HomeMy WebLinkAboutContract 57531 DocuSign Envelope ID:OCF5BF00-EEA6-4768-A306-A63ED390288E CSC No. 57531
CONSTRUCTION
REIMBURSEMENT AGREEMENT
CITY OF FORT WORTH, TEXAS— CLEAR FORK LIFT STATION PROJECT
THIS AGREEMENT is made and entered into by and between the CITY OF FORT
WORTH, a Texas home-rule municipal corporation ("City"), by and through its duly authorized
assistant city manager, and TOTALENERGIES E&P USA BARNETT 1, LLC, a Delaware limited
liability company, f/k/a Total E&P USA Barnett, LLC, authorized to do business in Texas
("Company").
WITNESSETH:
WHEREAS, Company owns and operates a gas well padsite facility (the "Facility") in
Tarrant County, Texas; and
WHEREAS, City is installing a lift station at 3633 Mopac Drive ("Clear Fork Lift Station")
as depicted on Attachment "A" and City has requested that Company reroute, adjust and/or
take protective action on a portion of the Facility (the "Relocation"); and
WHEREAS, Company has agreed to provide the Relocation services subject to payment
for relocation costs as detailed herein as generally depicted on Attachment "B" attached
hereto and made a part hereof; and
WHEREAS, City has agreed to reimburse Company for the costs and expenses for the
Construction of the Relocation, estimated at$10,000 as shown on Attachment "B";
NOW, THEREFORE, for and in consideration of the mutual covenants and agreements
hereinafter set forth, it is hereby agreed by and between City and Company as follows:
RECITALS:
The recitals, above, are incorporated into this Agreement insofar as they contain
material elements germane to the Parties.
REIMBURSEMENT BY CITY:
A. City agrees to pre-pay Company $10,000, the estimated cost for the Relocation,
based on Attachment B; and if the actual costs exceed the estimated cost for the
Relocation, City agrees to pay such difference to Company.
B. The obligation of the City to make a cost reimbursement payment under this
Agreement does not constitute a general obligation or indebtedness of City for which
the City is obligated to levy, pledge or collect any form of taxation.
ADDITIONAL WORK BY CITY: City agrees to complete the following at no cost to
Company: (1) Provide a drainage swale across City's proposed access road to accept the
drainage weir water from the Facility; and (2) install bollards around the electric pole to remain
that services to the Facility.
Reimbursement Agreement
OFFICIAL RECORD
City of Fort Worth&Total Energy CITY SECRETARY
Clear Fork Lift Station FT.WORTH, TX
Page 1 of 5
31197967v.2
DocuSign Envelope ID:OCF5BF00-EEA6-4768-A306-A63ED39028SE
INGRESS AND EGRESS: City hereby grants to Company the right of ingress and
egress across all lands owned, leased or controlled by City as may be reasonable and/or
necessary for Company to perform the Relocation.
AUDIT: City shall have the right, upon reasonable notice and during normal business
hours; to audit and obtain copies of the books, records, and accounts of Company relating to
the Relocation for up to two years after the date Company completes the Relocation.
COMPANY LIABILITY AND INDEMNIFICATION: Company shall be liable for and shall
promptly and fully compensate City for liabilities, claims and costs resulting either from the
negligent activities of Company employees, agents and/or contractors or from spillage or
discharge of petroleum products or other hazardous substance from the Pipeline.
Company agrees to indemnify and hold harmless the City, its officers, agents and
employees, against and from any and all liability, loss and expense and shall defend all
claims resulting from loss of life or damage or injury to persons or property directly or
indirectly resulting from the work performed by Company to the extent such loss,
damage or injury, is caused by the negligence or willful misconduct of Company or its
agents or arises out of or in connection with the Relocation Services. As a necessary
condition for such indemnity to be enforceable against Company:
(i) Company shall be notified in writing promptly of any and all claims,
liability, loss and expense for which City seeks indemnification from
Company, and
(ii) Company shall have sole control of the defense of any and all claims,
liability, loss and expense and all negotiations for their settlement or
compromise.
