Loading...
HomeMy WebLinkAbout(0107) M&C 21-0992City of Fort Worth, Mayor and DATE: 12/14/21 Texas Council Communication LOG NAME: 60NEARSSMEDWSSA3-ANA SUBJECT M&C FILE NUMBER: M&C 21-0992 (CD 8 and CD 9) Authorize Execution of Amendment No. 3 in the Amount of $258,780.00 to an Engineering Agreement with A.N.A. Consultants, L.L.C. for Near Southside Medical District Water and Sanitary Sewer Improvements and Adopt Attached Appropriation Ordinances RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 3 with A.N.A. Consultants, L.L.C. in the amount of $258,780.00 to City Secretary No. 46607 for the Near Southside Medical District Water and Sanitary Sewer Improvements City Project No. CO2445 for a revised contract amount of $952,969.00; 2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water & Sewer Bond 2017A Fund in the amount of $108,392.00 by decreasing estimated receipts and appropriations in the Wastewater Collectors Bucket (Water Department) programmable project (City Project No. P00003), and increasing estimated receipts and appropriations in the Near Southside Medical District W/SS Project (City Project No. CO2445) by the same amount; 3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water/Sewer Bond 2016 Fund in the amount of $147,600.00 by decreasing estimated receipts and appropriations in the Miscellaneous Water Facilities (Water Department) programmable project (City Project No. P00004), and increasing estimated receipts and appropriations in the Near Southside Medical District W/SS Project (City Project No. CO2445) by the same amount; and 4. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water/Sewer Bond 2016 Fund, in the amount of $324,780.00 by increasing appropriations in the Near Southside Medical District W/SS Project (City Project No. CO2445) and decreasing appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount. DISCUSSION: On April 14, 2015, Mayor and Council Communication (M&C) C-27261, the City Council authorized an engineering agreement with A.N.A. Consultants, L.L.C. in the amount of $107,865.00 for the Near Southside Medical District Water and Sanitary Sewer Improvements. The general time frame for the design and construction of all program streets is 2014-2020 based upon the following construction plan and schedule: Group A streets, Group B streets, Group C streets, and Group D streets. The agreement was subsequently revised by Amendment No. 1 in the amount of $314,000.00 authorized on April 18, 2017 M&C (C-28195) that provided for the replacement of deteriorated water and sanitary sewer mains on Group B streets and Amendment No. 2 in the amount of $272,324.00 authorized April 16, 2019 M&C (C-29097) that provided for the replacement of deteriorated water and sanitary sewer mains on some group C and D streets. Amendment No. 3 will provide design for the replacement of the deteriorated water and/or sanitary sewer mains as indicated on the following additional Group C and D streets. Street From To Scope of Wor Council IDistricts East Broadway Avenue IH-35W Frontage Road Kentucky Avenue Water 8 East East Kentucky Avenue Vickery Broadway Water/Sewer 8 Boulevard Avenue Missouri Avenue East Broadway Avenue Stella Street Water 8 South South West Peter Smith Street Ballinger Henderson Water 9 Street Street West Tucker Street Lipscomb Street Hemphill Street Water West West 6 Avenue Terrell Rosedale Water/Sewer �79� Avenue Istreet I 150 feet West Galveston Avenue Rosedale North of Water 9 Street Pulaski Street West West South Lake Street Rosedale Magnolia Water 9 Street Street South Galveston West Peter Smith Street Jennings Avenue Water 9 Street West West Galveston Avenue Peter Broadway Water/Sewer 9 Smith Avenue Street In addition to the contract amount, $66,000.00 (Water: $40,000.00; Sewer: $26,000.00) is required for project management and material testing. Appropriations for the Near Southside Medical District Water and Sanitary Sewer Improvements, Part 1 Project is depicted below: Existing Additional FUND Appropriations Appropriations project Total* Water/Sewer Bond $147,600.00 $324,780.00 $472,380.00 2016 - Fund 56005 Water & Sewer Bond 2017A- Fund $1,399,392.00 $0.00 $1,399,392.00 56011 WS Capital Project $4,508,896.00 $0.00 $4,508,896.00 2019 - Fund 56016 Water Capital - Fund 59601 $337,834.00 $0.00 $337,834.00 Sewer Capital Legacy - Fund $183,955.00 $0.00 $183,955.00 59607 W&S Rev Bond Series 2021 — Fund $0.00 $0.00 $0.00 56190 W&S Capital Projects — Fund $4,790,429.00 $0.00 $4,790,429.00 56002 Project Total $11,368,106.00 $324,780.00 $11,692,886.00 *Amounts rounded for presentation purposes. Approval of recommendations No. 2 and 3 would adjust appropriations between the programmable projects and convert the Near Southside Medical District W/SS Project (City Project No. CO2445) into a static capital project. This action is needed as future funding for the Near Southside Medical District W/SS Project (City Project No. CO2445) is anticipated from other funding sources and the scope of this project differs from that of the current programmable projects. This project will have no impact on the Water Department's operating budget when completed. Business Equity: A.N.A. Consultants, L.L.C. agrees to maintain its initial SBE commitment of 13 percent that it made on the original agreement and extend and maintain that same SBE commitment of 13 percent to all prior amendments up to and inclusive of the Amendment No. 3. Therefore, A.N.A. Consultants, L.L.C. remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous SBE Commitment Form executed by an authorized representative of its company. The project is located in COUNCIL DISTRICTS 8 and 9. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified — All Funds project and the Misc Wtr Facilities programmable project within the Water/Sewer Bond 2016 fund and in the WW Collectors Bucket programmable project within the Water and Sewer Bond 2017A Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Water/Sewer Bond 2016 Fund and the Water and Sewer Bond 2017 A Fund for the Near South Side Med. Dist. W S project to support the approval of the above recommendations and execution of the amendment. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Submitted for City Manager's Office by. Dana Burghdoff 8018 Originating Business Unit Head: Chris Harder 5020 Additional Information Contact: John Kasavich 8480