HomeMy WebLinkAboutContract 55286-PM2CSC Na. 5528b-PM2
F�RT�ORTH
PRO,IECT MANUAL
FOR
THE CaNSTRUCTIUN OF
WAT�R, SANITARY SEWER,, ST�RM DRAI2�I, PAVING,
& STREET LIGHTS
T� SERVE
KELLER CR�SSiNG PHAS� l
De�ember �02i1
IFRC Recr�rd l�v. ZU-0108
City Praject No. �U2$75
FI❑ Na. 30114-U2[�0431-102875-E�7685
�[ File l�o. X-Z2544
File Na. W-�73b
Betsy Pri�e David Coake
Maynr Citw� Manager
�hristapher P. Harder. P.E.
Direcl�r, ��Vater Departn�eni
Williarn .lohnson
�irector. Transportatian and �ublic V►�'arlts Department
Prepared for
The City af Fort Warth
�����Rir�!
s P�Es. OF o r�..1�+�
� �t ..• �•:;� �
� �. .S'
�.*., : * I
�*P. ..._ e*
THOMAS E WILSQlV
..; .e,°oe ....ee.e.: .,
� e i27S9i
� �� C �{J� �!��1
�j�•l���4�`V • V�
r
��a�tR+_" � � _,r',+��
PF,�,QTQN LAND SaLUTIQNS
9$OQ H[LLWQOD PAIt�{''VVA1', SCiITF, 25U
F�RT WURTH, TX 76177
817-5GZ-3350
TBPE FIRM Na. 122�7
���R�,� :-� 121171�02a
S$; -' '"�T��,
► „ '.
fk' :r
itF: :�
/...r........r.....■■.�►■,..i.
i �EfV RAEF
r�+. � ,... '11322D �� �,•`�
�'n
' e; CfV.�.e�'�•- �-r
� � �`� F
i 4l �7�1+ }�L �-�
E�\R1ti'�'
aFFICIAL REC�RD
CITY SECRETARY
FT. iNORTH, TX
00 (70 OQ
STA1�L?ARD C�NSTAULTIL]I� SY�Cl1-'1CA I'iQlv f)C}CL]IVIE'�ITS
Pags 1 vf 5
sECT�a�v ao 001a
TABLE DF CC]NTEhITS
DEVF�,i]PF..R AWARI]EI] PRDIFCTS
Di►�isian 00 - C:enera� Canditions
nn i i i� r„�,;,.,�,�„ f., s�;�a���r�
��
nn �s i t� r.,�+.-,,.,,;..r�. +n n;.�a�,��
r.�.-z-.--,�
Op 41 Ud $id Farm
d[7 4� 43 Prn osal Form Unit Price
nn� ��d��
n��
UD 45 12 Pre Lialificatinn Statexnent
nr'w-�-=.� �� - t�a-i+�e � ������
DO 45 26 Contractor Com liance with Workers' G
nnvo-�-�
00 52 43 � Agreement
DQ fi l 25 I Certiticate of Insurante
DD 52 13 Performance Bond
DO G2 l4 Payment Bond
DO 62 ] 9 Mai ntenance Bond
�'rl� ��eral t;e�x�s
nri �z nn C,,.,.,te..,o„��r.� rar�.r.,z.,�
�Q
Law
00 73 10 �tandard City Conditions of thc Constru�tion Contract for De��elaper
Awarded Praic�ts
Di�isivn Oi - Ceneral Rec�uire�ents __
O1 l] 0� 5u�nina of Work
O1 2S Q[1 Su�rstitution Procedures
U 1 31 19 PreGonstrueiic�n Meetin
n i�o
O1 3Z 33 Preconstr�ictic,n Video
dl 33 UO Submittals
O1 35 13 Spe�ial Project Procedures
D i 45 23 Testin and lns��ction Ser�iccs
OI 50 00 Tem ora racilities and Contr�ls
O1 55 2b 5treet Llse Permit and Modificatians to TraF�c Control
D I S7 ] 3 Starm Watcr PallutiUn Pre�ei�tian Plan
Q] 6Q dD P��oduct Re uirements
O] 66 �0 Product 5tora e and Handlin Re uirements
�] ?� DD Mohilizatinn and Remnbiliaatic�n
n'� Ev��H-�-�rl� �
� 1 74 23 Cleariin
O1 7'7 19 Clnseout Re uirements
�1 78 23 (]�seration and Maintenance Ilata
O1 78 39 Pr�iect Recc�rd Documents
Last Revised
n� i�n��m❑
��
n� ��n��n�❑
��
0410212 0 1 4
[]512212� 19
nn�n�r�nin
��
��
�91[l i 12015
9-31$�-2�9
441D2!2U 14
nsr�� � i�ru Q
��
Q611 Gi'2C] 16
a��oiizoi i
Q113112C112
41i3112012
Q113112d12
-�-}����4�
rs� �n��}
01/10/2013
Last Re�ised
121? U12� 12
0�13012d13
Q�.�3012013
��ni�-'r
�813�I�O l 3
4813�12[�l 3
0�13012U13
a312012U2[�
a�roii2o � i
(i71Q 112011
471Q 1 !2011
D312012fl20
04.�fl712 C] 14
D�1�712014
941n'r r�
�410 712 0 1 4
��11Q712� l4
�41D712014
a��a��2ot�
CiTY L71' I'(?R'3' W(]AT'1 i Kellcr Cnossing Phase ]
STANI7AWJ C'[]h'S'I NL�C�I I�N SPECiF1CATiC]N I]DCL]MF'.�fTS - C]EVELOPFR AWAR�ED PRO]CCTS City Pro�ect Nn. If12k?5
Ac�•iscd hlarch 2f1, 2E]?t}
00 6U fl[1
STAItiIJARF] CONSTRL:CTIUn SYT:L'1PIC'ATIDN C]OC��1Eh'TS
Page 2 of 5
Technical S��ece�cations which ha�=e beem m�dified by the Engineer speei�cally far this
Project; hard capies are included in the 1'raject's Cantra�t Uocuments
None
Technical Specificatians lis#ed below are included for this Project by reference and can be
�iewedldownloaded from the Cif�'s wehsiie at:
h ttp :1 Jf n rtwa rth tc xa s.�p wlca ntra � to rsl
ar
http s:llapps.f�rhvart�tesas.�ovlPro j ectRcsourcesl
Di�ision 02 - Existin Canditior�s
n�� coia„+:.,a c:.a r�a..,,,i:,:....
n�� ,�i�n��
n��� � n��,'nn ��,,,.,z,.,t
Divisiot� 43 - Cancrete
43 3Q 00 Cast-ln-Place �ancrct� ~
43 34 13 Conlr�lled Low 5tren th Material CLSM
43 34 16 Concrete Base Material fs�r Trench Re air
D3 SO QO Modifications to Existin� Cancrete Structures
❑i�isian 25 - Elee#rieal
26 �5 d� Common Wark Results for F.iectri�al
7l�� �s
�� a.�,.�..��,.� a.�� u.,,,�r f r�:�.�„f ;.,�ls�_��.o....,
26 �5 43 Under�round Ducts and Itac�ways for Etectrical S
'�lz. R� !•..r.-,.-.,��,,;..��:..,,�� AA��I�; T]��.-s C'.�„�.��t
Di�isiun 31 - Earthwork
� s i�n nnn
ZS '7� 1�
-r'i�--rn
�--z�i. � �Bifff�`
� IT1 GTvv� ����iiTJ
31 25 �d Erasion and Sediment Control
�;�a �-a�ie�s
�1 37 OD Ri ra
Division 32 - Exteriar Im rn�ements
32 �1 17 Permanent Asphalt �a�in� RJ
2'] R1 14
32��()] 29 C'oncrete Pavii� l�i air
�� i i �� ❑i�.,:�.t� nn�o r•,,,,,-���
��
32 11 29 Lime Treated Base [:ourses
���� r-•�.,.,o.,f -r,.o.,+�.1 a��n r.,,,.-eo�
7'7 1 1 7 7
�T
32 12 1 b Aspl�alt Pavin�
Last Re�'tsed
i��nn;�ni-�
�z
i���r�i
n� �n��
1212�J2D 12
12�'2�12Q 12
12120�'2(} 12
I212[f!2D 12
1112212U 13
, z ��.�i
,� r� r�=
�7101i2fl11
!1'1��'!t "1��1 !
i�n�z
f1 ] 1'3��
nc n�;�n � z
��
!1 1 17 4 r'7 n i 2
��
1L�Z��i2VIL
��
1212�124I2
izi�ai�olz
, � r��zl�sn, �
12�'20�'2012
i � ���. y��n i�
izizoizoiz
t 7 M�zl'1!1 1 7
!14 1 I��C
]212Di2�12
C1TY OF rURT WORTIi Kellcr C'rassiizg Phase I
STANI7AH[7 CC3N5I'KL1Cl'IC7L Sl'F'CIFIC'A"S'lClh f)C3CL1Mf:VTS - CIEVELC}YEk A4VAADFD PAC}7ECT5 City Yrojcct?�fn. t(12875
Ac�iscd March 2�, 2U2U
0o no 00
STAi�F}ARll CUNSTRUCTI[}I�: SPf3C1I�1CAT1nN IJQCUMEIVTS
Page 3 of 5
�� ��
3Z 13 ] 3 Concrete 4'a�vin 1?�'Za12D12
32 13 2[1 Concrete Sidcwalks, llri�ewa s and Sarriet� Free Ram s []GIU5.�2418
32 13 73 C:oncrete Pavin Joint Scala�zts 1212D�ZD12
z ��o , 7-�-�0,�� nt�.�
32 1G 13 Con�rctc CurU �nd Guttcrs and Vall� Gutters 1U105!2D16
32 17 23 Pa�ement Markin =s 11i2212D13
z ��� , , u,��
z�s�� �t,..;,, ❑�.,..a�. .,a r,.,+��. ---- i���r�z
���o �ar;,-o �o...,a.. . „a r_.,.o.. � �����
���� tx�,,,,a �o.,,.a� .,.,a r�.,�o� i���r�z
32 32 ] 3 Cast-sn-Place Cancrete Retainin Walls 461fl512[]18
32 9l ]9 Tn soi] Placement and Finishin ofParkwa s 1212a12U12
32 92 13 H dra-Mulchin , Seedin , and �c�ddin �2,'2Dr'2012
�-93-�r �'-�s--R;����� �-�1=2�i!�B-��
❑i�ision 33 - ti telities
33 O1 30 Sewer and Manhole T�stin�
33 O1 31 Closcd Circuit Tele�ision CCTV Ins ection
��
�i-e-a---�a
Z�� !'.-.rr..<.:...,. !'.-..,r.-..3 'E'.��r C'f.,+:.-..,�
�--}� �9 c�iiirir-�•�-�i3(}}C•�-t'E3�L�
��
33 U4 4� Cieanin and Acce tan�e '1'estii� of Water Masns
33 04 5� Cleanin�of Sewei_Mains
33 05 10 Lltilit Trcnch �xca�atiQn, EmUcdment, and F3ackf ]l
33 QS 12 Water Line Lawerin r ^
33 OS 13 Prame, Co��er and Grade Rin s— Cast Iron
33 fi5 13.10 Frame Ca�er anr� Grade Rir� s— Cam osite
33 Q5 14
33 45 l6
3:i Q5 l7
3i�-f�rz�
"Y 2�
33 O5 22
zz r�c �z
��
33 fl5 24
33 05 26
33 05 30
33 1 ] Q5
33 I ] 10
33 �1 1�
33 3 ] 12
��
Z 2�T
33 12 10
3? ,.�--�
Adjustiiig Manhoies, Inlets, Val�e Boxes, and Utl�cr Structures to
Grade
Cnncrete Water Vaults
Concrete Colfars
'C',.,,r.ol 1 : r 17fa*o
Steel Casing_Pipc
lnstallation af Carrier Pipe in Casin
Utility MarkerslLocators
Location of ixistin� C]tilities
Balts, Nuts, aE�d Ciaskets
Duc€ile Iron Pipe
Quctile Irnn Fittings
Polv�invl Chloride (PVC] Pressure
or Tunnel Liner Plate
Water Ser�i�es ]-inch to 2-inch
��12(}12fl12
U31i13!20l G
� � ����z
� � �� rti +7 ri i �
.�
i���r��
-�.�� n r�
n�rn ���
Q210G12013
12124�'2012
12112120IG
121?0120 i 2
U1/2212a16
D 112212[} 16
1212t112[] 12
�ziza�2�iz
tz�2aiza�z
��
��
1 �12012fl 12
-�-�9l28-��
U61] 9�'2013
1212[)12012
121�Q12012
izizn�zo��
1212[]120 ] 2
iz�zn�za�2
]lilbi2al8
i � r � ri �7 ri i'�
�z
t� i� ri +� rti i �
��
U211412Q17
, � «��z
CTT"Y C]F FC]RT 4V(}RTH Keller Crossin� Phuse 1
S7'Alv[]ARU CC]NSTR[]CTION SPFCIF[C'RT IC]N D�CU;vIENTS I]EVELUPL'•R A1VAItD� i7 PRUl1:L' i5 L iry Pro,�eci :Jn. 1 p2875
ftc�iscd Man:h 20, 202a
33 12 2U
� z�T
33 12 25
'� 2�-cc ✓v
33 12 40
2 ��-zi ✓v
Z 7��
2Z�
Z 7�T
22�
33 31 2D
2Z�
'Y Z�y
��
33 31 5fl
�8
333910
33 39 ZO
�9-�8
��
33 39 b0
33 41 10
�-4-�-��
z z�z
� ��o
Z Z�-�7- "�T
�Y�'�ly"[7�
3i49 ]Q
33 49 ��
33494fl
Ili�ision 34 -
-� ^�
�sn �si inna
��S
i n n_-�-�:-=���
�� �-r�i�r-._�-r
��
�4^T� 't�
3J�"�' �
�-��
34 4� 2�
Z n A��
7 �1 �l�v�
�4 412o.a3
34 41 3a
��
34 71 13
aa �o 00
STA,tiDnAl] L'ONSTRLfCTIC]Iti 5PL'C1t�1C'A�I IC7N I]{]C:iIMEhTS
Page A o4 5
Rcsilicnt S�ated Gate Val�e 12,'2012Q1�
n unai n�..t,t,o,- co�ta,� ri� -1-�`�n�
L'c�nncctiQn to Existine Water Maiiis 021�612(] 13
Fire H�dra.
�ry,y�nr�
O 11fl312014
�nr�
RLr101'7R11
1�1��� �
���
�Fi�z�-�
P�lyvinyl Chloride (PVC) Gra�ity Sanitary Scwcr Pipc _ UC�11412013
n„i,,,,:,,..i r�,�n.-•��, rr��r�"� r-�i�.��a o,.r,r,i� rv,-„:.;+., c�,,;,�,-., co.:.o,-
_. ""'� 1.���n��
5ewcr Scr�i�c Connec#ions and Ser�i�e Line
Cast-in-Place Conerete Manhales
Precast C:oncrete Manl�oles
Epox� Liners far Sanitary 5ewer Structures
Rcinfarced CQn�rete Storm Sewer PinelCul�erts
T,-�.,...h Tl,-.�:.,.,
Cast-in-Place M��iiholes and Junction Soxes
C'urb and �rc�p Inlets �
St�rm I]raina�e Headwalls and Win�walls
!� 4}nr.�imors4 1� 'Y^ p�� ���b.in.c�♦
S"CRTFGiICi-IGZITT� V"fiLTo C �C-R'VY31Li
r�r�u"cm-i=c"+rir�vi-ri�hfurL��@Bi�iEsi��9hr'-r
Illuminatinn Assemblies
Residential LED
Aluminum Signs
Luminaires
Traffi� Contrc�l
����r7�
���nr�
�4i2[i12D 1 �
'�� �
1212D12fl 12
1212Q12fl12
' ��Q}?.
i z��n��ns �
�_
1212[]120 ] 2
071�]12f11 1
����
�--1-! l 2 r�
-1-�-F�n ��
4��18' '�
71'? IR�T,�
� �����2� 12
i 2izo�za i 2
0 710 1 12 0 1 i
} n r, �,vr-rz ��v;�
�141�
��
9-���9-��
��
����
� l��s��
�.!•?�� �
1212012Q 12
n,c� �41� 5
f7�11 Cr'7C11 C
vrn-�-��--r.�
Q6115!2�15
111l2!2�13
m,��.:�nir.
a��
1 11221ZO13
CIT1' C7F FUA7 WDR'1"l i Keller Crassing Phase 1
STANDAILL] C'C]V51�RLlC:'IlUV SPEC:IFICAT[C7N I]DCllMENTS UEVELOPL•R AINARDEiU PRUII:CTS i'icy Yrnjcct Nn. 1U2875
Ar�iscd Ulanch ?U, 2p2U
no nn an
S`I'AVUARI] i:C]�]STHI'CTION SPFCiFICAT[fl:V Df]CUi4E"JTS
Page 5 of 5
Appendix
�-4-$� — —�v.,:�.,�.•i;,_, .,r r .,�,��
�E�. r �,.ao...,�.,,,.,,e ��..;i;.;n�
C�-4,8�i— u., �a„ � n �, ., i r�.,,,a;,; ., � c: �
��-.�-�:"ro�,.., .,.,a ►x�...,-,�„ n..,,,o.� r�„�;,,.��� i.,,to,-,,.-;�o r�.,.,,,,l;z,,..a
�� � n^� W,�ge-R�Ees
� � n❑ �� :+� ..a r r::::���.3
�
�E'��4 hr,�na;���t���-i�
GR-C}1 b{] DU Praduct Requirements
END UF SECTI[]N
CITY i7F Fi7RT WDRTH Kullor C rassing Phase 1
STANBARD COI�STRtiCTiOIt SYECII'tL'Ai fL]i� 17C3CUMFiv'�5 - f]h.VF:LOPER AL4'AKUED PRi]JECTS City Projcer Nn. 10��75
Re�ised March 20, 202ff
SECTIaN �� 4] flti — PRDPC)SAL
DEVELDPER AWARDED CC]NTRACTS
This proposal must not be remo�ed fram t}tis hoak of Cantract Daeuments.
TO: D.R. Horton-Texas LTll.
FR�PDSAL FO�R: WATER, SANITARY SEWER, STDRM DRAIN, AND PAVING
IMPRQVEMENTS
PRaJECT NAME: KEL,LER CROSSYNG PHASE 1
IPRC NU. 2Q-d148
FILE N�. X-2G64[l
CITY PRDJECT N�. 102875
FID NO. 3U114-DZ40431-102875-Ed7685
Includes thc furnishing af all materials, equipment and labor for the installation nf' median
openin�s, left turn lane, water & sanitary sewer impro�ements and all ne�essary appurtenances
and incidental wark to pro�ide a complete and serviceable project designated as:
WATER SANITARY SEWFR STURM ORAIN AND PAVING IMPR�VEMEIVTS
TCl SERVE KELLER CRDSSZNG PHA�E 1
Pe�rsuant to the foregoing 'Notice to Bidders', the undersigned gidder, ha�ing tharoughly°
examined the Contract Do�uments. incl�ding plans, special Gontract dacuments. the Technical
Specificati[�ns listed in ihis cantract, the site of the project and understanding the amount nf wark
t� be dt�ne, and the pre�aiiing conditions, hereby propases to do all the work, furnish aI! ]abor,
equipment and material except as sp�c:fied to be furnished by the City, whi�h is necessary to
fully complete the wark as pro�ided in the P�ans and Contract Documents and subject ta the
inspection and appro�al of the DireCte�r of the Department af Transportatinn & Pub�ic Wnrks of
the i'ity of Fort Worth, �I-exas; and binds himself upon ac�eptance of this Proposal to execute a
contract and furnish an approved Performance Bond, Payment $and, Maintenance Band, and
suGh ather bc�nds, if any, as may he required by the Cantract Da�uments for the performin� and
completing of the said work. �ontractor praposes t� do the work wilhin the time stated and fvr
the fallawing sums:
Fumish and instali, inclt�din� al1 appurtcnant work, camplete in place, the fotlow°ing itetns:
!'age 1 oi 3
�A�T B - p�oPasAL �ep�t.�
After acceptance Qf this Proposal, the undersigned will execute the fvrma] c�ntract and will
deli�er an appraved Surety Band and such other bands as required by the Contract �ncuments,
for the faithful perfvrmance of the Cnntract. The attached bid security, if required, is ta become
the praperty af the De�el�per.
"I'he suc�essful bidder sha1I be required to perfvrm the work in accord with these cant�ract
dacutnents and the techni�al specifications a�aitable in the City of Fort Warth's Su2�saw site
and incorporated herein and made a part herenf for al� purpases.
The undersigned assures that its emp�nyees and applicants f�r etnployment and thase of any
labor organi�ation, subcontractars, or employment agency in eit�er furnishing or referring
em�loyee applicants to the undersigned are nat discriminated against as prohi�ited by the terms
nf City �rdinance No. 7Z78 as amend�d hy City Drdii�ance Na. 740�.
Page 2 af 3
{k�4��
The Bidder agrecs to begin constructi�n within ,� �ar days aFter issue of the
wark order, and to catnplete the cantract within l� (�} working days aFter
be�inning construction as set forth in t�e written work order to be furnished hy the Owner.
I(we] acknawtedge receipt af the fvllowing addenda ta the plans and specifi�atiotts, all ❑f the
pro�visions and requirements of which ha�e been taken inta consideratian an preparaiian of the
foregaing bid:
Addendum No. 1 (Initials}
Addendum Na. Z (Initials}
R�spcctfit3ly submitted.
Addendum No. 3 (lnitials)
Addendum No. 4 (initials}
,lackson Canstruction, Ltd.
Name ❑i Cnntractar ^ '
By: �
{Si�nat� e)
'Trvy L. Jackson
Tit�e:
Cvmpany Name:
Address:
�.mail:
Telephone:
[Printed Name)
�reslden�
.Iacks�n C'ansVuctian, Ltd._,
S I 1 Z Sun Valle_y Dri�e
Fvrt Warth, TX 76119
Page 3 of 3
W 3? 1,
C7A P- Sf f 1 Pk U!'f1C A L
3*agr I n!❑
sECTian� oo az aa
De�laper Awarded Projects - PRpPpSAL FQRIuf
UNIT PRICE BID
Bidder's AQpli�ation
Pro�ecs ftem inFormatrnn B�ddcr s Yropvsa]
Aidiist Item Specifcaunn l�n�l af 13id
�o Deseriplion Scrlivn Nu Measure �n1t Pri�e 8id Value
(,7uantih
Ul�fIT I: WATEi� IMPR�QVE�IAENTS
1 3311.Q241 8" Water Pipe 33 9 3 12 LF 5459 $29.�0 5158,39 7.Qp
2 33] 2.2003 1" Water Serrrice 33 12 10 EA 95 597n.Dq $92,15p.pn
3 33122103 1 112" Water 5ervioe 33 12 70 EA 3 $1,500.p0 $4,50a.Qtl
4 3312.3003 8" Gate Val�e 33 �2 20 EA 14 $9,360.Q0 $79,040.�0
5 9999.0001 8" Q�ick�ai�e Insertian Val�e 33 12 20 EA 2 $�,�a.aa $75,920.ff0
$ 9889.Ofl12 Fr�ssure Plane Val�e and 8ox 33 72 20 EA 1 $1,36i1.40 $1,36�.40
7 3312.�p001 Fire Hydrant 33 12 4p �A 4 $3,800.Ofl $15,2p0,t1�
B 3311.Ofl�1 Du�tile Iron Water Fittings w! Restraint 33 11 13 TON 3.9 $7,400.�0 $28,860.�0
9 33fl4.b1C19 Tren�h Safety 33 4S 1Q LF 5452 $1 ❑p $5,452.0�
f0 0241.1118 4"-12" Pressure Plug 02 41 14 EA 2 $175.Ofl $35fl.04
7 i 3312.0'! 17 Connectipn fo Existing 4"-12" Water Main 33 '!2 25 EA 2 $3,3�Q.00 $fi,fi0d.0�
i2 320�.Q127 10' INide Asphalt P�mt Repair, Arterial 32 01 17 LF 30 $184.00 $4,$Of].Ofl
13
14
15
16
i7
1$
19
2Q
21
�2
23
24
25
2S
27
28
29
3d
31
32
33
34
35
3fi
37
38
39
4Q
41
42
43
44
45
T i UMIT !: WATER lMPRQVEMENT $351,743.n0
C[Fti� UF FVRI WL1[iTH
ti7�74D,�Rf] COVS�I�liL'[']�ICI� SPFC�IFiC-�TIUti OV(-L'1fEtiT5 - OEL'EI_(]pF.H �i1i'.7KOFD I'RO1tC-TS
Foim ��ersioa �la.� ?± 2[114 �0'�I 103 M S2 a] 6�d Prnpusal DAP
uu a� sf
r�nr - aio rRorosn�
P�se=nf5
SECTION OU 42 43
Developer Awarded Projects - PROPOSA� FORM
IJNIT PRlCE B�D
Bidder's Applicatinn
Pro]cc[ Ilem Informa[ion Bedders f'roposal
Bidl�st Item i7esrriplion SpeciFicaitUn Linzr of ��d �,+nit Price B�d Vaiue
No Seetion Na Measur� i]uantit}
ll IT I[: SANITARY SEWER lMPR�VEMENT
� 3331.4� 15 8" 5ewe� Pipe 33 31 2fl LF 2727 $28.00 $7B,35fi.0�
2 3331.4201 10" Sewer Pipe 33 41 10, 33 LF 1463 $36.�f] $52,668.00
3 9999.0004 1fl" C90� 5ewer Pipe 33 1# 1p, 33 LF 5p $65.�0 $3,250.60
3 3339.42d5 1CI" DtP Sewer 33 13 10 LF 385 $92.�0 $3S,42g.Ofl
5 3339.T001 4' ManhoEe 33 39 20 EA 18 $4,3p0.4f} $77.400.60
fi 3339.3 Q02 4' Orop Manhole 33 39 �� EA 3 $6,20b.00 $18,6a0.40
7 99'99.6062 CS5 Encasement for Lltility Pipes 33 05 � 6 LF 2g3 $50.Oa $14,650.00
$ 3339 10ff3 4' Extra �spth Manhflle 33 39 20 VF 7(] $10fl.Q4 $7,040.�0
9 3338.{10a1 Epaxy Manhvle Liner 33 39 6Q VF 84 $24{7.Op $19,240Aa
1p 3331.31fl1 4" Sewer Service 33 3'i 50 EA 112 $790.00 $88,480.00
11 9999.iiDfl3 Cannect ta Ex 4' Manhofe 33 31 20 EA 1 $2,600.�p $2,fiO4).00
12 32a1.0i27 10' Wide Asphalt P�rrlk Repair, Arterial 32 Q7 17 LF 2p $150.00 $3,zaa.00
13 33�1.D101 Manhole Va�uum �esting 33 01 30 EA 21 $1flp_Op $2,100.Oa
14 33ff5.D908 Trench 5afety 33 05 1p LF 4585 $2.� $9,17�.Oa
15 3361.OflD2 Past-CCN Inspection 33 �1 31 LF 4585 $3A0 $93,755.00
16 9999.Ofl�ff Post N inspectian {Paving] 33 01 31 LF 4585 $3.�� $13,755.00
17 9999.fl921 P4st N Insp�ction Manholes 33 01 31 EA 21 $2�0.0� $4,200.Q0
18 3305.'l4�3 20" Casing By Qpen Gut 33 05 �2 LF 55 $13�.00 $7,150.60
1S 3305.140� 1fi" Casing By Qpen Cut 33 65 22 LF 35 $120.�0 $4,200.00
�0 33�5.�112 Cvncrete Colfar 33 Q5 17 EA 1 $G2$.OQ $425.�0
21
22
23
24
25
2s
z�
2s
�s
3fl
31
32
33
34
35
3fi
37
38
39
4fl
41
42
43
44
45
46
TQTAL UNIT II: SANITARY SEWER IiNPRQVEMENT $�153,579.QD
rir� nFrnKrun�rrt
S�fAtip.{� ('p1�5TRL:CTi6ti SPf•.ClFiCA I�f[7ti UUC�I'�7F VTS - DE�'FLf1PF:R .iW'.Akhl�.1) PkiG1F�L: i5
Fnrm l-ersion Lla�� __. _nl9 :o_pl IUl .W �"- a3 9id Propnsal fS.;P
0o a: s3
❑AP - BIIl E'RUPQSAI.
Page 3 oFB
S�CTiQl�i Op 42 43
[3erreloper Awarded Prajects - PFtOP05AL Fd#2M
uNiT PRicE Bio
Bidder"s Applicatian
Projec[ Item Information Li�dder's Praposal
Ridiist Itcm Spec�ficas�Un Lmt af Bid
f7es[riptiun Unit Price 8id Value
tia Secteon No Measurc Quantlr}
LINIT III: DRAINAGE IMPROVEMENTS
1 334i.1163 4'xA' 8ox Cul�ert 3341 10 LF 192 $238.D0 $45.696.Qa
2 3341.12fl1 5'x3' Box Culr�ert 33 4Z 1� LF 5g $258_fl0 $15.222.Q�
3 9998.Ofl17 5'x3' Box Culvert, Class !V 34 41 2fl EA 442 $25$.fl0 $1i4,036.40
4 9999.0013 8'x3' Bax Culr,ert 33 41 10 LF 7 $1,537.a0 $10,759.{}�
5 3341.0409 48" RCP, Glass III 33 41 1p LF 1 S2 $1 S�.OU $32,7fia.a0
6 3341.041pA$" RCP, Class IV 334i 1p LF 450 $240.00 $1❑B4OflO.OD
7 3341.qa�3 42" RCP. Glass IV 3341 10 LF �p2 g172_pp $�7,�q4,�
S 33a1.0309 36" RCP. Class III 33 41 10 LF 7d $113.OD $8,362.DQ
9 33a�.a�p927��RCP.CiasslV 33413a LF 21fi $87.00 $19,792.Q0
#p 3341.6208 27" RC�, Class ul 33 a1 1� LF 2g g7� .pp $2,pgg,pp
11 334'l.p2Q6 24" RCP. Ci�ss IV 33 41 1Q LF 147 $76.a0 $i1.172.0�
i 2 3341.6205 24" RCP, Class 1EI 33 41 1 p LF 25 $fi6.40 $1,650.Off
13 334�.0202 21" RGP, Class IV 34 41 1� LF 4fi $fi3.Q0 $2,898.0�
14 3341.�201 21" RCP, CI�SS III 33 41 10 LF afi $5i.pp $4.9{]2.00
15 3349.50f31 10' Curk� Inlet 33 49 20 EA 1 d $4.4�0.00 $44.OQ0.00
16 3349.0001 4' Storm Jun�tion 6ox 33 49 1� EA 'f $4.350.06 $4,350.04
1 T 3343.fl062 5' Storm Junctian 6ox 33 49 10 EA 5 $5.506.00 $32,5�0.00
18 3349.{�003 6' Storm Jun�fian Bpx 33 49 i 0 EA 7 $10,ff0a.00 $20,04�.��
19 9893.0�05 TxDOT 8'x3' CH-FW-p He3Clw�ll 3349 4Q EA 9 $8,70ff.00 �a,�aa.av
20 9S99.DD06 5'x3' Sloping Headwall 3349 4Q EA 1 $5,10ff.d0 $S,Ia0.n0
2i 9999.DD15 3fi" 5loping Headwall 33 49 4a EA 1 $4,BOfl.00 $4,S4�.d�
�2 9H99.flD14 TxOaT 42" CH-PW-O Headwall 33 49 4a EA 1 $6,ODflAO $B4OOn.00
23 9999.fl024 TxDflT 3fi" CM-PW-O HeadwalE 33 49 4a EA 1 $4,5a0.40 $4,50�.�0
2A 9939.flD16 4'x4' 4:1 FW-fl Fieadwall 33 49 4� EA 1 $11,800.4Q $'! 1,soa.ao
25 3137.0142 Large 5tone Riprap. dry 31 37 00 5Y 4Q9 $69.00 �28,22'1.�4
25 9999.0018 6" Concrete Lining 31 37 Ofl 5Y 332 $88.00 $29,216.p0
27 33Q5A109 Trench Safety 33 45 1� LF 2p57 $2.00 $4,714.p0
28
29
3p
31
32
33
34
35
�s
s�
38
39
40
41
42
43
44
45
4&
T�TAL UNIT III: ORAINAG� iMPR VEMEN7 $596,353.4�
�'i iti' nr roRr woRni
5 F.A �l � A RD COS S�I�k l'["Y�I flti SPEL-f FI C A f] V� PO(� l� Nf � TS - OL �'E LOPFR .1 N' A kf7f• p PiEl31l: C�iti
F�onn �'elS�Un 11a� ?2. "�'�I9 �O_i13 �U? W 32 i5 B�d Pro�osal O.AF
il{i i_ 3 S
DAP - BID PiipPOSAI.
Payc 4 al h
SEC7IQN DO 4� 43
De�eloper Awarded Proje�ts - PRflPaSA1 FaRM
LJNIT PRICE BID
Bidder's Appli�ation
Pro�ers ftem InTnrma�ian l3idder5 Prn�nsal
Bkdlist I[em Descriptipn Specification L�nii of ��d U��� �i�� Rid VaIu�
Na 5etlian Na Measure (,luan[in
UNIT IV: PAV[NG IINPRpVEMENTS
1 321.01 Q1 5" Cane Pvmt 32 13 13 5Y 12281 $35.86 $437,203.fi4
2 3�13.fl3Q1 4" Conc Stdevvaik 32 13 20 5F 7318 $5.?6 $41,71Z.80
3 3211.Q561 6" Lime Treatment 32 71 29 SY �312$ $3.50 $47,26�.8a
4 321'�.ff4�0 Hydrated Lime 32 71 29 TN 211 $199.a0 Sa1,9as.p�
5 3213.05�5 8arrier Free Ramp, Type P-1 32 13 2fl FA 13 $1,BQQ.pO $20,8QR.00
fi 3217.4�4a1 18" SLD Pvmt Markkng FIAE {VN) 32 17 23 LF 28 $25.0� S7QQ.p0
7 329i.01a�Topsoil 329� 19 CY 437 $22.R� $9,$1A.�D
8 3292.0400 5eeding, Mydromulch 32 92 i3 SY 182 $9.00 $1.63$.00
9 3477.OQ{}i Tra�c Control 34 71 t3 !N� 1 $6.fi75.0� $B,&75.0�
30 9899.�01Z End-ef-Road Barricade 00 Ofl 00 EA 4 $gpp.pp $3,gpQ.Qp
11 9999.D022 Concrete 5treet Header �Q 00 �0 LF 58 $'15.p0 $87p.Qp
12 9999.D023 Connect to Exist Pa�ement �Q 00 OD LF 15g $17.pp $2,686.00
T3 3441,4pflfi install Alum 5ign Graund Mount 34 41 3D EA 8 $q7d.p0 $3,76p.pp
�a
15
16
]7
38
19
2p
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
33
4a
41
42
43
44
45
TQ7AL !lN17 iV: PAVING IMPR�V�M MT $618,509.p0
CIT�' [1F F(]kl� �4'QR'Ili
STRI�D.IRQ COZSTRL�C'T70� SPCCIf•IC.�TIC7�' OpCi'hSFfVFS - I]F��'�I.UAEH .�N��iROEO P3iOICCTS
Fnrm l�ers�on Aqsy :7. �O14 ]t;=D1 l�? �N] d: Sz g�d Proposal OAP
117;,',;3
DAP - BfO PRqPOSAI.
AaKr 5 of 5
SECTIDN QO 42 43
De�eloper Awarded Prajects - PRDPQSAL f �RM
L�J��rr�:�Cfl�=�l��
Bidder's Appli�a#ivn
Pro�ect l�em Informasipn Aidder's ProFxrsal
Bidhst [tem ���i�ynnn Specificatipn L1n�t af ��d Und Pri¢e Eiid Value
A1n Section No Measure Quantin
Bid Sna�mary
[lNIT I: WATER INFPRpVEMENTS
U1�iIT II 5AIJITARY SEWER fMPROVEINEM1ITS
UNET III� DRAINAGE IMPR[]11EMENTS
UfYIT IV� PAVING IMPRpVEA+lEN�S
This $i�i is su6rnitfed b�• the entit► named 6ein�:
$351.
