Loading...
HomeMy WebLinkAboutContract 44282-CO1 10 cloft } I r<)P,.,-rW"n'-Ft4 City of Worth Z-(o C0XCWTN1*N"z=/= Change Oi r'der Request Project Nerve. Vickery Boulevard Water and Sanitary deer Relocations, Phe1 City Sep .; 48 Plroject No. . 2 3-60911�7Oil434 "&P' 702'17014 487 DOE No,. 46018, City Prof. No.: 01434 Water and Smite Sewer Mein Relocation on West Vickery Boulevard,South Jennings Avenue Lipscomb Streeet and Project erupt�o'r��: �" � � West Daggett Avenue Contractor; Conetser Construction TX, LP Change Order# 1 Date. 4/19/2013 City Project Mgr.1 Roberto Mgr. C. Seucede City Inspector: Quincy Jones Phone Number. 7-392-2387 Phone Number; 7-992-0873 Contract Time Dept. Water P2 Sec A Sewer P2 Sec Sewer P3 Con.56 Totals ('Calendar days) Original Contract Amount $511,61805.oo $393)580-00 $5951'40,00 a � Extras to ate Credits to Date Pending Change Orders in M&C l ' Process Contract Cost to fete i;,,,:'vr,///„„✓/,/,,rir%�,r „a,,;,,,,,,,,,,,,, //;,,/„irk„ ,%,,,v„, „/.,,;/� r%. r uProposed Change � M /;rr� r„ �,,,�r,;,r, r r/ r l�r/�,r,,/,/,/,.i/,o i/r,uc„rr/.r//ri,G, ,,,,/�/r.,;r„r/r,,,,?;',,�i r,„-r�o r:r./�i„r�,.✓i r,,,,a„,%,,,rr,r../oi��/�,,.., r,r i r„rc,/,.r/ i,!/// // r I%//�,,i,�. /r;,r i.: r r r I 4/4.�Res a sad on r t m unt / Original Funds Available for Change Orders � �04�0!0 , ��� ��� $/1,0/111c, , r , r r /i i � /Remaining ands Available for th s C ,r ,f r r/err / r f, I / Additional Funding(if necessary) IMINMIM CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT /� MAX L OWAB L CONTRACT AMOUNT ORIGINAL CONTRACT COST+25 The change order will provide for trenchless rehabilitation (via e gyred in-place pipe method) of a 5001 foot segment of 13 (sty.. 49 sta. 43. 8) that crosses underneath a pond located within the Botanical. Gardens. Recent cleaning of the pipe identified leafs in the pipe which allow for infiltration into the sewer system. With the proposed i pravernents to the pond by the parks and Community Services Department, it is necessary to rehabilitate t he sewer main to eliminate the infiltration sources before the pond is filled with water. Staff concurs with the contractor's request est� � s on the project jeet for this change order., This change order can be processed at] the bVect was adver xse for bid on November 8,2012. 'FICIAL RIECORD ........................n CITY SECRETARY RY FTe WORTH,, TX wwwo IMAM* 000 0 7—T T YOU- da I w AMINI i It IS un rstood crude me het t acceptance ci this then i ntreictor constitutes an accord)and satisfaction end,represents payment in full(Moth time and money)for all costs arising out of,or incidental to,the above Change Order. Conetser Construction TX LP Jesse Martine rM q1Z., L3 a rn &C Number N/A M&C Cate Approved Fort-F Wc>wrti City of Fold,Wofth Change Order Additions :] y Sec Project Dare Vicke,[y Boulevard Water and Sanitary Sewer Relocations, Phase 11 Cit Inc No: =4282 Project No,(s): P253-609170143487&P258-702170143487 DOE No.1 46087, City Prod. No,: 01434 Project Water and Sanitary Sewer Main Relocation on West Vickery Boulevard,South Jennings Avenue, Lipscomb Streelet and Description West Daggett Avenue Contractor Conatser Construction TX, LP Change Order: Date: =4/19/ City Project Mgr, Roberto C.Sauceda. City Inspector Quincy Jones ADDITIONS ;2' �'-wo# Pill 2,15 Clean and Mobilization Sewer P2 Sec B 1.0�O LS $11)814.00 $11,814.00 26 24 Inch CIPP Sewer Line Sewer P2 Sec B 510.00 LP' $156.10,01 $i 1 5601.010i 27 I Bypass,Pumping Sewer P21 Sec B, 1.00 LS $6,240.00 $61240.00 28 CIPPI Sewer Service Connections Sewer P2 Sec B 2.00 EA $840.00 $1,680.00 Water Pl2 Sec A S ewe 100 r P2 Sec B $99,294,00 ,,Buyer P3 Con. 56 Page 2 of 4 Additi ons Sub Total $99,294. Fo n-ir 'Wo m-r ti City of Fo'rt Worth Change Order Deletions Project Name Vickery Boulevard Water and Sanitary Sewer Relocations, Phase 11 City Sec No.i: 44282 Project No.(s): P253-6109170143487&P,258-702170143487 DOE No. 4608] City Prof. No.. L 0 1 434 Project Description Water and Sanitary Sewer Main Relocation on West Vickery Blouleva,rd,South Jennings,Avenue, Lipscomb Streeet and as Daggeft Avenue contractor Cana tser Construction TX,,L,P Change Order,: Date 91/201 City Prow obe ect Mgr. Rrto C'.Sauceda City Inspec to r. Quincy Jones DELETIONS rr If/ IFW//`/�� i0i _NIN�Now womil, NOW---------- i 000111111imlow ow 11 o AI ----------- Water P2 Sec A Sewer P2 S,ec B Sewer P3 Cori. 56 Page 3 of 4 Deletions Sub Total M/WBE Breakdown for thi�s, Change Order 1172 ............ Total Previous Change Orders MAIA,U,//�',,D""/"'M,r, r 77 W"'M/7",-7/7' ii r. r T/ �77 Total ri 1 6/1, Page 4 of 4