HomeMy WebLinkAbout(0011) M&C 22-0219City of Fort Worth,
Mayor and
Texas
Council Communication
DATE: 03/29/22 M&C FILE NUMBER: M&C 22-0219
LOG NAME: 20HIGHWAY SAFETY IMPROVEMENT PROJECTS FUNDING
SUBJECT
(CD 5 and CD 6) Adopt Attached Appropriation Ordinances in the Cumulative Amount of $350,000.00 for Three Highway Safety Improvement
Projects for Design Engineering, Environmental Studies and Project Management, and Amend the Fiscal Year 2022-2026 Capital Improvement
Program
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the 2007 CritCapProj-CO2013A Fund in
the amount of $125,000.00 from available funds for the purpose of funding the West Risinger Road at Garden Springs Drive Project (City
Project Number 103636);
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the 2007 CritCapProj-CO2013A Fund in
the amount of $110,000.00 from available funds for the purpose of funding the Mitchell Boulevard at South Beach Street Project (City Project
Number 103633);
3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the 2007 CritCapProj-CO2013A Fund in
the amount of $115,000.00 from available funds for the purpose of funding the Ramey Avenue at Stalcup Road Project (City Project Number
103635) ; and
4. Amend the Fiscal Year 2022-2026 Capital Improvement Program.
DISCUSSION:
The Texas Department of Transportation (TxDOT) approved funding for construction of six Highway Safety Improvement Projects in November
2021.These projects include design and construction of traffic signals, turn lane and pedestrian facility improvements at six intersections within the
City of Fort Worth. The City will fund design engineering, right of way, utility relocations, environmental studies and project management for these
projects. The funding for preliminary design of the other three intersections has already been appropriated.
The collective $350,000.00 appropriated in this Mayor and Council Communication (M&C) will fund the remaining three projects through
preliminary design. Additional funds will be allocated for final design and construction subject to approval of the upcoming 2022 bond program.
The following table summarizes the funding for West Risinger Road at Garden Springs Drive project:
Fund
Existing
Additional
Project
Funding
Funding
Total
34012 - 2007
CritCapProj-
$0.00
$125,000.00
$125,000.00
CO2013A Fund
Project Total
$0.00
$125,000.00
$125,000.00
The following table summarizes the funding for Mitchell Boulevard for South Beach Street project:
Fund
Existing
Additional
Project
Funding
Funding
Total
34012 - 2007
CritCapProj-
$0.00
$110,000.00
$110,000.00
CO2013A Fund
Project Total
$0.00
$110,000.00
$110,000.00
The following table summarizes the funding for Ramey Avenue at Stalcup Road project:
Fund
Existing
Additional
Project
Funding
Funding
Total
34012 - 2007
CritCapProj-
$0.00
$115,000.00
$115,000.00
CO2013A Fund
Project Total
$0.00
$115,000.00
$115,000.00
Approximately $1,024,571.47 is available in the Unspecified project (City Project No. UNSPEC) in the 2007 CritCapProj - CO2013A Fund, and
the adoption of these appropriation ordinances totaling $350,000.00 will reduce the available amount to $674,571.47. The funding for these
projects was not included in the Fiscal Year 2022-2026 Capital Improvement Program because these projects were not identified for funding by
TxDot at the time the Capital Improvement Program plan was developed. The action in this M&C will amend the Fiscal Year 2022-2026 Capital
Improvement Program as approved in connection with Ordinance 25073-09-2021.
These projects are located in COUNCIL DISTRICTS 5 and 6.
A Form 1295 is not required because: This M&C does not request approval of a contract with a business entity.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspecified -All Funds project within the 2007 CritCapProj-CO2013A Fund
and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the W
Risinger Rd at Garden Spring, Mitchell Blvd at S Beach St and Ramey Ave at Stalcup Rd projects. Prior to an expenditure being incurred, the
Transportation and Public Works Department has the responsibility of verifying the availability of funds.
Submitted for City Manager's Office by. Dana Burghdoff 8018
Originating Business Unit Head: William Johnson 7801
Additional Information Contact: Monty Hall 8662