$453,
$596,
$s � s.
"i"otal C`onssrurtinn Bid! $2,020,1
B[DDER: Sl':
Jacksan ['onstruction, l_td.
5112 5uo ►'alle� Brirc � �-` A
�[FTJI
F'ori N nnh, TJi 76119 FITI.E: �"�� . aC .�+��
DATE: �r�e��dent
('ontnrtqr agrees !o tompletc 1VC11iK for Ff���L ��('C'EPTAtiCE within �✓ warking da►r� after [he da[e wbeo 1he
['f7?YTRAC"T cummeaees to run as prnrided in 4&e Grneral C'nnditipns.
E'VO i7F SEC"TiQ'ti
L-l7�ti' UF� F{)RT N'6RTH
ST���OARF] t plrSl"R L�C'I�IVti SPECIFIL-ATlQti OOC'i'MEtiTS - Ok:1'F1.i3PFR A�'.4RDt p PRUIECTS
Fo�m ��eis�on �1ay ': 2u1�� :6�ill Ip? 911 a'_ J3..H�d Yro{rosaI.OAP
00 45 1 ?
l3AP PRFQE;ALIFIC'ATIOti STATE�IE!�-I
Page 1 nf" 1
SFCTif]N 00 45 i2
F]AF - p��QUALIFICATiC]N STATEMENT
Each Bidder is rec�uired ta complete the inf'ormatia�� helow l�y identifying the preqvalified carztractors
andlor subcontra�tars whom they i��tend to �tilize fe,r the majvr work typets} �isied. f n the ``Major Wark
Type" k�ox pra�ide the carrEplete major work type and actual descriptior� as pra�ided by the Water
Department far water and sewer and TP W far pa�ing.
Major Work Type CantractorlSubcontractor �nmpany Name Prequali�ication
�:x iration �ate
Wastewater Mains (all sizes] far Jacfcson Constru�tinn, Ltd Q4-30-2�21
New De�elapment,
Rehabilitation, and
Rede�elopment �sing Qpen Cut
and 'I�rerrchless �onstruction
methods
Water Mains {all si�es} fnr New T Jackson Canstructiors, l,td {14-3Q-2U21
De�eioprnent. Rei�abilitation, and
Rede�elopme�t usin� Dpen Cut
and Trenchiess constructior�
methods
Concrete Pavement 3ackson Cnnstructinr�, Ltd, a7-fl 1-20Z 1
['onstructi anlReGnn structian
The undersigned hereby ce�tifies that the �ontractars andlar subcantractors described in the tabfe above
are currently pregualified for lhe work types iisted.
� 11 1 ;
Jacksan Canstru�tion, Ltd
5l l2 Sun Valley Dri�e
Fort Worth, TX 7G1 19
BY: Trov L. ackson
-� ..� �i
(5i ature)
TiTF�E: Presi ent
DATE: ���24 2'
END OF SECTIDIY
ci�r pF Fosr wosrr,
5TRN6ARQC�N5TRliCTIQPJ PREQkfALIFICATiON STA7EMEAIT •• pEVEL6PER AWAROEO PRCYlECTS
farm Version Septem6er I, 2015
00452fi-1
CpNTRAC70R COMPLIANCE WIFN WORKER'5 Cf]MPEIVSATIpN LAW
Page 1 aF 1
�
�
s�rnoru �o a5 z�
C�NTRACfDR C�MPLIANCE WlTH WDRICER'5 C�MPEN5A71�N EAW
3 Pursuant to Texas La6or Code 5ection 4Q5.096�aj, as amended, Cnntractor �ertifres that +t
4 pro�ides worker's compensation insurance coverage #or all af its employees emplayed on City
5 Project No. 102875. Cnntra�tor further certifies that, pursuant tn Texas Lak�or Code, 5ection
6 40fi.09fi(bj, as amended, it will pro�ide to Gty its subcantractar's certi#icates of campliance with
7 worker's campensation co�erage.
8 CONTRACTOR:
0
1D
11
12
13
14
15
16
17
18
19
2Q
2I
22
23
24
25
�6
27
28
29
3U
31
32
33
34
35
ICi:7
�ackson Construction, Ltd. �y: ��� �-• ����5��'
COmpany jPlease Print]
5112 5un Vallev ❑ri�e _ __ 5ignature:
Address
Fort Worth T7{ 751I9 7i#le:
Ci#y/5tate�Zip
THE STATE OF TE?CAS
CDt�N7Y OF TARRANT
§
��
`' � �: �
{pfease Printj
BEF�R� ME, the undersigned au#hority, on this day persanally ap}�eared
T , known tn me t❑ be the person whose name is
suhs�rihed to the foregoing instrurnent, and acknnwiedged ta me that he�she exe�utec! the
same as the act an�t deed af ° for the purposes and
�onsideration th�rein expressed and in the capacity therein stated.
GIVEN UNOER MY HAND AND SEAL OF DF�fCE this i � day of
Y 2��R .
Y e � I
p�` . Nicote lvf�Col�um V
x My Gamm�ssjar Exprea
�;._ �¢ �w3v�zoaz nt ry Public in and for the 5tate of Texas
�,� _ � ia n�o. ,zsas�e�ae
ac
F SECTI�N
CITY OF FqRT WQRTH
STANpARa C4NSTRUCTIDN SPECIF�CArIpN DDCUINENTS
Revised Rpril 2, 2p14
Keiler Crassing Phase 1
City Prplect No. 1Q2875
005243-1
Qeveloper Awarded Proje�t Agreement
Page 1 af 6
1
SECTI0IV 00 52 43
Z j��� ! AGREEMENT
3 THIS AGREEMENt, authcrrixed is made by and he#ween the ae�eloper, �R.
4 H�rton-Texas, LTp, authorited ta dn 6usiness in Texas {"pe�eloper"} , and 1a�kson Canstruct�on,
5 �td., autharized tn d4 husiness in Texas, acting by and thrnug� its duly authorized
5 representati�e, ("Contraetnr"j.
7 De�elaper and Cnntra�tor, in consideration of the mutual �o�enants hereinafter set forth, agree
8 as follows:
9 Arti[le 1. WORIC
10 Cvntractar shaii camplete afl Work as specified ❑r indicated in the Contract [}acuments for the
11 Project id�ntifiec! herein.
12 Article 2. PRDIECT
13 The prnject far which the Work under the Contract Documents may be the whole or oRly a part
14 is generafiy described as follaws:
i5 KELLER CR0551NG PHASE 1
1b Cit Pro'ect lVo. 1U2875
17 Arti[le 3. Ct}NTRACf TIME
18 3.1 Time is af the essence.
19 All time limi#s for Milestones, if any, and Final Acceptan�e as stated in the Contract
2Q ❑oeuments are �f the essence to this Contract.
21 3.2 Fina! Acceptance.
22 The Work wil! be cample#e #or Finaf Acceptance wiEhin {��f warking days after the
23 date when Ehe Contract Time cammences to run as provided in Paragraph 12.04 of the
24 5tandard City Cnnditions of the Construction Contract for �e�el�per Awarded Projects.
25 3.3 �iquidated damages
26 Contra�#ar recagnizes that time is of the essence of this Agreement and tha# ❑e�eloper
27 wili suffer finan�ia! lass if the Work is not comple#ed withir� the times specified in
28 Paragraph 3.2 abo�e, plus any extension thereaf allowed in accordanee with Artirle ID
29 af the Standard City Conditions of the Constructi�n Contratt for De►�eioper Awarded
3fl Projects. The Contractor a4so recognEres the delays, expense and difficuities in�ofved in
CITY i3F FflRT WOR7H Keiler Crossing Phase 1
STAN�AR� CdNSTRl1CTI�N SPECIFICA710N OOCLIMENTS— �EVELOPER AWAROE{3 PRp1�CT5 City Project No. 10287$
Re�ised June lb, 26I6
oosza3-z
Pe�eioper Awarded Praject Rgreement
PdgP � of 6
31
32
33
34
35
3fi
pro�ing in a lega! proceeding the actual Inss suffered by the Qevelaper if the Work is nat
campieted �n time. Accordingly, instead of requiring any sueh praof , Contra�tar agrees
that as liquidated darr�ages fnr delay jhut not as a penaltyj, Cantractnr shall pay
De�eloper Qne Thousand poliars �$1�0�O.O�j far each day tF+at expires after the time
specified in Paragraph 3.2 for Fi�►al Acceptan�e until the �ity issues the Final Let#er of
Acceptance.
37 Arti[le 4. C�NTRACT PRICE
38 ❑e�e�oper agrees ta pay Contractor far performance of the Work in accordance with the
39 Cantra�t aocuments an amaunt in current funds of Trvo Miliion, Twentv Thousancf, �ne
40 Hundred Ei�hk`y-Faur ❑oliars and �ero Cents �$�.020,1$4.Qp].
41 ArtiEfe S. CUNTRACT D�CUMEN75
42
43
44
Cl.7
5.1 C�NTEfVTS:
A. The C�ntract �ucuments which �omprise the entire agreement hetween ae�eloper
and Cantra�tar cancerning the Wark c�nsist �f the fvllnwing:
1. This Agreement.
45 �. Attachments ta this Agreement:
47 a. 6id Form (As pra�ided by DevelaperJ
48 1j Proposal Form �f3AP Versianj
49 2j Rrequalifi�atian 5tatement
5� 3j 5tate and Federal dacuments (projectsAecrficJ
51 b. Insurance ACDRa Formjsj
52 c. Payment Bpnd �DAP VersionJ
53 d. PerFormance Bond jDAP Version)
S4 e. Maintenance B�nd {�AP Versionj
55 f. Pawer flf Attarney for the Bonds
56 g. Wvrker's Cvmpensation Affidavit
57 h. M6E and�Qr SBE Commitment Form [If requiredj
58 3. Standard City General Canditions of the Constructinn Contract f�r ❑e�eioper
53 Awarded Proje�ts.
CITY dF F�R7 WdHTH !(eller Crassing Phase 1
STAN�ARa C�NSTRUCTIpN SPECIFILATIDN dOCi1MEN75— DEVELpPER AWARf7E� PRp1ECT5 City Proje�t No. 102875
Re�ised lune 16, Z015
0052n3-3
Oevelaper Rwarded Proje�t Agreement
Page 3 af 5
60 4. 5upplementary Conditions.
51 S. Spe�ifications specifiralfy made a part of the Contract Documents by attachment
62 ❑r, if not attached, as in�orparated hy reference and des�ribed in the Table of
63 Cantents of the praject's Cantrac# ❑ocuments.
54 6. �rawings.
65 7. Addenda.
Ci�
67
68
69
7U
71
7�
73
74
75
8. Documentation subrnitted �y �ontrartflr prior to [Vatice �f Award.
9. The fallowing which may he deli�ered or issued after the Effective Date of the
Agreement and, if issued, beeome an insarporated part of the Contract
Dotumer�ts:
a. Notice to Prflceed.
6. Field �rders.
c. Change Drders.
d. Le#ter of Final Arceptance.
C3TY pF FORT WORTH Keller Crossing phase 3
STRNDAR� CDNSTRUCTIaN SPECIFICATION QQCLIMENTS — pEVEL�PER AWARflE{] PRpJECTS City Project Na. I02875
Re�ised lune 16, 201fi
a05243-4
Pe�elnper Awarded Proje�t Agreement
Page 4 of 6
76 Arti�le 5. INDEMNIFIG4TIDN
77 f.i Cantractor co�enants and agrees ta indemnify, hald harmless and de#end, at its awn
78 expense, the c'rty, its afficers, servants and employees, from and against any and ali
79 daims arising aut of. or alleged to arise aut of, the wrark and se:vi�es tn be perFormed by
80 the contrartur. its officers, agents, emptuyees, suhcontractors, IiCenses or in►►itees under
81 this contratt. This indemnificatian ro�isian is s etificall intended to a erate and be
82 effetiiue er+en if it is alle ed �r ro�en that all or sume vf the dama es hein sau ht
83 were caused, in whole or in part. 6y ars,y,,,act, umissian or ne�li�ence af #he �ity. This
84 indemnity pra�ision ix intended ta include, without limitation, indemnity for custs,
85 expenses and legal fees ineurred hy the city in de#ending against suth elaims ancE �auses
$6 �f ��tians.
87
88 fi.2 Contractnr Gvvenants and agrees ta indemnify and hald harmless, at its own expense,
89 the rity, its nffi�ers, sen►ants and employees, fram and against any and all loss, damage
9� nr destruCtion af praperty of the ci#y, �rising aut of, or alleged to arise aut o#, the wark
91 and services tn be performed hy the �ontrar#or, its officers, agents, empioyees,
92 subcnntra�tars, licensees ar in�i#ees under this cantra�t. This indemni�cation prn�isian
93 is s e�ificall intended tn o erate and he effecti►►e even if it is alle ed �r ro�en that all
94 ar some af the damages hein� sou�ht were caused, in whale ar "sn part, hy any act
95 omission ar ne�li�ence q# the ei#Y.
96
97 Article 7. M15C�LtANEQLIS
98 7.1 ierms.
99 Terms used in this Agreement are def�ned in Artiele 1 of the 5tandard City C�nditions of
10D the Construction Contract for C3��eioper Awar�ed PrQjects.
1�1 7.2 Assignment of Contrac#.
I�2 This Agreement, including ail of the Contract pocurreents may n�t be assigned by the
Id3 Contra�tar wi#hout #he ad►�anced express written eonser+t of the De�eloper.
1D4 7.3 SucEessors and Assigns.
105 ❑evelaper and Contractor each binds itseff, its partners, suc�essors, assigns and iegal
TQfi representati�es t❑ the other party heretQ, in respect t❑ aEl c��enants, agreements and
1�7 obligations contained in the Contract Qa�uments.
CITY�F FpRT WORTH Kellei Crossing Phase 1
SiAN�ARD L�NSTRUCTIpl�E SPECIFICA7101�f DOCl1MENT5 - f7EVELflPER AWARDED PROlECTS City PrajeCt No. 102875
Re�ised June Ifi, 2016
00 52 43 - 5
4e�eloper Awarded Project Agreement
Page 5 af 6
ios
109
1ia
111
11�
7.4 5e�erahility.
Any prn�ision ar part of the Contract �oruments held to be un�anstitutinnal, void ❑r
unenfnrceable �y a court of c�mpetent jurisdi�tinn shall he deemed stricken, and afl
remaining pra�isions shall �nn#inue tn be �alid and binding upon �EVELOPER and
CQ NTRACT�R.
113 7.5 Go�erning Law and Venue.
114 This Agreement, including alf of the Contract Documents is performable in the State of
115 7exas. Venue �hall he Tarrant ��unty, Texas, ar the United 5tates �istrict Caurt for the
116 Northern Distrirt of �exas, Fnrt Wor#h �i�ision.
117
118 7.6 Autharity to 5ign.
119 Cantractor shall attach e�idence ❑f authority tQ sign Agreement, if ather than duly
�z0 authorized signatory of the Contractor.
121
122
123
124
125
1�6
IN WITNESS WHERE�F, Oe�elaper and Contractor ha�e executed this Agreement in multiple
counterparts.
This Agreement is effecti►+e as of the last date signed t�y the Parties �"Effe�ti�e Date"]
Contract�r:
Jackson Construeti�n, Ltd.
De�eloper:
D.R. Hvrton-Texas, LTD
B . � �fGG'r� By�
t5ignatu ) (5igna urej
CE7Y OF FQRT WpRTH
STANpARD CONSTRl1CTI0N SPECfF1CATIpH ppCUMEl�1T5 —�EVEL�PER AWARDEp PRdlECTS
Revised June S5, 2Q15
Ke[!er CrosSing Phase 1
City Project Na. 1Q2875
Q� 52 43 - 5
Oe�eloper Awarded Prvje�t Agreement
127
Page fi of 6
r
Tr�y L. Jacksvn ,
�Printed hame) [Printed Namej
Title: ��d�
Cnmpany Name:la�ksan Construction,
Ltd.
Address: 5112 Sun Valley ❑ri�e
CityJStatelZip: Fort Worth, T?( 761T9
�1131�z�
aate
Title: � }��
�� ji
Corrrpany name: D.R. H�rton-Texas. LT❑
Address: 5751 North Freeway
City�State/2ip: Fort W�rth, T7t 76131
Z� � �f
Date
CITY OF F�RT W�RTH
STANDARp CDNSTRUCTIflN SPECIFICATION dOCl1MENT5— OEVELOPER AWAR�Efl PRpJECTS
Revisad June 16, Z016
Keller Crossing �hase I
City Praje�t No. 102875
�
� 2
3
�
4
5
6
.� �
�
OD5213-1
PERFflRMANCE 8aAf0
Pdg2 1 nf 3
B(�l1� � i o�� i 3�
SECTI�N Qd bZ 13
PERFdRMANCE BQNO
THE STATE OF TEl[AS
§
§ KNQW A�L BY i�lE5E PRE5EMT5:
COiJNTY �F 1'ARRANT
��
That we, Jackson Construction, LT�, , knnwn as "Principal" herein
an� _The Hanc�i�er Insurance Cnm�aan�� , a corporate surety{sureties, if mare
than ❑ne] duly autf�oriied to do be�siness in the State of Texas. knawn as "5uret�' herein
(whether one ar more], are held and �rmly bnund unto the Develnper, �l,R. Horton-7exas, L�D,
authnrixetl to do husiness in 7exas t"ae�eioper"j and #he Ci#y Qf Fqrt Warth. a Texas municipal
�arppration �"Cit�'], in the penal Sum af, �wo Million 7wen Thausand One Hundred Ei ht -
F�ur f}vlfars and Zero Cents ($2,U2�.184.001, law€ul maney af the Elnited 5#ates, to he paid in
�ort wartn, 7arrant County, Texas far the payrr�ent o# which sum well and truly to be made
jaintfy unto the ae�elvper and the City as dual ok�ligees, we hind vurSel�es, our heirs, executQrs,
administrators, successars and assigns, join#!y and se�erally, firmly by these presents.
8
9
1D
1I
12
13
14
1S
�5
17
— 18 WHfREAS, �eveloper and City have entered inta an Agreement for the construct'sorr of
19 eammunity facilities in the City af Fert Worth by and th�ough a Cammunity Faciiities Agreement,
— 20 CFA �Vumber CFA2�-a12Q; and
.,
Z1 f�REAS, the Frincipal has entered into a certain written contract with the aevelaper awarded
2� th�day af Jar� Jc� r y_ , ZO,�, whith Cantract is hereby referred tn and made a
23 part hereaf fvr all purpases as if fully set forth herein, to furnish all materiafs, equipment lahor
24 ar►d ather a�cessaries defined �y iaw� in the prasetiutian af thQ Work, including any Change
�5 �rders, as prnvided for in said Contract designated as Water, 5anitary 5ewer, StQrm Drain,
Zfi Pa�ing and Streets Lights to ser�e Keller Cra�sing f�hase 1.
27 N�W, T#IfRfF�RE, the cnndition af this ohligatson is Su�h that if the said Printipal shall
28 faithfully perfarm it obligatidns under the Cantract and shall in all respects duly anrf faithfully
�9 perform the Work, irscluding Change Orders, under the Cantract, aecard+r�g to the plans,
ClTY DF FDRT WpRTH Kelier Cress�ng Phase 1
5TANDARO CI7Y CONl71TI0N5 — OEVELOPER AWARDfO PRC1iELT5 City Proje�t Na. Y02875
Revised lanuary 31, 2012
w
7. specifiea#ians, and cpn#ra�t dotuments therein referred ta, and as wefi during any perivd of
y 2 extensivn of ih� Contratt that may he granted an the part nf the DeveEaper and/or City, then
3 this abEigatifln �hall be and I�ecome n�li and Waid. atherwise tn remain in full farce and efFect.
� 4 RR�VIdEa FLIRTHER, that if any legal actinn be fiied on this Bond, r+enue shall lie in
5 Tarrant Caunty, Texas ar the United States District Court #nr the �vrthern ❑istrict af Texas, FaR
" 5 Worth Di�ision.
7 This bond is made and executed in campliance with the prn�isions vf C�apter 2�53 Qf
8 the Texas Go�ernment Code. as amended, ar�d al1 lia6ilities Qn thfs bnrsd shall he det�rmined in
9 ac�ordance with the prQvisions af said statue.
flpfi2i3-2
PERFDRMAHCE BQND
Page 2 of 3
14 1N WETNE55 WHfRE�F, the Rrincipal and the 5urety ha�e SIGNED and SEALEO this
� 11 instrument by duly authorized agents and offieers an this the ��day of .� �+J: U�I
12 ,20�j .
0
0
�
r�
13
14
15
zs
17
18 ATTf 5T:
19
2� �Prin�ipaij Secretary
21
2i
23 ,
24 I�
Z5 Witness as tn Principal
2fi
Z7
PRIA�CIPAL:
Jac�;son Canstruction, Ltd.
BY: �
Signature
Trny� L lackst�n, Fresidenl
Name and Title
Address: S11? Sun Va�lev Dri��e
Fori Worth, TX 7C�1 I9_ _
GffY OF FDRT WOR7H
STANE3AR0 C�i1' CONOITIONS — QEVELQPER AYUARDEO PRRJECTS
Revised lanuary 31, 2012
Ke41er Crpssing Phase 1
[ity PrajeEt Na. 102875
...
�
�
00 62 i3 - 3
PERFORMANCE BdNb
Page 3 of 3
1 StJRETY:
� Thc Hano�er Insurance Cnmpany
3
� �
5 6Y:
6 Signatur�
7
g .1a�[: M Crc�wle�•, Attnrne�� in Fae[
9 Name and Titie
10
�1 Atfdress:
5ClU N Ai�arc� Street, #430a
Z� % �al l as, TK 75�0 k
13 t�14 �
15 Witness as tn Surety Telephnne Number: ��'--3�5-9i34�
16
17
18
19 *Nnte: I# s9gned hy an oificer af the Surety Company, there must he on file a tertified extract
ZO frnm the by-iaws sf�owing that this persQ� has authority to sign such ob4igation. If
21 Surety's physi�al address is di#ferent fram its mailing adriress, both must be prv►►ided.
�2
23 The date of ihe �nnd shail nat be prior ta the date the Contract is awarded.
24
CI'#`'! {7F FORT WORTH
STAM1IL]AR� CfiY CflNQITI�N5 — pEVELOPEii AWAR4ECT PR�JECTS
Re�ised January 31, 2012
Keiier Crassirsg Phasa �
£ity Project I�o. 1C32875
�
� �
3
4
� 5
6
_ 7
8
.� 9
10
� 11
12
i3
14
� 15
15
~ 17
I]p 6� 14 - 1
PAYMENT BOND
Page 1 aF 3
$���a ��n�� i3 i
SECTIDN aQ 6214
PAYMENT S�Nfl
YHE STRTE OF TEl[AS
C�LINTY n� TARRANT
§
§
�
I(N�W A!L BY THESE PRESENTS:
ihat we, lacksan _Con�truttion�__ Ltd. ,, , kr+awn as
"Printipal" herein, and __ _ The Hann��er Insuranee Cc�mpany°._ �
�orporate surety = or sureties if more than anej, duly autharited to do husiness in the 5tate af
Texas, known as "5urety" herein �whether ❑ne ❑r morej, are hei� and firmly bound unto the
�er�eloper, D.R Hnrton-Texas. LTD, authorited ta do busineSs in Texas "[Developer"j, and the
City of F�rt Worth, a Texas municipa! carparation {"Cit�'), in the pe�af sum of �w� Miliion.
Twenty Thflusand, �ne _Hundred Fi�htv-Four dnilars, and 7era C�nts ($�,Q20.184.0�1, lawful
money of the Uni#ed States, tn be paid in Fort Wnrth, Tarrant Cnunty, 7exas, fnr #he payi'nent of
whi�h 5um well and truly be made jointly unto the De�elaper and the City �s duai ohkigees, we
hind aursel�es� our heirs, exe�utors, administrators, successors and assigns, jointly and
se�erally, firmly by these presents:
18 WHEREAS, fle�el�per and City h��e �ntered int� an Agreement for the con5tructior� �f
19 comm�nity facilities in the City of F❑rt wartr�, by and thraugh a Community FaCilities
20 Agreement, CFA Numher CFA2�-Qi24; and
21 WHEREA5, Principal has entered inta a certain written Contract with ❑e�eloper,
22 awarded th� �day of �� nJ Q!� , 2p�]y, vyhith C�ntract is hereby
23 referred to and made a part herenf far all purpnses as if ful�y set forth herein, ta furnish all
24 materials, equipment, labar and other accessaries as defined by law, in the prasecution of the
25 Work as pro�ided fnr in said Contract and designated as Water, Sanitary Sewer, 5torm Drain,
26 Pa►►ing ar�d 5treets Lights to serve Keller Crossing Phase ].
�, 27 NQW, 'i�1E�tEFDaf, THE CONDITION OF THIS OB�IGATIqf� is such that if Prin�ipa! shall
28 pay all manies owing to a�y �and ailj payment h�nd heneficiary �as defined in Chapter �253 of
,,, 29 the 7exas Gn�ernment Cade, as amendedj in the {�rosecution af E�+e W�rk under the Cpntract,
CI*1' pF F4R7 WQRTH Kelier Crassing Phase 1
5TANdARO ClTY CdN�ITIDNS — �EVELOPER AWARpE� PliOJECTS City Project Na. I02875
� Re�ised January 31, 2�12
.�
0
0
{1Ofi214-2
PAYMEIVT BDND
�age 2 of 3
1 then this obiigatian sF�aFl he and beeome nufl and void; otf�erwise ta remain in fuff furce and
2 effect.
3 This bond is made and exe�utecf in �ompliance with the pra�isions Qf Chapter Z253 af
— 4 the Texas Government Code, as amended, and ali liabilities on #his bond shall be determined in
5 accardance with the provtsivn5 �f said statute.
6 IN WITNESS WHERE��. the Principa# and 5urety ha�e each SIGPVE� and SEALED thi5
_ 7 instrument by duly authorixed agents and afficers on this the_�_ day af
a _;��►� ��a.r y _..,.� z� 2!
� g
0
0
�, ATl'EST:
�- � YY- , ,._
�" �Printipalj 5etretary
. �
WitneSs as tn Printipal
PRINCIPAL:
Jacksc7n Canstru�tian, Ltd.
BY:
Signature
Tray L Jackson, Presiden[
Name and �itle
Address: 51 12 Sun Valic�� ]3rir•e
Fort Wnrth, TX 76119
CITY QF FORT WORTH Kelle� Crossing Phase 1
STAfVQARLI Cf7Y CQNf]IFiC1NS — pE11ElOP�R AWARDFD PRp1EC15 City PraJect No. 1fl2875
^ Re�ised ldnuary 31, 2412
..,
rr
�
�
RTT�ST:
, - - � �L �,__.
�5uretyj Secretary
QDfi214-3
?AYMFN7 6DfVD
Page 3 af 3
5 ti R E�Y:
The Har�o��er I nsurance C�rr�pan}�
6Y: � ��
5ignature
Jack M Cr�7►►.Ic��, Attame�� in Fact
Name and Title
.
� �
— witness as ta Surety
�
�
Address: 5UU N Akard Strcel, #43Df]
Da�las, TX 7S3t)1
Te4ephone Number: y���385-9SU[)
1
2 Note: If Signed by an offi�er of the 5urety, there mUst be an �fe a certifiet� extract frpm the
3 bylaws showing that this person has autharity ta sign such p�ligation. !f 5urety's phy�i�ak
4 address is different frvm its mailing address, I�oth must be pro�ided.
5
6 The date of the bnnd shali not be prior ta the date #he Cnntract is awarded.
7
8
END OF SECiiDN
EtTY OF FOR3 WORT1i
STAN�ARO CiTY COMOITIpNS — S]EVEL�PER AWARpEO PRDIECTS
Re�ised January 33, 2fl12
xellef Crossing Ahase 1
City Praject No. 2p2875
�
� �
3
�.
A
5
6
.. �
..
8
9
10
I1
1�
13
14
15
16
17
18
19
on �i i� - i
MAINFENAHCE BON❑
Page 1 af 4
BC7i7L� #�L��1�1
THE STATE �F TE]iA5
CalIN7Y �F TARRANT
§
§
s�crioro uo �z is
MAlNiENANCE 80N❑
§ KN�W ALL BY�HESE PRE5ENTS:
That we Jackson Canstructivn. Ltd. knnwn
as "Printipal" herein and The Hana��er Insura�cc Cnmpan}� a eorparate
surety (sureties, if more than anej duly authorixed to do business in th� 5tate of Texas, known
as "Surety" herein {whether one �r moreJ. are held and firmly bnund unta the Qeveloper. D.R.
Hurton-Texas, LT�, autharired tn do be�siness in 7exas �"Qe�eloper"j and the City nf �ort Wnrth,
a Texas municipai carporation j"Ci#y"j, in the sum of Twn Mfllion Twen Thousand �ne
Hundred Ei h-Faur poliars and Zero Cents ($2,Q2�.184.(�j, lawful mnney of ihe IJnited States,
ta be paid in Fnr�t Worth, Tarrant County, Texas, for payment of whict� sum well and iru�y he
made jointly unta the Develnper and the City as duaf obligees and their su�cessors, we bind
aurSe4�es, aur heirs, exetutars, administrat�rs, successors and assigns, jaintly and se►►eral[y,
fir�nly by t�ese presents.
20 WHEREAS� Lle�efnper and City have entered into an Agreement for t�e cons#ructi�n nf
21 Ca+nmunity facilities in the City of Fort Wnrth by and thraugh a Cammunity Facilities Agreement,
22 C�A Number CFA�D-012fl; and
23
24
25
26
�7
28
Z9
WHER�AS, the Printipal has entered into a certain written contract with the Qe�eloper
awa rded th�� [fay of �} ��t J� _ , z0� which Contratt is
heretay referred ta and a made part herea# #flr al! purposes as if fu41y set farth herein, iu furnish
all materials, equipmer�t la6or and ather aeceSsories as de�ned �y iaw, in the prase�ution of the
Wark, including any Waric resulting #rom a duly authoriied Change Qr�fer �colle�ti�eEy herein,
the "Wark"] as pror►ided for in said Contratt and designated as Water, 5anitary 5ewer, 5tarm
Orain, Paving and 5treet Lights tfl serve Keller Crassing PF�ase 1; and
CffYOF FORT WORTH
STANE]ARD CfTY C[]NdFfipHS-- DFVELpPER AWqRAEp PRp�ECTS
Re�isedlanuary 31, 2012
Keller Crpssing Phase 1
City Praject Nfl. 1D2875
�.
1
OQ6219-2
MAINTEiVANCE B�Np
PdgE x uf 4
'""' 7 WHEREAS, Printipaf hinds itself to use such materials and tn sn construct the Wark in
3 accardan�e with the plans, specifir.atians and Cantra�t Doeurr�ents that the Work is and will
� 4 remain iree from defects in materiais or workmanship far and during the period of twa (2) years
5 after the date nf Final Acteptance �f the Wark by the City �"Maintenance Period"j; and
5
,� 7 WHERfAS, prineipa! binds itself to repair or recnnstruct the Wvrk in whnle or in part upon
8 receiving natice from the De�eloper andlor City af the need thereof at any time within th�
,... 9 Maintenance Perifld.
Z�
17. HOW THEREFORE, #he conditinn of this obligatian is su�h that if Principal shall remedy
w Z� any cfefe�tive Work, for which timely noti�e was pravided by De�elnper or City, to a �ampletinn
13 satisfactnry tQ the City, then this obiigation shalf he�ome null and �oid; ntherwise to remain in
f4 fuli force and effect,
15
� 16 ARDVIDEO, HDWEVER, if Prin�ipal shall fail s� to repair or reeanstruct any timely
17 noticed defe�ti�e Work, i# is agreed that t�►e ❑evelaper or City may cause any and all such
^ 18 defe�ti�e Work to #�e repaired and�or reebnsiructed with all associated tasts thereof being
19 bome hy the Prin�ipal and the Surety under this Maintenance Band; and
zo
'~ 21 PR�VIDE� FkJRiHER, that if any lega! ac#inn k�e filed an this Band, �enue shaii lie in
Z2 Tarrant Cnunty, Texas or the United 5tates District Court far #he Nort#�ern DiStrick of Fexas, Fort
"' 23 Warth ❑i�isian; and
�
24
25 PR�VIDE� FLIRTHER, that this obligatian shal} be continuous in nature and successi�e
_ 26 reco�eries may be had hereon for successi�e breaches.
CF7Y OF FpRT W�RTH iCeiler Crossing Phase 1
STAN{]ARQ CfTYCOhE01T1DFl5—i]EVELOPER AWRRbEf7 PRfl1ECi5 City Projett Np. 102875
� Re�ised lanuary 31. 2012
�
r�
oa6xx�-�
MAINTEhEANCE BQNR
Page 3 ef 4
1 fN WITNESS WHERFBF� the Principal and the Surety have ea�h 51GNEd and SEALED thiS
r�-�
^ 2 instrurnent by duly authorixed agents and vffiters n� this the �� day of _ o� i] �."tf3l
3 ZD� f .
'� 4
5 PRINCIPAL:
^ 6 Ja�ksnn C�nstructinn, Ltd.
7
.,
$ BY: (.C�t�j
� � 5ignature
10 ATTEST:
,_ 11 .
IZ � �
�3 Trc��° L .lacksan, President
14 {Principalj 5ecretary Name and Title
� 15
1� Address: 51 �� �un VaIlcS° Dri■°e
— �7 F�rt Worth, TX 7C�119
1.8 �
_ �� �
2� Witness as to Printipal
21
22
x3
,. � 4
ZS
� 2fi
27
0
CITY flF FORT WORTH
57ANpARp CITY {pNpFTIDNS — �EVELOPER AWARaE4 PRDlECTS
� Revised January 31, 2012
I(eller Crnssing Phase 1
City Prpje�t No. ]�2875
...
qOfi219-6
MAtIVTENANCE 6QN0
Page 4 of 4
1 5l1REiY:
� 2 The Hanc�►��r Insurance Cnmpam'
3
4 ��
� $Y: �
5 � Signature -
� 6
7
^ g 3ack M Craw�{e}', Att��rne} in Fact
9 A�TESr= Name and Title
_ �Q
11 � _ - . ' Address:
w... y'1 • �-'y7 �'-. �.. r
li �
I3 tSurety) 5etretary
.— 14 S[7[) N Akard 5treet, #43�1�
15
16 Dallas, TX 7S?Q1
w 17 � V
— 18 Witness as ta 5urety Telephnne y7?-385-9F[](7 Number:
19
,� 2D
2I *Note: I� signed hy an o�cer of t�+e Surety Company, #here must be an fike a certified extraet
^ 22 irom the 6y-laws s�owing that this persan has autharity tn sign sueh obligatian. lf
23 5urety's physical address is different from its mailing address, both must be prn►►ided.
