Loading...
HomeMy WebLinkAbout(0003) IR 22-048 - Bellaire Drive S Reconfig.Travel Lanes.Dedication Bike Lanes.SafetyINFORMAL REPORT TO CITY COUNCIL MEMBERS No. 22-048 To the Mayor and Members of the City Council March 22, 2022 Page 1 of 1 *a SUBJECT: BELLAIRE DRIVE SOUTH RECONFIGURATION OF TRAVEL #"A LANES AND DEDICATED BIKE LANES FOR SAFETY AND Y@7'a OPERATION The purpose of this Informal Report is to provide information regarding proposed changes to the travel lane configuration of Bellaire Drive South between Oakmont Boulevard and Bryant Irvin Road from a four -lane undivided roadway to a two-lane roadway with continuous center turn lane and dedicated bike lanes. This segment of Bellaire Drive is designated as a future on -street bicycle facility in the Bike and Trail Network map of the Active Transportation Plan. In 2020 city staff received requests from the public for implementation of this future designated continuation of the bicycle lanes on Bellaire Drive South from Oakmont Boulevard to Bryant Irvin Road. Staff conducted a virtual community meeting on October 5, 2020, to receive public input on the project and reconfiguration of the street. Community input was supportive of the project. Staff does not anticipate negative impacts to vehicle capacity with the reconfiguration. After the community meeting, staff met with representatives from St. Peter Antiochian Orthodox Church regarding parking on the street. Staff re -designed the project such that on -street parking will be accommodated in front of the church and its school to facilitate safe and legal parking with the addition of the bike lane. The striping changes will be complete by Summer 2022. If you have any questions, please contact Kelly Porter, Assistant Director, Transportation and Public Works, Regional Transportation and Innovation Division, at 817-392-7259. David Cooke City Manager ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS N W E S INSTALL 6" Solid White = 347 6" Dashed White (ft) = 77 8" Solid White (ft) = 793 18" Solid White (ft) = 170 24" Solid White (ft) = 84 24" Sld Wh Contrast (ft) = 11 6" Solid Yellow = 1384 Type II-CR 4" RPM = 48 Type II -A -A 4" RPM = 18 PREP AND SEAL PAVEMENT 6" Markings (ft) = 1808 8" Markings (ft) = 793 1 8" Markings (ft) = 170 24" Markings (ft) = 194 6" Solid White Edgeline (typ) (347 ft) REMOVE 4" Markings (ft) = 1098 8" Markings (ft) = 790 24" Markings (ft) = 194 Type 1-C 4" RPM = 176 Type II-CR 4" RPM = 128 Type II -A -A 4" RPM = 189 6" Double Yellow (typ) (T: 3 S 5 ft - A: 710 ft) w/Type II -A -A 4" RPM (typ) (9) 8" Solid White 0 73 ft) w/Type II-CR 4" RPM (typ) (9) lu 