HomeMy WebLinkAboutContract 57542 Received Date: 05/11/2022
Received Time: 4:09 pm
Developer and Project Information Cover Sheet:
Developer Company Name: Great Hearts America—Texas
Address, State,Zip Code: 12500 San Pedro Ave., Suite 500, San Antonio,TX 78216
Phone &Email: 704-777-8498,joriol@pmsitx
Authorized Signatory,Title: Brendan Miniter, Superintendent
Project Name: Great Hearts Harmon
Brief Description: Water, Sewer,Paving, Storm Drain and Street Lights
Project Location: 1231 E.Harmon Rd.,Fort Worth,TX 76131
Plat Case Number: Plat Name:
Mapsco: Council District: 2
CFA Number: CFA21-0167 City Project Number: 103715
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort Worth,Texas Page 1 of 16
Standard Community Facilities Agreement
Rev.9/21
City Contract Number: 57542
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT("Agreement") is made and entered into by
and between the City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and Great Hearts America - Texas
("Developer''),acting by and through its duly authorized representative.City and Developer are referred to
herein individually as a"party" and collectively as the"parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth,Texas or its extraterritorial jurisdiction,for a project known as Great Hearts
Harmon("Project"); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement("Community Facilities"or"Improvements");and
WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional
obligations contained in this Agreement,and Developer may be required to make dedications of land,pay
fees or construction costs,or meet other obligations that are not a part of this Agreement; and
WHEREAS,the City is not participating in the cost of the Improvements or Project;and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated
into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exists between the terms and conditions
of this Agreement and the CFA Ordinance,the CFA Ordinance shall control.
City of Fort Worth,Texas Page 2 of 16
Standard Community Facilities Agreement
Rev.9/21
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been approved by the City ("Engineering
Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
❑X Exhibit A: Water
❑X Exhibit A-1: Sewer
❑X Exhibit B: Paving
❑X Exhibit B-1: Storm Drain
❑X Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering Plans, the Engineering Plans shall control. If applicable,Attachment I —
Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and
Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
City of Fort Worth,Texas Page 3 of 16
Standard Community Facilities Agreement
Rev.9/21
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term").
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement,becomes insolvent,or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors,or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
City of Fort Worth,Texas Page 4 of 16
Standard Community Facilities Agreement
Rev.9/21
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent(100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2)years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions,Chapter 2253 of the Texas Government Code,and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider,which shall be made a part of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight(48)hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain,or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(f) Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
City of Fort Worth,Texas Page 5 of 16
Standard Community Facilities Agreement
Rev.9/21
11.
Easements and Rights-of-Way
Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS,AGENTS AND EMPLOYEES FROM ALL SUITS,ACTIONS OR CLAIMS OF
ANY CHARACTER, WHETHER REAL OR ASSERTED,BROUGHT FOR OR ONACCOUNT
OFANYINJURIES OR DAMAGES SUSTAINED B YANY PERSONS,INCL UDING DEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION,DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PROPERL Y SAFEGUARD THE WORK, OR ON ACCOUNT OF ANY ACT,INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES,
WHETHER OR NOT SUCHINJURIES,DEATH OR DAMAGESARE CAUSED,IN WHOLE
OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS,SERVANTS, OR EMPLOYEES.
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH,RESULTING FROM, OR INANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE,
AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
13.
Right to Enforce Contracts
City of Fort Worth,Texas Page 6 of 16
Standard Community Facilities Agreement
Rev.9/21
Upon completion of all work associated with the construction of the Improvements,Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors,along with an assignment of all warranties given by the contractors,whether express or implied.
Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees,and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund
the difference to the Developer.If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars($50.00),the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting.The City
will obtain proof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand-
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY: DEVELOPER:
Development Coordination Office Great Hearts America—Texas
City of Fort Worth 12500 San Pedro Ave.
200 Texas Street Suite 500
Fort Worth, Texas 76102 San Anotonio, TX 78216
City of Fort Worth,Texas Page 7 of 16
Standard Community Facilities Agreement
Rev.9/21
With copies to:
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of
three (3)years after final payment under the contract,have access to and the right to examine any directly
pertinent books, documents,papers and records of such contractor, involving transactions to the contract,
and further,that City shall have access during normal working hours to all of the contractor's facilities,and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants,officers,contractors,subcontractors,and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
City of Fort Worth,Texas Page 8 of 16
Standard Community Facilities Agreement
Rev.9/21
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer,nor any officers,agents, servants,employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants,officers,contractors, subcontractors,and volunteers.
