Loading...
HomeMy WebLinkAboutContract 46003 (3) CITY SECRUAW CONTRACT NO. 0a? FORT WORTH PROJECT MANUAL FOR THE CONSTRUCTION OF Installation of 16" Meters and Bypass Line For Crowley Wastewater Meter Station City Project No.02086 Sewer Project No.P258-541200-706250208680 DOE No. 6837 Betsy Price Tom Higgins Mayor City Manager S. Frank Crumb, P.E. Director, Water Department Richard Zavala Director, Parks and Community Services Department Prepared for The City of Fort Worth Water Department May 2013Z"S,OF . �i9 r t�s.ry j{'S' ......... ...... if �G.f Ali G. I'o `c (-,"-w-'. ,P OFFICIAL.RECORD _ =4 CITY SECRETARY IFT. WORTH,gx OIL CEIVEp oCr o fi M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FO>~irWalH COUNCIL ACTION: Approved on 9/9/2014 REFERENCE 60CROWLEY WW METER DATE: 9/9/2014 NO.: C-26969 LOG NAME: STATION-MELA CONTRACTING CODE: C TYPE: NON- PUBLIC NO CONSENT HEARING: SUBJECT: Authorize Execution of a Contract with MELA Contracting, Inc., in the Amount of $471,000.00 for Construction of the Crowley Wastewater Meter Station Replacement Project and Provide for Project Contingencies and Parks and Community Services Forestry Fees for a Project Total of$543,900.00 (COUNCIL DISTRICT 6) RECOMMENDATION: , It is recommended that the City Council authorize exec tipin'rof a contract with MELA Contracting, Inc., in the amount of$471,000.00 for construction of tho'Crowley Wastewater Meter Station Replacement Project and provide for project contingencies and Parks and Community Services Forestry fees for a project total of$543,900.00. DISCUSSION: The Crowley wastewater meter,station replacement project will replace an existing flume type meter with an inverted siphon type meter, which should improve metering accuracy over a wider range of flow conditions. This project was previously bid on May 23, 2013, with bids rejected by City Council on September 10, 2013, Mayor and Council Communication (M&C C-26428) due to the failure of the low bidder to submit Minority Business Enterprise subcontractor utilization forms in a timely manner. The project was re-advertised on May 22, 2014 and May 29, 2014 in the Fort Worth Star- Telegram. On July 10, 2014, the following six bids were received: BIDDER BID AMOUNT11 CONTRACT MELA Contracting, Inc. $471,000.00 1190 calendar days crescent constructors, Inc. $487,000.00 Circle "C" Construction $494,999.60 North Texas Contracting, Inc. $585,540.70 Mountain Cascade of Texas, LLC $639,793.40 Ark Contracting Services, LLC $679,414.90 M/WBE Office- MELA Contracting, Inc., is in compliance with the City's BDE ordinance by committing to 12 percent MBE participation on this project. The City's MBE goal on this project is 10 percent. In addition to the contract cost, $38,500.00 is provided for project contingencies and $34,400.00 for PACS forestry fees. The project is located in COUNCIL DISTRICT 6, Mapsco 118H. http://apps.cfwnet.org/council_packet/mc review.asp?ID=20182&councildate=9/9/2014 9/23/2014 M&C Review Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P258 541200 706250208680 $471,000.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: Chris Harder(8293) (l Y ATTACHMENTS 60CROWLEY WW METER STATION-MELA CONTRACTING map.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=20182&councildate=9/9/2014 9/23/2014 000000-1 TABLE OF CONTENTS Page 1 of 3 1 SECTION 00 00 00 2 TABLE OF CONTENTS 3 4 Division 00- General Conditions 5 0005 10 Mayor and Council Communication _ 6 0005 15 Addenda 7 00 11 13 Invitation to Bidders 8 0021 13 Instructions to Bidders 9 0035 13 Conflict of Interest Affidavit 10 0041 00 Bid Form 11 00 42 43 Proposal Form Unit Price 12 0043 13 Bid Bond 13 00 43 37 Vendor Compliance to State Law Nonresident Bidder 14 6045 11 Bidders Prequalifications 15 0045 12 Prequalification Statement 16 0045 13 Bidder Prequalification Application 17 00 45 26 Contractor Compliance with Workers'Compensation Law 18 00 45 40 Minority Business Enterprise Goal 19 00 52 43 Agreement 20 0061 13 Performance Bond 21 0061 14 Payment Bond 22 0061 19 Maintenance Bond 23 00 61 25 Certificate of Insurance 24 00 72 00 General Conditions 25 00 73 00 Supplementary Conditions 26 27 Division 01 - General Requirements 28 01 1100 Summary of Work 29 0125 00 Substitution Procedures 30 01 31 19 Preconstruction Meeting 31 01 3120 Project Meetings 32 01 32 16 Construction Progress Schedule 33 01 32 33 Preconstruction Video 34 _ 01 3300 Submittals 35 01 35 13 Special Project Procedures 36 01 45 23 Testing and Inspection Services 37 01 50 00 Temporary Facilities and Controls 38 0157 13 Storm Water Pollution Prevention Plan 39 0158 13 Temporary Project Signage 40 01 60 00 Product Requirements 41 01 66 00 Product Storage and Handling Requirements 42 01 70 00 Mobilization and Remobilization 43 01 7123 Construction Staking and Survey 44 01 74 23 Cleaning 45 01 77 19 Closeout Requirements 46 01 78 23 Operation and Maintenance Data 47 01 78 39 Project Record Documents 48 CITY OF FORT WORTH 16"METERS FOR CR 0 WLEY WASTE WA TER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 000000-3 TABLE OF CONTENTS Page 3 of 3 I 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 2 33 31 50 Sanitary Sewer Service Connections and Service Line 3 33 39 20 Precast Concrete Manholes 33 39 60 Epoxy Liners for Sanitary Sewer Structures 5 6 Appendix 7 GC-4.01 Availability of Lands 8 GC-4.02 Subsurface and Physical Conditions 9 GC-4.04 Underground Facilities 10 GC-4.06 Hazardous Environmental Condition at Site 1 I GC-6.06.D Minority and Women.Owned Business Enterprise Compliance 12 GC-6.07 Wage Rates 13 GC-6.09 Permits and Utilities 14 GC-6.24 Nondiscrimination 15 GR-01 60 00 Product Requirements 16 17 END OF SECTION CITY OF FORT WORTH 16"METERS FOR CR 0 WLEY WASTE TVA TER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 0005 10-1 MAYOR AND COUNCIL COMMUNICATION(M&C) Page 1 of 1 1 SECTION 00 05 10 2 MAYOR AND COUNCIL COMMUNICATION(M&C) 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 END OF SECTION CITY OF FORT WORTH 16"METERS FOR CR 0 TVLE Y WASTE TVA TER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 CITY OF FORT WORTH WATER DEPARTMENT ENGINEERING SERVICES DIVISION ADDENDUM NO. 1 INSTALLATION OF 16"METERS AND BYPASS LINE FOR CROWLEY WASTEWATER METER STATION AT RENDON-CROWLEY ROAD DOE NO. 6837 CITY PROJECT NO. 02086 SEWER PROJECT NO. P258-541200-706250208680 RELEASE DATE: June 16,2014 INFORMATION TO BIDDERS: The Specifications and Contract Documents for the above mentioned project are revised and amended as follows: 1. In SECTION 00 1113 INVITATION TO BIDDERS,the first paragraph specifies that sealed proposals "will be received at the Purchasing Office until 1:30 p.m., Thursday,June 19,2014 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers."The INVITATION TO BIDDERS shall be REVISED in that sealed proposals"will be received at the Purchasing Office until 1:30 p.m.,THURSDAY Il JUNE 26,2014 and then publicly opened and read aloud at 2:00 p.m.in the Council Chambers." Please acknowledge receipt of the Addendum in the bid proposal and on the outside of the sealed envelope. RECEIPT ACKNOWLEDGED: S. FRANK CRUMB,P.E. DIRECTOR,WATER DEPARTMENT f-aioll / < Paul Wright,P.E. Water Department Engineering Services/Production 1 CITY OF FORT WORTH WATER DEPARTMENT ENGINEERING SERVICES DIVISION l ADDENDUM NO. 2 INSTALLATION OF 16" METERS AND BYPASS LINE FOR CROWLEY WASTEWATER METER STATION AT RENDON-CROWLEY ROAD i DOE NO. 6837 CITY PROJECT NO. 02086 SEWER PROJECT NO. P258-541200-706250208680 1 RELEASE DATE:June 26,2014 INFORMATION TO BIDDERS: The Specifications and Contract Documents for the above mentioned project are revised and amended as follows: 1. The INVITATION TO BIDDERS shall be REVISED in that sealed proposals"will be received at the Purchasing Office until 1:30 p.m.,THURSDAY JULY 10,2014 and then publicly opened and read aloud at 2:00 p.m.in the Council Chambers." II Please acknowledge receipt of the Addendum in the bid proposal and on the outside of the sealed envelope. RECEIPT ACKNOWLEDGED- S.FRANK CRUMB,P.E. .1 DIRECTOR,WATER DEPARTMENT By: (4*-4 Paul Wright,RE'.' Water Department Engineering Services/Production 1 0005 15-1 ADDENDA Page I of 1 1 SECTION 00 05 15 2 ADDENDA 3 4 5 6 7 8 9 10 11 12 13 14 . 15 16 17 18 19 20 21 22 END OF SECTION CITY OF FORT WORTH 16"METERS FOR CR0WLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 i� 0011 13-1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 00 11 13 2 INVITATION TO BIDDERS 3 4 RECEIPT OF BIDS 5 Sealed bids for the construction of Installation of 16"Meters and Bypass Line for Crowley 6 Wastewater Meter Station, City Project No. 02086 will be received by the City of Fort Worth 7 Purchasing Office: 8 9 City of Fort Worth 10 Purchasing Division 11 1000 Throckmorton Street 12 Fort Worth,Texas 76102 13 until 1:30 P.M. CST, Thursday, June 19,2014, and bids will be opened publicly and read aloud 14 at 2:00 PM CST in the Council Chambers. 15 16 GENERAL DESCRIPTION OF WORK 1 17 The major work will consist of the following: abandonment of approximately 191 LF of 18" 18 sanitary sewer main(1\4-325), 10 LF of 24"sanitary sewer main(M-325), 103 LF of 8" sanitary 19 sewer pipe, and a 9"Parshall Flume,removal of three(3) concrete sanitary sewer manholes and 20 concrete meter vault, installation of approximately 135 LF of 36"sanitary sewer DIP by open cut, 21 41 LF of 16"sanitary sewer DIP by open cut, 148 LF of 24"sanitary sewer DIP(bypass line)by 22 open cut, 51 LF of 12"sanitary sewer PVC(SDR-26)pipe by open cut, and 39 LF of 8"sanitary 23 sewer PVC(SDR-26)pipe by open cut, installation of four(4)precast concrete manholes,two (2) 24 wastewater meters, and construction of concrete meter vault(inside dimensions: 24.45' height x 25 10' length x 8' width). 26 27 PREQUALIFICATION 28 The improvements included in this project must be performed by a contractor who is pre- 29 qualified b the City at the time of bid opening. The procedures for qualification and re- q Y t3' p q p 30 qualification are outlined in the Section 00 2113 —INSTRUCTIONS TO BIDDERS. 31 32 DOCUMENT EXANIINATION AND PROCUREMENTS 33 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 34 of Fort Worth's Purchasing Division website at hU://www.fortworthgov.org/purchasing/and 35 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site. The 36 Contract Documents may be downloaded,viewed, and printed by interested contractors and/or 37 suppliers. 38 39 Copies of the Bidding and Contract Documents may be obtained from 40 Paul Wright(817)392-8265 41 Water Department/Engineering Services 1 42 927 Taylor Street 43 Fort Worth,Texas 76102 44 45 The cost of Bidding and Contract Documents is free. 46 47 48 49 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 I 00 11 13-2 INVITATION TO BIDDERS Page 2 of 2 1 PRE BID CONFERENCE 2 A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO 3 BIDDERS at the following location, date, and time: 4 DATE: Monday, June 9, 2014 5 TIME: 2:00 p.m. (CST) 6 PLACE: Rolling Hills Surface Water Treatment Plant; 7 Classroom; 2500 S.E.Loop 820; 8 Fort Worth, Texas 76140 9 LOCATION: The Administration Building is located south of the entrance gate/guard shack. 10 The Classroom is located in the Administration Building. 11 12 13 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 14 City reserves the right to waive irregularities and to accept or reject bids. 15 16 INQUIRIES 17 All inquiries relative to this procurement should be addressed to the following: 18 Attn: Paul Wright, City of Fort Worth 19 Email: Paul.Wright@fortworthtexas.gov 20 Phone: (817)392-8265 21 AND/OR 22 Attn: Chris Harder, City of Fort Worth 23 Email: Christopher.harder@fortworthtexas.gov 24 Phone: (817) 392-8293 25 26 ADVERTISEMENT DATES 27 First date for advertisement,May 22, 2014 28 Second date for advertisement,May 29, 2014 29 30 END OF SECTION CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTETTIATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 002113-1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1 SECTION 00 21 13 2 INSTRUCTIONS TO BIDDERS 3 Defined Terms 4 5 1.1.Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 00 72 6 00 -GENERAL CONDITIONS. 7 8 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 9 meanings indicated below which are applicable to both the singular and plural thereof. 10 11 1.2.1. Bidder: Any person, firm,partnership, company, association, or corporation acting 12 directly through a duly authorized representative, submitting a bid for performing 13 the work contemplated under the Contract Documents. 14 15 1.2.2. Nonresident Bidder: Any person, firm,partnership, company, association, or 16 corporation acting directly through a duly authorized representative, submitting a 17 bid for performing the work contemplated under the Contract Documents whose 18 principal place of business is not in the State of Texas. 19 20 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 21 (on the basis of City's evaluation as hereinafter provided)makes an award. 22 23 2. Copies of Bidding Documents 24 25 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 26 resulting from the Bidders use of incomplete sets of Bidding Documents. 27 28 2.2.City and Engineer in making copies of Bidding Documents available do so only for the 29 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 30 for any other use. 31 32 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 33 34 3.1.All Bidders and their Subcontractors are required to be prequalifred for the work types 35 requiring prequalifrcation at the time of bidding. Bids received from contractors who are 36 not prequalifred(even if inadvertently opened) shall not be considered. Prequalification 37 requirement work types and documentation are as follows: 38 39 40 3.1.1. Water and Sanitary Sewer—Requirements document located at; 41 https://projectpoint.buzzsaw.com/fortworthgov/Resources/02%20- 42 %20Constraction%2ODocuments/Contractor%2OPrequalifrcation/Water%20and%2 43 OSanitary%2OSewer%2OContractor%2OPrequalification%2OProgran1/WSS%20pre 44 qual%20requirements.doc?public 45 46 47 48 49 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised November 27,2012 0021 13-2 INSTRUCTIONS TO BIDDERS Page 2 of 9 1 3.2.Each Bidder unless currently prequalified,must be prepared to submit to City within 2 seven(7) calendar days prior to Bid opening, the documentation identified in Section 00 3 .45 11, BIDDERS PREQUALIFICATIONS. 4 5 3.2.1. Submission of and/or questions related to prequalification should be addressed to 6 the City contact as provided in Paragraph 6.1. 7 8 9 3.3.The City reserves the right to require any pre-qualified contractor who is the apparent low 10 bidder(s) for a project to submit such additional information as the City, in its sole 11 discretion may require,including but not limited to manpower and equipment records, 12 information about key personnel to be assigned to the project, and construction schedule, 13 to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to 14 deliver a quality product and successfully complete projects for the amount bid within 15 the stipulated time frame. Based upon the City's assessment of the submitted 16 information, a recommendation regarding the award of a contract will be made to the 17 City Council. Failure to submit the additional information,if requested,may be grounds 18 for rejecting the apparent low bidder as non-responsive. Affected contractors will be 19 notified in writing of a recommendation to the City Council. 20 21 3.4.In addition to prequalification, additional requirements for qualification may be required 22 within various sections of the Contract Documents. 23 24 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 25 26 4.1.Before submitting a Bid, each Bidder shall: 27 28 4.1.1. Examine and carefully study the Contract Documents and other related data 29 identified in the Bidding Documents (including "technical data" referred to in 30 Paragraph 4.2. below).No information given by City or any representative of the 31 City other than that contained in the Contract Documents and officially 32 promulgated addenda thereto, shall be binding upon the City. 33 34 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and 35 site conditions that may affect cost,progress,performance or furnishing of the 36 Work. 37 38 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 39 progress,performance or furnishing of the Work. 40 41 4.1.4. Study all: (i)reports of explorations and tests of subsurface conditions at or 42 contiguous to the Site and all drawings of physical conditions relating to existing 43 surface or subsurface structures at the Site (except Underground Facilities)that 44 have been identified in the Contract Documents as containing reliable "technical 45 data" and(ii)reports and drawings of Hazardous Environmental Conditions, if any, 46 at the Site that have been identified in the Contract Documents as containing 47 reliable "technical data." 48 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised November 27,2012 0021 13-3 INSTRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of 2 the information which the City will furnish. All additional information and data 3 which the City will supply after promulgation of the formal Contract Documents 4 shall be issued in the forin of written addenda and shall become part of the Contract 5 Documents just as though such addenda were actually written into the original 6 Contract Documents. No information given by the City other than that contained in 7 the Contract Documents and officially promulgated addenda thereto, shall be 8 binding upon the City. 9 10 4.1.6. Perform independent research,investigations,tests,borings, and such other means 11 as may be necessary to gain a complete knowledge of the conditions which will be 12 encountered during the construction of the project. On request, City may provide 13 each Bidder access to the site to conduct such examinations,investigations, 14 explorations,tests and studies as each Bidder deems necessary for submission of a 15 Bid. Bidder must fill all holes and clean up and restore the site to its former 16 conditions upon completion of such explorations, investigations,tests and studies. 17 18 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the 19 cost of doing the Work, time required for its completion, and obtain all information 20 required to make a proposal.Bidders shall rely exclusively and solely upon their 21 own estimates, investigation,research,tests, explorations, and other data which are 22 necessary for full and complete information upon which the proposal is to be based. 23 It is understood that the submission of a proposal is prima-facie evidence that the 24 Bidder has made the investigation, examinations and tests herein required. Claims 25 for additional compensation due to variations between conditions actually 26 encountered in construction and as indicated in the Contract Documents will not be 27 allowed. 28 29 4.1.8. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 30 between the Contract Documents and such other related documents. The Contractor 31 shall not take advantage of any gross error or omission in the Contract Documents, 32 and the City shall be permitted to make such corrections or interpretations as may 33 be deemed necessary for fulfillment of the intent of the Contract Documents. 34 35 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification o£ 36 37 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 38 the site which have been utilized by City in preparation of the Contract Documents. 39 The logs of Soil Borings,if any, on the plans are for general information only. 40 Neither the City nor the Engineer guarantee that the data shown is representative of 41 conditions which actually exist. 42 43 4.2.2. those drawings of physical conditions in or relating to existing surface and 44 subsurface structures (except Underground Facilities)which are at or contiguous to 45 the site that have been utilized by City in preparation of the Contract Documents. 46 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised November 27,2012 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 2 on request. Those reports and drawings may not be part of the Contract 3 Documents,but the "technical data" contained therein upon which Bidder is entitled 4 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 5 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 6 responsible for any interpretation or conclusion drawn from any"technical data" or 7 any other data, interpretations, opinions or information. 8 9 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 10 that Bidder has complied with every requirement of this Paragraph 4, (ii) that without 11 exception the Bid is premised upon performing and furnishing the Work required by the 12 Contract Documents and applying the specific means,methods,techniques, sequences or 13 procedures of construction(if any) that may be shown or indicated or expressly required 14 by the Contract Documents, (iii)that Bidder has given City written notice of all 15 conflicts, errors, ambiguities and discrepancies in the Contract Documents and the 16 written resolutions thereof by City are acceptable to Bidder, and when said conflicts, 17 etc.,have not been resolved through the interpretations by City as described in 18 Paragraph 6., and(iv)that the Contract Documents are generally sufficient to indicate 19 and convey understanding of all terms and conditions for performing and furnishing the 20 Work. 21 22 4.4.The provisions of this Paragraph 4, inclusive, do not apply to Asbestos,Polychlorinated 23 biphenyls (PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by 24 Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract 25 Documents. 26 27 S. Availability of Lands for Work,Etc. 28 29 5.1.The lands upon which the Work is to be performed, rights-of-way and easements for 30 access thereto and other lands designated for use by Contractor in performing the Work 31 are identified in the Contract Documents. All additional lands and access thereto 32 required for temporary construction facilities, construction equipment or storage of 33 materials and equipment to be incorporated in the Work are to be obtained and paid for 34 by Contractor. Easements for permanent structures or permanent changes in existing 35 facilities are to be obtained and paid for by City unless otherwise provided in the 36 Contract Documents. 37 38 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 39 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 40 of-way, easements, and/or permits are not obtained,the City reserves the right to cancel 41 the award of contract at any time before the Bidder begins any construction work on the 42 project. 43 44 5.3. The Bidder shall be prepared to continence construction without all executed right-of- 45 way, easements, and/or permits, and shall submit a schedule to the City of how 46 construction will proceed in the other areas of the project that do not require permits 47 and/or easements. 48 49 50 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised November U,2012 0021 13-5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 6. Interpretations and Addenda 2 3 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to 4 City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions 5 received after this day may not be responded to. Interpretations or clarifications 6 considered necessary by City in response to such questions will be issued by Addenda 7 delivered to all parties recorded by City as having received the Bidding Documents. 8 Only questions answered by formal written Addenda will be binding. Oral and other 9 interpretations or clarifications will be without legal effect. 10 11 Address questions to: 12 13 City of Fort Worth 14 1000 Throckmorton Street 15 Fort Worth,TX 76102 16 Attn: Paul Wright,Water Department 17 Fax: (817)392-8410 18 Email: Paul.Wright@fortworthtexas.gov 19 Phone: (817)392-8265 20 21 J 22 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by 23 City. 24 25 6.3.Addenda or clarifications may be posted via Buzzsaw at J 26 <https://projectpoint.buzzsaw.com/client/fortworthgov/Infrastruct yy 27 ure%20Projects/02086%20- 28 %20%20Crowley%20Wholesale%20WW%20Meter%20Station%20and%20Bypass> 29 30 6.4.A prebid conference may be held at the time and place indicated in the Advertisement or 31 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 32 Project. Bidders are encouraged to attend and participate in the conference. City will 33 transmit to all prospective Bidders of record such Addenda as City considers necessary 34 in response to questions arising at the conference. Oral statements may not be relied 35 upon and will not be binding or legally effective. 36 37 7. Bid Security 38 .l 39 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 40 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 41 the requirements of Paragraphs 5.01 of the General Conditions. 1 42 1 43 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 44 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 1 45 Agreement within 10 days after the Notice of Award, City may consider Bidder to be in 1 46 default,rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. 47 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 48 other Bidders whom City believes to have a reasonable chance of receiving the award 49 will be retained by City until final contract execution. 50 i CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised November 27,2012 I 0021 13-6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 8. Contract Times 2 The number of days within which, or the dates by which, Milestones are to be achieved in 3 accordance with the General Requirements and the Work is to be completed and ready for 4 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 5 attached Bid Form. 6 7 9. Liquidated Damages 8 Provisions for liquidated damages are set forth in the Agreement. 9 10 10. Substitute and "Or-Equal" Items 11 The Contract, if awarded,will be on the basis of materials and equipment described in the 12 Bidding Documents without consideration of possible substitute or "or-equal" items. 13 Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or- 14 equal' item of material or equipment may be furnished or used by Contractor if acceptable to 15 City, application for such acceptance will not be considered by City until after the Effective 16 Date of the Agreement. The procedure for submission of any such application by Contractor 17 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General 18 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 19 20 11. Subcontractors, Suppliers and Others 21 22 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 23 12-2011 (as amended),the City has goals for the participation of minority business 24 and/or small business enterprises in City contracts. A copy of the Ordinance can be 25 obtained from the Office of the City Secretary. The Bidder shall submit the MBE and 26 SBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor 27 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 28 Venture Form as appropriate. The Forms including documentation must be received 29 by the City no later than 5:00 P.M. CST,five(5) City business days after the bid 30 opening date. The Bidder shall obtain a receipt from the City as evidence the 31 documentation was received. Failure to comply shall render the bid as non- 32 responsive. 33 34 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person 35 or organization against whom Contractor has reasonable objection. 36 37 12. Bid Form 38 39 12.1. The Bid Form is included with the Bidding Documents; additional copies may be 40 obtained from the City. 41 42 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 43 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 44 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 45 price item listed therein. In the case of optional alternatives,the words "No Bid," 46 "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, 47 written in ink in both words and numerals, for which the Bidder proposes to do the 48 work contemplated or furnish materials required.All prices shall be written legibly. 49 In case of discrepancy between price in written words and the price in written 50 numerals,the price in written words shall govern. 51 CITY OF FORT WORTH 16"NIETERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised November 27,2012 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.3. Bids by corporations shall be executed in the corporate name by the president or a 2 vice-president or other corporate officer accompanied by evidence of authority to 3 sign. The corporate seal shall be affixed. The corporate address and state of 4 incorporation shall be shown below the signature. 5 6 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 7 partner, whose title must appear under the signature accompanied by evidence of 8 authority to sign. The official address of the partnership shall be shown below the 9 signature. 10 11 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 12 member and accompanied by evidence of authority to sign. The state of formation of 13 the firm and the official address of the firm shall be shown. 14 15 12.6. Bids by individuals shall show the Bidder's name and official address. 16 17 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 18 indicated on the Bid Form. The official address of the joint venture shall be shown. 19 20 12.8. All names shall be typed or printed in ink below the signature. 21 22 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 23 which shall be filled in on the Bid Form. 24 25 12.10. Postal and e-mail addresses and telephone number for communications regarding the 26 Bid shall be shown. 27 28 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 29 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 30 to State Law Non Resident Bidder. 31 32 13. Submission of Bids 33 Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents, 34 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 35 addressed to City Manager of the City, and shall be enclosed in an opaque sealed envelope, 36 marked with the City Project Number,Project title, the name and address of Bidder, and 37 accompanied by the Bid security and other required documents. If the Bid is sent through the 38 mail or other delivery system,the sealed envelope shall be enclosed in a separate envelope 39 with the notation"BID ENCLOSED" on the face of it. 40 41 14. Modification and Withdrawal of Bids 42 43 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be 44 withdrawn prior to the time set for bid opening. A request for withdrawal must be 45 made in writing by an appropriate document duly executed in the manner that a Bid 46 must be executed and delivered to the place where Bids are to be submitted at any 47 time prior to the opening of Bids. After all Bids not requested for withdrawal are 48 opened and publicly read aloud, the Bids for which a withdrawal request has been 49 properly filed may, at the option of the City, be returned unopened. 50 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised November 27,2012 0021 13-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 2 time set for the closing of Bid receipt. 3 4 15. Opening of Bids 5 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 6 abstract of the amounts of the base Bids and major alternates(if any)will be made available 7 to Bidders after the opening of Bids. 8 9 16. Bids to Remain Subject to Acceptance 10 All Bids will remain subject to acceptance for the time period specified for Notice of Award 11 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 12 City's sole discretion,release any Bid and nullify the Bid security prior to that date. 13 14 17. Evaluation of Bids and Award of Contract 15 16 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 17 to reject any or all nonconforming,nonresponsive,unbalanced or conditional Bids 18 and to reject the Bid of any Bidder if City believes that it would not be in the best 19 interest of the Project to make an award to that Bidder,whether because the Bid is 20 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 21 meet any other pertinent standard or criteria established by City. City also reserves 22 the right to waive infornialities not involving price, contract time or changes in the 23 Work with the Successful Bidder. Discrepancies between the multiplication of units 24 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 25 between the indicated sum of any column of figures and the correct sum thereof will 26 be resolved in favor of the correct sum. Discrepancies between words and figures 27 will be resolved in favor of the words. 28 29 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 30 among the Bidders,Bidder is an interested party to any litigation against City, 31 City or Bidder may have a claim against the other or be engaged in litigation, 32 Bidder is in arrears on any existing contract or has defaulted on a previous 33 contract,Bidder has performed a prior contract in an unsatisfactory manner, or 34 Bidder has uncompleted work which in the judgment of the City will prevent or 35 hinder the prompt completion of additional work if awarded. 36- 37 17.2, City may,consider the qualifications and experience of Subcontractors, Suppliers, and 38 other persons and organizations proposed for those portions of the Work as to which 39 the identity of Subcontractors, Suppliers, and other persons and organizations must 40 be submitted as provided in the Contract Documents or upon the request of the City. 41 City also may consider the operating costs,maintenance requirements,performance 42 data and guarantees of major items of materials and equipment proposed for 43 incorporation in the Work when such data is required to be submitted prior to the 44 Notice of Award. 45 46 17.3. City may conduct such investigations as City deems necessary to assist in the 47 evaluation of any Bid and to establish the responsibility, qualifications, and financial 48 ability of Bidders,proposed Subcontractors, Suppliers and other persons and 49 organizations to perform and furnish the Work in accordance with the Contract 50 Documents to City's satisfaction within the prescribed time. 51 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised November 27,2012 002113-9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 17.4. Contractor shall perform with his own organization, work of a value not less than 2 35% of the value embraced on the Contract, unless otherwise approved by the City. 3 4 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and 5 responsive Bidder whose evaluation by City indicates that the award will be in the 6 best interests of the City. 7 8 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award 9 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 10 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 11 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 12 comparable contract in the state in which the nonresident's principal place of 13 business is located. 