Loading...
HomeMy WebLinkAboutContract 41724-A1 MWECRIETARY. CONTRACt 00: AMNDMENT N0. 1 TO CITY SECRETARY ARY COQ C VMEREAS, the City of Fort Woo rth (CITY) and K . ley--Horn and Associates,, Inc. ,, (ENGINEER) made and entered into City' Secretary Contract No. 41724,, in the amount o f $ the C which was authorized by M&C Cl-24826 on the St day of April,, 2' '11 i and, WHERFAS, the CONTRACT involves engineering services for the following,ng, ; ro ect Medical District Part 8 - water Distribution cyst Improvements for the JPS Health Network, The Da nn Company and Park P'l ac a and NMEREA81 it has, become necessary to execute Amendment No-.1 to the CONTRACT to include an #increased scope of work and revised fee. NOWTHEREFORE , CITY and ENGINEER, acting herein by and through their duly authorized representatives, renter into, they following, agreement, which amends the CO CT O. 10 Article I of the CONTRACT is amended to 'Include a the add t.o l engineering se ices specified in a proposal date April 9, 2013, a copy of' which h is attached hereto and Is incorporated herein The cost to City for the add3s t�o gal, design services to be performed by Engineer totals $26,9131.00'. 2 Article 11 of the CONTRACT is amended to, prcvie for an increase in the f tie to he paid to; Eng ineer for all work and services, performed under the C tract, as end d, so that the total fee aid the City for all work and stir ices shill be an amount of $228,0081.00, 3g, All other provisions of the Contract, which h are not expressly amended herein, shall .re in in full forge and effect. OFFICIAL RECORD ETAR FTI WORTHs TX EXECUTED and EFFECTIVE as of the date last wrJtten, by a signatory, below. APPROVED: ENGINEER City of Fort Worth Kamley-Horn and Associates, Inc. , -_Mal 0001 MEN& Fernando Costa Glenn Gary, P.E. -Pres ident Assistant City Manager Senior Vice DATE DATE AP VAL"': "C ND Frank Crumb,, P.E. Director, Water Department APPROVED AS 'T' , FORM AND LEGALITY.O &CM. N/A Date: N/A ........... Douglas W. Black Assistant City Attorney. ATTEST. Mary' J. 00000 jk^ .4% City Sec et,ary OFFICIAL RECORD CITY SECRETARY Fx MMIN6 Tx Page %S AIM Klmley-Horn and Associates,, Inc. April 9, 2013 Suite 950 Mr. John Kasavich P.E. 801 Cherry Street,Unit 11 1) Fort Worth,Texas Project Manager 76102 City of Fort Worth Water Department 1000 `Throckrno ton Street Fort Worth, TX 76102 Re: City of Fort Worth-Water Improvements to serve J Health Network and The Dannon Company, Additional Services City Secretary No.4172,4- Contract Amendment No.I City Project No. 01687, KHA No. 0610:180:84 Dear John: The City of Fort Worth (City) has requested l mley-Horn and Associates, Inc. (Klmlev-Horn),to perform additional water line design services for the Water Improvements to serve JP'S Health Network project. Kimley-Horn will perform the work outlined as follows: Turner 8finch Water Line The services associated with this itern include design survey and the preparation of plans for water line improvements along Turner Street(from Stalcup Rd.,to Walker St.) associated with an existing street rehabilitation project causing excessive main breaks to the existing water line. This project was needed to be expedited in order for the improvements to be constructed as soon as possible. These improvements consist of approximately 2,500 LF of 8-inch water Bile. '"I'he design will include only plan sheets for incorporation into an existing construction project. These services will be provided as described in the, General Scope of Services with the following exceptions: 0 Topographic survey will not include property research, existing easements,or identification of property come rs/ri t-of-way. Tarrant Appraisal District data will be used to obtain parcel information. 0 Survey will include 50-ft cross-sections from black olf curb to black of curb, driveway openings, storm manholes, inlets, water meters, water valves, fire hydrants and any sanitary sewer manholes 0 Water line design sheets will consist of plan view only. 0 Stakeholder meetings will not be conducted except for- s,em ices related to preparation for and attendance at one(I) public meeting. One site visit will be performed.. City Standard 'rraffic Control Details will be referenced. No site specifi c traffire control will be provided. Project manual will riot be prepared because plans will be change ordered into an existing construction contract. Fee.-, $26,913 (Water Fee- $17,538; Sewer Fee- $l0; Survey Fee*. $9,375) TEL 817 335 6511 '?"*AX 81 7 335'070 Kimley-Horn I'vir J'ohn Kasavich,I E,April 9,,20,13,Page 2 and Associates, Inc. We recommend that the City increase the budget by $26,913 for these addit,io�nal services, From the additional services listed above, the recommended breakdown for water services is as follows: � 913 $0 $261�9,113 Description Water Sewer Total Item 1, —Turner 8-inch WL $26,1 ....... ......... . m Mw-- Total $26,913 $0 $26,913 The following table summarizes the f,e per Work Phase-. Work Phase Water Fee Sewer Fee Total Fee 311 $52631 $0 $51263 32, $10,1522 $0 $10,522 33 $1,753 $0 $1 1753 5 1 $91,375 $0 $9,375 wx�I III I I 1 11 111 RXEMOMMOMM" 111-0, ON Total $26,913 $0 $211611913 If the City concurs with our requested additional services, the summary of fees for this Project is shown in the table below-. Revisled Contract C Contract/Amendment Water Fee Sewer Fee Survey Fee Tod Amount OnI Original Contract $1 72M5 $0 $28,250 $201,0915 N me ndirnient No. 1 $17,538 $0 $()1375 $26 913 $228,008 TOTA,!:�, $190,383 $0 $37,625 $22 1008 $2281008 -0 101 1 M . ......------ III I III M/WBE participation will e provided by Gorrondona and Associates, Inc. fo r these additional services. With the revised contract amount of$228,0018, our total contract M/WBE participation is projected to be $41,725 (18.3% . We appreciate the opportunity to be of continued service, to the City. Please contact us if we need to provide any further inn orniation., 'Very truly yours,, KIMLEY-HORN AND ASSOCJA FES, ING .0"00 Glenn A. Gary, P.,E., Senior Vice President J RT j rt K F'I-W-Utiliti,esft]018(8,4,1Pi,*P',,A mend 1',.Amt!nd I-L.tr,ivviseddoc General Project Information Fee Information Task Budget Summary task goo Task eee Task Name �L Expense, Allocation F1 'Additional WL Design Mill C Subconaultant Summary F-M& 7j�jjki Name Mulitip iller, Project Budget Summary �Lalb,or. $ 161300 Fixed Multiplier: 35 lExplense: $1 10,613 Overall Multiplier 3, 57 TOTALI $ 261913 "" General Project Information "ask Effort Summary Task Information OF Task Description and Budgeting FTIM UNA.0 i ma- III I I »- • I MMM MM � II i 'I II II I I I I i I I „ r r r. /_, r / r r r r/f r,/,, / r.. r r r r, r, / i o :, i / .:,. .. ...,. 1. / � r.= 1. //... i. / / ,..�.. ,,../r d r // ," / r ,.,r / r l r ///1 / //, n , r r o/ /, ,.;, art. r Ek I