciude:
1) 1'aWement remor�a!
2) Exca�ation
3} Hauling
4) Concrete Meter Box and Lid
5) Sanitary Sewer Clean out and lid
6) Disposal of exeess materiaj
7) Structural modifications
8) �"urnishing, placing and compaction of embedment and backfill
9) Concrete base material
CITY OF FQRT WORTH
STAN�ARD COI�STRUCTION SPECIFICATIOT�! DOCUiv(EAfTS
Revised 7uly 17, 2021-M Assaad
(.rrciclancl Road .5'rdeirallc Mrprorenrerz�s
C!'A': �()f1G37-3
33DS14-5
A�,![]5T3NG MANHOI.ES, INLETS, VALV� I30XC5, AI�D OTH�R STRUCTURES TO GRADE
Page 5 of 7
1 1 Q) Permailent asphalC patch or concrete paving repair, as raquired
2 11} Clean-up
3 1.3 REFERENCES
4
5
6
7
8
9
10
11
T2
13
14
15
l6
17
18
19
20
21
22
23
2�
25
26
27
A. Defnitions
1. Mi�iar Adjustment
a. Refers to a small elevation cliange performed on an existing manIlole or water
meter box where the existing frame and cover are reused.
2, Major Adjustment
a. Refers ta a significa�t elevation change performed on an existing manhale
which requires structural znodification or when a 24-incll ring is changed ta a
30-inch ring.
B. Referej�ce Standards
1. Reference s#andards cited in this Specification refer to the current referenc�
standard published at the time of the latest revisian date logged at the end of tlais
Speci�cation, unless a date is speciFcally cited.
2. Texas Commission an Environmental Quality (TCEQ):
a. Title 30, Part I, Chapter 217, Subchapter G, Rule 217.55 — Manholes and
Rela#ed Stn�ctures.
I.4 ADNIINISTRATIVE R.EQUIREMENTS [NOT USED]
1.S SUBNIITTALS [NOT USED]
1.5 ACTIDN SUBMITTALS/INFORMATIONAL Si�BM�TTALS [NOT USED]
1.7 CLOSEOUT SUBNIITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL �T]BMITTALS [NOT iTSED]
1.9 QUALITY ASSUItANCE [NOT U�ED]
1.10 DELNERY, STORAGE, AND HANDLING [NOT USED]
111 FIELD [�ITE] CQNDITIONS [NOT i7SED]
112 WARRANTY [NOT USED]
28 PART 2 - PROD[ICTS
29 2.1 OWNER FLTRNISHED [oR] �WNER-SUPPLIED PRODUCTS [NOT USED]
30 �.� MATERIALS
31
32
33
34
35
A. Cast-in-Place Cancrete
l. See Section 43 30 00.
B. Modifications to Existing Concrete Structuras
Z. See Section 03 80 00.
C. Grade Rings
CITY �F FORT W�RTH
'STANDARD CdNSTRUC'1'ION SPECIFICATION T70CU�AEIV'I'S
Revised luly 17, 2021-M Assaad
Lacldrrrzd Road Srdeircrlk Improrenleri�s
C'P,1: 1 f10�3Y-3
33 US l$ - 6
ADJUSTII�G iv[AI�II-[OL�S, INLETS, VALVE BDXES, AND OTHER STRUCTCIRES TO GTiAI]E
Page 6 of 7
1 1. See Section 33 05 13.
2 D. F'rame and Cover
3 I. See Sectioi� 33 OS 13.
�4 E. Back�ll material
5 1_ See S�ction 33 OS 10.
6 F. Water valve box extension
7 1. See Section 33 12 2Q.
8 G. Corrosion Protection Test Station
9 1. See Section 33 04 11.
10 H. Cast-in-Place Concr�t� Manl�oles
11 1. See Sectian 33 39 10.
12 I. Precast Canerete Manhales
13 1. 5ee Section 33 39 20.
14 2.3 ACCESSORIES [NOT USED]
15 2.4 �Oi1RCE QiTALITY CONTROL [NOT USED]
16 PART 3 - EXCCUTION
17 3.1 INSTALLERS [NOT i1SED]
1 s 3.� EXAMINATTON
19 A. Verification of Conditions
20 1. Exami��e existing structure to be adjusted, for damage or defects that may afFect
21 grade adjustment.
22 a. Report issue to City for cansicieration before beginning adjustment.
23 3.3 PREPARATION
24
25
25
27
28 3.4
29
30
31
32
33
34
35
36
37
A. Grade Verification
1. On major adjustments confirtn any grade cliange noted on Drawii�gs is consistent
with field measurements.
a. If not, caordinate with City to �erify final grade before beginning adjustment.
ADJUSTMENT
A. Manhoies., Inlets, and Miscellaneous Structures
1. On any sanitary sewer adjustment replace 24-inch fram� and eover assembly witli
30-inch irame and cover assembly per TCEQ requirezx�ent.
2. On ma��hole major adjustments, inlets and miscella►ieous structures protect the
bottom using wood forms shaped to fit so that no debris hlocks the invert or the
inlet or outl�t p'rping in during adjustments.
a. Do nat use any more than a 2-piece bottorr�.
3. Do not extend chimney portion of the manhole beyond 24 it�►ches.
4. Llse the least number of grade rings nacessary to ineet required grade.
CITY OF FORT WORTH Lpcd'fc��1d RnCrd Sidc ircrlk 1nrPrrn=�rne��ls
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CP,1r: 1f10637-3
Revised 7uly l7, 2D21-M Assaad
1
z
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
33 U5 14 - 7
RD]USTIMG MANHOLES, INLETS, VALVE IiOX�5, A3�D OTHER STRUCTURES TO GRADE
Page 7 of 7
a. For e�ample, if a 1-foot adjustment is req�ired, use 2 6-inch rings, not b 2-iiach
rings.
S. Valve Boxes
1. Utilize typica� 3 piece adjustable valve box for adjusting to final grade as shown on
the Drawings.
C. Backfill and Gradin�
1. B:ack�ll area of ex�a�ation surrounding each adjustment in accordance to Sectian
33 OS 10.
D. Pavement Repair
1. Tf required pavement repair is to be perfarmed in aceardance rvith Section 32 01 17
or Section 32 O1 29.
3.� REPAIR / RESTORATION iNOT USED]
3.6 RE�IN�TALLATION [NOT USED]
3.'� FIELD [oR] SITE QUALITY CONTROL [NOT USEDJ
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJ[TSTING [NOT USED]
3.1U CLEANING [N�T USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
31� PROTECTIDN [NOT USED]
3.13 MAINTENANCE [NOT L1SED]
3.14 ATTACH1VlENTS [NOT U5ED]
END OF SECTION
Revision Log
DATE NAM� SUMMARY O� CHANGE
1.2.A — Pay item added for a majar manhole adjustment which reuses tE�e existing
frama and cover and a major adjustment requiring a new frame and cover; Added
12/20/2012 D. Johnson �tems to be included in price bitis; Blua text added for clarificatinn far miscellaneous
structure adjustments
3.�4 — Pavement repair requirements were added
1.2 A 8 a.Measurement I} Measurement for this Item shall be per each adjustment
using vnly minor grade adjustment to raise or lower a water meter box ta a grade as
neaded in the field the City Insp�ctor.
(i7/i4/2021 M Assaad I.2.A.8.a.1 Mcter hnx adjustment clarifcakion
23
GITY DF PORT WORTIi
STANDARD CDNSTRUCTION SPECIFICATION DOCUMENTS
Revised July 17, 2021-M Assaad
LUcklarrd l�ocrd Sideirrrlk h�rf�r�rerrreirls
CPN: lOOG37-3
331210-1
WAT�R SERVICES I-1NCH TD 2-[NCH
Page 1 of 17
SECTION 33 1� 10
WATER SERVICES 1-INCH TO 2-iNCH
PART1- GENERAL
1.1 SITMMARY
A. Section Includes:
1. Lead-free I-inch to 2-inch water service lines from tl�e water main to tl�e right-af-
way, �ttings and water meter boxa:s complete in placa, as shown on the Drawings,
directed by the Engineer, and specified herein for:
a. New Water Service
b, New Water Service (Boreci)
c. Water Meter Service Relocate
d. Private Water Service
B. Deviatians from this City of Fart Worth Standard Specification
] . None.