14 15 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 16 to be awarded, City will award the Contract within 90 days after the day of the Bid 17 opening unless extended in writing. No other act of City or others will constitute 18 acceptance of a Bid.Upon the contractor award a Notice of Award will be issued by 19 the City. 20 21 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 22 23 18. Signing of Agreement 24 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 25 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 26 Contractor shall sign and deliver the required number of counterparts of the Agreement to 27 City with the required Bonds, Certificates of Insurance, and all other required documentation. 28 City shall thereafter deliver one fully signed counterpart to Contractor. 29 30 31 32 END OF SECTION CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised November 27,2012 00 35 13 BID FORM Page 1 of 1 SECTION 00 3513 CONFLICT OF INTLREST AFFIDAVIT Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) below pursuant to state law. This affidavit'will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may also be downloaded from the website links provided below. htti)://www.ethics.state,tx.us/forms/CIQ.i)df htti)://www.ethics.state.tx.us/forms/CIS.r)df ❑ CIQ Form is on file with City Secretary L CIQ Form is being provided to the City Secretary ❑ CIS Form is on File with City Secretary CLY CIS Form is being provided to the City Secretary (/-},-I ,Hed) BIDDER: ,rv1��A ��►rR�c�►�,a, INS r By: L.R• CPA,4L1 rVlzNvozA ,�'� HSo I—AKE✓16PJ ?-D n Signature: (L Title: END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 bid proposaWAs 0041 00 BID FORM Page 1 of 3 SECTION 00 41 00 BID FORM TO: The City Manager c/o: The Purchasing Department 1000 Throckmorton Street City of Fort Worth, Texas 76102 FOR: Installation of 16"Meters and Bypass Line for Crowley Wastewater Station 400 Block Oriel Road City Project No.: 02086 Units/Sections: Sanitary Sewer 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms-and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6._Bidder has not engaged in corrupt,fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels, or(c)to deprive City of the benefits of free and open competition. c. "collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels. d. "coercive practice"means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 bid proposai.xls 0041 00 BID FORM Page 3 of 3 7. Bid Submittal This Bid is submitted on, ),4L3 f 0 1 0 1 L4 by the entity named below. Respectfully miffed Receipt is acknowledged of the Initial following Addenda: By: Addendum No. 1: (Signature) Addendum No.2: Addendum No.3: A14L r14 jAddendum No.4: Title, Company: J,✓I-A Corporate Seal: Address: 0 . ......... State of -incorporation: p4 stA Email* Phone: P4 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 bid proposaWAs 00 42 43 BID PROPOSAL Page 1 of 4 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Pay Item Bid List Specification Bid Unit of Item No. Section No. Quantity• Measurement Description Unit Price Bid Value 1 3311.0001 33 11 12 74.0 LF Pipe-Sump Pressure-1 1/2-inch Pipe Install(PVC/Open Cut) S2J�r2 \Yti��f Gl kl,t�y� to, Dollars Cents 2 3331.4115 33 31 20 38.7 LF 8-inch(SDR-26)Sewer Pipe Seyen�� ut�sr � 17g4— Dollars �—� Cents 3 3331.4208 3331 20 51.4 LF 12-inch(SDR-26)Sewer Pi e n hoLL5c�ri� 3b .OU 15 a Dollars Cents 4 3331.4222 3311 10 41.4 LF 16-inch DIP Sewer Pipe E�5n+--fhotLSc�nJ +wo Dollars �r L Cents 5 3331.4321 3311 10 148.0 LF 24-Inch DIP Sewer Pipe U-�A--n+-f n1 n c fkoa! 4 S i>� ki U vu�L v-LGQ ��aLT' 9 Dollars of Cents 6 3331.4418 33 11 10 135.2 LF 36-inch DIP Sewer Pipe F-� `ThaL>I Y`ZGQ btJ Dollarsf Cents 7 3331.3401 3311 11 4.8 TN Ductile Iron Sewer Fittings(>16-inch) rb L zig nJ' Dollars ev^G Cents 8 0241.1001 02 41 14 1.3 Cy Wastewater Line Grouting-8"SS pipe Pressure Grout Dollars,—L, Cents CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 16'Meters for Crowley Wastewater Meter Station Form Rcvised 20120120 02086 00 42 43 BID PROPOSAL Page 2 of 4 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Pa Item Bid List Specification Bid Unit of y Item No. Section No. Quantity Measurement Description Unit Price Bid Value 9 0241.1001 0241 14 12.5 CY Wastewater Line Grouting-18"SS pipe (Pressure Grout) T-10 F hVWscrul �7 0Y1QeYLU1&;1e +1k-1.er,4q(:�,tC 1` L��r�� Dollars t Cents 10 0241.1001 0241 14 1.2 CY Wastewater Line Grouting-24"SS pipe (Pressure Grout) -FWD hLkMtzzeLQ � L Dollars Vlr�_v�t� Cents 11 3339.1001 33 39 20 2 EA �4�Man w/lockable lid LL�GLVL� Dollars2—eJ`C5 Cents ' 12 3339.1003 33 39 20 17.8 VF 4'Extra Depth Manhole Seri a d+r41 Diameter Mao toll Dollars Cents 13 3339.1105 33 39 20 1 EA 5'Type A Manhole w/lockable lid Dollars p Cents 14 3339.1103 33 39 20 11.4 VF 5'Extra Depth Manhole Type"A"5'Dia.Manhole Dollars r—Lj Cents 15 3339.1102 33 39 20 1 EA 5'Drop Manhole w/lockable lid pp �l �rEt?Yl�1i LE CV1(X Cf, 151Cc� l S�t� Dollars Cents 16 3339.1103 33 39 20 11.1 VF 5'Extra Depth Manhole Drop 5'Diameter Manh le Cr1�-lkvtts� t � ®�L�L) �i�i8 tin�1titt_nii�c�.n�n>~�t) e1.r�YL�- c� l� Dollars Cents CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 165 Meters for Crowley Wastewater Meter Station Form Revised 20120120 02086 00 42 43 BID PROPOSAL Page 3 of 4 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Pa Item Bid List Specification Bid Unit of y Item No. Section No. Quantity Measurement Description Unit Price Bid Value 17 3305.0112 330517 4 EA Concrete Collar for Manhole d Dollars Cents 18 3301.0101 33 01 30 4 EA Manhole Vacuum Testing n �O t_,q—+L,-V-L& -,e G�C I Op L� © Dollars �v Cents 19 0241,2201 02 41 14 3 EA Remove 4'Sewer Manhole S L Y- -n� z,,.c� ea Dollars Cents Fir 20 0241.0900 0241 13 1 LS Remove Concrete Wastewater Vault Structure (� TeY1 1 Dollars ��1 ' Cents 21 3339.0001 33 39 60 64.3 VF Epoxy Manhole Liner fit,�h-leert'TYiot��2.-,G� S�k ltuuvtic{.u-ec.� �� Dollars p Cents 22 3305.0001 33 05 16 1 LS Construct Concrete Meter Vault L�"^ om Ilir =�,t�ne �� r obwo epJ Dollars Cents <a..1 Z�-T ESQ 23 3301.0002 33 01 31 416.7 LF Post-Closed Circuit Television Inspectipn \ilinLt rl�L� -TLTT` 1 0 0 JV a -- Dollars t �p Cents 24 3303.0001 33 03 10 1 LS Bypass Pumping of 18"Sanitary Sewer DollarsrG Cents CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 16°Meters for Crowlcy Wastewater Meter Swion Form Revised 20120120 01-086 00 42 43 BID PROPOSAL Page 4 of 4 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Pa Item Bid List Specification Bid Unit of y Item No. Section No. Quantity Measurement Description Unit Price Bid Value 25 3305.0109 33 05 10 488.7 LF Trench Safety System over 5'depth 9 Dollars r —13 Cents 26 3292.0400 329213 1,000.0 SY Seeding-Hydromulch kY`ee- Lc: ����cQ 3- 3) Dollars Cents 27 3110.0101 31 1000 1.0 LS Site Clearing ;bm Dollars Cents Total Bid AY),I/00.0 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 160 Meters for Crowley Wastewater Meter Station Form Revised 20120120 02086 00 43 13 BID BOND Page 1 of 1 SECTION 00 43 13 BID BOND j . KNOW ALL BY THESE PRESENTS: That we, (Bidder Name) Company Name Here hereinafter called the Principal,and(Surety Name) a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the City, hereinafter called the Obligee, in the sum of .. �, "'A and No/100 Dollars �_ He',U 00), the payment of which sum will be well Wand truly made and the said Principal and the said Surety, bind ourselves,our heirs,executors,administrators,successors and assigns,jointly and severally, firm by these presents. WHEREAS, the Principal has submitted a proposal to perform work for the following project of the Obligee, identified as Installation of 16"Meters and Bypass Line for Crowley Wastewater Station 400 Block Oriel Road NOW, THEREFORE, if the Obligee shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the Obligee in accordance with the terms of such proposal,then this bond shall be null and void. If the Principal fails to execute such Contract in accordance with the terms of such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal, this bond shall become the property of the Obligee,without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference between Principal's Total Bid Amount and the next selected Bidder's Total Bid Amount. SIGNED this day of ,2013. By: Company Name Here (Signature and Title of Principal) *By: SL.re,ty:Name Here _ (Signature of Attorney-of-Fact) *Attach Power of Attorney(Surety)for Attorney-in-Fact Impressed Surety Seal Only END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 00_41_00_00_43_13_00_42_43_00_43_37_00_45_12_00_35_13_Bid_Proposal_Workbook.xls 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders(out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications.The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of 14 our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of our principal place of business, are not required to underbd resident bidders. (Din principal place of business of our company or our parent company or majority owner is In the State of Texas. 11-� BIDDER: By:jt 11 . C PA,4I-) "t E o� {M�� C,�n.�r�n.�., /+mac qgo 9-4 —J/,c 3-4 o}6 (Signature) Title: ' 5"�E'✓r Date:��/�)/� END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 bid proposaWAs 0045 11-1 BIDDERS PREQUALIFICATIONS Page 1 of 3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 3 4 1. Summary.All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s)listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven(7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31 st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application,the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter,Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxpermit/and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by Dun&Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements.Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0045 11 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory,the financial statements must be audited or reviewed 2 by an independent, certified public accounting fine registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting films perfornung audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting finis should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or(2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital(working capital=current assets—current 26 liabilities)by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidden Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report,the notation of 37 "None"or"N/A"should be inserted. 38 (2) A minimum of five(5) references of related work must be provided. 39 (3). Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer,model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0045 11-3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 d. If a contractor has a valid prequalification letter,the contractor will be eligible to bid- 2 the prequalified work types until the expiration date stated in the letter. 3 4 5 6 7 8 END OF SECTION 9 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 004512 BID FORM Page 1 of 1 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Sewer Collection System, 3 '€ Urban/Renewal,24"and 36" �OV1 !N` g 157 Sewer Collection System, i Urban/Renewal, 16"and yl/1 r,-[-tA Cw#vr vn•vH, /AX 14911 S smaller _ �, � ,r ..FS".tS ���•.�� y. r- ����_1e�i -��. � � � a�_ + Concrete Structures 0w The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: �(\ ��GL��V� �'"ct `C �� sz D 7 (Signature) Title: PtaES�00*,r Date: END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 bid proposaWAs FORTWORTH SECTION 00 45 13 BIDDER PREQUALIFICATION APPLICATION Date of Balance Sheet Mark only one: Individual, Limited Partnership Name under which you wish to qualify General Partnership Corporation Limited Liability Company Post Office Box City State Zip Code Street Address (required) City State Zip Code Telephone Fax Email Texas Taxpayer Identification No. Federal Employers Identification No. DUNS No. (if applicable) MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 1000 THROCKMORTON STREET FORT WORTH, TEXAS 76102-6311 AND MARK THE ENVELOPE: "BIDDER PREQUALIFICATION APPLICATION" 0045 13-2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 8 BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify your firm: (Check the block(s) which are applicable—Block 3 is to be left blank if Block 1 and/or Block 2 is checked) Has fewer than 100 employees and/or Has less than$6,000,000.00 in annual gross receipts OR Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. MAJOR WORK CATEGORIES Water Department Augur Boring-24-inch diameter casing and less Augur Boring-Greater than 24-inch diameter casing and greater Tunneling—36-Inches—60—inches, and 350 LF or less Tunneling-36-Inches—60—inches, and greater than 350 LF Tunneling—66"and greater, 350 LF and greater Tunneling—66"and'greater, 350 LF or Less Cathodic Protection Water Distribution,Development, 8-inch diameter and smaller Water Distribution,Urban and Renewal,8-inch diameter and smaller Water Distribution,'Development, 12-inch diameter and smaller Water Distribution,Urban and Renewal, 12-inch diameter and smaller Water Transmission,Development, 24-inches and smaller Water Transmission,Urban/Renewal, 24-inches and.smaller Water Transmission,Development,42-inches and smaller Water Transmission,Urban/Renewal, 42-inches and smaller Water Transmission,Development,All Sizes Water Transmission,Urban/Renewal,All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches—36-inches Sewer.Bypass Pumping 42-inches and larger CCTV, 8-inches and smaller CCTV, 12-inches and smaller CCTV, 18-inches and smaller CCTV, 24-inches and smaller CCTV, 42-inches and smaller CCTV, 48-inches and smaller CITY OF FORT WORTH 16'METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 ' 0045 13-3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED Sewer CIPP, 12-inches and smaller Sewer CIPP, 24-inches and smaller Sewer CIPP, 42-inches and smaller Sewer CIPP, All Sizes Sewer Collection System,Development, 8-inches and smaller Sewer Collection System,Urban/Renewal, 8-inches and smaller Sewer Collection System,Development, 12-inches and smaller Sewer Collection System,Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer Interceptors, Urban/Renewal,48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement,All Sizes Sewer Cleaning, 24-inches and smaller Sewer Cleaning, 42-inches and smaller Sewer Cleaning, All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Construction/Reconstruction(LESS THAN 10,000 square yards) Asphalt Paving Construction/Reconstruction(10,000 square yards and GREATER) Asphalt Paving Heavy Maintenance(UNDER$1,000,000) Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction(LESS THAN 10,000 square yards) Concrete Paving Construction/Reconstruction(10,000 square yards and GREATER) Roadway and Pedestrian Lighting CITY OF FORT WORTH 16'METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 0045 13-4 BIDDER PREQUALIFICATION APPLICATION Page 4 of 8 1. List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in construction work has your organization had: (a) As a General Contractor: (b) As a Sub-Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION NAME AND DETAILED CONTRACT OF DATE CITY-COUNTY- ADDRESS OF OFFICIAL TO AMOUNT WORK COMPLETED STATE WHOM YOU REFER *If requalifying only show work performed since last statement. 5.Have you ever failed to complete any work awarded to you? If so, where and why? 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract? If so, state the name of the individual, other organization and reason. 7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual,name of owner and reason. CITY OF FORT WORTH 16'METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 0045 13-5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 8. In what other lines of business are you financially interested? 9. Have you ever performed any work for the City? If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. NAME OF FIRM OR COMPANY DETAILED ADDRESS 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGNITUDE POSITION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee,please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CITY OF FORT WORTH 16'METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 004513-6 BIDDER PREQUALIFICATION APPLICATION Page 6 of 8 CORPORATION BLOCK PARTNERSHIP BLOCK If a corporation: If a partnership: Date of Incorporation State of Organization Charter/File No. Date of organization President Is partnership general, limited, or registered limited liability partnership? Vice Presidents File No. (if Limited Partnership) General Partners/Officers Secretary Limited Partners (if applicable) Treasurer LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Individuals authorized to sign for Partnership Officers or Managers (with titles, if any) Except for limited partners,the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals,please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement,power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH 16'METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised Decen-iber 20,2012 004513-7 BIDDER PREQUALIFICATION APPLICATION Page 7 of 8 14. Equipment $ TOTAL BALANCE SHEET. ITEM QUANTITY ITEM DESCRIPTION VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 .21 22 23 24 25 26 27 28 29 30 Various- TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include,the manufacturer, model, and general common description of each. CITY OF FORT.WORTH 16'METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 0045 13-8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information,.while this statement is in force,necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of , Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT WORTH 16'METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 00 45 26-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of I 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a),as amended,Contractor certifies that it 4 provides Worker's compensation insurance coverage for all of its employees employed on City 5 Project No.02086.Contractor further certifies that,pursuant to Texas Labor Code,Section 6 406.096(b),as amended,it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 9 CONTRACTOR: 10 MELA Contracting, Inc Jeff Lamar 11 By: 12 Company (Please Print) 13 --._ 14 430 Lakeview Road Signatur 15 Address � 17 Rhome, Texas 76078 Title: Vc >=esident 18 City/State/Zip (Please Print) 19 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT § 24 25 BEFORE ME,the undersigned authority,on this day personally appeared 26 —,known tome to be the person whose name is 27 subscribed to the foregoing instrument,and acknowledged to me that he/she executed the same as 28 the act and deed of it �viG1Cni — for the purposes and 29 consideration therein expressed and in the capacity therein stated. 30 31 GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 32 201 l 3334 g 35 jW1 �co 36 Notary Public in a for the State of Texas 37 38 END OF SECTION —... - r TRACYIAMAR 39 2•i MY COMMISSION EXPIRES +'A July 28,2018 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 00 45 40-1 MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL Page 1 of 1 1 SECTION 00 45 40 2 MINORITY BUSINESS ENTERPRISE GOAL 3 4 APPLICATION OF POLICY 5 If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal 6 may be applicable. If the total dollar value of the contract is $50,000 or less, the MBE 7 subcontracting goal is not applicable. 8 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 11 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 12 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 13 14 MBE PROJECT GOAL 15 The City's MBE goal on this project is 10 % of the total bid. Note: If both MBE and SBE 16 subcontracting goals are established for this project, then an Offeror must submit both a MBE 17 Utilization Form and a SBE Utilization Form to be deemed responsive. r 18 19 COMPLIANCE TO BID SPECIFICATIONS 20 On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are 21 required to comply with the intent of the City's Business Diversity Ordinance by one of the 22 following: 23 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 24 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation,or 25 3. Good Faith Effort documentation, or; 26 4. Waiver documentation. 27 Failure to comply with the City's M/WBE Ordinance, shall result in the Bid being considered non- 28 responsive.Any questions,please contact the M/WBE Office at(817) 392-6104. 29 30 SUBMITTAL OF REQUIRED DOCUMENTATION 31 The applicable documents must be received by the Managing Department, within the following J 32 times allocated, in order for the entire bid to be considered responsive to the specifications. The 33 Offeror shall deliver the MBE documentation in person to the appropriate employee,of the Managing 34 Department and obtain a date/time receipt. Such receipt shall be evidence that the City received the 35 documentation in the time allocated. A faxed copy will not be accepted. 1. Subcontractor Utilization Form,if goal is met received by 5:00 p.m., five (5) City business days after or exceeded: the bid opening date,exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form,if participation is less than the bid opening date,exclusive of the bid opening date. stated goal: J 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form;if no MBE participation: the bid opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form,if firm will received by 5:00 p.m., five (5) City business days after perform all subcontracting/supplier work: the bid opening date,exclusive of the bid opening date. 5. Joint Venture Form,if utilizing a joint venture received by 5:00 p.m., five (5) City business days after to meet or exceed goal. the bid opening date,exclusive of the bid opening date. 36 END OF SECTION CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 00 52 43-1 Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 44 3 THIS AGREEMENT, authorized onS cyityM�w120is'made by and between the City of Forth 4 Worth, a Texas home rule municipality,;actin by an1144 through ' duly authorized City Mandger, 5 . ("City"), and AtYl C 6 authorized to do business in exas, acting by and thro gh its duly authorized representative, 7 ("Contractor"). 8 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK 11 Contractor, shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2.PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 Installation of 16"Meters and Bypass Line for Crowley Wastewater Meter Station 17 City Project No. 02086 18 Article 3. CONTRACT TIME 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 90 days after the date when the 24 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that City will 27 suffer financial loss if the Work is not completed within the times specified in Paragraph 28 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 29 General Conditions. The Contractor also recognizes the delays, expense and difficulties 30 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 31 is not completed on time. Accordingly, instead of requiring any such proof, Contractor 32 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 33 City Two Hundred and Ninety-two Dollars ($292.00) for each day that expires after the 34 time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter 35 of Acceptance. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised August 17,2012 00 52 43-2 Agreement Page 2 of 4 36 Article 4. CONTRACT PRICE 37 City agrees to pay Contractor for performance of the Work 'n accordance with the Contract 38 Docu�m-/ents an amount in current funds'of D g r A> i n ee ao Do ars 40 Article S. CONTRACT DOCUMENTS 41 5.1 CONTENTS: 42 A. The Contract Documents which comprise the entire agreement between City and 43 Contractor concerning the Work consist of the following: 44 1. This Agreement. 45 2. Attachments to this Agreement: 46 a. Bid Form 47 1) Proposal Form 48 2) Vendor Compliance to State Law Non-Resident Bidder 49 3) Prequalification Statement 50 4) State and Federal documents (project specific) 51 b. Current Prevailing Wage Rate Table 52 c. Insurance ACORD Form(s) 53 d. Payment Bond 54 e. Performance Bond 55 f. Maintenance Bond 56 g. Power of Attorney for the Bonds 57 h. Worker's Compensation Affidavit 58 i. MBE and/or SBE Commitment Form, 59 3. General Conditions. 60 4. Supplementary Conditions. 61 5. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings. 65 7. Addenda. 66 8. Documentation submitted by Contractor prior to Notice of Award. 67 9. The following which may be delivered or issued after the Effective Date of the 68 Agreement and, if issued,became an incorporated part of the Contract Documents: 69 a. Notice to Proceed. 70 b. Field Orders. 71 c. Change Orders. 72 d. Letter of Final Acceptance. 73 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised August 17,2012 005243-3 Agreement Page 3 of 4 74 Article 6. INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of, the work and services to be performed 78 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 79 under this contract. This indemnification provision is specifically intended to operate 80 and be effective even if it is alleged or proven that all or some of the damages being 81 sought were caused, in whole or in part, by any act, omission or negligence of the city. 82 This indemnity provision is intended to include, without limitation, indemnity for 83 costs, expenses and legal fees incurred by the city in defending against such claims and 84 causes of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 87 the city,its officers, servants and employees,from and against any and all loss, damage 88 or destruction of property of the city, arising out of, or alleged to arise out of,the work 89 and services to be performed by the contractor, its ,officers; agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification 91 provision is specifically intended to operate and be effective even if it is alleged or 92 proven that all or some of the damages being sought were.caused, in whole or in part, 93 by any act, omission or negligence of the city. 94 95 Article 7.MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 98 have the meanings indicated in the General Conditions. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Document's may not 'be assigned by the 101 Contractor without the advanced express written consent of the City. 102 7.3 Successors and Assigns. 103 City and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. 106 7.4 Severability. 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shall continue to be valid and binding upon CITY and 110 CONTRACTOR. 111 7.5 Governing Law and Venue. 112 This Agreement, including all of the Contract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of Texas;Fort Worth Division. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised August 17,2012 00 52 43-4 Agreement Page 4 of 4 115 7.6 Other Provisions. 116 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 117 classified, promulgated and set out by the City, a copy of which is attached hereto and 118 made a part hereof the same as if it were copied verbatim herein. 119 7.7 Authority to Sign. 120 Contractor shall .attach evidence of authority to sign Agreement, if other than duly 121 authorized signatory of the Contractor. 122 123 IN WITNESS WHEREOF, City and Contractor .have executed this Agreement in multiple 124 counterparts. 125 126 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 127 Contractor: City of Fort Worth IM L CoM�AtTI N :BY c�LdO L.Pd�-�Fernando Costa By Assistant City Manager (Signature Date L•i?. ��Au��'M��DoiA � Attest: (Printed Name) City ecret 0 00 ��. (Seal) Title: 8 070 Address: y30 L***,VtCW ytp b8�y �oo 0°0° Date: � _� �X,qg City/State/Zip: A owed a o F and Legality: Date Douglas W.Black Assistant City Attorney 128 129 130 APPRO RECO ED. 131 132 133 134 Andrew T. Ctonberg, P.E. 135 _Interim,Director 136 Water Department 137 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH 6IF CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised August 17,2012 0061 13-1 PERFORMANCE BOND Page 1 of 2 1 SECTION 00 6113 Bond No. 10 0 0 9 9 619 8 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we,_MELA Contracting, Inc. ,known as American Contractors Indemnity Company 9 "Principal"herein and dba Texas Bonding Company ,a corporate 10 surety(sureties, if more than one)duly authorized to do business in the State of Texas,known as 11 "Surety"herein(whether one or more),are held and firmly bound unto the City of Fort Worth,a 12 municipal corporation created pursuant to the laws of Texas,known as"City"herein,in the penal 13 Sum of, Four Hundred Seventy One Thousand and No/100--- Dollars 14 ($ 4 71, 0 0 0 . 0 0--- ),lawful money of the United States,to be paid in Fort Worth, 15 Tarrant County,Texas for the payment of which sum well and truly to be made,we bind 16 ourselves, our heirs, executors,administrators, successors and assigns,jointly and severally, 17 firmly by these presents. 18 WHEREAS,the Principal has entered into a certain written contract with the City 19 awarded the day of ei QTe or ,20JI which Contract is hereby referred to and 20 made a part hereof for all purposes as if fully set forth herein, to furnish all materials,equipment 21 labor and other accessories defined by law, in the prosecution of the Work,including any Change 22 Orders, as provided for in said Contract designated as Installation of 16"Meters and Bypass Line 23 for Crowley Wastewater Meter Station,City Project No. 02086 24 NOW,THEREFORE,the condition of this obligation is such that if the said Principal 25 shall faithfully perform it obligations under the Contract and shall in all respects duly and 26 faithfully perform the Work, including Change Orders,under the Contract,according to the plans, 27 specifications, and contract documents therein referred to,and as well during any period of 28 extension of the Contract that may be granted on the part of the City,then this obligation shall be 29 and become null and void,otherwise to remain in full force and effect. 30 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 31 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 32 Worth Division. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0061 13-2 PERFORMANCE BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government-Code, as amended,and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF,the Principal and the Surety have SIIGN,TED and SEALED 5 this instrument by dul ddauthorized agents and officers on this the / ''tt�� day of SC4e r► Le✓ 6 20 �T. 7 PRINCIPAL: 8 MELA Contracting, Inc 9 10 11 BY: 12 ignatufe 13 ATTEST: 15 Z.EL .CP r✓� JW4_4M,ep,�irex�t.�- 16 (Principal)Secret Name and Title 17 18 Address: 430 Lakeview Road 19 Rhome, TX 76078 20 21 22 VAtness as to Principal 23 SURETY: 24 American Contractors Indemnity Company f; 25 dba Tee as Boncli 'Company 26 27 B r 28 igna e 29 30 ire ifer Picchi, Attorney-in-Fact 31 Name and Title 32 33 Address: 601 South Figueroa St., 7 6th Floor 34 Los Angeles, CA 90017 . 35 36 37 Witness as to Surety,Trenae Donovan Telephone Number: (310) 6 4 9-0 9 9 0 38 39 40 41 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address, both must be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. 45 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0061 14-1 PAYMENT BOND Page 1 of 2 Bond No. 1000996198 1 SECTION 00 6114 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, MELA Contracting, Inc. known as American Contractors Indemnity ompany 9 "Principal" herein, and _Texas Bonding Company , a 10 corporate surety (sureties), duty authorized to do business in the State of Texas, known as 11 "Surety"herein(whether one or more), are held and firmly bound unto the City of Fort Worth, a 12 municipal corporation created pursuant to the laws of the State of Texas,known as "City"herein, 13 in the penal SUM Of Four Hundred Seventy one Thousand and No/100--- Dollars 14 ($4 71, 0 0 0 . 0 0--- ), lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County,Texas, for the payment of which sum well and truly be made, we bind ourselves, 16 our heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these 17 presents: 18 A WHEREAS,Principal has entered into a certain written Contract with City, awarded the 19 =day of C eno 20 which Contract is hereby referred to and 20 made a part hereof for all purposes as if fully set forth herein,to furnish all materials, equipment, 21 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 22 said Contract and designated as Installation of 16" Meters and Bypass Line for Crowley 23 Wastewater Meter Station,City Project No. 02086. 24 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 25 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 26 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 27 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 28 force and effect. 29 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 30 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 31 accordance with the provisions of said statute. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0061 14-2 PAYMENTBOND Page 2 of 2 1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 2 this i stru lment by duly authorized agents and officers on this the day of 3 S e0T erhbPr ,20 A". 4 PRINCIPAL: MELA Contracting, Inc . ATTEST: BY: Signature 4 (Princip ) Secre Name and Title Address: 430 Lakeview Road Rhome, TX 7 6-0 7 8 y�ay /YLJy1 �L C� Witness as to.Principal t SURETY: American Contractors Indemnity Company db.4-T xas Bonding-'C miAny ATTEST: B 1gn re ennifer Picchi, Attorney-in-Fact (Surety) Secretary Name and Title Address: 601 South Figueroa St., 16th Floor Los Angeles, CA 9001-7 Witness as to Surety Trenae Donovan Telephone Number: (310) 6 4 9-0 9 9 0 5 6 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 7 bylaws showing that this person has authority to sign such obligation. If Surety's physical 8 address is different from its mailing address,both must be provided. 9 10 The date of the bond shall not be prior to the date the Contract is awarded. 11 END OF SECTION 12 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0061 19-1 MAINTENANCE BOND Page 1 of 3 Bond No. 1000996198 1 SECTION 00 6119 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 9 That we MELA Contracting, Inc. ,known as American Contractors Indemnity Company 10 "Principal'herein and dba Texas Bonding Company ,a corporate surety 11 (sureties, if more than one)duly authorized to do business in the State of Texas,known as 12 "Surety"herein(whether one or more),are held and firmly bound unto the City of Fort Worth,a 13 municipal corporation created pursuant to the laws of the State of Texas, known as"City"herein, 14 in the sum of Four Hundred Seventy One Thousand and No/100---Dollars 15 ($4 71, 0 0 0 . 