24" Contrast Crosswalk Total (typ w/ 4 ft separation between bars) (1 10 ft) 24" Stop Bar Total (typ) (84 ft) ' t 8" Solid White (620 ft) w/Type II-CR 4" RPM (typ) (31) 1 8" Solid White (typ) (1 70 ft) r Oakmont Boulevard 6" Dashed White (typ) (T:308 ft - A:77 ft) w/Type II-CR 4" RPM (typ) (8) SCALE SCOPE: 0 20 40 60 80 100 PROJECT ENG: Q. JOHNSON PHONE: 81 7-392-8618 DRAWN BY: D. MEEHAN START DATE: Apr 23, 2021 EST. COMPL.: Apr 23, 2021 NOTICE VERIFY LOCATION OF ALL EXISTING --.Now r 6" Double Yellow (typ) (T:337 ft - A:674 ft) w/Type II -A -A 4" RPM (typ) (9) NOTE: T = Total Distance of Object Measured in Feet A = Actual Paint Needed Per Object in Feet RESTRIPING FROM FoRTWoRm OAKIVI OAI<MONT BOULEVARD TO BRYANT IRVIN ROAD PROPOSED STRIPING LAYOUT BELLAIRE DRIVE SOUTH UNDERGROUND UTILITIES TOTAL LINEAR FEET OF STRIPING (MEASURED IN 6" WIDTH): 28135 SHEET 1 OF 7 N W E S INSTALL 6" Solid White = 1912 6" Dotted White (ft) = 67 8" Solid White (ft) = 155 18" Solid White (ft) = 156 6" Solid Yellow = 1 146 6" Dashed Yellow (ft) = 232 18" Solid Yellow (ft) = 34 Type II-CR 4" RPM = 8 Type II -A -A 4" RPM = 27 Bike Symbol = 3 Bike Arrow = 3 PREP AND SEAL PAVEMENT REMOVE 6" Markings (ft) = 3357 Type 1 -C 4" RPM = 482 8" Markings (ft) = 155 Type II-CR 4" RPM = 80 18" Markings (ft) = 190 Type II -A -A 4" RPM = 290 6" Double Yellow (typ) (T:109 ft - A:21 8 ft) w/Type II -A -A 4" RPM (typ) (3) 18" Solid Yellow (typ) (34 ft) Bike Lane Page Total (typ) 6" Solid White (1 91 2 ft) 18" Solid White (1 56 ft) 6" Dotted White (T:200 ft - A:67 ft) 173 8" Solid White (1 55 ft) w/Type II-CR 4" RPM (typ) (8) 0� *0 -4,it. Lost Star Lane 6" Left Turn (typ) Solid (928 ft) Dashed (232 ft) w/Type II -A -A 4" RPM (typ) (23) r Bright Water Road, 1� 4ll lCOM SCALE SCOPE: 0 20 40 60 80 100 PROJECT ENG: Q. JOHNSON PHONE: 81 7-392-8618 DRAWN BY: D. MEEHAN START DATE: Apr 23, 2021 EST. COMPL.: Apr 23, 2021 NOTICE VERIFY LOCATION OF ALL EXISTING -1a !. NOTE: T = Total Distance of Object Measured in Feet A = Actual Paint Needed Per Object in Feet RESTRIPING FROM O T 11VH OAKMONT BOULEVARD TO BRYANT IRVIN ROAD PROPOSED STRIPING LAYOUT BELLAIRE DRIVE SOUTH UNDERGROUND UTILITIES 1 TOTAL LINEAR FEET OF STRIPING (MEASURED IN 6" WIDTH): 28135 I SHEET 2 OF 7 N W E S INSTALL 6" Solid White = 2316 6" Dotted White (ft) = 34 1 8" Solid White (ft) = 177 6" Solid Yellow = 1064 6" Dashed Yellow (ft) = 266 Type II -A -A 4" RPM = 27 Bike Symbol = 3 Bike Arrow = 3 PREP AND SEAL PAVEMENT REMOVE 6" Markings (ft) = 3680 Type 1 -C 4" RPM = 300 1 8" Markings (ft) = 177 Type II -A -A 4" RPM = 250 Bike Lane Page Total (typ) 6" Solid White (231 6 ft) 1 8 Solid