C. Proc�ucts Installed i�ut i�ot Furnished iJnder this Sectian
1. Water rneters %r various sizes
D, Related Specification Seetions include, but are not necessarily fimited to:
1. Division 0— Bidding. Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Reyuiraments
3. Section 33 0�4 40 — Cieaning and Acceptaaace Teating of Water Mains
4, Sectian 33 05 10 — Utility Trench ��cavation, Embedment and Backfill
5. Section 33 12 25 — Connection to E�cisting Water Mains
1.2 PRICE AND PAYMENT PROCEDiTRES
A. Measurement and Payrnent
1, New Water Service
a. Measurement
1) Measurernent %r this Item shall be per each new "Water Service" complete
in place froYn the tap of the main to the installation of the meter 6ox and
associated appurte�iances where the service line is installed by apen cut
construction.
b. Paymer�t
1) The work performed and materials furnished ir� accordanee with this Item
and measured as pro�+ided under "Measurement" will be paid for at the unit
price bid per each "Water Service" installed far:
a) Various sizes
c. Tlie pxice bid shall include:
1) Furnishing and installing New Service Line a� specified by the Drawings
2) Submitting product data
3) Tapping saddl�
4) Coeporation stop
5) Curb stop
CITY OF FQRT WORTH I.acklanrl lirruc! Sid�jralk If�rproi�eitaenls
STANbARb CqNSTRUCTiON SPECIFICATION DOCUMENTS C'PN: 10l1(37-3
Revised May ], 2Q2D
33 12 10 - 2
WAT�R SERVICES l-INCH TO 2-INCH
Page 2 of 17
&j Fittings
7) Ser�ice line ins#alled by open cut
8) Connection to meter
9) Meter Box and Lid
l Q) Pa�ement removal
l 1) Excavation
12) Hauling
13) Disposal of excess material
14} Surface Restaratian associated with Meter Bax i.nstallation and connection,
exclu�ing grass (seeding, sodding or hydro-mulch paid separately)
15} Clean-up
16) Disinfeciion
17) Testing
2. New Bored Water Ser�ice
a. Measurement
1} Measurement far this Item shall be per each new Water Service complete in
place from the tap of the maiil to the uistallation of the rr►eter box and
associated appurEenances where th� s�rvice line is instalied by trenchless
method.
b. Payment
1) The wark per�orzned and materiais furnished in accordance with this Ttem
and measured as pravided under "Measurement" will be paid for at the unit
price bid per each "Bored Water Service" installed for:
a) Various sizes
c. Tha price hid shall include:
1) Submitting product data
2) Tapping saddle
3) Carporation stop
4) Curb stop
5} Fittings
6} Servic� line installed by trenchless �nethod
7) Connection to ineter
8) Meter Ba� and Lid
9} Pavement removal
10} Excavation
11 } Hauling
I2) Disposal of excess material
13) Surface restoration associated with Meter Box installatioii and connectian,
excluding grass (seeding, sodding or hydro-inulch paid separately)
14) Clea»-up
15) Disinfection
i 6) Testing
3. Water Meter Ser�iea Reca��aiect
a. 1Vleasurement
1) Measurement for this Item shall be per each Water Meter Service
Reconnect complete in place from public service �ine connection to private
service line connection.
b, Payinent
CITY pP FORT WORTH Lrrcklrnrd Rr�ucl ,Sideirnik lutli��orerrtervs
57'ANDARD CONSTRUCTION fiPECIFICATIpN DQCUMENTS C.'PN: l0(1637-3
Revised May l, 2020
331210-3
WATER SERVICES 1-INCH TO 2-INCH
Page3of17
I) The work performed in conjunction with relacation oftlse metar, assoeiated
private service line, fittings and meter hox S feet or less in any direction
from centerline of existing meter �acation and the materials furnished in
accardance with this Item wi11 be paid for at the unit price �id per each
"Water Meter Servic�, Reconnection" installec� for:
a} Various size of services
c. The price bic� shall include:
1) Private sarvice Iii1e
2) Fittings
3) Private connection to water meter
4) Conn�etion to existing private ser�ice line
5) Cut anc� crimp of existing service
6) Remnval and Disposal or Salvage of existing 2-inel� or smaller water meter,
as directed by City
7) Pavement removal
8) Excavation
9} Hauling
10) Disposal of exeess material
11) 5urface restoration for area disturbed for installatian of ineter box,
excluding grass (seeding, sodciing or hydro-mulch paid separately)
12) Clean-up
13} Cleaning
14} Disinfection
15} Testing
4. Private Water Service Relocation
a. Measurement
I) Measurement for this Item shall be per linear foot af Private Service
relocation complete in place from the meter box to a connection to the
existing service line an private properiy.
b. Payment
1) The work pei-formad in caryjunction witl� Private Service Line installation
where the meter and meter boxes are moved mare than 5 f�et in any
direction from centetline of existing meter location and materials furnished
in accardance with the Item anci measured as provided under
"Measurement" will be paid for at the unit price bid per linear £oot of
"Private Water Ser�ice" per%rmed for:
a) Various service sizes
c. The priee bid shall include:
1) Obtaining appropriate p�rmit
2) Obtaining Right of Entry
3) S�bmitting product data
4) Private service line
5) Fittings
6} Backflaw prev�nter, check valve, and isolation valve relocation, if
applicable
7) Con�zectian to existing private service line
8) Pa�ement removal and replacement
9) Excavatio�i
10} Hauling
11} Disposal of excess material
C1TY OP PORT WORTH Lucklcmd 12ocrd S'idcnrcrlk lnrl�r•oner�re�tls
STANDART] CONSTRUCTION SPECIFICATIQN pOCUMEI�TS C'PN: 100637-3
Revised May 1, 2020
a3 r� ia - a
WATERSERVIC�S 1�INCH'I'02-INCH
Page 4 af 19
12) 5urface restoration, excluding grass (seeding, sodding ar hydro-mulch paid
separately)
13} Clean-up
t 4) Cleaning
15) Disinfection
1 b) Testing
5. Water Meter Box Replacement
a. Measure�nent
1} Measurement for tliis Item shall be per each new Water Meter Box
comp�ete in place at the installation af the meter box and associated
appurtenances where the service Iine is existiug.
b. Payment
1} The work performed and materials furnished in accordance with thi� Item
and measured as provided under "Measurennent" will be paid for at the unit
price hid per each "Water Meter Box Replacement (Cancrete)" insta�led
for:
a) Various sizes
c. The price bid shall include:
1) Submitting praduct data
2} Private eonnec�tion to water meter; Subsidiary if ineter dainagad during
constructio�i per City Inspector
3) Cou�section to existing private service liiie; Subsidiary if ineter damaged
during construction per City Inspecior
�) Cut and crimp of existing ser�ice; Subsidiary if ineter damaged duriz�g
canstruction per City Inspector
5) Remo�al and Disposal or Salvage of existing 2-iiich or smaller water meter,
as directed by City; Subsidiary if ineter damaged during construct�on per
City Inspector
6) Meter Box and Lid
7) Exeavation
8} Hauliiig
9} Disposal of excess material
10) Surface restoration associated witis Meter Bax installation, excluding grass
(se�ding, sodding ar hydro-mulch pai� separately)
11) Clean-up
12) Disinfection
13} Testing
1.3 REFERENCES
A. Def►nitions
l, New Service
a. Installation of new 1-incl� to Z-i��ch Water Service Line by open cut
coi�.struction from tlle water main to #1ie right-of-way, including corparation
sto�, curb stop, fittings and water meter boxes compleie in pface, as shown on
the Drawings.
2. New Sez'vice {Bared)
CITY OF FORT WORTH f_acklcirrd Ro�cJ,Sicic�rcrlk Inry�r�ai�e�ne���s
STAAIDARD CO.N5TRUCTIflN 3PECIFICATlON DOGUMENT5 C`PA': IOOff37-3
Revised May 1, 2020
33 12 10 - 5
WATER 5ERV10E5 L-INCH TO 2-INCH
Page 5 of 17
a. Installation of new 1-inch to 2-ixicl� Water Service Line by trencliless
construction method from �li� wafer main tn the right-o� way, including
corporation stop, curb stop, fittings and water meter boxes comp�ete in place, as
sl�own on tlie Drawings.
Meter Ser�ice Reconnection
a. Relocatio�� and reconnectian ofthe private set�+ice line from an e�isting meter
tv be abandoned and a nerw meter installed that lies within S feet of the e�sting
meter.
4. Private Serviee Relocation
a. Relocation ar►d reconnectian of private s�3rvice lit�e behind the water meter
wher� tl�e existing trt�ter to be abandoned and the new meter installeci is grester
�lian 5 feet of the existing met�r. A licensed plumber is requirad ta relocate the
private ser�ice.
5. Lead-free
a. Lead-free pipes and plumbing fittings and �xtures shaII contain less than 0.25
percent lead in accordance with the reduetion of Lead in Drinking Water Act
(P.L. 111-380).
S. Reference Standards
l. Reference standards cited in this Speci�cation refer to the current reference
standard p�blished at the tiine of the iatest revision date logged at the end af tl�is
Specification, unless a date is specifically cited.
2. ASTM International (ASTM):
a. A48, Standard Specification for Gray Iron Castings.
b. AS36, Standard Specificatian far Ductile Iron Castings.
e. B88, Standard Specificat�on for Seamless Copper Water Tube.
d. B98, Standard Specifcation for Copper-Silican Alloy Rod, Bar and Shapes.
e. Ci31, Standard Specification for Resistance to Degradation of Small-5�ze
Coarsa Aggregate by Abrasion and Impact in the Los Angeles Macliine.
£ C 150,. 5tandard Specification for Portland Cement.
g. C330, S#audard Specifcation for Lightweigh# Aggregates for Structural
Concrete.
h. C85'1(RLj, Standard Ptactice for Minimum Structural Design Loading for
Undergraund Precast Concrete Utility S�ructures
i. D883, Standard Tertninolagy Relating to Plastics.
j. D1693, Standard Test Method for Enviroiimenta� Stress-Cracking of Ethylene
Plastics
3. American Water Works Association (AWWA);
a. C700, Cold-Water Meters - Displacement Type, Bronze Main Case.
b. C800, Und�rground Service Line VaIves and Fittings.
4. NSF InternaEia�aal (NSF}:
a. 61, Drinking Water System Components - HeaIth Effects.