2�
�
25 The date af the bond shali nat 6e prior to th� daCe the C�ntract is awarded.
~ 2fi
CITY DF FORT WpRT�{
STANDAR� CITY C�NQITIONS —�EVELpPER AWAROEa PR01ECT5
� Revised lanuary 3i, �612
Ketfer Crossing Phase 1
City Project Nfl. 102875
THE FlAPFQVER IHfSL1RANCE COMPqNY
NFASSACHLJSETTS BAY INSURANCE CpMPANY
CITiZENS INSURANC6 COMPAI�Y aF AMERICA
YVYYGi Ut R7 1-UTiN�Y
THIS PQwer af Aftorney limits the acts oE those named �erein, and they ha�e na a�thor�ty fn bind the Campany except in the manner and to the
extent Yrerein stated,
KIY�IN ALL PERSONS BY THESE PRESENTS:
That THE HAAIDVER 1NSURAI3CE G�MPAI��'and MASSACHUSETFS BAY INSLfRAHCECOMPANY, foath being corparaiions vrganized ar�d existing uncler 3he laws
af the State af New Hampshire, and GITEZ�HS INSVRANCE CpMPA�EYflF AMERSCP� a corporalion organized andexisGng underthe lawrs af the State of Allichigan,
(hereinaiter indi�duafly and caiiedively tise "Campanyl'] does herehy consfRute and appaint,
Sfe►�en R. Fasfer, Jack M. Crowley, l.aurie Pfl�g , and Teuta L,uri
af Wiliis Towers Waisnn Insuran�e Services West, InC ai []alla5, TJ( each indi�irfuafly, if there t�e mor$ than one named, as iTs true and iaw(ul attorney[s}-in-
faot ro sign, execufe, seaf, acknowfedge and deli�er for, and on its behalf, and as its act and deed any place within fhe Llnited States, any and a!I surety honds,
recognizanees, underYakings, or other surety ohfigations. Ths execubon of such surety 6onds, recagnizanr.es, ur�dertakings o�suretyobligatipns, in pursuanceofthese
presents, shall be as hinding upon the Campany as iFYhey had been duly signed by the president ar�d attested 6y the secrefary of the Company, in their own praper
persans. Pm�ded however, that this power oT attvmey limits the acts of those narr�ed herein; a�d they ha�e no authoriry to hind the Company except in the manner
stated and to the extent of any limitation stated lselaw.
Any suGh a6ligatians in the Llnited Sfates, nat ta exeeed 7'tiirty Fi�e MiliFnn and No17QU {§35,00�,OODJ in any singie irtstarrce
That this power is made and executed pursuant to the authorityaf the Fo]lawing Resaluiians �ssed by fhe Haard af Qirectors oFsaid Company, and said ResoluGons
remain in full force and effecY
R�54LVED: That the President or any Vae President, in conjuncSian with any �rx Presiderrt, be and they hereby are au[harized and empow+ered to
appomt Rttorneys-in-iact aF the Company, in its name and as it acts, to execute and acknovuledge for and on its hohalf as surety, any and all bonds,
reeogniaances. cantraets af indernnity, wai�ers of cifation and all vther writirsgs o67igaUary in the nature thereof, wifh power tv attach thereto the seaE aithe
Campany. Aeiysuch writings sv executed by suoh Aftorneys-in-faet shall be bin�ing upon the Companyas if tlseyhad been dutyexacuted and adcnowledged
6y the regularly elected ofFicers of tije Company in thsir own proper pevsons.
RESQLVEp: Thatany and al{ Po+n,�rs of Attpmey and Cortified Copies of such Powers aF Aftarney and certi�acation in rasped thereto, grantedand execuEed
by the Presiden[ ar �ce President in cvnjunction with any Vice presidenf af the Company, shall �e binding on the Campany to fhe same extent as if all
signatures therein were manually affuced, e�en though one or more oi any such signafures thereon may E�e facsimile. [Adopted �ctoher 7, 1981 — 7he
Nana�er Insurance Company: Adopted Aprii 74, �982 — Massaohusens Bay Insurance Com}�any; Adapted September 7, 2001 — Cifizens Insurance
Company oi America and effrmed hy each Company on March 24, 2614}
1N W E7ME55 W H EREpF, TH E HANOVER IKSURAhCE COlNPANY, MASSACH LiSETTS BAY IIVSU RANC E COMPANY and CfTIZENB INSL] RANCE CDMPANY �F
AMERlCA fia�e r�used ihese presents to 6e seaEed with their respective carporate seafs, duly a3tesYed hy rivo Vioe Presicfents, this 10'�" day of January, 20Zi�.
TH£ HAk�VER ft�FStJ � COh4PADlY
dAA55AGHl}SE7T5 Y I LiRANCE COfWPAHY
EITIZEI�l5 iNSURA E C l49PAFiY OF AAA�RECR
VipB Presedant
�+
7�
THE COMM�hFWEA�TH QF MASSACHi15�T"iS J
C�UN1Y fl� WaRC�STEft } ss.
y�•��
:� �•� Y'
On this 10°" day of January, 2p20 befare me came H�e abo�e riamed Executive Vice PresideM and Vice President af The Hano�er Insurance Campa�y,
Massachusetis Bay Insurance Comparryand CiGzens insuranr.a Campanyof America, fa me personallyknown to be fhe individuals andoffioers descriaed herein, and
acknawfedged that the seais airixed tn the preceding inshumentare the corparate seals of The Har�aver Insurance Comparry, Massachusetts Bay InsuranceCampany
ar�d Citizens Irfsurance Company af America, respecii�ely, and thatthe said corpvrate seals and their signatures as offioers were duly af%ced and suhscribed Fo said
�sSrument by the aufhority and direc4an oi said Coroarations.
�, ARLEEl� V. 5lAAQNS
tr� Noiary Pu61iC
CDMI�IOMN�I�TFi DF h1�58ACfR15E7i5
My CommiasFan Expires
June i5, 2[iZ3
� •
Ariee� V- Simons, tVotary u�c
IYij! C6iTIRiiS51QiZ EXPIf@S ,]urse 15, 2�2�
I, the undersigned Vice President oi The FEarFo�er lnsurance Company, Massachusetts Bay lrssurance Company and Gitizens Insurance CompanyaFAmerica, hereay
certitythat the abo�e and feregoing is a fuIl, true and correct wpy af the QrEgiaal Power of AtYorney issued by said Campanies, end do hereby further certify tliaithe
said Powers of Attomey are stlfl in for�e and eFfeGt,
G1VElV under my hand and fhe seaEs af said Comparsies, at Worcester, Nlassaehusetis, this day of
CERTIFIED C�PY THE HANOVER lilSllRAliCE Cp1Y1PAHY
lHp ACkF15ETT5 BAY Ii�iSURkNCE CaNiPANY
C�NS INSURA�LI�F_S�MPANY aF AM�RICA
�_,
� � ��� �� � ��-----�
� Car7ick q. Hligh, Wce-P+�ldent
tHE FiAH�VEit IN9URRA9CE C��RPIUiY
R�ASSAGFi3JSET3S BAY IHSfJRAA1Cf C�IY�PAi�iY
� �"���r The Hann�er Insuranoe Carnpariy � 444 Linwin Sfreet Worcxster, nAA 01553
I�S11tdIlC£ GIOU�7� Gtire�x Insuran[e Company af Am�ra � 645 West Grand River A�enue, Flowel� MI 48843 TexaS Camplaint NatiGe
IMP�RTANT NOTICE AVIS� IMPaRTAN7E
To obtasn infa►mation ar make a car�plaint:
You may call The Hanaver lnsuranee Campar�ylCitizens
Insurance Com�any af America's tofi-iree tefephane
r�umber f�r infarmat3on or to make a cam�lairrt at:
Fara a6tener informacion o para sameter una que�a:
[Jsted puede lfamar al numero de te4efono gratis de The
Hanover Ins�rance CampanylCiti�er�s Insuran�e Cornpany
of AmerFca's para in�armacios� o para sameter �rna gueja al:
'l-8�6U8-$74'i
'�-8D�8-8'141
You may also write ta The Hanover Insuran�e Companyl Usted iambien puede escribir a Tf�e Hano��r lnsurar�ce
Citizens Insurance Company o� America at: CampanylCitizens lnsurat��e Campany af America al:
44Q Lineoin Street
Worcesker, MA Q1515
44a Lincoln Street
Warcester, MA �1515
You may cc�ntact the Texas aepartment a# Insurance to
abtain infarrna�ion on companies, coverag�s, rights or
compkair�ts at:
1-SD�252-3439
You may write the Texas Department of lnsuranee:
P. Q. Bvx '149'I D�i
Austin, T7{ �$7"f4-91D4
Fax: {5'I2} 475-1TI'i
Web: httpJlwww.tdi.texas.ga�
E-maif: CansumerProtect'svr��a7tdi.state.bc.us
PREMIl1M QR CL►41M E]15PLJ7E5:
Shauld yau have a dispute canceming yaur �remium ar
about a claim yau shauld �ontact the agent ❑r the corn-
pany first. If the dispute is not resalved, ya� may cantact
the Texas Department of Insurance.
ATfACH THIS N�TICE T� Y�L1R P�LICV: This notice is
for i�forrnation only and cioes not become a part ❑r con-
ditson af the attached document.
Pt�ede comunicarse con ei Departamento de Seguras de
�exas para abtener informacior� acerca de campanias,
coberturas, derech�s a quejas al:
1-8��52-3�39
Puede escribir al Departamento de 5eg�ras �fe Texas:.
P. �. 8ox 'i49104
Austin, T7( 787'�4-91�
Fax: [5'f2} 475-'€771
Web: http:llwww.tdi.texa5�ov
E-r►�a+l: ConsumerPratection�tdistate.bc.us
D15PUTA5 S�BRE PRlMAS � RECLAMaS:
Si tiene una disputa cancemiente a su prima o a un rec-
lamo, tiebe camunicar5e can el agente a la eompania
primero. Si no se resuei�e la c#isputa, puede entonces
comunicarse can el departamentv {T�f}.
LfNA ES7E AVIS� R St3 P�LI�A: �ste aviso es solQ para
praposito de informacit�n y na se cor��ierte en parte o
condicion del documento adjunta.
,e:-,s5� �51,�
s�:eTiorr oa �i oo - P�oposAz.
DEVEL�PER AWAADED C'ONTRACTS
This propasal must nat be remo�ed fr�m this boak of Contract Documents.
Ta: �.R. Harton-Texas LTO.
PR�POSAL FDR: STREET LIGHT IMPRaVEME1�ITS
PR�IECT NAMF: KELLER CRQSSING PHASE 1
IFR�C NQ. 24-�1U$
�iL� No. x-zr��o
CITY Pi�Q,IECT NQ. 1Q2$75
FIIl ND. 3U� 14-020043I-10287�EQ7b85
Includes the furnishing �i ail materiais, ec�uipment and iabor for the instaliation af inedian
openings, left turn lane, water & sanitary sewer impravements and a�I necessary appurtenances
and in�idental work ta provitie a complete and scr�ri�eable project designated as:
STREET LIGHT IMPRUVEMENTS
TU SERVE KELLER CR�55i�TG PHASE 1
Pursuant to the foregoing `Notice to Sidders', the undersigned Bidder, ha�ing thoroughly
exatnined the Cantraci ❑ocuments, including pians, special contract docurnents, the Te��nical
Speci�cations listed in this contract. the site of the praject and understanding the amount �f work
to he done, and the prevailing �onditions, hereby propases to do a�l the work. furnish ail labor,
equipment and rrtaterial exc�pt as spe�ifed to be furnished by the City, rhrhich is ncces�ary to
ful�y camplete the wark as pro�ided in t�e Flans and Contract Docunnenls and subject ta the
inspection and appra�al ❑f the Dire�tar nf the Department of Transpartatinn & Public Warks af
the City of Fort Worth, Texas; and hinds t�imself upan a�ceptanGe �f this Yropasal to execute a
cantract and furnish an approved Performance Band, Payment Bnnd, Maintenan�e Band, and
such other bonds, �f any, as may be required by the Cantra�t Dacuments far the perf�rming and
completing of the said wnrk. Contractor proposes to d� the wark within the time stated and for
the fallowing sums:
Furnish and install, inciuding ail appurtenant w�rk, complete in pla�e, the following items:
Page 1 nf 3
PART B - PR�P�SAL {Cont.}
After acceptance af this Proposal, the un�ersigne� will execute the formal �vntract and w�ill
deii�ver an apgraved Surety Sand and such ot�er 6onds as required by the Contract Documents,
far the faithful perfortnance af the Contract. The attached bid se�urity, if required, is tn become
the property vf the De�elaper.
The su�cessful bidder shali be required ta perfarrn the wvr�C in a�cvrd with these �or�traci
documents and the technical specifications a�ailahie in the City of Fort Worth's Huzzsaw site
and incorporated herein and made a part hereaf far ali purpases.
The undersigned assures that its employees and applicants for errtployment and thase of any
labor arganization, subcontractors, ar empiayment agen�y in either fi�rnishing ar referring
emplayee applicants tv the �ndersigned are nQt dis�rim,inated against as prahibited hy ihe tercns
af City �rdinancc No, 727$ as amended by City C)rdinar�ce No. 74fl0.
Pagc 2 of 3
r,]�l '
The Bidder agrees to hegin �onsttlt�tion within ���}ettdrrrrr�ays after issue af the
work order, and ta c�mpiete the ��ntra�t within � {�C �) working days after
beginning canstructinn as set forth in th� written wark Qrd r to be furnished by the awner.
I{we} acknnwledge receipt of the fallawing addenda ta the plans and s�eci�cations, alI af the
provisians and reyuirements of whieh have been Eaken into consideratian on preparation of the
faregoin� bid:
Addendum No. 1(Initials) Addendum Na. 3{Initials}
Addendum No. 2(Initials} Addendum No. 4[Initials}
Respe�tfully submitted,
Inde endent Utili Constructian. Inc.
Name of ConVactor
By:
(Signature7
� � � � �
(Printed Name)
T'itle: �f�,5 � I'�
Campany Name; Inde endent Utili �:anstruction ln�.
Address: St�9 Sun Valley Drir�-e __
Fort worth TX 76 �� 9
Email: � �= - C_�'
Telephone: � � - � - 'i
Page 3 oF3
rx� az s;
❑AI' - BID YROYOSAL
Page ! oF=
s�cnon� aa az as
pe�elaper Awarded Proje�ts - PF2QPp5AL FORAII
UNIT PRICE E31D
Pro�eci Itcm Informaunrs
�u [lescnpt�on
UNfT V: SiREET LI.�',h
1 2605.3015 2" CQM[7T PVC 5CF1 86 (Tj
� 344�.3050 Fumishllnstall LEp �ighting �ixture {70 watt
ATB4 Cnbra Head]
3 3441.33Q1 Rdvry Illum FQundation TY 1,2, and 4
A 3441.335t Furnishllnstall 4�dway !llum iY i 1 Pole
5 3441.1645 furnishllnstall 7ype 338 Arm
6 3441.150i Ground Box Type B
7 9999.a008 No. l0 ?[HHW Insulated E#ec Condr
S
9
1❑
11
12
13
14
15
1b
17
18
l9
20
21
22
23
24
25
2s
27
28
29
30
31
32
33
�
35
36
37
38
39
40
49
42
43
44
6iddQr`s Application
8idder's Yrapasal
Specificatian � Unit of I Ficd I
ilnit Price
SectEon Na. Measure Quani�h
'IN ENIPRDVEMENiS
�B D5 33 LF 142� $12.70
34 41 2� EA 17 $273.00
34 41 20 EA 17 $i ,252.40
34 41 20 EA 17 $1.3]3A4
34 41 20 EA 17 $31fi.00
34411� F�1 2 $673.�0
34411� LF 4250 $1.2E
Bid 4'alue
$4,fi41.00
$21,284.Od
$23, 341.OQ
$5,372.OQ
$1.346.�
$5,387.BD
$79.385.fi0
r�ry vF ForerNORri�
STA.'�D.ARS7 Cf11STRL�CTlO� SPECiFEC.AT]O1 []pf'L�h1F.ti7S - DFL�TI.[]PF.R qH'.{ROED PROICCTS
Fnrm �-ervan A7a.� ", ?u 19 ?u=�n q; nn J7 a; _FS�d �opvsal_ DAP L�chiin.•
uaa^a3
UAP - HII] PRUPL75AL
Pagc ? nf �
sEcrioN on az aa
�eveloper Awarded Projects - PROP05AL FORM
UNIT PRlCE BID
Bidder's Application
Pra,tect EFem Enformatinn Bidder's Pro�asal
$tdlESE [Fem L]es�n uon Speeificasion Unii of Bid
�� � Sectwn Nn. Measure (���in• L�nit Prsee fiid Vaiu�
UfVIT V� STREET LIGHTING
8ed
Total Canstrurtioo
i'his Sid is suhmitted b►• the eati[►' ns�med below:
BIUI�ER: B2: � �/ "" `
Indcpendrnt l tilih C'onsrrucitun, lne.
i109 Sun ►'alle► Qrne
Fan ►1'orlh, 1�� 76119 TI'[ LE: r� ��
pATE: 1� � —�� ��'VrT�
Confnctor agrees ra camplete H'ORlC far FIHAL AC'CEPTA'�CE wiihin ��7� workiog da►'s aftrr fhe da[e Khen 1he
CQti7'RAC7 rammrnceR to run ss prua�ided in fhe Certrrai fbndilions
E11U pF" SF;CTlO�
CIT}' QF FpR�f �F'URTH
STA1tip.�FtD CpY5'FRL!CTIGIti SPECiFICATIOti flp['I;MF�TS - Dt=�'El.f1PFH .4u�.qRDtiO PRC11FC7'$
Fu�rn �'ers�on tifa} ?:,'_GlY ?i1_QI103 n!7 a:.13 Bid F4upoul 6.aP L.i�htiiig
(16 45 }?
pAP PHEQI'ALIFlC��TiC1N 5TATEM�:VT
Pa�c 1 uf 1
SECTIQN Ofl 45 12
DAP — PREQUALII=ICATION STAT�MENT
Each $idder is rec�uirec3 to comple#e tl�e ir�formation below by identifying the prequalified cantractors
andlnr subcontractors whom they iniend ta utilize for the major wark type[s) listed. In the "Ma'ar Work
T " bax ro�ide the catn �ete ma'or work e and actva� des�ri tian as rn�ided b the Water
De artment for water and sewer and TPW for a�in ,
BiDDER:
Independent iJti}ity Construction, Inc.
5 l �9 Sun Valley Drive
Fort Worth. TX l6] l9
Bv: C:�Ar� 11� � fe
�gna ure}
TIT1.F: ���51 C{ � r'1�
❑A�E,: � � _ �-� --�-� �`-D
END aF SECT��itiI
CfTY OF FOR7 WORTH
STqNQRRd CONSTRUCTIOfY PRf4UALIFICATION STATFMEN7 - �EVELRPERRWARDE� PRqlECTS
❑0 45 12 _ P req ual�h�at�on Sta [ement 2015 _pA P_ Ug h[ i ng
Fprm Versiort Septem6er 1, 2015
The undersigned hereby certifies that the cantra�tors andlor suh�ontractors [fescribed in the tahle aba�e
are currer�tly prequalified fnr the work types listed.
oa as as - i
CDN7RACTOR CpMpLEANCE WITH WORKER'S Cfl{NPENSATION LAW
Page 1 of 1
1
z
SECTI�N flEi 45 Zfi
C�NTRAC'fOR COMP�IAI�CE WITH WC]RKER'S COMPENSATI�N LAW
3 Pursuant to Texas �abar Code Section 405.�9fi4a�, as amended, Cvntractar certifies that it
4 pro�ides warker's compensation insuran�e co�erage for al! af its emplayees employed an Ci#y
5 Project No, 1U2875. Contractor iurther certifiies that, pursuant to Texas Lahor Cade, Sectian
fi 406.09fitbj, as arnended, it wiil pro�ide ta City its subcontra�tnr's certificates af campEiance with
7 worker's campensatian �a�erage.
8 CONT�tACT�R:
�
�a
it
12
13
14
15
15
17
ZS
19
20
21
�2
23
za
25
Z6
27
28
29
30
31
�z
33
34
3S
36
j 'A .I �`r,
Inde�enden# Utilitv Constr�ction. lnc. By; �'�-1 r V V ��
Company ease Printj
5��9 5un Valle Dri�e _ Signature:
Adcf ress
Fort Worth Tx 76115
CitylState/Zip
THE 5TATE OF TE}(A5 §
C�UNTY �F 7ARRAPVT §
iitl�: T� � � 1 U+ `� � �
{p�ease Printj
B�ORE�! E, the upd rsi ned a�arity, on this day persanalky appeared
__ �. �r �G�Y ��L ��' � , known to me to he the persnn whose narrte �s
subs�rihed to the foregaing instrument, nd ack nyvi.edge ❑ me that he/s�e execu#ed the
same as the act and deed ❑r � E � t e purpQses and
consideration therein expressed and iro the capacity therein stated.
�VEN UNQER �rY HA�p ANd 5EA1 F OFFICE this day of n
�.1r1'1" Y� r zo� f�, 1 1 I
a''`Yvr''. CHRISTIIVA GARCIR
� tr� .. �m's
3x;����IVetary Pu6li�, SYate af Texas
=`�'. ,'Q-` Comrrt Expires 32-20-�02d
I
r��►_
%".'FOF�,� � Notary Public in and for the 5tate ❑f Texas
•rr,,,,,�� Notary fd 13094p785
ENa OF SECTI�N
CI7Y dF FpRT WOR7H
STAI+lpARp CONSTRLlCTI(]N SPECIFICATI�IV ppCi1MENT5
Re�ised April 2, 2014
Keller {rossing Phase 1
City Proje�t Np. iD2875
005243-i
�e�elaper Awarded Proje�t Agreertsent
Page 1 of 6
1
SECTfON QQ 5Z 43
� � AGREEMEN7
r1��/�
3 TFfE5 A�REEMENT, authQrized on is made hy and between the Developer, pR.
4 Flarton-Texas, L�"R, authorized t❑ do business in Texas �"�e�eiaper"j , and Indeqendenc titilitv
5 Construction Inc, authvrized to dn business in Texas, acting by and through its duEy authorized
6 representati�e, ["Cor�tractnr"j.
7 De�eloper and Contra�tor, in eonsideration af the mutual co�enants hereinafter set fnrth, agree
8 as failaws:
9 Arti�le 1. WORK
1� Contractor shall compiete all Wark as specified ar indicated in the Contract D�cuments f4r the
11 Projett identified hsrein.
1Z Article 2. PROJECT
13 The project for which the Work under the Cantrart ❑o�uments may 6e the wh�le ❑r only a part
14 is generally described as fnll�ws:
1S KELLER CR0551NG PHASE 1
16 City Praiect No. 1U2875
17 Article 3. CONTRACT TfME
18 3.1 iime is of the essen�e.
19 All time limits for Milestanes, if any, and Finai Acceptance as stated in the Cantract
2� D��urnents are af the essence to this Contract,
2]. 3.2 Final Acceptance.
22 ihe Work will be complete for Final Acceptance within {�j warking days after the
23 date when the Cantratt 7ime cammences t❑ run as pra�ided in Paragraph 12.�4 ❑f the
24 5#andard City Conditinns of the Constructian Contract fvr [Je►►eloper Awarded Projects.
25 3.3 Liquidated damages
26 Cantract�r recognizes that time is of the essence of this Agreement and that De�eioper
27 will su#fer financial Eoss if the Wor�C i� nat �ompleted within the times specified in
28 Paragraph 3.Z af�ove, plus any extension ther�of allowed in accardance with Article lE3
Z9 of the 5tandarc! City Canditions of the Construction Cvntra�t for ❑e�eloper Awarded
30 Prajects. The Cantractor aks� reeagnizes the delays, expense and diffrculties in�ol�ed in
CITY pF �ORT WORTH Keller Crnssing Phase 1
5TAIYE}ARp CpNSTRlJL74ON SPECIFfCATIOM paCL1MENT5— DEVEEpPER AWARQE� PRpJECTS CiYy Project No. 102875
Re�ised June 16, 2016
005243-2
�e�elaper Awarded Froject Agreement
Page2of5
31
32
33
34
35
36
pro�ing in a legal proceeding the a�tua! loss suf#ered by tF►e C]eveinper if the Work is not
completed Qn time. Ac�ardRngly, instead af requiri�g any such praof , Contractor agrees
that as [iquidated damages fQr delay {but not as a penaltyf, Caniractor shaE! pay
De�el4per �Jne Thnusand �olfars [$T,400.a0j fnr ea�h day that expires after the time
specified in Paragraph 3.� for Final Acceptan�e until the City issues the Final Letter nf
Acceptance.
37 Artitle 4. CdNTRACT PRICE
38 De�eE�per agrees ta pay Cnntractar far perfnrmanee af the Work 3n accordance with the
39 Cantract ❑acuments an amnunt in current funds of Se�en -IVine Thousand, Three FEundred
40 Ei ht -Fi�e Dollars ancf 5ixt Cents ($79 385.50 .
41 Arti�le 5. C�NTRACT D�CUMENTS
42
43
44
45
46
5.3 CONTENTS:
A. The Contract �oeuments which comprise the entire agreement between aeveloper
and Cantractor concerning the Wnrk �onsist of the foEiowing:
1. This Agreement.
2. Attachments to this Agreement:
47 a. Bid Farm �As pra�ided hy De�eloperj
48 Ij Proaasal Form (DAP Versionj
49 2j Prequalification 5tatement
50 3j 5tate and Federal dacuments jprojert sAec+fi�J
51
52
b. insurance ACORA Form{s]
c. Payment Band �DAP Versiony
53 d. Perf�rmance Band (�AP Versionj
54 e. Maintenance 6ar�d �DAP Versionj
55 f. Power af Attorney for the Bnnds
56
57
58
59
g. Warke�'s Compensation Affidavi#
h. MBf and�or 56E Commitment Fnrm �If required]
3. Standard City Generai Conditians af the Cons#ru�tion Contract for Developer
Awarded Praje�ts.
ci�r oF FORT woRr+�
STAN�AR6 CdIdSTRL1CFIQN SPEClFfCATION DpCUMENTS — DEVELppER AWAR�E� PRQiECTS
Re�ised lune 15, 2d16
Kelier Crossing Phase 2
City Prp�e[t I+Eo. 1b2875
005�43 3
�e�eloper Awarded Frojeet Agreement
Rage 3 of 6
6� 4. 5upplementary Conditions.
61 S. Specifieatinns sperifiealfy made a part of the Contract Documents 6y attachment
6i or, if nat attached, as incorporated hy reference and des�ribed in the TabEe of
53 C�ntents of the Project's Con#ract pocuments.
64 fi. p�'awings.
55 7. Addenda.
..
67
68
69
7�
71
72
73
74
�5
8. aocumentation submitted by Cnntractor prinr to Noti�e of Award.
9. The follpwing which may be deli�ered or issued after the Effec#ive Date of the
Agreement and, if issued, become an in�orparated part of the Contra�t
❑o�u ments:
a. Notice t� Froceed.
b. Field Orders.
c. Change arders.
d. Letter of Final Acceptante.
CI7Y bF FpRT WQRTH Keller CrasSing Phase 1
STANpARd CQNSiRUCTIpN SPECIFlCATIqM OOCIJMEAFTS— DEVELflPER AWARpEO PR01ELT5 �ity Project No. i02$75
Re�ised lune lfi, 2Q16
D05243-R
Qevpioper Awarded Proj2tt Agreement
Page 4 of 6
76 Article f. INOEMN�FICATf�N
77 S.1 Cantrat#ar ca�enants arsd agrees ta indemnify, ho[d harmless and defend, at its awn
78 expense, the C+ty, its o�cers, servant5 and employees, frarn and agains# arey and afl
79 cfaims arisirtg aut of� or afteged t� arise aut of, the work ar�d servi�es to be perfnrrrred hy
8a the eontractor� its offi�ers, �gents, emp�oyees, subcnntractars, licenses ar invitees under
81 thRs tantract. This indemnifi�atiQn ro�isiun is s ecificall intended to o erate anrf be
82 effecti�e even if it is alle ed or r��en that ali or some �f the dama es be€n sou ht
83 ►nrere caused, in , whale or in part, 6v „an►► act, omissian or neRli�ence of the �it►r. This
84 indemnity pro�isian is intender! tv include, withaut limitation, indemnity for costs.
85 expenses and legal fees ir�curred by the ti#y in defending agains# suth claims and causes
86 of actinns.
87
88 6.2 C�n#racEar �n�enants and agrees tn indemnify and hold harmless, at its own expense,
89 the city, its officers, servants and emplQyees, #rom and against any and all loss, damage
9� �r destructivn �f praperty pf the city� arising aut af� or alleged #o arise aut of, the work
9i and servires to be perfarmed hy the cant►actor. its officers, agents, empfoyees,
92 subcontractors, licensees �r irnitees under this �antraet. ThiS indemni�tation roWisian
93 is s �ifi�all intended ta o erate and be effecti�e e►►en if it is alie ed or ra�en that all
94 or svme ot the dama es bein sou ht were caused in whole or in art h an act
95 amissian or ne !i ence of the c'r .
96
97 Articfe 7. M15CELLANEDLlS
98 7.1 Terms.
99 7erms used in this Agreement are defined in Article i of the 5tandard City Conditians nf
1U� the Cnnstruction Contrac# fnr De�elaper Awarded Projects.
101 7.2 Assignment of Contract.
102 This Agreement, incfuding alI of the Contract Dncuments may not be assigned by the
1�3 Contractor without the ad�an�ed express written consent of the Developer.
104 7.3 Successors and Assigns.
145 De�eioper and Contractar each f�inds itself, its partners, suceessors, assigns and legal
106 representatives to the other party heretv, in respect to a�l �o�enants, agreements and
107 obligatians contained in the Contract DQcuments.
CITY OF FORT WpRTH KeUer Crossing Phase 1
57ANQARfl CdNS7RUCT60N SPECIFICATION 40CUMENi5— �fVELpPER AWAR�EQ PROfEC75 City Project No. ].0�875
R2�ised June lfi, 20i6
DOS243-5
Developer Awarder} Projert Rgreement
Page 5 aF 6
�U8 7.4 5e�era�iiity.
ld9 Any provision ❑r part of ttte Contract €]ocumer�ts heid to be unconstitutinnal, ��id ar
11� unenforceable 6y a court of competent jurisdi�tion shali E�e deemed stricken, and al!
1I1 remaining pra�isions shall continue to he �alid a�d hinding upon QEVE��PER and
1Ti CONTftACT�R.
113 7.5 Go�erning l.aw and Venue.
114 This Agreement, inciuding alf of the Contract pocuments is perFormable in the 5tate of
115 Texas. Venue shail be Tarrant County, �exas, or ihe lJnited Sta#es ❑istriet Court for the
116 Northern ❑istrict of Texas, Fort Worth Oi�ision.
117
118 7.fi Authority to Sign.
119
12a
121
122
�z�
124
125
126
Cantractor shall attach e�iden�e of authority to sign Agreement� if ather t�an duly
authorized signatnry af the Cantrartor.
IN WfTNE55 WHERE�F, De�elaper and Contractor ha►►e exeeuted this Agreement in multiple
counterparts.
This Agreement is effective as of the fast date sign�d by the parti�s ("Effe�tF�e Date"j.
Contra�tar:
Independent Lltility Constructi�n, In�.
Developer:
D.R. Horton-Texas, LTp
By: gy;
,
(Signatw � �gna e)
CETY �F FpRT WORTH
STANOARp CDlVSTRl1CTIpN SPECIFfCATION RaCUMENTS— �EVELqPER AWAi�DEO PRf]JECTS
Re�ised lune 16, 2016
Reller Crossing Phase 1
City Preject fVo. i�2875
aas�a3-6
de�eloper Awarded PrvJett Agreement
127
Page f 5
� � � �� � �
� � 4.1� W
[Printed IVameJ (Printed NameJ
�itle:
1�'� � � ���? r'�1.�
Company �Vame: Independent Utility
Canstruction, knc.
Address: 51D9 5un Valley Dri�e
City�State/Zip: Fort Warth, TX 7fi�I9
_1� -_ �� � ����
Date
t���������STFi[/�'T �%�i
-��. �yG� .......,y �p� •.
.
� � : �`p ° �'��'� � �
. %o ,�,-
•o�
=FeU �� ;p=
-s% S� ;��
►a� : a�
� .•..r ��ge� ��
• o .....-•• o ���
�r'f`..�►►N� i Ar, ►`'i,.
Title:
Company �ame: D.R. Hortan-Texas. LT€l
Address: 5751 North Freeway
CitylStatel�ip: Fort Wor#h, i7[ 76131
l � �z �
❑ate
CITY pF FQiiT WflR7H
STANDAROCQIVSTRL1iTfaN SPECIFICAT101V f]OCUMEIV75— Q�IIEL�PER AWARDEp PRpJECTS
Re�ised lune i6, 2016
Kelier Crpssing PhaSe 1
City Project luo. 102875
{1�� fi I I � - I
f'[_Rf�!)Hi�fANC'C BQN❑
Page 1 nF2
Fiond Na. [ 24l $2N
�
a
3
4
5
6
7
sECTaory aa b� i3
PERFCJRMANCE BQND
THE STATE UF TE7CAS �
§ KNQW ALL SY TH�;S� PRESENTS:
COi7NTY OF TARRANT §
That we, lr�de endeni LJtilitv Constructioti. Int. , kT�o�vn as "Pri2icipal" herein and
S Westfield ]nsuranc�: Company�, a corporate surety{sureries, if more ihan ❑ne} duly
9 autlinrized to do b«siness i�� tlie 5tate of'I'exas, knQ��n as "Surety" herein {wl�etlzer one or more},
l� are I�elci and firmly hound untn tl�c De�eloper, D.R. Horton-Texas L�I'� autlioriaed ta da btisiness
1 I in Texas {"De�eloper") a��d t��e City of' Fort Worih, a Texas municipal corporatinr� ("City"}, in t�e
i2 penal suEn of, 5e�ent�-Nine Thousand, Three Hund��ed F..i �}�t �-Fi�e D�Ilars & 5ixt Cents
i 3 ��79.3$5.60� lawful rrzoney ai the Lfnited States. to 6e paid i�i Forr Wnrtii, Tarrant CQuniy. Texas
la for the payinent ❑f whi��� sum �veil and truly tn be made. jointiy unto the �e�eloper ai7d the City a,s
15 dual ohii�es, we �ind oursel�es_ our heirs, eyecutprs, administrators. s��ccess�rs and assigns,.joirltly
l5 and se�erally, firmly by tilese prese�its.
17 WHEREAS, De�eloper and �ity ha�e entcred into an Agreeinent far the constrtiction of
IS cam���unity f'acilities in the C'ity of Fort Wczrt}3 by and through a Cammuniry Fa�ilities Agreemeni,
19 CFA Number 2�-�120 ; and
20 W�EREAS, the Priricipal has eiitered inta a ce�-t��in written cnntract with the C7e�elaper
21 awarded tl�e �day of���v�I'y .?p'��, which C'ontract is l�ere�y referred to and
?? inade a part hereof for aIf pt�rposes as if fully set i'nrtl� herein. ta f'urnish all materials, equipment
23 ]abor and other accessnri�:s defined by law. in the prnsecution of t��e Wor�:, incliiding any Clzange
24 Orders, as provi�led fo�� in said Contract desi�nated as 5{�eet l.i litin [m ro�ements to ser�e Keller
25 Crassi «� Phase I .
2G itiEUW, TH�:REFORE, tf�e conditinn af tliis obligation is siicli that if the said Principal
27 slzall #'aithfully perform it o�li�atinn5 under the Contract and slzal! in all respects duly and f'aithfully
28 p�rf��rm tl�e Work. incl�idi��� t:han�e �rders. under tl�e CantraCt. according tn the plans,
29 specifications, and contract doc�Ements thereir� referred to, and as wei! d�irin� any period of
30 extension af the Contract that may be granted an the part c�Fthe �evelnper andlar City, tl�en this
31 nhli�ation sl�all he and becon�c n��il and �oid, oil�ei�wise to remain in fui� fcir-ce and effect,
C'f"iy [7f FC]R 1" 14'[]R"[ f j kcllc� L'rnssiiie I'hasc i
5I AN[)r7RC] C']7�Y (�[l?�[]I I[C7;�'S []{:G'1 1.C)PI R All'.4ftUF:f] PF�(1JCCT5 L iri Pnryrrt Nn iCi�R7i
Itc��sedJa���iar� il.?f11�
ua�i i3-z
PfRFOfLtiiANCF f3()Nr3
Pa�e ? nf ?