The City,through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas,Fort Worth Division.
20.
Non-Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose,their attorneys, have had the opportunity to review
City of Fort Worth,Texas Page 9 of 16
Standard Community Facilities Agreement
Rev.9/21
and comment on this document;therefore any rule of contract construction or interpretation that would
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1)does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and"company"have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement,by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1)does not boycott Israel;and(2)will not boycott Israel during the term of this Agreement.
26.
Prohibition on Boycotting Energy Companies
Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code,as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2,the City is prohibited from entering into a contract for
goods or services that has a value of$100,000 or more that is to be paid wholly or partly from public funds
of the City with a company with 10 or more full-time employees unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott
energy companies during the term of the contract. The terms "boycott energy company" and "company"
have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is
applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature
provides written verification to the City that Developer: (1) does not boycott energy companies; and (2)
will not boycott energy companies during the term of this Agreement.
27.
Prohibition on Discrimination Against Firearm and Ammunition Industries
Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code,as added by Acts 2021,87th Leg.,R.S.,S.B. 19, § 1,the City is prohibited from entering
into a contract for goods or services that has a value of$100,000 or more that is to be paid wholly or partly
from public funds of the City with a company with 10 or more full-time employees unless the contract
contains a written verification from the company that it: (1) does not have a practice,policy, guidance, or
directive that discriminates against a firearm entity or firearm trade association;and(2)will not discriminate
during the term of the contract against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms
by Chapter 2274 of the Texas Government Code,as added by Acts 2021, 87th Leg.,R.S., S.B. 19, § 1. To
the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not have a practice,policy, guidance, or directive that discriminates against a firearm
City of Fort Worth,Texas Page 10 of 16
Standard Community Facilities Agreement
Rev.9/21
entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
28.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'SEMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
29.
Amendment
No amendment,modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing,dated subsequent to the date hereof, and duly executed by the City and Developer.
30.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
31.
No Third-Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise,to any other person or entity.
32.
Compliance with Laws, Ordinances,Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that,if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
33.
Signature Authority
City of Fort Worth,Texas Page 11 of 16
Standard Community Facilities Agreement
Rev.9/21
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
34.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
35.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth,Texas Page 12 of 16
Standard Community Facilities Agreement
Rev.9/21
36.
Cost Summary Sheet
Pro]ectName: Great Hearts Harmon
CFA No.: CFA21-0167 City Project No.: 103715 IPRC No.: IPRC21-0118
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 514,982.50
2.Sewer Construction $ 580,344.25
Water and Sewer Construction Total $ 1,095,326.75
B. TPW Construction
1.Street $ 128,532.38
2.Storm Drain $ 38,185.00
3.Street Lights Installed by Developer $ 12,046.00
4. Signals $ -
TPW Construction Cost Total $ 178,763.38
Total Construction Cost(excluding the fees): $ 1,274,090.13
Estimated Construction Fees:
C. Construction Inspection Service Fee $65,750.00
D. Administrative Material Testing Service Fee $4,655.00
E. Water Testing Lab Fee $840.00
Total Estimated Construction Fees: $ 71,246.00
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 1,274,090.13 X
Completion Agreement= 100%/Holds Plat $ 1,274,090.13
Cash Escrow Water/Sanitary Sewer= 125% $ 1,369,158.44
Cash Escrow Paving/Storm Drain= 125% $ 223,454.23
Letter of Credit= 125% $ 1,592,612.66
City of Fort Worth,Texas Page 13 of 16
Standard Community Facilities Agreement
Rev.9/21
IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH DEVELOPER
Great Hearts America—Texas
��ha Gtc�o 8relcdwy mtr t�
Dana Burghdoff(May 9,2022 53 CDT) Brendan M'lrlter(May%202213:01 CDT)
Dana Burghdoff Brendan Miniter
Assistant City Manager Superintendent
Date: May 9,2022 Date: May 9,2022
Recommended by:
Tennifer EzernacK
Jennifer Ezernack(May 9,202213:09 CDT)
Jennifer Ezernack
Contract Compliance Specialist
Planning and Development
Approved as to Form &Legality:
4e-z— Contract Compliance Manager:
Richard A.McCracken(May 9,202217:01 CDT)
Richard A.McCracken By signing, I acknowledge that I am the person
Sr.Assistant City Attorney responsible for the monitoring and
M&C No. N/A administration of this contract,including
4nn ensuring all performance and reporting
Date: paG4FORr�aa requirements.