5. Reduct�on of Lead in Drinking 1�Vater Act
a. Public Law i 11-380 (P.L. 11 l-3$0)
6. GeneraI Ser�ices Administratian (GSA):
a. RR-F-G21E, Frames, Covers, Gratings, Steps, Surrip and Catch Basin, Manhole
C1TY OF FORT V�+ORTI-i Lr�ckland Road S'rrles��ulk inrp��n,�e„zerar.s
STANDARp CONSTALIGTI�N 5PECIFICATION DOCiJivfEldTS ('Yr1:• 10(1Gi7-3
Revised May 1, 2020
331210-6
WAT�R S�RVICES 1-INCH TO 2-IAICH
Paga b oF 17
1.4 ADMINI�TRATIVE REQiJIItEMENTS
A. Saheduling
1. Pro�ide advance notice for service interruptions and meet requirements of Division
0 and Division 1.
1.5 SiTSMITTALS
A. Submittals sliall be in accordance with Section Ol 33 00.
B. Al� submittals shall be approved by the City prior to delivery.
1.6 ACTION SUBMITTALS/INF�RMATI�NAL SLTBNIITTALS
A. Product Data, if applicable:
1. Tapping 5addle
2. Corporation stop
3. Curb Stop
4. Service Line
5. Meter Box
6, Meter Box Lid
B. Certi�cates and Test Reports
1. Prior to sliipmeirt of any Water Service components, the inai�ufactur�r shall submit
the following:
a. A Certificate of Adequacy of Design stating that tiie camponents to be
furnished coir�ply with all regulatory requirements identifed ii� this Sectipn
ineluding;
1) The Reduction of Lead in Drinking Water Act {P,L, 111-380)
2) AWWA C8a0
3) NSF 61
1.'� CLOSEOUT SUBMITTALS [NOT USED]
I.� MAINTENANCE MATERIAL SUBMTTTALS [NOT i]SED]
1.9 QUALITY ASSURANCE
A. Quali�cations
1. Manufacturers
a, Water Services sha�l meet ar exeeed the lat�st re�isions of AWWA C840, NSF
bl, the Reduction of �.ead in D�•inking Water Act and shall meet or exceed the
requirements of ti�is Specification.
1.14 DELTVERY, STORAGE, AND HANDLING
A. Storage and Handling Reyuire�nents
1. Protect all patts such that no damage or deterioration will oceur during a pralonged
delay from the time of s1lip�nent until installatioii is completed and the units and
eyuipment are ready for operation.
2. Protect all equipinent and parts agaiilst any damage during a prolonged period at the
sit�.
CITY OF FORT WORTH Luckland 1?aacl,Sirleu�nik hur�roi�NnverNs
STAI�IDAAD CdNSTRUCTION SPECIFiCATIQN DQCUNI�NTS C'P�V: 1 fJU637-3
Revised May 1, 2Q20
33121Q-7
WA1'�R SERViCE5 1-It�lC�-i TO 2-INCH
P�ge 7 of 17
3. Pre�ent plastic and similar brittSe items fram being directiy exposed to sunlight or
extremes in temperature.
4. Secure and maintain a location to store the material in accordance with Section Q1
66 00.
l.11 FIELD [STTE] CONDTTIONS [NOT USED]
1.1� WARRANTY [NOT USED]
PART 2 - PRODUCTS
�.1 QWNER-F[IRNISHED PRODUCTS
A. Water meters for various sizes
2.2 EQUIPMENT, PRODUCT TYPES, ANII MATERIALS
A. Manufact�rsrs
I. Only the manufacturers as listed on the City's Standard Praducts List will be
considered as shown in Section O 1 60 00.
a. The manufactvrer must comply witl� this Speeification and related Sections.
2, Any prodvct that is not 3isted o�� the Standard Products List is considered a
substitutivn and shall be submitted in accordance with Section 01 25 00.
3. The Water Services and appurtenances shall be new and the product oia
manufacturer regularly engaged in tl�e manufacturing of Water Services and
appurtanances having similar service and size.
B. Descriptian
Regulatory Requirements
a, Ail materisls shall conform io the Reductian of Lead in Dri�lang Water
Att {P.L. 111-380}. Titis Aet defines "Lead-free" for pipes and other
appurtenances to be less than 0.�5 percent [ead.
b, Water Services shall meet or exceed the latest re�isions of AWWA C800 and
shall meet or exceed the requireme�,ts of this Speci�cation.
c. All Water 5ervices components in contact with potable water shall conform to
#he requirements af NSF 6I .
C. Materials/Design Crit�ria
1. Service Lines
a. Pr�vide Type K Copper Tubing per ASTM B88.
b. Furnish iu the annealed conditions, unless otherwise specified in the Contract
Document�.
2. Service Couplings
a. Fitting Ends
l) Fjared Copper Tubing with thread dimansians per AWR�A C800
2) Provide ca�pling nuts with a machined bearing skirt af a leng#h eyuai to tl�e
tubing outer di�meter (O.D.).
b. Pra�ide with hexaganal wrench grip camgatibl� with the coupling size.
e. Provide lead-free service couplings in accordance with the Reduction of Lead
in Drinking Water Act.
CITY 0�' �ORT WQRTH L.crchlcitzd Road Sicleu*ulk I�xproveure�zle'
STANDARD COI�ISTRUCTIOI�i SPECIFICA"iIpN DOCUNfENi'S C!'n?• 10(JG37-3
Revised May 1, 2020
331210-8
WATER 3EItV[CE5 1-INCH TO 2-WCl-I
Page8ofl7
3. Corporation stops
a. Pro�ide bra�s castings per AW WA C800 for:
1 } Bodias
2) Plugs
3) D washers
4) Bottom nuts
b, IVlachinvsg azsd Finishiug of Surfaces
1) Provid� 1 3/4 inch per foot or Q.1458 inch per inch � O.Q07 inch per inch
taper of the seatuig surfaces for the key and body.
2) Reduce large end of the tapered surface of tha key in diameter by chamfe�•
ar turning for a distance that will bring the largest end of t�e seating surface
of tl�e key into the largest diameter of Yhe seating surface of the bndy.
3) Relieve taper seat in the body on the �mall end.
4) Extend smajl end af the key there-through to prevent the wearing af a
shaulder and facilitate proper seating of kay,
5) Design key, key nut a�d washer such tIiat if the key nut is tightened to
failure poini, the stem eiyd ofth� key shalI not fracture.
6) Design nut and stem to withstand a turning force on the nut of at least 3
times the necessary effort to properly seat the key without failure in ai�y
maa�ner.
7) Port through corporation stop sliall be full size to eliminate turbLijerice in
the flaw way.
8) Design stop for rotation about the axis of the flow passageway inside the
falIowing minimum circles in order ta properly clear the tapping machine:
a) Two '7/8-inch for 1-inch corparatian stnps
b) Four 15/I 6-inch for 1%z -inch and 2-inch corporation stops
c. Provide lead-free corporation staps in accordance with the Reduction of Lead in
Dri�iking Water Act.
4. Curb Stops
a. I'rovide hrass castings per AWWA C800.
b. Valve plugs shall be:
I ) Cylinder type
2) Plug type, or
3) Bal� type
c. Incarporate iull flaw porting.
d. Provide for fu11360 degree plug ratation clockwise ar counter-clockwise.
e. Ov�rall Length
1) 3-5116 i�1ch ± 1/8 inch far 1-inoh diameter
2) 4-1/32 inch + 9,32 %r 1-inch diaineter
f. Cylindrical P1ug Type
1) Provide O-ring seal at top and bottom.
a) O-ring at top anly is acceptable if bottom of curh stop body is clased.
2) Seals shall be Buna N.
3) I O-ring seal shall surround the outlet pnrt af the curb stop and act to
effectively seal in the closed position.
4) The port in the plug shall provide a straight tl�rough, full size �law way, so
shaped as ta ejiminate turbuience.
5) All waterways shall be smoo. th and free of bw�rs or rough areas.
6} Design the curb stop to prowide eas� and accuracy of operation a��d positive
shut-nff of water.
CITY OF FQRT WQRTH 1 acklaru! Rond .5rden'nik lf�rprnrenrcnls
STANDARD CQAf�TRUCTION SPECIFICATION DDCL3MENTS CI'�1': lfl�G.�7-3
Revised May 1, 2020
33 12 LO - 9
WATER SERVICES f-INCH TO 2-INCH
Page 9 of 17
g. Tapered Plug Type
1 j Pro�ide Q-ring seal at top and bottom.
2) The tapered plu.g and cylindrical recess in the valve body shall be mac��ined
to raatch within approved manufacturing tolerances.
3) Inlet and outlet po►�ts shall b� sealed by O-rings or combination Teflon U-
shaped seal rings backed witii O-rings.
4) The port in the plug shall pro�ide a straight ilzroug.h, full s'tze flow way, so
shaped as to eIiminate turbule«ce.
5} All watetways shall be smooth and free of burrs or rough areas.
6) Design� the curb stop to provide ease and accuracy of operation an.d positive
shut-o#� of water,
h. Ball Plug Type
1) Provide double O-ring seals on the stem.
2) The ball shalI seal against r�bber rings m�ui7ted in the valve body at the
inlet and outl�t ports.
3} The ball shall be branze with a smooth Teflan cnating.
4) The part in the piug shall provide a straight through, full size flov� way, sa
shaped as to eliminate tur6ulence.
5) All waterways shall be smooth and free of burrs or rough areas.
i. Provide Iead-frce curb stops in aecordance with the Reduction of Lead in
Drinking Water Act.