NO THIRD PARTY: This Agreement is solely for the benefit of the City and Company,
and neither the City nor Company intends by any provision of this Agreement to create any
rights in any third-party beneficiaries or to confer any benefit or enforceable rights, under this
Agreement or otherwise, upon anyone other than the City and Company.
VENUE AND JURISDICTION: This Agreement shall be governed by the laws of the
State of Texas. Venue for any action brought to interpret or enforce, or arising out of or incident
to, the terms of this Agreement shall be in Tarrant County, Texas or the United States District
Court for the Northern District of Texas, Fort Worth Division.
ENTIRETY OF AGREEMENT: This Agreement constitutes the entire agreement
between the parties hereto relating to the subject matter hereof, and no alterations of the terms
and conditions of this Agreement shall be valid unless in writing and signed by both of the
parties hereto. This Agreement shall be binding upon and inure to the benefit of the parties
hereto, their successors and assigns.
SIGNATURE PAGE TO FOLLOW
Reimbursement Agreement
City of Fort Worth&Total Energy
Clear Fork Lift Station
Page 2 of 5
31197967v.2
DocuSign Envelope ID:OCF5BF00-EEA6-4768-A306-A63ED390288E
IN WITNESS WHEREOF, this Agreement shall become effective as of the date it
becomes fully executed by the parties.
CITY OF FORT WORTH TOTAL ENERGIES E&P USA
BARNETT 1, LLC, a Delaware
limited liability company
ignd by.
Dc�nc� Bu�cih�%ff Fv::
By:Dana Burghdoff ay 9,202217:48 CDT) By: wyg�
Dana Burghdoff Dave LeoFd'`ir ` ident,
Assistant City Manager and CEO
Date: May 9, 2022 Date: 3/28/2022
Recommended by:
CGI�/f�D,dGIG�fI��G�G�
Christopher H rder(May 6,2022 17:07 CDT)
Chris Harder
Director, Water Department
Approved as to Form and Legality:
0.4
DBlack(M5y 9,202215:31 CDT)
Douglas W. Black
Assistant City Attorney
M&C: �d44�� Attest:
dp on
oF°°°°°°°°°� a
Date: �a�.o° 0.0
q�p. Jannette S. Goodall
P v o °_� Jannette S. Goodall
°o � City Secretary
a�>Z TEXAS-oAp
OFFICIAL RECORD
Reimbursement Agreement CITY SECRETARY
City of Fort Worth&Total Energy FT.WORTH, TX
Clear Fork Lift Station
Page 3 of 5
31197967v.2
DocuSign Envelope ID:OCF5BF00-EEA6-4768-A306-A63ED390288E
ATTACHMENT A
W
0
Z '
� o
LU
oroa saaOoa _
�5 \
9�7
�O_
�V N
a \
\\ .. L) \
1 LL
Off()I
a 1 c:>
OF
LL
J� U W Z_
02
+r ,, o ' � 5's
tY W tiQ I rac
fr/r
2¢ \1 LL~ I
a
FZ
co I
�z
o o r
oz r
0
r
i I!
\
ro \
1
Reimbursement Agreement
City of Fort Worth&Total Energy
Clear Fork Lift Station
Page 4 of 5
31197967v.2
DocuSign Envelope ID:OCF5BF00-EEA6-4768-A306-A63ED390288E
ATTACHMENT 8
Estimated costs and expenses for the Construction of the Relocation:
$2,500—relocation of solar panel
$3,000—relocation of the production pump and piping
$3,500—relocation of the drainage weir valve,berm, a portion of the chain link fencing
1 000—relocation of the ESD (emergency shut down)
Total: $10,000
Signature: �79eedt g dall(May16XW911
JanneEmail: jannette.goodaii@fortworthtexas.gov
Reimbursement Agreement
City of Fort Worth&Total Energy
Clear Fork Lift Station
Page 5 of 5
31197967v.2