White (1 77 ft) 6" Dotted White (T:1 00 ft - A:34 ft) x AL, w ,. �t 6" Left Turn (typ) Solid (1064 ft) Dashed (266 ft) w/Type II -A -A 4" RPM (typ) (27) C'tove PWit. yfavia "4,, �► . � aver � - SCALE SCOPE: 0 20 40 60 80 100 PROJECT ENG: Q. JOHNSON PHONE: 81 7-392-8618 DRAWN BY: D. MEEHAN START DATE: Apr 23, 2021 EST. COMPL.: Apr 23, 2021 NOTICE VERIFY LOCATION OF ALL EXISTING A. NOTE: T = Total Distance of Object Measured in Feet A = Actual Paint Needed Per Object in Feet RESTRIPING FROM FoRTWoRm OAKM OAI<MONT BOULEVARD TO BRYANT IRVIN ROAD PROPOSED STRIPING LAYOUT BELLAIRE DRIVE SOUTH UNDERGROUND UTILITIES 1 TOTAL LINEAR FEET OF STRIPING (MEASURED IN 6" WIDTH): 28135 I SHEET 3 OF 7 N W E S Bike Lane Page Total (typ) 6" Solid White (1 968 ft) 1 8" Solid White (1 32 ft) 6" Dotted White (T:100 ft - A:34 ft) Pebble Ridge Drive :r 6" Left Turn (typ) Solid (970 ft) Dashed (243 ft) w/Type II -A -A 4" RPM (typ) (24)� Parking (typ) 6" Solid White (1 51 ft) MR-j INSTALL PREP AND SEAL PAVEMENT REMOVE S C A L E RESTRIPING FROM O TWORTH 6" Solid White = 2119 6" Markings (ft) = 3366 Type 1 -C 4" RPM = 300 SCOPE. OAKMONT BOULEVARD TO 6" Dotted White (ft) = 34 1 8" Markings (ft) = 132 Type II -A -A 4" RPM = 240 0 20 40 60 80 100 BRYANT IRVIN ROAD 1 8" Solid White (ft) = 132 6" Solid Yellow = 970 PROJECT ENG: Q.JOHNSON PROPOSED STRIPING LAYOUT 6" Dashed Yellow (ft) = 243 PHONE: 81 7-392-8618 Type II -A -A 4" RPM = 25 DRAWN BY: D. MEEHAN Bike SymbArrow 4 EST.STACO PL.: Apr23,2021 BELLAIRE DRIVE SOUTH Bike Arrow = 4 EST. COMPL.: Apr 23, 2021 NOTICE VERIFY LOCATION OF ALL EXISTING UNDERGROUND UTILITIES TOTAL LINEAR FEET OF STRIPING (MEASURED IN 6" WIDTH): 28135 SHEET 4 OF 7 N W E S Y INSTALL 6" Solid White = 1656 6" Left Turn (typ) Solid (121 5 ft) Dashed (304 ft) w/Type II -A -A 4" RPM (typ) (30) i Bike Lane Page Total (typ) 6" Solid White (1432 ft) 18" Solid White (138 ft) 6" Dotted White I (T:200 ft - A:67 ft) 6" Dotted White (ft) = 67 PREP AND SEAL PAVEMENT REMOVE 1 8" Solid White (ft) = 138 6" Markings (ft) = 3242 Type 1-C 4" RPM = 300 6" Solid Yellow = 1215 1 8" Markings (ft) = 138 Type II -A -A 4" RPM = 278 6" Dashed Yellow (ft) = 304 Sharrow = 2 Type II -A -A 4" RPM = 31 Bike Symbol = 2 Bike Arrow = 2 Bike Sharrow = 2 Parking (typ) 6" Solid White (224 ft) AN q NOTE: T=Total Distance of Object Measured in Feet A = Actual Paint Needed Per Object in Feet S C A L E RESTRIPING FROM ORTWORTH SCOPE. OAKMONT BOULEVARD TO 0 20 40 60 80 100 BRYANT IRVIN ROAD PROJECT ENG: Q. JOHNSON PROPOSED STRIPING LAYOUT PHONE: 81 7-392-8618 DRAWN BY: D. MEEHAN DATE: Apr23,2021 EST. COMPL.: Apr23,2021 BELLAIRE DRIVE SOUTH NOTICE VERIFY LOCATION OF ALL EXISTING UNDERGROUND UTILITIES TOTAL LINEAR FEET OF STRIPING (MEASURED IN 6" WIDTH). 