5. Straight Adapters
a. Brass castings a�id threads per AWWA C8U0
b. Provide lead-free straight adapters in aceardance with t�e Reduction of Lead in
Drinking Wat�r Act.
G. Three Part Copper Unions
a. Brass castings and threads per AWWA C800
b. Provide lead-free Three Part Copper Unions in acaordance witla the Reduction
of Leaci in Driuking Water Aet.
7. Straighi Meter Couplings
a. Brass castings per AWWA C$00
b. Threads per AWWA C700
c. Tailpieee with outside iron pipe thread
d. Chamfer corners on threaded end of ineter nut.
e. Machine inside and outside af tailpiece.
f. Provide lead-free Straight Meter Couplings in aecordance with the Reduction of
Leaci in Drinking Water Act.
S. Branch Cannections
a. Brass castings per AWWA C800
b. Inlet and outlet cannections per AWWA C80Q
c. Provide lead-free branch connection� in aceordance with the ReducYion of Lead
in Drinkiiig Water Act.
9. Seivice Saddles
a. Castings
1) Brass or Nylon coated ductile iro�; castings per AWWA CSQO
2) Free of porosity with sharp edges removed
3) Saddle
a} Form to fit firmly against side of maximum diameter of wa#er main
with appraxiznately 180 degrees wrap arounci.
CITY Oi FDRT WORTH f.acklaizd lioad Sidemalk lnrprnvenrerrfs
STANDARD CONSTRUCTIOi�i SPECIFICATIOtr! DOCUMEhlTS C'1',�1': 1ll(1G37-3
Rcvised May l, 2020
331270-]0
WATCR SERVICES 1-Ti�1CH TO 2-I1�CH
Page iD of 17
4) Outlet
a) Design outlet bass for no thread d�stortion by bending momezits,
b) Tapped for taper threaded corporation stop conforming to A11�'WA
C�OQ.
b. Straps
1) Confarm to ASTM B98.
2) Form flat to fit uniFormly against th� wall of the water main.
3) ShaI1 be double sh•aps
4) Rod diameter pot less than 5/8 incl� flattened to 1 inch on one side.
5} Straps shall be threaded 5/8 inch (11-NC-2A) for a distance such that'/z
inch remains after clamp is fully tightened on the pipe.
6) Cham€er strap ends to pratect the starting threads.
7) The threads shall be ful� and free from shear.
S) 4-i.nch and larger pipe s�iall be in aceorc�ance with Section 33 12 2S.
c. Nuts
1) Bronze material
a) Same material as st�raps
2) Dimensions equal to or larger than hea�y hexagon nuts
3) Tapped 518 ii�ch (11-NC-2B}
d. Gaskets
I ) Neoprene rubber material
2) Cemented to saddle and positioned to facilitate installatian
10, Brass Flanged Angle Valve
a. For 1'/z-inch and 2-inch services
b. Brass castings per AWWA C800
c. Valve Bady with i�itegral autlet flange and inlet wrenching flat
d. Fit together key and body by tunzing key and reamiug bnciy
1) Key with O-ring seal seat at the upper end
2) Lap key and body seat are to conform ta cnrporation stop requiretnents of
this Specification.
3) Tlie outlet flange shall contain an O-ring seat or a uniform flafi drop-in
flange gask�t surFace.
4) Drap-in flange gasket surFace sha11 contain gasl�et retaining groo�es mill�d
cireular about the aXis of #he flange.
S} The size of the out�et flange and the diameter a�id spacing of the bolt hoies
shall confotm to AWWA C700.
6) The flange an 2-inch angle valves sliall be double drilled to permit
eannection to 1 % -inch meters.
7) The inlet port of fi�i�: valve shall be tapered to conform to AWWA CS00
taper pipe thread.
$) The key cap shall include a wrenching tee marked with a raised or recessed
arrow to show whether the �al�e is open or closed.
9) Valve Assembly (main body, key, key cap}
a) Brass material per AWWA C8D0
b} O-ring seal on tl�e top of the key between the key and body s�at
c} Key cap shall camplete the asse�nbly by attaching to the key by meaj�s
of a strorlg bronze pin with phosphor bronze spring vvasher(s)
depresse.d between the k. ey cap and the top of the valve inain bady.
d) Provide with padlack wings for locking the val�e in the elosed gosition,
CITY OF FORT WORTH Lucklcrr�[! Hoad SidetiraRc Ini��r•pti�eirrelvls
STANDARD CONSTRUCTION 3FECIF]CAT10N DOCUMENTS CPr1'; I�(iG37-3
Revised May l, 2D2d
33 12 10 - I 1
WATER SERVICES 1-INCH TO 2-INCH
Page 1 L of 17
e) TI�ere slsall be a unifor�n application of cold water valva grease
between th� body and the key.
f� The valve shall be capable of being easily open�d and stopping Iugs.
g) The waterway through the valve shall be smooth a��� rounded for
mini�num pressure loss, and shaIl be free oiburrs or fins.
li} The va��e sha11 be s�rong, well designed, neat in appearance, water-
tight and entirely adequate for the intended purpase.
i) Provide with either a high quality rubher drop�in gasket or an O-ring
seal depending on the manufaeturer's f�ange seal surface design choice.
e. Provide lead-free brass fianged angle val�es in accordance with the Reduction
of Lead in Drinking Water Act.
11. Meter Baxes shaIl:
a. Be constructed of:
I) Polymer, black polyethylene material as defned in ASTM D883.
a) Minimum wall thicknass of 3/S-inch throu.ghout with no blowing
agents or foaming plasties
b) Body s1aaI I be black throughout, blended at the tim.e of manufacture,
a�zd shall have a inolded recycled emblem with a minimuin of 35
percent Post Industria�l Pre Consumer Recycled Conten�- verified with
a Leed Product Documentation.
c) Have a fiensile strength greater than 1700 paunds per square ineh (psi}.
d) Smooth edges and corners and be free frorn sharp edges so the unit can
be hanciled safely without gloves.
e) Exterior free f'rom s�ams or parting lines.
f} Ha�e crush resistant rib6ing along the outside of the box.
g) Have a flange around the lid o�ening to help pre�+ent settling and aide
in adjustment to grade.
h) Not to be installec� iu roadway — designed to withstand loading in non-
c#eliberate and inciciental traffic only.
2) Conerete
a} Frame of No. 6 gauge wire welded closed
b) Type I or Type II Portland ceanent, in accordance with ASTM C15fl,
portioned with lightweight aggregate, in accordance with ASTM C330
(1) Percentage of wear not to exceed 40 per ASTM C131
(2} Minimum 28 day compressive strength af 3,000 psi
b. Be able to withstand a minimum 15,000 paunds vertical load
c. Withsta�ad a minimum 400 pounds sidewall load.
d. Have pipe lioles measuring a minimu�n of 2-112" � 3-ll4'°.
e. 1-inch Standard Meter Box (Class A)
1) Far use witli services t�tilizing SI8-inch x�/4-inch, a/a-inch ar 1-inch meter
Single or Dual service meter.
2) Polymer
a) Size: working of i�at less tkan 10 inches x 16 inches, 12 inches higli
3) Concrete
a) Size: working area not less than 10-inches x 16-inches, 12 inches l�igh
£ 2-inch Standard Meter Box (Class C)
1) For use with services utilizing 1-1/2-inch or 2-inch Single service meter.
2) Polyiner
a) Size: workiiig area not less t�an 14-►nches x 28-inehes, 12 inches high
3) Concrete
C1TY OF I'ORT WORTH Lucklrr�ad Raud 5'icleiradr If�rp�•oi�enretNs
STANDARp CQNSTRUCTI[]N SPECiFICATIQN QDCUMENTS CI'Af: lOOG37-_i
Revised May 1, 2Q2D
a� �z �n - �x
WAT�,I� S�RVIC�� E-INCI17'O 2-INCf3
Page 12 of 17
a) Size: working area not less than 15-iiiches x 26-1/2-inches, l2 inclies
high
g. Sullhead Standard Mefer Box (Class B}
I) Far use with s�rvices utalizi�ig two 5/8-inch x 3/4-inch or 3/a-incl� or 1-inch
Single service meter.
2) Polymer
a) Size: working area not less than 15-incl�es x 1 S-iuches, 12 incl�es high
3} Concrete
a) Size: working area not less than l5-inohes x l 8-inches, 12 inches high
12. Meter Box Lid
a. Meter Bax Lids Shall:
1) Be solid throughout with reinfarcing rikzs.
2) Ha�e City of Fort Worth `Molly' logo molded into tl�e lid.
3) Bear th� Manufacturer's IS (name or logo) and Country of Origin.
4) Be designed both with and without AMI receptacles
5) Have a molded tread-plate
6) Seat seeurely and evenjy ii7side the meter box aud shall not averlap the top
edge of the meter box.
7} Have a malded pick bar for use by meter reading tool.
8} Have Auto�nated Meter I�frastructure (AMI) snap lacking s�ide mounts far
number of rneterslendpoints associated with meter box
9) Have an apening to accept the AMI end-poii�t. Opening shalI accommodate
an endpaiirt vuith a 1-718 inches diameter.
10} Have recessed AMI end paint atea, to alleviate a irip hazard, c�ntered over
AM1 slide �naunt. Recess area should be 4-1/2 uiches iu diameter axid 3/�"
deep.
11) Have built-in ant3-flatation davices.
b. Cast Iran or Ductile Iron
1) Lids for Concrete Meter Boxes shall be coiistructed aut of a cast iron and
meet RRF-621 sp�cification.
