HomeMy WebLinkAbout(0013) IR 22-030 - Fund Allocation of 11M General Fund.Arterial Projects in 2022 Bond ProgramINFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 22-030
To the Mayor and Members of the City Council February 15, 2022
Page 1 of 2
�`o s
SUBJECT: FUND ALLOCATION OF $11 M FROM GENERAL FUND TO
rrA PROVIDE ADDITIONAL FUNDING FOR ARTERIAL PROJECTS IN
THE 2022 BOND PROGRAM
The purpose of this informal report is to provide specific information on how a proposed cash
infusion of $11 M from the General Fund would be utilized to increase the number of arterial
projects to be executed in the 2022 Bond Program.
As a result of concerns expressed by citizens about traffic and congestion issues in rapidly
growing sections of the City, City leadership has identified $11 M in end-of-FY21 available fund
balance from the General Fund to address some of the major concerns (M&C 22-0088). TPW
has identified intersection and traffic signal projects previously scheduled to be included as part
of the bond program and re -programmed them for design and construction utilizing the $11 M
cash to be provided from the General Fund. Projects were selected because they appear less
complex, are mostly within the City's right-of-way, and should be completed within 18 to 24
months of initiating design.
The resulting cost reductions for intersections and signals allowed for an additional arterial
project (Wagley Robertson) to be included in the 2022 Bond Program. The intersection and
signal categories were reduced by $6.5M and $4.5M respectively. Further details are provided
below.
Intersection Projects for $6.5M:
The original funding request for the intersection category in the 2022 Bond Program was $32AM
to complete 12 intersection projects. The revised funding request is $25.9M, a reduction of
$6.5M.
The following are the proposed projects to be removed from the 2022 Bond request and instead
executed utilizing $6.5M from the General Fund.
Cost
Intersection
CD
Type of Improvement
Estimate
McCart Ave and Westcreek
Capacity & Geometric
Dr
6
Improvements
$ 2,600,000
N Tarrant Pkwy and N Beach
Capacity & Geometric
St
4
Improvements
$ 4,500,000
Sub Total
$ 7,100,000
Anticipated Transportation Impact
Fees
- $ 600,000
Total
$ 6,500,000
ISSUED BY THE CITY MANAGER
FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 22-030
To the Mayor and Members of the City Council February 15, 2022
Page 2of2
�`o s
SUBJECT: FUND ALLOCATION OF $11 M FROM GENERAL FUND TO
rrA PROVIDE ADDITIONAL FUNDING FOR ARTERIAL PROJECTS IN
THE 2022 BOND PROGRAM
Traffic Signal Projects for $4.5M:
The original funding request for the traffic signal category in the 2022 Bond Program was $19.5M.
The revised funding request is $15M, a reduction of $4.5M. The following seven new traffic
signals are proposed to be removed from the 2022 Bond REQUEST and executed utilizing $4.5M
from the General Fund.
Intersection (New Traffic Signal)
CD
Cost
Estimate
Trinity Blvd and Re is Ct
5
$ 650,000
John T White and Sandy Ln
5
$ 650,000
N. Beach Street and Ray White Rd
7
$ 650,000
Western Center Blvd and Sandshell
Rd
4
$ 650,000
Basswood Blvd and Old Santa Fe
Trail
2
$ 600,000*
Wichita St and Martin St
8
$ 650,000
Forest Park Blvd and W 10th St
9
$ 650,000
Total
$4,500,000
• $50k contribution from Future Funding Agreement
If you have any questions, please contact William Johnson, Transportation and Public
Works Director (817) 392-7801.
David Cooke
City Manager
ISSUED BY THE CITY MANAGER