Bond Nr�. 124182N
I PR(]VIDEU FURTHER, that if any legal a�tian be �iled an tl�is Band, �enue sha!! lie iri
2 Tarrant Counry, �'exas ❑r the Llnited States ❑istrict Court far the Northern ❑istrict of'i'exas, Fort
3 Worth ❑i�isian.
4 This �ond is iziade and exer�rted in complian�e with the pro�isions of Chapter 2253 nf the
5 Texas Go�ernment Code, as an�ended, and all liabilities on this �o�id shall be determined in
G a�cordanCe witE� the pro�isions of said stata�e.
7 IN WIT11iF,SS WHEREUF, the Principal and the Surety ha�e SfGN�D and SEALEI] tf�is
8 instrtEmer�t by diFly authorized agents anc! o�ficers an [his ti�e J�day of ��'+� . 2��
9
10
11
t2
13
14
]i
��
r�
I8
14
20
21
�2
��
24
25
2b
��
�g
29
3i]
31
32
33
34
35
3G
_3 7
38
AT--rEST:
r
( rin ipal} cretary
�
itness as to Principal
r
�
� -�
Witness as to 5urety Gaia Harris
PRINCIAAI_:
I�iDE��'F�QENT U'1"�LfTY
C'(7N5T 1Qti. [TvC.
J --
8Y:
Signature
Richard W'o1Fe President
Tvame and Title
Address: 5t09 5un Valiey pri�e
Fart WorEh, i'exas 7G1 19
SLIR�.TY:
V4'F,STFlEL❑ 11VSt]RA�CE CDMPANY
F3�r:C��i.�.� ��.t, T I � 7
5ignature
Elizabeth Gra Aitvrne -in-Fact
Nan�e and Title
Address: 555 Re ublic �ri�e S�ite 45U
Plan❑ Texas 75074
-f elephorye Numt�er: 97?-5 IG-2b��
i4
�U �Nate: lf signed hy aii nff�ce�� o!'the Surety Coi�ipany, tlzere musk be on file a �ertifed extract
41 frnm the b�•-la�vs sl�owing that this person has a�3ttzariiy tn stgn su�h nh�igatic�n. lf
42 Surety's physiral addr�ss is differenr fram its Fnailing adr�ress, bath must be pra�ideci.
43 Thc dace of tl�e bond s]�a�I not hc �riar ta the date the Cantract is awarded.
C'I i�' Q� f=llR"E V<<(]li l ll f�eifer i'rnssi3i� I'has� 1
S IANf7AR[7 C'� I Y C[7�1]fZ l[)NS — U1:Vl[1.C3Y�R �lu'AftI)I.E] f'Ri}.IF"['i"ti L'ii� t'roicrt No. ]u2k7�
Rr.•ixd Janu:rn i 1. 3111?
(]i}fi! k� - I
PAY?�9�NTRC]NI]
Pae� 1 n� ?
Bond No. 124182N
[
7
3
4
S
6
THE STATE UF TF,xA�
CUUNTY ❑F TARRA�VT
s�criorr aa �z z4
PAYME�iT BCJND
�
§ KNOW AL�, SY THESE PRESEN'TS:
§
7 That we. Inde endent Litilii Constni�tion lnc. , known as --�rincipal" Iierein.
8 and Westtie�d lnsurance iC:om�any , a corporate surety [or sureties if more ihan
9 one], duly authnriced to dn husiness in the 5tate of"7'exas, known as "Surety" E�er�iiz {w�iether one
1� or Fnnr-e}. are held and tirmly boiind untn the Qe�eFvper ❑.R. Horton-Texas, LT�, authorized t❑
i 1 do business iEi Texas ("Qev�ioper'�}, and t�1e Citr af }�ort Wc�rcl�. a Texas mt�nic€pal corparatian
12 ("Ciry"), in tiie penal su�n of Se�enty-Ni��e ']'housand, Three �-]undred Fi�y-fiir•c D�Ilars c�
13 Si,rty Cents 7t),38�.f0� IawfcEl morzey af' €he United 5tates, to he �aaid i� Fos-t Warth, Tarram
14 Cnunty. �C'exas, t'or the payment of which sizm well and truiy be madc Jointly unto the De�elnper
15 and City as dua� o�li�ees, we hind ❑ursel�es, aur heirs, exerutors, administrators, succ.essars and
!G assibns. jnintly and se��erally, firmly t�y ihese presents:
17 WHEREAS, De�elc�per and C'sty ha�e entered into an Agreement for t€ie canstructinn �f
l8 co�nm�irsity facilities in tlie City of Fort Worth, by and through a Communfty Fa�ilities
19 A�reemer�t. CFA Number . 20-012� : and
20 W�RFAS, Principal has entered into a certain written Contract with CJe�eloper.
21 a�varcled t ie � day of� rt J rc r y _,?QZ.I . N,�I��� Contract is herehy referred to and
22 made a part ��erenf-for all purposes as iifutly set fn�th #�erein, t❑ furnish all i��aterials. ec�uipn�ent.
23 Iabor and other acressories as defined by la4v, in tY�e �rose�utian ofti�e Work as pro�ided for in
?4 said Contract and desi�nated as 5treet Li htin = lrr3 ru�einents to ser��e Keller Crossir� Phase 1.
25 NDVH, THF,REFDRE, '[ HE CDNU[T[ON ❑F' TH1S d13L1GATIQN is su�h t��at if
Z5 f'rin�ipal sl}all pay all monies owing to any {and ail} payment 6nnd bene�"iciary (as defireed in
27 Chapter 2?53 c7f the '�exas Ga�ern�ner�t Code, as amended] in the prnsecution of'the Work un
�g
?g
3D
31
der t��e Cnritrart. tlien tl�is obligati�n shall he anci he�ome nuii and �oid; otherwise to remain in
f�uIl lorce and ef'fect.
Cl� l" C�i r[)N1" 11'[1N7 li I:e]€�� C'ros,n�e Pfoase I
tiTnNf7AR[) C'I"!"1' C'UNpll ICSNS — Df_VFI.OPLR ��1�'Aft!)Lf3 PR(3,IFC"]'S Cit� Prc�jrrt Nu lil?H7�
rt�� �.rd .�i111lIiIR ; i . �ui �
[][7 (�i I�S _ �
f'Al'M] iVFF3[11tf)
Paee � u€' �
I3ond No. i 24 [ 82N
�
3
4
S
G
7
x
9
1Q
11
I?
13
This �iand is made and executed in cnmplianc� with the pro�isinns ot Chapier 2253 of- th�
Texas Gn�ernmenc Code, as amended, and all fia�ilities on this band shal] 6e determined in
accordance witl� the pra�isiaris of'said statute.
IN WITNESS WHEREUF, [he Frincipal and 5urery ]za�e eac� SiGNE� and S�ALE�
tl�is instrtainent by duly aut�arixed age�ts and officers an this t�e � day of _a� �� . 2Cli(�
AT�'EST:
1
( rineipal e�reta�y
��.
itness as to Prir��ipal
A TT�;S'I�:
r� � �
(S«rety) 5c�retaiy Frank A. Carrino
•, ,-f
I � —
Witness as to S�e Gala Harris
PRINCIPA�,:
IN�EPENdE i1TIL]TY
C�NSTRt] � , 1NC.
�
BY:
5 ignatu re
Richard Wolfe. President
N�me and Titie
Address: 5109 S�in Valle Uri�e
Fort Worth 'I'exas 76 i 19
5LIRETY:
WESTFf�L� fNSL]RANCE CQM�ANY
F3Y:
Signatti
�iizat�eth Gra Attorne�-ii�-Fact
Name and Title
Address: 555 R�pri�e, 5uite 450
Plano. Texas 75074
7'elephone Number: 972-5 � 6-26pQ
ivote: If si�ned hy an affieer oithe Surety, there must be on file a certifed ehtra�t from tl�e
hylaws showing that t��is persnn has au[iiority to si�n suriz oi�ligation. 1!' Suret_y's physical
address is different f'r«m its mailin� address, bath inust he pro�ided.
'i'i�e date pf the hcmd shall not be �rior to the date t�ie Cnntract is awarded.
Eti Fl QF 5EC'i I[]14
L'!'f1 [lI f[}kTLI'C7R1fl
ST,AN1).4iil] i'I"I"Y C'DNpI"1"�[]NS — UI:V�I.()Pt:R AWARDLU PR{IJ.F.CTS
kev�sed.I.uivan 3].�(FI?
Iti eller C'rnssens� I'kaasc• 1
f �t� E'ru�cri I�� 1[I?R7�
�lI] [i? [�7 - I
h7.�IN l f�!�:Aiv(:f. ki[7N1]
pas� I n! 3
Rond Na. 124 [ 82N
l
�
3
4
5
fi
7
8
9
ro
1]
i?
THF STATF QF TEXAS
COUNTY OF TARRANT
SECT[DN 00 bZ 19
MAINTENANCE BQN❑
§
� KNQW ALL $Y THESE PRES�:NTS:
§
T�at we �nde endent Utilit Construction [nc. , known as "Princi}�al" I�erein and
Westfield insiirance Compan�, a cnrporate surety {sureties, if n3vre than nne] du�}'
a�it�itirized t�a do 6usiness in the 5tate pf Texas, know�n as "5��rety" herein (whet��er one or �nare},
are l�eld and f irmly boua�d untn the De�elaper, D.R. Hartnn-"f exas LT'U authorized to d❑
hissiness in Texas ["Develnper"} and the City of Fort Wor[l�, a Texas municipal corpai�ati�tn
13 ("Cit��"}, in tl�e sum ❑f 5e�ent �-Nine �'hot�sand_ Three Hundred Ei ht -FiWe Daliars & Si�t
f�4 Ce.r�ts $74.385.6� lawftil invney of tlie United States, t❑ be paid in Fart Wortfi. 'f an-ant Ca��ntv.
15 �e�as. For pa��rnent of-�vf}i�h sum well and truly be rnade joint�y unta tl�e Qe�elaper and t��e City
1 b as dual obligees arld their successors. Gve bind ovrsel�es, our heirs, exe�utors, adrni��istratars.
]l
18
19
?0
?I
surcessars and assi���s__jointly a:�d se�erally. #irmly �y these �resents.
WHEREAS, ❑e�elo�er and City ha�e eniered inta an �lgreement fo�� tl�e cnnstriiction of
com�nur�ity faciiities �n Fl�e City of Fort Worth by and t�irou�h a Communiry FaciliFies
A�.reeincnt. C'F11 Number 20-�12fl , and
?? W� REAS, the �rifzcipa� has entered into a certain written c�ntract with tl�e De�elo�er
23 awarded t�e� day ❑i' r/� r . 2��. whirlti Contract is Izereby ��eferred ic� arid
?� a iT�ade part herenf for all �ur�os�s as if Fully set forth herein, to furnish all s��ateriais. cquipiz�ent
�;
?b
7�
�g
�g
30
3i
;?
;3
34
lahor and otl�er accessories as defineri 6y la�v, in tF�e prnsec�ztion nf tl�e Work, includin�, any
Wnrh res�ltitz�. from a d�aly auihoriz�d Change Q��der (co�lecti�ely herein, t�se ••W'ork"j as
pra�ided for tri said Cnntra�i and desi�nated as 5treet Li htin � Im ro�ements 1❑ ser�e Keller
CI'oSsi n� t'hase I; and
WNEREAS. Principal binds itself to use such materia�s and to so �onstruct tl�e Work in
accordanc� with the plans. spee.i�catinns and Ccmiract Qoc��ments that thc Work is and wi�t
�-ernain free from defects in m�terials or �varkmanship for and during the perio�i oFtwo {2) years
afce�-the date o#�Fi�sal Ac�eptance of the Wnrk h}� the Cit}� ("Maintenancc 1'eriod"); and
C't"["Y [7F i C3R"I' W[]H"f� I ftrllrr C'ru�tiin� I'hatic f
S'1ANi]ARf] CI I'1' C[INUI"f'I[]f�ti — 17�VF! []P! R.�WAR[71.I.� PEit7.li-C'7"5 {•��� Prugcrt Nn III�R7i
Rcnud lanuan 31. �U I'_
fl[1 (�? I�] - ?
W1AIfv"I"�AiANC'E 13[lRE]
P�ge 2 ��i i
6cfnd Nn. 1�4 I 82N
[
�
3
�
5
(
7
8
9
10
il
i�
l.i
l4
15
]5
17
18
l9
�a
zr
z�
z.;
WHEREAS, Yrinripal bit�ds itse2f tq repair or rec�nstruct the Work in wh��ie or in part
upar� recei�ing notice from tl�� C]e�eloper ancilor City nf'the need therec�f at any ti�ne ���iil�in tlie
Mai��ter�ance Period.
NUW THEREFURE, the �vnditia�� af this n�ligativn is sur1� thai if Principal s[tall
remedy any defecti�e Work, fnr wliich timely notice was pro�ided hy €7e�eloper or City. Fo a
completi�n satisfactory to the City, Fhen this obFigation shall become nuEl and �oid; otl�er��ise to
remain in f�ll fQrce and effect.
PRi�V1�E�, HflWEVER, if PF�in�ipal sha[1 €ail sn t❑ repair or recor�str�rct a��r tim�!}
nn�iced defec#i�e Work, it is a�reed that lhe Ue�e[aper or City may cause an� and all su�h
defecti�e W'ork to be repair�d andlac� rccc�nstrurted with aif assoriated casis thereoF bein� bprn�
by the Principal and the 5urety under this Maintenance Qnnd; and
1'RCiVIIIED FURTHER, tf�at if any legal action be filed on this I�ond. �eT�ue sliall lie i�
Tarranl County, Texas or the LJnited 5tates ❑istrict Court For tl�e Noriktern �istrict of Texas, Foi�t
Wortii Di�isiori: and
PRDVIDED FL]RTHER, ti�at this oh[i�ation sl�alE �ie cantinuvus in natiar� and
surcessi�e recn�eries rnay he lia�i hereon for suc�essi�e breaches.
L'I I Y[]F F(7R'f W(3K f 1 i
S f A:�'l)ARf7 CITI' CC7NL7I I �t 1NS —[7FV1_I.(]f'E-R A�4'��R[}f:I] PI2[]JLC� l S
Rnvscd.�aiuian iI.?UI_'
krflrrC ri+ss�izs� Ph.�se I
Cll� f'rujrri M1u. 1[l'R7�
f 1[} f,? I�] - 3
MAIM1i l f:ItirINL'I: k3C71�iI]
f'aer3ui3
i3nnd No. ! �4 I 82N
I IlV WITNESS WHEF2EOR, the Principal and the S�irety ha�e eacl� S�GNELJ and S�:A[.F�7 t��is
2 instri�mertt by duly authoriled agents and offi�ers o�� tfiis ihe � r�ay of �E[��� ,�{]7�.
4
5
G
7
8
c�
1D
Il
I�
13
14
FS
16
17
l�,
i9
20
21
2?
23
24
7j
26
? �7
28
ag
30
31
;2
33
34
ATTES �
(Principal] 5ecretary �
'1
� • .
ness as �o Prin�ipa!
ATTEST:
�:.=a....� � �.'
[Su i e reta ,�anh A. Carrino
,
���
Witness as ta Surety ala Harris
35
36 *Note
37
38
39
�}0
41
PRINC[PAL=
]NL]EPE��'C7I� L`TILI'I-Y
CnNSTR N I'�C.
BY:
Sien ure
R'schard GVolfe, Presi�fent
!tiaine and Title
Address: �304 Sun_Va}le� ❑ri�e
Fart 1�l'ort)i. Texa; 7G I I 9
SURETY:
WESTI=IELD lNS�1R�INCE C'C}�1h.ANY
,
6 Y : � ����_.�'�.��
5i�n re
E3izaheth C;ra Atmnie�-in-Fact
�lanie and T�it[e
Address: �55 Re�ubli� ❑ri�e. Suite=iSL}
Piana Texas 7SQ7�}
Telephone l�umber: 97?-S1G-�6�D
If sign�d by an afficer oFthe 5«rety Cornpan}. tliere m��st be on tile a �crtitieci ettract
f'rom tiie 6y-laws s��owing tl�at this person has a��thor-ity la si�.�n si�ch nbli�;atian. If
5urety's pl�ysical address is different Frorn its mailin� add�ess, hot#z intist �e �r���ided,
Ti�e date of tl�e band shali riot he �rior to the date the Cantra�t is a�iard�tl.
C'I I Y Df f(]1t'f 1�1'ORTI1 kcllcr L'rnasine Phasc I
S f ANI].�R�7 C I'i'Y C[7iVi?�TI(]P!5 -- I]F V1.1.[}pl=k A�A Ai�[)[ I7 P32(}.II:(' f� C'in I'rc+je�� Nn. 1[1?R7�
Re� iud.lan�ian 31. ?Cli?
iMPo��ANr Nori�E
To obEain informafian aT make a camplaint:
You may call Wes#field fnsurance Com�any's
andlar Qhio Farmers Insurance Campat�y's
tol!-free telephane r�um6er for information or to
make a cflrr��Eai�t at:
1-8Q0-368-3597
Y�u may alsa write ta Westfie�d Ins�arance
Campa�sy andlar Ohio Farrt�ers lnsurance
Campany at:
555 Republic �ri�e, 5uite 45�}
PIanQ, Texas 75D74-88�L8
Yau may cantact the l�exas Departr�ent of
Insurance to ❑btain ir�fflrmatian on
companies, ca�erages, rights t�r camp[aints
�t:
'i -8Q�-252-3439
Yau may write the Texas �epartment a€
Insurance:
P. 0. Box 'f491�4
Austin, TX 7871 �-91 Q4
Fax: [532} 475-1�71
Web: http:llwww.tdi_s#ate.tx.us
E-mail� CansumerProteetianC�tdi.state.#x.us
PREMfUM ❑R CLAIM DISPLJTES:
5hould yQu ha�e a dispufe concern�ng your
premium or abaut a claim you should
cor�tact th� ag�nt or Westfieid Insurance
Cam{�any andlor ❑hio Farmers Insurance
Comapny firsi. ff the dispute is not �esalved,
you may con#a�t the Texas Department of
Insurance_
AT'TACH THlS NQT�GE T� Y�UR
P�LI�Y: This notice is for information flnly
and does nat become a part or canditf�n of
the attached doeurnent.
AVlSD IMP�RTANTE
Para ahiener informacion a para sameter una
que}a:
Ust�d puede Ilamar al numera de telefono gratis de
WestField Insurance Company's 1 �hio Farmers
Insurance Company's para inform��ion ❑ para
someter ur�a queja al:
1-8�Q-368-359T
Llsted tamhien pu�de escriE�ir a WeStfield Enst�rance
Company ! �hio Farmers Irtsurance Campany:
555 Republic Orive, Suite �450
Pla na, Texas 75QT4-8848
Puede �omun��arse can el Departamento de
Seguros de Texas {�ara ohtener infarmacion acerca
de campanias, coberturas, C����Ch05 D C�L1BJ�5 �I:
9-$��-252-3439
Puede escr�bir al Departamento r�e 5eguros de
Texas:
P. O. Box 149104
Austir�, TX 78714-91 �4
F�x: (512j 475-1771
Web: h�:llwww.tdi.state.tx.us
E-rnail: ConsumerProtection(c�tdi.state.tx.us
�ISPUTAS S�6RE PRIMAS 0 RECLAM�S:
5i tiene una disputa can�erniente a su prima o a�n
re�Eamo, de�e camunicarse can el agenfe o
Westfield Insurance Company 1 Dhio Farmers
Insurance Company primero. Sf no se resuefve la
disputa, �uede entances carnunicarse can el
departarr�enta �TDIj.
UNA ESTE AVI50 A SLl P�LIZA: Este a�iso es
s�ola para propasita de inforrnacian y no se
con�ierte en parte o candicion de! dacumento
adjunta.
- ---. �+ ._.__ .__ __.- . ..,..,. ,....,-..�.,. � , r...n nn r r=rc��+�v ..+rc r�rc-��•�.r i...m�u o���.xr.
General
Power
of Atto rn ey
CERTlF1�� C�PY
Westfie�d Nationa! Insurance Ca.
�hio Farmers Insurance Co.
Westfield Center, Ohi�
Knoiw AN Men 6y These Presents, That WESTFIEi.C] lNSURANC� C�N4PAMY, WESTFIEL� NATldNAL INSURANCE CDM?AMY and OH}O
FAf2N,1ERS ItJSUF2ANCE C�A+IPANY, Cprparations, hereina�ter referred to indl��dua3ly as a'Gompany" and �olle�trvely as 'Campanies," duly
organizeQ and exrsting trnder the laws of the 5tate af Dhio, and having ifs prffi�ipal ofPi�e in Westheid Center, Med�na Caunty, C7hia, pp by Ehese
pr�sents make, CansFElute and appoint
CHARLES �. $WE�HEY, MICHAEL A. SWEEHEY, KYLE W. SWEEhfEY, ELIZA6EFH GRAY, JaINTLY OR SENERRLLY
ai FORT YY�RTH and State af T7( ifs true and lawfua Aitorney�s}-ia-Fact, wrth fukl pflwer and aufhprity hereby cpnferred in iFs name,
p!a[:e and stea�, to axeeute, ack�owledge and ❑eii�er any and af! bonds, re�ogruzances, undertakings, or o�her instrumersts ar contracts nf
suretysfiip- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
LIiW[TATION_ iHIS PDWER ❑F AiTORNEY CANN�T BE {JSE� T� ERECUiE NqTE GUARANTEE, M�RTGAGE OEFICIENGY, MpRTGAG�
GUARANTEE, aR BANK �EPaSITORY BpNdS.
and io bind any oi the Companies [hereby as fuily and Fo the sams exfea�i as if such bonds were signed by the Pres�dent, se.ated wat� the �arporate
seal of the applacaple C.t�mpany and duly attes[ed py its Secre[ary, herehy rafifying and confirming all that the said Attnrney[s}-in-Fa�t may dv in
the preml5es. Saip appv�nlmEnt is made under a�d by aufhority ❑f F�e follawing resvlution adapied by the Baartl Of DireGFors of eaGh ot tne
WESTFI�LD Ih(SIiRANCE CDMPANY, WESTFIEL� NATIdNAL lI�SURAIVCE CDAAPANY and L]tii� FAFtMERS INSURANCE COMPANY:
"6e 1i Resolved, that the President, any Senivr Executi�e, any SeGratary vr any Fidelity & 5urety �perations Executi�e ar ather �xe�utiveshall
be and is heret]y vested with full power and �uthority tO appoint any one or more suitable persarls as At[Orney(s]-in-Fact ta represenf and act €Or
and on behalf of tfle Company suk�jeC! ta [he fol3pwing prvvssiQf'is'
7he At[brney-+n-Fact. rrlay be given full power and author�ty For and in the name pf arta on 6ehaif oF the Campany, to execute, acknowleCge and
dali�er, any aracf ali bonds, recognizances, contrads, agrerrments oF indemnrty and vther conditiona! or ohligatory undertakmgs and any and all
nptices and documen[s ca�cefing or terminating the Compar�y's lia�ility thereunder, and any su�h instruments so executed py ar�y such
Attvrnay-in-Fact shall �e as bin�ing upon the Cnmparty as if signed by the Presideni and sealed anp attested t�y the Cor�ibrate Secretary.'
"6e it Further Resa�ve^ar, that the sfgnature af any such designafed person and the sea[ pf the Compaay haretoTore or hereafte� affixed to any
power of attorney or any cer[ificate relating thereto by iacsimite, anp any pvvver nf attvrney ar certificate �earing fa�s�mEle sigr�atures or facsimile
Sea! sha�l be �alid and hinding upon the Company With respeGt to any bon0 ar undertaking [o WhiCh it is afiacheG." (�ach adqpteG a[ a mee[iRg
held an Fetaruary S, 2�qj.
fn Witness Nlhereof, W£S7FIELD INSURAMCE CpMPANY, WESiFIELt} HATEQNA� INSURANCE COMPA�iY and L1Hf� FARAAERS IMSURANGE
CdMPANY ha�e cattsed fhese presents to be signed hy their 5enivr Escecati�e and tfieir r,arporate seals to be hereto affixed tnis 24lF� day of
APR#L R.L}., 2ptt .
Corpara[e ����� �
Sea� s Q�..�--•.. _Ctp �
Alfixed �rri �' � [r 1
� M � +�/As�,L s a
} ��l'+ 'ti� � ��.�J
� ��...� �
State of Ohia �"""-
County ar Medina ss__
••;�yP-��ON����L ��'.
: �'; '�r •sri�y �
;� �7�' �, .p _
• k
P�WER N0. 4220052 Dfi
W�estfield Insurance Co.
�:, 184g ;
+ ••�-- '•
WESTFIELD {NSURANCE COMPANY
WESTfIELfl NATIONAL INSURANCE GQMPAHY
DHIQ FARMEf2S E�fSkJFiAhlC� COMPAMY
� ` _ .
8�/.
Richard L. Kinnaird, Jr., Nativaaf 5urety teader and
5errior Ex�cufi�e
On this 20ih day of RPRfI. P�O., 2a77 oeFore ma personaliy rzme Richard L. Kinnaird, Jr. tn me known, who, being by me duly
sworn, did depose and say, that ha resides In Medina, ❑hio; that he is 5eniof �xeCUtiYe of WESTFIEL£1 lMSURANCE CDMPANY, WESTFfELp
MA7IDNAL INSURANCE COMPANY and pHip FARMERS 1NSURANCE GdlNPANY, the companies descrihed in and whir.F► execute0 the ahave
instrument; that he knaws the seals vf said Companies; that the seals affix� to said instrument are such ovrporate seafs; that they were sfl affixed
by flrder af the 6oards of Directors of said Campanies; and tt�rat he signed his name thereto Gy like order.
Nvtarial
��ed ,iPR � � �
Q.: -1�i��!/� �
Z•�:A-r r
• ll��liam J. iCahelin, A rney at Law, lYotary Publi�
State of Dhia �� ��p My Commission Does Not Expire (Sec. 547.03 �hio Re�ised Coda}
County Qf Meclina ss._ � .t+
�ti,.4, TE p � � .fi'
I, Frank A. Garrinv, S�cretary Qf WESTFIELD I.NSURAi�GE COMPANY, W�STF[ELEI NAT[�MAL 1NSifRANCE C�MPANY artd �HiO FAft�lERS
INSIJRANCE GOl�.4PANY, da herehy �ertify that the abo�e and Fnregoing is a true and carrect cvpy �f a Power of Attorney, executed by sat�
Companies, whi�h is stili in full iorce and effe.G; and fur�hermore, the resalutivns af the Boards of �ire�tvrs, set out in She Pawer of Attarney are
in fulf force and eifect.
1►+ Witr+ess Whereof, l Feave hareunto set my hand and affixed the seals oi said Cvrnpar?i�s at WestfielC Center, Ohio, this day af
���y�c
�o,�•'" � "•tiA�
.�
l� r ;O
f N = ��.�,�, : �
;�e ��'
��� ��� ��
vd P�`��� ,�s�� -
:�.; ,p�j
; �,; SEAL �� �
�' 'a,
•-� -
l���j �' ��"r�,� y��� � �
. � ��� �� �
` ; a _ f .Srrrarerp
s; le4B .z=
� ., _ � _ ; •* : Frank A. Carrino, 5er,retary
BP�AC2 [cvrt�6ined] (a5-�2)
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
STANDARD CITY CONDITIONS
OF THE CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
TABLE OF CONTENTS
Page
Article 1 – Definitions and Terminology .......................................................................................................... 1
1.01 Defined Terms ............................................................................................................................... 1
1.02 Terminology .................................................................................................................................. 5
Article 2 – Preliminary Matters ......................................................................................................................... 6
2.01 Before Starting Construction ........................................................................................................ 6
2.02 Preconstruction Conference .......................................................................................................... 6
2.03 Public Meeting .............................................................................................................................. 6
Article 3 – Contract Documents and Amending ............................................................................................... 6
3.01 Reference Standards ..................................................................................................................... 6
3.02 Amending and Supplementing Contract Documents .................................................................. 6
Article 4 – Bonds and Insurance ....................................................................................................................... 7
4.01 Licensed Sureties and Insurers ..................................................................................................... 7
4.02 Performance, Payment, and Maintenance Bonds ........................................................................ 7
4.03 Certificates of Insurance ............................................................................................................... 7
4.04 Contractor’s Insurance .................................................................................................................. 9
4.05 Acceptance of Bonds and Insurance; Option to Replace ........................................................... 12
Article 5 – Contractor’s Responsibilities ........................................................................................................ 12
5.01 Supervision and Superintendent ................................................................................................. 12
5.02 Labor; Working Hours ................................................................................................................ 13
5.03 Services, Materials, and Equipment ........................................................................................... 13
5.04 Project Schedule .......................................................................................................................... 14
5.05 Substitutes and “Or-Equals” ....................................................................................................... 14
5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) ..................................... 16
5.07 Concerning Subcontractors, Suppliers, and Others ................................................................... 16
5.08 Wage Rates.................................................................................................................................. 18
5.09 Patent Fees and Royalties ........................................................................................................... 19
5.10 Laws and Regulations ................................................................................................................. 19
5.11 Use of Site and Other Areas ....................................................................................................... 19
5.12 Record Documents ...................................................................................................................... 20
5.13 Safety and Protection .................................................................................................................. 21
5.14 Safety Representative ................................................................................................................. 21
5.15 Hazard Communication Programs ............................................................................................. 22
5.16 Submittals .................................................................................................................................... 22
5.17 Contractor’s General Warranty and Guarantee .......................................................................... 23
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
5.18 Indemnification ........................................................................................................................... 24
5.19 Delegation of Professional Design Services .............................................................................. 24
5.20 Right to Audit: ............................................................................................................................ 25
5.21 Nondiscrimination....................................................................................................................... 25
Article 6 – Other Work at the Site ................................................................................................................... 26
6.01 Related Work at Site ................................................................................................................... 26
Article 7 – City’s Responsibilities................................................................................................................... 26
7.01 Inspections, Tests, and Approvals .............................................................................................. 26
7.02 Limitations on City’s Responsibilities ....................................................................................... 26
7.03 Compliance with Safety Program ............................................................................................... 27
Article 8 – City’s Observation Status During Construction ........................................................................... 27
8.01 City’s Project Representative ..................................................................................................... 27
8.02 Authorized Variations in Work .................................................................................................. 27
8.03 Rejecting Defective Work .......................................................................................................... 27
8.04 Determinations for Work Performed .......................................................................................... 28
Article 9 – Changes in the Work ..................................................................................................................... 28
9.01 Authorized Changes in the Work ............................................................................................... 28
9.02 Notification to Surety .................................................................................................................. 28
Article 10 – Change of Contract Price; Change of Contract Time ................................................................ 28
10.01 Change of Contract Price ............................................................................................................ 28
10.02 Change of Contract Time............................................................................................................ 28
10.03 Delays .......................................................................................................................................... 28
Article 11 – Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 29
11.01 Notice of Defects ........................................................................................................................ 29
11.02 Access to Work ........................................................................................................................... 29
11.03 Tests and Inspections .................................................................................................................. 29
11.04 Uncovering Work ....................................................................................................................... 30
11.05 City May Stop the Work ............................................................................................................. 30
11.06 Correction or Removal of Defective Work ................................................................................ 30
11.07 Correction Period ........................................................................................................................ 30
11.08 City May Correct Defective Work ............................................................................................. 31
Article 12 – Completion .................................................................................................................................. 32
12.01 Contractor’s Warranty of Title ................................................................................................... 32
12.02 Partial Utilization ........................................................................................................................ 32
12.03 Final Inspection ........................................................................................................................... 32
12.04 Final Acceptance ......................................................................................................................... 33
Article 13 – Suspension of Work .................................................................................................................... 33
13.01 City May Suspend Work ............................................................................................................ 33
Article 14 – Miscellaneous .............................................................................................................................. 34
14.01 Giving Notice .............................................................................................................................. 34
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
14.02 Computation of Times ................................................................................................................ 34
14.03 Cumulative Remedies ................................................................................................................. 34
14.04 Survival of Obligations ............................................................................................................... 35
14.05 Headings ...................................................................................................................................... 35
00 73 10- 1
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 1 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
ARTICLE 1 – DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed-defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
1. Agreement - The written instrument which is evidence of the agreement between Developer
and Contractor covering the Work
2. Asbestos—Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
3. Business Day – A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
4. Buzzsaw – City’s on-line, electronic document management and collaboration system.
5. Calendar Day – A day consisting of 24 hours measured from midnight to the next midnight.
6. City— The City of Fort Worth, Texas, a Texas home-rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
7. Community Facilities Agreement (CFA) -–A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs.
A CFA may include private facilities within the right-of-way dedicated as private right-of-
way or easement on a recorded plat.
8. Contract—The entire and integrated written document incorporating the Contract
Documents between the Developer, Contractor, and/or City concerning the Work. The
Contract supersedes prior negotiations, representations, or agreements, whether written or
oral.
9. Contract Documents—Those items that make up the contract and which must include the
Agreement, and it’s attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
a. An Agreement
00 73 10- 2
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 2 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
b. Attachments to the Agreement
i. Bid Form
ii. Vendor Compliance with State Law Non-Resident Bidder
iii. Prequalification Statement
c. Current Prevailing Wage Rates Table (if required by City)
d. Insurance Accord Form
e. Payment Bond
f. Performance Bond
g. Maintenance Bond
h. Power of Attorney for Bonds
i. Workers Compensation Affidavit
j. MWBE Commitment Form( If required by City)
k. General Conditions
l. Supplementary Conditions
m. The Standard City Conditions
n. Specifications specifically made part of the Contract Documents by attachment, if
not attached, as incorporated by reference and described in the Table of Contents of
the Project’s Contract Documents
o. Drawings
p. Documentation submitted by contractor prior to Notice of Award.
q. The following which may be delivered or issued after the effective date if the
Agreement and, if issued become an incorporated part of the Contract Documents
i. Notice to Proceed
ii. Field Orders
iii. Change Orders
iv. Letters of Final Acceptance
r. Approved Submittals, other Contractor submittals, and the reports and drawings of
subsurface and physical conditions are not Contract Documents.
10. Contractor—The individual or entity with whom Developer has entered into the Agreement.
11. Day or day – A day, unless otherwise defined, shall mean a Calendar Day.
12. Developer – An individual or entity that desires to make certain improvements within the
City of Fort Worth
13. Drawings—That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Submittals are not Drawings as so defined.
14. Engineer—The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
15. Final Acceptance – The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
00 73 10- 3
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 3 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
16. Final Inspection – Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
17. General Requirements—A part of the Contract Documents between the Developer and a
Contractor.
18. Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
19. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
20. Milestone—A principal event specified in the Contract Documents relating to an
intermediate Contract Time prior to Final Acceptance of the Work.
21. Non-Participating Change Order—A document, which is prepared for and reviewed by the
City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
22. Participating Change Order—A document, which is prepared for and approved by the City,
which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
23. Plans – See definition of Drawings.
24. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor’s plan to accomplish the Work within the Contract Time.
25. Project—The Work to be performed under the Contract Documents.
26. Project Representative—The authorized representative of the City who will be assigned to
the Site.
27. Public Meeting – An announced meeting conducted by the Developer to facilitate public
participation and to assist the public in gaining an informed view of the Project.
28. Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding legal holidays).
29. Samples—Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
00 73 10- 4
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 4 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
30. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
31. Site—Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights-of-way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
32. Specifications—That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto.
Specifications may be specifically made a part of the Contract Documents by attachment or,
if not attached, may be incorporated by reference as indicated in the Table of Contents
(Division 00 00 00) of each Project.
33. Standard City Conditions – That part of the Contract Documents setting forth requirements
of the City.
34. Subcontractor—An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of a part of the Work at the Site.
35. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
36. Superintendent – The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
37. Supplementary Conditions—That part of the Contract Documents which amends or
supplements the General Conditions.
38. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having
a direct contract with Contractor or with any Subcontractor to furnish materials or
equipment to be incorporated in the Work by Contractor or Subcontractor.
39. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including but not limited to, those that convey
electricity, gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or
other control systems.
40. Weekend Working Hours – Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
00 73 10- 5
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 5 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
41. Work—The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non-Participating Change Order, or Field
Order, and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
42. Working Day – A working day is defined as a day, not including Saturdays, Sundays, or
legal holidays authorized by the City for contract purposes, in which weather or other
conditions not under the control of the Contractor will permit the performance of the
principal unit of work underway for a continuous period of not less than 7 hours between 7
a.m. and 6 p.m.
1.02 Terminology
A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Defective:
1. The word “defective,” when modifying the word “Work,” refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City’s written acceptance.
C. Furnish, Install, Perform, Provide:
1. The word “Furnish” or the word “Install” or the word “Perform” or the word “Provide” or
the word “Supply,” or any combination or similar directive or usage thereof, shall mean
furnishing and incorporating in the Work including all necessary labor, materials, equipment,
and everything necessary to perform the Work indicated, unless specifically limited in the
context used.
D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
00 73 10- 6
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 6 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
ARTICLE 2 – PRELIMINARY MATTERS
2.01 Before Starting Construction
Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting
the Work. New schedules will be submitted to City when Participating Change Orders or Non-
Participating Change Orders occur.
2.02 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.03 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
ARTICLE 3 – CONTRACT DOCUMENTS AND AMENDING
3.01 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision or instruction shall be effective to assign to City, or any of its officers,
directors, members, partners, employees, agents, consultants, or subcontractors, any duty or
authority to supervise or direct the performance of the Work or any duty or authority to
undertake responsibility inconsistent with the provisions of the Contract Documents.
3.02 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Work or to modify the terms and conditions thereof by a Participating Change Order or a
Non-Participating Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
00 73 10- 7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 7 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
1. City’s or Engineer’s review of a Submittal (subject to the provisions of Paragraph 5.16.C); or
2. City’s written interpretation or clarification.
ARTICLE 4 – BONDS AND INSURANCE
4.01 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverage so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided Section 4.04.
4.02 Performance, Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in
accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount
equal to the Contract Price as security for the faithful performance and payment of all of
Contractor’s obligations under the Contract Documents.
B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount
equal to the Contract Price as security to protect the City against any defects in any portion of the
Work described in the Contract Documents. Maintenance bonds shall remain in effect for two
(2) years after the date of Final Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney-in-fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 4.01 and 4.02.C.
4.03 Certificates of Insurance
Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee
identified in these Standard City Conditions certificates of insurance (and other evidence of
insurance requested by City or any other additional insured) which Contractor is required to
purchase and maintain.
00 73 10- 8
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 8 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
1. The certificate of insurance shall document the City, an as “Additional Insured” on all
liability policies.
2. The Contractor’s general liability insurance shall include a, “per project” or “per location”,
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers’ compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required, written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in these Standard City
Conditions. Failure of the City to demand such certificates or other evidence of full
compliance with the insurance requirements or failure of the City to identify a deficiency
from evidence that is provided shall not be construed as a waiver of Contractor’s obligation
to maintain such lines of insurance coverage.
6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
7. Unless otherwise stated, all required insurance shall be written on the “occurrence basis”. If
coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims-made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
9. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
00 73 10- 9
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 9 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first-dollar basis, must be acceptable to and approved by the City.
11. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage’s and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Order.
12. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either party or the underwriter on any such policies.
13. City shall not be responsible for the direct payment of insurance premium costs for
Contractor’s insurance.
4.04 Contractor’s Insurance
A. Workers Compensation and Employers’ Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers’
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers’ Liability as is appropriate for the Work being performed and as will provide
protection from claims set forth below which may arise out of or result from Contractor’s
performance of the Work and Contractor’s other obligations under the Contract Documents,
whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts
any of them may be liable:
1. claims under workers’ compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor’s employees.
3. The limits of liability for the insurance shall provide the following coverages for not less
than the following amounts or greater where required by Laws and Regulations
a. Statutory limits
b. Employer's liability
00 73 10- 10
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 10 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
1) $100,000 each accident/occurrence
2) $100,000 Disease - each employee
3) $500,000 Disease - policy limit
B. Commercial General Liability. Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance
Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the City. The Commercial General
Liability policy, shall have no exclusions by endorsements that would alter of nullify
premises/operations, products/completed operations, contractual, personal injury, or advertising
injury, which are normally contained with the policy, unless the City approves such exclusions
in writing.
1. For construction projects that present a substantial completed operation exposure, the City
may require the contractor to maintain completed operations coverage for a minimum of no
less than three (3) years following the completion of the project
2. Contractor's Liability Insurance under this Section which shall be on a per project basis
covering the Contractor with minimum limits of:
a. $1,000,000 each occurrence
b. $2,000,000 aggregate limit
3. The policy must have an endorsement (Amendment – Aggregate Limits of Insurance)
making the General Aggregate Limits apply separately to each job site.
4. The Commercial General Liability Insurance policies shall provide “X”, “C”, and “U”
coverage’s. Verification of such coverage must be shown in the Remarks Article of the
Certificate of Insurance.
C. Automobile Liability. A commercial business auto policy shall provide coverage on “any auto”,
defined as autos owned, hired and non-owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
1. Automobile Liability, Contractor’s Liability Insurance under this Section, which shall be in
an amount not less than the following amounts:
a. Automobile Liability - a commercial business policy shall provide coverage on "Any
Auto", defined as autos owned, hired and non-owned.
00 73 10- 11
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 11 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
1) $1,000,000 each accident on a combined single limit basis. Split limits are
acceptable if limits are at least:
2) $250,000 Bodily Injury per person
3) $500,000 Bodily Injury per accident /
4) $100,000 Property Damage
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-of-way, the Contractor shall comply with the following requirements:
1. The Contractor’s construction activities will require its employees, agents, subcontractors,
equipment, and material deliveries to cross railroad properties and tracks owned and
operated by: ____________________________________________________________
Write the name of the railroad company. (If none, then write none)
2. The Contractor shall conduct its operations on railroad properties in such a manner as not to
interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use
or operation of its/their trains or other property. Such operations on railroad properties may
require that Contractor to execute a “Right of Entry Agreement” with the particular railroad
company or companies involved, and to this end the Contractor should satisfy itself as to the
requirements of each railroad company and be prepared to execute the right-of-entry (if any)
required by a railroad company. The requirements specified herein likewise relate to the
Contractor’s use of private and/or construction access roads crossing said railroad company’s
properties.
3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions
shall provide coverage for not less than the following amounts, issued by companies
satisfactory to the City and to the Railroad Company for a term that continues for so long as
the Contractor’s operations and work cross, occupy, or touch railroad property:
a. General Aggregate: _____________________________________
Enter limits provided by Railroad Company (If none, write none)
b. Each Occurrence: : _____________________________________
Enter limits provided by Railroad Company (If none, write none)
4. With respect to the above outlined insurance requirements, the following shall govern:
a. Where a single railroad company is involved, the Contractor shall provide one insurance
policy in the name of the railroad company. However, if more than one grade separation
or at-grade crossing is affected by the Project at entirely separate locations on the line or
lines of the same railroad company, separate coverage may be required, each in the
amount stated above.
b. Where more than one railroad company is operating on the same right-of-way or where
several railroad companies are involved and operated on their own separate rights-of-
00 73 10- 12
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 12 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
way, the Contractor may be required to provide separate insurance policies in the name
of each railroad company.
c. If, in addition to a grade separation or an at-grade crossing, other work or activity is
proposed on a railroad company’s right-of-way at a location entirely separate from the
grade separation or at-grade crossing, insurance coverage for this work must be included
in the policy covering the grade separation.
d. If no grade separation is involved but other work is proposed on a railroad company’s
right-of-way, all such other work may be covered in a single policy for that railroad, even
though the work may be at two or more separate locations.
5. No work or activities on a railroad company’s property to be performed by the Contractor
shall be commenced until the Contractor has furnished the City with an original policy or
policies of the insurance for each railroad company named, as required above. All such
insurance must be approved by the City and each affected Railroad Company prior to the
Contractor’s beginning work.
6. The insurance specified above must be carried until all Work to be performed on the railroad
right-of-way has been completed and the grade crossing, if any, is no longer used by the
Contractor. In addition, insurance must be carried during all maintenance and/or repair work
performed in the railroad right-of-way. Such insurance must name the railroad company as
the insured, together with any tenant or lessee of the railroad company operating over tracks
involved in the Project.
E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractor shall stop work until replacement insurance has
been procured. There shall be no time credit for days not worked pursuant to this section.
4.05 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the Developer and City shall so notify the
Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence
requested). Contractor shall provide to the City such additional information in respect of insurance
provided as the Developer or City may reasonably request. If Contractor does not purchase or
maintain all of the bonds and insurance required by the Contract Documents, the Developer or City
shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure
to maintain prior to any change in the required coverage.
ARTICLE 5 – CONTRACTOR’S RESPONSIBILITIES
5.01 Supervision and Superintendent
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
00 73 10- 13
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 13 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor’s representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
5.02 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City’s written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perform Work:
1. for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
5.03 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary
facilities, temporary facilities, and all other facilities and incidentals necessary for the
performance, Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
00 73 10- 14
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 14 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
5.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01
and the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and
the General Requirements) proposed adjustments in the Project Schedule.
2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 9. Adjustments in Contract Time
for projects with City participation shall be made by participating change orders.
5.05 Substitutes and “Or-Equals”
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no like, equivalent,
or “or-equal” item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
1. “Or-Equal” Items: If in City’s sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an “or-equal” item, in which
case review and approval of the proposed item may, in City’s sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
00 73 10- 15
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 15 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitute Items:
a. If in City’s sole discretion an item of material or equipment proposed by Contractor does
not qualify as an “or-equal” item under Paragraph 5.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 01 25 00 and:
1) shall certify that the proposed substitute item will:
i. perform adequately the functions and achieve the results called for by the general
design;
ii. be similar in substance to that specified;
iii. be suited to the same use as that specified; and
2) will state:
i. the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor’s achievement of final completion on time;
ii. whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
iii. whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
i. all variations of the proposed substitute item from that specified;
ii. available engineering, sales, maintenance, repair, and replacement services; and
00 73 10- 16
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 16 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City’s sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written application to City for
review in the same manner as those provided in Paragraph 5.05.A.2.
C. City’s Evaluation: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require
Contractor to furnish additional data about the proposed substitute. City will be the sole judge of
acceptability. No “or-equal” or substitute will be ordered, installed or utilized until City’s review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an “or-equal.” City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor’s expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
E. City’s Cost Reimbursement: City will record City’s costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents.
F. Contractor’s Expense: Contractor shall provide all data in support of any proposed substitute or
“or-equal” at Contractor’s expense.
G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Participating Change Order.
5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors)
A. The Contractor and any subcontractors are required to be prequalified for the work types
requiring pre-qualification
5.07 Concerning Subcontractors, Suppliers, and Others
A. Minority and Women Owned Business Enterprise Compliance:
00 73 10- 17
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 17 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
Required for this Contract.
(Check this box if there is any City Participation)
Not Required for this Contract.
It is City policy to ensure the full and equitable participation by Minority and Women Business
Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the
Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent
of the City’s MWBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MWBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MWBE. Material misrepresentation of any nature will be grounds for
termination of the Contract. Any such misrepresentation may be grounds for disqualification
of Contractor to bid on future contracts with the City for a period of not less than three years.
B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor’s own acts and omissions. Nothing in the Contract
Documents:
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
C. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing
any of the Work shall communicate with City through Contractor.
E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract
00 73 10- 18
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 18 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
Documents, Contractor shall provide City contract numbers and reference numbers to the
Subcontractors and/or Suppliers.
5.08 Wage Rates
Required for this Contract.
Not Required for this Contract.
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Government Code (as amended), including the payment of not less than the
rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the
City’s determination that there is good cause to believe the Contractor or Subcontractor has
violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or
claimants as the difference between wages paid and wages due under the prevailing wage rates,
such amounts being subtracted from successive progress payments pending a final determination
of the violation.
D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Paragraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the 11th day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
00 73 10- 19
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 19 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258, Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
5.09 Patent Fees and Royalties
A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
the incorporation in the Work of any invention, design, process, product, or device not specified
in the Contract Documents.
5.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor’s
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws
or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor’s responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor’s obligations under Paragraph 3.01.
5.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
00 73 10- 20
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 20 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work: During the progress of the Work
Contractor shall keep the Site and other areas free from accumulations of waste materials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.
C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the
Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as
the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the
written notice (by letter or electronic communication), and shall be entitled to recover its cost in
doing so. The City may withhold Final Acceptance until clean-up is complete and cost are
recovered.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
5.12 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor
and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated
to show changes made during construction. These record documents together with all approved
00 73 10- 21
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 21 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Work, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
5.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City’s safety programs, if any.
D. Contractor shall inform City of the specific requirements of Contractor’s safety program, if any,
with which City’s employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor’s duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
5.14 Safety Representative
Contractor shall inform City in writing of Contractor’s designated safety representative at the Site.
00 73 10- 22
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 22 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
5.15 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or
among employers in accordance with Laws or Regulations.
5.16 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal
will be identified as required by City.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 5.16.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For-Information-Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 5.16.C.
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City’s review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City’s Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City’s review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole as indicated by the Contract
Documents.
00 73 10- 23
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 23 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
2. City’s review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident thereto. The review and
acceptance of a separate item as such will not indicate approval of the assembly in which the
item functions.
3. City’s review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City’s review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
5.17 Contractor’s General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor’s warranty and guarantee.
B. Contractor’s warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible; or
2. normal wear and tear under normal usage.
C. Contractor’s obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor’s obligation to
perform the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City or Developer of any progress or final payment;
3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
00 73 10- 24
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 24 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefrom which shall appear within a period of two (2) years
from the date of Final Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
4.02.B. The City will give notice of observed defects with reasonable promptness.
5.18 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
City, its officers, servants and employees, from and against any and all claims arising out of, or
alleged to arise out of, the work and services to be performed by the Contractor, its officers,
agents, employees, subcontractors, licenses or invitees under this Contract. THIS
INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE
AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME
OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY
ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is
intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by
the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its
officers, servants and employees, from and against any and all loss, damage or destruction of
property of the City, arising out of, or alleged to arise out of, the work and services to be
performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees
under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY
INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR
PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE
CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF
THE CITY.
5.19 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry out Contractor’s responsibilities for construction means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified
by such professional, if prepared by others, shall bear such professional’s written approval when
submitted to City.
00 73 10- 25
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 25 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 5.19, City’s review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance
and design criteria given and the design concept expressed in the Contract Documents. City’s
review and acceptance of Submittals (except design calculations and design drawings) will be
only for the purpose stated in Paragraph 5.16.C.
5.20 Right to Audit:
A. The City reserves the right to audit all projects utilizing City funds
B. The Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of the Contractor involving transactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
5.21 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit-
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national
origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
00 73 10- 26
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 26 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
ARTICLE 6 – OTHER WORK AT THE SITE
6.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City’s employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other work with City’s employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
introduction and storage of materials and equipment and the execution of such other work, and
properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of
the Work that may be required to properly connect or otherwise make its several parts come
together and properly integrate with such other work. Contractor shall not endanger any work of
others by cutting, excavating, or otherwise altering such work; provided, however, that
Contractor may cut or alter others' work with the written consent of City and the others whose
work will be affected.
C. If the proper execution or results of any part of Contractor’s Work depends upon work
performed by others under this Article 7, Contractor shall inspect such other work and promptly
report to City in writing any delays, defects, or deficiencies in such other work that render it
unavailable or unsuitable for the proper execution and results of Contractor’s Work. Contractor’s
failure to so report will constitute an acceptance of such other work as fit and proper for
integration with Contractor’s Work except for latent defects in the work provided by others.
ARTICLE 7 – CITY’S RESPONSIBILITIES
7.01 Inspections, Tests, and Approvals
City’s responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
11.03.
7.02 Limitations on City’s Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor’s means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor’s failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13.
00 73 10- 27
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 27 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
7.03 Compliance with Safety Program
While at the Site, City’s employees and representatives shall comply with the specific applicable
requirements of Contractor’s safety programs of which City has been informed pursuant to
Paragraph 5.13.
ARTICLE 8 – CITY’S OBSERVATION STATUS DURING CONSTRUCTION
8.01 City’s Project Representative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City’s representative during construction are
set forth in the Contract Documents.
A. City’s Project Representative will make visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor’s executed Work. Based on
information obtained during such visits and observations, City’s Project Representative will
determine, in general, if the Work is proceeding in accordance with the Contract Documents.
City’s Project Representative will not be required to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Work. City’s Project Representative’s efforts
will be directed toward providing City a greater degree of confidence that the completed Work
will conform generally to the Contract Documents.
B. City’s Project Representative’s visits and observations are subject to all the limitations on
authority and responsibility in the Contract Documents.
8.02 Authorized Variations in Work
City’s Project Representative may authorize minor variations in the Work from the requirements of
the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City Developer, and also on Contractor, who shall perform the Work involved promptly.
8.03 Rejecting Defective Work
City will have authority to reject Work which City’s Project Representative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or
completed.
00 73 10- 28
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 28 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
8.04 Determinations for Work Performed
Contractor will determine the actual quantities and classifications of Work performed. City’s Project
Representative will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City’s written decision will be final (except as modified to
reflect changed factual conditions or more accurate data).
ARTICLE 9 – CHANGES IN THE WORK
9.01 Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety, City may, at any time or
from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall
promptly proceed with the Work involved which will be performed under the applicable
conditions of the Contract Documents (except as otherwise specifically provided). Extra Work
shall be memorialized by a Participating Change Order which may or may not precede an order
of Extra work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a
project with City participation, a Field Order may be issued by the City.
9.02 Notification to Surety
If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notice will be Contractor’s
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effect of any such change.
ARTICLE 10 – CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
10.01 Change of Contract Price
A. The Contract Price may only be changed by a Participating Change Order for projects with City
participation.
10.02 Change of Contract Time
A. The Contract Time may only be changed by a Participating Change Order for projects with City
participation.
10.03 Delays
A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
00 73 10- 29
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 29 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
ARTICLE 11 – TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
11.01 Notice of Defects
Notice of all defective Work of which City has actual knowledge will be given to Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Article 13.
11.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and
testing. Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor’s safety procedures and programs so that they may comply therewith as applicable.
11.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certificates of
inspection or approval; excepting, however, those fees specifically identified in the
Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR)
inspections, which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re-tests, or approvals required for City’s acceptance of materials or
equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor’s purchase thereof for incorporation in the Work.
Such inspections, tests, re-tests, or approvals shall be performed by organizations approved by
City.
D. City may arrange for the services of an independent testing laboratory (“Testing Lab”) to
perform any inspections or tests (“Testing”) for any part of the Work, as determined solely by
City.
1. City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 11.03 D result in a “fail”, “did not pass” or other
similar negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor’s cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
00 73 10- 30
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 30 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the
Testing Lab by Contractor. City will forward all invoices for retests to
Developer/Contractor.
4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance
until the Testing Lab is Paid
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
11.04 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City’s observation and replaced at Contractor’s
expense.
11.05 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent
of any of them.
11.06 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has
been rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (including but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07,
Contractor shall take no action that would void or otherwise impair City’s special warranty and
guarantee, if any, on said Work.
11.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
00 73 10- 31
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 31 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available for Contractor’s use by City or permitted by Laws and Regulations as
contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City’s written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City’s written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or replacement of work of others) will be paid by Contractor.
C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 11.07, the correction period hereunder with respect
to such Work may be required to be extended for an additional period of one year after the end
of the initial correction period. City shall provide 30 days written notice to Contractor and
Developer should such additional warranty coverage be required. Contractor’s obligations under
this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this
Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any
applicable statute of limitation or repose.
11.08 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such
deficiency.
B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor’s services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
00 73 10- 32
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 32 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
stored elsewhere. Contractor shall allow City, City’s representatives, agents, consultants,
employees, and City’s other contractors, access to the Site to enable City to exercise the rights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City’s rights and remedies under this
Paragraph 11.09.
ARTICLE 12 – COMPLETION
12.01 Contractor’s Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment will pass to City no later than the time of Final Acceptance and shall be
free and clear of all Liens.
12.02 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part of the Work that can be
used by City for its intended purpose without significant interference with Contractor’s
performance of the remainder of the Work. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Work which City determines to be ready for its
intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completion. If City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
12.03 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the
Contract Documents:
00 73 10- 33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.04 Final Acceptance
A. Upon completion by Contractor to City’s satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction
of the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor’s
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 – SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will stop contract time on City
participation projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
00 73 10- 34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 – MISCELLANEOUS
14.01 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given if:
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
14.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
00 73 10- 35
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 35 of 35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
14.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
14.05 Headings
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
01 11 00 - 1
DAP SUMMARY OF WORK
Page 1 of 3
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects City Project No. 102875
Revised December 20, 2012
SECTION 01 11 00 1
SUMMARY OF WORK 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Summary of Work to be performed in accordance with the Contract Documents 6
B. Deviations from this City of Fort Worth Standard Specification 7
1. None. 8
C. Related Specification Sections include, but are not necessarily limited to: 9
1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 10
2. Division 1 - General Requirements 11
1.2 PRICE AND PAYMENT PROCEDURES 12
A. Measurement and Payment 13
1. Work associated with this Item is considered subsidiary to the various items bid. 14
No separate payment will be allowed for this Item. 15
1.3 REFERENCES [NOT USED] 16
1.4 ADMINISTRATIVE REQUIREMENTS 17
A. Work Covered by Contract Documents 18
1. Work is to include furnishing all labor, materials, and equipment, and performing 19
all Work necessary for this construction project as detailed in the Drawings and 20
Specifications. 21
B. Subsidiary Work 22
1. Any and all Work specifically governed by documentary requirements for the 23
project, such as conditions imposed by the Drawings or Contract Documents in 24
which no specific item for bid has been provided for in the Proposal and the item is 25
not a typical unit bid item included on the standard bid item list, then the item shall 26
be considered as a subsidiary item of Work, the cost of which shall be included in 27
the price bid in the Proposal for various bid items. 28
C. Use of Premises 29
1. Coordinate uses of premises under direction of the City. 30
2. Assume full responsibility for protection and safekeeping of materials and 31
equipment stored on the Site. 32
3. Use and occupy only portions of the public streets and alleys, or other public places 33
or other rights-of-way as provided for in the ordinances of the City, as shown in the 34
Contract Documents, or as may be specifically authorized in writing by the City. 35
a. A reasonable amount of tools, materials, and equipment for construction 36
purposes may be stored in such space, but no more than is necessary to avoid 37
delay in the construction operations. 38
01 11 00 - 2
DAP SUMMARY OF WORK
Page 2 of 3
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects City Project No. 102875
Revised December 20, 2012
b. Excavated and waste materials shall be stored in such a way as not to interfere 1
with the use of spaces that may be designated to be left free and unobstructed 2
and so as not to inconvenience occupants of adjacent property. 3
c. If the street is occupied by railroad tracks, the Work shall be carried on in such 4
manner as not to interfere with the operation of the railroad. 5
1) All Work shall be in accordance with railroad requirements set forth in 6
Division 0 as well as the railroad permit. 7
D. Work within Easements 8
1. Do not enter upon private property for any purpose without having previously 9
obtained permission from the owner of such property. 10
2. Do not store equipment or material on private property unless and until the 11
specified approval of the property owner has been secured in writing by the 12
Contractor and a copy furnished to the City. 13
3. Unless specifically provided otherwise, clear all rights-of-way or easements of 14
obstructions which must be removed to make possible proper prosecution of the 15
Work as a part of the project construction operations. 16
4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 17
lawns, fences, culverts, curbing, and all other types of structures or improvements, 18
to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 19
appurtenances thereof, including the construction of temporary fences and to all 20
other public or private property adjacent to the Work. 21
5. Notify the proper representatives of the owners or occupants of the public or private 22
lands of interest in lands which might be affected by the Work. 23
a. Such notice shall be made at least 48 hours in advance of the beginning of the 24
Work. 25
b. Notices shall be applicable to both public and private utility companies and any 26
corporation, company, individual, or other, either as owners or occupants, 27
whose land or interest in land might be affected by the Work. 28
c. Be responsible for all damage or injury to property of any character resulting 29
from any act, omission, neglect, or misconduct in the manner or method or 30
execution of the Work, or at any time due to defective work, material, or 31
equipment. 32
6. Fence 33
a. Restore all fences encountered and removed during construction of the Project 34
to the original or a better than original condition. 35
b. Erect temporary fencing in place of the fencing removed whenever the Work is 36
not in progress and when the site is vacated overnight, and/or at all times to 37
provide site security. 38
c. The cost for all fence work within easements, including removal, temporary 39
closures and replacement, shall be subsidiary to the various items bid in the 40
project proposal, unless a bid item is specifically provided in the proposal. 41
01 11 00 - 3
DAP SUMMARY OF WORK
Page 3 of 3
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects City Project No. 102875
Revised December 20, 2012
1.5 SUBMITTALS [NOT USED] 1
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2
1.7 CLOSEOUT SUBMITTALS [NOT USED] 3
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4
1.9 QUALITY ASSURANCE [NOT USED] 5
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6
1.11 FIELD [SITE] CONDITIONS [NOT USED] 7
1.12 WARRANTY [NOT USED] 8
PART 2 - PRODUCTS [NOT USED] 9
PART 3 - EXECUTION [NOT USED] 10
END OF SECTION 11
12
Revision Log
DATE NAME SUMMARY OF CHANGE
13
41 25 44 - 1
DAP SUBSTCPLITION FROCEDURES
Page 1 of 4
SECTIUN 0125 4�
SLTBSTITLTTI�N PR�CEDURES
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
The procedw•e for requestiu� the approval of suUstitution of a product that is not
equivalent ta a product which is specified by descripti�e or perfai�nce criteria or
defived by reference ta 1 ar more of the following:
a. Name of manufact��rer
b. Name of vendor
c. Trade i�me
d. Catalo� uumber
2. Substitutions are not "or-equals".
B. Deviations fi�om t1u5 City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections ivclude, Uut are nat necessarily limited to:
1. Di�ision 0— Sidcling Requu�emeuts, Cont�act Foi�ns and Conditians of the Cana�act
2. Divisian 1— General Requuements
1.2 PRICE AND PAYNIENT PR�CEDLTRES
A. Meast�rement and Payment
1. Work associated with tlus Item is cansidered suUsidiaiy to the variaus items bid. No
separate payineut will be allowed far this Item.
1.3 REFEliENCES [N�T LTSED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS
A. Request far Substit�rtian - General
1. Witlun 3� days after award of Contract (ul�less noted atherwise}, the City will
con�ider foi�nal requests from Cova�actor for substit�rtion of products iu place of
thase sgecified.
2. Certain rypes of equipment and l�inds of material are described in Sgeci�icatians by
means of references ta names af mavufacturers and vendors, t�ade i�ames, or catalag
nuiuUers.
a. W}leu tlus methad of specifyiug is used, it is nat iutended ta exclude fram
consideratiou other praducts bearing other inauufacturer's ar veudor's names,
trade names, or catalog numbers, pro�ided said product� are "or-equals,"' as
deternuned Uy City.
3. Other types of equipment and kiuds of material may Ue acceptaUle substitutions
uuder the followuig conditious:
a. �r-equals are unavailable due ta strike, discantuiued productiou ofproducts
meetiug specified requuements, ar ather factors beyond cantrol af Cont�actor;
ar_
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaCCTMEIVTS — DEVEL�PER AR7ARDED PRQ7ECTS City Praject Na_ 1D2875
Re��ised August 3D, 2D 13
41 25 44 - 2
DAP SUBSTCPLITION FROCEDURES
Page 2 of 4
b. Contractor proposes a cast andlor time reduction incenti�e to the City.
1.5 SUBMITTALS
A. See Request far Substitutian Form (attached}
B. Pracedure far Requestiug Substit�rtiou
1. Substitutian shall be considered only:
a. After aw�•d of Contract
b. LTnder the conditions stated }�ereiv
2. Subnut 3 copies af each written request for substitutian, includuig:
a. Documentation
1} Complete data substantiating compliavice ofpropased substitution with
Contract Dacuments
2} Data relatuig to changes in canstructian schedule, when a reduction is
proposed
3} Data relatuig to changes iu cost
b. Far graducts
1} Product identificatian
a} Manufacturer's name
b} Telephane numUer aud repre5entative cantact name
c} Sgecification Section ar Drawivg reference of originally specified
groduct, includin� discrete name or tag nuznber assigned to origuial
product iv t}�e Cant�act Dacuments
2} Manufacturer's literature clearly uiarked to show couiplia.uce of proposed
product with Cana�act Docurnevts
3} Iteziuzed camgarisan of ori�inal and proposed praduct addressin� praduct
ch�racteristics includin�, Uut nat necessarily lii�uted ta:
a} Size
b} Couiposition or materials af const�liction
�} Weight
d} Electx•ical or iuechauical requirements
4} Product experience
a} Location af past prajects utiliziug product
b} Name and telephone number �f peisans associated with referenced
grojects l�iawledgeable conceinin�proposedgroduct
c} A�ailable field data aud reparts associated with proposed praduct
5} Samples
a} Provide at request af City.
b} Samples become the praperty af the City.
c. Far coi�st�lictiou methads:
1} Detailed descriptian ofproposed methad
2} Illustration drawuigs
C. Appraval or Rejectiou
1. Written approval or rejectian af suUstitutiou giveu Uy the City
2. City reseives the right to require pragased praduct to coiuply with colar and pattern
of �pecified product if necessaiy to sect�re de5ign intent.
3. In the event the substihition is appraved, if a reductian iu cast or time results, it will
be dacuiuented by Cha.uge �rder.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaCCTMEIVTS — DEVEL�PER AR7ARDED PRQ7ECTS City Prnject Na. 162875
Re��ised August 3D, 2D 13
41 25 44 - 3
DAP SUBSTCPLITION FROCEDURES
Page 3 of 4
4. Substitutian will Ue rejected if:
a. Subnuttal is nat tlu�augh t}�e Coutractor with his �tamp of approval
b. Request is not made in accardance with tlus Specification Sectian
c. Iu the Developer's opinion, acceptance will requu�e suUstautial revision af the
ari�inal desigr►
d. Iu the City's or Develaper's opiviov, substitution will not perfoiYu adequately
the fiu�ctian cansistent wit}� the desigai ivtent
1.6 ACTIUN S[JBMITTALSIINFORII�LATIONAL SiTSNIITTALS [NQT USED]
1.7 CL�SE�LTT SUSMITTALS [N�T USED]
1.8 MAINTENANCE MATERIAL SLTBNIITTALS [NUT USED]
1.9 QUALITY ASSLTRANCE
A. Iv making request for substinrtian or in usiug av approved praduct, the Cont�actor
represents that the Conaactor:
1. Has iu�estigatedproposedproduct, and has deteruuued that it is adequate ar
superior in all respects ta that specified, aud that it will perfai�n function far which it
is inteuded
2. Will provide same guarantee far suUstitute iteLu as for product specified
3. Will caardinate iustallation of accepted substitution into Work, C� Li1C111C� �]illitilll�
modificatians if necessaiy, makuig such chan�es as u�y be requu�ed for Work to be
complete in all respects
4. Waives all claims for additianal costs related to substitution w}�ic}� subsequently
arise
1.10 DELIVERY, STORAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CONDITI�NS [N�T LTSED]
1.12 WARRANTY [NDT USED]
PAAT 2 - PRODUCTS [N�T LTSED]
PAAT 3 - EXECL7TION [NOT USED]
END aF SECTION
Rez-isioii Lag
DATE NAME SUMMARY OF CHANGE
CITY QF FQRT WQRTH Keller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised August 3D, 2D 13
41 25 44 - 4
DAP SUBSTCPLITION FROCEDURES
Page 4 of 4
E�HISIT A
liEQLTEST F�R SLTBSTTI'LTTIDN FORM:
T0:
PROJECT: DATE:
We hereUy subtiut for yout• consideratian the followiu� product uistead ❑f the specified item for
t�ie abo�e project:
SECTION PARAGRAPH SPECIFIED ITEM
Prapased SuUstitution:
I�eason far Substitution:
Include complete iufai�nation ou c}�anges ta Drawin�s audlar Specifications which prapased
substitution will require for its proger installation.
Fill in Blauks Below:
A. Will the urtdersigned cont�actor pay for c}�anges to t}�e Uuilding design, including engineering
and detailiug casts caused by the requested substitution?
B. What effect daes suUstitution }�a�e ou other tx�ades?
C. Differeuces Uetween propased substit�rtiau and specified item?
D. Differe�tce5 in praduct cast or product delivery tiiue?
E. Manufacn�rer's guarantees af the proposed and specified items are:
Equal Setter {explain an attaclunent}
The undersigued states that the function, appearauce and quality are equivaleut ❑r superior to the
specified item.
Subuutted By:
Siguah�re
as nated
Firm
Address
Date
Teleghane
For LTse Uy City:
Appro�ed
City
For LTse Uy City
_ Recommended _ Recommended
Not recomiuended Received late
By —
Date
Remarks
Date
Rej ected
CITY QF FQRT WQRTH Keller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised August 3D, 2D 13
413119-1
DAP PRECQNSTRUCTIdN MEETING
Page 1 of 3
SECTIUN 0131 19
PREC�NSTRLTCTION MEETING
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. Provisions for the preconst�liction meetin� to Ue }�eld prior ta the start of Work to
clarify canst�liction contract adnunist�•atinn procedt�res
B. Deviations fi�om tlus City of Fort Worth Standard Specificatian
1. No canstructian sc}�edule requu�ed iulless requested by the City.
C. Related Specificatiav Sectians iuclude, Uut are not uecessarily limited ta:
1. Division a— Siddin� Requirements, Coutract Foi�s aud Couditions of the Cantract
2. Division 1— General Requireinents
f R►� �:� C�I �I•.�►11] a��1�� I�1►� M�:Z1IfJ �! El ll N�`!
A. Meast�rement and Payment
1. Work associated with this Item. is cansidered subsidiaiy ta the vaiious items Uid.
No separate payment will be allawed for ttus Item.
1.3 REFEliENCES [N�T LTSED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS
A. Caordinatian
1. Attend precanstiuction meeting.
2. Represeutatives af Cant�•actor, subcantractors and suppliers attending meetings
shall be qualified aud authari�ed to act on behalf of the enitity each represents.
3. Meetin� aduunistered by City n�y be tape recorded.
a. If recorded, tapes will Ue used ta prepare minutes and retained Uy City far
future reference.
B. Precanstructian Meetiug
1. A preconstructiobi iueetiug will be held wit}�in 14 day� after the delivery af the
distribution package to tlie City.
a. The meetiug will be scheduled and adu�i_uistered by the City.
2. The Project Regresentati�e will preside at the meetin�, prepare the nates af the
meetiug and disa�ibute copies af same to all participants who so request Uy fu11y
couipleting the attendance forni to be circulated at the Ueginniug af the iueeting.