0 0--- ), lawful money of the United States,to be paid in Fort Worth, 16 Tarrant County,Texas, for payment of which sum well and truly be made unto the City and its 17 successors,we bind ourselves,our heirs, executors,administrators,successors and assigns,jointly 18 and severally,firmly by these presents. 19 20 WHEREAS,the Principal has entered into a certain written contract with the City awarded g 21 the / h day of S e0 4 B1"► b er 20��;which Contract is hereby 22 referred to and a made part hereof for all purposes as if fully set forth herein,to furnish all 23 materials, equipment labor and other accessories as defined by law,in the prosecution of the 24 Work, including any Work resulting from a duly authorized Change Order(collectively herein, 25 the"Work")as provided for in said contract and designated as Installation of 16"Meters and 26 Bypass Line for Crowley Wastewater Meter Station,City Project No. 02086;and 27 28 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 29 accordance with the plans, specifications and Contract Documents that the Work is and will 30 remain free from defects in materials or workmanship for and during the period of two(2)years 31 after the date of Final Acceptance of the Work by the City("Maintenance Period"); and 32 33 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part 34 upon receiving notice from the City of the need therefore at any time within the Maintenance 35 Period. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 i I 00 61 19-2 MAINTENANCE BOND Page 2 of 3 1 2 NOW THEREFORE,the condition of this obligation is such that if Principal shall 3 remedy any defective Work,for which timely notice was provided by City,to a completion 4 satisfactory to the City,then this obligation shall become null and void;otherwise to remain-in 5 full force and effect. 6 7 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 8 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 10 the Surety under this Maintenance bond; and 11 12 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 13 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 14 Worth Division; and 15 16 PROVIDED FURTHER,that this obligation shall be continuous in nature and 17 successive recoveries may be had hereon for successive breaches: 18 19 - CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0061 19-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the / ii day of 4er%Ge r 3 20 . 4 5 PRINCIPAL: 6 MELA Contracting, Inc . 7 8 9 BY: I0 Signature 11 ATTEST: 12 13 4, f e.,q ar 14 (Princip )Sec—re-V Name and Title 15 16 Address: 430 Lakeview Road 17 _Rhome, TX 76078 18 19 20 Witness as to Principal 21 SURETY: 22 American Contractor- I demnity Company 23 dbd to xas B nd'-n mDany 24 25 I/A 26 igna J 27 28 J nifer icch, Attorney-in-Fact 29 ATTEST: Name and Title 30 31 Address: 601 south Figueroa St. , 16th Floor 32 (Surety)Secretary Los Angeles, CA 9001? 33 34 35 Witness as to Surety, Trenae Don van Telephone Number: (310) 6 4 9-0 9 9 0 36 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH 16 METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 American Contractors Indemnity Company dba Texas Bonding Company TEXAS COMPLAINT NOTICE IMPORTANT NOTICE AVISO IMPORTANTE 1. To obtain information or make a complaint: Para obtener informacion o para someter una quej a: 2. You may contact your agent. Puede comunicarse con su agente. 3. You may call the company's toll free telephone Usted puede llamar al numero de telefono gratis number for information or to make a complaint at: de la compania's para informacion o para someter una queja al: 1-800-486-6695 1-800-486-6695 4. You may also write to the company at: Usted tambien puede escribir a la compania: 601 S.Figueroa Street, Suite 1600 601 S.Figueroa Street, Suite 1600 Los Angeles,CA 90017 Los Angeles, CA 90017 5. You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on companies, Seguros de Texas para obtener informacion acerca coverages,rights,or complaints at: de companias,coberturas, derechos,o quejas al: 1-800-252-3439 1-800-252-3439 6. You may write to the Texas Department of Puede escribir al Departamento de Seguros de Insurance at: Texas al: Consumer Protection(111-1A) Consumer Protection(111-1A) P.O.Box 149091 P.O.Box 149091 Austin,TX 78714-9091 Austin,TX 78714-9091 Fax No. (512)475-1771 Fax No. (512)475-1771 Web:http://www.tdi.state.tx.us Web:http://www.tdi.state.tx.us E-mail: ConsumerProtection(Dtdi.state.tx.us E-mail: ConsumerProtection a,tdi.state.tx.us 7. PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS: Should you have a dispute concerning your Si tiene una disputa concerniente a su prima o a premium or about a claim you should contact the un reclamo, debe comunicarse con el agente o la agent or the company first.If the dispute is not compania primero. Si no se resuelve la disputa, resolved,you may contact the Texas Department puede entonces comunicarse con el departamento of Insurance. (TDI). 8. ATTACH THIS NOTICE TO YOUR POLICY UNA ESTE AVISO A SU POLIZA This notice is for information only and does not Esta aviso es solo para proposito de informacion y become a part or condition of the attached no se convierte en parte o condicion del document. documento adjunto. HCCSTXM0008/10 POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S.SPECIALTY INSURANCE COMPANY MK A BY THESE AMES rican Contractors,Indemnity Company, a Californiagto- 9c�I ems= t d04416yaart assumed ban� r»ic ---fUDr_ctors Indemnity Company, United States Surety Ct a NW0f �;orporation and U.S. Specialty Insurance malry,p a�Texas corporation(collectively,the"Companies"),do by t resents make, constitute and appoint: Clem F.Lesch,Eric Lesch,Melissa Lesch,Roger Bales,Steven Lewis,Jennifer Picchi,Trenae Donovan or Lisa Borhaug of Dallas,Texas li t ttl nd ttorney(s)-in-fact, each in their separate capacity if mo ame ove,with full�and a Zhq&b5Qqx&W its name,place and stead,to execute,acknowledge a> le eWa�a bmids,recognizawe a lc �r her instruments or contracts of suretyship to include riders, amendmel�s, AnKconsents of surety, pr5MV1ngfhC bbA penalty does not exceed ******Ten Million****** Dollars ($ **10,000,000.00** ), This Power of Attorney shall expire without further action on December 8,2016. This Power of Attorney is granted under and by authority of the-following resolutions adopted by the Boards of Directors of the Companies: Mt _/t�-t President,any Vice iderft, tsta tce-President,any Secretary or any Assistant Secretary shall be and is. steffwith-ffidl woomer and auk toppoint any one or_�it ons�s t of tey(s)-in-Fact to represent and act for and on behalf of the Compark �hWrolto Attorney-in-Fact maybe given full power a-H au hoitty for and in the name of and on behalf of the Company,to execute,acknowledge and de�v�any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts,and any and all notices and documents canceling or terminating the Company's liability thereunder,and any such instruments so executed by any such Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected bathe Cook aer to Smeary. - - M Mbly t signature of any authorized officer and seal of the Company heremfiinv 1l power of attorney o e c rel ` i o fa==mf many power of attorney or certificate bearing facsimile signature or ii�gal MI bra a�binding upon the��_m�Jtht=== �— nn betaking to which it is attached. IN WITNESS WHEREOF,The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed,this 10th day of December,2012. AMERICAN CONTRACTORS)INDEMNITY COMPANY TEXAS BONDING COMPANY ore UNITED ' 'ANY U.S.SPECIALTY INSURANCE COMPANY - -Lw-� u �:lrr un �. C` f� ;s. _'o n - .Py,. = - Daniel P.Aguilar,Vice President StaW GfEWOM& --- -_ - - - � f At les SS: IOt ofDecember,2012 before me Vanessa'Wri ht a notary ubl�sonall a eared Daniel P.A ilff� est ent o� Y 9 9 g 1 ry e r Y PP � American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the l oq� ntity upon behalf ciEw *) cted,executed the instrument. — IMM Whifoitide"ENALTY OF PL URI n �+sue the State of California that the foregoing paragrapl eandlihy"" ---WITNESS my hand and official seams V.WRtGNT �� Commission N 1998319 Signature (Seal) r Notary Poh11C-CatNarnh Los Anpates County - 1 — —-- -_ My Comm.Expires No S.2018� - - 11 !ems M ■ ,Ma ie stant Secretary of American Contractors Indemnity t a ��xa�=B-p-n Company, LWtEdiStateseS� t pan.Van J.S=.=Specialty Insurance Company,do hereby certify that tie_tdIftoong is a true and corfft fwltww of Attorney,executed by said Companies,which is still in full force and effect;furthermore,the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In_Witne�_Wh f,I have hereunto set my hand=and affixed the seals of said Companies at Los Angeles,California this may= - ,2 0 1 `y„Cr :�nu`OrHnpg4: "umw°rrpn Corporate Seals ?^5[oR''' s sup - a°aP�,- ...sy., `d�l� ...Fj�.., cqo.• .;c0� ,.�4e�:y..........�°s.,, j'{ =Ci i '3_ 'Y /) •tz` cv?i a NO W %SEVT.l9. Y-: 'L�: — - Bond sb.. ;:o= ;y.- -:•_, ;•5 s Jeannie Lee, sistant Secretary n, = n �081 'pnALiFORM�pa````' rn rrwnn o"````` STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 —Definitions and Terminology..........................................................................................................I 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology..................................................................................................................................6 Article2—Preliminary Matters.........................................................................................................................7 2.01 Copies of Documents....................................................................................................................7 2.02 Commencement of Contract Time;Notice to Proceed................................................................7 2.03 Starting the Work..........................................................................................................................8 2.04 Before Starting Construction........................................................................................................8 2.05 Preconstruction Conference..........................................................................................................8 2.06 Public Meeting..............................................................................................................................8 2.07 Initial Acceptance of Schedules....................................................................................................8 Article 3—Contract Documents: Intent,Amending, Reuse............................................................................8 3.01 Intent..............................................................................................................................................8 3.02 Reference Standards......................................................................................................................9 3.03 Reporting and Resolving Discrepancies.......................................................................................9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................I I Article 4—Availability of Lands; Subsurface and Physical Conditions;Hazardous Environmental Conditions;Reference Points...........................................................................................................11 4.01 Availability of Lands ..................................................................................................................11 4.02 Subsurface and Physical Conditions ..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities ...............................................................................................................13 4.05 Reference Points .........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article5—Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers...................................................................................................16 5.02 Performance,Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6—Contractor's Responsibilities........................................................................................................19 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 6.02 Labor; Working Hours................................................................................................................20 6.03 Services,Materials, and Equipment...........................................................................................20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and"Or-Equals".......................................................................................................21 6.06 Concerning Subcontractors, Suppliers, and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties...........................................................................................................26 6.09 Permits and Utilities.. ................27 6.10 Laws and Regulations.................................................................................................................27 6.11 Taxes ...........................................................................................................................................28 6.12 Use of Site and Other Areas .......................................................................................................28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection..................................................................................................................29 6.15 Safety Representative..................................................................................................................30 6.16 Hazard Communication Programs .............................................................................................30 6.17 Emergencies and/or Rectification...............................................................................................30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work...................................................................................................................32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification .........................................................................................................................33 6.22 Delegation of Professional Design Services ................................................................:.............34 6.23 Right to Audit..............................................................................................................................34 6.24 Nondiscrimination.......................................................................................................................35 Article7-Other Work at the Site...................................................................................................................35 7.01 Related Work at Site...................................................................................................................35 7.02 Coordination................................................................................................................................36 Article 8-City's Responsibilities...................................................................................................................36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data......................................................:.........................................................................36 8.03 Pay When Due .......................................................................................:....................................36 8.04 Lands and Easements;Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections, Tests, and Approvals..............................................................................................36 8.07 Limitations on City's Responsibilities.......................................................................................37 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program...............................................................................................37 Article 9-City's Observation Status During Construction...........................................................................37 9.01 City's Project Representative .....................................................................................................37 9.02 Visits to Site................................................................................................................................37 9.03 Authorized Variations in Work........................................:.........................................................38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 Article 10-Changes in the Work; Claims;Extra Work................................................................................38 10.01 Authorized Changes in the Work...............................................................................................38 10.02 Unauthorized Changes in the Work ...........................................................................................39 10.03 Execution of Change Orders.......................................................................................................39 10.04 Extra Work..................................................................................................................................39 10.05 Notification to Surety..................................................................................................................39 10.06 Contract Claims Process.............................................................................................................40 Article 11 -Cost of the Work;Allowances;Unit Price Work;Plans Quantity Measurement......................41 11.01 Cost of the Work........................................................................................:................................41 11.02 Allowances..................................................................................................................................43 11.03 Unit Price Work..........................................................................................................................44 11.04 Plans Quantity Measurement.......................................................................................................45 Article 12-Change of Contract Price; Change of Contract Time.................................................................46 12.01 Change of Contract Price............................................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays..........................................................................................................................................47 Article 13 -Tests and Inspections; Collection,Removal or Acceptance of Defective Work......................48 13.01 Notice of Defects ........................................................................................................................48 13.02 Access to Worlc...........................................................................................................................48 13.03 Tests and Inspections..................................................................................................................48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 13.06 Correction or Removal of Defective Work................................................................................50 13.07 Correction Period........................................................................................................................50 13.08 Acceptance of Defective Worlc...................................................................................................51 13.09 City May Correct Defective Work..............................................................................................51 Article 14-Payments to Contractor and Completion....................................................................................52 14.01 Schedule of Values......................................................................................................................52 14.02 Progress Payments ......................................................................................................................52 14.03 Contractor's Warranty of Title...................................................................................................54 14.04 Partial Utilization........................................................................................................................55 14.05 Final Inspection...........................................................................................................................55 14.06 Final Acceptance.........................................................................................................................55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release ........................................................56 14.09 Waiver of Claims ........................................................................................................................57 Article 15-Suspension of Work and Termination........................................................................................57 15.01 City May Suspend Work.............................................................................................................57 15.02 City May Terminate for Cause...................................................................................................58 15.03 City May Terminate For Convenience.......................................................................................60 Article16-Dispute Resolution......................................................................................................................61 16,01 Methods and Procedures.............................................................................................................61 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 Article17—Miscellaneous.......................................................................................:......................................62 17.01 Giving Notice..............................................................................................................................62 17.02 Computation of Times................................................................................................................62 17.03 Cumulative Remedies.................................................:... ............................................62 17.04 Survival of Obligations...............................................................................................................63 17.05 Headings......................................................................................................................................63 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 007200-1 General Conditions Page 1 of 63 ARTICLE I —DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. hl addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement—The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment—The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award—Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder—The individual or entity who submits a Bid directly to City. 8. Bidding Documents—The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Buzzsaw—City's on-line, electronic document management and collaboration system. 12. Calendar Day—A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 2 of 63 13. Change Order—A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and chartered under the Texas State Statutes; acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. City Attorney— The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth,Texas, or his duly authorized representative. 18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim, 19. Contract—The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations,or agreements,whether written or oral. 20. Contract Documents—Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price—The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time—The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and(ii) complete the Work so that it is ready for Final Acceptance. 23. Contractor—The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Docember2l,2012 007200-l General Conditions Page 3 of 63 25. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 26. Day or day—A day, unless otherwise defined, shall mean a Calendar Day. 27. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Planning and Development— The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Director of Water Department— The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 32. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the Agreement—The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 36.Field Order—A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 4 of 63 38. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements—Sections of Division 1 of the Contract Documents. 40. Hazardous Environmental Condition—The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste—Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item—An Item of work included in the Contract Documents that has a total cost equal to or greater than 5%of the original Contract Price or$25,000 whichever is less. 45. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award—The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed—A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs—Polychlorinated biphenyls. 49. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 50. Plans—See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 5 of 63 51. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52. Project—The Work to be performed under the Contract Documents. 53. Project Representative—The authorized representative of the City who will be assigned to the Site. 54. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactive Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 56. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday(excluding legal holidays). 57. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion. of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values—A,schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site—Lands or areas indicated in the Contract Documents as being furnished.by City upon which the Work is to be performed, including rights-of-way, permits, and easements"for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and . certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, - may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site.. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 6 of 63 63. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent— The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions—That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water,wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69. Unit Price Work—See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours—Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day—A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory,faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2—PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time;Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3—CONTRACT DOCUMENTS: INTENT,AMENDING,REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes,Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents.No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a. written interpretation or clarification from City.before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized,by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the, printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies,the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with.the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 12 of63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsuiface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site(except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members,partners, employees, agents, consultants, or subcontractors with respect to: I. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 DifferingSubsuiface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A),notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or-Indicated. 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Worlc. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members,partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 007200-1 General Conditions Page IS of63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor.interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be.within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City(and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. .G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or, by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition'uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 16 of 63 ARTICLE 5—BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payinent, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured)which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement,which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property &Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required,written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims-made basis,the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups,must also be approved by City. 11. Any deductible in excess of$5,000.00, for any policy that does not provide coverage on a first-dollar basis,must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations,personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dwember2l,2012 007200-1 General Conditions Page 19 of63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured.There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6—CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods,techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication)to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up,and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid,unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 0132 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or-Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or-Equal"Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or-equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 00 72 00-1 General Conditions Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales,maintenance, repair,and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to.that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each .proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an"or-equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by, Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal" at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions:No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract,unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Business Diversity Enterprise Ordinance Compliance: It is City policy to ensure the full and equitable participation by Minority and Small Business Enterprises (MBE)(SBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE and/or SBE goal, Contractor is required to comply with the intent of the City's Business Diversity Ordinance (as amended) by the following: 1. Contractor shall, upon request by the City, provide complete and accurate information regarding actual work performed by a MBE and/or SBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE and/or SBE. Material misrepresentation of any nature may be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Ditty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing.wage rates in accordance with. Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation, A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the. prevailing wage rates stipulated in these.contract documents. This penalty shall be retained by the City to offset its administrative costs,pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall .make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the frill amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CrFY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the l lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii)the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fidlest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 27 of 63 the incorporation in the Work of any invention, design,process,product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. http://www.window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Docember2l,2012 007200-1 General Conditions Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor.that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work, 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal,relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal,relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dxember2l,2012 00 72 00-1 General Conditions Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours,the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier,pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Revievn: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection,test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.13.The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART BY ANY ACT OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation,.indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 34 of63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED IN WHOLE OR IN PART BY ANY ACT OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space-in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. . The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title V1, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7—OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site,the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8—CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements;Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 007200-1 General Conditions Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to.perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE-9—CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. The Project Representative(s) will be as provided in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 38 of 63 9.03 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor,who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptahility of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10—CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.09 or City's correction of defective Work under Paragraph 13.09, or(iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof; and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original . Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 00 72 00-1 General Conditions Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice. 