2} Shall withstand a mini�num vertical load of ] 5,004 pounds
3} Coat casiings with a bituminous emulsi�ed as�halt unless otherwise
specified in the Cantract Documents, grouiid smooth, and cleaned with shot
blasting, to get a uniform quality free from strengtl� defects and distortians.
4) Dimeilsions shall he within industry standards of �1/16 inch per foot.
5) Shall ha�e a pl.ug inserted in to the AMI reoeptacle to avoid water entering
tl�raugh opening until the AMl receptacle is used
6) Be a minimum of 1-3/4 inches thick at reinforcing ribs.
7) Casting weights may vary �5 percent from drawing weight per industry
standards.
c. Plastic{Composite)
I) The lid shall :
a) Constructed of Engineered Plastic as defned in ASTM D883
(1} Ha�e a molded recycled emblem wit17 a mininnu�n ofSO percent
Post Consumer Recycled and 50 percent Post Industriall Pre
Cons�mer Recycled Content- r�eri�ed with a Leed Product
Docuinez�tatian.
(2) Be designed to fit a concrete box/cast iron bax in retrofit
installations.
CI'�Y OF FORT VVORi'H Lacl,�lcrnd Rocrd Src7ex�cilk Iu�prot+eniervf,r
STANDARD CONSTItUCTiON SPECIFICATIt]N bOCUM�N'PS C'PA': I110b37-�
Revised May 1, 2D2U
3a iz io - ia
WATER SERVICES 1-INCH TO 2-INCH
Page 13 of 17
2)
3)
(3) Have a tensile strengtl� greater tha» 17U0 psi.
(4) Ha�ve a`knock-out" plug to accept the AMI end- point. Knock-out
diameter shali be 1-7/8 inch diameter. A rama�able pIug may be
subs�ituted for the knock-out plug.
(5) Be constructed out of a composite material blend for maximum
durability and corrosion resistance.
(6} Be black throughout with no hlowing agents or foami�zg plastics
{7} Smooth edges and corners and be iree irom sharp edges so the unit
c�n be hazidled safely without gloves..
(8} Exterior free from seams or parting lines.
(9) Have a molded tread-pattern- tread dimensions shall be .1 S$-inch x
.938-inch x .15b-inch deep.
(10) Have "City of Fort Worth" molded into the lid.
(11) Have "Water Mater" inolc�ed into the lid- Font shall be standard
Fac�al CNC font with 1-inch characters x.15Q-inch deep.
(12) Have a molded pick hole pocket- dimensions shall be 3-inch x
9116-inch x Thru Hole with 31I6-inch 30� stainless steel rod.
(l3) Have 2 pieces of %z-inch rebar located in lid packets far
lacatability as shown in Drawings.
{1 �4) Have location capabi3ity using matal detector.
b) Domestic Manufacture Only-Made in USA molded on Lid.
c} Not to be installed in roadway or parking area
d) Be ciesi�ned to withstand H-10 loading for non-deliberate and
incidental traffic only as .
e) Have ultraviolet protection.
1-inch Standard Plastic Meter Box Lid {Class A)
a) For use with services utilizing 5/$-inch x 3/n-inch, a/a-inch or 1-inch
meter Singie or Dual ser�ice meter.
b} Size: 11-718-inch x 17-7/8-inch, 1-1/2 inches high
c} For use with Class A Standard Meter Box.
d) Polymer lid shall seat eveuly inside iiieter aox and sha11 not overlap the
top edge of the meter box.
2-inch Standard Plastic Meter Box Lid (Class C)
a) Far use wit11 services utilizing 1-1/2-inch nr 2-ineh Single service
meter.
b) Size 27-inches x 15-1/4-inches, l-7/8 inches high
c) For use with Class C Stanciard Meter Box.
d) Polymer lid shall seat evenly inside meter bax aaid shall nat aveelap the
top edge of the meter box.
4) Bullhead 5tandard Plastic Meter Box Lid (Class B)
a) For use with ser�ices utilizing two 518-inch x 3/4-inch or 3/4-inch ar 1-
inch Single service xneter:
b) Size: 1G-5/8-inch x 14�5/8-incl�, 1-3/4 inches high
c) For use with Class B Standard Meter Box.
d) f'oIymer lid s1�aII seat evenly inside meter box and shall not overlap the
top edge of the ineter hax.
13. Horizontal �heck Valve
a. Equip 1'/z-inch and 2-incl� Water Ser�ices with a horizontal cl�eck �alve, with
pipe plug, only if specified in the Drawings.
CITY OF FORT WORTH 1_ncklrrnd l2ocrr�.Srcic�tirr�!!r h�rl�r'ovente�zls
5TANbARi] CONSTRUCTION SPECIFiCt�TION DOCUMENTS Cl'A�: 1(1f1G3i-3
Revised May 1, 202D
33 12 l0 - 14
WATER 5ERVIC�S 1-�NCI3 TO 2-{NCH
Page 14 af 17
b. IFan existing baakflow preventer is present, the Contractor is to leave it, and is
�iot required to provide an addit�onal horizontal check valve.
c, Provide lead-free horizontal chack valves in accordance with tlie Reduction of
Lead in Drinking Water Act.
14. Service Marker
a. 3 ineh �ide, 5 mil blue vinyl tape
�.3 ACCESSORi�S [NOT USED]
�.4 SOUItCE QUALITY CONTROL
A. Tests and Inspections
1. At tl�e City's option, the manufacturer shall be required to provide eertificatron
records showing conformance of materials, design and testing to these
Speci�cations.
2. The test pxocedures shalj confarm to AW WA C800.
a. In the event that a chosen valve fails the City's hydrostatic test, the cost of the
test shall be at the expensa of the supplier.
b. Proof testing of the remainder of t1�e valves shall he at the cost and
responsibilii� o�the supplier.
c. These tests will be the basis of acceptance or rejection of the remainder af th�
shipinent by the City.
3. The City reserves the right to select products at random for testing. The failure of
niaterials to confor�n to the applicable Specification may result in the rejection of
the entire shipinent.
B. Marking
1. Seiviee saddle castings shall be clearly marked by letters and numerals cast thereaj�
sl�owing:
a. Mai�ufacturer's name
b. Type
c. Size af Pipe
PART 3 - EXECUTION
3.1 INSTALLERS
A. A licensed plumber is required for installations on the outleY side of the service meter.
3.� EXAMINATTON [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 INSTALLATION
A, General
1. Instal� Water Services a�id appurtenances in accordance with AWWA C8Q0.
2. Install Water Service Lines 5 feet north or east af center of lot frontage on lots 75
%et ar wider, or where shown on Drawings.
3. Install Water Service Lines on lot center line an lots less tha�i 75 feet wide, unless
otherwise shown on t17e Drawings.
CITY DF FORT WORTH Lacklcrr�c! Road 5irleiralk hirprov<anteitls
S7`ANT7ARD CONSTRUCTION SPECIFICATION DdCUNiE3�'T5 C'PAl: 10(�G37-3
Revised May I, 2020
33 12 10 - 15
WATER SERVICES 1-INCH TD 2-INCH
Page l5 of 17
�. Install services at a minimum depth of 36 inches balow finai grade/proposed iop oF
curb, unless otherwise specified in the Contract Documents.
5. Perfarm leak tests in accordance with Sectian 33 04 40.
6. Replace existing 3/a-inch Service Lines with 1-inch new Service Line, tap, and
corporatian.
7. Tustall replaced ar relacated services with the service main tap and service line
being in line with the serviee meter, unless otherwise directed by the City.
8. Excavate, embed and backfill treuches in accorc�ance with �ection 33 05 10.
B. Haiidling
l. Haul and distribut� S�rvice Lines fittings at the project site and handle wifh care to
avaid damage.
a. Inspect each segment of Service Line and reject or repair any da�naged pipe
priar to lowering into the trench.
b. Do not handle the pipe in such a way that will damage the p�pe.
2. At the close of each operatiag day:
a. Keep the pipe ciean and free oidebris, dirt, animals and trash — during and after
the laying operation.
b. Effectively seal the open end of the pipe using a gasketed night cap.
C. Servica Line Installation
Service Taps
a. On1y ductile iron pipe may be directly tapped,
b. Install service taps andlor tap assemblies of the specified size as indicated on
the Drawings, or as specifieci by the Engineer.
c. PerfQrm taps on a water system that is either uncharged ar �uider pressure.
d. Taps coa�sist of
1) For ConCrete Pressure Pipe or Steel Pipe
a} Standard internal pipe threaded holes in the pipe walls
(1) Made during pipe fabrication
(2) Provide tapered threaded outlet with ce threads for up to 2-inch.
(3 ) Pa•ovide flang� outlet with flange to thread insulator adaptor kits for
4-inch and larger taps.
2) OthEr pipe inaterials
a) Bronze service clamp with a s�aled, threaded part througli which the
pipe wall is driiled to complete a ser�ice port
e. Tap Assemblies
1) Consist of corporation stop with iron to copper connection attached to:
a) Copper iubing terminating as shown on the City's Standard Detail
b) May t�e required adjacent to gate valr�es
c) Install as shown on the Drawings, or as directed by the Eugineer.
d) When required, sha11 be included in the unit price bid for installing gate
vaZ�e,
2) Chlorination and testing purposes
a) Na separate payment will be made %r taps reyuired for testing and
clilorination.