3. Attendance shall inchide:
a. De�eloper aud Consultant
b. Contractor's project manager
c. Contractor's superiuteudent
d. Any subcautractar ar supplier representatives wham the Contractar n�y desire
ta iu�ite or the City may request
CITY QF FQRT WQRTH I�eller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMENTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project No. 102$75
Re��ised August 3D, 2D 13
413119-2
DAP PRECQNSTRUCTIdN MEETING
Page 2 of 3
e. ❑ther City representatives
f. athers as apprapriate
4. Preliuunaiy Ageuda may iuclude:
a. Ivtraductiov of Froject Personuel
b. General Descriptiau af Project
c. Status of ri�ht-af-way, utility clearances, easeiuents or ot}�er pertiuent pen�uts
d. Contractor'� workplan and schedule
Contract Tiiue
Notice to Proceed
Const�liction Stakin�
Progaess Payinents
Ext�a Wark and Chan�e �rder Pracedures
Field Orders
Disposal Site Letter for Waste Material
Iusurauce Renewals
Payrall Certificatian
Material Certificatians and Quality Contral Testiug
a. Public Safety and Conveiuence
p. Documentation af Pre-Canstiuction Cauditiaus
q. Weekend Work Notification
r. Legal Holidays
s. Trench Safety Plaus
t. Confined Space Entny Staudards
u. Coorduiatian with the City's regresentative far operations of existin� water
systen�s
v. Stonu Water Polhitian Prevention Plan
w. Coorciuiatian with other Contractors
x. Early Wariung Sy�tem
y. Contractor Evaluation
z. Special Canditions applicable ta t}�e praject
aa. Damages Clain�s
bb. 5ubnuttal Fi�ocedus�es
cc. Substitutinn Procedures
dd. Con�espondence Routing
ee. Recard Drawuigs
ff. Temparaiy const�uctian farilities
gg. MBEISSE pracedures
}ill. Final Aeceptauce
ii. Final Payment
j j. Questi ons or Canuuents
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaCCTMEIVTS — DEVEL�PER AR7ARDED PRQ7ECTS City Praject Na. 14?875
Re��ised August 3D, 2D 13
413119-3
DAP PRECQNSTRUCTIdN MEETING
Page 3 of 3
1.5 SUBMITTALS [N�T USED]
1.6 ACTIUN SiJBMITTALSIIlVFURMATI�NAL SLTBNIITTAI.S [NOT USED]
1.7 CL�SE�LTT SUSNIITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SLTBMITTALS [NOT USED]
1.9 QUALITY ASSLTRANCE [NOT USED]
1.10 DELIVERY, STDAAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CONDITI�NS [N�T LTSED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [N�T LTSED]
PAAT 3 - E�ECUTI�N [N�T USED]
END OF SECTION
Rez�ision Log
DATE NAME SUMMARY OF CHANGE
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AR7ARDED PAQ7ECTS City Praject No. 1D2875
Re��ised August 3D, 2D 13
413233-1
DAP PRECONSTRUCTIdN VIDEQ
Page 1 of 2
SECTIUN 0132 33
PRECONSTRLTCTIaN VIDEa
F'AAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. Admivistrative and pracedural requuements for:
a. Precanstructian Videa�
B. De�iations fi�om t1u5 City of Fort Worth Standu�d Specification
1. Though nat uiandatory, it is highly reconunended on i_vfill developer groj ects.
C. Related Sgeci�cation Sectians iuclude, Uut are not uecessarily limited to:
1. Division a— Biddin� Requirements, Contract Foims and Conditions of the Cona�act
2. Division 1— General Requiretnevts
1.2 PRICE AND PAYNIENT PR�CEDL]RES
A. Meast�rement and Payment
1. Work associated with this Item is cansidered subsidiaiy ta the vaiious items Uid.
No separate �ayment will be allowed for tlus Item.
1.3 REFEIiENCES [N�T USED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS
A. Precanstructian Video
1. Produce a preconsalictiou video of the sitelalig,�ment, iueluding all areas in the
viciiury of and ta Ue affected by canstructian.
a. Provide digital copy of video upan request by the City.
2. Retain a copy of the precnn�aliction video until the end af the maintenauce surety
periad.
1.5 SUBMITTALS [NOT USED]
1.6 ACTIUN SiJBMITTALSIINFURMATI�NAL SUSNIITTAI.S [NOT USED]
1.7 CLOSEOUT SUSMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SLTBNIITTALS [NUT USED]
1.9 QUALITY ASSLTRANCE [N�T USED]
1.10 DELIVEAY, STORAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CONDTTI�NS [N�T LTSED]
1.12 WARRANT'Y [N�T USED]
PAAT 2 - PRODUCTS [N�T LTSED]
CITY QF FQRT WQRTH Keller CmsC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised August 3D, 2D 13
41 32 33 - 2
DAP PRECONSTRUCTIdN VIDE❑
Page 2 of 2
PAAT 3 - E�ECUTI�N [N�T LTSED]
END OF SECTION
Rez�ision Log
DATE NAME SUMMARY OF CHANGE
CITY QF FQRT WQRTH I�eller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMENTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project No. 102$75
Re��ised August 3D, 2D 13
41 33 44 - 1
DAP SUBMITTALS
Page 1 of 8
SECTIUN 0133 4�
DAP SUBMITTALS
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
General metliods aud requuements of subnussions applicable to the following
Work-related suUmittals:
a. Shop Ihawivg5
t}. Pl'OC�i1Ct Dc�tc� �]I1CIl1C�lI1� �Cki11t�C7TC� pi'QC�i1CT I.15t 511�}IIllLC715�
c. Samples
d. Mock Ups
B. De�iations fi�om tlus Ciry of Fort Worth Standard Specificatian
1. None.
C. Related Sgeci�cation Sections iuclude, Uut are not uecessarily limited to;
1. Division a— Biddin� Requuements, Coutract Foi�s and Cavditians af the Cana�act
2. Division 1— General Requiretnents
1.2 PRICE AND PAYNIENT PR�CEDL]RES
A. Measi�rement and Payment
Work associated with this Iteiu is cansidered subsidiaiy ta the vaiious items Uid.
No separate payment will be allowed for ttus Item.
1.3 REFEliENCES [N�T LTSED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS
A. Coordination
1. Notify tlie City iu writiug, at the time of suUuuttal, of any de�iations iu the
suUmittals fi•om the requirements of the Contract Doctunents.
Z. Coorduiatian of Subuuttal Times
a. Prepare, prioritize and trausnut each suUmittal sufficiently in advauce af
perfoiYuiug the related Wark or other applicable acti�itie�, or within the time
specified in the indi�ridual Work Sections, of the Specifications.
b. Cantractor is responsible suc}� t}�at the installation will not be delayed by
processing times iucludiug, but not limited ta:
a} Disapproval a.ud resubnuttal (if required}
b} Coorduiatian with ather suUmittals
c} Testing
d} Purchasing
e} Fabrication
�} Delivery
g} Similar sequenced activities
c. No extension af time will Ue authorized because of the Cont�•actor's failt�re to
transuut subi�uttals sufficiently in advance of the Work.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMENTS — DEVEL�PER AWARDED PRQ7ECTS City Project No_ 102875
Re��ised August 3D, 2D 13
41 33 44 - 2
DAP SUBMITTALS
Page 2 of 8
d. Make subnuttals promptly in accordance with appraved schedule, and iu such
sequence as ta cause na delay in the Wark or in the work of any other
contractor.
B. Subnuttal Nulnberin�
Wlieu suUmittitig shag drawivgs or samples, utilize a 9-character submittal crass-
reference identificatiou numbering systeiu ui the followivg maiwer:
a. LTse the fust 6 digits of the applicable Sgecificatian Section Number.
b. Far the next 2 di�its number u�e numbers U1-99 to 5equentially uuiuUer each
iiutial separate item or drawiug submitted under each specific Section number.
c. Last use a letter, A-Z, uidicating the resubnussion af the same drawiug (i.e.
A=2nd suUmissian, B=3rd suUmission, C=4t�i subnussion, etc.}. A typical
suUmittal numUer wauld Ue as fallows:
a3 30 UU-US-S
1} U3 3a 00 is the Specification Section for Cancrete
2} US is the eightli initial subi�uttal lmder this Specification Section
3} B is the third suUmission {second resubiiussion} af that particular shop
drawuig
C. Contractor Certification
Review shop drawings, product data and samples, includin� those by
suUconaactors, prior to suUmissian to deternune and verify the followiug:
a. Field iueasi�rements
b. Field consauction criteria
c. Catalo� uumbers aucl sinulat� dat�
d. Confat�nance with the Cautract Dacuznents
Provide each shop drawing, sample and praduct data subnutted by the Cont�actor
with a Certification Statement aff"ixed including:
a. The Cont�actor's Comgany name
b. Sig�iatuse of subt�uttal re�riewer
c. Certificatian Stateiuent
1} "By this 5ubuuttal, I hereby repre5eut that I have determiued and verified
field measuz�emeuts, field canstruction criteria, n�terials, dimensians,
catalog nusnbers and similar data and I have checked and caardinated each
item witlt other applicaUle approved s}�op drawuigs."
D. Subnuttal Fonuat
1. Fald shop drawuigs lar�er thau 8'/z iuche5 x 11 inches ta S'/� inches x l liuches.
2. Biud shap drawin�s and praduct data sheets together.
3. Order
a. Ca�er Sheet
1} Desciiption af Packet
2} Contractor Certification
b. List of iteu�s 1 TaUle of Contents
c. Product Data IShop Drawiug�ISamples ICalculations
E. Subnuttal Content
1. The date of submissiou aud the dates of any previous submissions
CITY QF FQRT WQRTH Keller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project No. 102875
Re��ised August 3D, 2D 13
41 33 44 - 3
DAP SUBMITTALS
Page 3 of 8
2. The Project title and number
3. Cantractor identification
4. The names of:
a. Contractor
b. Supplier
c. Manufacturer
5. Identification af the groduct, with the Sgecification Sectian uumUer, page and
paragraph(s}
6. Field dimeusions, clearly ideutified as such
7. Relation ta adjacent or ciitical features af the Wark or materials
S. Applicable standards, such as ASTM or Federal Specificatiov nuznber�
9. Identification by highli�htiug af deviations fram Canaact DocuLuents
lU. Identification by highli�htiug af revisian5 on resubuuttals
11. An 8-inch x 3-iuch blank sgace for Coutractor and City stamps
F. Shap Ihawiugs
1. As specified in irtdi�idual Wark Sections inchides, but is nat necessarily linuted to:
a. Custom-prepared data suc}� as fabricatian avd erectiai�luistallatian {warkiug}
drawuigs
b. Scheduled uiforn�tian
c. Settin� diagrams
d. Act�ial shapu+ork manufactuz�iug instructions
e. CuStom template5
f. Sgecial wirivg diagrams
g. Coorduiatian drawiugs
h. Ivdividual systeiu or equipment inspection and test repai�ts including:
1} Perforn�nce ciuves aud certifications
i. As applicaUle ta the Work
2. Details
a. Relation af the �aiious pairts to the maiu members and lines of the st�uet��re
b. W}�ere can•ect fabrication af the Work depends upon field measurements
1} Pravide such Lueasuz�emevts aud note on the drawiugs prior to submittiug
for approval.
G. Product Data
1. Far subuuttals af product data for products included on the Ciry's 5taudard Product
List, clearly identify each itein selected for use an t}�e PY�oject.
Z. Far subuuttals af praduct data for praducts not included on the City's Standard
Product List, subuuttal data may include, but is uat necessarily liuuted ta:
a. 5tandard prepared data far manufactw•ed praducts (soiuetimes refeiYed to as
catalag clata}
1} Such as the Luanufacturer's praduct specification and installation
instructians
2} Availabiliry of colors and patten�s
3} Manufacturer's pruited stateiuents of couipliances and applicability
4} Roughiug-in diagXams and templates
5} Catalo� cuts
6} Product phatagraphs
CITY QF FQRT WQRTH Keller Cmscin�a Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142$75
Re��ised August 3D, 2D 13
41 33 44 - 4
DAP SUBMITTALS
Page 4 of 8
7} Standard wiring diaga�am�
S} Privted perfoi�nce cuive� and operatianal-ran�e diagr�am�
9} Production ar quality cant��ol inspection and test reports aud certifications
lU) Mill reports
11) Product aperatuig and u�aiutenance insalictions and recouuuended
spare-pairts listuig and pruited product wairanties
12} As applicaUle to the Work
H. 5amples
1. As specified in indi�idual Sectians, iuclude, but are not uecessarily limited to:
a. Physical exauiples af the Work such as:
1} Sectians af n�nufact�ued ar faUricated Work
2} Si��all cuts or containers of materials
3} Complete uzuts of repetitively used praducts colorJtexturelpatteru swatches
and range sets
4} Sgecimens far coordinatian of visual effect
5} Grapluc symbols aud units of Work to be used by the City for independent
inspectian and testing, as applicable to the Wark
I. Da not start Wark requu�iug a�hap drawing, sauiple ar product data nar auy n�aterial to
be faUiicated ar installed priar to the appraval ar qualified appro�al af such item.
1. Fabrication perfai�ned, n�terials purchased ar on-site cansauction accomplished
which does nat confonn to approved shap drawiugs and data is at the Cont��actor's
ri5k.
2. The City will not Ue liable for auy exgeuse or delay due to canections or remedies
requu�ed ta accouiplish caufai7nity.
3. Camplete praject Work, �terials, faUricatian, and ivstallatians iv confoi�nce
with appra�ed shop drawuigs, applicaUle samples, and praduct data.
.T. Subnuttal Distributian
Electronic Dist�ibutian
a. Confu�n de�elopment of Froject directory for eleca•anic submittals ta be
uploaded ta City's Suz�saw site, or another extei�al FTP site approved by the
City.
b. 5hog Ihawiugs
1} LTpload subuuttal to designated project duectoiy aud notify aggropriate
City represeutati�es �ia email of subnuttal pastiug.
2} Hard Capies
a} 3 copies for all subLttittals
b} If Contractar requires more than 1 hard copy of Shop Drawings
returned, Cona•actor shall suUmit mare thau the uumUer of copies listed
above.
c. Product Data
1} Uplaad subuuttal to designated project directory and �tatify apprapriate
City represeutatives via email of subnuttal postin�.
2} Hard Capies
a} 3 copies for all suUmittals
d. Samples
1} Dist�ibuted to the Praject Representative
2. Hard Cagy Distributian (if required iu lieu of electronic dist�ibution)
CITY QF FQRT WQRTH Keller Cmscin�a Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142$75
Re��ised August 3D, 2D 13
41 33 44 - 5
DAP SUBMITTALS
Page 5 of 8
c�. 5�1��] �T7WLLl�S
1} Dist��ibuted to the City
2} Copies
a} 8 copies for mechauical suUmittals
b} 7 copies for all other subtiuttals
c} If Contractar requires more than 3 eopies of Shop Drawiugs retusned,
Cantractor shall subn�it mare t}�an tlie number of capies listed abo�e.
b. Praduct Data
1} Dist�ibuted to tlie City
2} Copies
a} 4 copies
c. Samples
1} Dist��ibuted to the Praject Representative
2} Copies
a} Submit t�ie numUer stated ui the respective Specification Sections.
3. Dist�ibute reproductions of approved shop drawui�s and copies of appraved
product data and samples, where requued, ta the joU site file snd elsewhere as
directed Uy the Ciry.
a. Provide nulnber of copies as du�ected Uy the City Uut nat exceeduig the nulnber
previausly specified.
K. Subnuttal Review
1. The review of shop drawuigs, data aud sauiple5 will Ue far general coufarmauce
with the desigxi concept avd Contract Dacuments. T1tis is nat to be canstrued as:
a. Permittivg any departure fiom the Contr�ct requu�ements
b. Relievin� the Contt•actor of responsibility for avy eirars, ivcludiug details,
diinevsions. and ivaterials
c. Appravin� depai��res fi�oiu details furuished by the City, except as otherwise
pravided hereiu
2. The review aud approval of shop drawiugs, samples or product data by the Ciry
does nat relieve the Cantractar fram 1tis1}�er responsiUility wit}� regard to the
fulfilhnent of the tern�s of t�ie Cana�act.
a. All risks of eiror and oiiussion are assumed Uy the Contractor, aud the City will
have uo respansibiliry therefare.
3. The Cont�actor remains responsiUle for details and accuracy, for coordinatiug the
Work with all other assaciated wark and aades, far selecting faUricatiou processes,
for teclwiques of assembly and for perfornung Work in a safe i�iauuer.
4. If the shap drawiugs, data or samples as submitted describe variatians and shaw a
departure from the Contract requirements which Ciry fiuds to be in the uiterest of
the Ciry and to be sa nunor as not to involve a chan�e in Cautract Price or time far
perfoi�nce, the City r�y ret�un the reviewed drawings withaut uating an
exception.
5. Subnuttals will be renuned to the Cantractar �uider 1 af the followiug cades:
a. Code 1
1} "N� E�CEPTIONS TAKEN" is assigned when t}�ere are no notatians or
couuuents au the suUmittal.
a} Wl�en r�etus�ed tu�der this code the Cautractar uiay relea�e the
equipmevt andlor material for u�nufact��re.
b. Code 2
CITY QF FQRT WQRTH Keller Cmscin�a Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142$75
Re��ised August 3D, 2D 13
41 33 44 - 6
DAP SUBMITTALS
Page 6 of 8
1} "EXCEPTIflNS NOTED". This cade is assigned when a canf'u-mation of
the notations and couiment� IS NOT requu�ed Uy the Contractor.
a} The Cont��actor may release the equipiuent ar material for manufacture;
hawever, all notation5 and camments must be iucorporated into the
final praduct.
c. Code 3
1} "EYCEPTI�NS NOTEDIRESLTBMTT". T}�is cambination of cades is
assigned whev rrotatiov� and couuuents are extensive enough to requu�e a
resubuuttal of the package.
a} The Cont�actor may release the equipiuent ar u�terial for u�nufact��re;
hawever, all notatians and camments must be uicorparated ivto the
final praduct.
b} Ttus resubnuttal is to address all comments, anussions and
non-coufai�iug items t}�at were noted.
c} Resubtiuttal is to be received by t�ie City within 15 Calendar Days of
the date af the City's tratismittal requirivg the resuUmittal.
d. Code 4
1} "NQT APPR4VED" is assig,r►ed w}�en the subi�uttal does not meet the
intent of the Cout�act Docrunents.
a} The Cont�actor must resubnut the entire package revised to brin� the
suUuuttal into confanuance.
b} It ivay be neces5ary to resuUmit usui� a different mauufacn�rerlvendar
ta meet the Cant��act Documents.
6. Resubnuttals
a. Handled ui the same manner as fust suUmittals
1} Correctians ather t}�au requested by the City
2} Marked with revision triangle or other sinular uiethod
a} At Cana�actor's ri5k if not ivarked
b. Subnuttals for each item will be re�riewed na more than twiee at the City's
expense.
1} All subsequent reviews will be perfai�ned at times canvenient to the City
and at t}�e Contractor's expense, based on the City's ar City
Represeutative's then prevailiug rates.
2} Provide Contractor reiinbl�rsement ta the City wit}�in 30 Calendar Days for
all suc}� fees uivaiced Uy the Ciry.
c. The need far more t}�an 1 re5ubi�ussion ar auy ather delay iu oUtainiug Ciry's
re�riew of subuuttals. will nat entitle the Cont�actar to an exteusion af Conaact
Time.
7. Pairtial SuUmittal�
a. City reserves the right to nat review subuuttals deeiued partial, at the City's
discretion.
b. Subnuttals deemed Uy the City ta be uat camplete will Ue retuined ta the
Contractor, aud will be cansidered "Not Agpro�ed" tuitil resubmitted.
c. The City may at its optian pravide a list ar mark t}�e submittal du•ectivg the
Contractor to the areas that are incomplete.
S. If the Canaactar considers any correctian iudicated ou the shop drawings ta
constit�rte a change to t}�e Contract Daculneuts, then wr7tten natice must Ue
provided t}�ereof to the Developer at least 7 Calendar Days prior ta release for
u�anufacn�re.
CITY QF FQRT WQRTH Keller Cmscin�a Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142$75
Re��ised August 3D, 2D 13
41 33 44 - 7
DAP SUBMITTALS
Page 7 of 8
9. Wheu the shop drawin�s have been completed to the satisfactian af the City, t}�e
Contractor may cairy out the con�tiuction iu accordauce t}�erewith aud no fiurther
changes therein except upan written uistructians fiom the City.
lU. Each subnuttal, appropri�tely coded, will be renuned within 30 Calendar Days
followiug receipt af subuuttal by the City.
L. Mock ups
1. Mack Up usuts as specified ui ivdividual Sections, include, but are not necessarily
limited ta, couiplete uzuts of t1�e standard of acceptance far that type of Work to be
used on the Project. Reinove at the completion of t}�e Work or wheu duected.
M. Qualificatians
1. If specifieally requu•ed iu other Sections of these Specifications, suUmit a P.E.
Certif catian far each item re�uu�ed.
N. Request far Infai�nation (RFI}
Contractor Request for additional iufai�nation
a. Clarification or iuterpretatian of the contract dacuiuents
b. W}�en tlie Cont�actor belie�es there is a canflict Uetween Contract Dacuments
c. W}ien the Conaactar belie�es there is a conflict between the Ihawiugs aud
5gecifications
1} Identify the conflict and request clarification
5ufficient infonnation shall Ue attaehed ta pernut a written response without fiurther
itifaiYuation.
1.5 SUBMITTALS [N�T USED]
1.6 ACTIaN SLJBMITTALSIIlVFORMATI�NAL SUBMITTALS [NOT USED]
1.7 CL�SE�LTT SUSMITTALS [N�T USED]
1.8 MAINTENANCE MATEAIAL SLTBNIITTALS [NUT USED]
1.9 QUALITY ASSLTRAN�E [N�T USED]
1.10 DELNEAY, STORAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CONDITI�NS [N�T IISED]
1.12 WARRANTY [N�T USED]
CITY QF FQRT WQRTH Keller Cmscin�a Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142$75
Re��ised August 3D, 2D 13
41 33 44 - 8
DAP SUBMITTALS
Page S of 8
PAAT 2 - PR�DUCTS [N�T LTSED]
PAAT 3 - E�ECUTI�N [N�T USED]
END OF SECTION
Rei-ision Lag
DATE NAME SUMMARY OF CHANGE
12:'2D:'2D12 D. 7ahnsan 1.4.K. S. L�orkuig Bays modified to Calendar Days
CITY QF FQRT WQRTH Keller Cmscinoa Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142875
Re��ised August 3D, 2D 13
01 35 13 - 1
DAP SPECIAL PROJECT PROCEDURES
Page 1 of 7
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. 102875
Revised August, 30, 2013
SECTION 01 35 13 1
SPECIAL PROJECT PROCEDURES 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. The procedures for special project circumstances that includes, but is not limited to: 6
a. Coordination with the Texas Department of Transportation 7
b. Work near High Voltage Lines 8
c. Confined Space Entry Program 9
d. Air Pollution Watch Days 10
e. Use of Explosives, Drop Weight, Etc. 11
f. Water Department Notification 12
g. Public Notification Prior to Beginning Construction 13
h. Coordination with United States Army Corps of Engineers 14
i. Coordination within Railroad permits areas 15
j. Dust Control 16
k. Employee Parking 17
B. Deviations from this City of Fort Worth Standard Specification 18
1. None. 19
C. Related Specification Sections include, but are not necessarily limited to: 20
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 21
2. Division 1 – General Requirements 22
3. Section 33 12 25 – Connection to Existing Water Mains 23
24
1.2 REFERENCES 25
A. Reference Standards 26
1. Reference standards cited in this Specification refer to the current reference 27
standard published at the time of the latest revision date logged at the end of this 28
Specification, unless a date is specifically cited. 29
2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 30
High Voltage Overhead Lines. 31
3. North Central Texas Council of Governments (NCTCOG) – Clean Construction 32
Specification 33
1.3 ADMINISTRATIVE REQUIREMENTS 34
A. Coordination with the Texas Department of Transportation 35
1. When work in the right-of-way which is under the jurisdiction of the Texas 36
Department of Transportation (TxDOT): 37
a. Notify the Texas Department of Transportation prior to commencing any work 38
therein in accordance with the provisions of the permit 39
01 35 13 - 2
DAP SPECIAL PROJECT PROCEDURES
Page 2 of 7
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. 102875
Revised August, 30, 2013
b. All work performed in the TxDOT right-of-way shall be performed in 1
compliance with and subject to approval from the Texas Department of 2
Transportation 3
B. Work near High Voltage Lines 4
1. Regulatory Requirements 5
a. All Work near High Voltage Lines (more than 600 volts measured between 6
conductors or between a conductor and the ground) shall be in accordance with 7
Health and Safety Code, Title 9, Subtitle A, Chapter 752. 8
2. Warning sign 9
a. Provide sign of sufficient size meeting all OSHA requirements. 10
3. Equipment operating within 10 feet of high voltage lines will require the following 11
safety features 12
a. Insulating cage-type of guard about the boom or arm 13
b. Insulator links on the lift hook connections for back hoes or dippers 14
c. Equipment must meet the safety requirements as set forth by OSHA and the 15
safety requirements of the owner of the high voltage lines 16
4. Work within 6 feet of high voltage electric lines 17
a. Notification shall be given to: 18
1) The power company (example: ONCOR) 19
a) Maintain an accurate log of all such calls to power company and record 20
action taken in each case. 21
b. Coordination with power company 22
1) After notification coordinate with the power company to: 23
a) Erect temporary mechanical barriers, de-energize the lines, or raise or 24
lower the lines 25
c. No personnel may work within 6 feet of a high voltage line before the above 26
requirements have been met. 27
C. Confined Space Entry Program 28
1. Provide and follow approved Confined Space Entry Program in accordance with 29
OSHA requirements. 30
2. Confined Spaces include: 31
a. Manholes 32
b. All other confined spaces in accordance with OSHA’s Permit Required for 33
Confined Spaces 34
D. Use of Explosives, Drop Weight, Etc. 35
1. When Contract Documents permit on the project the following will apply: 36
a. Public Notification 37
1) Submit notice to City and proof of adequate insurance coverage, 24 hours 38
prior to commencing. 39
2) Minimum 24 hour public notification in accordance with Section 01 31 13 40
E. Water Department Coordination 41
1. During the construction of this project, it will be necessary to deactivate, for a 42
period of time, existing lines. The Contractor shall be required to coordinate with 43
the Water Department to determine the best times for deactivating and activating 44
those lines. 45
01 35 13 - 3
DAP SPECIAL PROJECT PROCEDURES
Page 3 of 7
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. 102875
Revised August, 30, 2013
2. Coordinate any event that will require connecting to or the operation of an existing 1
City water line system with the City’s representative. 2
a. Coordination shall be in accordance with Section 33 12 25. 3
b. If needed, obtain a hydrant water meter from the Water Department for use 4
during the life of named project. 5
c. In the event that a water valve on an existing live system be turned off and on 6
to accommodate the construction of the project is required, coordinate this 7
activity through the appropriate City representative. 8
1) Do not operate water line valves of existing water system. 9
a) Failure to comply will render the Contractor in violation of Texas Penal 10
Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 11
will be prosecuted to the full extent of the law. 12
b) In addition, the Contractor will assume all liabilities and 13
responsibilities as a result of these actions. 14
F. Public Notification Prior to Beginning Construction 15
1. Prior to beginning construction on any block in the project, on a block by block 16
basis, prepare and deliver a notice or flyer of the pending construction to the front 17
door of each residence or business that will be impacted by construction. The notice 18
shall be prepared as follows: 19
a. Post notice or flyer 7 days prior to beginning any construction activity on each 20
block in the project area. 21
1) Prepare flyer on the Contractor’s letterhead and include the following 22
information: 23
a) Name of Project 24
b) City Project No (CPN) 25
c) Scope of Project (i.e. type of construction activity) 26
d) Actual construction duration within the block 27
e) Name of the contractor’s foreman and phone number 28
f) Name of the City’s inspector and phone number 29
g) City’s after-hours phone number 30
2) A sample of the ‘pre-construction notification’ flyer is attached as Exhibit 31
A. 32
3) Submit schedule showing the construction start and finish time for each 33
block of the project to the inspector. 34
4) Deliver flyer to the City Inspector for review prior to distribution. 35
b. No construction will be allowed to begin on any block until the flyer is 36
delivered to all residents of the block. 37
G. Public Notification of Temporary Water Service Interruption during Construction 38
1. In the event it becomes necessary to temporarily shut down water service to 39
residents or businesses during construction, prepare and deliver a notice or flyer of 40
the pending interruption to the front door of each affected resident. 41
2. Prepared notice as follows: 42
a. The notification or flyer shall be posted 24 hours prior to the temporary 43
interruption. 44
b. Prepare flyer on the contractor’s letterhead and include the following 45
information: 46
1) Name of the project 47
2) City Project Number 48
01 35 13 - 4
DAP SPECIAL PROJECT PROCEDURES
Page 4 of 7
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. 102875
Revised August, 30, 2013
3) Date of the interruption of service 1
4) Period the interruption will take place 2
5) Name of the contractor’s foreman and phone number 3
6) Name of the City’s inspector and phone number 4
c. A sample of the temporary water service interruption notification is attached as 5
Exhibit B. 6
d. Deliver a copy of the temporary interruption notification to the City inspector 7
for review prior to being distributed. 8
e. No interruption of water service can occur until the flyer has been delivered to 9
all affected residents and businesses. 10
f. Electronic versions of the sample flyers can be obtained from the Project 11
Construction Inspector. 12
H. Coordination with United States Army Corps of Engineers (USACE) 13
1. At locations in the Project where construction activities occur in areas where 14
USACE permits are required, meet all requirements set forth in each designated 15
permit. 16
I. Coordination within Railroad Permit Areas 17
1. At locations in the project where construction activities occur in areas where 18
railroad permits are required, meet all requirements set forth in each designated 19
railroad permit. This includes, but is not limited to, provisions for: 20
a. Flagmen 21
b. Inspectors 22
c. Safety training 23
d. Additional insurance 24
e. Insurance certificates 25
f. Other employees required to protect the right-of-way and property of the 26
Railroad Company from damage arising out of and/or from the construction of 27
the project. Proper utility clearance procedures shall be used in accordance 28
with the permit guidelines. 29
2. Obtain any supplemental information needed to comply with the railroad’s 30
requirements. 31
J. Dust Control 32
1. Use acceptable measures to control dust at the Site. 33
a. If water is used to control dust, capture and properly dispose of waste water. 34
b. If wet saw cutting is performed, capture and properly dispose of slurry. 35
K. Employee Parking 36
1. Provide parking for employees at locations approved by the City. 37
L. {Coordination with North Central Texas Council of Governments (NCTCOG) Clean 38
Construction Specification [if required for the project] 39
1. Comply with equipment, operational, reporting and enforcement requirements set 40
forth in NCTCOG’s Clean Construction Specification.} 41
01 35 13 - 5
DAP SPECIAL PROJECT PROCEDURES
Page 5 of 7
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. 102875
Revised August, 30, 2013
1.4 SUBMITTALS [NOT USED] 1
1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2
1.6 CLOSEOUT SUBMITTALS [NOT USED] 3
1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4
1.8 QUALITY ASSURANCE [NOT USED] 5
1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6
1.10 FIELD [SITE] CONDITIONS [NOT USED] 7
1.11 WARRANTY [NOT USED] 8
PART 2 - PRODUCTS [NOT USED] 9
PART 3 - EXECUTION [NOT USED] 10
END OF SECTION 11
12
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31/2012 D. Johnson
1.3.B – Added requirement of compliance with Health and Safety Code, Title 9.
Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
13
01 35 13 - 6
DAP SPECIAL PROJECT PROCEDURES
Page 6 of 7
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. 102875
Revised August, 30, 2013
EXHIBIT A 1
(To be printed on Contractor’s Letterhead) 2
3
4
5
Date: 6
7
CPN No.: 8
Project Name: 9
Mapsco Location: 10
Limits of Construction: 11
12
13
14 15
16
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 17
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 18
PROPERTY. 19
20
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 21
OF THIS NOTICE. 22
23
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 24
ISSUE, PLEASE CALL: 25
26
27
Mr. <CONTRACTOR’S SUPERINTENDENT> AT <TELEPHONE NO.> 28
29
OR 30
31
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 32
33
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 34
35
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 36
37
01 35 13 - 7
DAP SPECIAL PROJECT PROCEDURES
Page 7 of 7
CITY OF FORT WORTH Keller Crossing Phase 1
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. 102875
Revised August, 30, 2013
EXHIBIT B 1
2
3
4
O1 45 23
DAP TESTINGAND INSPECTIdN SERVICES
Page 1 of 2
SECTIUN �145 23
TESTING AND 1N5PECTI�N SERVICES
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. Testing and ii�spectian seivices pracedures aud coardination
B. De�iations fi•am tlus Ciry of Fort Wart}� Standard Specification
1. None.
C. Related Specification Sectians iuclude, Uut are not uecessarily limited to:
1. Division a— Biddin� Requirements, C.outract Foi�s and C.ouditians af the Cana�act
2. Division 1— General Aequiretnents
1.2 PRICE AND PAYNIENT PR�CEDLTRES
A. Meast�rement and Fayment
Work associated with this Item is cansidered subsidiaiy to the vaiious Iteu�s bid.
No separate gayment will be allawed for thi� Item.
a. Contractor is respon�ible for perfarniuig, coardivating, and payment af all
Quality Canaol testing.
b. City i5 respansible for perfon�ung and payment for first set of Quality
Assuz�ance testiug.
1} If ttie first Quality Assurance test perfoiYued by the City fails, the
Cantractor is responsible for pay�nent af subsequent Quality Assurance
testiug until a passin� test occurs.
a} Final acceptavice will nat be issued by City until all requu�ed payments
for testivg by Conaactor have beeu paid in fiill.
1.3 REFEliENCES [N�T LTSED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS
A. Testing
1. Complete testiug in accordance with the Cana�act Docusneuts.
2. Coordination
a. W}�en testivg is requued to Ue performed by the Ciry, notify City, sufficiently
in advance, when testiug is needed.
b. Wheu testiug is requued to be completed by the Contractor, notify City,
sufficiently iu advauce, that testiug will be gerfonued.
3. Dist�ibution of Testiug Repoirts
a. Elect��onic Dist��ibution
1} Confu�n de�elopment af Project directory for eleca�onic subuuttals ta be
uploaded to the City's docusneut ivanagement �ystem, or another fonu af
distribution appraved by the C.iry.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N I]QCUMENTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project No. 102875
Re��ised 14farch 20, 2020
O1 45 23
DAP TESTINGAND INSPECTIdN SERVICES
Page 2 of 2
2} LTplaad te�t reports ta desiguated project directory and notify apprapriate
City repre�eutatives �ia email of subnuttal postin�.
3} Hard Capies
a} 1 copy far all subnuttal5 subnutted to the Praject RepreSentati�e
b. Hard Capy Disa�ibutian (if required iu lieu of electronic distribution)
1} Tests performed by Ciry
a} DistriUute 1 hard copy to t}�e Contractor
2} Tests performed by the Contractor
a} DistriUute 3 hard copies to City's Froject Representative
4. Provide City's Fi�oject Representative with trip tickets far each delivered load of
Concrete ar Lime ivaterial uicludin� the followivg infoiYuation:
a. Name of pit
b. Date of deliveiy
c. Material delivered
B. Iuspection
1. Ivspection ar lack of uispectian does not relieve the Contractor from oUligation ta
perfoiYu wark in accardance with the Contract Docul�ients.
1.5 SUBMITTALS [N�T USED]
1.6 ACTIUN SiJBMITTALSIINFURMATI�NAL SUSNIITTAI.S [NOT USED]
1.7 CL�SE�LTT SUSMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SLTBMITTALS [NUT USED]
1.9 QUALITY ASSLTRANCE [N�T USED]
1.10 DELIVERY, STORAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CONDITI�NS [N(]T LTSED]
1.12 WARRANTY [N�T USED]
PAAT 2 - PRODUCTS [N�T LTSED]
PAAT 3 - EXECL7TION [NOT USED]
END aF SECTI�N
Rez-ision Lag
DATE NAME SUMMARY OF CHANGE
03:20:2D20 D.V. Ma�ana Remo�-ed referc���e to Buczsa�v aud noted t1�at elech•oni� subiuittals be uploaded
` tlu•ougl� the City's da�iuuent mauageineut system.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N I]QCUMENTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project No. 102875
Re��ised 14farch 20, 2020
41 54 44 - 1
DAP TEMPORARY FACILTTIES ANfl CQNTROLS
Page 1 of 4
SECTIUN 0150 4�
TEMPORARY FACILITIES AND CONTROLS
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
Provide temporaiy facilities aud cont�•ols needed for the Work iucluduig, but not
uecessarily limited ta:
a. Temporaiy utilities
b. 5aiut�ty facilities
c. Storage Sheds and Buildings
d. Dust contral
e. Temparaiy fencing of the construction site
B. De�iations fi�om t1u5 Ciry of Fort Worth Standard Specification
1. None.
C. Related Sgeci�cation Sectians iuclude, Uut are not uecessarily limited to:
1. Division a— Eiddin� Requirements. Contract FoiYus and Conditions of tlie Cont��act
2. Division 1— General Requiretnevts
1.2 PRICE AND FAYNIENT PR�CEDL]RES
A. Meast�rement and Payment
1. Work associated with this Iteiu is cansidered subsidiaiy to the various Iteius bid.
No separate payment will be allowed for tlus Item.