28135 SHEET S OF 7 N W E S 6" Left Turn (typ) Solid (1412 ft) Dashed (353 ft) w/Type II -A -A 4" , RPM (typ) to ) 1 4 A•17_ - .. ��x x INSTALL PREP AND SEAL PAVEMENT REMOVE 6" Solid White = 2369 6" Markings (ft) = 4198 Type 1-C 4" RPM = 3 3 S 6" Dotted White (ft) = 64 1 8" Markings (ft) = 207 Type II -A -A 4" RPM = 300 1 8" Solid White (ft) = 207 6" Solid Yellow = 1412 6" Dashed Yellow (ft) = 353 Type II -A -A 4" RPM = 36 Bike Symbol = 2 Bike Arrow = 2 Bike Lane Page Total (typ) 1 6" Solid White (2369 ft) 18" Solid White (207 ft) 6" Dotted White (T:1 92 ft - A:64 ft) Ilk OTE: T=Total Distance of Object Measured in Feet A = Actual Paint Needed Per Object in Feet SCALE FROM L'oR OAKM SCOPE. OAKMONT NT BOULEVARD TO 0 20 40 60 80 100 BRYANT IRVIN ROAD PROJECT ENG: Q. JOHNSON PROPOSED STRIPING LAYOUT PHONE: 81 7-392-8618 DRAWN BY: D. MEEHAN DATE: Apr23,2021 EST. COMPL.:Apr 23, 2021 BELLAIRE DRIVE SOUTH NOTICE VERIFY LOCATION OF ALL EXISTING UNDERGROUND UTILITIES TOTAL LINEAR FEET OF STRIPING (MEASURED IN 6" WIDTH). 28135 SHEET 6 OF 7 17 to Bike Lane Page Total (typ) E$27 6" Solid White t (367 ft) 18" Solid White 4 � (30 ft) ,IAi rSW. 8" Solid White (1 50 ft) w/Type II-CR 4" RPM (type) M .W (8) 'Av.., 24" Stop Bar Total (typ) (128 ft) 0. I k r � -ti 6" Dashed White (typ) / (T:769 ft - A:1 92 ft) w/Type II-CR 4" RPM (typ) / r+� INSTALL PREP AND SEAL PAVEMENT REMOVE 6" Solid White = 367 6" Markings (ft) = 769 4" Markings (ft) = 402 6" Dashed White (ft) = 402 8" Markings (ft) = 598 8" Markings (ft) = 598 8" Solid White (ft) = 598 1 8" Markings (ft) = 30 24" Markings (ft) = 438 1 8" Solid White (ft) = 30 24" Markings (ft) = 438 Type ]I-CR 4" RPM = 72 24" Solid White (ft) = 128 24" Sld Wh Contrast (ft) = 310 Type II-CR 4" RPM = 72 Bike Symbol = 1 Bike Arrow = 1 8" Solid White (312 ft) w/Type II-CR 4" RPM (typ) (16) 8" Solid White (1 36 ft) w/Type II-CR 4" RPM (typ) (7) / / oa 6" Dashed White (typ) (T:837 ft - A:209 ft) w/Type II-CR 4" RPM (typ) (21) 24" Contrast Crosswalk Total (typ w/ 4 ft separation between bars) (310 ft) NOTE: T=Total Distance of Object Measured in Feet A = Actual Paint Needed Per Object in Feet S C A L E RESTRIPING FROM FORTWORm SCOPE. OAKMONT BOULEVARD TO 0 20 40 60 80 100 BRYANT IRVIN ROAD PROJECT ENG: Q. JOHNSON PROPOSED STRIPING LAYOUT PHONE: 81 7-392-8618 DRAWN BY: D. MEEHAN DATE: Apr23,2021 EST. COMPL.: Apr23,2021 BELLAIRE DRIVE SOUTH NOTICE VERIFY LOCATION OF ALL EXISTING UNDERGROUND UTILITIES TOTAL LINEAR FEET OF STRIPING (MEASURED IN 6" WIDTH). 28135 SHEET 7 OF 7