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto(unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal(unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any,take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11—COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.0 LB, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.01.B, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55%markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATI0N DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of . partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.01.A.1 or specifically covered by Paragraph 11.01.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by. any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly Supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.B, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. ,Specified Allowance: It is understood that Contractor has included in the Contract- Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre-bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH , STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 007200-1 General Conditions Page 44 of 63 a. the pre-bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre-bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 i£ 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25%from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities,unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity,multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 46 of 63 E. For callout work or non-site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12—CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.0l.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit(determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0l.A.1, 11.0l.A.2. and 11.01.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.0l.A.5,the Contractor's fee shall be five percent(5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.01.C.2.a and 12.01.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (51/o) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized tinder Paragraphs 11.01.A.6, and 11.01.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any,which is.to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 48 of 63 ARTICLE 13—TESTS AND INSPECTIONS; CORRECTION,REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected,or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections,which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work;,or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible,with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 49 of63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any.retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor,material, and equipment. 1. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection,testing,replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others)will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page S I of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or . removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of " the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim,pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of,the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City.shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven(7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, .City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH, STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14—PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of,all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 53 of63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules,that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b, there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. .For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment. 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of' such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page SS of63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. .3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 56 of 63 14.07 Final Payment A. Application for Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied(except as previously delivered) by: a, all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any,to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15—SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which. may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor maybe reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature,the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or banlaupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.13, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of . said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02,the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final-settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for(without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work,plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work,the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16—DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.1) shall become final and binding 30 days after termination of the mediation unless,within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decembei2l,2012 007200-1 General Conditions Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17—MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December 21,2012 007200-1 General Conditions Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or tennination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 0073 00-1 SUPPLEMENTARY CONDITIONS Page 1 of 5 1 SECTION 00 73 00 2 SUPPLEMENTARY CONDITIONS 3 TO 4 GENERAL CONDITIONS 5 6 Supplementary Conditions 7 8 These Supplementary Conditions modify and supplement Section 00 72 00-General Conditions,and other 9 provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are 10 modified or supplemented remain in full force and effect as so modified or supplemented. All provisions 11 of the General Conditions which are not so modified or supplemented remain in full force and effect. 12 13 Defined Terms 14 15 The terms used in these Supplementary Conditions which are defined in the General Conditions have the 16 meaning assigned to them in the General Conditions,unless specifically noted herein. 17 18 Modifications and Supplements 19 20 The following are instructions that modify or supplement specific paragraphs in the General Conditions and 21 other Contract Documents. 22 23 SC-3.03B.2, "Resolving Discrepancies" 24 25 Plans govern over Specifications and Specifications shall govern over standard details. 26 27 SC-4.61A 28 29 Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. 30 Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the 31 Contract Drawings. 32 33 SC-4.01A.1.,"Availability of Lands" 34 35 The following is a list of known outstanding right-of-way, and/or easements to be acquired,if any as of 36 May 1,2013. 37 38 Outstanding Right-Of-Way,and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION t 02 Carroll Village Ltd. August 20, 2013 39 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, 40 and do not bind the City. 41 42 If Contractor considers the final easements provided to differ materially from the representations on the 43 Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, 44 notify City in writing associated with the differing easement line locations. 45 46 SC-4.01A.2,"Availability of Lands" 47 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 007300-2 SUPPLEMENTARY CONDITIONS Page 2 of 5 1 Utilities or obstructions to be removed,adjusted, and/or relocated 2 3 The following is list of utilities and/or obstructions that have not been removed, adjusted,and/or relocated 4 as of March 1,2013. 5 EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT None 6 The Contractor understands and agrees that the dates listed above are estimates only,are not guaranteed, 7 and do.not bind the City. 8 9 SC-4.02A.,"Subsurface and Physical Conditions" 10 11 The following are reports of explorations and tests of subsurface conditions at the site of the Work: 12 13 The Geoteclmical Engineering Report No.FW 132748,dated April 4,2013,prepared by Ellerbee-Walczak, 14 Inc. who is a consultant of the City,provides additional information on the subsurface at two core drills at 15 site of construction. 16 17 The geotechnical report with bore logs and site plan is given in Appendix GC-4.02 Subsurface and Physical 18 Conditions. 19 20 SC-4.06A.,"Hazardous Environmental Conditions at Site" 21 None 22 23 The following are reports and drawings of existing hazardous environmental conditions known to the City: 24 None 25 26 SC-5.03A.,"Certificates of Insurance" 27 2.8 The entities listed below are"additional insureds as their interest may appear"including their respective 29 officers, directors, agents and employees. 30 31 (1) City 32 (2) Consultant: None 33 (3) Other: None 34 35 SC-5.04A.,"Contractor's Insurance" 36 37 The limits of liability for the insurance required by Paragraph GC-5.04 shall-provide the following 38 coverages for not less than the following amounts or greater where required by laws and regulations: 39 40 5.04A.Workers'Compensation,under Paragraph GC-5.04A. 41 42 Statutory limits 43 Employer's liability 44 $100,000 each accident/occurrence 45 $100,000 Disease-each employee 46 $500,000 Disease-policy limit 47 48 SC-5.04B.,"Contractor's Insurance" 49 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 007300-3 SUPPLEMENTARY CONDITIONS Page 3 of 5 1 5.04B. Commercial General Liability,under Paragraph GC-5.04B. Contractor's Liability Insurance 2 under Paragraph GC-5.04B.,which shall be on a per project basis covering the Contractor with 3 minimum limits of- 4 5 $1,000,000 each occurrence 6 $2,000,000 aggregate limit 7 8 The policy must have an endorsement(Amendment—Aggregate Limits of Insurance)making the 9 General Aggregate Limits apply separately to each job site. 10 11 The Commercial General Liability Insurance policies shall provide"X", "C", and"U"coverage's. 12 Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. 13 14 SC 5.04C.,"Contractor's Insurance" 15 5.04C. Automobile Liability,under Paragraph GC-5.04C. Contractor's Liability Insurance under 16 Paragraph GC-5.04C.,which shall be in an amount not less than the following amounts: 17 18 (1) Automobile Liability-a commercial business policy shall provide coverage on"Any Auto", 19 defined as autos owned,hired and non-owned. 20 21 $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at 22 least: 23 24 $250,000 Bodily Injury per person/ 25 $500,000 Bodily Injury per accident/ 26 $100,000 Property Damage 27 28 SC-5.04D.,"Contractor's Insurance" 29 30 The Contractor's construction activities will require its employees, agents,subcontractors,equipment, and 31 material deliveries to cross railroad properties and tracks: None 32 33 The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, 34 hinder,or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains 35 or other property. Such operations on railroad properties may require that Contractor to execute a"Right of 36 Entry Agreement"with the particular railroad company or companies involved,and to this end the 37 Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute 38 the right-of-entry(if any)required by a railroad company.The requirements specified herein likewise relate 39 to the Contractor's use of private and/or construction access roads crossing said railroad company's 40 properties. 41 42 The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide 43 coverage for not less than the following amounts,issued by companies satisfactory to the City and to the 44 Railroad Company for a term that continues for so long as the Contractor's operations and work cross, 45 occupy,or touch railroad property: 46 47 (1) General Aggregate: N/A 48 49 (2) Each Occurrence: N/A 50 51 With respect to the above outlined insurance requirements,the following shall govern: 52 53 1. Where a single railroad company is involved,the Contractor shall provide one insurance policy in 54 the name of the railroad company. However, if more than one grade separation or at-grade CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 00 73 00-4 SUPPLEMENTARY CONDITIONS Page 4 of 5 1 crossing is affected by the Project at entirely separate locations on the line or lines of the same 2 railroad company, separate coverage may be required,each in the amount stated above. 3 4 2. Where more than one railroad company is operating on the same right-of-way or where several 5 railroad companies are involved and operated on their own separate rights-of-way, the Contractor 6 may be required to provide separate insurance policies in the name of each railroad company. 7 8 3. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a 9 railroad company's right-of-way at a location entirely separate from the grade separation or at- 10 grade crossing,insurance coverage for this work must be included in the policy covering the grade 11 separation. 12 13 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- 14 way, all such other work may be covered in a single policy for that railroad, even though the work 15 may be at two or more separate locations. 16 17 No work or activities on a railroad company's property to be performed by the Contractor shall be 18 commenced until the Contractor has furnished the City with an original policy or policies of the insurance 19 for each railroad company named,as required above. All such insurance must be approved by the City and 20 each affected Railroad Company prior to the Contractor's beginning work. 21 22 The insurance specified above must be carried until all Work to be performed on the railroad right-of-way 23 has been completed and the grade crossing,if any,is no longer used by the Contractor. In addition, 24 insurance must be carried during all maintenance and/or repair work performed in the railroad right-ofway. 25 Such insurance must name the railroad company as the insured,together with any tenant or lessee of the 26 railroad company operating over tracks involved in the Project. 27 28 SC-6.04.,"Project Schedule" 29 30 Project schedule shall be tier 3 for the project. 31 32 SC-6.07.,"Wage Rates" 33 34 The following is the prevailing wage rate table(s)applicable to this project and is provided in the 35 Appendixes: GC-6.07 36 37 <Buzasaw location, Resources/02-Constritction Doctrntertts/Specifications/Div 00-General 38 Conditions/CFW Wage Rate Table 20080708.pctf> 39 40 SC-6.09.,"Permits and Utilities" 41 42 SC-6.09A.,"Contractor obtained permits and licenses" 43 The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: 44 None 45 46 SC-6.09B."City obtained permits and licenses" 47 The following are known permits and/or licenses required by the Contract to be acquired by the City:None 48 49 SC-6.09C. "Outstanding permits and licenses" 50 51 The following is a list of known outstanding permits and/or licenses to be acquired,if any as of March 1,. 52 2013: 53 54 Outstanding Permits and/or Licenses to Be Acquired CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 007300-5 SUPPLEMENTARY CONDITIONS Page 5 of 5 OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION None 1 2 3 SC-7.02.,"Coordination" 4 5 The individuals or entities listed below have contracts with the City for the performance of other work at 6 the Site: None Vendor Scope of Work Coordination Authority None 7 8 9 SC-8.01,"Communications to Contractor" 10 None 11 12 SC-9.01.,"City's Project Representative" 13 14 The following firth is a consultant to the City responsible for construction management of this Project: 15 None 16 17 SC-13.03C.,"Tests and Inspections" 18 None 19 20 SC-16.01C.1,"Methods and Procedures" 21 None 22 23 24 25 END OF SECTION CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 011100-1 SUMMARY OF WORK Pagel of 3 1 SECTION 01 11 00 2 SUMMARY OF WORK 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0 -Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 -General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Work Covered by Contract Documents 19 1. Work is to include furnishing all labor, materials, and equipment, and performing 20 all Work necessary for this construction project as detailed in the Drawings and 21 Specifications. 22 B. Subsidiary Work 23 1. Any and all Work specifically governed by documentary requirements for the 24 project, such as conditions imposed by the Drawings or Contract Documents in 25 which no specific item for bid has been provided for in the Proposal and the item is 26 not a typical unit bid item included on the standard bid item list, then the item shall 27 be considered as a subsidiary item of Work,the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C. Use of Premises 30 1. Coordinate uses of premises under direction of the City. 31 2. Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3. Use and occupy only portions of the public streets and alleys, or other public places 34 or other rights-of-way as provided for in the ordinances of the City, as shown in the 35 Contract Documents, or as may be specifically authorized in writing by the City. 36 a. A reasonable amount of tools,materials, and equipment for construction 37 purposes may be stored in such space, but no more than is necessary to avoid 38 delay in the construction operations. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 11 00-2 SUMMARY OF WORK r Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks,the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D.• Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights-of-way or easements of 15 obstructions which must be removed,to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery,plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines,to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission,neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal,temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal,unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 11 00-3 SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 012500-1 SUBSTITUTION PROCEDURES Page 1 of 4 1 SECTION 0125 00 2 SUBSTITUTION PROCEDURES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or-equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include,but are not necessarily limited to: 17 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1 —General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution-General 26 1. Within 30 days after award of Contract(unless noted otherwise),the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors,trade names, or 31 catalog numbers. 32 a. When this method of specifying is used, it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names, or catalog numbers,provided said products are "or-equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or-equals are unavailable due to strike, discontinued production of products 39 meeting specified requirements, or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 25 00-2 SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time-reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form(attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product,including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including,but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved,the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if. 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. In the City's opinion, acceptance will require substantial revision of the original 6 design 7 d. In the City's opinion, substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product, the Contractor 14 represents that the Contractor: 15 1. Has investigated proposed product, and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform function for which 17 it is intended 18 2. Will provide same guarantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work,to include building 20 modifications if necessary,making such changes as may be required for Work to be 21 complete in all respects 22 4. Waives all claims for additional costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 26 1.12 WARRANTY [NOT USED] 27 PART 2- PRODUCTS [NOT USED] 28 PART 3 - EXECUTION [NOT USED] 29 END OF SECTION 30 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 012500-4 SUBSTITUTION PROCEDURES Page 4 of 4 1 EXHIBIT A J 2 REQUEST FOR SUBSTITUTION FORM: 3 4 TO: 5 PROJECT: DATE: 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SECTION PARAGRAPH SPECIFIED ITEM 9 10 11 Proposed Substitution: 12 Reason for Substitution: 13 Include complete information on changes to Drawings and/or Specifications which proposed 14 substitution will require for its proper installation. 15 16 Fill in Blanks Below: 17 A. Will the undersigned contractor pay for changes to the building design, including 18 engineering and detailing costs caused by the requested substitution? 19 20 21 B. What effect does substitution have on other trades? 22 23 24 C. Differences between proposed substitution and specified item? 25 26 27 D. Differences in product cost or product delivery time? 28 29 30 E. Manufacturer's guarantees of the proposed and specified items are: 31 32 Equal Better (explain on attachment) 33 The undersigned states that the function, appearance and quality are equivalent or superior to 34 the specified item. 35 Submitted By: For Use by City 36 37 Signature Recommended Recommended 38 as noted 39 40 Firm Not recommended _Received late 41 Address By 42 Date 43 Date Remarks 44 Telephone 45 46 For Use by City: 47 48 Approved Rejected 49 City Date CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0131 19-1 PRECONSTRUCTION MEETING Page I of 3 1 SECTION 013119 2 PRECONSTRUCTION MEETING 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to:. 11 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 —General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor, subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded,tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the execution of the 28 Agreement and before Work is started. 29 a. The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting,prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Project Representative 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may desire 38 to invite or the City may request CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised August 17,2012 01 31 19-2 PRECONSTRUCTION MEETING Page 2 of 3 1 e. Other City representatives 2 f. Others as appropriate 3 4. Construction Schedule 4 a. Prepare baseline construction schedule in accordance with Section 0132 16 and 5 provide at Preconstruction Meeting. 6 b. City will notify Contractor of any schedule changes upon Notice of 7 Preconstruction Meeting. 8 5. Preliminary Agenda may include: 9 a. Introduction of Project Personnel 10 b. General Description of Project 11 c. Status of right-of-way,utility clearances, easements or other pertinent permits 12 d. Contractor's work plan and schedule 13 e. Contract Time 14 f. Notice to Proceed 15 g. Construction Staking 16 h. Progress Payments 17 i. Extra Work and Change Order Procedures 18 j. Field Orders 19 k. Disposal Site Letter for Waste Material 20 1. Insurance Renewals 21 in. Payroll Certification 22 n. Material Certifications and Quality Control Testing 23 o. Public Safety and Convenience 24 p. Documentation of Pre-Construction Conditions 25 q. Weekend Work Notification 26 r. Legal Holidays 27 s. Trench Safety Plans 28 t. Confined Space Entry Standards 29 u. Coordination with the City's representative for operations of existing water 30 systems 31 v. Storm Water Pollution Prevention Plan 32 w. Coordination with other Contractors 33 x. Early Warning System 34 y. Contractor Evaluation 35 z. Special Conditions applicable to the project 36 aa. Damages Claims 37 bb. Submittal Procedures 38 cc. Substitution Procedures 39 dd. Correspondence Routing 40 ee. Record Drawings 41 ff. Temporary construction facilities 42 gg. M/WBE or MBE/SBE procedures 43 hh. Final Acceptance 44 ii. Final Payment 45 J. Questions or Comments CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised August 17,2012 013119-3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] a 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE a 13 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised August 17,2012 013120-1 PROJECT MEETINGS Page 1 of 3 1 SECTION 013120 2 PROJECT MEETINGS 3 4 PART1 - GENERAL 5 1.1 SUMMARY 6 A. Section Includes: 7 1. Provisions for project meetings throughout the construction period to enable orderly 8 review of the progress of the Work and to provide for systematic discussion of 9 potential problems 10 B. Deviations this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 —General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES f 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES [NOT USED] 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. Coordination 22 1. Schedule, attend and administer as specified,periodic progress meetings, and 23 specially called meetings throughout progress of the Work. 24 2. Representatives of Contractor, subcontractors and suppliers attending meetings 25 shall be qualified and authorized to act on behalf of the entity each represents. 26 3. Meetings administered by City may be tape recorded. 27 a. If recorded,tapes will be used to prepare minutes and retained by City for 28 future reference. 29 4. Meetings, in addition to those specified in this Section,may be held when requested 30 by the City, Engineer or Contractor. 31 B. Pre-Construction Neighborhood Meeting 32 1. After the execution of the Agreement, but before construction is allowed to begin, 33 attend 1 Public Meeting with affected residents to: 34 a. Present projected schedule, including construction start date 35 b. Answer any construction related questions 36 2. Meeting Location 37 a. Location of meeting to be determined by the City. 38 3. Attendees CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 013120-2 PROJECT MEETINGS Page 2 of 3 1 a. Contractor 2 b. Project Representative 3 c. Other City representatives 4 4. Meeting Schedule 5 a. hi.general,the neighborhood meeting will occur within the 2 weeks following 6 the pre-construction conference. 7 b. In no case will construction be allowed to begin until this meeting is held. 8 C. Progress Meetings 9 1. Formal project coordination meetings will be held periodically. Meetings will be 10 scheduled and administered by Project Representative. 11 2. Additional progress meetings to discuss specific topics will be conducted on an as- 12 needed basis. Such additional meetings shall include,but not be limited to: 13 a. Coordinating shutdowns 14 b. Installation of piping and equipment 15 c. Coordination between other construction projects 16 d. Resolution of construction issues 17 e. Equipment approval 18 3. The Project Representative will preside at progress meetings,prepare the notes of 19 the meeting and distribute copies of the same to all participants who so request by 20 fully completing the attendance form to be circulated at the beginning of each 21 meeting. 22 4. Attendance shall include: 23 a. Contractor's project manager 24 b. Contractor's superintendent 25 c. Any subcontractor or supplier representatives whom the Contractor may desire 26 to invite or the City may request 27 d. Engineer's representatives 28 e. City's representatives 29 f. Others, as requested by the Project Representative 30 5. Preliminary Agenda may include: 31 a. Review of Work progress since previous meeting 32 b. Field observations,problems, conflicts 33 c. Items which impede construction schedule 34 d. Review of off-site fabrication, delivery schedules 35 e. Review of construction interfacing and sequencing requirements with other 36 construction contracts 37 f. Corrective measures and procedures to regain projected schedule 38 g. Revisions to construction schedule 39 h. Progress, schedule, during succeeding Work period 40 i. Coordination of schedules 41 j. Review submittal schedules 42 k. Maintenance of quality standards 43 1. Pending changes and substitutions 44 in. Review proposed changes for: 45 1) Effect on construction schedule and on completion date 46 2) Effect on other contracts of the Project 47 n. Review Record Documents 48 o. Review monthly pay request CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July I,2011 013120-3 PROJECT MEETINGS Page 3 of 3 1 p. Review status of Requests for Information 2 6. Meeting Schedule 3 a. Progress meetings will be held periodically as determined by the Project 4 Representative. 5 1) Additional meetings may be held at the request of the: 6 a) City 7 b) Engineer 8 c) Contractor 9 7. Meeting Location 10 a. The City will establish a meeting location. 11 1) To the extent practicable,meetings will be held at the Site. 12 1.5 SUBMITTALS [NOT USED] 13 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 14 1.7 CLOSEOUT SUBMITTALS [NOT USED] 15 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 16 1.9 QUALITY ASSURANCE [NOT USED] 17 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 18 1.11 FIELD [SITE] CONDITIONS [NOT USED] 19 1.12 WARRANTY [NOT USED] 20 PART 2- PRODUCTS [NOT USE]'.] 21 PART 3 - EXECUTION [NOT USED] 22 END OF SECTION 23 Revision Log DATE NAME SUMMARY OF CHANGE 24 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 013216-1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 1 SECTION 0132 16 2 CONSTRUCTION PROGRESS SCHEDULE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal,updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include,but are not necessarily limited to: 13 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 —General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES 20 A. Definitions 21 1. Schedule Tiers 22 a. Tier 1 -No schedule submittal required by contract. Small,brief duration 23 projects 24 b. Tier 2 -No schedule submittal required by contract,but will require some 25 milestone dates. Small,brief duration projects 26 c. Tier 3 - Schedule submittal required by contract as described in the 27 Specification and herein. Majority of City projects, including all bond program 28 projects 29 d. Tier 4 - Schedule submittal required by contract as described in the 30 Specification and herein. Large and/or complex projects with long durations 31 1) Examples: large water pump station project and associated pipeline with 32 interconnection to another governmental entity 33 e. Tier 5 - Schedule submittal required by contract as described in the 34 Specification and herein. Large and/or very complex projects with long 35 durations,high public visibility 36 1) Examples might include a water or wastewater treatment plant 37 2. Baseline Schedule-Initial schedule submitted before work begins that will serve 38 as the baseline for measuring progress and departures from the schedule. 39 3. Progress Schedule-Monthly submittal of a progress schedule documenting 40 progress on the project and any changes anticipated. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0132 16-2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 1 4. Schedule Narrative- Concise narrative of the schedule including schedule 2 changes, expected delays,key schedule issues, critical path items, etc 3 B. Reference Standards 4 1. City of Fort Worth Schedule Guidance Document - 5 1.4 ADMINISTRATIVE REQUIREMENTS 6 A. Baseline Schedule 7 1. General 8 a. Prepare a cost-loaded baseline Schedule using approved software and the 9 Critical Path Method(CPM) as required in the City of Fort Worth Schedule 10 Guidance Document. 11 b. Review the draft cost-loaded baseline Schedule with the City to demonstrate 12 understanding of the work to be performed and known issues and constraints 13 related to the schedule. 14 c. Designate an authorized-representative (Project Scheduler)responsible for 15 developing and updating the schedule and preparing reports. 16 B. Progress Schedule 17 1. Update the progress Schedule monthly as required in the City of Fort Worth 18 Schedule Guidance Document. 19 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 20 3. Change Orders 21 a. Incorporate approved change orders, resulting in a change of contract time, in 22 the baseline Schedule in accordance with City of Fort Worth Schedule 23 Guidance Document. 24 C. Responsibility for Schedule Compliance 25 1. Whenever it becomes apparent from the current progress Schedule and CPM Status 26 Report that delays to the critical path have resulted and the Contract completion 27 date will not be met, or when so directed by the City,snake some or all of the 28 following actions at no additional cost to the City 29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule 30 outlining: 31 1) A written statement of the steps intended to take to remove or arrest the 32 delay to the critical path in the approved schedule 33 2) Increase construction manpower in such quantities.and crafts as will 34 substantially eliminate the backlog of work and return current Schedule to 35 meet projected baseline completion dates 36 3) Increase the number of working hours per shift, shifts per day, working 37 days per week, the amount of construction equipment, or any combination 38 of the foregoing, sufficiently to substantially eliminate the backlog of work 39 4) Reschedule activities to achieve maximum practical concurrency of 40 accomplislunent of activities, and comply with the revised schedule 41 2. If no written statement of the steps intended to take is submitted when so requested 42 by the City, the City may direct the Contractor to increase the level of effort in 43 manpower(trades), equipment and work schedule(overtime, weekend and holiday 44 work, etc.)to be employed by the Contractor in order to remove or arrest the delay 45 to the critical path in the approved schedule. 46 a. No additional cost for such work will be considered. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 013216-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 1 D. The Contract completion time will be adjusted only for causes specified in this 2 Contract. 3 a. Requests for an extension of any Contract completion date must be 4 supplemented with the following: 5 1) Furnish justification and supporting evidence as the City may deem 6 necessary to determine whether the requested extension of time is entitled 7 under the provisions of this Contract. 8 a) The City will, after receipt of such justification and supporting 9 evidence,make findings of fact and will advise the Contractor, in 10 writing thereof. 11 2) If the City finds that the requested extension of time is entitled,the City's 12 determination as to the total number of days allowed for the extensions 13 shall be based upon the approved total baseline schedule and on all data 14 relevant to the extension. 15 a) Such data shall be included in the next updating of the Progress 16 1 schedule. 17 b) Actual delays in activities which, according to the Baseline schedule,_ 18 do not affect any Contract completion date shown by the critical path in 19 the network will not be the basis for a change therein. 