1.3 REFEIiENCES [N�T USED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS
A. Temgaraiy Utilities
Obtaiiung Temporary Seivice
a. Make airangements with utility service cainpanies far temporary seivices.
b. Abide by rules aud regulations of utility service companies or authorities
haviug jurisdiction.
c. Be respousiUle far utiliry service costs until Work is approved for Final
Acceptance.
1} Ivcluded are fuel, pawer, light, heat and ather utiliry seivices necessaiy for
execution, completion, testiug and iiutial operation of �Vork.
Water
a. Contractor to provide water required for and iu conuection with Work to be
perFoiYued aud for �pecified te�ts af pipuig, equipmeut, devices or ather use as
requu�ed far the comgletion af the Wark.
b. Provide aud maintain adequate supply af potable water far damestic
consumption by Conaactor persouuel and Ciry's Praject Representatives.
c. Coordination
1} Cantact City 1 week before water far const�lictian is desued
CITY QF FQRT WQRTH Keller Cmscin�a Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N DOG"CTMENTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142$75
Re��ised 7LTLY 1, 2D 11
415444-2
DAP TEMPORARY FACILTTIES ANfl CQNTROLS
Page 2 of 4
d. Contractor Payment for Canstructian Water
1} �btain constructian water meter fram City for payuient as billed Uy City's
established rates.
3. Electricity and Lighting
a. Provide aud pay far electric powered seivice as required for Work, iucludiug
testivg af Work.
1} Provide pawer for lightuig, operatian of equipment, or ather u5e.
b. Eleca�ic pawer �eivice includes teiuporary power service ar generator to
maiutain operations during �c}�eduled shutdaum.
4. Telephane
a. Provide emergency telephone seivice at Site far use Uy Coutractor persamiel
and others perfarn7in� u+ork or fiu7us}�ing services at Site.
5. Temporaiy Heat and Ventilation
a. Provide temporaiy heat as necessary for grotection or completion of Work.
b. Provide temporaiy heat aud veutilation to assure safe worl�ing canditious.
B. Saiutaiy Facilitie5
1. Provide aud maintaui saiutary facilities for persons an Site.
a. Comply with regulatians af State and local departments of health.
2. Enfarce use af saiutaiy facilities by constructinn personnel at joU site.
a. Enclose and anchor saiutary facilities.
b. No disc}�arge will be allowed fram these facilities.
c. Collect aud stare sewa�e and waste sa as not ta cause nuisance or health
proUlem.
d. Haul sewage and waste off-site at uo less tl�u weekly uitezval5 and praperly
dispose in accordance with applicable regulation.
3. Locate facilities near Work Site and keep clean and ivaiutaiued tlu�oughout Fraject.
4. Rema�e facilities at campletion of Project
C. Storage 5heds and Suildings
1. Provide adequately ventilated, watertight, weatherproof stara�e facilities with floor
above gra�uid level for material� and equipment susceptible ta weather dau��e.
2. Storage of materials not susceptible to weather dar��e n�y be an blocks aff
graund.
3. Store n�terials ui a neat aud orderly mamier.
a. Place n�terials and equipment to permit easy aecess for identification,
inspection avd inventoiy.
4. Equip buildin� witli lockable doors aud lighting, and pravide electiical service for
equipi�ient �pace heater� and t�eativg ob� ventilatian as necessaiy to pravide 5tora�e
envirotunevts acceptable ta specified inanufacturers.
5. Fill and g,xade site far teuiporaiy st�lict�ues ta pro�ide drainage away fiam
temporary and existiug buildiugs.
6. Remove building from site prior ta Fuial Acceptance.
D. Temgoraiy Fencuig
1. Provide aud maintain far the dul�atian ar consauction when required in coutract
docuiuents
E. Dust Coutrol
CITY QF FQRT WQRTH Keller Cmscinoa Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N DOG"CTMENTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142875
Re��ised 7LTLY 1, 2D 11
415444-3
DAP TEMPORARY FACILTTIES ANfl CQNTROLS
Page 3 of 4
1. Contractor is responsible for maintainiug dust cant��ol tlu�ough the duration af the
proj ect.
a. Contractor reu�aius ou-call at all times
b. Must respond in a timely matmer
F. Temparaiy Frotectian of Consalictiou
1. Contractor or subcontractars are respansible for protectin� Work fi�om dama�e due
ta weather.
1.5 SUBMITTALS [N�T USED]
1.6 ACTIUN SLJBMITTALSIIlVFORMATI�NAL SUBMITTALS [NOT USED]
1.7 CL�SE�LTT SUSNIITTALS [N�T USED]
1.8 MAINTENANCE MATERIAL SLTBNIITTALS [NUT USED]
1.9 QUALITY ASSLTRANCE [N�T USED]
1.10 DELIVERY, STORAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CalYDITI�NS [N�T LTSED]
1.12 WARRANTY [N�T USED]
PAAT 2 - PRODUCTS [N�T LTSED]
PAAT 3 - E�ECUTI�N [N�T USED]
3.1 IlVSTALLERS [N�T USED]
3.2 EXAMIlYATI�IY [N�T LTSED]
3.3 PREPARATI�N [N�T USED]
3.4 IlVSTALLATI�N
A. Temporaiy Facilities
1. Maintain all temporaiy facilities far divatian of canstructian activities as needed.
3.5 [REPAIIZ] ! [RESTORATI�N]
3.6 RE-IlVSTALLATIaN
3.7 FIELD [ax] SITE QUALTTY C�NTRUL [N�T LTSED]
3.8 SYSTEM STARTUP [N�T LTSED]
3.9 ADJUSTING [NaT USED]
3.10 CLEANING [N�T USED]
3.11 CL�SE�LTT ACTIVITIES
A. Temparaiy Facilities
CITY QF FQRT WQRTH Keller Cmscinoa Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N DOG"CTMENTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142875
Re��ised 7LTLY 1, 2D 11
415444-4
DAP TEMPORARY FACILTTIES ANfl CQNTROLS
Page 4 of 4
1. Remave all temparaiy facilities and restare area after completian of the Work, ta a
condition equal to ar better than prior to start of Work.
3.12 PRaTECTIUN [N�T LTSED]
3.13 MAINTENANCE [NOT LTSED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTIDN
Rez�ision Log
DATE NAME SUMMARY OF CHANGE
CITY QF FQRT WQRTH Keller Cmscinoa Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N DOG"CTMENTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142875
Re��ised 7LTLY 1, 2D 11
41 55 26 - 1
DAP STREET USE PERMIT AND MOI}IFTCATIDNS Td TRAFFIC CdNTRQL
Page 1 of 3
SECTIUN 0155 26
STREET LTSE PERMIT AND M�DIFICATIONS T� TRAFFIC CaNTRaL
F'AAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. Admiui�trative pracedw�es for:
a. St�eet Use PeiYuit
b. Modificatian of appao�ed traffic cautral
c. Removal of Sa�eet Sigus
B. Deviations fi�om tlus Ciry of Fort Worth Standard Specificatian
1. Noue.
C. Related Specification Sectians iuclude, Uut are not uecessarily limited to:
1. Divisiov 0— Biddin� Requuements, Coutract Foi�s aud Couditions of the Cant��act
2. Division 1— General Requiretnents
3. Sectian 34 71 13 — Traffic Cavtrol
1.2 PRICE AND PAYNIENT PR�CEDL]RES
A. Meast�rement and Payment
1. Work associated with this Item is cansidered subsidiaiy to the vaiious Iteuis bid.
No separate gayment will be allawed for ttus Item.
1.3 REFEliENCES
A. Reference Stavdards
1. Refereuce standards cited in tlus sgecification refer tn the ct�ent reference standard
published at the time af the latest re�ision date lo�ged at the end of this
specification, unless a date is specifically cited.
2. Texas Manual on Uiuform Traffic Contral Devices (TMLT"fCD).
1.4 ADNII1tiTISTRATIWE REQUIREMENTS
A. Traffic Canc�ol
General
a. W}len traffic cona•ol plaus are included iu the Drawings, pro�ide Traffic
Cantral iv accordavice with Drawings and Section 34 71 13.
b. W}ieu traffic cana�ol plaus are not included in the I3rawin�s, pregare traffic
contral pla.us iu accordance with Section 34 71 13 and �ubnut to City for
review.
1} Allaw miniiuuiu la worl�ing days for review of prapased Traf�ic Covtrol.
B. Saeet Use PeiYuit
1. Prior to installation of Traffic Cont�ol, a City Sa�eet Use Peruut is required.
a. To obtain Street U5e Pen�ut, suUmit Traffic Cont�ol Plans to City
Transgairtation a�td Public Works Departmeut.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATTON I]QCUMENTS — DEVEL�PER AR7ARDED PR47ECTS City Project No. 102875
Re��ised 7uly 1, 2011
41 55 26 - 2
DAP STREET USE PERMIT AND MOI}IFTCATIDNS Td TRAFFIC CdNTRQL
Page 2 of 3
1} Allaw a miiumuln of 5 worl�in� days for peiYnit review.
2} Contractor'� re�pansibility to caardinate review of Traffic Cantrol plays far
Saeet Use PeiYuit, such that canstructian is uat delayed.
C. Modificatian to Appraved Traffic Conhal
Prior to installation trafFc cant�al:
a. Subnut re�rised aaf�ic canaol plans to City Departmeut Transportatian and
Public Works Departiuent.
1} ReviSe Traffic Coutrol plan� iu accordauce with Section 34 71 13.
2} Allaw miniiuuiu 5 workui� days far review of revised Traffic Cont�al.
3} It is the Conaactar's responsiUility to coordinate review of Traffic Control
plans for St�eet ZTse Pernut, such that construction is not delayed.
D. Rema�al of Sa�eet Si�u
1. If it is detertiuned that a street sigu must Ue rema�ed for construction, then contact
City Transpoirtatian and Public Warks Depaitment, Si�us and Marl�ings Divisian to
reinave the sigr►.
E. Temporaiy Sigx►age
1. Iu the case of regulatoiy sigps, replace permanent sigx► with temporary sign iueetin�
requu�ement5 of the latest edition af the Texas Manual ou Uiufonn Traffic Cautrol
De�ices (MiJTCD).
2. Iustall temparaiy sign Uefore the remo�al af pern�nent sigu.
3. W}�en const�lictiau is complete, ta the extent t}�at the pei�nanent sigai can be
reinstalled, contact the City Transportatian and Public Warks Department, Signs
and Markings Divisiau, to reiustall the permanent sigx►.
F. Traffic Cant�ol Standards
1. Traffic Cant�ol Standards can be found on the Cit�r's Buzzsaw website.
1.5 SUBMITTALS [N�T USED]
1.6 ACTIUN SL]BMITTALSIINFURMATI�NAL SiTBNIITTAI.S [NOT USED]
1.7 CL�SE�LTT SUBMITTALS [N�T USED]
1.8 MAINTENANCE MATERIAL SLTBNIITTALS [NUT USED]
1.9 QUALITY ASSLTRANCE [N�T USED]
1.10 DELIVEAY, STORAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CONDITI�NS [N�T LTSED]
1.12 WARRAiVTY [N�T USED]
PAAT 2 - PRODUCTS [N�T LTSED]
PAAT 3 - E�ECUTI�N [N�T USED]
END OF SECTION
CITY QF FQRT WQRTH Keller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATTON I]QCUMENTS — DEVEL�PER AWARDED PR47ECTS City Project No. 102875
Re��ised 7uly 1, 2011
41 55 26 - 3
DAP STREET USE PERMIT AND MOI}IFTCATIDNS Td TRAFFIC CdNTRQL
Page 3 of 3
Rei-ision Lag
DATE NAME SUMMARX �F CHANGE
CITY QF FQRT WQRTH Keller Cmssing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATTON I]QCUMENTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised 7uly 1, 2011
415713-1
DAP STDRM WATER POLLUTIQN PREVEN'ITON
Page 1 of 3
SECTIUN 0157 13
STORM WATER P�LLUTI�N PREVENTION
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. Proeedures for Stonn Water Pallutian Prevention Plans
B. De�iations fi•am tlus City of Fort Wort}� Standard Specification
1. None.
C. Related Specification Sectians include, Uut are not necessarily limited to:
1. Division a— Biddiug Requirements, Cona�art Fai�ns and Conditiaus af t}�e
Contract
2. Division 1— General Requireinents
3. Sectian 31 25 UU — EroSian and Sedimeut Cana�ol
1.2 PRICE AND PAYNIENT PR�CEDL]RES
A. Meast�rement and Payment
1. Canst�liction Activities result�ig iv less than 1 acre of disturbance
a. Work associated with this Iteiu is cansidered subsidiaiy ta the various Iteu�s
bid. Na separate payment will be allawed for this Item.
2. Const�liction Activities resultuig iv gx�eater thau 1 acre af disturbauce
a. Meast�rement and Payment shall be iu accordance with Section 31 25 UU.
1.3 REFEliENCES
A. Abbreviatians and Acranyms
1. Notice of uitent: N�I
2. Notice af Tei7nivatiou: NOT
3. Stonu Water Pollutian Prevention Plan: SWPPP
4. Texas Couiuiissian ou Eu�iramneutal Quality: TCEQ
5. Notice af Chan�e: NOC
A. Refereuce Staudards
1. Refereuce standards cited in tlus Specification refer ta the current reference
standard publi�}�ed at the time af the latest re�ision date lo�ged at the end of thi�
Sgecificatian, ui�less a date is specifically cited.
2. Ivtegrated Storm Manageiuent (i5W11�I) Tecluucal Manual for Canstruction
Contrals
1.4 ADNII1tiTISTRATIVE REQUIREMENTS
A. General
1. Contractor is responsible for resalution and paymeut of any fines issued associated
with compliance to Stonuwater Pollution Fre�ention Plan.
CITY QF FQRT WQRTH Keller CrosC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PR47ECTS City Project No. 1 a2875
Re��ised 7uly 1, 2011
415713-2
DAP STDRM WATER POLLUTIQN PREVEN'ITON
Page 2 of 3
B. CDI15C111Ct10I1 f�CT1V1C1E5 Te5l11C1i1� Lil:
1. Less t}�av 1 acre of dist�ubance
a. Provide erasion aud sediment conaal in accardance ��it1i Sectian 31 25 aa avd
Drawings.
2. 1
b
to less than 5 acres of disn�rbance
Texas Pollutant Dischar�e Elittunation System (TPDES} General Construction
PeiYnit is requu•ed
Complete SWPPP in accordance with TCEQ requireinents
1} TCEQ Small Coust�-uction Site Notice Requued under general pern�it
THIt150000
a} Sigai andpast at jab site
b} Prior to Precanstiuctian Meeting, send 1 capy to Ciry Department af
Transpai�tatiau avd Public Works, Envu�oiuuental Divisiou, (817} 392-
6088.
2} Provide erosion avd sediment canaol in accardance with:
�} se�rio�� � i 2s aa
b} The Drawiugs
c} TXR150000 General Peniut
d} SWPPP
ej TCEQ requu�ements
5 acres or mare af Distul•Uance
a. Texas Pollutant Dischar�e Eluiunation System (TPDES} General Coustructian
PeiYnit is requu�ed
b. Complete SWPPP in accordance with TCE� requirements
1} Prepare a TC�Q NflI fonn and subuut to TCEQ along with requu�ed fee
a} Sigai andpast at jab �ite
b} Send copy ta City Depairtment af Tran�partation and Public Warks,
Enviraumental Di�risian, (817} 392-6aSS.
2} TCEQ 1Votice of Chan�e required if mal�ing changes ar updates to N�I
3} Provide erosion and sediment cont�al in accardance witli:
�} se�ria�� � i 2s aa
b} Tt�e Ihawiugs
c} TXR150000 General Peniut
d} SWPPP
e} TCEQ requu�ement�
4} Qnce the project l�as been completed avd all the closeaut requirements af
TCEQ have been met a TCEQ Noti�e of Termination can be subnutted.
a} Send copy ta City Departiuent af Tran�portation and Public Warks,
Enviromnental Division, (817} 392-6a88.
1.5 SUBMITTALS
if���
Subnut ui accardance with Section 41 33 00, except as stated hereiu.
a. Prior to the Preconstrlirtion Meetin�, subnut a dl�aft copy af SWPPP to the City
as follows:
1} 1 capy to the City Froj ect Manager
a} City Fraject Mana�er will forward to the City Department of
Transpairtatiau aud Public Works, Envu�oiuuental Divisiou for review
CITY QF FQRT WQRTH Keller CrosC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PR47ECTS City Project No. 1 a2875
Re��ised 7uly 1, 2011
415713-3
DAP STDRM WATER POLLUTIQN PREVEN'ITON
Page 3 of 3
B. Modified SWPPP
1. If the SWPPP is revised durin� const�uction, resuUmit modified SWPPP ta the Ciry
in accordance with Sectiou U1 33 Ofl.
1.6 ACTIUN SLJBMITTALSIIlVFORMATI�NAL SUBMITTALS [NOT USED]
1.7 CL�SE�LTT SUSMITTALS [N�T USED]
1.8 MAINTENANCE MATERIAL SLTBNIITTALS [NUT USED]
1.9 QUALITY ASSLTRANCE [N�T USED]
1.10 DELIVEAY, STORAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CONDITI�NS [N�T IISED]
1.12 WARRANT'Y [N�T USED]
PAAT 2 - PRODUCTS [N�T LTSED]
PAAT 3 - E�ECUTI�N [N�T USED]
END OF SECTION
Rei-ision Lag
DATE NAME SUMMARY OF CHANGE
CITY QF FQRT WQRTH Keller CrosC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PR47ECTS City Project No. 1 a2875
Re��ised 7uly 1, 2011
415813-1
DAP TEMPORARY PRd7ECT SIGNAGE
Page 1 of 3
SECTIUN 0158 13
TEMPORARY PROJECT SIGNAGE
F'AAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. Temporaiy Froject Si�aiage Requirements
B. De�iations fi•am tlus City of Fort Worth Standard Specificatian
1. None.
C. Related Specification Sectians include, Uut are not uecessarily limited to:
1. Division a— Biddin� Requirements, C.outract Foi�s and C.ouditians af the Cana�act
2. Division 1— General Aequiretnents
1.2 PRICE AND PAYNIENT PR�CEDL]RES
A. Meast�rement and Fayment
1. Work associated with this Item is cansidered subsidiaiy to the vaiious Iteu�s bid.
No separate gayment will be allawed for ttus Item.
1.3 REFEliENCES [N[3T LTSED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS [NQT USED]
1.5 SUBMITTALS [NOT USED]
1.6 ACTI�N SLTBMITTALSIINFORMATI�NAL SLTBMITTAI.S [NaT USED]
1.7 CL�SE�LTT SUSNIITTALS [N�T USED]
1.8 MAINTENANCE MATERIAL SLTBNIITTALS [NUT USED]
1.9 QUALIT'Y ASSURANCE [NQT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CONDITI�NS [N�T LTSED]
1.12 WARRANTY [NOT USED]
PAAT2- PRODUCTS
2.1 OWNER FLTRNISHED [oR] OWNER-SUPPLIEDPRUDLTCTS [NOT USED]
2.2 EQUIPMENT, P1t�DLTCT TYPES, AND MATERIALS
A. Desi�ai Criteria
1. Provide fi�ee standing Praject Desiguation Sign in accardance with City's Standard
Details far project 5igns.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaCCTMEIVTS — DEVEL�PER AR7ARDED PRQ7ECTS City Praject Na. 1D2875
Re��ised Apri17, 2014
415813-2
DAP TEMPORARY PRd7ECT SIGNAGE
Page 2 of 3
B. Material�
1. Sig�i
a. Consnlicted of 3/d-inch fir plywaad, grade A-C (extei7or} ar Uetter
2.3 ACCESS�1tIES [NOT USED]
2.4 S�URCE QUALTI'Y CONTR�L [N�T LTSED]
PAAT 3 - E�ECUTI�N
3.1 IlVSTALLERS [NOT USED]
3.2 E�MINATION [NOT USED]
3.3 PREPARATI�N [N�T USED]
3.4 IlVSTALLATI�N
A. General
1. Provide vertical installatian at extents of project.
2. Relocate sigai a� needed, upon request of the City.
B. Mountiug aptians
a. Skids
b. Pasts
c. Bairicade
3.5 REPAIA 1 RESTORATI�N [NDT LTSED]
3.6 RE-INSTAI.LATI�N [N�T USED]
3.7 FIELD [ax] SITE QUALTTY C�NTRUL [N�T LTSED]
3.8 SYSTEM STARTUP [N�T LTSED]
3.9 ADJLTSTING [NOT USED]
3.10 CLEANING [N�T USED]
3.11 CL�SE�LTT ACTIVTI'IES [NOT USED]
3.12 PRaTECTIUN [N�T LTSED]
3.13 MAINTENANCE
A. General
1. Maintenance will iuclude paiuting and repairs as ueeded ar duected by the City.
3.14 ATTACHMENTS [NflT USED]
END OF SECTIDIV
CITY QF FQRT WQRTH Keller CmsC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised Apri17, 2014
415813-3
DAP TEMPORARY PRd7ECT SIGNAGE
Page 3 of 3
Rei-ision Lag
DATE NAME SUMMARY OF CHANGE
4.7:2D14 M. I3amenech Revised for DAP appli�ation
CITY QF FQRT WQRTH Keller Cmssing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised Apri17, 2014
O1 60 00
I}AP PRQDUCT REQUIREMENCS
Page 1 of 2
SECTIUN 0150 4�
PRODUCT REQLTIREMENTS
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. References for Product Requirements aud Ciry Standard Products List
B. De�iations fi•am tlus City of Fort Wort}� Standard Specificatian
1. None.
C. Related Specification Sectians iuclude, Uut are not uecessarily limited to:
1. Division a— Biddin� Requirements, C.outract Foi�s and C.ouditians af the Cana�act
2. Division 1— General Aequiretnents
1.2 PRICE AND PAYNIENT PR�CEDL]RES [NOT USED]
1.3 REFEliENCES [N�T LTSED]
1.4 ADNIIIYISTRATIVE REQUIREMENTS
A list of City approved products far use is a�ailaUle tluough the Ciry's weUsite at:
httus:llanns.fortwarthteaas.gavlPraiectResourcesl and fallowing the directoiy
path, 02 - Coustruction DoculneutslStandard Products List
A. �nly products speci�ically included ou City's Staudard Froduct List in these Conaact
Documents shall be allawed for use an the Project.
1. Any subsequently appraved products will only be allawed for use upan specific
approval by the City.
B. Auy specific product re�uirements in the Cantract Doc�unents supersede sinular
products included on the City's Standard Froduct List.
1. The City reseives t}�e right to not allow praducts to be used for ceirtaiv projects even
though the product is listed on the City's Standard Product List.
C. Althou�h a specifi� product is iucluded on City'S Staudard Froduct List, not all
products fram that ti�anufact��rer are approved for use, iucludin� but not limited ro, that
u�nufacn�rer'S standard product.
D. See Sectian U1 33 UU for subuiitt�l requirements af Product Data iuchided on City's
Standard Praduct List.
1.5 SUBMITTALS [N�T USED]
1.5 ACTIUN SiJBMITTALSIINFURMATI�NAL SiTBNIITTALS [NOT USED]
1.7 CL�SE�LTT SUBNIITTALS [N�T USED]
1.8 MAINTENANCE MATERIAL SLTSNIITTALS [NUT USED]
1.9 QUALIT'Y ASSLTI2ANCE [N�T USED]
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N DQCUMENTS — DEVEL�PER AR7ARDED PRQ7ECTS City Praject Na. 1D2875
Re��ised 14farch 20, 2020
O1 60 00
I}AP PRQDUCT REQUIREMENCS
Page 2 of 2
1.10 DELIVEAY, STDAAGE, AND HANDLING [N�T LTSED]
1.11 FIELD [SITE] CONDITI�lVS [N�T LTSED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [N�T LTSED]
PART 3 - EKECUTI�N [N�T USED]
END OF SECTION
Rez�ision Log
DATE NAME SUMMARY OF CHANGE
1D� 12:`12 D. 7ahnsan Modified Lacatiaii of City's Staudard Pradu�t List
4;'7, 2014 M,I3amenec}► Re�ised for DAP agpli�atiou
03.'2D.'2D2D D.V. Magana
Remo�-ed refc�•c���e to BLu.zsa�r- aud nated tl�at the City appra�-ed produets list is
accessible throii�h tl�e City's ���ebsite.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N DQCUMENTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project Na. 1 Q2875
Re��ised 14farch 20, 2020
41 66 44 - 1
DAP PRQDUCT STQRAGE A1VD HANDLING REQLTIREMEN'PS
Page 1 of 4
SECTIUN �155 4�
PR�DLTCT STORAGE AND H,4NDLING REQLTIltEMENTS
F'AAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. Scheduling af product deliveiy
2. Packagan� of products for deli�eiy
3. Protection af praducts against damage fram:
a. Handliug
b. Exposuz�e to elements or harsh en�iramneuts
B. Deviations fi•om tlus City of Fort Worth Standard Specification
1. None.
C. Related Specification Sectians iuclude, Uut are not uecessarily limited ta:
1. Division �— Bidding Requu�ements, Coutract Foru�s aud Couditions of the Contract
2. Division 1— General Requiretnents
1.2 PRICE AND PAYNIENT PR�CEDL]RES
A. Meast�rement and Payment
1. Work associated with this Iteiu is cansidered subsidiaiy to the vaiious Iteuis bid.
No separate gayment will be allawed for ttus Item.
1.3 REFEliENCES [N�T LTSED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS [NaT USED]
1.5 SUBMITTALS [N�T USED]
1.6 ACTIaN SLJBMITTALSIIlVFORMATI�NAL SUBMITTALS [NOT USED]
1.7 CL�SE�LTT SUSNIITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SLTBNIITTALS [NUT USED]
1.9 QUALITY ASSLTRANCE [N�T USED]
1.10 DELIVERY AND HANDLIlVG
A. Deliveiy Requu�emeuts
1. 5chedule delivery of praducts or equipment as required to allow tiiuely uistallatian
and t� avoid pralonged stora�e.
2. Provide apprapriate persamiel and equipment to recei�e deliveries.
3. Deliveiy t�ucks will nat be pei�nitted to wait exteuded periads af time on the Site
for persoiwel ar equipment ta receive the delivery.
CITY QF FQRT WQRTH Keller CmsC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFICATT4N DQCUMEN'I5 — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised Apri17, 2014
41 66 44 - 2
DAP PRQDUCT STQRAGE A1VD HANDLING REQLTIREMEN'PS
Page 2 of 4
4. Deli�er products or equipment in manufacturer's original uubraken cartans ar atlier
contaiuers desigaied and consalicted to protect the cantents fiomphysical or
enviraiunevtal damage.
S. Clearly and fiilly mark a.ud ideutify a� to ma.uufacturer, item aud in�tallatian
lacatiau.
6. Provide n�nufact��rer's instructions for storage and handliug.
B. Handliug Requirements
1. Handle products or equip��ient iu accordance with these Contract Daculnents aud
u�anufacn�rer'S recouimendatians and ii�st�lictiaus.
C. Storage Requirements
1. Store n�terials ui accardance with manufacturer'� recanuneudatians avd
requu�ements of these Specificatious.
2. Make necessary pravisiovs for safe storage af uiaterials and equipment.
a. Place loo�e soil matetials a�id u�terials to be iucorparated ivto Wark to prevent
daiva�e to any part of Wark or existui� facilities aud to u�ivtain fiee acces� at
all times to all parts af Work and to utility service company installatians ui
viciiury of Work.
3. Keep �terials and equigment neatly and compactly stored iu locations that will
cause minimum uicanveuieuce to other coutractars, public t�avel, adjoiuiug awuers,
tenavts and accupants.
a. An�an�e stora�e to provide ea�y acce�s for in�pection.
4. Rest��ict storage to u�eas available an constructian site for storage of material and
equigmevt as showu on Ihawings, ar appraved Uy City's Froject Representative.
5. Provide aff=site storage aud protection when on-site stora�e is uot adequate.
a. Provide addresses of and aecess to aff-site starage locations for inspection by
City's Project Representative.
6. Do not use lawus, ga�ass plots ar ather private properry for starage piupases without
written peri�ussian af owner or other persan ui pos�ession or cantral af preuuses.
7. Store ui manufacturers' unopened coutaiuers.
S. Neatly, safely and compactly stack materials delivered and stored along live of
Work to avaid iucon�eiuence aud dan�ge ta praperty owuers aud geueral puUlic
and maintain at least 3 feet fi�om fue hydrant.
9. Keep public and private driveways and street crassiugs opeu.
14. Repau� ar replace dan�ged lawns, sidewalks, streets or other impro�ements to
sati�faction of City's Project Representative.
a. Total length which materials ivay be disaibuted alang route of coust�lictiou at
aue time is 1,QUa luiear feet, unless atherwise appraved ui writing by City's
Project Representative.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFICATT4N DQCUMEN'I5 — DEVEL�PER AWARDED PRQ7ECTS City Project No. 102875
Re��ised Apri17, 2014
41 66 44 - 3
DAP PRQDUCT STQRAGE A1VD HANDLING REQLTIREMEN'PS
Page 3 of 4
1.11 FIELD [SITE] CONDITI�NS [N�T LTSED]
1.12 WARRANTY [N�T USED]
PAAT 2 - P1i0DUCTS [N�T LTSED]
FAAT 3 - E�ECUTI�N
3.1 IlYSTALLEAS [N�T USED]
3.2 EXAMINATI�N [N�T LTSED]
3.3 PREPARATIDN [N�T USED]
3.4 ERECTI�N [N�T USED]
3.5 REPAIlt 1 RESTaRATION [NOT USED]
3.6 RE-INSTAI.LATIaN [N�T USED]
3.7 FIELD [ax] SITE QUALTTY C�NTRUL
A. Tests avd Inspections
1. Iuspect all products or equipmeut delivered to the site prior to uuloading.
B. Non-Caufai7niug Work
1. Reject all products or equipmeut that are damaged, used or iu any other way
tu�satisfactary far use ov the praject.
3.8 SYSTEM STARTUP [N�T LTSED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NDT USED]
3.11 CL�SE�LTT ACTIVITIES [NOT USED]
3.12 PRaTECTIUN
A. Protect all product5 or equipmeut iu accordauce with n�nufacturer's written directions.
B. Store products ar equipment in lacatiou to a�oid physical dati�age ta iteuis while in
storage.
C. Protect equipiuent f�am expost�re ta elements and keep thorau�l�ly dry if required by
the manufacturer.
3.13 MAINTENANCE [NOT LTSED]
3.14 ATTACHMENTS [NflT USED]
END OF SECTION
CITY QF FQRT WQRTH Keller Cmssing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFICATT4N DQCUMEN'I5 — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised Apri17, 2014
41 66 44 - 4
DAP PRQDUCT STQRAGE ANI3 HANDLING REQLTIREMEN'PS
Page 4 of 4
Rez-ision Lag
DATE NAME SUMMARY �F CHANGE
4;'7,1014 M,I3amenec}► Revised for DAP appli�ation
CITY QF FQRT WQRTH Keller Cmssing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFICATT4N DQCUMEN'I5 — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised Apri17, 2014
41 74 44 - 1
DAP MQBILIZATIQN AND REMdBILIZATIQN
Page 1 of 4
SECTIUN 0170 4�
M�BII.IZATI�N AND REMOBII.IZATIaN
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. MoUilization and Demobilization
a. MoUilization
1} Transportation of Canaactor's personuel, equipment, and operating supplies
to the Site
2) Establishment of necessary �eneral facilities for the Conaactor's ogeratiau
at the Site
3} Prei�uulns paid far perforu�nce and payment bands
4} TranSportation of Canaactar's personuel, e�uipment, and aperatuig supplies
ta anather lacation withiu the desigvated Site
5) Relocatian af necessary �eneral facilities far the Cantractar's operatiou
fi•am 1 location to anather lacation on the Site.
b. DemoUilizatiau
1} Transportation of Canaactar's personuel, equipment, and operatuig supplies
away from the Site includuig disasseiubly
2} Site Clean-up
3} Remaval of all builclin�s andlor ather facilities asseiubled at the Site far tlus
Cant�act
c. Mabili�ation and Demobilization do nat iuclude a�ti�ities far specific iteu�s of
work that are for wluch payinent is provided elsewhere in the contract.
2. Remabilization
Remobilization for Suspension of Wnrk specifically requued ui the Contract
Doculneuts or as requu�ed by City iuclude5:
1} DemoUilizatiau
aj Transportation of Cana•actor's personuel, equipment, and aperating
supplies f�•am the Site ivcludivg di5assemUly or temporarily 5ecw•iug
equipment, supplies, and ather facilities as designated by the Contract
Dacuznents neces�aiy to suspevd the Work.
b} Site Cleau-up a5 desig�ated in the Contract Documents
2} Remobilization
a} Transportatian of Cana�actar's persoiutel, equipmeut, and aperativg
supplies to the Site necessaiy ta resulne the Work.
b} Establishment of ueces�ary �eneral facilities for the Cant��actor's
operatiov at the Site necessary to resulne the Work.
3} No Payments will be made for:
a} Mobili�ation and Demobilization from ane location ta another on tlie
Site in the noi�l progXess ofperforu�iug the Work.
b} Stand-by or idle time
c} Last profits
3. MaUilizations and DemaUilization for Miscellaneous Projects
a. MoUilization avd Deinobilizatian
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project No_ 102875
Re��ised Apri17, 2014
41 74 44 - 2
DAP MQBILIZATIQN AND REMdBILIZATIQN
Page 2 of 4
1} Mabili�ation shall consist af the activities and cost au a Wark flrder basis
neces�ary for:
a} Transportation of Cana�actar's persouuel, equipmeut, and aperatiug
supplie5 to the Site for tlie issued Work Order.
b} Establishment of ueces�ary general facilities for the Cont�actor's
operation at the Site far the issued Work Order
2} DemoUilization sl�ll consist of the activities avd cost necessaiy for:
a} Transportation of �ana�actor's persoiutel, equipmeut, and aperatiug
sugglies f�am the Site iuchidiug disasseiuUly for each issued Work
Order
b} Site Cleau-up for each issued Wark Order
c} Removal of all buildin�s or other facilities assemUled at the Site for
each Wark flder
b. Mabili�ation and Demobilization do not iuchide a�tivities far specific iteu�s of
work for which payment is provided elsew}�ere in the contract.
4. Emer�ency Mobilization� and I3emabili�atiou for Miscellaneous Prajects
a. A MoUilization for Miscellaneaus P-roject� when directed by the City and the
moUilization occi�rs witlun 24 hours of the issuance of the Wark Order.
E. De�iations fi�om tlus Ciry of Fort Worth Standard Specificatian
1. None.
C. Related Specification Sectians iuclude, Uut are not uecessarily limited to:
1. Division a— Biddin� Requu�ements, Coutract Foi�s aud Couditions of the Canh�act
2. Division 1— General Requirez�ients
1.2 PRICE AND PAYNIENT PR�CEDL]RES
A. Meast�rement and Payment
MoUilization aud Deinabilizatian
a. Measi�re
1} This Item is considered subsidiaiy to the �aiious Items bid.
b. Payi�ient
1} The work performed and u�terials fulnished in accordance with tlus Iteiu
are subsidiaiy to the vaiious Iteu� bid and no other compensatian u+ill Ue
allowed.
