HomeMy WebLinkAboutContract 54041-CO2 CSC No.54041-CO2
FORTWORTH City of Fort Worth
Change Order Request
Project Nam�Riverside Community Park Phase I Improvements Project I CilySec II 54041
ClienlProjeclll(s{ C01196
Project Description Riverside Community Park Phase I Improvements f
' Norlhslar,ConskuclionLLC Change0rder1l _ 2 Dale 211612022 1
J
City Project Mgr.r— Tonda Wee J City Inspeclorl Ralph Ouimelte
Dept. PARD Contract Time
Tolals (CD)
OriginalContraclAmounl ,86�ou 180
Extras to Dale 60
Credils to Dale $2,353.00 L $2,353.00 k
Pending Change Orders(in M&C Process) I $0.00 i I I
Contract Cost to Date $1,865,502.00 $1,865,502.00 240
moun o Proposed ange Order 7. 0 0( 7. 30
Revised ConlractArnount 1,911,179
, ,179, 0 $fi?3iT,T7�.� 270
Original Funds Available for Change Orders $50,000.00
Remaining Funds Available for this CO $52,353.00 $52,353.00
AddlUo nal Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.32%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+257.) $ ,33 ,8 8.75
JUSTI IC 10 R SO S;FOR MANGE OR�f
1) During construction it was determined that additional drainage was needed, water was being retained under
the tree grove and damaging the root systems.
2) Existing electrical poles will be painted to match the new installed as part of this project.
3) ADA parking pavement was removed and replaced to bring the spaces into compliance with TAS.
4) Replacement of deterioration parking lot 1 &2.
5) Sawtooth curb removal and patching parking lot 4.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents paymentin
full(both time and money)for all costs arisingo utof,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges
that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting
requirements.
Conlracloes Company Name Contractor(Name) _ Co_ntractSl.nalllu�ulre Dale
NorthslarConslurclion,LLC Michael Heimlich I. ,Za Q. �`1`',.vt I 211?121
Ins eclorlins eclion Supervisor Dale Project and Contract Compliance Manager -�*� Dale
? ^�•n �• Mar 30,2022 T"Aa Mar29,2022
Progra,�ammManager Dale Senior Capital Project Officer Dale
Apr11,2022
Asslslant Dlrevor Depl Dale .Director,Contracting De rtmenb Depl Dale
May 5,2022 May 6,2022
E
Assislant City Attorney Dale AsslslanlCIluManauer Dale
gBiay o,�u�3�r May 10,2022 May 10,2022
Council Acllon(If required '
M&C Number I M&C Dale Approved
ATJannette TnS y S. ll(M5I1,202207:36CDT) May 11,2022 00
O1o�ORo0aa
Jamelle Goodall,City secretary � a oO��d OFFICIAL RECORD
~a °'�d CITY SECRETARY
FT.WORTH, TX
v o o=d
o°
�`.d
°O000000°
a�nEXASgap
FortrWourrl City of Fort Worth
�U-- Change Order Additions
Project Name I Riverside Community Park Phase I Improvements Project Cily SecR 54041
Client Projectlt I C01196
Conuaclor Norlhslar,Construction LLC PM Tonda Rice Inspector Ralph Ouimelle
Change Order Submittal N 0 Date 1 21312 0 2 1
ADDITIONS
ITEM DESCRIPTION Dhpf ly Unit Un4cost Total
1-01.2 emove Existing Faving
7. oncrete n ur
77—Install our trail un er rams and handexcavate swa a 5,
Install two trail un er rams
Drainage System n el,Connect to Intel)
aInstall Block in Bioswale b.
2.5 Remove concrete pier and posts at south end of trail
oncrete oe do
Paint Existing Ught Poles
Adjust SS Manhole in Drive Approach
Belknap Parking Lot 94 ADA Revision
Savitooth Curb RemovaliPatching 5.
PARD $45,677.20
240 Calendar Days 50.00
u Iola] ikons 7 .
Change Order Additions Page 1 of 1
rORT1,Voitrit City of Fort Worth
Change Order Deletions
Project Name I Riverside Community Paik Phase I Improvements Project City Sec tt 54041
ClienlProjecl# C01196
Contractor Northstar,Conshuction LLC PM Tondo Rice Inspector Ralph Ouimeb
Change Order Submittal It Dale 121JI2021
DELETIONS
ITEM DESCRIPTION DEPT ry Unit ml osl total
PMD $0.00
240 Calendar Days $0.00
Sub TotalDeletions
Change Order Deletions Page 1 of 1
MISBE for this Change Order
MISBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
rid NORTHSTAR
December 3, 2021 �� �VVV
//�\'� CONSTRUCTION,LLC
Change Order Proposal#: 02
Ms. Tonda Rice
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
RE: City Project No: C01196
Riverside Community Park - Phase 1 Improvements
Dear Ms. Rice,
Northstar offers the following Change Order Cost Proposal for the site grading and concrete
adjustments on the above referenced project.
Segit Description Quantity Units Unit Price Extended Price
Install four(4)trail underdrains(8', 6', 6', 6')and hand
2.1 excavate swale 1 LS $ 5.893.00 $ 5,893.00
.2 Install two(2)trail underdrains 20' & 10') 1 LS $ 3,240.00 $ 3,240.00
2.3 Drainage System (6"&4" HDPE, Inlet, Connect to Inlet) 1 LS $ 12,895.00 $ 12,895.00
2.4a Install Block Sod in Bioswale (1440 SF) 1 LS $ 864.00 $ 864.00 V
2 5 Remove concrete pier and posts at south end of trail 1 LS $ 585.00 $ 585.00
Concrete Toe Ditch 104 LF $ 9.00 $ 936.00
r1.2 Remove concrete pavement 14 SY $ 28.30 $ 396.20
�1-7,2 Concrete Ribbon Curb 86 LF $ 23.00 $ 1,978.00
.3-1�—, Paint Existing Light Poles 1 LS $ 945.00 $ 945.00
Adjust SS Manhole In Drive Approach 1 LS $ 325.00 $ 325.00
3.3 Belknap Parking Lot##4 ADA Revisions 1 LS $ 17,345.00 $ 17,345.00
Sawtooth Curb Removal/Patching 1 LS $ 275.00 $ 275.00
TOTAL CHANGE ORDER REQUEST $ 45,677.20
We also request that the contract time be extended by Thirty (30) calendar days to complete
this work.
Please let me know if you have any questions or need additional information.
Sincerely,
NORTHSTAR CONSTRUCTION, LLC
r ,
Michael A. Heimlich
President
(817)244-8885-Office 2112 Solona Street, Fort Worth, Texas 76117 (817)244-8886- Fax