Form 1295: N/A ,O`*- -,
000000 �
0 Y
'T''T' �T` ° 0 mod{{
ATTEST. �C)o °0T We Scarlett Morales(May 9,202216:02 CDT)
° ° d
d� °° *d Janie Scarlett Morales
°O000°o.
Tannette5.Goodall da��rEXASaAp Development Manager
JannetteS.Goodall(May 1g m2208:43 CDT) lt,6 d4
Jannette S. Goodall/Ronald P. Gonzales
City Secretary Assistant City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort Worth,Texas Page 14 of 16
Standard Community Facilities Agreement
Rev.9/21
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
❑X Attachment 1 -Changes to Standard Community Facilities Agreement
❑ Attachment 2—Phased CFA Provisions
❑ Attachment 3 —Concurrent CFA Provisions
❑X Location Map
❑X Exhibit A: Water Improvements
❑X Exhibit A-1: Sewer Improvements
❑X Exhibit B: Paving Improvements
❑X Exhibit B-1: Storm Drain Improvements
❑X Exhibit C: Street Lights and Signs Improvements
❑X Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas Page 15 of 16
Standard Community Facilities Agreement
Rev.9/21
ATTACHMENT"1"
Changes to Standard Community Facilities Agreement
City Project No. 103715
None
City of Fort Worth,Texas Page 16 of 16
Standard Community Facilities Agreement
Rev.9/21
00 42 43
DAP-BID PROPOSAL
Pagel oF5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
GREAT HEARTS HARMON
INDUSTRIAL UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Unit of Bid
Description Specification Section No. Unit Price Bid Value
No. Measure Quantity
UNIT I:WATER IMPROVEMENTS
1 3137.0104 Medium Stone Riprap,dry 31 3700 Sy 44 $180.00 $7 920.00
2 3292.0401 Utility Service Surface Restoration 33 92 13 Sy
Hydromulch 3650 $225 $8,212.50
3 3305.0005 12"Waterline Lowering 33 05 12 EA 1 $10 600.00 $10 600.00
4 3305.0109 Trench Safety 330516 LF 3020 $1.50 $4 530.00
5 3305.1104 24"Casing by Other Than Open Cut 33 05 22 LF 135 $350.00 $47 250.00
6 13311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 0.1 $50 000.00 $5 000.00
7 3311.0061 4"PVC Water Pipe 3611 12 LF 60 $61.00 $3 660.00
8 3311.0161 6"PVC Water Pipe 3511 12 LF 70 $75.00 $5 250.00
9 3311.0261 8"PVC Water Pipe 3411 12 LF 696 $85.00 $59 160.00
10 3311.0451 12"DIP Water 3311 10 LF 135 $158.00 $21 330.00
11 3311.0461 12"PVC Water Pipe 3311 12 LF 2065 $125.00 $258 125.00
12 3312.0001 Fire Hydrant 33 12 40 EA 2 $4 000.00 $8 000.00
13 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 2 $2 500.00 $5 000.00
14 33122003 1"Water Service 32 12 10 EA 1 $660.00 $660.00
15 33122203 2"Water Service 33 12 10 EA 1 $700.00 $700.00
16 33122802 4"Water Meter and Vault 33 12 11 EA 1 $25 600.00 $25 600.00
17 33122802 4"Water Meter 34 12 11 EA 1 $6 500.00 $6 500.00
18 3312.3002 6"Gate Valve 33 12 20 EA 3 $1 950.00 $5 850.00
19 3312.3003 8"Gate Valve 33 12 20 EA 5 $2 450.00 $12 250.00
20 3312.3005 12"Gate Valve 33 12 20 EA 4 $3,950-001 $15 800.00
21 9999.0001 Automatic Flusher w/Fire Hydrant 00 00 00 EA 1 $3,585-001 $3 585.00
TOTAL UNIT I:WATER IMPROVEMENTS1 $514,982.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 Unit Pricing Proposal-CFA Scope REV2
00 42 43
DAP-BID PROPOSAL
Page 2 oF5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
GREAT HEARTS HARMON
INDUSTRIAL UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Unit of Bid
Description Specification Section No. Unit Price Bid Value