20 2. Submit each request for change in Contract completion date to the City within 30 21 days after the beginning of the delay for which a time extension is requested but 22 before the date of final payment under this Contract. 23 a. No time extension will be granted for requests which are not submitted within 24 the foregoing time limit. 25 b. From time to time, it may be necessary for the Contract schedule or completion 26 time to be adjusted by the City to reflect the effects of j ob conditions, weather, 27 technical difficulties, strikes, unavoidable delays on the part of the City or its 28 representatives, and other unforeseeable conditions which may indicate 29 schedule adjustments or completion time extensions. 30 1) Under such conditions,the City will direct the Contractor to reschedule the 31 work or Contract completion time to reflect the changed conditions and the 32 Contractor shall revise his schedule accordingly. 33 a) No additional compensation will be made to the Contractor for such 34 schedule changes except for unavoidable overall contract time 35 extensions beyond the actual completion of unaffected work, in which 36 case the Contractor shall take all possible action to minimize any time 37 extension and any additional cost to the City. 38 b) Available float time in the Baseline schedule may be used by the City 39 - as well as by the Contractor. 40 3. Float or slack time is defined as the amount of time between the earliest start date 41 and the latest start date or between the earliest finish date and the latest finish date 42 of a chain of activities on the Baseline Schedule. 43 a. Float or slack time is not for the exclusive use or benefit of either the 44 Contractor or the City. 45 b. Proceed with work according to early start dates, and the City shall have the 46 right to reserve and apportion float time according to the needs of the project. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 i 01 32 16-4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 1 c. Acknowledge and agree that actual delays, affecting paths of activities 2 containing float time, will not have any effect upon contract completion times, 3 providing that the actual delay does not exceed the float time associated with 4 those activities. 5 E. Coordinating Schedule with Other Contract Schedules 6 1. Where work is to be performed under this Contract concurrently with or contingent 7 upon work performed on the same facilities or area under other contracts,the 8 Baseline Schedule shall be coordinated with the schedules of the other contracts. 9 a. Obtain the schedules of the other appropriate contracts from the City for the 10 preparation and updating of Baseline schedule and make the required changes 11 in his schedule when indicated by.changes in corresponding schedules. 12 2. In case of interference between the operations of different contractors, the City will 13 determine the work priority of each contractor and the sequence of work necessary 14 to expedite the completion of the entire Project. 15 a. In such cases,the decision of the City shall be accepted as final. 16 b. The temporary delay of any work due to such circumstances shall not be 17 considered as justification for claims for additional compensation. 18 1.5 SUBMITTALS 19 A. Baseline Schedule 20 1. Submit Schedule in native file format and pdf format as required in the City of Fort 21 Worth Schedule Guidance Document. 22 a. Native file format includes: 23 1) Primavera(P6 or Primavera Contractor) 24, 2. Submit draft baseline Schedule to City prior to the pre-construction meeting and 25 bring in hard copy to the meeting for review and discussion. 26 B. Progress Schedule 27 1. Submit progress Schedule in native file format and pdf format as required in the 28 City of Fort Worth Schedule Guidance Document. 29 2. Submit progress Schedule monthly no later than the last day of the month. 30 C. Schedule Narrative 31 1. Submit the schedule narrative in pdf format as required in the City of Fort_Worth 32 Schedule Guidance Document. 33 2. Submit schedule narrative monthly no later than the last day of the month. 34 D. Submittal Process 35 1. The City administers and manages schedules through Buzzsaw. 36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule 37 Guidance Document. 38 3. Once the project has been completed and Final Acceptance has been issued by the 39 City,no further progress schedules are required. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 013216-5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1 1.6 ACTION SUBMITTALS/INFORIVIATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE 5 A. The person preparing and revising the construction Progress Schedule shall be 6 experienced in the preparation of schedules of similar complexity. 7 B. Schedule and supporting documents addressed in this Specification shall be prepared, 8 updated and revised to accurately reflect the performance of the construction. 9 C. Contractor is responsible for the quality of all submittals in this section meeting the 10 standard of care for the construction industry for similar projects. 11 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 12 1.11 FIELD [SITE] CONDITIONS [NOT USED] 13 1.12 WARRANTY [NOT USED] i 14 PART 2- PRODUCTS [NOT USED] 15 PART 3 - EXECUTION [NOT USED] 16 END OF SECTION 17 Revision Log DATE NAME SUMMARY OF CHANGE 18 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 32 33-1 PRECONSTRUCTION VIDEO Pagel of 2 1 SECTION 0132 33 2 PRECONSTRUCTION VIDEO 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 —General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2- PRODUCTS [NOT USED] CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 32 33-2 PRECONSTRUCTION VIDEO Page 2 of 2 1 PART 3 - EXECUTION [NOT USED] 2 END OF SECTION 3 Revision Log DATE NAME SUMMARY OF CHANGE 4 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 013300-1 SUBMITTALS Page 1 of 8 1 SECTION 0133 00 2 SUBMITTALS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work-related submittals: 8 a. Shop Drawings. 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 —General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare,prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities, or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including,but not limited to: 32 a) Disapproval and resubmittal(if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 g) Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 013300-2 SUBMITTALS Page 2 of 8 1 d. Make submittals promptly in accordance with approved schedule, and in such 2 sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 B. Submittal Numbering 5 1. When submitting shop drawings or samples,utilize a 9-character submittal cross- 6 reference identification numbering system in the following manner: 7 a. Use the first 6 digits of the applicable Specification Section Number. 8 b. For the next 2 digits number use numbers 01-99 to sequentially number.each 9 initial separate item or drawing submitted under each specific Section number. 10 c. " Last use a letter,A-Z, indicating the resubmission of the same drawing (i.e. 11 A=2nd submission,B=3rd submission, C=4th submission, etc.). A.typical 12 submittal number would be as follows: 13 14 03 30 00-08-B -15 16 1) 03 30 00 is the Specification Section for Concrete 17 2) 08 is the eighth initial submittal under this Specification Section 18 3) B is the third submission(second resubmission) of that particular shop 19 drawing 20 C. Contractor Certification 21 1. Review shop drawings,product data and samples, including those by 22 subcontractors,prior to submission to determine and verify.the following: 23 a. Field measurements 24 b. Field construction criteria 25 c. Catalog numbers and similar data 26 d. Conformance with the Contract Documents 27 2. Provide each shop drawing, sample and product data submitted by the Contractor 28 with a Certification Statement affixed including: 29 a. The Contractor's Company name 30 b. Signature of submittal reviewer 31 c. Certification Statement 32 1) `By this submittal, I hereby represent that I have determined and verified 33 field measurements, field construction criteria,materials, dimensions, 34, catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 D. Submittal-Format 37 1. Fold shop drawings larger than 8 %2 inches x 11 inches to 8 %inches x 11 inches. 38 2. Bind shop drawings and product data sheets together. 39 3. Order 40 a. Cover Sheet 41" 1) Description of Packet 42 2) Contractor Certification 43 b. List of items/Table of Contents 44 c. Product Data/Shop Drawings/Samples/Calculations 45 E. Submittal Content 46 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 013300-3 SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of- 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number,page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes,but is not necessarily limited to: 17 a. Custom-prepared data such as fabrication and erection/installation(working) 18 drawings. 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include,but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 _ 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing-in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 33 00-4 SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational-range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare-parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections, include,but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small-cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed,materials purchased or on-site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work, materials, fabrication, and installations in conformance 24 with approved shop drawings, applicable samples, and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site, or another external FTP site approved by the 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) If Contractor requires more than 1 hard copy of Shop Drawings 38 returned, Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution(if required in lieu of electronic distribution) CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 013300-5 SUBMITTALS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a) 8 copies for mechanical submittals 5 b) 7 copies for all other submittals 6 c) If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples,where required, to the job site file and elsewhere as 18 directed by the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings, data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: . 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors, including details, 26 dimensions, and materials 27 c. Approving departures from details furnished by the City, except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy, for coordinating the 35 Work with all other associated work and trades, for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings, data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance,the City may return the reviewed drawings without noting an 41 exception. 42 5. Submittals will be returned to the Contractor under 1 of the following codes: 43 a. Code 1 44 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or 45 comments on the submittal. 46 a) When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b. Code 2 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 013300-6 SUBMITTALS Page 6 of 8 1 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of 2 the notations and continents IS NOT required by the Contractor. 3 a) The Contractor may release the equipment or material for manufacture; 4 however, all notations and comments must be incorporated into the 5 final product. 6 c. Code 3 7 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is 8 assigned when notations and comments are extensive enough to require a 9 resubmittal,of the package. 10 a) The Contractor may release the equipment or material for manufacture; 11 however, all notations and comments must be incorporated into the 12 final product. 13 b) This resubmittal is to address all comments, omissions and 14 non-confornning items that were noted. 15 c) Resubinittal is to be received by the City within 15 Calendar Days of 16 the date of the City's transmittal requiring the resubmittal. 17 d. Code 4 18 1) "NOT APPROVED" is assigned when the submittal does not meet the 19 intent of the Contract Documents. 20 a) The Contractor must resubmit the entire package revised to bring the 21 submittal into conformance. 22 b) It may be necessary to resubmit using a different manufacturer/vendor 23 to meet the Contract Documents. 24 6. Resubmittals 25 a. Handled in the same manner as first submittals 26 1) Corrections other than requested by the City 27 2) Marked with revision triangle or other similar method 28 a) At Contractor's risk if not marked 29 b. Submittals for each item will be reviewed no more than twice at the City's 30 expense. 31 1) All subsequent reviews will be performed at times convenient to the City 32 and at the Contractor's expense,based on the City's or City 33 Representative's then prevailing rates. 34 2) Provide Contractor reimbursement to the City within 30 Calendar Days for 35 all such fees invoiced by the City. 36 c. The need for more than 1 resubmission or any other delay in obtaining City's 37 review of submittals, will not entitle the Contractor to an extension of Contract 38 Time. 39 7. Partial Submittals 40 a. City reserves the right to not review submittals deemed partial, at the City's 41 discretion. 42 b. Submittals deemed by the City to be not complete will be returned to the 43 Contractor, and will be considered"Not Approved"until resubmitted. 44 c. The City may at its option provide a list or mark the submittal directing the 45 Contractor to the areas that are incomplete. 46 8. If the Contractor considers any correction indicated on the shop drawings to 47 constitute-a change to the Contract Documents,then written notice must.be 48 provided thereof to the City at least 7 Calendar Days prior to release for 49 manufacture. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 013300-7 SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City,the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded,will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include,but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information(RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Use the Request for Information(RFI) form provided by the City. 21 3. Numbering of RFI 22 a. Prefix with"RFI"followed by series number, "-xxx",beginning with"01"and 23 increasing sequentially with each additional transmittal. 24 4. Sufficient information shall be attached to permit a written response without further 25 information. 26 5. The City will log each request and will review the request. 27 a. If review of the project information request indicates that a change to the 28 Contract Documents is required,the City will issue a Field Order or Change 29 Order, as appropriate. 30 31 1.5 SUBMITTALS [NOT USED] 32 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 33 1.7 CLOSEOUT SUBMITTALS [NOT USED] 34 1.8 MAINTENANCE MATERIAL.SUBMITTALS [NOT USED] 35 1.9 QUALITY ASSURANCE [NOT USED] 36 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 37 1.11 FIELD [SITE] CONDITIONS [NOT USED] 38 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 33 00-8 SUBMITTALS Page 8 of 8 1 PART 2 - PRODUCTS [NOT USED] 2 PART 3 - EXECUTION [NOT USED] 3 END OF SECTION 4 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.4.K.8.Working Days modified to Calendar Days 5 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 0135 13-1 SPECIAL PROJECT PROCEDURES Pagel of 8 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives,Drop Weight,Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 —General Requirements 23 3. Section 33 12 25—Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Coordination within Railroad permit areas 27 a. Measurement 28 1) Measurement for this Item will be by lump sum. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 will be paid for at the lump sum price bid for Railroad Coordination. 32 c. The price bid shall include: 33 1) Mobilization 34 2) Inspection 35 3) _ Safety training 36 4) Additional Insurance 37 5) Insurance Certificates 38 6) Other requirements associated with general coordination with Railroad, 39 including additional employees required to protect the right-of-way and 40 property of the Railroad from damage arising out of and/or from the 41 construction of the Project. 42 2. Railroad Flagmen CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 35 13-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various Items 13 bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification,unless a date is specifically cited. 19 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 20 High Voltage Overhead Lines. - 21 3. North Central Texas Council of Governments (NCTCOG)—Clean Construction 22 Specification 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 1. When work in the right-of-way which is under the jurisdiction of the Texas 26 Department of Transportation(TxDOT): 27 a. Notify the Texas Department of Transportation prior to commencing any work 28 therein in accordance with the provisions of the permit 29 b. All work performed in the TxDOT right-of-way shall be performed in 30 compliance with and subject to approval from the Texas Department of 31 Transportation 32 B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines (more than 600 volts measured between 35 conductors or between a conductor and the ground) shall be in accordance with 36 Health and Safety Code,Title 9, Subtitle A, Chapter 752. 37 2. Warning sign 38 a. Provide sign of sufficient size meeting all OSHA requirements. 39 3. Equipment operating within 10 feet of high voltage lines will require the following 40 safety features 41 a. Insulating cage-type of guard about the boom or arm 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 013513-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a. Notification shall be given to: 2 1) The power company(example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordination with power company 6 1) After notification coordinate with the power company to: 7 a) Erect temporary mechanical barriers, de-energize the lines, or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. 11 C. Confined Space Entry Program 12 1. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 2. Confined Spaces include: 15 a. Manholes 16 b. All other confined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 1 General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days designated as"AIR POLLUTION WATCH DAYS". 22 b. Typical Ozone Season 23 1) May 1 through October 31. 24 c. Critical Emission Time 25 1) 6:00 a.m. to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Environmental Quality(TCEQ), in coordination 28 with the National Weather Service, will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior to the WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.m. whenever construction phasing requires the 32 use of motorized equipment for periods in excess of 1 hour. 33 2) However, the Contractor may begin work prior to 10:00 a.m. i£ 34 a) Use of motorized equipment is less than 1 hour, or 35 b) If equipment is new and certified by EPA as "Low Emitting", or 36 equipment burns Ultra Low Sulfur Diesel(ULSD), diesel emulsions, or 37 alternative fuels such as CNG. 38 E. TCEQ Air Permit 39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 40 F. Use of Explosives,Drop Weight,Etc. 41 1. When Contract Documents permit on the project the following will apply: 42 a. Public Notification 43 1) Submit notice"to City and proof of adequate insurance coverage, 24 hours 44 prior to commencing. 45 2) Minimum 24 hour public notification in accordance with Section 01 31 13 46 G. Water Department Coordination CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 0135 13-4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 1. During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to detennine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on 11 to accommodate the construction of the project is required,_coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition,the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 H. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis,prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No (CPN) 30 c) Scope of Project(i.e. type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre-construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 1. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water sel vice to 44 residents or businesses during construction,prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 0135 13-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will take place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. 11 d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f. Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 J. Coordination with United States Army Corps of Engineers (USACE) 18 1. At locations in the Project where construction activities occur in areas where 19 USACE permits are required,meet all requirements set forth in each designated 20 permit. 21 K. Coordination within Railroad Permit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required,meet all requirements set forth in each designated 24 railroad permit. This includes, but is not limited to,provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e. Insurance certificates 30 f. Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 3. Railroad Flagmen 37 a. Submit receipts to City for verification of working days that railroad flagmen 38 were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust, capture and properly dispose of waste water. 42 b. If wet saw cutting is performed, capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 35 13-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 1.4.B—Added requirement of compliance with Health and Safety Code,Title 9. 8/31/2012 D.Johnson Safety,Subtitle A.Public Safety,Chapter 752.High Voltage Overhead Lines. 1.4.E—Added Contractor responsibility for obtaining a TCEQ Air Pen-nit CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 0135 13-7 SPECIAL PROJECT PROCEDURES Page 7 of 8 1 EXHIBIT A 2 (To be printed on Contractor's Letterhead) 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 Mapsco Location: 11 Limits of Construction: 12 13 14 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23. 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 6135 13-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 1 EXHIBIT B 2 FORT WORTH ef� Date: DOE MO.XXXX Project Heme: TICE OF TEMPORARY WATER SERVICE . INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT,PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR 4 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 014523-1 TESTING AND.INSPECTION SERVICES Page 1 of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails,the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until-a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City,notify City, sufficiently 31 in advance,when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance,that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another external FTP site approved by 38 the City. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 45 23-2 TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2. City representatives via email of submittal posting. 3 3) Hard Copies ' 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution(if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2- PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 END OF SECTION 29 Revision Log DATE -NAME SUMMARY OF CHANGE 30 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 50 00-1 TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to- 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 —General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 C. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel,power, light,heat and other utility services necessary for 32 execution, completion,testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact.City 1 week before water for construction is desired CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01.50 00-2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 1) Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off-site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight,weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill andgrade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 015000-3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on-call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2- PRODUCTS [NOT USED] 17 PART 3 - EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE-INSTALLATION 26 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29( 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 50 00-4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION[NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0157 13-1 STORM WATER POLLUTION PREVENTION Page 1 of 3 1 SECTION 0157 13 2 STORM WATER POLLUTION PREVENTION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1 — General Requirements 13 3. Section 3125 00—Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 3125 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent:NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification,unless a date is specifically cited. 32 2. Integrated Storm Management(iSWM)Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0157 13-2 STORM WATER POLLUTION PREVENTION Page 2 of 3 1 B. Construction Activities resulting in: 2 1. Less than 1 acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 31 25 00 and 4 Drawings. 5 2. 1 to less than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System(TPDES) General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Small Construction Site Notice Required under general pernlit 10 TXR150000 11 a) Sign and post at job site 12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of 13 Transportation and Public Works, Environmental Division,.(817) 392- 14 6088. 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 3125 00 17 b) The Drawings 18 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 3. 5 acres or more of Disturbance 22 a. Texas Pollutant Discharge Elimination System(TPDES) General Construction 23 Permit is required 24 b. Complete SWPPP in accordance with TCEQ requirements 25 1) Prepare a TCEQ NOI fornl and submit to TCEQ along with required fee 26 a) Sign and post at job site 27 b) Send-copy to City Department of Transportation and Public Works, 28 Environmental Division, (817) 392-6088. 29 2) TCEQ Notice of Change required if making changes or updates to NOI 30 3) Provide erosion and sediment control in accordance with: 31 a) Section 3125 00 32 b) The Drawings 33 c) TXR150000 General Permit 34 d) SWPPP 35 e) TCEQ requirements 36 4) Once the project has been completed and all the closeout requirements of 37 TCEQ have been met a TCEQ Notice of Termination can be submitted. 38 a) Send copy to City Department of Transportation and Public Works, 39 Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 01 33 00, except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0157 13-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction,resubmit modified SWPPP to the City 3 in accordance with Section 01 33 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 9 1.11 FIELD[SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] i l PART 2- PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 END OF SECTION 14 Revision Log DATE NAME SUMMARY OF CHANGE 15 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 58 13-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 1 SECTION 0158 13 2 TEMPORARY PROJECT SIGNAGE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Temporary Project Signage Requirements 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to:. 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS 27 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 28 2.2 EQUIPMENT,PRODUCT TYPES,AND MATERIALS 29 A. Design Criteria 30 1. Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 58 13-2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 1 B. Materials 2 1. Sign 3 a. Constructed of 3/-inch fir plywood, grade A-C(exterior) or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTROL [NOT USED] 6 PART 3 - EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION [NOT USED] 10 3.4 INSTALLATION 11 A. General 12 1. Provide vertical installation at extents of project. 13 2. Relocate sign as needed,upon request of the City. 14 B. Mounting options 15 a. Skids 16 b. Posts 17 c. Barricade 18 3.5 REPAIR/RESTORATION [NOT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS [NOT USED] 30 END OF SECTION CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 58 13-3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 1 Revision Log DATE NAME SUMMARY OF CHANGE 2 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 016000-1 PRODUCT REQUIREMENTS Page 1 of 2 1 SECTION 0160 00 2 PRODUCT REQUIREMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is located on Buzzsaw as follows: 16 1. Resources\02-Construction Documents\Standard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List,not all 26 products from that manufacturer are approved for use, including but not limited to,that 27 manufacturer's standard product. 28 E. See Section 0133 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 016000-2 PRODUCT REQUIREMENTS Page 2 of 2 1 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D.Joluison Modified Location of City's Standard Product List 8 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 66 00-1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 1 SECTION 0166 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments 11 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. 13 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division 1 —General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 66 00-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 envirorllnental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors,public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off-site storage and protection when on-site storage is not adequate. 25 a. Provide addresses of and access to off-site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,00O linear feet,unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 016600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 ERECTION [NOT USED] 9 3.5 REPAIR/RESTORATION [NOT USED] 10 3.6 RE-INSTALLATION [NOT USED] 11 3.7 FIELD [OR] SITE QUALITY CONTROL 12 A. Tests and Inspections 13 1. Inspect all products or equipment delivered to the site prior to unloading. 14 B. Non-Conforming Work 15 1. Reject all products or equipment that are damaged,used or in any other way 16 unsatisfactory for use on the project. 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION 22 A. Protect all products or equipment in accordance with manufacturer's written directions. 23 B. Store products or equipment in location to avoid physical damage to items while in 24 storage. 25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by 26 the manufacturer. 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION 30 - CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 016600-4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 1 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 017000-1 MOBILIZATION AND REMOBILIZATION Page 1 of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Mobilization and Demobilization 7 a. Mobilization 8 1) Transportation of Contractor's personnel, equipment, and operating supplies 9 to the Site 10 2) Establishment of necessary general facilities for the Contractor's operation 11 at the Site 12 3) Premiums paid for performance and payment bonds 13 4) Transportation of Contractor's personnel, equipment, and operating supplies 14 to another location within the designated Site 15 5) Relocation of necessary general facilities for the Contractor's operation 16 from 1 location to another location on the Site. 17 b. Demobilization 18 1) Transportation of Contractor's personnel, equipment, and operating supplies 19 away from the Site including disassembly 20 2) Site Clean-up 21 3) Removal of all buildings and/or other facilities assembled at the Site for this 22 Contract 23 c. Mobilization and Demobilization do not include activities for specific items of 24 work that are for which payment is provided elsewhere in the contract. 25 2. Remobilization 26 a. Remobilization for Suspension of Work specifically required in the Contract 27 Documents or as required by City includes: 28 1) Demobilization 29 a) Transportation of Contractor's personnel, equipment, and operating 30 supplies from the Site including disassembly or temporarily securing 31 equipment, supplies, and other facilities as designated by the Contract 32 Documents necessary to suspend the Work. 33 b) Site Clean-up as designated in the Contract Documents 34 2) Remobilization 35 a) Transportation of Contractor's personnel, equipment, and operating 36 supplies to the Site necessary to resume the Work. 37 b) Establishment of necessary general facilities for the Contractor's 38 operation at the Site necessary to resume the Work. 39 3) No Payments will be made for: 40 a) Mobilization and Demobilization from one location to another on the 41 Site in the normal progress of performing the Work. 42 b) Stand-by or idle time 43 c) Lost profits 44 3. Mobilizations and Demobilization for Miscellaneous Projects 45 a. Mobilization and Demobilization CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 70 00-2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include,but are not necessarily limited to: 22 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 —General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES . 25 A. Measurement and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2. Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a. Measurement 36 1) Measurement for this Item shall be per each remobilization performed. 37 b. Payment 38 1) The work performed and materials furnished in accordance with this Item 39 and measured as provided under"Measurement"will be paid for at the unit 40 price per each"Specified Remobilization"in accordance with Contract 41 Documents. 42 c. The price shall include: 43 1) Demobilization as described in Section l.l.A.2.a.1) 44 2) Remobilization as described in Section 1.1.A.2.a.2) 45 d. No payments will be made for standby, idle time, or lost profits associated this 46 Item. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 70 00-3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 3. Remobilization for suspension of Work as required by City 2 a. Measurement and Payment 3 1) This shall be submitted as a Contract Claim in accordance with Article 10 4 of Section 00 72 00. 