Remabilization for suspensiou of Wark as sgecifically requued in t}�e Cantract
Documents
a. Meast�rement
1} Meas�u�ement for tlus Item shall Ue per each remabilization perforiued.
b. Payinent
1} The workperformed and uiaterials fiiiYust�ed ui accordance with this Item
and iueasured as pro�ided u.uder "Measuretnent" will Ue paid for at the uiut
price per eac}� "Specified Remobilization" iv accordance wit}� Cont�•act
DOCL11I1�L1t5.
c. The price shall include:
1} DemoUilizatiau as described in Section 1.1.A.2.a.1}
2} Remobilization a5 descriUed in Section 1.1.A.2.a.2)
d. No payments will be made for staudby, idle time, ar lost prafits associated this
Item.
CITY QF FQRT WQRTH Keller Cmscin�a Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142$75
Re��ised Apri17, 2014
41 74 44 - 3
DAP MQBILIZATIQN AND REMdBILIZATIQN
Page 3 of 4
Remabilization for suspensiou af Work as requued by City
a. Meast�rement and Payment
1} Tlus shall Ue subnutted as a Contr�ct Claim in accord�ice with Article la
❑f Section 00 72 Ofl.
2} No payiuents will be u�ade far standUy, idle time, OI' I05t ]]I'O�1C5 �55dC1�T�C�
with this Item.
4. MoUilizations and DemoUilizations far Miscellaneau� Prajects
a. Meast�rement
1} Meas�u�ement far tlus Item shall Ue far each Mabilization and
Deinabilization requu�ed by the Cont�act Documents
b. Payinent
1} The Wark perfonued aud inaterials fiu-�us}�ed ui accardance with tlus Itein
and iueasured as provided u.uder "Meas�uement" will be paid for at the uiut
price ger each "Work arder Mobilization" in accorciance with Contract
Dorulneuts. Demobilization shall be coi�sidered suUsidiaiy ta moUilization
and shall nat Ue paid for separately.
c. The price shall include:
1} MoUilization as described iu Sectiov 1.1.A.3.a.1}
2} DemoUilizatiau as de�cribed ui Section 1.1.A.3.a.2}
d. No payments will be made for staudby, idle tiiue, or lost profits associated this
Item.
Emer�ency Mobilizations and Demabili�ation� for Miscellaneous Frojects
a. Meast�rement
1} Measur�ement for tlus �tem shall be far each l��obilization and
Demobilization requu•ed by the Cont�act Documents
b. Payinent
1} The Work perfonued a.ud materials fi�us}�ed ui accordance with tlus Item
and iueasua�ed as provided uvder '`Measurement" will Ue paid for at the usut
price per each "Wark nrder Emergeucy MoUilizatian" in accordance with
Canaact Documents. DemaUilization s}�all be cansidered subsidiaiy ta
moUilization and shall uot be paid for separately.
c. The price s}�all include
1} MoUilization as described iu Sectiav 1.1.A.4.a}
2} DemoUilization as de�cribed in Section 1.1.A.3.a.2)
d. No payments will be made for standby, idle tinte, or last profits associated this
Item.
1.3 REFERENCES [N�T IISED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 IlVFORMATIDNAL SUBNIITTALS [NOT USED]
1.7 CL�SE�LTT SUSNIITTALS [N�T USED]
1.8 MAINTENANCE MATERIAL SLTBMITTALS [NOT USED]
1.9 QUALITY ASSLTRANCE [N�T USED]
1.10 DELIVERY, STORAGE, AND HANDLING [N�T LTSED]
CITY QF FQRT WQRTH Keller Cmscin�a Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 142$75
Re��ised Apri17, 2014
41 74 44 - 4
DAP MQBILIZATIQN AND REMdBILIZATIQN
Page 4 of 4
1.11 FIELD [SITE] C[]NDTTI�NS [N�T LTSED]
1.12 WARRANTY [N�T USED]
PAAT 2 - P1i0DUCTS [N�T LTSED]
FAAT 3 - E�ECUTI�N [N�T USED]
END OF SECTION
Rei-ision Lag
DATE NAME SUMMARY OF CHANGE
4:'7:'2D14 M.I3amenec}i Revised for DAP appli�ation
CITY QF FQRT WQRTH I�eller Crossing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 102875
Re��ised Apri17, 2014
41 74 23 - 1
DAP CLEANING
Page 1 of 4
SECTIUN 0174 23
CLEANING
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. Ivtermediate and final cleaiun� for Work vot including special cleatung of closed
systen�s specified elsewhere
B. Deviations fi�om tlus City of Fort Wort}� Standard Specificatian
1. None.
C. Related Specificatiav Sectians iuclude, Uut are not uecessarily limited to:
1. Division a— Siddin� Requirements, Coutract Foi�s and Couditians af the Cana�act
2. Division 1— General Requireinents
3. Sectian 32 92 13 — Hyd1�a-Mulchiug, Seeding aud Soddiug
1.2 PRICE AND PAYNIENT PR�CEDL]RES
A. Meast�rement and Payment
1. Work associated with this Iteiu is cansidered subsidiaiy to the vaiYous Iteius bid.
No separate payLuent will be allawed for ttus Item.
1.3 REFERENCES [N�T IISED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS
A. Scheduling
1. Schedule cleanivg operatians so that dust avd ather contamivants distzarbed Uy
cleaniug process will not fall on newly painted sul�faces.
2. Schedule fival cleaniug upan cai�ipletion af Work and iuunediately prior to fival
inspectian.
1.5 SUBMITTALS [N�T USED]
1.6 ACTIUN SiJBMITTALSIINFURMATI�NAL SiTSNIITTAI.S [NOT USED]
1.7 CLOSEOUT SUSMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SLTBNIITTALS [NUT USED]
1.9 QUALITY ASSLTRANCE [N�T USED]
1.10 STOIZAGE, AND HANDLING
A. Storage aud Handling Requiremeuts
1. Store cleaning products and clea.uing wastes iu cantainer5 specifically desigx►ed for
thase n�terials.
CITY QF FQRT WQRTH Keller CrosC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised Apri17, 2014
417423-2
DAP CLEANING
Page 2 of 4
1.11 FIELD [SITE] CONDITI�NS [N�T LTSED]
1.12 WARRANTY [N�T USED]
PAAT 2 - P1i0DUCTS
2.1 OWNER FLTRNISHED [oR] OWNER-SUPFLIEDFRUDLTCTS [NOT USED]
2.2 MATERIALS
A. Cleanin� Agents
1. Compatible with surface beiug cleaned
2. New aud uncantauunated
3. Far ti�avufacnired surfaces
a. Material recouunended by manufactw�er
2.3 ACCESS�RIES [NOT USED]
Z.4 S�URCE QUALTI'Y C�NTR�L [NflT LTSED]
PART 3 - E�ECL7TI�N
3.1 INSTALLERS [NaT USED]
3.2 EXAMINATI�N [N�T LTSED]
3.3 PREPARATI�N [N�T USED]
3.4 APPLICATION [NOT USED]
3.5 REFAIR ! RESTORATI�IV [NOT USED]
3.5 RE-IlVSTALLATIaN [N�T USED]
3.7 FIELD [ax] SITE QUALTTY C�NTRUL [N�T LTSED]
3.8 SYSTEM STARTUP [N�T LTSED]
3.9 ADJLTSTING [NOT USED]
3.10 CLEANING
A. General
1. Prevent accurt�ulatian of wastes t}�at create hazardaus conditians.
2. Conduct cleanin� aud dispasal operatians to cnmply u+ith law� and safety order� af
governui� authorities.
3. Do not dispose of valatile wastes such as u�iueral spiiits, ail ar paiut thuuier in
stonn or sauitaiy draius or sewers.
4. Dispose af degradable debiYs at av approved salid waste dispasal site.
5. Dispose of nandegradable debris at au appraved salid waste dispasal site or iu an
alternate mamier appra�ed by Ciry and regulatoiy agencies.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaCCTMEIVTS — DEVEL�PER AR7ARDED PRQ7ECTS City Praject Na_ 1D2875
Re��ised Apri17, 2014
41 74 23 - 3
DAP CLEANING
Page 3 of 4
6. Handle materials in a contralled uianner with as few l�ndliugs as possible.
7. Tharoug}�ly clean, sweep, wash and polis}� all Work and equipme�it associated with
tlus project.
S. Rema�e all sigus of teuiporary cansauction and activities uicidental to coust�liction
af requu�ed pei�uanent Work.
9. If praject is vot cleaved to the satisfactian of the City, the City reseives the right to
have the cleauing completed at the expei�se of the Coutractor.
lU. Do not burn on-site.
B. Ivtermediate Cleaiung during Construction
1. Keep Wark areas cleav so as not to hinder health, safety or conveiuence of
personuel in existin� faciliry operations.
2. At maximum weekly intervals, dispose of waste materials, deUris aud ilibbish.
3. Confine canstruction deUris daily ui st�ategically lacated container(s};
a. Cover to prevevt Ulowing by wind
b. Store debris away fioiu canstructian or operational acti�ities
c. Haul fiam site at a miniiuum of once per weel�
4. Vacuum clean interior areas when ready to recei�e fuush painting.
a. Continue vacuuiu cleaniug an an as-needed basis, uutil Final Acceptance.
5. Prior to stonn eveuts, thorougl�ly clean site af all loase ar unsecured iteii�s, which
u�ay become airUoi�e or trauspoirted by flowing water during the stai�n.
C. Exterior (Site ar Right of Way} Fival Cleanin�
1. Rema�e trash aud debri5 cantauiers fram site.
a. Re-seed areas disn�rbed Uy locatiou of a�ash and deUris contaiuers in accordance
with Section 32 92 13.
2. Sweep roadway to remave all rock5, pieces af asphalt, concrete ar auy ather abject
that may hiuder or disiupt the flow af t��affic alang the raadway.
3. Clean any uiterior areas uicluduig, but not liuuted ta, vaults, n�nholes, structures,
junctian Uoxes and iiilets.
4. If no longer requued for mauitenance af erosion facilities, and upan approval Uy
City, remove erosion cont�ol fram site.
5. Clean sigr►s, lights, signals, etc.
3.11 CL�SE�LTT ACTIVITIES [1VOT USED]
3.12 PRaTECTIUN [N�T LTSED]
3.13 MAINTENANCE [NOT LTSED]
3.14 ATTACHMENTS [NflT USED]
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project No. 102875
Re��ised Apri17, 2014
41 74 23 - 4
DAP CLEANING
Page 4 of 4
END OF SECTION
Rez�ision Log
DATE NAME SUMMARY OF CHANGE
4r7�`1D14 M.I3amenec}► Revised for DAP appli�ation
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaCCTMEIVTS — DEVEL�PER AR7ARDED PRQ7ECTS City Praject Na. 1D2875
Re��ised Apri17, 2014
417719-1
DAP CLdSEQUT REQUIREMENCS
Page 1 of 3
SECTIUN �177 19
CLOSE�LTT REQLTIREMENTS
F'AAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. The procedtue for closing out a eona•act
B. De�iations fi•am tlus Ciry of Fort Wart}� Standard Specificatian
1. None.
C. Related Specification Sectians iuclude, Uut are not uecessarily limited to:
1. Division a— Biddin� Requirements, C.outract Foi�s and C.ouditians af the Cana�act
2. Division 1— General Aequiretnents
1.2 PRICE AND PAYNIENT PR�CEDL]RES
A. Meast�rement and Fayment
1. Work associated with this Item is cansidered subsidiaiy to the vaiious Iteu�s bid.
No separate gayment will be allawed for this Item.
1.3 REFEliENCES [N[3T LTSED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS
A. Guarautees, Sonds and Af£ida�rits
1. No apglicatian far final payment will be accegted witil all guarantees, Uonds,
certificates, licenses and affida�rits requued for Work ar equipment as specified are
sati�factarily filed with the City.
B. Release of Liens ar ClaimS
1. No apglicatian for final payment will Ue accepted until sati�factoiy evidence of
release of liens has Ueeu suUmitted to the Ciry.
1.5 SUBMITTALS
A. Subnut all required docuznevtation to City's Fraject Representative.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N DOCCTMENTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project Na. 1 Q2875
Re��ised Apri17, 2014
417719-2
DAP CLdSEQUT REQUIREMENCS
Page 2 of 3
1.5 IlVFORMATIDNAL SUBNIITTALS [NOT USED]
1.7 CL�SE�LTT SUBNIITTALS [N�T USED]
PAAT 2 - P1i0DUCTS [N�T LTSED]
FAAT 3 - E�ECUTI�N
3.1 IlYSTALLEAS [N�T USED]
3.2 EXAMINATI�N [N�T LTSED]
3.3 PREPARATIDN [N�T USED]
3.4 CL�SE�LTT PROCEDURE
A. Prior tv requestiug Fival uispectiou, subnut:
1. Project Recard Documents in accordauce with Section U1 78 39
2. aperatian and Maurtenance Data, if requued, iu accordance with Sectian a 1 78 23
B. Prior to requestiug Fival uispectiou, perfann final cleauing iu accordance with Sectian
U1 74 23.
C. Finalluspection
1. After final cleaivng, provide notice ta the City Praject Representative that the Work
is campleted.
a. The City will make an initial Final Iuspection with the Contractor preseut.
b. LTpou campletion af this it�spection, the City will notify the Coutractar, in
writing within 10 Uusiness clays, of any particulars in which tlus inspection
reveals tl�at the Work is defective or incomplete.
2. LTpou receivin� writteu notice fi�om the Ciry, immediately undertake the Work
requu�ed to remedy deficiencies and complete the Wark ta t}�e satisfactian of the
City.
3. LTpou ramgletion of Wark associated with the items listed iu the City's written
uotice, iufoi�n the City, that the required Wark ha� beeu campleted. LTpon receipt
af tlus natice, the City, in the presence af the Conaactar, will make a suUsequent
Final Iuspection of the groject.
4. Provide all special accessaries required ta place each item af equipment in fiill
aperatian. These special accessoiy items include, but are nat litiuted to:
a. Sgecified spare parts
b. Adequate oil a�id grease as requu�ed far tlie first lubrication af the e�uipment
c. Iuitial fill up of all cheuucal tauks avd fuel tanks
d. Light bu1Us
e. Fuses
f. Vault keys
g. Handwheels
h. ❑ther expendable items as re�uu�ed far iiutial start-ug and ogeratian of all
equipment
D. Notice af Project Completion
CITY QF FQRT WQRTH Keller CmsC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N DOG"CTMENTS — DEVEL�PER AWARDED PRQ7ECTS City Project No. 1 a2875
Re��ised Apri17, 2014
417719-3
DAP CLdSEQUT REQUIREMENCS
Page 3 of 3
1. �nce the City Praject Representative �inds the Work subsequent to Final Iuspection
ta be satisfactary, the City will issue a Notice af Praject Campletian (Green Sheet}.
E. Supportiug Dacuznentatian
1. Coorduiate with the City Project Representative to coiuplete the fallowing
additianal foni�s:
a. Final Payment Request
b. Statetnevt of Cantract Time
c. Aff"idavit af Payment and Release of Liens
d. Consent of St�rety to Final Payiuent
e. Pipe Repait (if required}
f. Cantractor's Evaluation of City
g. Perforn�nce Evaluatian of Canaactor
F. Letter of Fuial Acceptauce
1. LTpou review and acceptance af Notice af Froject Completion aud Supportiug
Documentation, iu accordance with General Canditions, Ciry will issue Letter of
Final Acceptavice and release t}�e Fuial Payment Request far pa�nnent.
3.5 REPAIIZ 1 RESTORATION [NQT USED]
3.6 RE-IlVSTAI.LATIaN [N�T USED]
3.7 FIELD [ox] SITE QUALITY C�NTR�L [N�T LTSED]
3.8 SYSTEM STARTUP [N�T LTSED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CL�SE�LTT ACTIVITIES [NOT USED]
3.12 PRaTECTIUN [N�T LTSED]
3.13 MAINTENANCE [NOT LTSED]
3.14 ATTACHMENTS [NflT USED]
END OF SECTION
Rez-ision Lag
DATE NAME SUMMARY OF CHANGE
4;'7,1014 M,I3amenec}► Revised for DAP apglY�ation
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N DOCCTMENTS — DEVEL�PER AR7ARDED PRQ7ECTS City Project Na. 1 Q2875
Re��ised Apri17, 2014
41 78 23 - 1
DAP dPERATIQN AND MAINTENANCE DATA
Page 1 of 5
SECTIUN 0178 23
aPERATION AND MAINTENANCE DATA
PAAT 1- GENER,Ai.
1.1 SiTNIlkZARY
A. Sectian Includes:
1. Product ciata aud related infoi�nation appropiiate far Ciry's n�aiutenance and
aperatian of products fiunis}�ed under Contract
2. Such products u�ay include, but are not liuuted to:
a. Traffic Canri�ollers
b. In�igatian Canaollers (to be aperated Uy the Ciry)
c. ButterIly Valves
B. De�iations from tlus City of Fort Worth Standard Specificatian
1. None.
C. Related 5pecification Sectians iuclude, Uut are not uecessarily limited to:
1. Division a— Biddin� Requirements. C.outract Foi�s and C.ouditians af the Cana�act
2. Division 1— General Requirements
1.2 P12ICE AND PAYNIENT PR�CEDUIZES
A. Meast�rement and Fayment
1. Work associated with this Iteiu is cansidered subsidiaiy ta the various Items Uid.
No separate payment will be allawed for thi� Item.
1.3 REFEliENCES [N�T LTSED]
1.4 ADNIIIVISTRATIVE REQUIREMENTS
A. Schedule
1. Subnut n�mials in fival fonu ta the City witlun 3Q calendar days af graduct
shipment ta the project site.
1.5 SUBMITTALS
A. Subnuttals shall be in accordauce with Section O1 33 a0. All subnuttals shall be
approved Uy the City prior to deliveiy.
1.5 IlVFORMATIDNAL SUSNIITTALS
A. Subnuttal FoiYu
1. Prepare data in fonn of an iust�lictional manual for use Uy City persamiel.
2. Fai�nat
a. Size: 8%z ivches x 11 uiches
b. Paper
1} 4U pound muumum, wlute, far typed pages
2} Holes reinforced u+ith plastic, cloth ar metal
c. Text: Mauufacn�rer'S printed data, ar veatly typewritten
CITY QF FQRT WQRTH Keller CrosC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQJECTS City Project No. 1 a2875
Re��ised Apri17, 2014
417823-2
DAP dPERATIQN AND MAINTENANCE DATA
Page 2 of 5
d. Drawings
1} Provide reinforced ptulc}�ed bivder taU, biud in with text
2} Reduce larger drawin�s and fald ta size af text pages.
e. Provide fly-leaf for each separate praduct, ar each piece of operating
equipment.
1} Provide typed descriptian of produet, and n�ajor component parts of
equipment.
2} Provide uidexed tabs.
f. Cover
1} Identify each valulne with typed ar grinted title "�PERATING AND
M,4INTENANCE INSTRLTCTIONS".
2} List:
a} Title of Project
b} Identiry of separate structure as applicable
c} Identiry of general suUject u�atter covered iu the ivanual
3. Biuders
a. Commercial qualiry 3-rin� binders with duz�able and cleanable plastic covers
b. W}leu multiple bivders are used, coirelate the data iuto related coi�sisteut
graupings.
4. If a�ailable, provide au electronic fai7n of the flc�M Manual.
B. Manual Content
Neatly typewritten table af contents for each volume, airanged in systerr�tic order
a. Contractor, name of respousiUle pruicigal, addres� and telephaue uumber
b. A list of eac}� product requu�ed ta Ue included, iudexed ta content of the volulne
c. List, with each product:
1} The name, address aud telephone number af the Subcont��actor or installer
2} A list of each product requu�ed ta Ue included, ivdexed ta content of the
voluzne
3} Identify area af responsiUility af each
4} Lacal sousre of supply for parts and replaeement
d. Identify each praduct by praduct uame and ather identifyin� symUals as set
forth in Contract Dacuiuents.
Product Data
a. Iuclude only thase sheets which are pertuievt to the speeific produet.
b. Annotate each sheet to:
1} Clearly identify specific product or part installed
2} Clearly identify data agglicaUle ta installation
3} Delete references ta inapplicable inforn�tian
3. Drawings
a. Supplement product data with drawings as necessary ta clearly illustrate:
1} Relation� of camponent garts af equipLuent and systems
2} Contral and flow diagxau�
b. Coorcluiate dsawin�s with uiforn�tian iu Project Recard Documents to assure
con�ect illust�ation of coiupleted uistallatiay.
c. Do not use Project Record Drawing� a� maintenauce drawuigs.
4. Written text, as requued to supplemeut product data for the pa��ticular iustallation:
a. �rganize iu consistent fonnat under separate headings for different procedures.
b. Provide lagical sequence of in�tiuctions of each prncedure.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaCCTMEIVTS — DEVEL�PER AR7ARDED PRQJECTS City Praject Na. 1D2875
Re��ised Apri17, 2014
41 78 23 - 3
DAP dPERATIQN AND MAINTENANCE DATA
Page 3 of 5
5. Copy of each wairanty, band and setvice cont�act issued
a. Provide uiforivatiai� �heet far City persamiel �ivin�:
1} Proper procedures in event of failuz�e
2} Iustances which might affect validity of waiYanties or bands
C. Manual far Materials uid Fiius}�es
1. Subnut 5 copies of camplete n�nual iu final fai�n.
Cantent, for arc}�itectural products, applied materials and fiius}�es:
a. Manufactzuer's data, gaving full inforn�tion on groducts
1} Catalog uumber, size, comgosition
2} Color and text��re desigvations
3} Iuforn�tian required for reorderin� special manufactuz�ed praducts
b. Iustructions for care and �uaiutevauce
1} Manufacturer'S recouimendation for types af cleauiug agents avd methads
2} Cautiaus against cleaiung agents and methods which are dea�imental ta
product
3} Reconut�ended schedule for cleaniv� avd maintenavice
Content, for moist��re protection aud weather exposi�re products:
a. Manufacturer's data, givin� full uiforn�tian on groducts
1} Applicable standards
2} Cherrucal composition
3} Details of iustallatian
b. Iustructians for iuspection, Luaivteuauce and repair
D. Manual for Equipment and Systems
1. Subnut 5 copies of camplete ii�anual iu fmal fat7n.
Content, for each unit of equipment and systeuL as apprapiiate:
a. Description af ulut and component gaits
1} Functian, narmal ageratuig characteristics and limitiug canditions
2} Perfarn�ance ciuves, engineering data aud tests
3} Complete noi�ienelat��re and commercial uumber of replaceable pairts
b. aperating procedw•es
1} Start-up, break-iu, routiue a.ud noi�l operating ii�st�lictiai�s
2} Re�ulation, cont�ol, stopping, shut-down and emergeucy insauctions
3} Sultuner and winter ageratiug insauctions
4} Sgecial operatin� iust�uctious
c. Maintenance procedures
1} Routine aperations
2} Guide to "trouUle shooting"
3} Disassembly, repau• and reassembly
4} A11�1llIl�L1T, adjustivg and checkivg
d. Seivicin� and luUrication schedule
1} List of lubricants required
e. Manufacturer's pruited operating and mauitenance uistructians
f. Desciiption af sequence af operatian by control r�nufact�uer
1} Predicted life ofpatrts �ubject to wear
2} Iten�s recanunended to be stacked as spare parts
g. As installed cautrol diagrau�s by canaals n�nufact�uer
h. Each cont��actor's coordination drawin�s
1} As installed calor caded piping diag�ams
CITY QF FQRT WQRTH Keller CrosC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQJECTS City Project No. 1 a2875
Re��ised Apri17, 2014
41 78 23 - 4
DAP dPERATIQN AND MAINTENANCE DATA
Page 4 of 5
i. Charts af val�e tag munbers, with lacation aud fiulctiau af each �al�e
j. List of origii�al manufacturer's spare pairts, manufacturer's cuzrent prices, and
recanuuended quantities to be ii�aintained in storage
k. Other data as requued under pertinent Sectiaus af Sgecifications
Content, for each electrir and elect�aiuc system, as appragriate:
a. DeSciiption af system and component parts
1} Functian, narmal ageratuig characteristics, and liuutin� conditions
2} Perforn�ance ciuves, engineerui� data and tests
3} Complete namenclat��re and commez�cial nulnber af replaceable pairts
b. Circuit directories of panelbaards
1} Elect�•ical seivice
2} Contrals
3} Communicatiays
c. As installed calor coded wuing diagaau�s
d. aperating procedw�es
1} Routine and normal aperatuig iustnictians
2} Sequeucesrequued
3} Sgecial operatin� iust�uctious
e. Maintenatice procedures
1} Routine operations
2} Guide to "trauUle shoatin�"
3} Disassembly, repau� and reassembly
4} Adjustment and checkiug
f. Manufacturer's pruited operating and mauitenance uistructians
g. List of origii�l manufacturer's spare parts, manufacturer's cuzrent prices, avd
recotiuuended quantities to be n�aintained in storage
h. ❑t}�er data a� requu�ed under pertinent Sectiaus af Sgecifications
4. Prepare and uichide additional d�ta when the need far such data Uecames apparent
CLl1I'lll� ll15iTL1CT1QIl Of C1Ly's persaiutel.
1.7 CL�SE�LTT SUSMITTALS [N�T USED]
1.8 NLAINTENAIVCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSLTRAIVCE
A. Provide ageratian and ti�aivtenance data Uy persoiutel with the followiug criteria:
1. Traiued and exgerienced in maintenance and operation af descriUed praducts
2. Skilled as tecluucal writer to the extent required to canunutucate essential data
3. Skilled as draftsu�n competent to prepare requued drawings
CITY QF FQRT WQRTH Keller Crassing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMENTS — DEVEL�PER AR7ARDED PRQJECTS City Project No. 102875
Re��ised Apri17, 2014
41 78 23 - 5
DAP dPERATIQN AND MAINTENANCE DATA
Page 5 of 5
1.10 DELIVERY, STORAGE, AND HANDLIlYG [N�T LTSED]
1.11 FIELD [SITE] CONDITI�lVS [N�T LTSED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [N�T LTSED]
PART 3 - EKECUTI�N [N�T USED]
END OF SECTION
Rez�ision Log
DATE NAME SUMMARY OF CHANGE
8:31;'2U12 D. 7ahnsan 1.5.A.1 — title of se�tian remoti•ed
4:'7;'2D14 M,I3omenech Re��ised for DAP Applicatiou
CITY QF FQRT WQRTH Keller Cmssing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQJECTS City Project No. 1 a2875
Re��ised Apri17, 2014
417839-1
DAP PROJECT RECdRD DOCUNIENTS
Page 1 of 4
SECTIUN 0178 39
PROJECT RECaRD DOCL]MENTS
F'AAT 1- GENER,Ai.
1.1 SiTMNIARY
A. Sectian Includes:
Work associated with the documentin� the projeet and recardin� chan�es to project
documents, including:
a. Record Drawuigs
b. Water 1�7eter Setvice Regoirts
c. Saiutaiy Sewer Seivice Regarts
d. Lar�e Water Meter Repoirts
B. De�iations fi�om tlus Ciry of Fort Worth Standard Specificatian
1. None.
C. Related Sgeci�cation Sections iuclude, Uut are not uecessarily limited to;
1. Division a— Biddin� Requirements, Coutract Foi�s and Cavditians af t�ie Cana�act
2. Division 1— General Requiretnents
1.2 PRICE AND PAYNIENT PR�CEDL]liES
A. Measi�rement and Payment
1. Work associated with this Item is cansidered subsidiaiy ta the variaus Items Uid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [N�T USED]
1.4 ADMIIVISTRATIVE REQUIREMENTS [NaT USED]
1.5 SUBMITTALS
A. Prior to suUmittiug a request far Fuial Iuspectian, deliver Froject Recard Documents to
City's Project Representative.
1.6 ACTIDN Si]BMITTALSlIlVFORMATI�NAL SUSMITTALS [N�T USED]
1.7 CL�SE�LTT SiTBNIITTALS [NUT USED]
1.8 MAINTENANCE MATERIAL SLTBMITTALS [NaT USED]
1.9 QUALITY ASSLTRANCE
A. Accuracy of Records
1. Thoroughly caardivate changes witivn the Recard Dacuments, n�kiug adequate
and proper entries on each page of Specificatious and each sheet of Drawings a.ud
ather pocuments where such enay is requu�ed to shaw the change pragerly.
2. Accuracy of records shall be such that fim�re search for items shawn in the Contract
Documents uiay rely reasanably an uifaruiation obtained fi•om the appro�ed Praject
Recard Dacuiuents.
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaCCTMEIVTS — DEVEL�PER AR7ARDED PRQJECTS City Project Na. 1 Q2875
Re��ised Apri17, 2014
417839-2
DAP PROJECT RECdRD DOCUNIENTS
Page 2 of 4
3. Ta facilitate accuz�acy of recards, n�ke enti7es within 24 hauis after receipt of
infonuation that the cl�nge has occuired.
4. Provide facnial inforniatian regardiug all asgects of the Work, both concealed and
visible, to enable future modification of the Worl� to proceed without lengthy and
expeusive site measiu�ement, investi�ation aud exauunatian.
1.10 STURAGE AND HANDLIN�
A. Storage and Handling Requirements
1. Maintain the joU set of Record Docusneuts completely protected fiom deterioration
and fiam loss and damage until completion af the Work aud aansfer af all recarded
data to tt�e fival Project Record Documents.
2. Iu the e�ent af lass of recorded data, use means necessaiy ta again secure the data
ta the City's appraval.
a. Iu 5uch case, pro�ide replacements to the standards ori�ivally requued by the
Contract Dacuments.
1.11 FIELD [SITE] CUNDITIaNS [N�T USED]
1.12 WARRANTY [NOT USED]
PAAT2- PRODUCTS
2.1 OWIVER FLTRNISHED �ox] OWNER-SUPPLIED PRODUCTS [NaT USED]
2.2 RECORD D�CLTMEIVTS
A. .ToU set
1. Promptly following receipt of t}�e Notice to Proceed, secure fiom the City., at no
char�e to the Cont�actor, 1 camplete set af all DocuLuents comprisiug the Cona�act.
B. Final Recard Documents
1. At a time nearin� the completion of the Work and prior to Fival Inspection, pravide
the Ciry 1 coit�plete set af all Final Record Ihawin�s iv the Cant�act.
2.3 ACCESS�RIES [NOT USED]
2.4 SOURCE QUALTI'Y CONTR�L [N�T LTSED]
PART 3 - EKECUTI�N
3.1 IlYSTALLERS [NaT USED]
3.2 EXAMINATI�N [N�T LTSED]
3.3 PREPARATI�N [N�T USED]
3.� MAINTENANCE DOCLTMENTS
A. Maintenance af .ToU Set
1. Inunediately upon receipt of the jab �et, ideutify each of the Document� with the
title. "RECORD DflCLT1�ZENTS - J�B SET".
CITY QF FQRT WQRTH Keller Crossing Phase 1
STANDARD CONSTRUCTTQN SPECIFTCATT4N IJaCCTMEIVTS — DEVEL�PER AR7ARDED PRQJECTS City Prnject Na. 162875
Re��ised Apri17, 2014
417839-3
DAP PROJECT RECdRD DOCUNIENTS
Page 3 of 4
2. Preservation
a. Con�idering the Cana�act catnpletiov time, the prabaUle vumber ❑f occasions
upan which the jab set must be taken out for new enh�ies and for e�amivation,
avd the conditiovs t�uder wluch these activities will be perforined, devi5e a
suitaUle method for protecting the job set.
b. Do not use the joU set far any ptupose except entry of new data and for re�riew
by the City., until start of t�•ansfer of data to final Project Recard Docui��ents.
c. Maintain the job set at the site of work.
3. Coorduiatian with Caust�liction Sruvey
a. At a u�iuinnim clearly n�ark any deviations fi�om Coutract Documeuts
associated with ivstallation af t}�e infiastiucture.
4. Makin� entries an Drawiug�
a. Recard any deviatians fram Canaact Dacuments.
b. LTse an erasable colored pencil (not ink or iudeliUle pencil), clearly des�ribe the
change by g�apluc line and note as required.
c. Date all ent�ies.
d. Call atteutian to the ent�y by a"claud" drawu around the area or areas afFected.
e. Iu the event af averlaggui� changes, use differeut colars for the averlappivg
changes.
5. Conversion of schen�tic layouts
a. Iu same cases on the Ihawin�s, an�angeuients af covduits, curuits, piping,
ducts, and similar items, are shawn schematically and are not uitended to
poi�aygrecise physical layout.
1} Final physical arrangement is deternuned Uy the Canaactar, subject to the
City'� approval.
2} Howe�er, desigai of fim�re madificatiaus af the facility ivay requue
accw�ate infoi�nation as ta the final physical layout af items w}�ic}� are
shown aiily schematically on the Drawiugs.
b. Show on the joU set of Record Drawiugs, Uy dimension accurate to within 1
inch, the centerline af each run of iteuLs.
1} Final physical arrangement is detern�ined by the Canaactor, subject to the
City's approval.
2} Shaw, by symUol or note, the vertical location of the Item {"uuder slab", "iu
ceiling plenum", "expased", and t}�e like}.
3} Make all ideutification sufFiciently descriptive tliat it n�ay be related
reliaUly to the Specificatiovs.
c. The City may waive the requu�ements for can�ersian of schematic layouts
where, iu the City's judgment, cou�ersion seives no useful puspase. However,
do nat rely upon waivers being issued except as specifically issued ui urriting
by the City.
B. Final Project Record Docusnents
Transfer af data ta Drawiugs
a. Carefiilly traysfer chauge data shown on t}�e job set of Record Drawings to the
cor�•esponding fival doeuments, coordivativ� the changes as required.
b. Clearly indicate at each affected detail a.ud other Drawiug a fu11 description of
changes made duriug const�uction, and the actual location af iteu�s.
c. Call atteutian to each evtry Uy dz�awuig a"claud" around the area or areas
affected.
CITY QF FQRT WQRTH Keller CrosC1�II Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQJECTS City Project No. 1 a2875
Re��ised Apri17, 2014
417839-4
DAP PROJECT RECdRD DOCUNIENTS
Page 4 of 4
d. Make changes neatly., cansistently and with ttie groper media ta assul�e
lange�ity and clear reproduction.
Trausfer af data ta ather poc�unents
a. If the Doculnents, other than Drawings, have been kept clean during proga�ess of
the Wark, and if enaies thereorr have beeu arderly to the appraval of the C.iry..
the joU set af tt�ase Documents, other t}�an Drawiugs, will Ue accepted as final
Recard Dacuiuents.
b. If any such Document i� not so apgroved by the City, secuse a new capy of that
no�,����t fio� rne cir� at t�i� ciry'S usual char�e far repraductian and
handling, aud carefully a�ansfer the chan�e data to the new copy to the appro�al
of the City.
3.5 REPAIR 1 REST�RATIflN [NOT USED]
3.b RE-IlVSTALLATI�N [N�T LTSED]
3.7 FIELD [ax] SITE QUALTTY C�NTRaL [N�T LTSED]
3.8 SYSTEM STARTUP [NaT LTSED]
3.9 ADJUSTING [NUT USED]
3.10 CLEANING [N�T USED]
3.11 CL�SE�LTT ACTIVITIES [NOT USED]
3.12 PR�TECTIaN [N�T USED]
3.13 MAINTENANCE [N�T LTSED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Rez-ision Lag
DATE NAME SUMMARY OF CHANGE
4;'7; 2014 M,I3amenec}► Re��ised far DAP Agglicatiau
CITY QF FQRT WQRTH Keller Cmssing Phase 1
STAIVDARD CONSTRUCTTQN SPECIFTCATT4N IJaC[IMEIVTS — DEVEL�PER AWARDED PRQJECTS City Project No. 1 a2875
Re��ised Apri17, 2014