HomeMy WebLinkAboutContract 56582-AR2 CSC No. 56582-AR2
FORT WORTH City of Fort Worth
Construction Allowance Request
Project Name I Water and Sanitary Sewer Replacement Contract 2011 WSM-D,Part 2 City Sec No. 56582
Project No.(s) 1929-2 71M&C: 21-0763 City Proj.No. 1929
Project Description: Water and Sanitary Sewer Replacement on various streets.
Contractor: Woody Contractors Allowance No: 0 Date: 5/13/2022
City Project Mgr. Suby Varughese City Inspector: I Tamara Vaughn
Phone Number: 817 392 7803 Phone Number: 682 225 9106
Dept. WATER SEWER Totals Contract Time
(Calender days)
Original Contract Amount $2,031,329.25 $914,697.25 $2,946,026.50 365
Previous Allowances Allocated $14,436.00 $10,710.00 $25,146.00
Amount of Proposed Allocation $28,900.00 $0.00 $28,900.00
Original Allowance Available for Allocation $100,000.00 $501000.00 $150,000.00
Remaining Funds Available for this Allocation $85,564.00 $39,290.00 $124,854.00
Revised Contract Time 365
JUSTIFICATION(REASONS)FOR ALLOWANCE
Allowance No.2 will provide for the 8"water line lowering to avoid the direct conflict with existing 36"and 18"storm drain pipes.Also provides
V private service relocation that is nescessary for relocating the existing water meter from the driveways,
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.
Contractor's Company Name Contractor Name Contractor Signature Date
Woody Contractors Troy woody _a0-2
Inspector Date Project Manag6r Date
Tamara Vaughn 5/20/202 Suby Varughese 5/23/2022
Director Water Dept) Date Construction Su ervisor(TPW Dept) Date
May 25,2022 4 �uQ�� 5/20/22
CJt,iStophe,Ha�d (May25,202215:45 CDT)
Assistant City Attorney Date Assistant City Manager Date
nal
1-k •20221—CDT) May 27,2022 "` .ff�"27,2 CDT,— May 27,2022
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT r M O RT H City of Fort Worth
Construction Allowance Request
Project Name Water and Sanitary Sewer Replacement Contract 2011 WSM-D,Part 2 City Sec No. 1 56582
Project No.(s) 1929-2 1 M&C: E= City Proj.No. 1929
Project Water and Sanitary Sewer Replacement on various streets.
Description
Contractor Woody Contractors Allowance No: E= Date: 511372022
City Project Mgr. Suby Varughese City Inspector r Tamara Vaughn
GUNSTKUGTIUN ALLUWANGE ITEMS TU 6E ADDETED
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
56 1"Private Service Relocation WATER 300.00 LF $43.00 $12,900.00
57 8"Water lowering WATER 2.00 EA $8,000.00 $16,000.00
WATER $28,900.00
SEWER
Additions Sub Total $28,900.00
Page 1 of 1
FORT WORTH City of Fort Worth
Construction Allowance Request
Project Name Water and Sanitary Sewer Replacement Contract 2011 WSM-D,Part 2 City Sec No. 56582
Project No.(s) 1929-2 M&C: 21 0763 City Proj.No. 1929
Project Description Water and Sanitary Sewer Replacement on various streets.
Contractor Woody Contractors Allowance No: F Date 5/13/2022
City Project Mgr. Suby Varughese City Inspector FTamara Vaughn
CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
WATER
SEWER
f'ase 1 of 1 IDeletions Sub Total
MMSE Breakdown for this Change Order
.... .........
k W
Total '007
Previous Change Orders
-Mnl. laOU TT
Total
Page 1 of 1.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Suby Varughese
Name of Employee
Professional Engineer
Title
a� OR 4�
ATTEST: �� °�°°°°A
o00
0000
o o=�
J ette S.Goodall(May 27,2022 16 CDT) o o y ��
°° o Iy
Jannette Goodall ��� °°°°°°°° o
�?EXAsa�'
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
(; WOODY
CONTRACTORS
WOODY CONTRACTORS INC.
650 TOWER RD
KENNEDALE, TX 76060
PHONE-817-483-4787
FAX 817-483-2048
Job: WTR & SS CONTRACT 2011 WSM-D PART 2
Date May 9, 2022
CHANGE ORDER 2
Item Description Quantity Unit Price Total Price
1 1" PRIVATE SVC RELOC. 300 LF $ 43.00 $ 12,900.00
2 8"WATER LOWERING 2 EA $ 8,000.00 $ 16,000.00
Total for Sheet $ 28,900.00
Total For Job $ 28,900.00
CPN-1929-2 Allowance Request-2 notes
The Contractor provided a price proposal for 8"water lowering, which directly conflict with the
36" and 18" storm drainpipes. The contractor also provided a price proposal for 1"private
service line and meter relocation from the existing driveways. The proposal covers the
additional cost associated with 1"private services, lowering 8"water pipes, equipment,fuel,
and labor costs. Compared with bid values from past projects,the proposed unit prices are fair
and reasonable.