2. Installation of Wa#er 5ervices
a. Install tap aud Service Line in accordance with City Details.
b. Install meter box in accordaiiee with City Details.
C11'Y Or FORT WORT�1 l.arhluiztllZoacl S'adei�rdk Inrproremm�l.s
STANDARD CQNSTRUCTIO7V SPECIFICATION DOCUMENTS C'PA': l�J0G.37-3
Revised May 1, 2020
33 12 10-16
WATER SERVICES 1-INCH TO 2-INCH
Fage l6 of l7
1) �ldjustment of'the S�rvice Lina to proper meter placennent height sliall be
cansidered as part ofthe Meter Box installation.
3. Trei�ching
a. Pro�ide a tr�nch width suf�ciently wide to allaw for 2 inclies of granular
embec3ment on either side of the Service Line.
4. Bored Services
a. Services shall be bored utilizizag a pilot l�ale having a diameter'/z inch to 3/4
inches larger than the Service Line.
5. Arrange�nent
a. Arrange corporation stops, branches, cur6 stops, meter spuds, meter baxes and
other associate appurtenances as shown in the City Detail, and to the approval
oithe Engineer.
6, Service Marker
a. Wlien Metei° Box is not installed immediately subsequent tn s�rviee installatian:
1) Mark Curb 5top with a strip of blue vinyl tape fastened to the end of the
service and extending through the backtill approximately G inches abave
ground at the Meter Box locatian.
b. Installation of service taps only:
1) Attach service marker iape to the corporatioia stop ar plug and axtend
upward and normal to the �nain througli the backfijl at the adjacent trench
edge to at Ieast 6 inches above ground to flag the fap Iocation.
7. Corporatioi� stops
a. Fully open corporation stop prior to backfill.
D. Removal of Existing Water Meters
1. Rernove, tag and collect existing Water Service meter far pickup by tli8 City for
reconditionii�g or replacement.
2. A�ter installation ofthe Wat�r Service in tl�e praposed �oeation and receipt af a
meter from the City inspector, install the meter.
3. Reset the meter box as necessary to be t7�ash with existing ground or as atherwise
directed by the City.
4. All such wark on the outjet side of tlie ser�ice meter shall be performed by a
licensed plumber.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE-IN5TALLATION [NOT �CTSED]
3.'� FIELD [oRj SIT� QIIALITY CONTROL
A. Field Tests and Inspections
1. Check each Water Service installation for leaks and fu11 flaw througl� the curb stop
at the time the main is tested in accordance with Section 33 04 40.
3.8 SYST`EM STARTUP [NOT USED]
3.9 ADJUSTING [N�T USED}
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES (NOT USED]
CITY OP FORT WORTH l,uc•hlrind 12our1.5'icleiralh lr�rprovemei7�,s
STANDP.RD CONS�'12UCT[Oi� SP�CIFICATION DdCUMENTS CPA'; 1�lp637-3
Re�ised May 1, 2020
33121d-17
WATER SBRV[CE5 1-INCH TO 2-1I�ICH
Page 17 oF 17
3.12 PROTECTION [N'OT USED]
3.13 MA�NTENANCE [NOT USED�
3.14 ATTACAMENTS [N�T USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF' CHANGE
Added Blue Text for clarification
1.2 A. — Revision to items included in price bid
5pecification modified to be in ac�ordance with the Reduction of Lead in brinEting
12/20/2012 D, 7ohnson Water Act — All materials shall be lead fre.e in accordance with this Act.
1.2.A.3 — Water Mefer Service Relocate was renamed Water Meter Service
Reconnecl
l.6.S. — added certifcation suhmittals for compliance with regulatory requiremants
Added the phrase `, including grass' ta lines;
Part 1, L2.A.l,c.l4, Partl, L2.A.2.c.13, Part l, 1.2.A.2.c.13, Part 1,1.2.A.3.c.11,.
211 3120 1 3 F. Griffin Partl, 1.2.A.4,e.1 I
Added the phtase `and replacemenY to line Part 1,1.2.A.4.c.7
Revised {ines with `including grass' repEacing with `excluding grass (seeding,
4/26/2fl 13 F. Gri�n sodding or hydromulching paid separatety)'
Included in Pat� i, 1.2, A, I, c, 14; Part 1, 1.2, A, 2, c, 13; Part 1, 1,2, A, 3, c, 11;
Part 1, 1.2, �1, 4, 2, 1 L
6/19/2013 D. Johnson �•2•A.4.c— Addition of pri�ate �uater service appurtenances relocation to being
included in the linear foot rice af rivate water services
11/21/2016 W. Norwood Require meter box suitable fvr AMI meter. 2.2,C, 11 & 22,C,12
11/21/2016 W. Norwoad Requfre service saddle with double straps. 2.2,C,9,b
2/14117 W. Norwood �.2, C, 9.a.3 Remo�e table "Fit Contour of pipe..."
2/14117 W. Norwood 3.4, C, I.d.(2) Remove nyEon sleeve inserts, requirc cc threads.
071I4/2021 M. Assaad 1.2, S. Water Meter Box Replacement
CITY OF FORT WORTH Lcrckkrnd R�ctel5ir/cnrrrllc Iuiprove�rrerrls
STANT3ARD CONSTRUCTION SPEC�k'ICATION DOCIIM�NTS C'Pr1': !(JO(.i7-3
Revised May I, 2p2p
APPENDIX
GC-4.p1 AvailabilityofLands
NONE
GC-4.02 Subsurface and Physical Conditions
NONE
GG4.04 UncEerground Facilities
�I►C���1�
GC-4.06 Hazardous Enviranmental Condition a� Site
NONE
GC-6.06.D Diversity and Inclusion — Business Equity Division
Subcontrsctor/,Supplier Utilizatian Form, P�rinae Contracior Waiver Form, Good Faith
Effort Form, and Joint Venture Eligibiliiy Form
GC-6.07 Wage Rates
�013 PREVAILING WAGE RATES {Heavy aad Highway Construction Prajects)
GC-6.U9 Permi�s and Utilities
NONE
GG6.24 Naaidiscrimination
Nt�NE
GR-Ol 60 OU Product Requirements
NONE
CITY OF FORT WORTH tackland Noad Side.wa�k lmprovemenfs
STANDARa CONSTRUCTION SPECIFICATION DOCUMENTS C'1'A': 1(TOG.i7-3
Revised 7uly 1, 2011
��a6o��.D I]n�v�rsIlt� �rn� I�nclusi�� �
�a�s��ess ��uIl% �]i��sIlon
�'�IIS PAGE �LL�]�T ][l'�'I�IEl�T�[�1��]LI��' �]LAl�(�
CITY OF FORT WORTH Lackland Road SidewQlk lmprovements
STAt�IDARD COI�STItUCTION SPECIrIC.ATION DOCUMEIVT3 C'PA': 1F10G37-3
Revised July 1, 2011
C1t�I Of FO� WOI��1 ATfACHMENT 1A
FORTVVORTH �usiness Equity Utilization Forrn �a' °�a
Dlsadvan#aged Business �nterprEse lJtilizat9on Form (Applfcahle if Federallv-Fundedf
PRIMFJOFFERORIQWNER
CaMPANYNAME: ��-�ac� Conerefie Inc.
PRo.,�cT N�r��: CPN 100637�3 Lackland SidewalEt [mprouements from Camp Bowie Blvd to Calmont A�enue
PR�J@Gi NUNIBER: BID �ATE: City's Business Equlty GoaL• - Offeror's Business Equity (ar D8E}
�����7-3 Q2/1012022 �{Check if addressing UBE Goaq � rJ °/a Comrr�itment: � 6.�� °/a
Check all ap�licable baxes tb describe ��ot Certified �MBE �WBE ��BE � HUB ❑VoSe �5ec�lon 3
PrimelOfferorlOwner's Classification:
Gerti4yingAgency: ❑��TRCA �plFWMS�C �TX�OT �WBCS �O1her.
EthniGity: ❑��ricanAmerican �Hispanic �Caucas3an �Asian �Nati�eAmerican �ender: �Male �Female �Non-8inary
❑efinitions: Buslrtess Equity Firm: Certifled MBE Minority Bus9ness Enterprise or WB� Women Business Enterprise DBE: Qisadvantaged Business Enlerprise
HWB; Historically Under Utiiized Business VOSB: Veteran Owned Small Business Seckian 3: Certified Housing Urhan Oevelopment Vendors
ALL BUSINES5 EQl11TY FIRMS MUST BE CERTIFIEI] B.EFDRE CONTRACT AWARD
Failure tn complete this form, in 11s entlrety, anci received by the Purchasing Division no laterthan 2:U0 p.m. on the seopnd City business cEay after bid opening, exclusive of bid apening
date, wpl resull in tM.e bld b.eing considered non-responsiva to hid spec'rfications. Exce tion: CFA ICA and CI7BG ro'ects documents will ba submitted to the Git Pro'ect Mana er if
ubEid bid ar to the Devela sr if rivatal bid.
The undersigned PrimelOfferor agrees to enter into a formal agreement with th� Business Equity �rm(s) listed in this utilixalian schedule, eonditioned upon executian of a contract with the
City oF Fort Worth .(�xception: pevelaper proiecisl. The inEentional and/or knawing mBsrepresentalian of faets is grounds for consideraCion of disqualification and wlll result in the bid psing
consiAered non-respansive to bid speciFications.