No. Measure Quantity
UNIT II:SANITARY SEWER IMPROVEMENTS
1 0241.1100 Remove Asphalt Pvmt 0241 15 SY 68 $50.00 $3,400.00
2 3136.0104 Twisted Gabion Mattresses 31 3600 CY 75 $313.33 $23,499.75
3 3201.0202 Asphalt Pvmt Repair Beyond Defined Width, 3301 17 SY
Arterial 10 $167.50 $1,675.00
4 3292.0401 Utility Service Surface Restoration 33 92 13 SY
Hydromulch 3450 $225 $7,762.50
5 3301.0002 Post-CCTV Inspection 3301 31 LF 3201 $1.50 $4,801.50
6 3301.0101 Manhole Vacuum Testing 3301 30 EA 21 $200.00 $4,200.00
7 3305.0109 Trench Safety 33 05 10 LF 3201 $1.50 $4,801.50
8 3305.0112 Concrete Collar 33 05 17 EA 4 $450.00 $1,800.00
9 3305.0113 Trench Water Stops 33 05 15 EA 2 $800.00 $1,600.00
10 3305.1003 20"Casing By Open Cut 32 05 22 LF 213 $108.00 $23,004.00
11 3305.1103 20"Casing by Other Than Open Cut 33 05 22 LF 213 $330.00 $70,290.00
12 3331.3201 6"Sewer Service 3331 50 EA 10 $70.00 $700.00
13 3331.4115 8"Sewer Pipe 3311 10,3331 12, 1168
3331 20 LF $80.00 $93,440.00
14 3331.4208 12"Sewer Pipe 3311 10,3331 12, LF 1165
3331 20 $120.00 $139,800.00
15 3331.4212 12"DIP Sewer 3311 10 LF 358 $145.00 $51,910.00
16 3331.5751 12"Sewer Pipe,CLSM Backfill 3311 10,3331 12, LF 20
3331 20 $92.50 $1,850.00
17 3339.0001 Epoxy Manhole Liner 33 39 60 VF 210 $200.00 $42,000.00
18 3339.1001 4'Manhole 33 39 10 33 39 20 EA 21 $4,920.00 $103,320.00
19 3339-1003 4'Extra Depth Manhole 33 39 10,333920 VF 1 $490.00 $490.00
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $580,34425
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 Unit Pricing Proposal-CFA Scope REV2
00 42 43
DAP-BID PROPOSAL
Page 3 oF5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
GREAT HEARTS HARMON
INDUSTRIAL UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Unit of Bid
Description Specification Section No. Unit Price Bid Value
No. Measure Quantity
UNIT III:STORM DRAIN IMPROVEMENTS
1 0241.3015 Remove 24"Storm Line 0241 14 LF 20 $80.00 $1,600.00
2 0241.3104 24"Storm Abandonment Plug 0241 24 EA 1 $1,200.00 $1,200.00
3 0241.4101 Remove 10'Recessed Curb Inlet 0241 14 EA 1 $2,400.00 $2,400.00
4 0241.4103 Remove 20'Recessed Curb Inlet 0241 14 EA 1 $2,990.00 $2,990.00
5 3125.0101 SWPPP >_1 acre 31 2500 LS 1 $1,000.00 $1,000.00
6 3305.0109 Trench Safety 33 05 10 LF 3200 $1.50 $4,800.00
7 3341.0205 24"RCP,Class III 3341 10 LF 37 $125.00 $4,625.00
8 3349.6001 10'Recessed Inlet 33 49 20 EA 2 $4,950.00 $9,900.00
9 3349.6003 20'Recessed Inlet .334920 EA 1 $9 670.00 $9 670.00
TOTAL UNIT III:STORM DRAIN IMPROVEMENTS $38,185-00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 Unit Pricing Proposal-CFA Scope REV2
00 42 43
DAP-BID PROPOSAL
Page 4 oF5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
GREAT HEARTS HARMON
INDUSTRIAL UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Unit of Bid
Description Specification Section No. Unit Price Bid Value
No. Measure Quantity
UNIT IV:PAVING IMPROVEMENTS
1 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 435 $17.00n$283
0
2 3201.0614 Conc.Pvmt Repair,Arterial/Industrial 32 01 29 Sy 100 $115.500
3 3211.0400 Hydrated Lime 321119 TN 12 $190.000
4 3211.0502 8"Lime Treatment 32 11 29 Sy 669 $30.028
5 32130105 10"Conc Pvmt 321313 SY 654 $88000
6 32130301 4"Conc Sidewalk 321320 SF 3574 $550 $ 0
