Loading...
HomeMy WebLinkAboutContract 53607-CO2 Attest: A 4a ovan�4� FORT as O 0000000000Q a Tannette S.Goodall ��o `�'AOd Jannette S.600dall(May 5,20221115 CDT) F1 j.O 0 [x]!1 May 5,2022 0,000 o°*2d FORT ■f DRTH, CSC No.53607-0O2 ado °0000c000°a at INKI S 4 City Of Fort Worth Change Order Request Facility and Project Park Maintenance Facility Phase 2 City Sec No. 53607 Description: Funding(FID)34018 0800450 5740010101010 004480 999918020111 City Pr0j.No. 101010 No.(s) Contractor:IMucWeroy&Falls Construction Company Change Order#�2 Date: 4I27II2022 City Project Mgr.I Ronnie Clements City Inspector: I Mitch Kiowski Phone Number:(817)392-8014 Phone Number: (817)392-2297 Contract Time (CD) Original Contract Amount $9,099,973.00 365 Extras to Date $55,259.00 30 Credits to Date $0.00 0 Pending Change Orders(in M&C Process) $0.00 0 Contract Cost to Date $9,155,232.00 0 Amount of Proposed Change Order $14,665.00 15 Revised Contract Amount $9,169,897.00 410 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $0.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.61 MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $11,374,966.25 JUSTIFICATION(REASONS)FOR CHANGE ORDER The purpose of Change Order#2 is for additional work to provide concrete and rip rap at the northeast inlet to help alleviate silt from getting into the inlet.Change Orders No.1($55259.00 and 2$14,665.00 increases the original contract($9,099,973.00)by$69,924.00 for a revised contract amount of$9.169,897.00.A 0.33 percent increase to the original contract price.Additionally,there are 15 days added to the contract for this extra work. It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order. Muckleroy&Falls .gv�� Apr 27,2022 Contractor's Company Name Contractor Name Contractor Signature Date / Apr 27,2022 May 2,2022 7D Don Isaacs A r27 202210,04T • � PMD Inspector Date Architecural Services Manager Date a2 Apr27,2022 May 2,2022 Skive 7.Rk,(Mzy 2,20 PMD Superintendent Date Director Property Management Department Date 7yl G2amerot Apr 27,2022 ?St Kt May 5,2022 PMD Project Manager Date Assistant City Attorney Date pavid puman Apr 27,2022 Oaell May 5,2022 avid Duman A r27 202210:21 CDT Y Project Architect Date Assistant City Manager Date OFFICIAL RECORD M&C Number N/A M&C Date Approved I N/A CITY SECRETARY Contract Compliance Manager: / yam, FT.WORTH, TX By signing I acknowledge that I am the person responsible 140-rl 4. 6y'r,� 00 for the monitoring and administration of this contract,including Brian R.Glass,AIA ensuring all performance and reporting requirements. Architectural Services Manager June 2018 Rev 1 Lr.�. I W� Change Order Request Detailed(with Breakdown of PCOs), Grouped by Each MUCKLEROY LEROY FALLS Number CoFW Park Maintenance Facility-Phase II Project# 19636 HM&MF Ltd.,d/b/a MUCKLEROY&FALLS 5189 James Ave.Fort Worth TX,76115 Tel: Fax: Change • • 036 Date: 4/11/2022 To: James Diestel From: Dustin Vardeman City of Fort Worth HM&MF Ltd.,d/b/a MUCKLEROY&FALLS 401 W 13th St 3200 Riverfront Dr Fort Worth,TX 76102 Suite 200 Fort Worth,TX 76107 Description Category Status Northeast Inlet Modifications Reference Required By Days Req Amt Req 4/18/2022 0 14,665 N otes PCO No Date Reference Amt Prop Days Req Category Reason Description Notes PCO 36 4/11/2022 14,665 0 Northeast Inlet Modifications This PCO is to install the surrounding concrete and rip-rap at the Northeast Inlet per sheet C3.13 provided by DeOtte engineering. This PCO is issued to incorporate the revisions as specifically detailed on the attached cost summary and supporting documents.If additional costs become apparent at a later date,or additional information regarding this scope of work become available,we reserve the right to price any additional cost and/or schedule impacts as they become known. Item No Item Description Amt Prop Reference 001 Northeast Inlet Modifications-Miller Sierra 13,282 002 Northeast Inlet Modifications-Overhead @ 10% 1,383 Approved By: Signature Name Date Prolog Converge Printed on: 4/11/2022 MuckleroyFallsProlog Page 1 9 19L Xi H12�OM DAOd _ E `3nv s3wvr o Za L' " � ao a U ao o v Z 3SVHd s W w z M .11lMV=l 30NVN3iNIVA )42]Vd75 4PoM)Jod 10 40 LL o o III I / / Hill — --- ----------- — --a � _ ---- g " egg"°�ax8°a�$;-�$ ���$e�a ------- --------8AF Cl -- — a ze=a $_¢ _ way " -------------- Sp'°¢E�oy'N=o w — ___ --- -------- — �g i r i x e.�P5 r r i r r i a e i r r i i r i r / i r � r From: Blake Brosenne<bbrosenne@millersierra.com> Sent: Friday, March 25, 2022 2:13 PM To: Dustin Vardeman Subject: FW: FW PARD P2 -Area Inlet Sheet Attachments: FW PARD P2 -GRADING PLAN DROP INLET 2022-02-09 - FINAL.pdf Dustin, Pricing for the flume at the inlet is below and is to be free form invoice due upon completion. Hand digging out inlet if filled with dirt/debris is excluded (estimated to add 1 day for the 4 man crew, but tough to gauge what that would actually take....could be a vac truck/trailer costing roughly$1500- 3000), our General tried to go by and get a look at the inlet, but wasn't able to gain access this morning. As discussed we will scatter the dirt, I have a haul off charge to handle additional rip-rap haul off as they have a minimum delivery. Labor Labor—4 men x 4 days—128 hours x$40=$5,120 Materials Concrete—11 CY x$145 per=$1,595 Rebar- 314 LBS x$1.25 per=$392.5 Forms/Supports/Cure etc. 385 SF x$.55 per= $211.75 Epoxy—5 tubes x$22 per=$110 Dowels—36 ea x$2.50 per=$90 Rip Rap—(min load fee$700) _$700 Equipment Skid Steer x 1 Week=$1,922 Concrete Conveyance—11 CY x$15 per=$165 Dowel Drill—1 Day x$417 =$417 Air Compressor—1 Day x$411=$411 Subcontracts Spoils Haul Off(1 Load) _$165 Sawcutting (Min Charge) _$250 Sub Total =$11,549.25 OH&P—10%+5% _$1,732.39 Total =$13,281.64 Let me know if you have any questions. Thanks, MILLER j� SIERRA