5 2) No payments will be made for standby, idle time, or lost profits associated 6 with this Item. 7 4. Mobilizations and Demobilizations for Miscellaneous Projects 8 a. Measurement 9 1) Measurement for this Item shall be for each Mobilization and 10 Demobilization required by the Contract Documents 11 b. Payment 12 1) The Work performed and materials furnished in accordance with this Item 13 and measured as provided under"Measurement"will be paid for at the unit 14 price per each"Work Order Mobilization"in accordance with Contract 15 Documents. Demobilization shall be considered subsidiary to mobilization 16 and shall not be paid for separately. 17 c. The price shall include: 18 1) Mobilization as described in Section 1.1.A.3.a.1) 19 2) Demobilization as described in Section 1.1.A.3.a.2) 20 d. No payments will be made for standby, idle time, or lost profits associated this 21 Item. 22 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 23 a. Measurement 24 1) Measurement for this Item shall be for each Mobilization and 25 Demobilization required by the Contract Documents 26 b. Payment 27 1) The Work performed and materials furnished in accordance with this Item 28 and measured as provided under"Measurement"will be paid for at the unit 29 price per each"Work Order Emergency Mobilization"in accordance with 30 Contract Documents. Demobilization shall be considered subsidiary to 31 mobilization and shall not be paid for separately. 32 c. The price shall include 33 1) Mobilization as described in Section 1.1.A.4.a) 34 2) Demobilization as described in Section 1.1.A.3.a.2) 35 d. No payments will be made for standby, idle time, or lost profits associated this 36 Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE [NOT USED] 44 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 70 00-4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION [NOT USED] 5 END OF SECTION 6 Revision Log DATE NAME SUMMARY OF CHANGE 7 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 4 1 SECTION 01 71 23 2 CONSTRUCTION STAKING AND SURVEY 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1 Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will 27 be allowed. 28 1.3 REFERENCES [NOT USED] 29 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 30 1.5 SUBMITTALS 31 A. Submittals, if required, shall be in accordance with Section 0133 00. 32 B. All submittals shall be approved by the City prior to delivery. 33 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 34 A. Certificates 35 1. Provide certificate certifying that elevations and locations of improvements are in 36 conformance or non-conformance with requirements of the Contract Documents. 37 a. Certificate must be sealed by a registered professional land surveyor in the 38 State of Texas. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 71 23-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 4 1 B. Field Quality Control Submittals 2 1. Documentation verifying accuracy of field engineering work. 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Construction Staking 7 1. Construction staking will be performed by the City. 8 2. Coordination 9 a. Contact City's Project Representative at least 2 weeks in advance for 10 scheduling of Construction Staking. 11 b. It is the Contractor's responsibility to coordinate staking such that construction 12 activities are not delayed or negatively impacted. 13 3. General 14 a. Contractor is responsible for preserving and maintaining stakes furnished by 15 City. 16 b. If in the opinion of the City, a sufficient number of stakes or markings have 17 been lost, destroyed or disturbed,by Contractor's neglect, such that the 18 contracted Work cannot take place,then the Contractor will be required to pay 19 the City for new staking with a 25 percent markup. The cost for staking will be 20 deducted from the payment due to the Contractor for the Project. 21 B. Construction Survey 22 1. Construction Survey will be performed by the City. 23 2. Coordination 24 a. Contractor to verify that control data established in the design survey remains 25 intact. 26 b. Coordinate with the City prior to field investigation to determine which 27 horizontal and vertical control data will be required for construction survey. 28 c. It is the Contractor's responsibility to coordinate Construction Survey such that 29 construction activities are not delayed or negatively impacted. 30 d. Notify City if any control data needs to be restored or replaced due to damage 31 caused during construction operations. 32 1) City shall perform replacements and/or restorations. 33 3. General 34 a. Construction survey will be performed in order to maintain complete and 35 accurate logs of control and survey work as it progresses for Project Records. 36 b. The Contractor will need to ensure coordination is maintained with the City to 37 perforin construction survey to obtain construction features,including but not 38 limited to the following: 39 1) All Utility Lines 40 a) Rim and flowline elevations and coordinates for each manhole or 41 junction structure 42 2) Water Lines 43 a) Top of pipe elevations and coordinates for waterlines at the following 44 locations: 45 (1) Every 250 linear feet CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 7123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 4 1 (2) Horizontal and vertical points of inflection, curvature, etc. (All 2 Fittings) 3 (3) Cathodic protection test stations 4 (4) Sampling stations 5 (5) Meter boxes/vaults (All sizes) 6 (6) Fire lines 7 (7) Fire hydrants 8 (8) Gate valves 9 (9) Plugs, stubouts, dead-end lines 10 (10) Air Release valves (Manhole rim and vent pipe) 11 (11) Blow off valves (Manhole rim and valve lid) 12 (12) Pressure plane valves 13 (13) Cleaning wyes 14 (14) Casing pipe(each end) 15 b) Storm Sewer 16 (1) Top of pipe elevations and coordinates at the following locations: 17 (a) Every 250 linear feet 18 (b) Horizontal and vertical points of inflection, curvature, etc. 19 c) Sanitary Sewer 20 (1) Top of pipe elevations and coordinates for sanitary sewer lines at 21 the following locations: 22 (a) Every 250 linear feet 23 (b) Horizontal and vertical points of inflection, curvature, etc. 24 (c) Cleanouts 25 c. Construction survey will be performed in order to maintain complete and 26 accurate logs of control and survey work associated with meeting or exceeding 27 the line and grade required by these Specifications. 28 d. The Contractor will need to ensure coordination is maintained with the City to 29 perform construction survey and to verify control data, including but not 30 limited to the following: 31 1) Established benchmarks and control points provided for the Contractor's 32 use are accurate 33 2) Benchmarks were used to furnish and maintain all reference lines and 34. grades for tunneling 35 3) Lines and grades were used to establish the location of the pipe 36 4) Submit to the City copies of field notes used to establish all lines and 37 grades and allow the City to check guidance system setup prior to 38 beginning each tunneling drive. 39 5) Provide access for the City to verify the guidance system and the line and 40 grade of the carrier pipe on a daily basis. 41 6) The Contractor remains fully responsible for the accuracy of the work and 42 the correction of it, as required. 43 7) Monitor line and grade continuously during construction. 44 8) Record deviation with respect to design line and grade once at each pipe 45 joint and submit daily records to City. 46 9) If the installation does not meet the specified tolerances, immediately notify 47 the City and correct the installation in accordance with the Contract 48 - Documents. 49 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 71 23-4 CONSTRUCTION STAKING AND SURVEY Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 APPLICATION 9 3.S REPAIR/RESTORATION [NOT USED] 10 3.6 RE-INSTALLATION [NOT USED] 11 3.7 FIELD [OR] SITE QUALITY CONTROL 12 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 13 City in accordance with this Specification. 14 B. Do not change or relocate stakes or control data without approval from the City. 15 3.8 SYSTEM STARTUP [NOT USED] 16 3.9 ADJUSTING [NOT USED] 17 3.10 CLEANING [NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION [NOT USED] 20 3.13 MAINTENANCE [NOT USED] 21 3.14 ATTACHMENTS [NOT USED] 22 END OF SECTION 23 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson 24 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 017423-1 CLEANING Page 1 of 4 1 SECTION 0174 23 2 CLEANING 3 PARTI - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 General Requirements 13 3. Section 32 92 13 —Hydro-Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 . A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE,AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 74 23-2 CLEANING Page 2 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART2- PRODUCTS 4 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3. For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3 - EXECUTION 14 3.1 INSTALLERS [NOT USED] 15 3.2 EXAMINATION [NOT.USED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION [NOT USED] 18 3.5 REPAIR/RESTORATION [NOT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING 24 A. General 25 1. Prevent accumulation of wastes that create hazardous conditions. 26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3. Do not dispose of volatile wastes such as mineral spirits,oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 74 23-3 CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep,wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City,the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn on-site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of 11 personnel in existing facility operations. 12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as-needed basis,until Final Acceptance. 19 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airborne or transported by flowing water during the storm. 21 C. Interior Final Cleaning 22 1. Remove grease,mastic, adhesives, dust, dirt, stains, fingerprints, labels and other 23 foreign materials from sight-exposed surfaces. 24 2. Wipe all lighting fixture reflectors, lenses,lamps and trims clean. 25 3. Wash and shine glazing and mirrors. 26 4. Polish glossy surfaces to a clear shine. 27 5. Ventilating systems 28 a. Clean permanent filters and replace disposable filters if units were operated 29 during construction. 30 b. Clean ducts,blowers and coils if units were operated without filters during 31 construction. 32 6. Replace all burned out lamps. 33 7. Broom clean process area floors. 34 8. Mop office and control room floors. 35 D. Exterior(Site or Right of Way) Final Cleaning 36 1. Remove trash and debris containers from site. 37 a. Re-seed areas disturbed by location of trash and debris containers in accordance 38 with Section 32 92 13. 39 2. Sweep roadway to remove all rocks,pieces of asphalt, concrete or any other object 40 that may hinder or disrupt the flow of traffic along the roadway. 41 3. Clean any interior areas including, but not limited to, vaults,manholes, structures, 42 junction boxes and inlets. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 74 23-4 CLEANING Page 4 of 4 1 4. If no longer required for maintenance of erosion facilities, and upon approval by 2 City,remove erosion control from site. 3 5. Clean signs,lights, signals, etc. 4 3.11 CLOSEOUT ACTIVITIES [NOT USED] 5 3.12 PROTECTION [NOT USED] 6 3.13 MAINTENANCE [NOT USED] 7 3.14 ATTACHMENTS [NOT USED] 8 END OF SECTION 9 Revision Log DATE NAME SUMMARY OF CHANGE 10 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 017719-1 CLOSEOUT REQUIREMENTS Pagel of 3 1 SECTION 017719 2 CLOSEOUT REQUIREMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division I —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees,Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 0177 19-2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Record Documents in accordance with Section 0178 39 11 2. Operation and Maintenance Data,if required, in accordance with Section 0178 23 -- 12 B. Prior to requesting Final Inspection,perform final cleaning in accordance with Section 13 01 74 23. 14 C. Final Inspection 15 1. After final cleaning,provide notice to the City Project Representative that the Work 16 is completed. 17 a. The City will make an initial Final Inspection with the Contractor present. 18 b. Upon completion of this inspection, the City will notify the Contractor, in 19 writing within 10 business days, of any particulars in which this inspection 20 reveals that the Work is defective or incomplete. 21 2. Upon receiving written notice from the City, immediately undertake the Work 22 required to remedy deficiencies and complete the Work to the satisfaction of the 23 City. 24 3. Upon completion of Work associated with the items listed in the City's written 25 notice,inform the City,that the required Work has been completed. Upon receipt 26 of this notice,the City, in the presence of the Contractor,will make a subsequent 27 Final Inspection of the project. 28 4. Provide all special accessories required to place each item of equipment in full 29 operation. These special accessory items include,but are not limited to: 30 a. Specified spare parts 31 b. Adequate oil and grease as required for the first lubrication of the equipment 32 c. Initial fill up of all chemical tanks and fuel tanks 33 d. Light bulbs 34 e. Fuses 35 f. Vault keys 36 g. Handwheels 37 h. Other expendable items as required for initial start-up and operation of.all 38 equipment 39 D. Notice of Project Completion CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 017719-3 CLOSEOUT REQUIREMENTS Page 3 of 3 1 1. Once the City Project Representative finds the Work subsequent to Final Inspection 2 to be satisfactory, the City will issue a Notice of Project Completion(Green Sheet). 3 E. Supporting Documentation 4 1. Coordinate with the City Project Representative to complete the following 5 additional forms: 6 a. Final Payment Request 7 b. Statement of Contract Time 8 c. Affidavit of Payment and Release of Liens 9 d. Consent of Surety to Final Payment 10 e. Pipe Report(if required) 11 f. Contractor's Evaluation of City 12 g. Performance Evaluation of Contractor 13 F. Letter of Final Acceptance 14 1. Upon review and acceptance of Notice of Project Completion and Supporting 15 Documentation, in accordance with General Conditions, City will issue Letter of 16 Final Acceptance and release the Final Payment Request for payment. 17 3.5 REPAIR/RESTORATION [NOT USED] 18 3.6 RE-INSTALLATION [NOT USED] 19 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 20 3.8 SYSTEM STARTUP [NOT USED] 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 29 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 017823-1 OPERATION AND MAINTENANCE DATA Page 1 of 5 1 SECTION 0178 23 2 OPERATION AND MAINTENANCE DATA 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include, but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers(to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 —General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in fmal form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 01 33 00 . All submittals shall be 28, approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8 1/2 inches x 11 inches 34 b. Paper 35 1) 40 pound minimum, white, for typed pages 36 2) Holes reinforced with plastic, cloth or metal 37 c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 7823-2 OPERATION AND MAINTENANCE DATA Page 2 of 5 1 d. Drawings 2 1) Provide reinforced punched binder tab, bind in with text 3 2) Reduce larger drawings and fold to size of text pages. 4 e. Provide fly-leaf for each separate product, or each piece of operating 5 equipment. 6 1) Provide typed description of product, and major component parts of 7 equipment. 8 2) Provide indexed tabs. 9 f. Cover 10 1) Identify each volume with typed or printed title "OPERATING AND 11 MAINTENANCE INSTRUCTIONS". 12 2) List: 13 a) Title of Project 14 b) Identity of separate structure as applicable 15 c) Identity of general subject matter covered in the manual 16 3. Binders 17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers 18 b. When multiple binders are used, correlate the data into related consistent 19 groupings. 20 4. If available,provide an electronic forin of the O&M Manual. 21 B. Manual Content 22 1. Neatly typewritten table of contents for each volume, arranged in systematic order 23 a. Contractor, name of responsible principal, address and telephone number 24 b. A list of each product required to be included, indexed to content of the volume 25 c. List,with each product: 26 1) The name, address and telephone number of the subcontractor or installer 27 2) A list of each product required to be included, indexed to content of the 28 volume 29 3) Identify area of responsibility of each 30 4) Local source of supply for parts and replacement 31 d. Identify each product by product name and other identifying symbols as set 32 forth in Contract Documents. 33 2. Product Data 34 a. Include only those sheets which are pertinent to the specific product. 35 b. Annotate each sheet to: 36 1) Clearly identify specific product or part installed 37 2) Clearly identify data applicable to installation 38 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 correct illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text, as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings for different procedures. 48 b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 78 23-3 OPERATION AND MAINTENANCE DATA Page 3 of 5 1 5. Copy of each warranty, bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content, for architectural products, applied materials and finishes: 8 a. Manufacturer's data, giving full information on products 9 1) Catalog number, size, composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content, for moisture protection and weather exposure products: 18 a. Manufacturer's data, giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection,maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in final form. 25 2. Content, for each unit of equipment and system, as appropriate: 26 a. Description of unit and component parts 27 1) Function,normal operating characteristics and limiting conditions 28 2) Performance curves, engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up, break-in,routine and normal operating instructions 32 2) Regulation, control, stopping, shut-down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly,repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear .45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 1) As installed color coded piping diagrams CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 78 23-4 OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers, with location and function of each valve 2 j. List of original manufacturer's spare parts,manufacturer's current prices, and 3 reconunended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content, for each electric and electronic system, as appropriate: 6 a. Description of system and component parts 7 1) Function,normal operating characteristics, and limiting conditions 8 2) Performance curves, engineering data and tests 9 3) Complete nomenclature and conmlercial number of replaceable parts 10 b. Circuit directories of panelboards 11 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to "trouble shooting" 22 3) Disassembly,repair and reassembly 23 4) Adjustment and checking 24 £ Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts,manufacturer's current prices, and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01 7823-5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson 1.5.A.1—title of section removed 8 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 01'7839-1 PROJECT RECORD DOCUMENTS Page 1 of 4 1 SECTION 0178 39 2 PROJECT RECORD DOCUMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports .12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 —General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents,making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 01 78 39-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records, snake entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work,both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data,use means necessary to again secure the.data 12 to the City's approval. 13 a. In such case,provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2- PRODUCTS 18 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection,provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set,identify each of the Documents with the 35 title, "RECORD DOCUMENTS -JOB SET". CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time,the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City,until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, 11 clearly mark any deviations from Contract Documents associated with 12 installation of the infrastructure. 13 4. Making entries on Drawings 14 a. Record any deviations from Contract Documents. 15 b. Use an erasable colored pencil(not ink or indelible pencil), clearly describe the 16 change by graphic line and note as required. 17 c. Date all entries. 18 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 19 e. In the event of overlapping changes,use different colors for the overlapping 20 changes. 21 5. Conversion of schematic layouts 22 a. In some cases on the Drawings, arrangements of conduits, circuits,piping, 23 ducts, and similar items, are shown schematically and are not intended to 24 portray precise physical layout. 25 1) Final physical arrangement is determined by the Contractor, subject to the 26 City's approval. 27 2) However, design of future modifications of the facility may require 28 accurate information as to the final physical layout of items which are 29 shown only schematically on the Drawings. 30 b. Show on the job set of Record Drawings, by dimension accurate to within 1 31 inch,the centerline of each run of items. 32 1) Final physical arrangement is determined by the Contractor, subject to the 33 City's approval. 34 2) Show,by symbol or note,the vertical location of the Item("under slab", "in 35 ceiling plenum", "exposed", and the like). 36 3) Make all identification sufficiently descriptive that it may be related 37 reliably to the Specifications. 38 c. The City may waive the requirements for conversion of schematic layouts 39 where, in the City's judgment, conversion serves no useful purpose. However, 40 do not rely upon waivers being issued except as specifically issued in writing 41 by the City. 42 B. Final Project Record Documents 43 1. Transfer of data to Drawings 44 a. Carefully transfer change data shown on the job set of Record Drawings to the 45 corresponding final documents, coordinating the changes as required. 46 b. Clearly indicate at each affected detail and other Drawing a full description of 47 changes made during construction, and the actual location of items. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 017839-4 PROJECT RECORD DOCUMENTS Page 4 of 4 1 c. Call attention to each entry by drawing a "cloud" around the area or areas 2 affected. 3 d. Make changes neatly, consistently and with the proper media to assure 4 longevity and clear reproduction. 5 2. Transfer of data to other Documents 6 a. If the Documents, other than Drawings,have been kept clean during progress of 7 the Work, and if entries thereon have been orderly to the approval of the City, 8 the job set of those Documents, other than Drawings,will be accepted as final 9 Record Documents. 10 b. If any such Document is not so approved by the City, secure a new copy of that 11 Document from the City at the City's usual charge for reproduction and 12 handling, and carefully transfer the change data to the new copy to the approval 13 of the City. 14 3.5 REPAIR/RESTORATION [NOT USED] 15 3.6 RE-INSTALLATION [NOT USED] 16 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 17 3.8- SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION [NOT USED] 22 3.13 MAINTENANCE [NOT USED] 23 3.14 ATTACHMENTS [NOT USED] 24 END OF SECTION 25 Revision Log DATE NAME SUMMARY OF CHANGE 26 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 329343-1 TREES AND SHRUBS Page 1 of 9 1 SECTION 32 93 43 2 TREES AND SHRUBS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Tree and shrub planting and maintenance within street right-of-way and easements. 7 2. Tree removal and transplant is to be performed in accordance with Section 31 10 00 8 B. Deviations from this City of Fort Worth Standard Specification 9 Damage to Trees During Construction,Maintenance or Repair. 10 11 In the event of any damage to trees during the construction, maintenance or repair of the Pipeline 12 Company shall comply with the following: 13 14 1. The City Forester shall have the right to inspect any trees located on the Park for 15 damage by Company and if applicable may inspect trees for slight, moderate or severe damage as 16 described below. 17 18 1.1. Slight Daman: 19 Slight damage shall be defined as damage, in the opinion of the City Forester, that may 20 heal, examples include but are not limited to scaring of the trunk into the cambial layer 21 %2"to 2" in width but less than 1/3 trunk circumference or breaking of limbs less than 2" 22 in diameter or limbs less than 1/3 trunk caliper whichever is less. Slight damage to 23 tree(s)shall be assessed at a rate of: $100.00 for each instance of slight damage to tree(s). 24 25 1.2.Moderate Damage: 26 Moderate damage shall be defined as damage, in the opinion of the City Forester, that 27 contributes to the poor health and reduced longevity of the tree, examples include but are 28 not limited to scaring of the trunk into the cambial layer greater than 2" but less than 1/3 20 the trunk circumference or breaking of limbs more than 2" in diameter but less than 1/3 30 trunk caliper. Moderate damages shall be calculated at a rate of%2 the assessed value of 31 the tree per each instance of damage. 32 33 1.3. Severe Damage: 34 Severe damage shall be defined as damage, in the opinion of the City Forester, that shall 35 include but is not limited to scaring of the trunk to the cambial layer greater than 1/3 the 36 trunk circumference, uprooting or causing a tree to lean, damage to a scaffolding branch 37 or branch greater than 1/3 of trunk caliper or removal of a tree. Branches shall be 38 measured at the point of attachment.or at the lateral to which the branch would be pruned 39 back to according to ANSI standards. Trees caliper shall be measured according to 40 accepted industry standards. Trees greater than 6" in caliper shall be measured using 41 diameter at breast height (DBH). Severe damage or removal of trees is subject to a 42 penalty of$200.00 per diameter inch of trees removed or damaged for trees less than 30" 43 in caliper, $400.00 per diameter inch of trees 30"caliper or greater. 44 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 32 93 43-2 TREES AND SHRUBS Page 2 of 9 1 2. Company shall make payment for any such damages and must plant replacement 2 trees for severely damaged trees at a location to be determined by PACSD. Replacement shall be 3 made on caliper inch per caliper inch basis with a minimum size of replacement tree of 2" in 4 caliper for trees damaged or removed less than 30" DBH and 2" per inch on trees 30" DBH or 5 greater. Company shall be responsible for the planting watering, mulching and maintenance of 6 replacement trees for a period of not less than 2 years. Replacement trees will be planted during 7 the optimal planting season as directed by the City Forester. Any tree that does not survive the 2- 8 year establishment period shall be compensated for by the contractor to PACSD at a rate of.$200 9 per caliper inch. 10 11 3. In addition to damages assessed by PACSD, trees removed shall also be subject 12 to the Urban Forestry Ordinance of the Fort Worth Zoning Ordinance. 13 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0 -Bidding Requirements, Contract Forums, and Conditions of the Contract 16 2. Division 1 -General Requirements 17 3. Section 31 10 00—Site Clearing 18 4. Section 32 92 13 -Hydromulching, Seeding and Sodding 19 5. Section 32 91 19 -Topsoil Placement and Finishing of Parkways 20 1.2 PRICE AND PAYMENT PROCEDURES 21 A. Measurement and Payment 22 1. Plant Tree 23 a: Measurement 24 1) Measurement for this Item shall be per each by caliper inch. 25 b. Payment 26 1) The work performed and materials furnished in accordance with this Item 27 and measured as provided under"Measurement"will be paid for at the unit 28 price bid per each tree to be Planted by caliper inch. 29 c. The price bid shall include: 30 1) Furnishing and installing trees 31 2) Hauling 32 3) Grading and backfilling 33 4) Excavation 34 5) Fertilization 35 6) Water 36 7) Removing and disposing of surplus material 37 1.3 REFERENCES 38 A. Reference Standards 39 1. Reference standards cited in this specification refer:to the current reference standard 40 published at the time of the latest revision date logged at the end of this 41 specification,unless a date is specifically cited. 42 2. American National Standards Institute(ANSI): 43 a. ANSI Z60.1,American Standard for Nursery Stock 44 3. Hortus Third,The Staff of the L.H. Bailey Hortorium. 1976. MacMillan Publishing 45 Co.,New York. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 32 93 43-3 TREES AND SHRUBS Page 3 of 9 1 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 2 1.5 ACTION SUBMITTALS [NOT USED] 3 1.6 INFORMATIONAL SUBMITTALS 4 A. Tree data: Submit certification from supplier that each type of tree conforms to 5 specification requirements. 6 1.7 CLOSEOUT SUBMITTALS [NOT USED] 7 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 8 1.9 QUALITY ASSURANCE 9 A. Coordination 10 1. Coordinate with City Forester prior to beginning construction activities adjacent to 11 or that will impact existing trees and shrubs. 12 B. Qualifications 13 1. Landscaper specialized in landscape and planting work 14 C. Substitutions 15 1. Not permitted unless approved by City when specified planting material is not 16 obtainable 17 a. Submit proof of non-availability together with proposal for use of equivalent 18 .material. 19 b. Substitutions of larger size or better grade than specified will be allowed upon 20 approval by City Forester,but with no increase in unit price. 21 1.10 DELIVERY, STORAGE,AND HANDLING 22 A. Do not remove container grown stock from containers before time of planting. 23 B. Delivery and Acceptance Requirements 24 1. Ship trees with Certificates of Inspection as required by governing authorities. 25 2. Label each tree and shrub with securely attached waterproof tag bearing legible 26 designation of botanical and common name. 27 3. Use protective covering during delivery. 28 4. Deliver packaged materials in fully labeled original containers showing weight, 29 analysis and name of manufacturer. 30 C. Storage and Handling Requirements 31 1. Protect materials from deterioration during delivery, and while stored at Site. 32 2. Do not prune prior to installation. 33 3. Do not bend or bind-tie trees or shrubs in such manner as to damage bark, break 34 branches, or destroy natural shape. 35 1.11 FIELD CONDITIONS [NOT USED] 36 1.12 WARRANTY 37 A. Warranty Period: 12 months after job acceptance 38 B. Warrant trees against defects including: 39 1. Death CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 32 93 43-4 TREES AND SHRUBS Page 4 of 9 1 2. Unsatisfactory growth 2 3. Loss of shape due to improper pruning, maintenance, or weather conditions 3 C. Plumb leaning trees during warranty period. 4 D. Remove and replace trees found to be dead during warranty period. 5 E. Remove and replace trees which are in doubtful condition at end of warranty period, or 6 when approved by City, extend warranty period for trees for full growing season. 7 PART 2 - PRODUCTS 8 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 9 2.2 MATERIALS 10 1. General 11 a. Plants shall be true to species and variety specified, grown under climatic 12 conditions similar to those in the locality of the project for at least 2 years and 13 have been freshly dug during the most recent favorable harvest season. 14 b. All plant names and descriptions are as defined in Hortus Third. 15 c. All plants are to be grown and harvested in accordance with the Anerican 16 Stai2dard for Nurseiy Stock. 17 d. Unless approved by the City Forester,plants shall have been grown in a latitude 18 not more than 200 miles north or south of the latitude of the project unless the 19 provenance of the plant can be documented to be compatible with the latitude 20 and cold hardiness zone of the planting location. 21 2. Trees 22 a. Provide container grown trees which are straight and symmetrical and have 23 persistently preferred main leader. 24 b. Mark the tree's north orientation in the nursery for all deciduous trees grown in 25 the field with a 1-inch diameter spot of white paint on the tree trunk within the 26 bottom twelve inches of the trunk. 27 c. Crown shall be in good overall proportion to entire height of tree with 28 branching configuration as recommended by ANSI Z60.1 for type and species 29 specified. 30 d. Trees designated as balled and burlapped(B&B) shall be properly dug with 31 firm,natural balls of soil retaining as many fibrous roots as possible, in sizes 32 and shapes as specified in the Ainerican Standard for Nursery Stock. Balls shall 33 be firmly wrapped with nonsynthetic,rottable burlap and secured with nails and 34 heavy,nonsynthetic, rottable twine. The root collar shall be apparent at surface 35 of ball. Trees with loose, broken,processed, or manufactured root balls will not 36 be accepted, except with special written approval before planting. 37 e. Where clump is specified, furnish plant having minimum of three stems 38 originating from common base at ground line. 39 f. Measure trees by average caliper of trunk as follows: 40 1) For trunks up to 4 inches or less in diameter,measure caliper 6 inches 41 above top of root ball. 42 2) For trunks more than 4 inches,measure caliper 12 inches above top of root 43 ball. 44 3) Caliper measurements 45 a) By diameter tape measure CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 329343-5 TREES AND SHRUBS Page 5 of 9 1 b) Indicated calipers on Drawings are minimum 2 c) Averaging of plant caliber: not permitted 3 g. Trees shall conform to following requirements: 4 1) Healthy 5 2) Vigorous stock 6 3) Grown in recognized nursery 7 4) Free of: 8 a) Disease 9 b) Insects 10 c) Eggs 11 d) Larvae 12 e) Defects such as: 13 (1) Knots 14 (2) Sun-scald 15 (3) Injuries 16 (4) Abrasions 17 (5) Disfigurement 18 (6) Borers and infestations 19 3. Soil Products 20 a. Topsoil: See 32 91 19. 21 b. Peat moss, mulch and fertilizer: Use material recommended by City Forester 22 for establishment of healthy stock after replanting. 23 4. Stakes and Guys 24 a. Provide minimum 8-foot long steel T-stakes and 1 inch wide plastic tree chains. 