7 3213.0507 Barrier Free Ramp,Type P-2 32 13 20 EA 2 $2 500.00 $5 000.00
8 3217.0203 8"SLD Pvmt Marking Tape(W) 33 17 23 LF 320 $6.50 $2 080.00
9 3217.1002 Lane Legend Arrow 32 17 23 EA 1 $130.00 $130.00
10 3217.1004 Lane Legend Only 32 17 23 EA 1 $160.00 $160.00
11 32172104 REFL Raised Marker TY II-C-R 33 17 23 EA 16 $20.00 $320.00
12 3291.0100 Topsoil 3291 19 Cy 10 $75.00 $750.00
13 3292.0100 Block Sod Placement 1329213 1 Sy 150 $6.00 $900.00
14 3441.4006 Install Alum Sign Ground Mount 13441 30 EA 3 $225.00 $675.00
TOTAL UNIT IV:PAVING IMPROVEMENTS1 $128,532.38
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 Unit Pricing Proposal-CFA Scope REV2
00 42 43
DAP-BID PROPOSAL
Page 5 oF5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
GREAT HEARTS HARMON
INDUSTRIAL UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Unit of Bid
Description Specification Section No. Unit Price Bid Value
No. Measure Quantity
UNIT V:STREET LIGHTING IMPROVEMENTS
1 2605.0121 Furnish/Install Elec Sery Pole Mnt 26 05 00 EA 1 $5 200.00 $5 200.00
2 3441.3050 Furnish/Install LED Lighting Fixture(70 watt 3441 20 EA 2
ATBO Cobra Head) $1 083.00 $2 166.00
3 3441.3323 Furnish/Install 8'Wood Light Pole Arm 3441 20 EA 2 $870.00 $1 740.00
4 9999.0001#4 Insulated Elec Conductor(#4 XHHW 3841 20 LF 400
COPPER) $7.35 $2 940.00
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS1 $12,046.00
Bid Summary
UNIT I:WATER IMPROVEMENTS $514 982.50
UNIT II:SANITARY SEWER IMPROVEMENTS $580,34425
UNIT III:STORM DRAIN IMPROVEMENTS $38 185.00
UNIT IV:PAVING IMPROVEMENTS $128,532.38
UNIT V:STREET LIGHTING IMPROVEMENTS $12 046.00
Total Construction Bid $1,274,090.13
This Bid is submitted by the entity named below:
BIDDER: BY:
Tergrity Contractors,Inc.
202 N.Allen Drive,Suite E
Allen,Texas 75013 TITLE:Project Manager
DATE:4/11/2022
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 210 worldng days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 Unit Pricing Proposal-CFA Scope REV2
_I..Dr
—i— a-
7h @ F Juarez Drive <
GrassyV—Drve ® O
Qualls Nest Drive y -GOwrrDrive
/ d
\ Birds Eye Road
erifag¢Trace Parkway Heritage Trace-ParkwaY�. v c
Quail Grove Drive 1° A
i
\\ P esdlo Vista
0
JT
try earU
3 zBJ
2
4P x
\i lG� d North Tarrant Parkway
SITE A
Albany Drivc0.
o xl
Har n Road e3 Hoch
Cattle Crossing Drive ,pf CGS
ti
d' J
P i J
I \
0 1500 3000 6000
1 inch = 3000 ft.
MAPSCO NO. TAR-35E
COUNCIL DISTRICT 2
DATE 3/9/22 LLI mlm�a
OWNER/DEVELOPER: GREAT HEARTS -
GREAT HEARTS AWMCA — HARMON civil engineering surveying landscape architecture planning
TEXAS, A TEXAS NONPROFIT tbpe registration number. f-2759
CORPORATION tbpls registration/license number. 1008MOO
12500 SAN PEDRO AVE VICINITY MAP 51 9 a a s t b o r d e r
SUITE 500 CITY PROJECT NO. 103715 arlington, texas 76010
SAN ANTONIO, TX 78216 8 1 7-4 6 9-1 6 7 1
EMAIT jor1o16pm dtz.com fox: 8 1 7—2 7 4—8 7 5 7
CONTACT: JASON ORIEL www.mmatexas.com
0 150 300 600 END 8" WL 30'WIDE PERMANENT EASEMENT
AND RIGHT—OF—WAY ENTERPRISE
TEXAS PIPELINE LLC CC/
CALLED 1. AC D209216341 B O269278476 OPRTCT
AflUDS ENERG
\ CORPMA77ON 15'WATER EASEMENT
1 inch = 300 ft. D214257623
\� OPRTCT END 12" LINE
PROP. AUTO \�\ // BEGIN 8" LINE
FLUSHER V \ PROP. IRRIGA TION
& FIRE \ AND FIRE SERVICE
HYDRANT
C.
