HomeMy WebLinkAboutContract 56582-AR1 CSC No.56582-AR1
FORT WORTH City of Fort Worth
Construction Allowance Request
Project Namel Water and Sanitary Sewer Replacement Contract 2011 WSM-D,Part 2= City Sec No. r 56582
Project No.(s) 1929-2 M&C: 21-0763 City Proj.No.1 1929
Project Description: Water and Sanitary Sewer Replacement on various streets.
Contractor: Woody Contractors Allowance No: Date: 4/21/2022
City Project Mgr.1 Suby Varughese City Inspector: I Tamara Vaughn
Phone Number:1 817 392 7803 Phone Number: 682 225 9106
Dept. WATER SEWER Totals Contract Time
(Calenderdays)
Original Contract Amount $2,031,329.25 $914,697.25 $2,946,026.50 365
Previous Allowances Allocated $8,500.00 $0.00
Amount of Proposed Allocation $5,936.00 $10,710.00 $16,646.00
Original Allowance Available for Allocation $100,000.00 $50,000.00 $150,000.00
Remaining Funds Available for this Allocation 1 $91,500.00 $50,000.00 $141,500.00
Revised Contract Time 365
JUSTIFICATION(REASONS)FOR ALLOWANCE
Allowance No.1 will provide for the removal and replacement of existing conflicting segments of 36"and 18"storm drain pipes that are in
direct conflict with a project 24"water main and 8"sewer main.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.
Contractor's Company Name Contractor Name Contra eG Signature Date
Woody Contractors Troy woody 7-a-9- a0.
Inspector Date Project Mana Date
Tamara Vaughn e 4/26/2022 Suby Varughese �"� 4/29/2022
Director Water Dept) Date Constrructiioo/nJ Supervisor TPW Dept Date
li
-phe,Mard (May 23,20220222 CDT)) i May 23,2022 /�� 04/27/22
Assistant CityAttome Date A1ll//ssiisttaan�tt City
f Manager Date
May 24 2022 bA�u R�aG2442 1 May 24,2022
Black Mz 24 202218:000DT na Burghdoff( y2,2 1&.02 CDT)
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
Fc)n-r WOa F City of Fort Worth
Vr Construction Allowance Request
Project Name Water and Sanitary Sewer Replacement Contract 2011 WSM-D, Part 2 City Sec No.
Project No.(s) 1929 2 M&C: 21 0763 City Proj. No. 1929
Project Water and Sanitary Sewer Replacement on various streets.
Description
Contractor Woody Contractors Allowance No: [ 1 Date: 4121%20�
City Project Mgr. Suby Varughese City Inspector Tamara Vaughn
CONSTRUCTION ALLOWANCE ITEMS TO BE ADDETED
IT EM DESCD PTION DEPT MY Unit Unit Cost Total
53 Removal of 36"RCP WATER 16.00 LF $21.00 $336.00
54 Install 36"RCP WATER 16.00 LF $225.00 $3,600.00
55 36"Concrete Collar WATER 2.0000 EA $1,000.00 $2,000.00
47 Removal of 18" RCP SEWER 30.00 LF $16.00 $480.00
48 Install 18" RCP SEWER 30.00 LF $141,00 $4,230.00
49 18"Concrete Collar SEWER 2.00 EA $800.00 $1,600.00
50 Connect to Inlet SEWER 2.0000 EA $2,200.00 $4,400.00
WATER 1$5,936.00
SEWER $10,710.00
Additions Sub Total 1$16,646.00
Page 1 of 1
F"R-' W"RT H City of Fort Worth
Construction Allowance Request
Project Name Water and Sanitary Sewer Replacement Contract 2011 WSM-D,Part 2 City Sec No, 56582
Project No.(s) 1929-2 M&C: 21 0763 City Proj.No. 1929
Project Description Water and Sanitary Sewer Replacement on various streets.
Contractor Woody Contractors Allowance No: Date 4/21/2022
City Project Mgr. Suby Varughese City Inspector F Tamara Vaughn
CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED
ITEM DESCRIPTION DEPT Oty Unit Unit Cost Total
WATER
SEWER
Paee 1 of 1 Deletions Sub Total
NIMBB Breakdown for this Change Order
MWBE^dub T e.o S Yriice, -Amon`t for this CO7,77
.... . �.., _z , Y. ,. E �
Total $0 00
Previous Change Orders
Total ' <<
Page 1 of 1
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suby Varughese
Name of Employee
Professional Engineer
Title
ATTEST: ��,*- .0
��OR? Da�D
Pao Pao0 0.
�ddG��GG ��,O od
J ette S.Goodall(May 25,2022 09 CDT) ��* po *�
00000000 IC/
lannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
000
CWOODY
CONTRACTORS
WOODY CONTRACTORS INC.
050 TOWER RD
KENNEDALE,TX 76060
PHONE-817-483-4787
FAX 817-483-2048
Job: CONTRACT 2011 WSM-D PART 2
Date Ap ri 121, 2022
CHANGE ORDER 2
Item Description Quantity Unit Price Total Price
1 REM. 36" RCP 16 LF $ 21.00 $ 336.00
2 36" RCP 16 LF $ 225.00 $ 3,600.00
3 CONC. COLLAR(36") 2 EA $ 1,000.00 $ 2,000.00
4 REM. 18 " RCP 30 LF $ 16.00 $ 480.00
5 18" RCP 30 LF $ 141.00 $ 4,230.00
6 CONC. COLLAR(18") 2 EA $ 800.00 $ 1,600.00
7 CONNECT TO INLET 2 EA $ 2,200.00 $ 4,400,00
Total for Sheet $ 16,646.00
Total For Job $ 16,646.00
CPN-1929-2 Allowance Request-1 notes
The Contractor provided a price proposal for removing and replacing the 36" and 18" RCP pipes,
which directly conflict with the 24"water main and 8" sanitary sewer lines. The allowance
request covers the additional cost associated with removing and replacing pipes, concrete collars,
equipment, fuel, and labor costs. Compared with bid values from previous projects,the proposed
unit prices are fair and reasonable.