HomeMy WebLinkAboutContract 52902-CO2 CSC No.52902-CO2
City of Fort Worth
Change Order Request
Project Name:1 Churchill Rd Water and Sanitary Sewer Improvements City Sec No.: 1 52902
Project No.(s):1 100888 DOE No. N/A CityProj.No.:l 100888
Installation of Water and Sanitary Sewer Improvements on Churchill Rd between White Settlement Rd and River Oaks
Project Description: Blvd.
Contractor: Flow-Line Construction,Inc. Change Order# Date: 4/29/2022
City Project Mgr.1 Lawrence Hamilton —� City Inspector: I Carmen Drake
Phone Number: 817-392-2626 —� Phone Number: 817-392-8347
Dept. Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $6,522,745.00 $1,614,210.00 $8,136,955.00 720
Extras to Date $22,705.70 $22,705.70 047
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $6,522,745.00 $1,636,915.70 $8,159.660.70 767
Amount of Proposed Change Order $405,066.09 $0.00 $405,066.09 062
Revised Contract Amount $6,927,811.09 $1,636,915.70 $8,564,726.79 829
Original Funds Available for Change Orders $130,455.00 $48,426.00 $178,881.00
Remaining Funds Available for this CO $130,455.00 $25,720.30 $156,175.30
Additional Funding(if necessary) $274,611.09 $274,611.09
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.26%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+2591o) $10,171,193.75
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change order No.2 will provide for the following that were(is) necessary on the project:
• The installation of 2-inch combination air valve assembly in lieu of 3-inch combination air valve assembly
• The installation of 8-inch DIP water pipe (Restrained Joints)in lieu of 8-inch PVC C900 water pipe(Restrained
Joints)
• The installation of 16-inch DIP water pipe(Restrained Joints) in lieu of 16-inch PVC C900 water pipe
(Restrained Joints
• The installation of 24-inch DIP water pipe(Restrained Joints) in lieu of 24-inch PVC C900 water pipe
(Restrained Joints)
• Payment for Claim#04 for incurred costs associated with the waterlines crossing Brookside Levee
• Additional excavation and backfill of bore pits for 16"waterline at Churchill Road and River Oaks Blvd
• The removal and relocation of existing water meters out of residential driveways into the parkway
• The contractor's rental costs for shoring devices in the receiving pit near Castleberry ISD's Technology Bldg
• The contractor's costs associated with re-excavating receiving pit near Castleberry ISD's Technology Bldg
• The contractor's costs for material to backfill the receiving pit near Castleberry ISD's Technology Bldg
Staff recommends the addition of 62 calendar days for the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Cont atur at
Flow-Line Construction,Inc. Eduardo Hernandez �p
Ins ector Date Project Manager Date
aA CAk nN Akki.11y 3T,9
Director Water Dept Date Cons c6on Su ervisor Water Dept) [Sate
May 4,2022 _3 —�
Assistant City Attomey Date Assistant City Manager Date
ow
on May 4,2022 a May 5 2022
doK
Council Action If Required)
M&C Number 22-0318 M&C Date Approved 26 2022 OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FC>IEZ-g- V$T®R-'1r City of Fort Worth
Change Order Additions
Project Name Churchill Rd Water and Sanitary Sewer Improvements City Sec No.: 52902
Project No.(s): 100888 DOE No.E= City Proj.No.: 100888
Project Installation of Water and Sanitary Sewer Improvements on Churchill Rd between White Settlement Rd and River Oaks
Description Blvd.