25 b. Where applicable for anchoring trees,use wood deadmen: 26 1) Minimum: 2-inch by 4-inch stock 27 2) Minimum: 36 inches long and buried 3 feet. 28 3) Provide white surveyor's plastic tape for flagging tree guys. 29 5. Tree Wrap, Twine and Seal 30 a. Wrap 31 1) First quality 32 2) Bituminous impregnated tape 33 3) Corrugated or crepe paper, specifically manufactured for tree wrapping and 34 having qualities to resist insect infestation 35 b. Twine 36 1) Lightly tarred, medium-coarse sisal(lath)yarn 37 2) Do not use nails or staples to fasten wrapping 38 c. Seal: Commercially available tree wound dressing specifically produced for use 39 in sealing tree cuts and wounds 40 6. Water: clean and free of industrial wastes or other substances harmful to the growth 41 of the tree 42 2.3 ACCESSORIES [NOT USED] 43 2.4 SOURCE QUALITY CONTROL 44 A. Notify City,prior to installation, of location where trees that have been selected for 45 planting may be inspected. 46 B. Plant material will be inspected for compliance with following requirements. 47 1. Genus, species, variety, size and quality CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 329343-6 TREES AND SHRUBS Page 6 of 9 1 2. Size and condition of balls and root systems, insects, injuries and latent defects 2 PART 3 - EXECUTION [NOT USED] 3 3.1 INSTALLERS [NOT USED] 4 3.2 EXAMINATION [NOT USED] 5 3.3 PREPARATION 6 A. General 7 1. Schedule work so that planting can proceed rapidly as portions of site become 8 available. 9 2. Plant trees after final grades are established and prior to seeding or sodding. 10 3. When planting of trees occurs after seeding work,protect seeded areas and 11 promptly repair damage to seeded areas resulting from tree planting operations in 12 compliance with requirements of Section 32 92 13. 13 4. Layout individual trees at locations shown on Drawings. 14 5. In case of conflicts, notify City before proceeding with work. 15 6. Stake trees for City approval. 16 B. Preparation of Planting Soil 17 1. Before nixing, clean topsoil of roots,plants, sod, stones, clay lumps, and other 18 extraneous materials harmful or toxic to plant growth. 19 2. Strip and utilize 4 inch layer of top soil from existing ground. 20 3. Delay mixing of fertilizer when planting will not follow placing of planting soil 21 within 48 hours. 22 4. Incorporate amendments into soil as part of soil preparation process prior to fine 23 grading, fertilizing, and planting. 24 5. Broadcast or spread amendments evenly at specified rate over planting area. 25 6. Thoroughly incorporate amendments into top 3 or 4 inches of soil until 26 amendments are pulverized and have become homogeneous layer of topsoil ready 27 for planting. 28 3.4 INSTALLATION 29 A. Planting 30 1. Excavate pits,beds, or trenches with vertical sides and with bottom of excavation 31 raised minimum of 6 inches at center for proper drainage. 32 2. Provide following minimum widths: 33 a. 15 gallon containers or larger, 2 feet wider than diameter of root ball 34 b. 1 and 5 gallon containers, 6 inches wider than diameter of root ball 35 3. When conditions detrimental to plant growth are encountered, such as 36 unsatisfactory soil, obstructions, or adverse drainage conditions,notify City before 37 planting. 38 4. Deliver trees after preparations for planting have been completed and plant 39 immediately. 40 5. When planting is delayed more than 6 hours after delivery 41 a. . Set trees and shrubs in shade. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 32 93 43-7 TREES AND SHRUBS Page 7 of 9 1 b. Protect from weather and mechanical damage. 2 c. Keep roots moist by covering with mulch,burlap, or other acceptable means of 3 retaining moisture, and water as needed. 4 6. Lift plants only from the bottom of the root balls or with belts or lifting harnesses of 5 sufficient width not to damage the root balls. Do not lift trees by their trunk as a 6 lever in positioning or moving the tree in the planting area. 7 7. Remove plastic,paper, or fibrous pots from the containerized plant material. Pull 8 roots out of the root mat, and cut circling roots with a sharp knife. Loosen the 9 potting medium and shake away from the root mat. Immediately after removing the 10 container, install the plant such that the roots do not dry out. Pack planting mix 11 around the exposed roots while planting. 12 8. Cut ropes or strings from the top of root balls and trees after plant has been set. 13 Remove burlap or cloth wrapping and any wire baskets from around top half of 14 balls. Do not turn under and bury portions of burlap at top of ball. Set balled and 15 burlapped trees in the hole with the north marker facing north. 16 9. Set root ball on undisturbed soil in center of pit or trench and plumb plant. 17 10. Place plants at level that, after settlement, natural relationship of plant crown with 18 ground surface will be established. 19 11. When set,place additional backfill around base and sides of ball, and work each 20 layer to settle backfill and eliminate voids and air pockets. 21 12. When excavation is approximately 2/3 full,water thoroughly before placing 22 remainder of backfill: 23 13. Repeat watering until no more water is absorbed. 24 14. Dish top of backfill to allow for mulching. 25 15. Mulch pits, trenches and planted areas. 26 a. All trees, shrubs and other plantings will be mulched with mulch previously 27 approved by the City Forester. The mulch on trees and shrubs shall be to the 28 depths shown on the drawing. Mulch must not be placed within 3 inches of the 29 trunks of trees and shrubs. 30 16. Provide 2 to 4 inch thickness of mulch, work into top of backfill, and finish level 31 with adjacent finish grades. 32 17. Cover entire root ball. 33 18. Prune 34 a. Plants shall not be heavily pruned at the time of planting. Pruning is required at 35 planting to correct defects in the tree structure, including removal of injured 36 branches, double leaders,watersprouts, suckers, and interfering branches. 37 Healthy lower branches and interior small twigs should not be removed except 38 as necessary to clear walks and roads. In no case should more than 1/4 of the 39 branching structure be removed. Retain the normal shape of the plant. 40 b. All pruning shall be completed using clean sharp tools. All cuts shall be clean 41 and smooth, with the bark intact with no rough edges or tears. 42 c. Except in circumstances dictated by the needs of specific pruning practices,tree 43 paint shall not be used. The use of tree paint shall be only upon approval of the 44 City Forester. Tree paint,when required, shall_ be paint specifically formulated 45 and manufactured for horticultural use. 46 19, Prune trees to retain required height and spread. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 329343-8 TREES AND SHRUBS Page 8 of 9 1 20. Do not cut tree leaders, and remove only injured and dead branches from flowering 2 trees. 3 21. Remove and replace excessively pruned or misforined stock resulting from 4 improper pruning. 5 22. Inspect tree trunks for injury, improper pruning and insect infestation and take 6 corrective measures. 7 23. Guy and stake trees immediately after planting. 8 B. Moving Existing Trees 9 1. Coordinate tree moving and replanting with City Forester during dormant growth 10 season. 11 2. Provide tree spade of adequate size as directed by City Forester. 12 3.5 REPAIIURESTORATION [NOT USED] 13 3.6 RE-INSTALLATION [NOT USED] 14 3.7 FIELD QUALITY CONTROL 15 A. City may reject unsatisfactory or defective material at anytime during progress of work. 16 B. Remove rejected trees immediately from site and replace with specified materials. 17 C. Plant material not installed in accordance with these Specifications will be rejected. 18 D. An inspection to determine final acceptance will be conducted by City at end of 12 19 month maintenance period. 20 E. Warranty periods provided for in paragraph 1.12A. 21 _ 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING 24 A. During planting work,keep pavements clean and work area in orderly condition. 25 B. Dispose of excess soil and waste in approved location. 26 C. Wastc Material Disposal: On-site burning of combustible cleared materials shall not be 27 permitted. 28 3.11 CLOSEOUT ACTIVITIES [NOT USED] 29 3.12 PROTECTION 30 A. Protect planting work and materials from damage due to planting operations. 31 B. Maintain protection during installation and maintenance period. 32 C. Treat,repair, or replace damaged planting work. 33 3.13 MAINTENANCE 34 A. Maintenance Period shall be 12 months after final acceptance. 35 B. During the maintenance period if a work schedule and frequency are not shown on the 36 Drawings,perform the minimum requirements shown below: 37 1. Water trees to full depth a minimum of once each week or as required to maintain 38 healthy,vigorous growth. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 329343-9 TREES AND SHRUBS Page 9 of 9 1 2. Prune, cultivate, and weed as required for healthy growth. 2 3. Restore planting saucers. 3 4. Tighten and repair stake and guy supports, and reset trees and shrubs to proper 4 grades or vertical position as required. 5 5. Restore or replace damaged wrappings. 6 6. Spray as required to keep trees and shrubs free of insects and disease. 7 7. Contractor shall replace any plant that does not survive. It shall be replaced as soon 8 as it is determined no longer alive. Contractor is to maintain new plants as 9 described above until growth is established and maintenance period expires unless 10 waived by the City. 11 3.14 ATTACHMENTS [NOT USED] 12 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.LA—Payment Items removed for tree removal and transplantation;these Items are to be performed in accordance with Section 31 10 00. 12/20/2012 D.Johnson 3.13.A—modified maintenance period to begin 12 months after final acceptance 3.13.13—Modified maintenance period requirements 13 14 15 16 17 18 19 20 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 O O O 1" rffi v a�i bb � itiL}3 1 bJD `� '�• w i --� 4--4 O 41 !3 1 tiy_ 4� g0gr.J A o t4 CO yt��vi a G{� 1F1 ,x 330513-1 FRAME,COVER,AND GRADE RINGS Page 1 of 5 1 SECTION 33 05 13 2 FRAME, COVER, AND GRADE RINGS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Frame, cover and grade rings used as access ports into water, sanitary sewer and 7 storm drain structures such manholes or vaults 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. At 2.2BA.£3.,use Pamrex lockable lid or equivalent. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements, Contract Forms, and Conditions of the 12 Contract 13 2. Division 1 —General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Measurement 17 a. This Item is considered subsidiary to the structure containing the frame, cover 18 and grade rings. 19 2. Payment 20 a. The work performed and the materials furnished in accordance with this Item 21 are subsidiary to the unit price bid per each structure complete in place, and no 22 other compensation will be allowed. 23 1.3 REFERENCES 24 A. Reference Standards 25 1. Reference standards cited in this Specification refer to the current reference 26 standard published at the time of the latest revision date logged at the end of this 27 Specification,unless a date is specifically cited. 28 2. ASTM International(ASTM) 29 a. ASTM A48—Standard Specification for Gray Iron Castings 3.0 b. ASTM A536 - Standard Specification for Ductile Iron Castings 31 c. ASTM C478 - Specification for Precast Reinforced Concrete Manhole Sections 32 3. American Association of State Highways and Transportation Officials (AASHTO) 33 a. AASHTO M306— Standard Specification for Drainage, Sewer,Utility and 34 Related Castings 35 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 36 1.5 SUBMITTALS 37 A. Submittals shall be in accordance with Section 01 33 00. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 33 05 13-2 FRAME,COVER,AND GRADE RINGS Page 2 of 5 1 B. All submittals shall be approved by the City prior to delivery and/or fabrication for 2 specials. 3 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 4 A. Product Data 5 1. All castings shall be cast with: 6 a. Approved foundry's name 7 b. Part number 8 c. Country of origin 9 2. Provide manufacturer's: 10 a. Specifications i 1 b. Load tables 12 c. Dimension diagrams 13 d. Anchor details 14 e. Installation instructions 15 B. Certificates 16 1. Manufacturer shall certify that all castings conform to the ASTM and AASHTO 17 designations. 18 1.7 CLOSEOUT SUBMITTALS [NOT USED] 19 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 20 1.9 QUALITY ASSURANCE [NOT USED] 21 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 22 1.11 FIELD [SITE] CONDITIONS [NOT USED] 23 1.12 WARRANTY [NOT USED] 24 PART 2- PRODUCTS 25 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 26 2.2 EQUIPMENT,PRODUCT TYPES,MATERIALS 27 A. Manufacturers 28 1. Only the manufacturers as listed on the City's Standard Products List will be 29 considered as shown in Section 01 60 00. 30 a. The manufacturer must comply with this Specification and related Sections. 31 2. Any product that is not listed on the Standard Products List is considered a 32 - substitution and shall be submitted in accordance with Section 0125 00. 33 B. Castings 34 1. Use castings for frames that conform to ASTM A48, Class 35B or better. 35 2. Use castings for covers that conform to ASTM A536, Grade 65-45-12 or better. 36 3. .Use clean casting capable of withstanding application of AASHTO HS-20 vehicle 37 loading with permanent deformation. 38 4. Covers CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 330513-3 FRAME,COVER,AND GRADE RINGS Page 3 of 5 1 a. Size to set flush with the frame with no larger than a 1/8 inch gap between the 2 frame and cover 3 b. Provide with 2 inch wide pick slots in lieu of pick holes. 4 c. Provide gasket in frame and cover. 5 d. Standard Dimensions 6 1) Sanitary Sewer 7 a) Provide a clear opening of 30 inches for all sanitary sewer frames and 8 cover assemblies unless otherwise specified in the Contract Documents. 9 2) Storm Drain 10 a) Provide a clear opening of 19 3/ inches for all storm drain frames, inlets 11 and cover assemblies unless otherwise specified in the Contract 12 Documents. 13 b) Provide a minimum clear opening of 22 1/2 inches for all storm sewer 14 manholes and junction structures. 15 e. Standard Labels 16 1) Water 17 a) Cast lid with the word"WATER"in 2-inch letters across the lid. 18 2) Sanitary Sewer 19 a) Cast lid with the word"SANITARY SEWER"in 2-inch letters across 20 the lid. 21 3) Storm Drain 22 a) Cast lid with the word"STORM DRAIN"in 2-inch letters across the 23 lid. 24 f. Hinge Covers 25 1) Provide water tight gasket on all hinged covers. 26 2) Water 27 a) Provide hinged covers for all water structures. 28 3) Sanitary Sewer 29 a) Provide hinged covers for all manholes or structures constructed over 30 24-inch sewer lines and larger and for manholes where rim elevations 31 are greater than 12 inches above the surface. 32 C. Grade Rings 33 1. Provide grade rings in sizes from 2-inch up to 8-inch. 34 2. Use concrete in traffic loading areas. 35 3. In non-traffic areas concrete or HDPE can be used. 36 D. Joint Sealant 37 1. Provide a pre-formed or trowelable bitumastic sealant in an extrudable or flat tape 38 form. 39 2. Provide sealant that is not dependant on a chemical action for its adhesive 40 properties or cohesive strength. C_ CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 3305 13-4 FRAME,COVER,AND GRADE RINGS Page 4 of 5 1 2.3 ACCESSORIES [NOT USED] 2 2.4 SOURCE QUALITY CONTROL [NOT USED] 3 PART-3 - EXECUTION 4 3.1 INSTALLERS [NOT USED] 5 3.2 EXAMINATION [NOT USED] 6 3.3 PREPARATION [NOT USED] 7 3.4 INSTALLATION 8 A. Grade Rings 9 1. Place as shown in.the water and sanitary sewer City Standard Details. 10 2. Clean surfaces of dirt, sand,mud or other foreign matter before placing sealant. 11 3. Seal each grade ring with sealant specified in this Specification and as shown on the 12 City Standard Details. 13 B. Frame and Cover 14 1. Water 15 a. For water structures install frame, cover and grade rings in accordance with 16 applicable City Standard Detail. 17 2. Sanitary Sewer 18 a. For sanitary sewer structures install frame, cover and grade rings in accordance 19 with applicable City Standard Detail. 20 3. Stonn Drain 21 a. For stonn drain structures install frame, cover and grade rings in accordance 22 with applicable City Standard Detail. 23 4. Hinge Cover 24 a. Provide hinge cover on elevated manholes,junction boxes, in the flood plain 25 and where specified on the Drawings. 26 C. Joint Sealing 27 1. Seal frame, grade rings and structure with specified sealant. 28 D. Concrete Collar 29 1. Provide concrete collar around all frame and cover assemblies. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 3305 13-5 FRAME,COVER,AND GRADE RINGS Page 5 of 5 1 3.5 REPAIR/RESTORATION [NOT USED] 2 3.6 RE-INSTALLATION [NOT USED] 3 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 4 3.8 SYSTEM STARTUP [NOT USED] 5 3.9 ADJUSTING [NOT USED] 6 3.10 CLEANING [NOT USED] 7 3.11 CLOSEOUT ACTIVITIES [NOT USED] 8 3.12 PROTECTION [NOT USED] 9 3.13 MAINTENANCE [NOT USED] 10 3.14 ATTACHMENTS [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 2.2.B.4.d.2)b)—Updated to clear opening dimensions to 22%inches 13 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 33 11 12-1 POLYVINYL CHLORIDE(PVC)PRESSURE PIPE Page 1 of 8 1 SECTION 33 1112 2 POLYVINYL CHLORIDE (PVC)PRESSURE PIPE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Polyvinyl Chloride(PVC)Pressure Pipe 4-inch through 36-inch for potable water, 7 wastewater and reuse applications 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. Use 1 %2"PVC pipe for discharge of sump pump from meter vault to manhole. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0—Bidding Requirements, Contract Forms, and Conditions of the 12 Contract 13 2. Division 1 —General Requirements 14 3. 33 01 31 —Closed Circuit Television(CCTV) Inspection 15 4. 33 04 40—Cleaning and Acceptance Testing of Water Mains 16 5. 33 05 10—Utility Trench Excavation, Embedment and Backfill 17 6. 33 05 24—Installation of Carrier Pipe in Casing or Tunnel Liner Plate 18 7. 33 11 11 —Ductile Iron Fittings 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Measurement 22 a. Measured horizontally along the surface from center line to center line of the 23 fitting,manhole, or appurtenance 24 2. Payment 25 a. The work performed and materials furnished in accordance with this Item and 26 measured as provided under"Measurement"will be paid for at the unit price 27 bid per linear foot of"PVC Water Pipe"installed for: 28 1) Various sizes 29 2) Various types of backfill 30 b. The work performed and materials furnished in accordance with this Item and 31 measured as provided under"Measurement"will be paid for at the unit price 32 bid per linear foot of"Sewer Force Main" installed for: 33 1) Various sizes 34 3. The price bid shall include: 35 a. Furnishing and installing PVC Pressure Pipe with joints as specified by the 36 Drawings 37 b. Mobilization 38 c. Pavement removal 39 d. Excavation CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised April 1,2013 33 11 12-2 POLYVINYL CHLORIDE(PVC)PRESSURE PIPE Page 2 of 8 1 e. Hauling 2 f. Disposal of excess material 3 g. Furnishing,placement and compaction of embedment 4 h. Furnishing,placement and compaction of backfill 5 i. Trench water stops 6 j. Thrust restraint, if required by Contract Documents 7 k. Gaskets 8 1. Clean-up 9 in. Cleaning 10 n. Disinfection 11 o. Testing 12 1.3 REFERENCES 13 A. Reference Standards 14 1. Reference standards cited in this Specification refer to the current reference 15 standard published at the time of the latest revision date logged at the end of this 16 Specification,unless a date is specifically cited. 17 2. American Association of State Highway and Transportation Officials (AASHTO). 18 3. ASTM International(ASTM): 19 a. D1784, Standard Specification for Rigid Poly(Vinyl-Chloride) (PVC) 20 Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds. 21 b. D3139, Standard Specification for Joints for Plastic Pressure Pipes Using 22 Flexible Elastomeric Seals. 23 4. American Water Works Association(AWWA): 24 a. C600, Installation of Ductile-Iron Water Mains and their Appurtenances. 25 b. C605,Underground Installation of Polyvinyl Chloride(PVC)Pressure Pipes 26 and Fittings for Water. 27 c. C900,Polyvinyl Chloride(PVC)Pressure Pipe, and Fabricated Fittings, 4 IN 28 through 12 IN, for Water Transmission and Distribution. 29 d. C905, Polyvinyl Chloride(PVC)Pressure Pipe, and Fabricated Fittings, 14 IN 30 through 48 IN, for Water Transmission and Distribution. 31 e. M23, PVC Pipe—Design and Installation. 32 f. M41,Ductile-Iron Pipe and Fittings. 33 5. NSF International(NSF): 34 a. 61,Drinking Water System Components—Health Effects. 35 6. Underwriters Laboratories,Inc. (UL). 36 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 37 1.5 SUBMITTALS 38 A. Submittals shall be in accordance with Section 0133 00. 39 B. All submittals shall be approved by the City prior to delivery. 40 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 41 A. Product Data CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised April 1,2013 33 11 12-3 POLYVINYL CHLORIDE(PVC)PRESSURE PIPE Page 3 of 8 1 1. For PVC Pressure Pipe that is used for water distribution,wastewater force mains 2 or wastewater gravity mains, including: 3 a. PVC Pressure Pipe 4 b. Manufacturer 5 c. Dimension Ratio 6 d. Joint Types 7 2. Restraint, if required in Contract Documents 8 a. Retainer glands 9 b. Thrust harnesses 10 c. Any other means of restraint 11 3. Gaskets 12 B. Shop Drawings: When.restrained joints are required,furnish for PVC Pressure Pipe 13 used in the water distribution system or for a wastewater force main for 24-inch and 14 greater diameters,including: 15 1. Wall thickness design calculations sealed by a Licensed Professional Engineer in 16 Texas including: 17 a. Working pressure 18 b. Surge pressure 19 c. Deflection 20 2. Provide thrust restraint calculations for all fittings and valves, sealed by a Licensed 21 Professional Engineer in Texas,to verify the restraint lengths shown on the 22 Drawings, 23 3. Lay schedule/drawing for 24-inch and greater diameters sealed by a Licensed 24 Professional Engineer in Texas including: 25 a. Pipe class 26 b. Joints type 27 c. Fittings 28 d. Stationing 29 e. Transitions 30 f. Joint deflection 31 C. Certificates 32 1. Furnish an affidavit certifying that all PVC Pressure Pipe meets the provisions of 33 this Section, each run of pipe furnished has met Specifications, all inspections have 34 been made and that all tests have been performed in accordance with AWWA C900 35 or AWWA C905. 36 1.7 CLOSEOUT SUBMITTALS [NOT USED] 37 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 38 1.9 QUALITY ASSURANCE 39 A. Qualifications 40 1. Manufacturers 41 a. Finished pipe shall be the product of 1 manufacturer for each size, unless 42 otherwise approved by the City. 43 1) Change orders, specials, and field changes may be provided by a different 44 manufacturer upon City approval. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised April 1,2013 33 11 12-4 POLYVINYL CHLORIDE(PVC)PRESSURE PIPE Page 4 of 8 1 b. Pipe manufacturing operations shall be performed under the control of the 2 manufacturer. 3 c. All pipe furnished shall be in conformance with AWWA C900 and AWWA 4 C905. 5 1.10 DELIVERY, STORAGE,AND DANDLING 6 A. Storage and Handling Requirements 7 1. Store and handle in accordance with the guidelines as stated in AWWA M23. 8 2. Secure and maintain a location to store the material in accordance with Section 01 9 6600. 10 1.11 FIELD [SITE] CONDITIONS [NOT USED] 11 1.12 WARRANTY [NOT USED] 12 PART 2 - PRODUCTS 13 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 14 2.2 EQUIPMENT,PRODUCT TYPES AND MATERIALS 15 A. Manufacturers 16 1. Only the manufacturers as listed in the City's Standard Products List will be 17 considered as shown in Section 01 60 00. 18 a. The manufacturer must comply with this Specification and related Sections. 19 2. Any product that is not listed on the Standard Products List is considered a 20 substitution and shall be submitted in accordance with Section 0125 00. 21 B. Pipe 22 1. Pipe shall be in accordance with AWWA C900 or AWWA C905. 23 2. PVC Pressure Pipe for potable water shall meet the requirements of NSF 61. 24 3. Pressure Pipe shall be approved by the UL. 25 4. Pipe shall have a lay length of 20 feet except for special fittings or closure pieces 26 necessary to comply with the Drawings. 27 5. The pipe material shall be PVC,meeting the requirements of ASTM D1784, with a 28 cell classification of 12454. Outside diameters must be equal to those of cast iron 29 and ductile iron pipes. 30 6. As a minimum the following Dimension Ratio's apply: 31 Diameter Min Pressure Class (inch) (psi) 4 through 12 DR 14 16 through 24 DR 18 32 7. Pipe Markings 33 a. Meet the minimum requirements of AWWA C900 or AWWA C905. Minimum 34 pipe markings shall be as follows: 35 1) Manufacturer's Name or Trademark and production record CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised April 1,2013 33 11 12-5 POLYVINYL CHLORIDE(PVC)PRESSURE PIPE Page 5 of 8 1 2) Nominal pipe size 2 3) Dimension Ratio 3 4) AWWA C900 or AWWA C905 4 5) Seal of testing agency that verified the suitability of the pipe 5 C. Pressure and Deflection Design 6 1. Pipe design shall be based on trench conditions and design pressure class specified 7 in the Drawings. Pipe shall be designed according to the methods indicated in 8 AWWA M23 for trench construction,using the following parameters: 9 a. Unit Weight of Fill (w)= 130 pcf 10 b. Live Load=AASHTO HS 20 11 c. Trench Depth= 12 feet minimum, or as indicated in Drawings 12 d. Maximum E' = 1,000 max 13 e. Deflection Lag Factor= 1.0 14 f. Working Pressure(P,,,)= 150 psi 15 g. Surge Allowance (PS)= 100 psi minimum 16 h. Test Pressure= 17 1) No less than 1.25 times the stated working pressure(187 psi minimum) of 18 the pipeline measured at the highest elevation along the test section. 19 2) No less than 1.5 times the stated working pressure(225 psi minimum) at 20 the lowest elevation of the test section. 21 1. Maximum Calculated Deflection= 3 percent 22 j. Restrained Joint Safety Factor(SF)= 1.5 23 k. Maximum Joint Deflection=50 percent of the manufacturer's 24 recommendations. 25 2. Verify trench depths after existing utilities are located. 26 a. Accommodate vertical alignment changes required because of existing utility or 27 other conflicts by an appropriate change in pipe design depth. 28 b. In no case shall pipe be installed deeper than its design allows. 29 3. Provisions for Thrust 30 a. Thrusts at bends,tees,plugs or other fittings shall be mechanically restrained 31 joints when required by the Drawings. 32 b. No thrust restraint contribution shall be allowed for the restrained length of 33 pipe within the casing. 34 c. Restrained joints,where required, shall be used for a sufficient distance from 35 each side of the bend,tee,plug, valve, or other fitting to resist thrust which will 36 be developed at the design pressure of the pipe. For the purpose of thrust the 37 following shall apply: 38 1) Calculate valves as dead ends. 39 2) Design pressure shall be greater than the pressure class of the pipe or the 40 internal pressure (P), whichever is greater. 41 3) Restrained joints shall consist of approved mechanical restrained or push- 42 on restrained joints as listed in the City's Standard Products List as shown 43 in Section 01 60 00. 44 4) Restrained PVC pipe is not allowed for pipe greater than 12 inches. 45 d. The Pipe Manufacturer shall verify the length of pipe with restrained joints to 46 resist thrust in accordance with the Drawings and the following: 47 1) Calculate the weight of the earth(We) as the weight of the projected soil 48 prism above the pipe, for unsaturated soil conditions. CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised April 1,2013 33 11 12-6 POLYVINYL CHLORIDE(PVC)PRESSURE PIPE Page 6 of 8 1 2) Soil density= 115 pcf(maximum value to be used), for unsaturated soil 2 conditions 3 3) In locations where ground water is encountered,reduce the soil density to 4 its buoyant weight for the backfill below the water table. 5 a) Reduce the coefficient of friction to 0.25. 6 4. Joints 7 a. Joints shall be gasket,bell and spigot and push-on type conforming to ASTM 8 D3139. 9 b. Since each pipe manufacturer has a different design for push-on joints, gaskets 10 shall be part of a complete pipe section and purchased as such. 11 c. Lubricant must be non-toxic and NSF approved for potable water applications. 12 d. Push-On Restrained Joints shall only be as approved in the Standard Products 13 List in Section 01 60 00. 14 5. Detectable Markers 15 a. Provide detectable markers in accordance with Section 33 05 26. 16 2.3 ACCESSORIES [NOT USED] 17 2.4 SOURCE QUALITY CONTROL [NOT USED] 18 PART 3 - EXECUTION 19 3.1 INSTALLERS [NOT USED] 20 3.2 EXAMINATION [NOT USED] 21 3.3 PREPARATION [NOT USED] 22 3.4 INSTALLATION 23 A. General 24 1. Install pipe, fittings, specials and appurtenances as specified herein, as specified in 25 AWWA C600,AWWA C605, AWWA M23 and in accordance with the pipe 26 manufacturer's recominendations. 27 2. Lay pipe to the lines and grades as indicated in the Drawings. 28 3. Excavate and backfill trenches in accordance with Section 33 05 10. 29 4. Embed PVC Pressure Pipe in accordance with Section 33 05 10. 30 5. For installation of carrier pipe within casing, see Section 33 05 24. 31 B. Pipe Handling 32 1. Haul and distribute pipe and fittings at the project site. 33 2. Handle piping with care to avoid damage. 34 a. Inspect each joint of pipe and rejector repair any damaged pipe prior to 35 lowering into the trench. 36 b. Use only nylon ropes, slings or other lifting devices that will not damage the 37 surface of the pipe for handling the pipe. 38 3. At the close of each operating day: CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised April 1,2013 33 11 12-.8 POLYVINYL CHLORIDE(PVC)PRESSURE PIPE Page 8 of 8 1 END OF SECTION 2 Revision Log DATE NAME SUMMARY OF CHANGE 2.2.C.1 and 3.4.C.3—revised maximum joint deflection requirements 12/20/2012 D. Johnson 3.4.C.1—Added reference to Ductile Iron Fittings 3.4.1)—Removed Marker Balls 1.1 Modified acceptable range for specification from up to 24-inch to up to 36-inch Change Section 2.2 B. 5. from"The pipe material shall be PVC,meeting the requirements of ASTM D1784,with a cell classification of 12454-B." to 4/1/2013 F. Griffin "The pipe material shall be PVC,meeting the requirements of ASTM D1784,with a cell classification of 12454". 3 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised April 1,2013 33 11 12-7 POLYVINYL CHLORIDE(PVC)PRESSURE PIPE Page 7 of 8 1 a. Keep the pipe clean and free of debris, dirt, animals and trash—during and after 2 the laying operation. 3 b. Effectively seal the open end of the pipe using a gasketed night cap. 4 C. Joint Making 5 1. Mechanical Joints 6 a. In accordance with Section 33 11 11. 7 2. Push-on Joints 8 a. Install Push-On joints as defined in AWWA C900 and AWWA C905. 9 b. Wipe clean the gasket seat inside the bell of all extraneous matter. 10 c. Place the gasket in the bell in the position prescribed by the manufacturer. 11 d. Apply a thin film of non-toxic vegetable soap lubricant to the inside of the 12 gasket and the outside of the spigot prior to entering the spigot into the bell. 13 e. When using a field cut plain end piece of pipe,refinish the field cut to conform 14 to AWWA C605. 15 3. Joint Deflection 16 a. Deflect the pipe only when necessary to avoid obstructions, or to meet the lines 17 and grades shown in the Drawings. 18 b. Joint deflection shall not exceed 50 percent of the manufacturer's 19 recommendation. 20 D. Detectable Metallic Tape Installation 21 1. See Section 33 05 26. 22 3.5 REPAIR/RESTORATION [NOT USED] 23 3.6 RE-INSTALLATION [NOT USED] 24 3.7 FIELD [OR] SITE QUALITY CONTROL 25 A. Potable Water Mains 26 1. Cleaning, disinfection,hydrostatic testing, and bacteriological testing of water 27 mains: 28 a. Clean, flush,pig, disinfect,hydrostatic test and bacteriological test the water 29 main as specified in Section 33 04 40. 30 B. Wastewater Lines 31 1. Closed Circuit Television(CCTV)Inspection 32 a. Provide a Post-CCTV Inspection in accordance with Section 33 0131. 33 3.8 SYSTEM STARTUP [NOT USED] 34 3.9 ADJUSTING [NOT USED] 35 3.10 CLEANING [NOT USED] 36 3.11 CLOSEOUT ACTIVITIES [NOT USED] 37 3.12 PROTECTION [NOT USED] 38 3.13 MAINTENANCE [NOT USED] 39 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER METER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised April 1,2013 APPENDIX GC-4.01 Availability of Lands Right of Way Easements (Perinanent and Construction)Provide current statement of record(s) legal title and legal descriptions for lands upon which the Work is to be performed> GC-4.02 Subsurface and Physical Conditions Geotechnical Engineering Report GC-4.04 Underground Facilities: None GC-4.06 Hazardous Environmental Condition at Site: None GC-6.06.1)Minority Owned Business Enterprise Compliance MBE Good Faith Effort Form MBE Joint Venture Eligibility Form MBE Prime Contractor Waiver Form MBE Specifications—Special Instructions for Bidders MBE Subcontractors/Suppliers Utilization Form GC-6.07 Wage Rates Mayor and Council Communication Heavy and Highway Construction Prevailing Wage Rates 2008 GC-6.09 Permits and Utilities:None GC-6.24 Nondiscrimination: None GR-01 60 00 Product Requirements CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 GC-4.01 Availability of Lands THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 GC-4.02 Subsurface and Physical Conditions GEOTECHNICAL ENGINEERING REPORT CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 GEO'fECHNICAL ENGINEERING REPORT CRWLEY METER STATION 400 BLOCK ORIEL DRIVE CROWLEY,TEXAS Prepared for: CITY.OF FORT WORTH WATER DEPARTMENT Fort Worth,Texas EWI Report No. FW132748 April 2013 Ellerbee-Walczak, Inc. GEOTECHNICAL ENGINEERING & CONSTRUCTION MATERIALS TESTING SERVICES April 4, 2013 City of Fort Worth Water Department 927 Taylor Street Fort Worth, Texas 76102 Attn: Mr. Paul Wright Re: Geotechnical Engineering Report Proposed Crowley Meter Station 400 Block Oriel Drive Crowley, Texas EWI Report No. FW132748 Gentlemen: Ellerbee-Walczak Inc. (EWI) has completed its Geotechnical Engineering Report at the above referenced location. The results are presented in the attached report. Please do not hesitate to contact us if you have any questions regarding the information in this report or if we can be of any additional assistance. It has been a pleasure providing geotechnical services for this project. I Sincerely, Ellerbee-Walczak, Inc. A� TBPE Firm No. F-4610 ................ P T. N. LAt4%HENJE 92693... ..,.. .f Zt r�cS<ipENSEQ.G���;,� T. NeiALWrence, Jr., P.E. lr tiro�tititi�~~� Manager Engineering One(1)Original Report,Submitted Electronic Report Issued via e-mail 4501 Broadway Ave. • P.O. Box 14809 • Haltom City,Texas 76117 Office 817-759-9999 •Fax 817-759-1888 TABLE OF CONTENTS Page 1.0 SITE & PROJECT INFORMATION...................................................................................... 