HomeMy WebLinkAboutContract 55953-A1 CSC No.55953-A1
AMENDMENT No. 1
TO CITY SECRETARY CONTRACT No. 55953
WHEREAS, the City of Fort Worth (CITY) and TranSystems Corporation
Consultants, (ENGINEER) made and entered into City Secretary Contract No .
55953, (the CONTRACT) which was authorized by M&C 21-0328 on the 7th day
of May, 2021 in the amount of $1, 247, 299 . 00; and
WHEREAS, the CONTRACT involves engineering services for the
following project :
Trinity River Vision-Central City Flood Control Drainage
Projects, CPN 103260, 103261 , 103262, 103263, and 103264; and
WHEREAS, it has become necessary to execute Amendment No . 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT :
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein which will add the project FWCC Cemetery Bypass
Outfall CPN 103667 . The cost to City for the additional design
services to be performed by Engineer totals $44,160. 00. (See
Attached Funding Breakdown Sheet, Page -4-)
2 .
Article II of the CONTRACT is amended to provide for an increase
in the fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City
for all work and services shall be an amount of $1 ,291,459. 00.
3 .
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and effect .
EXECUTED and EFFECTIVE as of the date subscribed by the
City' s designated Assistant City Manager.
APPROVED:
City of Fort Worth OFFICIAL RECORD
City of Fort Worth, Texas CITY SECRETARY RV-Central City Flood Control Drainage Projects
TRV-Central City Flood Control Drainage Projects 103260, 103261, 103262, 103263, 103264
Revision Date: November 23, 2021 F T. WORTH,
G TX
Page 1 of 4 VY RT LJ fly
TranSystems Corporation Consultants
TranSystems Corporation Consultants
Su � GG G ��Dana Burghdoff(Jun 1,202 6:57 CDT)
Dana Burghdoff Chad Gartner, P. E.
Assistant City Manager Senior Vice President
DATE : Jun 1,2022 DATE : May 26,2022
APPROVAL RECOMMENDED:
Wi Ilia m Johnson(M 31,202209:27 CDT)
William Johnson
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
Jean arie Alexan er(May 27,202209:35 CDT)
Jean-Marie Alexander, P.E .
Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas TRV—Central City Flood Control Drainage Projects
TRV—Central City Flood Control Drainage Projects 103260, 103261, 103262, 103263, 103264
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
ow Date : N/A
DBlack(May 31,2022 17:28 CDT)
Douglas W. Black
Sr. Assistant City Attorney
ATTEST:
,oq'�FORT a�
A 00
°000000
Jannette S.Goodall(Jun 1,202221:28 HST) p16.o o�d
Jannette Goodall 00, 0
City Secretary d� „�o d
o00 0000000 �
nEXpS.oap
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas TRV-Central City Flood Control Drainage Projects
TRV-Con tral City Flood Control Drainage Projects 103260, 103261, 103262, 103263, 103264
Revision Date: November 23, 2021
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 55953
Amendment No . 1
Department Fund-Account-Center Amount
T PW 5 2 0 0 7 02004315330500 103667 002830 44, 160 . 00
Total : 44, 160 . 00
City of Fort Worth, Texas TRV-Central City Flood Control Drainage Projects
TRV-Central City Flood Control Drainage Projects Revision Date: 103260, 103261, 103262, 103263, 103264
November 23, 2021
Page 4 of 4
Date: March 23,2022
Mike Bennett, PE
Project Manager—Capital Delivery Division
Transportation/Public Works Department
City of Fort Worth
200 Texas St.
Fort Worth,TX 76102
RE: Amendment 1—Cemetery Bypass Outfall Re-Design—Fort Worth Central City
City Project No. 103667
Dear Mr. Bennett,
TranSystems appreciates the opportunity to provide this fee proposal for additional scope of services for the above referenced
project as part of the Fort Worth Central City Program. These scope and budget modifications are needed to facilitate the
redesign of the Cemetery Bypass Outfall location based on current direction on site specific elements. Below is a summary of
each contract and amendment.
Summary of the Contract and Amendments
Original Contract $ 1,247,299.00
Amendment 1. $ 44,160.00
Contract Total $ 1,291,459.00
The project specific scope changes/additions are listed below.
Cemetery Bypass Outfall
• Modify 100%designs to lower profiles to submerge outfall in proposed by-pass channel
• Re-design the sluice gate structure to accommodate the profile revisions.
• Re-submit a 60%,90%and 100%to the project partners for review and comment.
This above scope will be covered with Amendment 1. The Level of Effort Spreadsheet is attached.
Assumptions/Additional Scope
TranSystems previous Central City Contract(CPN 00969) has approximately$13,000.00 in design fee remaining dedicated to
the Cemetery Bypass Outfall project. TranSystems is assuming that this remaining contract value will still be utilized for the
following:
• USACE updates to specifications.
• Updates to plans due to updated design standards and specifications.
TranSystems is utilizing this previously allocated fee and the above Amendment 1 amount to finalize the revised design for
Cemetery Bypass Outfall.
If you have any questions or require additional information please give me a call.
Sincerely,
TranSystems Corporation Consultants
4aDVe4,
Michael Hobbs, PE
Project Manager
1
\//
) � %_ _
2 |
50-
o
}\ �0
§Uf!/]k
M
*M'ESEQ!
�0�9) �°
\{a/\ |LL
H I—
�)_ . 4 \\
` `�)k\\f \lo ® ) t!!
- -_e,!-2 _! lU
Evi
} j }\\\ƒ\ )}\ § \ ) \� //2