Contractor Flow-Line Construction,Inc. Change Order:= Date: 4/29/2022
City Project Mgr. Lawrence Hamilton City Inspector F Carmen Drake
ADDITIONS
ITEM DESCRIPTION DEPT Qt Unit Unit Cost Total
Installation of 8"DIP Water Carrier Pipe in 24"Casing by Other Than Open Water 249.00 LF $691.52 $172,188.48
80 Cut
Installation of 16"DIP Water Carrier Pipe in 36 Casing By Other Than Water 160.00 LF $1,047.55 $167,608.00
81 Open Cut
82 Installation of 24"DIP Water Carrier Pipe in 42"Casing By Other Than Water 325.00 LF $1,344.93 $437,102.25
Open Cut
83 2"Combination Air Valve Assembly for Water Water 6.00 EA $26,677.08 $160,062.48
84 Remove Existing Water Meter Water 4.00 EA $1,200.00 $4,800.00
85 Relocate Existing Water Meter Water 4.00 EA $1,000.00 $4,000.00
86 Claim#4:Incurred costs associated with waterline crossing USAGE levee Water 1.00 LS $121,276.51 $121,276.51
Additional excavation and backfill of bore pit and receiving pits to lower Water 1.00 LS $9,642.86 $9,642.86
87 casing crossing 4 VF to clear gas line conflict
88 PCO-019:Technology Building Incurred Renton Shoring Devices Water 1,00 LS $19,161.09 $19,161.09
89 PCO-019:Re-excavate Receiving Pit Water 1.00 LS $20,251.52 $20,251.52
90 Claim#3:Imported Embedment/Backfill CLSM,As Directed Water 1.00 LS $48,532.90 $48,532.90
Water $1,164,626.09
Sewer
Page 2 of 4 Additions Sub Total $1,164,626.09
City of Fort Worth
Change Order Deletions
Project Name Churchill Rd Water and Sanitary Sewer Improvements City Sec No.: 52902
Project No.(s): 100888 1 DOE No. NJA City Proj.No.: 100888
Project Description Installation of Water and Sanitary Sewer Improvements on Churchill Rd between White Settlement Rd and River
Oaks Blvd,
Contractor Flow-Line Construction,Inc. Change Order: 1 Date 4/2912022
City Project Mgr. Lawrence Hamilton City Inspector: Carmen Drake
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
1-A 24"PVC C900 Water Pipe(Restrained Joints) Water 95.00 LF $175.00 $16,625.00
7 8"PVC Water Pipe Water 99.00 LF $65.00 $6,435.00
27 Installation of 8"Water Carrier Pipe in 24"Casing By Other Open Water 150.00 LF $650.00 $97,500.00
Cut
28 Installation of 16"Water Carrier Pipe in 36"Casing By Other Open Water 160.00 LF $1,000.00 $160,000.00
Cut
29 Installation of 24"Water Carrier Pipe in 42"Casing By Other Open Water 230.00 LF $1,300.00 $299,000.00
Cut
37 3"Combination Air Valve Assembly for Water Water 6.00 EA $30,000.00 $180,000.00
Water $759,560.00
Sewer
Deletions Sub Total $759,560.00
Page 3 of 4
MWWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co DATE AMOUNT
Total $0.00
Page 4 of 4
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
dwiluva-
Signature
Lawrence Hamilton
Name of Employee
Senior Professional Engineer
Title O�°F 00000
0P" °•Id
ATTEST: V°o o=�
0
� oo o°4 gy
1 oIci
°00000000 a
�tl TEX Asap
J ette S.Goodall(May 5,2022 11: DT) ���X
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, April 26, 2022 REFERENCE NO.: **M&C 22-0318
LOG NAME: 60CHURCHILLROADCO2-FLOWLINE
SUBJECT:
(CD 2 and City of River Oaks)Authorize Execution of Change Order No. 2 in the Amount of$405,066.09
and the Addition of 62 Calendar Days to a Contract with Flow-Line Construction, Inc.for the Churchill Road
Water and Sanitary Sewer Improvements for a Revised Contract Amount of$8,564,726.79, and Adopt
Attached Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2022-2026
Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1.Authorize execution of Change Order No. 2, in the amount of$405,066.09 and the addition of 62
calendar days, to City Secretary Contract No. 52902, a contract with Flow-Line Construction, Inc.
for the Churchill Road Water and Sanitary Sewer Improvements project for a revised contract
amount of$8,564,726.79; and
2.Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water& Sewer Bond 2017A Fund, in the amount of$405,067.00, from available funds, for Churchill
Road Water and Sanitary Sewer Improvements (City Project No.100888)to effect a portion of
Water's contribution to the Fiscal Years 2022-2026 Capital Improvement Program.
DISCUSSION:
On September 24, 2019, Mayor and Council Communication (M&C) 19-0197 authorized a contract with
Flow-Line Construction, Inc., (City Secretary Contract No. 52902) in the amount of$8,136,955.00 for the
Churchill Road Water and Sanitary Sewer Improvements Project. The agreement was subsequently
revised by Change Order No. 1 with a net total amount of$22,705.70, administratively authorized on
September 3, 2021, that provided for installation of special levee backfill material, relocation of a manhole
at the levee and an additional storm water pollution prevention plan.
