HomeMy WebLinkAboutContract 44282-CO1 10 cloft
} I r<)P,.,-rW"n'-Ft4 City of Worth Z-(o
C0XCWTN1*N"z=/=
Change Oi r'der Request
Project Nerve. Vickery Boulevard Water and Sanitary deer Relocations, Phe1 City Sep .; 48
Plroject No. . 2 3-60911�7Oil434 "&P' 702'17014 487 DOE No,. 46018, City Prof. No.: 01434
Water and Smite Sewer Mein Relocation on West Vickery Boulevard,South Jennings Avenue Lipscomb Streeet and
Project erupt�o'r��: �" � �
West Daggett Avenue
Contractor; Conetser Construction TX, LP Change Order# 1 Date. 4/19/2013
City Project Mgr.1 Roberto Mgr. C. Seucede City Inspector: Quincy Jones
Phone Number. 7-392-2387 Phone Number; 7-992-0873
Contract Time
Dept. Water P2 Sec A Sewer P2 Sec Sewer P3 Con.56 Totals
('Calendar days)
Original Contract Amount $511,61805.oo $393)580-00 $5951'40,00
a
�
Extras to ate
Credits to Date
Pending Change Orders in M&C l ' Process
Contract Cost to fete
i;,,,:'vr,///„„✓/,/,,rir%�,r „a,,;,,,,,,,,,,,,, //;,,/„irk„ ,%,,,v„, „/.,,;/� r%. r uProposed Change
�
M
/;rr� r„ �,,,�r,;,r, r r/ r l�r/�,r,,/,/,/,.i/,o i/r,uc„rr/.r//ri,G, ,,,,/�/r.,;r„r/r,,,,?;',,�i r,„-r�o r:r./�i„r�,.✓i r,,,,a„,%,,,rr,r../oi��/�,,.., r,r i r„rc,/,.r/ i,!/// // r I%//�,,i,�. /r;,r i.: r r r I 4/4.�Res a sad on r t m unt
/
Original Funds Available for Change Orders � �04�0!0 , ��� ���
$/1,0/111c, , r ,
r r
/i i � /Remaining ands Available for th s C
,r ,f
r r/err
/
r f,
I
/
Additional Funding(if necessary)
IMINMIM
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT /�
MAX L OWAB L CONTRACT AMOUNT ORIGINAL CONTRACT COST+25
The change order will provide for trenchless rehabilitation (via e gyred in-place pipe method) of a 5001 foot
segment of 13 (sty.. 49 sta. 43. 8) that crosses underneath a pond located within the Botanical.
Gardens. Recent cleaning of the pipe identified leafs in the pipe which allow for infiltration into the sewer
system. With the proposed i pravernents to the pond by the parks and Community Services Department, it
is necessary to rehabilitate t he sewer main to eliminate the infiltration sources before the pond is filled with
water.
Staff concurs with the contractor's request est� � s on the project jeet for this change order.,
This change order can be processed at] the bVect was adver xse for bid on
November 8,2012. 'FICIAL RIECORD
........................n
CITY SECRETARY
RY
FTe WORTH,, TX
wwwo IMAM*
000
0 7—T
T YOU- da
I w AMINI
i
It IS un rstood crude me het t acceptance ci this then i ntreictor constitutes an accord)and satisfaction end,represents payment
in full(Moth time and money)for all costs arising out of,or incidental to,the above Change Order.
Conetser Construction TX LP Jesse Martine
rM
q1Z., L3
a
rn
&C Number N/A M&C Cate Approved
Fort-F Wc>wrti City of Fold,Wofth
Change Order Additions
:] y Sec
Project Dare Vicke,[y Boulevard Water and Sanitary Sewer Relocations, Phase 11 Cit Inc No: =4282
Project No,(s): P253-609170143487&P258-702170143487 DOE No.1 46087, City Prod. No,: 01434
Project Water and Sanitary Sewer Main Relocation on West Vickery Boulevard,South Jennings Avenue, Lipscomb Streelet and
Description West Daggett Avenue
Contractor Conatser Construction TX, LP Change Order: Date: =4/19/
City Project Mgr, Roberto C.Sauceda. City Inspector Quincy Jones
ADDITIONS
;2' �'-wo#
Pill
2,15 Clean and Mobilization Sewer P2 Sec B 1.0�O LS $11)814.00 $11,814.00
26 24 Inch CIPP Sewer Line Sewer P2 Sec B 510.00 LP' $156.10,01 $i 1 5601.010i
27 I Bypass,Pumping Sewer P21 Sec B, 1.00 LS $6,240.00 $61240.00
28 CIPPI Sewer Service Connections Sewer P2 Sec B 2.00 EA $840.00 $1,680.00
Water Pl2 Sec A
S
ewe 100
r P2 Sec B $99,294,00
,,Buyer P3 Con. 56
Page 2 of 4 Additi ons Sub Total $99,294.
Fo n-ir 'Wo m-r ti City of Fo'rt Worth
Change Order Deletions
Project Name Vickery Boulevard Water and Sanitary Sewer Relocations, Phase 11 City Sec No.i: 44282
Project No.(s): P253-6109170143487&P,258-702170143487 DOE No. 4608] City Prof. No.. L 0 1 434
Project Description Water and Sanitary Sewer Main Relocation on West Vickery Blouleva,rd,South Jennings,Avenue, Lipscomb Streeet
and as Daggeft Avenue
contractor Cana tser Construction TX,,L,P Change Order,: Date 91/201
City Prow obe
ect Mgr. Rrto C'.Sauceda City Inspec to r. Quincy Jones
DELETIONS
rr If/ IFW//`/��
i0i _NIN�Now
womil,
NOW----------
i 000111111imlow ow 11 o AI
-----------
Water P2 Sec A
Sewer P2 S,ec B
Sewer P3 Cori. 56
Page 3 of 4 Deletions Sub Total
M/WBE Breakdown for thi�s, Change Order
1172
............
Total
Previous Change Orders
MAIA,U,//�',,D""/"'M,r, r 77
W"'M/7",-7/7' ii
r. r T/
�77
Total ri
1 6/1,
Page 4 of 4