Business Equity firms listed toward meeting the projeck goal must he located in fhe City's marketplace aE the tlme of bid or ihe business has a Significant Business Presence in the
Marketplece. The marketplace is the Clty of Farf Worih incfudina Aortians of Qenton. Parkec Wise, and all of Tarrant. Dallas. and Johnson eouniles.
Certi€ied means those f+rms, located within the Marketplace, that have Ween determined to be a'bona-fide minarity or uromen husiness enterprlse qy the North Central Texas
Reglonal CerHflcation Agency (NCTRCA}, �allaslFort Worth Minorily Supplier Development Council (O/FW MS�C) and Women's Business Council-Southwest (W8C5).
IFhauling senrices are utilized, the Primelqfferor will be given credit as long as the Buslness Equity firm listed owns and operates at least ona fully licensed and operational trusk to he
used on the contract. The Susiness Equfiy (Irms mey leasa Irucks from another Buslness Equity firm, inc�uding Busfness Equity awner-operated, and receive full Business Equiiy
cretfit. The 8usiness Equily firm may lease trucks from non-Business Equlty fi�'ms, including owner operated, 6ut will anly receive credit for tBe fees and commissions earned by Ehe
Business Equity as outlined in the lease agreement. Note: Far aB� Goals; 80% of the services count towards tha gaal. Please see below. �
Counting pB� F'arkielpatlon; If materials or suppEies are obtained from a �BE manufactarer, count 1 �o percent pf Ehe cosl of the materials nr supplies towerds the gaal. ff the maferials or
supplies are purchased from a RBE regular Bealer, eount 60 percent of the cost of the materials and supplies lnward the DBE goal. When materials or supplies are purchased from a oBE
neither a manufacturer nor a eeguler dealer, count the entire amount of fees or commissions charged for assistanrs in the procarement of the rnaterials and supplies or fees or
transportation charges for the delivery of the materiets or supplies delivered lo tiie job site, In all cases, the PrimelOfferor is responsible to identkty the amaunls ta be used toward the
commkted �BE geal.
EffeclWe 01/0172021
llpdated O6T2812U2t
FORT �OR'1"H AnACPage 2 ora
�usiness �quiiv Utilization F�orm
��.2ase �vct� u:si anfy ;.a��.iPd Q;;s„ ��ss Equiiy f:; �-s •:;rlf i.� �=::nta: ;o mae I Ifia �:��,^,ess Ea�sity AaaL Pr�me14fSnra�s ars required ,'a id2nliFy ALL suhcon!rectorsls�e�p{it�ra,
re�ardless a� s:alls�, re., k1u�u7css Equily firrns �nd riui �j3�isinr,�y Eqv�iy hrrns. Prlme�(Sflervrs nwsL Ideniify l7y kinr�,x� � 1i suprnn4xr'forsfsv�;.il9r� iw_r. mearts iho levol nf
':,ukxonlroclny L�low ihe F'rlrneiUft�or i.�. a d�rc:.! �symcn9 dr�m Ihr, Prlrne�CJl�r+�+! Ro � s�llCui iklaeW! IS eass=_itle*ed 3 sd Ilac, a paymanS Iry u sUticory�i ��clor la I� �ppller �e cc,���acc�l
' Tnd iioi, 13�s�etis FqSnIY tirrnx :rre iu he 31�szrJ he�ora rwn-8� slness ��i��iy iirm� ��e Fr�rseGic7tferor Is reypa�y�i:ia la Qrowida pren! 01 paymani {il all 4;ir� ��.�116 sciarsr5up�,�:�era
, idanSificd �a a FW�a�nsc E9�ulY �h ri i nhd c.cuasl��� khnae do�lers lawerds meeti^A Iho �n;r� .I aam�rdl�.�*A §�m
I�e�iiriod $ce�'tcss EQuily �rmn� 1Rornr i,Gizlr�� tbrn a:auFiflflO 111$r �-,��iormancr� 9otrardu ma�a�+n0 �hn cor5ttqr.l qqql, im�enk hH c�Mltxtl wilhks IFwse NAICS r.nrnrrirnilky r.q;lKs Wr,lr �,
Ic�illpusg egenay accaplahla �p 1he CISy o� FN1 W��rU�. C,nil.fed 4ius���s �quily I�rimed02fara coun11ny7 snl?-partoiminy sei�.zKe, ra�,atd� tlre gaal r+tie EEMLO?5� '0 4�a pnrFs�nra�l
y��,�ld i,n I�s.Hd irrs! rt�r� 91�e U1ili�aRlan form.
Check this hox�if certified Prime Contractor seroices will he counting tawards the Bustness �quity contract�ng goal. Please [ist services First below
Please list certified 6usiness E ui firm names as listed an their certiiicatinn includ9n UBA names�
NAMES AND A��RES5E5 OF TYPE OF SERVIGESISUPPLI�S Specify 71er Certific0tion Agency Gender and £thnlcfEy:
CONTRACTORS1SllPPLIHRS PROVIDE�i���-���p--=--ti; NamelstTler
+ 7v�p pf $anrir_.wI$ii{F liag' I Certiffad By: � Male � Female ❑ Non-Bina
Business Name� ���3 G�rr15-r�iCk��n, Llc � 1 st TY
Address: J.�751�#ofr�6waW{;iielaQa9las. Fl�rn�sii,�lrtsldll �OfFWMSRC
'�'}( f��g h�9iSoi3112n[#ous �a41�F81$ Ite[ns ❑Afriasn American � Hispanic
❑NGTRCA
Phane: �1 �-���-�+� }'� j—�}.� �Asian
Hmall: b,�ta5t�(v�lx rt Gom NAICSCOde�ai.i,a riu�ia �veir awtnu LJ'XOOT ❑V�113C5
ather: �G�ucasian � Mative
��rol &rQK� AGtlSi2 1 ( E�72) ❑ American
Contact Person; 83�r-�56+1 $ AMOUNT� ���, ���-�� I
Buslness Name;Air1�F�C2f1 $�flpl�g GOm�i�Ry
Address: F75S� Rawenvlewf�oad
Dall�s, ioxa5 752�3
Phane: 972-557� 85�5
�mall: os�Finating�ameficansGi�lrlg.ne
1
Contact Person: #�andi F�ullin� f(972� 5�7•855�
Business Hame-
Address:
Phpne:
Emall:
Contact Fersan;
'M1�no nf CnndrnlR��nnl7nc�
Pa�+emenk N}ark�ng
NAICS Code� � �� � � �
$AMOUNT-�.��� ��
TYF� �f Gorvirnf5u��liaa�
Code=
$ AN[DUNT_
I sl Certifled By: � Male � Fema3e ❑ Non-Binary
�DFW MS�C
�HCTRCA ❑ African American � Hispanlc
�TXaOT �gCg ❑Asian
nOther: � Caucasiarl � Nati�e
Ame�ican
rCertliied By: � ��B � Fernale ❑ Non-Blnary
�❑DFW MSpC
� � Airlcan A�eflcan � HEspanic
�❑NC7RCA
�❑TXpQT ❑WBGS ❑ Asian
InQther; � Caucaslan � Naiive
American
Effeckive �11a1/2021
lJpdated 06/2612021
ro�z�r Vi�oRTx
�usiness �quity Utilization Form
Please include multfple copies of this page If needed to list all cantractors and suppliers.
ATTACHM�NT 1A
Page 3 of 4
NAMES AN� AaDRESSES pF TYPE OF SERVICESISIlPRLI�S g�scify Tier Certification Agency Gender and Ethnicity;
CQNiRACTOR515UPPLIERS PROVlpE[]jnn�� -� � i NamelstTler
Business N�me: T;Ae af ServicelSupplias: CerEEfied By:
� Male � F'entafe � Non-Binary
Address: �IFW NiSDC
❑African American � Hispanic
�NCTRCA
Phone: �Asian
�mall: NAICS Cads: �7X�Q7 ❑UVBCS
Other. ❑�aucasian �Native
COntdCt PB[SOn; � AMOUNT: AmErican
Business Name: TY�� ¢f 9ervicelSup�lies: � Certlf3ed 6y
�Male �Femel� �Nnn-Binary
Addf�Ss: ��DFW MS�C
�NCTRCA ❑Afrfcan Ame�ican �Hispanic
Phvne: Ns'-- rntE : TXQOT W6C5 ❑Asian
Emafl: � ❑
�Other; �Caucasian �Native
Contact Person' $ AMOLINT: I Amarican
. �
Y1Tw nf Sanriral3rr�nlin�.
Business Name: - - ' _ CerEified By: � �qale �Female �Non-Sinary
Address: �oFW MSDC
��NCTRCA ❑AfricanAmervcan �Hispanic
phone; 4:�,fC°.Co�_: TX�OT VVRCS ❑Asian
�maii: ❑Other. ❑ ��aucasian �Native
Cont�Ct Pe�son; $ AMOIJNT: Amerlcan
Business Name� Ty, � vf co; ;,�„Alg,T„r��r,s. Certifiied 8y:
• '��� �Male �Female �Non-8inary
AdtlCess: �DFW MSDC
NCTRCA ❑African American �Hispanic
F'hane: NA�CS CodR= TXDOT WBCS ❑Aslan
�mail: ❑
1p���; �Caucasian �Native
Contact perSpn: S ANiOUN'f= American
Effeclive Ohl01l202�
Updated OB12812U21
ATTACHMEtJT 1A
I'age 4 of �
�iFORT WDRTH
�usiness � uit Utilization Form
Total DollarAmount of Certi�ed primelOfFeror Services kowards contract goal � O.OD�O
Total bnllar Arnount of Business Eq�[ty (or �SE if appEicablej SubcontractorslSuppliers $ 131,660.62
Total Dollar Amount of Non-Business Equity SubcontractorslSuppliers $ TBD - Readymix
TOTAL �OLLAR AMOUNT OF CER71�fED PRIMElALL SUBCONTRAC70FtSl5UPPL.I�RS ��787�g�g,50
Th� PrimelOfferor will not make additions, deletions, or substitutions to this oertified list �ivithauk the prior approval of the Business Equity Division
fhrough the submitta] of a Request far Approval of Change/Addifion online. Any unjustified change or deletian shal[ be a material breach of
contrac# and may result in debarment in accord with khe pracedures autlined in the ordinance. The Prime/Offerar shalf su6mit a detailed explanation of
how the requested changeladdition ar delation will affect #he commiited Business Equity goal, If ihe detail explanalion is not submitted, ikwill affec#
the final cornpliance determination.