1 2.0 SCOPE OF SERVICES................... 3.0 FIELD OPERATIONS.......................................................................................................... 1 4.0 LABORATORY TESTING ................................................................................................... 2 6.0 SITE SUBSURFACE CONDITIONS........................................... ........................................2 6.0 GROUNDWATER...............................................................................................................3 7.0 ANALYSIS AND RECOMMENDATIONS............................................................................. 3 7.1 Foundation Systems.................................................................................................... 3 7.1.1 Mat Foundations..........................:......................................................................3 7.1.2 Floor Slabs.........................................................................................................4 7.2 Excavations..................................................................................................................4 7.3 Utilities ...................:...........................................................4 8.0 LIMITATIONS..............................................................................................................._.......4 APPENDIX Figure Plansof Boring........................... ................................................................................................ 1 Boring Logs...................... - Key to Symbols used on Boring Logs.........................................................................................4 GEOTECHNICAL ENGINEERING REPORT CRWLEY METER STATION 400 BLOCK ORIEL DRIVE CROWLEY,TEXAS. 1.0 SITE & PROJECT INFORMATION The project site near the Fort Worth/Crowley city limits in the 400 block of Oriel Drive in the City of Crowley, Tarrant County, Texas. Proposed construction consists of a vault for a wastewater meter station. We understand the vault floor will be about 25 feet below the existing ground surface. 2.0 SCOPE OF SERVICES The purpose of our geotechnical services for this site were to: • Evaluate the subsurface conditions encountered in the boring. ® Evaluate the pertinent engineering properties of the recovered samples. Provide recommendations for bearing capacity of limestone for the vault floor. 3.0 FIELD OPERATIONS The subsurface conditions of the sites were evaluated by performing two borings, which were drilled on February 27, 2013. The approximate boring locations are provided on the Plan of Boring (Figure 1) in the Appendix. The results of the field exploration program are presented on the Boring Logs (Figures 2 and 3) in the Appendix. A Soil Classification Chart containing the keys to symbols and the description of terms used on the boring log is presented on Figure 4. A truck-mounted drilling rig with continuous flight augers was used to advance the borings. Soils were sampled using steel tubes or during performance of standard penetration tests. The samples were extruded in the field, logged, sealed, and packaged to preserve their in-situ moisture content and reduce disturbance during transportation to the laboratory. The load carrying capacity of the limestone encountered the borings was evaluated in the field by performance of standard penetration tests and the Texas Department of Transportation's (TxDOT) Cone Penetration Test. Drilling and sampling were performed in general accordance with applicable ASTM and TxDOT procedures. -1- FW132748 4.0 LABORATORY TESTING The Boring Log and samples were reviewed by a geotechnical engineer who assigned soil samples for testing. Tests were performed in the laboratory by technicians working under the direction of the engineer. Testing was performed in general accordance with applicable ASTM procedures. Liquid and Plastic Limit tests were performed on samples of the cohesive soils. These tests were used in conjunction with moisture content tests for classification and estimating their volume change potential. Hand penetrometer tests was performed the cohesive soils to evaluate consistency. The results of the laboratory tests are presented on the Boring Log in the Appendix. 5.0 SITE SUBSURFACE CONDITIONS The conditions encountered at the boring location are depicted on the Boring Logs in the Appendix. Descriptions of each stratum with its approximated depth and thickness are provided. The depths reported on the logs refer to the depth from-the existing ground surface at the time the borings were performed. A brief description of the stratigraphy indicated by the borings is presented below. Brown and grayish brown silty clay fills, with limestone gravel, asphalt and concrete fragments was encountered at the surface of Borings 1 and 2, and extended to a depth of about 5 and 9Y2 feet below existing grades, respectively. The fills had Liquid Limits (LL) of 35 and 36percent and Plasticity Indices (PI) of 18. The fill soil classified as CL according to the Unified Soil Classification System (USCS) and was firm to hard in consistency. Tan and gray clays and shaley clays, some with limestone fragments, were next encountered in the borings and extended to depths of about 12'l2 and 14Y feet below existing grades. They had LL's of 51 and 57 percent, PI's of 30 and 35, classified as CH according to the. USCS and were hard in consistency. Gray limestone with shale layers was next encountered in the borings and extended to termination depths of about 30 feet below existing grades. The soils encountered in the borings are considered to be moderately active to highly active with respect to moisture-induced volume changes. Active soils will s.hrink and swell within the active zone with variations in seasonal moisture change. -2- FW132748 6.0 GROUNDWATER The boring was advanced in the dry using auger-drilling techniques. This process allows relatively accurate short-term observations of groundwater while drilling. Seepage was not observed at the time of drilling and the boring remained dry at completion. Groundwater levels will seasonally fluctuate due to variations in the amount of precipitation, evaporation and surface water runoff. Seasonal seepage may occur above and within the limestone during wet seasonal cycles. In addition, groundwater conditions may change due to landscape irrigation, tree root demand and from leaking buried utilities. 7.0 ANALYSIS AND RECOMMENDATIONS 7.1 Foundation Systems We understand a mat foundation system will be constructed for the vault. Recommendations for this type of systems are presented below. 7.1.1 Mat Foundations Mat foundations may be considered for the vault structure. We recommend that the mat foundation be founded on undisturbed gray limestone/shale at minimum depths of about 13 feet below the existing grades. Foundation design parameters are presented below in Table 1. Static settlements are expected to be primarily elastic, on the order of inch or less, with the majority of the primary settlement occurring during or shortly after placement of the mat foundations. TABLE 2— FOUNDATION DESIGN PARAMETERS Depth Net Allowable Allowable Horizontal Estimated Shear Below Effective Allowable Skin Passive Modulus of Strength Parameters Unit End Subgrade Existing Friction Pressure Internal Weight Bearing Reaction Undrained Grade Value Value Friction (PCF) Pressure (Static) Cohesion {FT) (PSF)* (PSF) (PSF)** (PCI) (PSF). Angle K33�* 125 1,800 -- -- 400 2,5000* 132 10,000 1,500 4,000 1,300 15,000 -- The net allowable bearing pressure refers to the pressure at the foundation bearing level in excess of the minimum surround overburden pressure. "*The allowable passive pressures are based on a rectangular pressure distribution. Because of the potential strength loss due to moisture variations in the site soil, and due to disturbance during installation, it is recommended that the passive pressure within the initial 2 feet of soil be neglected. -3- FW 132748 7.1.2 Floor Slabs Lightly loaded floor slabs placed near existing grades will be subject to movement as a result of moisture induced volume changes in the soils. Active soils can expand (heave) with increases in moisture and contract (shrink) with decreases in moisture. This movement typically occurs as post construction heave. The potential magnitude of the moisture-induced movements is rather indeterminate. It is influenced by the soil properties, overburden pressures, thickness of clay soils and to a great extent by soil moisture levels at the time of construction. Based on the conditions encountered in the boring the potential movements for existing surface foundations at this site are estimated to be on the order of 3 inches. Slab-on-grade construction should only be considered if slab movement can be tolerated. A properly designed and constructed vapor barrier should be provided beneath those portions of the slab which will be covered, receive moisture sensitive finishes or adhesives. 7.2 Excavations The depths of the excavation are assumed to be around 25 feet. Based on the subsurface conditions encountered in the. borings, excavations will generally encounter silty clays and clay soils. Deeper excavation will encounter limestone. The upper soils have the most potential to cave and should be braced according to OSHA standards. 7.3 Utilities Limestone should be anticipated in utility excavations.. Care should be taken that utility cuts are not left open for extended periods, and that the cuts are properly backfilled. Backfilling should be accomplished with properly compacted on-site soils, rather than granular materials. A positive cut-off at the building line is recommended to help prevent water from migrating in the utility trench backfill. Long term settlements should be anticipated in deep utility fills. 8.0 LIMITATIONS The professional services performed for the preparation of this geotechnical report were accomplished in accordance with current and locally accepted geotechnical engineering principles and practices. The recommendations presented in this report are based upon the data obtained from the boring at the indicated location and/or from other information discussed in this report. The possibility always exists that the subsurface conditions beyond the boring, beneath any existing structure,.across the site, or due to seasonal/annual climatic cycles may vary from those encountered in the boring. The nature of these variations may not become evident until -4- FW 132748 during or after construction. Should subsurface conditions varying significantly from those described herein, EWI should be immediately notified to evaluate the effects on these recommendations and so supplemental recommendations can be provided. EWI's services "should also be retained for the final review of design plans/specifications so comments can be made regarding interpretation of the geotechnical recorri mend atio ns provided in this report. The recommendations provided in this report were prepared for the exclusive use of our client. No warranties, expressed or implied, are intended or made. The information and recommendations provided in this report are applicable only for the design of the types of structure(s) described in the Site and Proiect Information section of this report and should not be used for any other structures, locations or for any other purposes. We should not be held responsible for the conclusions, opinions or recommendations made by others based upon the information submitted in this report. If changes to the design and/or location of this project as outlined in this report are planned, the recommendations provided in this report shall not be considered valid unless EWI reviews these changes and either verifies or amends this report in writing. Construction issues such as site safety support of excavations and dewatering procedures are the responsibility of others. The scope of services for this report does not include any environmental or biological assessments either specifically or implied. If the owner is concerned about the potential mold, fungi, bacteria, identification of contaminants or hazardous materials and conditions, additional studies should be undertaken. EWI's capabilities include a full range of construction material testing and observation services. EWl should be retained to provide testing and observation during excavation, grading, foundation and construction phases of this project. We will retain the samples recovered from the boring on this project for a period of 30 days subsequent to the submittal date printed on this report. After the 30-day period, the samples will be discarded unless otherwise notified by the owner in writing. ® -5- FW132748 N � W N - N Q U p N I 1 m 23 1 LL FD � O w L I z � 0 � Q T � N O L U � J r w ; L m rr_ t � N + m ti Y • N U � C � O �y N � V7 O � � w 0 cp7i c V c m p N / X LL C O > O Z U I' w Ellerbee-Walczak, Inc. BORING NUMBER B-1 4501 Broadway Avenue Haltom City, Texas 76117 PAGE 1 OF 1 Telephone: 817-759-9999 Fax: 817-759-1888 CLIENT City of Fort Worth PROJECT NAME Crowley Wastewater Meter Station PROJECT NUMBER FW132748 PROJECT LOCATION Oriel Dr. Crowley,TX DATE STARTED 2127113 COMPLETED 2127/13 GROUND ELEVATION NIA GROUND WATER LEVELS: DRILLING METHOD Continuous Flight Auger AT TIME OF DRILLING Dry AT END OF DRILLING Dry NOTES AFTER DRILLING - Uj ATTERBERG ~ v M wo w Z = o U_ �- Z wQ O MATERIAL DESCRIPTION w zj o&--a z F-z 0 O F= O" 0 �U oL� ad }` 0LO z �W❑ - CO�Fa p� Q 20 i aJ sZ Z 0 t7W a. U_ Brown silty clay [Fill] -with limestone gravel ST P=0.5 16 36 18 18 47 ST P=2.0 5 ST P=4.5+ i FTan ay THD T=12"/90 limestone fragments SS N=28 SS N=24 14 57 22 35 d gray shaley clay Gray limestone -with shale layers i 15 THD T=0.75"/100 AU m 20 THD T=4"1100 N P 0 � - N H Z_ - - AU a - Q 25 THD T=4.75"/100 LL z Z � J zIn ALI m W 30 THD T=2.6"/100 W Bottom of hole at 30 feet. cU FIGURE 2 Elierbee-Walczak, Inc. BORING NUMBER B-2 4501 Broadway.Avenue PAGE 1. of 1 Haltom City, Texas 76117 Telephone: 817-759-9999, Fax: 817-759-1888 CLIENT City of Fort Worth PROJECT NAME Crowley Wastewater Meter Station PROJECT NUMBER FW132748 PROJECT LOCATION Oriel Dr. Crowley TX DATE STARTED 2127113 COMPLETED 2127113 GROUND ELEVATION NIA GROUND WATER LEVELS: DRILLING METHOD Continuous Flight Auger AT TIME OF DRILLING Dry AT END OF DRILLING Dry NOTES AFTER DRILLING -- W o l ATTERBERG 1z"_01— e)nts m wo MT F- =C7 F C.ti LL_ tr w OMATERIAL DE5CRIPTION J z a w o{ x Su -3 W Oz �2 �2 U)p< 0°�FO-�� �� JJ g� z 0 Fn:�cl� d Grayish-brown silty clay [Fill] with limestone, asphalt and cement fragmST P=4.5+ I - I ST P=4.0 14 35 17 18 5 SS N=22 SS N=35 _ I SS N=14 15 51 21 30 10 Tan and gray clay -with shaley clay seams 15 Gray times'tone THD T=1.75/100 -with shale layers AU 20 THD T=1.67100 I i O { � 7 F Z - AU 25 THD T=2.1"1100 3 _ LL Z - O - { m AU z - W 30 THD T=1.4"M00 Bottom of hole at 30 feet. FIGURE 3 OIL CLASSIFICATION CHART MAJOR DIVISIONS SYMBOLS TYPICAL GRAPH I LETTER DESCRIPTIONS CLEAN ` WELL-GRADED GRAVELS,GRAVEL- SAND MIXTURES,LITTLE OR NO GRAVEL GRAVELS AND a i G FINES GRAVELLY SOILS POORLY-G(LITTLE OR NO FINES) �p0�p �'P GRAVEL-SN DEMIXTURES,SLITTLE O 0,0 C3 OR NO FINES COARSE GRAINED GRAVELS WITH ° ° SILTY GRAVELS, GRAVEL-SAND- SOILS MORE THAN 50% FINES p GM SILT MIXTURES OF COARSE o FRACTION RETAINED ON NO. 4 SIEVE (APPRECIABLE CLAYEY GRAVELS,GRAVEL-SAND- AMOUNT OF FINES) GC CLAY MIXTURES CLEAN SANDS WELL-GRADED SANDS,GRAVELLY MORE THAN 50% SAND SW SANDS,LITTLE OR NO FINES OF MATERIAL IS AND LARGER THAN SANDY NO.200 SIEVE SOILS POORLY-GRADED SANDS, SIZE (LITTLE OR NO FINES) Sp GRAVELLY SAND,LITTLE OR NO FINES SANDS WITH SILTY SANDS, SAND-SILT MORE THAN 50% FINES SM MIXTURES OF COARSE FRACTION PASSING ON NO. 4 SIEVE (APPRECIABLE CLAYEY SANDS,SAND-CLAY AMOUNT OF FINES) SC' MIXTURES INORGANIC SILTS AND VERY FINE ML SANDS,ROCK FLOUR,SILTY OR CLAYEY FINE SANDS OR CLAYEY SILTS WITH SLIGHT PLASTICITY SILTS INORGANIC CLAYS OF LOW TO FINE LIQUID LIMIT MEDIUM PLASTICITY,GRAVELLY AND GRAINED CLAYS LESS THAN 50 CL CLAYS,SANDY CLAYS,SILTY SOILS _ _ CLAYS, LEAN CLAYS OL ORGANIC SILTS AND ORGANIC — — _ SILTY CLAYS OF LOW PLASTICITY MORE THAN 50% INORGANIC SILTS,MICACEOUS OR OF MATERIAL IS MH DIATOMACEOUS FINE SAND OR SMALLER THAN SILTY SOILS NO,200 SIEVE SIZE SILTS LIQUID LIMIT INORGANIC CLAYS OF HIGH AND CLAYS GREATER THAN 50 CH PLASTICITY OH I ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY,ORGANIC SILTS �' PEAT,HUMUS,SWAMP SOILS WITH HIGHLY ORGANIC SOILS P7' HIGH ORGANIC CONTENTS NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS Figure 4 GC-4.04 Underground Facilities NONE CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 GC-4.06 Hazardous Environmental Condition at Site NONE CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 GC®6.06.D Minority Owned Business Enterprise Compliance MBE Good Faith Effort Form MBE Joint Venture Eligibility Form MBE Prime Contractor Waiver Form MBE Specifications — Special Instructions for Bidders MBE Subcontractors/Suppliers Utilization Form CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 00 45.40-1 MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL Page 1 of I 1 SECTION 00 45 40 2 MINORITY BUSINESS ENTERPRISE GOAL 3 4 APPLICATION OF POLICY 5 If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal 6 may be applicable. If the total dollar value of the contract is. $50,000 or less, the MBE 7 subcontracting goal is not applicable. A 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 11 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 12 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 13 14 MBE PROJECT GOAL 15 The_ City's MBE goal on this project is 10 % of the total bid. Note: If both MBE and SBE 16 subcontracting goals are established for this project, then an Offeror must submit both a MBE 17 Utilization Form and a SBE Utilization Form to be deemed responsive. 18 19 COMPLIANCE TO BID SPECIFICATIONS 20 On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are 21 required to comply with the intent of the City's Business Diversity Ordinance by one of the 22 following: 23 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 24 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or 25 3. Good Faith Effort documentation, or; 26 4. Waiver documentation. 27 Failure to comply-with the City's M/WBE Ordinance, shall result in the Bid being considered non- 28 responsive.Any questions,please contact the M/WBE Office at(817) 392-6104. 29 30 . SUBMITTAL OF REQUIRED DOCUMENTATION 31 The applicable documents must be received by the Managing Department, within the following 32 tlmes allocated, in order for the entire bid to be considered responsive to the specifications eke 33 £7fferox shallIrverlie iI�IB docllmentaiorl in perspn to the apprcrprrafe employee of the Managing 34 Degar�Inent and obtain a dae(tlme recelpt Such receipt shall`be eldence t11at fke C1ty zeceived the 35 ciocumentaTn in tke#1me allogated A faxed co y�vil not be accepted 1. Subcontractor Utilization Form,if goal is-met received by 5:00 p.m., five (5) City business days after or exceeded: the bid opening date,exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form,if participation is less than the bid opening date,exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form,if no MBE participation: the bid opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form,if firm will received by 5:00 p.m., five (5) City business days after perform all subcontracting/supplier work: the bid opening date, exclusive of the bid opening date. 5. Joint Venture Form,if utilizing a joint venture received by 5:00 p.m., five (5) City business days after to meet or exceed goal. the bid opening date,exclusive of the bid opening date. 36 END OF SECTION CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised December 20,2012 ATTACHMENT 1C Page 1 of 3 FoRT 'VVORTH City of Fort Worth MBE Good Faith Effort Form PRIME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: ❑ M n//DBE NON-h•/,1''WDBE 16" Meters for Crowley Wastewater Station BID DATE City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER % % 102086 If the Offeror did not meet or exceed the MBE subcontracting goal for this project, the Offeror must complete this form. If the Offeror's method of compliance with the MBE goal is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation, and it being submitted to and received by the Managing Department on or before 5:00 p.m.five(5) City business days after bid opening, exclusive of bid opening date,will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non-MBE. (DO NOT LIST NAMES OF FIRMS) On all projects, the Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Rev.5130/12 ATTACHMENT I Page 2 of 3 2.) Obtain a current (not more than two (2) months old from the bid open date) list of MBE subcontractors and/or suppliers from the City's M/WBE Office or the City's website. Yes Date of Listing No 3.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? ❑ Yes (If yes,attach MBE mail listing to include name of firm and address and a dated copy of letter mailed.) =No 4.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? _ Yes (If yes,attach list to include name of MBE firm,person contacted,phone number and date and time of contact.) F-1 No 5.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile (fax), exclusive of the day the bids are opened? -_Yes (If yes,attach list to include name of MBE firm,fax number and date and time of contact. In addition,if the fax is returned as undeliverable,then that"undeliverable confirmation"received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or"undeliverable confirmation" documentation may render the GFE non-responsive.) No 6.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? _QYes (If yes,attach email confirmation to include name of MBE firm,date and time.In addition,if an email is returned as undeliverable,then that"undeliverable message"receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or"undeliverable message"documentation may render the GFE non-responsive.) =N o NOTE The four methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Offeror must document that either at least two attempts were made using two of the four methods or that at least one successful contact was made using one of the four methods in order to be deemed responsive to the Good Faith Effort requirement. NOTE: . The Offeror must contact the entire MBE list specific to each subcontracting and- supplier opportunity to be in compliance with questions 3 through 6. 7.) Did you provide plans and specifications to potential MBEs? _❑_Yes F-1_N o 8.) Did you provide the information regarding the location of plans and specifications in order to assist the MBEs? =Yes _aN o Rev.5/30112 ATTACHMENT 1C Page 3of3 9. Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set? Yes (If yes,attach all copies of quotations.) No 10.) Was the contact information on any of the listings not valid? Yes (If yes,attach the information that was not valid in order for the WWBE Office to address the corrections needed.) _F-1 No 11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. Please use additional sheets, if necessary,and attach. Company Name Telephone Contact Person Scope of Work Reason for Rejection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MBE participation on this project. The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance shall create a material breach of Rev.5/30/12 Joint Venture Page 1 of 3 F`R T WO R T CITY OF FORT WORTH MBE Joint Venture Elip-libility Form All questions must be answered;use"N/A"if not applicable. Name of City project: 1 s"Meters for Crowley Wastewater Station A joint venture form must be completed on each project RFP/Bid/Purchasing Number: 02086 1.Joint venture information: Joint Venture Name: Joint Venture Address: { of applicable) Telephone: Facsimile: E-mail address: Cellular: Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the joint venture MBE firm Non-MBE firm name: name Business Address: Business Address: City,State,Zip: City,State,Zip: Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Certifying Agency: i - 2. Scope of work performed by the Joint Venture: Describe the scope of work of the MBE: Describe the cope of work of the non-MBE: Rev.5/30/12 Joint Venture Page 2 of 3 3.What is the percentage of MBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4. Attach a copy of the joint venture agreement. 5.List components of ownership of joint venture: (Do not complete if this information is dese4bed in joint ventiu•e agreement) Profit and loss sharing: Capital contributions,including equipment: Other applicable ownership interests: 6. Identify by name,race,sex and firm those individuals (with titles)who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating b. Marketing and Sales c. Hiring and Firing of management personnel d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Minority and Women Business Enterprise Office will review your joint venture submission and will have final approval of the MBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's M/WBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's BIDE Ordinance. Rev.5/30/12 Joint Venture Page 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore,the undersigned shall agree to provide to the joint venture the stated scope of work, decision-making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits,interviews with owners and examination of the books,records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misrepresentation of facts._ _ — j Name of MBE firm Name of non-MBE firm Printed Name of Owner Printed Name of Owner r Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Title Title Date Date 1 -Notarization l State of County of On this day of ,20 ,before me appeared and to me personally known and who,being duly sworn,did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature fCommission Expires (seal) Rev.5/30/12 ATTACHMENT1B Page 1 of 1 City of Fort Worth Prime Contractor Waiver Form PRIME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: ❑ M'iAr/DBE NON40/110IDBE 16" Meters for Crowley Wastewater Station BID DATE City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER % % 02086 If both answers to this form are YES, do not complete ATTACHMENT 1 C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO,then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Managing Department on or before 5:00 p.m., five(5) City business days after bid opening, exclusive of the bid opening date,will result in the bid being considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this NO project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) on this contract, the payment therefore and any proposed changes to the original MBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one(1)year. Authorized Signature Printed Signature Title Contact Name(if different) Company Name Phone Number Fax Number Address Email Address City/State/Zip Date Rev.5/30/12 F`CII RT O ITT H City of Fort Worth Minority Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is greater than $50,000,then a MBE subcontracting goal may be applicable. If the total dollar value of the contract is$50,000 or less, then an MBE subcontracting goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance applies to this bid. MBE PROJECT GOALS The City's MBE goal on this project is %of the total bid(Base bid applies to Parks and Community Services). Note: If both rVIBE and SSE subcontracting goals are established for this project,then an Offeror must submit both a MBE Utilization Form and a SSE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are required to comply with the intent of the City's Business Diversity Enterprise Ordinance by one-of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or; 3. Good Faith Effort documentation, or; 4. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department,within the following times allocated, in order for the entire bid to be considered responsive to the specifications. Thy Of€eror shall deliver the 1 6E documentation In person to the appropria#a employee of.tha rranagin departmAnt and obta%n a dieltrme recelpf: .Such receipt shall be evid6n.te that,the Cty received the documentation in the time allocated A faxed _copy will;not be'accepted-. - 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form,if no MBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at(817)212-2674. Rev.5/30/12 A17ACHMENT1A Page 1 of 4 FORT FORTH City of Fort Worth MBE Subcontractors/Suppliers Utilization Form ,PRIME 8 PgNY N�AMEE: Check applicable block to describe prime IMVI�CI�_ 0nllracjtln , Inc. p 9,,E_CT NAM : �/ M/4MIDBE NON-MiANDBE I meters tfor Crowley Wastewater Station BID DATE 7-10-14 City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER 10 11 02086 Identify'all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal a��r,gement with the MBE firms) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will-result in the bid being considered non-responsive to bid specifications MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Dallas, Denton, Johnson, Parker, and Wise counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, J.e., a direct payment from the prime contractor to a'subcontractor is considered 1 st tier, a payment by a subcontractor to its supplier is considered 2"0 tier - ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bondafide minority business enterprise by the North Central Texas Regional Certification Agency (NCTRCA) or other certifying agencies that the City may deem appropriate and accepted by the City of Fort Worth. If hauling services are utilized, the prime will be given credit as long as the MBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The MBE may lease trucks from another MBE firm, including MBE owner-operators, and receive full MBE credit. The MBE may lease trucks from non-MBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the MBE as outlined in the lease:agreement. Rev.5/30/12 FORTWORTH ATTACHMENT 1A --�,�,s--- Page 2 of 4 i Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. i MBE firms are to be listed first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a copy of the firm's SBE certification if they have not previously registered with the City's M/WBE Office,which may be contacted for verification. Please note that onIV certified MBEs will be counted to meet an MBE goal. Attach N NCTRCA Certificate � SUBCONTRACTOR/SUPPLIER T Detail Detail Company Name i Subcontracting Supplies Dollar Amount Address e M W S M Work Purchased Telephone/Fax r B B B B E E E E Cowtown Redimix 3401 Bethlehem Avenue Concrete $15,000 Fort Worth, TX 76111 P: 817.759.1919 F: 817.759.1716 Industry Junction, Inc. Ductile Iron $35,000 1010 Kent Brown ! rt 'r ' Piping Garland, Texas 214.680.9655 Burton Trucking PO Box 39 Rock, clay $10,000 Keller, Texas 76244 and fill 0: 817.379.1517 ❑ materials i Gray Rebar Services Structural 10916 Adiana Lane $10,000 Rebar Crowley, TX 76036 1-1 ❑ 817.999.1290 Mahole coating, $10,000 Magnum Manhole pipeline video, 428 N. 1 st Street ❑ ❑ ✓ manhole testing Garland, Texas 75040 P: 972-276-2048 Ferguson Waterworks 10077 W. University Dr. Pipe, Valves $145,000 and Manholes Mckinney, Texas 75071 ✓ T. 972.434.2600 ❑ ❑ Rev. 5/30/12 ��� ATTACHMENT1A `T Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. Please list MBE firm's first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a copy of the firms SBE certification if they have not previously registered with the City's M/WBE Office which may be contacted for verification. Please note that only certified MBEs will be counted to meet an MBE goal. Attach N NCTRCA Certificate SUBCONTRACTOR/SUPPLIER T n Detail Detail Company Name i Subcontracting Supplies Dollar Amount Address e M W S M Work Purchased Telephone/Fax r B B B B E E E E ❑ ❑ L_I ❑ ❑ ❑ Rev.5/30/12 ATTACHMENT1A FORT WORTH Page 4 of 4 Total Dollar Amount of MBE Subcontractors/Suppliers s $50,000 Total Dollar Amount of Non-MBE Subcontractors/Suppliers $175,000 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ $225,000 The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women 'Business Enterprise Office through the submittal of a Request for Approval o Change/Addition form. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further grees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and any special- with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the MBE(s) on this cohlEact, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates 'a material breach of the contract and may result in a determination of an irresponsible Offeror and debarmen rom participating in City work for a period of time not less than one (1) year. Leopoldo (Paul) Mendoza Jr, PE Authorized Signature Printed Signature President Title Contact Name/Title(if different) MELA Contracting, Inc. 972.347.5260 Corn any Name Telephone and/or Fax 436 Lakeview Road paul@melacontracting.com Address E-mail Address Rhome/TX/76078 7-15-14 City/State/Zip Date Rev.5/30/12 C-6.07 Wage Rates Mayor and Council Communication Heavy and Highway Construction Prevailing Wage Rates 2008 CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 City of Fob Worth., Texas Mayor and Council Communication COUNCIL ACTION: Approved on 718/2008 DATE: Tuesday, July 08, 2008 LOG DAME: 30WAGE RATES REFERENCE NO.: **G-16190 SUBJECT: Adopt 2008 Prevailing Wage Rates for City-Awarded Public-Works Projects RECOMMENDATION: It is recommended that the City Council adopt the attached 2008 Prevailing Wage Rates for City-awarded public works projects. DISCUSSION: Texas Government Code Chapter 2258 requires that a public body awarding a contract for public works shall determine the general prevailing rate of per diem wages for each craft or type of worker needed to execute the contract, and shall specify In the bid documents and in the contract the prevailing wage rates in that locality. Each year The Quoin Chapter of the Associated General Contractors, in conjunction with the Association of Builders and Contractors (ABC) and the American Sub-Contractors Association (ASA), conducts a wage rate survey for North Texas construction. The attached 2008 prevailing Wage Rate data was compiled from that survey, FISCAL, INFORMATIONMERTIFICATION: The Finance Director certifies that this action will have no material effect on City funds, TO Fund/Account/Centers FROM Fund/AccountfCenters Submitted for Citv Mana er`s Office b� Fernando Costa (8476) Originatin Del2artment Head: A. Douglas Rademaker(6157) Additional Information Contact: Eric Bundy (7598) GC-6.09 Permits and Utilities NONE CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 GC-6.24 Nondiscrimination NONE CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011 G -01 60 00 Product Requirements NONE CITY OF FORT WORTH 16"METERS FOR CROWLEY WASTEWATER STATION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02086 Revised July 1,2011