Change Order No. 2 will provide for the installation of additional backfill material that was installed at the
levee crossing as required by the United States Army Corps of Engineers, the installation of 8, 16, and
24-inch ductile iron pipe encasing pipes instead of 8, 16, and 24-inch PVC pipe encasing pipes as
specified at the time of bid opening, additional excavation and backfill of bore pits in order to clear a gas
main conflict, and additional backfill material that was necessary on the project due to unstable material
that was encountered during construction.
Staff has reviewed and verified the quantities for the additional work under this Change Order No. 2.
Additionally, to complete this work, staff recommended that the contract time to be extended by 62
calendar days.
It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year as projects
commence, additional funding needs are identified, and to comply with bond covenants. The actions in
the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years
2022-2026 Capital Improvement Program, as follows:
60CHURCHILLROADCO2-FLOWLINE
Capital Fund Project FY2022 CIP7JAuthority Budget Revised
Name Name ADnironriationsil Change FY2022 i
1 il Budget i
(increase/
Decrease)
56011 — 1 100888 — ;� I
Water & Churchill RD I i
Sewer Bond WL & SS $ -1 This M&CJ$405,067.00 $405,067.00�
2017A Fund Improv
Funding for the Churchill Road Water and Sanitary Sewer Improvements project is depicted in the table
below:
Fund Existing IF_A�d_ditional project Total*1
Appropriations JAppropriations
W&S Capital 1
Projects — Fund $35,400.001 $0.001 $35,400.00
56002
Water and Sewer
Bond 2017A- Fund $653,804.00 $405,067.00 $1,058,871.00
56011
W&S Water &
Sewer Bond 2020A $8,903,938.00 $0.001$8,903,938.00
- Fund 56017 ! i
Project Total $9,593,142.obll $405,067.00 $9,998,209.00
*Numbers rounded for presentation purposes.
Funding is currently available in the Unspecified-All Funds project within the Water& Sewer Bond 2017A
fund for the.purpose of funding the Churchill RD WL & SS Improv project.
Business Equity: Flow-Line Construction, Inc. agrees to maintain its initial M/WBE commitment of four
percent that it made on the original contract and extend and maintain that same M/WBE commitment of
four percent to all prior change orders up to and inclusive of this Change Order No. 2. Therefore Flow-
Line Construction, Inc. remains in compliance with the City's M/WBE Ordinance and attests to its
commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an
authorized representative of its company.
The project is located in COUNCIL DISTRICT 2 and CITY OF RIVER OAKS.
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspecified -All Funds
project within the Water& Sewer Bond 2017A Fund and upon approval of the above
recommendations and adoption of the attached appropriation ordinance,funds will be available in the
Water&Sewer Bond 2017A Fund for the Churchill RD WL & SS Improv project to support the approval of
the above recommendation and execution of the change order. Prior to an expenditure being incurred,
the Water Department has the responsibility of verifying the availability of funds.
FUND IDENTIFIERS (FIDs);
TO
Fund Department Account Project PrograrnActivity) Budget Reference# Amounts
ID ID { , Year (Chartfield 2) I i
FROM
Fund Department Account Project (Program ctivityl Budget f Reference # Amount
L _ ID ID l I Year i (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by_ Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Lawrence Hamilton (2626)
ATTACHMENTS
1. 60CHURCHILL ROAD C2-FLOWLINE.pdf (CFW Internal)
2. 60CHURCHILLROADCO2-FLOWLINE 1295.pdf (CFW Internal)
3. 60CHURCHILLROADCO2-FLOWLINE APC FORM.pdf (CFW Internal)
4. 60CHURCHILLROADCO2-FLOWLINE FID Table (NN 03.28.22).xlsx (CFW Intemal)
5. 60CHURCHILLROADCO2-FLOWLINE MAP.pdf (Public)
6. 60CHURCHILLROADCO2-FLOWLINE PBS.pdf (Public)
7. 60CHURCHILLROADCO2-FLOWLINE SAM.pdf (CFW Internal)
8. 60CHURCHILLROADCO2-FLOWLINE 56011 6022(r2).docx (Public)