'N
LOT 7X, BLOCK 10A \
CORREC71 N PUTROG
CQ#WEWD217283667S
7 / PROP. FIRE
OPRTCT / HYDRANT
I
PROP. DOMESTIC SERVICE \ 2A'WD ENE�ECORPORAT NO.
I
l
BLOCK 10A \ D214257625 OPRTCT
ISDGENEW FARMS \
CC/D205053576 PROP. FIRE
OPRTCT
VARIABLE WIDTH \\ HYDRANT
DRAINAGE EASEMENT
\\ \ 15'WATER
EASEMENT
24'PUBLIC ACCESS BY SEPARATE
7 \\ EASMENT / INSTRUMENT
y I I 1 REMAINDER` / 2 A W10E EASEMENT TRACT GY CORPORA ON
OF A A D21 TWS 4257625 OPR7CT
CALLED 30'WIDE PERMANENT EASEMENT
90.634 AND RIGHT—OF—WAY ENTERPRISE
ACRES TEXAS PIPELINE LLC CC/
'T HARMON ( D209216341.&D209278476 OPRTCT
� e7 i PROP. FIRE &
LP IRRIGATION SEROCE
D1OPRTCT1 PROP. DOMESTIC SEROCE
74 50'DRAINAGE I X X
EASEMENT
/ / ' PROP. FIRE SEROCE REMAINDER
NAWAN BONWE
LOT IX, BLOCK 1 DA CC/D215290707
MDWWEW FARMS ' ( EX. 8" WL I OPRTCT
CC/D205053576
OPRTCT X-13113
WATER PROJECT NO.
LEGEND 'WSEREASEMENT P161-060166152070 II
PROP. WATER LINE w DOE NO. 3876
VARIABLE WIDTH
PUBLIC ACCESS 14.1838 ACRES
EX. WATER LINE 1 EASEMENT REMAINDER
DO EAST HARMAN LLC NAWAN BONWE
*OPRTCT 818 CCI D215290707
50'DRAINAGE ESMT. ' 1 I 25'SANITARY OPRTCT
SEPARATE �' SEWER EASEMENT IN 12"
PROP.INSTRUMENT II`
PROPOSED RICHT—OF—WAY EASEMENT BY SEPARATE WA TERLINE
INSTRUMENT CONNECTION
�I EX-4 "
12"-S� E. HARMON
EEX. 48" WL CALLED 3.257 ACRES
ASBUILT NO. X-9478 CELINA DEALERSHIP PARTNER$ LP
WATER PROJECT NO. 77-014003-00 CC/D214257623
FILE NO. 01-0894 OPRTCT
DATE 3123122 LL] mIm a
OWNER/DEVEWPER: GREAT HEARTS
GREAT HEARTS AMERICA — I
TEXAS, A TEXAS NONPROFIT HARM01V civil engineering surveying landscape architecture planning
CORPORATION tbpe registration number. f—2759
12500 SAN PEDRO bpls registration license number. 10088000
AVE,� 519 east border
SUITE 500 EXHIBIT A arlington, texas 76010
SAN ANTONIO, TEXAS 78216 WATER 8 1 7—4 6 9—1 6 7 1
EMAIL: joriolOpmsitmeom CITY PROJECT NO. 103715 f a x: 8 1 7—2 7 4—8 7 5 7
CONTACT: JASON ORIEL www.mmatexas.com
0 150 300 600 30'WIDE PERMANENT EASEMENT
AND RIGHT-OF-WAY ENTERPRISE
TEXAS PIPELINE LLC CC/
CALLED AC D209216341&D209278476 OPRTCT
ATM EM RG
1 \ CORPORA77ON 15'WATER EASEMENT
\ CCI D214257623
LEGEND 1 inch = 300 ft. \ N OPRTCT
PROP. SANITARY LINE SS ` \ �(
PROP. SANITARY SS
MANHOLE
EX. SEWER LINE EX-SS G
'N
LOT 7X,
CCORREC7►ONCPLAT
RIDGENEW FARMS
CC/D217283667
OPRTCT
/
25'WIDE EASEMENT TRACT NO.1
\ AIMOS ENERGY CORPORA7011
BLOCK IDA D214257625 OPRTCT
I�DGENEW FARMS \
CC/D205053576
OPRTCT VARIABLE WIDTH
�D INAGE EA\MENT \ WATER
EA
EASEMENT
100 YEAR ULTIMATE \ \ SEPARATE
`FLOODPLAIN PER FLOOD STUDY \ 24'PUBLIC ACCESS UMENT
12 BY MMA DATED 08/0412021 \ ,EASMENT
11 16 11