By affixing a signature to tiiis form, the PrimelOfferor further agrees to pro�ide, directly to the City upon request, complete and accuraie information
regarding actual work performed by all subcontractors, including non-Business Equity firms. The PrimelOfFeror also agrees to aliow an audit andlor
examination of any books, records and files held by their company. The PrimelOfferor agrees io aliow the transmissian of interviews with awners,
principais, officers, employees and applicable subconiractorslsuppliers participating on the contract that will substaniiate the actual work
pertormed by the Bvsiness �quity firms on this contract, by an authorized o�cer or empfoye� of the City, A F'rimelOfFe.rer wha intentionally andlor
knowingly rnisrepresents material fa.cts shall be Debarred for a period of tirr�e of not less than three (3) years.
?� 1 -
�--
Authorized Slgnature ` _,
Vice Presid.ent . i
Title
Ti-Zack Concrete lnc.
Company Name
39352 221 st Avenue
Address
Le Cenfer, MN 56057
CItylStatelZip Code
Deparlment af Diversity and Inelusion - Husiness Equity Division
�mail: oVIN_BEdffice(c�foriworihteuas.gov
Ph: 817-932-2fi74
Jeremy Gibbs
Printed Signature
Contact Name and Tkle (If different)
507.�}12.9589 �
Phone Number
jgibbs@tizack.com
Ema[I Address
02/14/22
Date
Eftective 0110112Cf21
Updated p6128/2021
G�-6��i Wa�e ��tes
7['I��S �A�E L]E]�T� Il�'I']EI�TT�TOI�AI1�� ]�I�A1�I�
CITY OP FORT WORTH tack7and JioadSrdewalk lmprovements
STAIVDARD CONS'1'RUCTIQN SPECIFICATION I]OCUiv1ENT5 CPh:• 1(1()fi37-3
Revised July 1, 2011
2013 PREVAILtNG WAGE RA�ES
(Heavy and Highway Construction Projectsj
CLASS�F1tATION DESCRIP710�1
Asphalt Distributor Operatar
Asphalt Paving Machine Operator
Asphalt Raker
Broam or 5weeper Operator
Concrete Finisher, Pa�ing and Structures
Concrete Pavement Finishing Machine Operatpr
Concrete 5aw Op�rator
Crane Operatar, Hydraulic 80 tons or less
Crane Operator, Lattice 600m 80 Tons or Less
Crane Operator, Lattite Boom Over 80 Tons
Crawler Tractor Operator
Electrician
Excavator Operator, 50,000 pounds or less
Excavator Operator, Over 50,Q00 ppunds
Flagger
Ferm Builder/5etter, 5trucfures
Form 5etter, Paving & Curb
Foundation Drill Op�rator, Crawler Mounted
Faundation �rill Operator, Truck Maunted
Front End Loader Operator, 3 CY or Less
�ront End Loader �peratar, Dver 3 CY
Laborer, Common
�abarer, Utility
Loader/Backhoe Operator
Mechanic
Milling Machine Operator
Motor Grader Operatar, �ine Grade
Motor Grader Operator, Rough
Off Road Hauler
Pav�ment Marking Machine Dperatpr
Pipelayer
Reclaimer/Pul�erizer Operator
Reinforcing Stee�l Worker
Roller Operator, Asphalt
Roller Operator, Other
5craper Operator
5ervicer
Small 5lipform Machine Operator
Spreader Box Qperator
Truck Driver Lowboy-Float
Truck DriverTransit-Mix
Truck �river, Single Axle
Truck Driver, Single br Tandem Axle Dump TruCk
Truck Driver, Tandem Axle Tractor with Semi Trailer
Welder
Work Zone Barricade Servicer
Wage Rate
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
S
$
$
$
$
$
�
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
15.32
13.99
12.fi9
11.74
14.12
16.05
14.48
18.12
17.27
20.52
14.47
19.$0
17.19
16.49
10.06
13.84
13.1fi
17.99
21.07
13.69
14J2
10.72
12.32
15.18
17.68
14.32
17.19
16.02
12.25
1.3.63
13.24
11.01
16.18
13.08
11.51
12.96
14.58
15.96
14, 73
1fi.24
14.14
12.31
12.62
12.86
14.84
11.68
Tha Da�is-Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by
the United 5tates DepartrrEent af l.abor and current as of September 201.3. The titles and descr€ptions farthe
elasslfications listed are detaifed in the AGC of Texas' Standard Job Ciassifications and Descriptions for Highway,
Heavy, Utiflties, and Industrfal Construction inTexas.
CI�'Y QI- I�OR'1' W6RTH Lackland Road Sidewnik fniprovements
S'I'Ah�]ARD CONS'I�RUCI'ION 5PECll=fCA1"ION bOCUMLNT5 Page 1 of 1 C'F'11'; JOOG37-3
RL-VISI:D: Sf:P'I'LM13L'R 2pI3
2013 PREVAILIfVG WAGE RATES
(Commercial Con�truction Projectsj
CLASSI�ICATIOR� DESCRIPTION
AC Mechanic
AC Meehanic Helper
Acoustical Ceiling Installer
Acoustical Ceiling Installer Helper
Sricklayer/5tone Mason
Bricklayer/Stone Mason 7rainee
Sricklayer/Stone Mason Helper
Carpenter
Carpenter Helper
Concrete Cutter/Sawer
Concrete Cutter/Sawer Helper
Cancrete Finisher
Concrete Finisher Helper
Concrete Form Builder
Concrete Form Bullder Helper
Drywall Mechanic
Drywall Helper
Drywall Taper
Drywall Taper Helper
Electrician {Journeymanj
Electrician Apprentice (Helper)
Electronic Technician
Floor Layer
Flaor Layer He{per
Glazier
Glazier Helper
Insulator
Insulator Helper
Laborer Common
Labarer 5killed
Lather
Metal 8uilding Assembler
Metal Building Assembler Helper
Metal Installer (Miscellaneousj
Metal Installer Helper {Miscellaneousj
Metal 5tud Framer
Metal Stud Framer Helper
P�itlter
Painter Heiper
Pipefitter
Pipefitter He�per
Plasterer
Plasterer Helper
Plumber
Plumber Helper
Reinfarcing Steel 5etter
Wage Rate
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
25.24
1.3.67
1fi.83
�2.70
19.45
7.3.31
�.0.91
�.7.75
14.32
17.00
11.00
15.77
11.D0
15.27
11.pp
15.36
12.54
15.00
11.50
19.63
�5.64
2Q.00
18.Q0
10.OD
21.D3
12.81
16.59
ss.zi
10.89
14.15
12.99
16.04
12.Q0
13.00
11.00
16.12
12.54
16.44
9.98
� 1.22
15.39
16.17
12.85
21.98
15.85
12.87
C'I'I"Y c)f PORT WOR'f'I I tack�and RoodSidewulklmprovements
STANDARll CONSTRUCTION SPECII�ICATI(7N {)OCLJMENI'S Page �. of 2 C'Pi1': 1(!�G_i7-3
IZIiVISL=ll. SGPTEMIiI{Id 2(ll3
Reinforcing Steel 5etter H�Iper
Roofer
Roofer Helper
Sheet Metal Worker
Sheet Metal Worker Helper
Sprinkler System Installer
Sprinkler 5ystem installer Helper
5teel Warker Structural
5teel Worker Structural Helper
Waterproofer
Equipment Operators
Concrete Pump
Crane, Clamsheel, Backhoe, Derrick, D'Line Shovel
Forklift
Foundation Drill Operator
Front End Loader
Truck �river
Welder
Welder H�Iper
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
ss.os
16.90
11.15
16.35
13.11.
19.17
14.15
17.00
13.74
15.DD
18.50
19.31
16,45
22.50
16.97
1C.77
19.96
13.00
The prevailing wage rates shown for Commercial constructivn �rojects were hased on a salary survey conducted
and puhlished by the North Texas Canstruction Industry (Fa1l 2012) Independently compiled by the Lane Gorman
Trubitt, PLLC tonstruction Gro�p. The descriptions for the dassificetions listed are pro�ided on the TEXO's (The
Construction Association} website. www.texoassociation.org/Chapter/wageCates.asp
CI'I'Y UI� f=QRT WC)ItTI l
S'TAN�ARD CONSTRUCTION Sl'LCIFICAZ'IUN DOCUMF.Nf5 Page 2 af Z
IZL-:VISF.D: SEPTLNiI3L=R 2[113
Lackland RoQd 5idewalk lmprovernents