1 10 171 END 12 LINE / \
BEGIN 8" LINE 25'WIDE EASEMENT TRACT NO.1
�l A1MOS ENERGY GORPORATTpV
REMAINDER D214257625 OPRTCT
OF A
CALLED U 30'WIDE PERMANENT EASEMENT
90.634 / AND RIGHT-OF-WAY ENTERPRISE
F 7 ACRES TEXAS PIPELINE,LLC CC/ \
HARMON D209216341&D209278476 OPR7CT
FAA°D1287
R7NERS` I ^ I
C/D198078001 / —�
J 2 50 EASEMEN� OPRTCT `
I REMAINDER I
14.1838 ACRES NATHAN WNW
LOT IX, BLOCK 10A I DD EAST HARMON LLC I CC,/D215290707
CC/D221165818 OPRTCT
R �SARMS I/ - OPRTCTCCf I
EX 18" SS 576
OPRTCT 15'SANITARY I
\ WER EASEMENT
X-16553
WATER PROJECT NO. VARIABLE W7D7H
P163-060163015147 PUBLIC
i
FILE NO. W-1353 REMAINDER
D.O.E. NO. 4254 \ NATHAN WNW
50'DRAINAGE ESMT. / 25'SANITARY CC/D215290707
i BY SEPARA7E �' SEWER EASEMENT OPRTCT
INSTRUMENT V —f-- - — p EASEMENT
RIGHT-OFR TE
EASEMENT BY SEPARATE
INSTRUMENT
PROP. 12" SEWER i ,
LINE CONNECTION. 12&
CALLED 3.257 ACRES
PROP. GABION MATTRESS CELINA DEALERSHIP PARTNER$ LP
CC/D214257623
OPRTCT
DATE 3123122 LL] mIm a
OWNER/DEVEIAPER: GREAT HEARTS
GREAT HEARTS AMERICA — I
TEXAS, A TEXAS NONPROFIT HARM01V civil engineering surveying landscape architecture planning
CORPORATION tbpe registration number. f-2759
12500 SAN PEDRO bpls registration license number. 10088000
AVE,� 519 east border
SUITE 500 EXHIBIT Al arlington, texas 76019
SAN ANTONIO, TEXAS 78216 SEWER 81 7-4 e 9-1 8 71
EMAIL: joriolOpmsitz.00m CITY PROJECT NO. 103715 f a x: 8 1 7-2 7 4-8 7 5 7
CONTACT: JASON ORIEL www.mmatexas.com
0 50 100 200
II 1 inch = 100 ft.
j I I I LEGEND:
I 4" CONCRETE
II SIDEWALK
II 8" CONCRETE
1 I PA VEMEN T
II I TYPE P-2
I I RAMP O
I �
\�\ PORTION OF A CALLED
37.5258 ACRES
NATHAN BONTKE
100 YEAR ULTIMATE CC#D215290707
FLOODPLAIN PER FLOOD \ \ 0PRTCT
STUDY BY MMA DATED
0810412021
I �
I \\ II 111
VARIABLE WDTH / I I ` 15'SANITARY SEVER
PUBLIC ACCESS I I I I EASEMENT
EASEMENT
50'DRAINAGE EASEMENT
50'DRAINAGE ESMT. I/ I PROPOSED RIGHT—OF—WAY
BY SEPARATE INSTRUMENT EASEMENT BY SEPARATE
INSTRUMENT h
PROP. SOLID WHITE LINE
E. HARMON ROAD 120'RIGHT—OF PROP. PA VEMEN T MARKING
—WAY)
DA TE: 319122 LL] m1maOWNER/DEVELOPER: GREATHEARTS
GREAT HEARTS AMERICA — I
TEXAS. A TEXAS NONPROFIT HARMON civil engineering surveying landscape architecture planning
CORPORATION tbpe registration number. f—2759
tbpls registration/license number. 10088000
12500 SAN PEDRO AVE, EXHIBIT B 519 e a s t b o r d e r
SUITE 500 PAVING a r I i n g t a n I
texas 76010
SAN ANTONIO, TEXAS 78216 CITY PROJECT NO. 103715 8 1 7—4 6 9—1 6 7 1
EMAIL: joriolOpmeit8.com f a x: 8 1 7—2 7 4—8 7 5 7
CONTACT: JASON ORIEL www.mmatexas.com
/ 1 1 0 50 100 200
1 inch = 100 ft.
/ � 1
LEGEND:
r I I I ( PROPOSED CURB INLET _=3L_
( II I PROPOSED STORM LINE -
II
1 ' I
I I I
I I
I �
PORTION OF A CALLED
37.5258 ACRES
WHAN BON7KE
CC#D215290707
OPRTCT
1 � \
OF A CALLED
REMAINER
HARMON \
ROAD1287 PARTNERS, L.P. `
CC#OPRTCT8001
PROP. 20' RECESSED CURB INLET
100 YEAR ULRMATE } l 21' OF 24" RCP
FLOCOPLAIN PER FL
STUDY BY MMA DA I' T� CONNECT TO EX. STORM LINE
STUTED
0810412021 15'SANITARY
VARIABLE WID7H SERER EASEMENT
PUBUC ACCESS r I I ` PROP. 10' RECESSED CURB INLET
EASEMENT ' 15' OF 24" RCP
50'DRAINAGE ESMT. CONNECT TO EX. STORM LINE
— BY SEPARATE INSTRUMENT
T _ _
_
SO'DRAINAGE ESMT. '1 I PROPOSED RIGHT—OF—WAY
BY SEPARATE INSTRUMENT EASEMENT BY SEPARATE
25'SANITARY INSTRUMENT
SEWER EASEMENT
r E. HARMON ROAD
(120'RIGHT—OF—WAY)
EX-48"W EX-48"W EX-48"W
UGT GT UGT UGT
12"SS
h" 41(4m VA
8"W — — — F.L-8 W — —
DATE 319122 LL] m1m a
OWNER/DEVELOPER: GREAT HEARTS
GREAT HEARTS AMERICA — I
TEXAS, A TEXAS NONPROFIT HARMON civil engineering surveying landscape architecture planning
CORPORATION tbpe registration number. f—2759
12500 SAN PEDRO AVE, tbpls 5gis9 registration/license numb o rb d e10088000
SUITE 500 EXHIBIT B1
STORM arlington, texas 76010
SAN ANTONIO, TEXAS 78216 CITY PROJECT NO. 103715 8 1 7—4 6 9—1 6 7 1
EMAIL: jOTiOlOpmBitZ.COm f a x: 8 1 7—2 7 4—8 7 5 7
CONTACT: JASON ORIEL www.mmatexas.com
rX 0 50 100 200
IY.
1 inch = 100 ft.
I LEGEND:
/ I I PROPOSED STREET SIGN
II PROPOSED STREET LIGHT
1 �
I �
\
\\ \ PORTION LED
3.5258 ACRES
\ \ NA7HAN BON7KE
REMAINDER OF A CALLED \ \ CC#O215290707
90.634 ACRES HARMON \'. `
PRTCT
ROAD1287 PARTNERS, L.P. \
CC#O198078001TCT
VARIABLE WIDTH I I II `
PUBLIC ACCESS 15'SANITARY
EASEMENT I SEWER EASEMENT
50'DRAINAGE EASEMENT
T I PROP. RIGHT TURN
OUT.
50'DRAINAGE SEPARA7E INSTRUMENT 1 I I L' 25'SANITARY ARROW SIGN PROPOSED
A _ SEWER EASEMENT AND NO +TRUCKS SIGN STREET
.. ..}... :,>:.:.....:...,: LIGHT
E. HARMON ROAD PROPOSED RIGHT—OF—WAY PROP. RIGHT TURN ONLY SIGN
EASEMENT BY SEPARATE
(120'RIGHT—OF—WAY) 1, INSTRUMENT
PROPOSED
d STREET LIGHT
12"SS
EX-8"W — — 1__FX-8 W — —
DATE 3123122 LL] m1m a
OWNER/DEVELOPER: GREAT HEARTS
GREAT HEARTS AMERICA — I
TEXAS, A TEXAS NONPROFIT HARM01V civil engineering surveying landscape architecture planning
tbpe registration number. f—2759
CORPORATIONtbpls registration/license number. 10088000
12500 SAN PEDRO AVE
EXHIBIT C1 519 east border
SUITE 500 STREET NAME SIGNS & arlington, texas 76010
SAN ANTONIO, TEXAS 78216 STREET LIGHTS 8 1 7—4 6 9—1 6 7 1
EMAIL: jOTIOlOpml9itZOOm f a x: 8 1 7—2 7 4—8 7 5 7
•
CONTACT• JASON ORIEL CITY PROJECT NO. 103715
www.mmatexas.com