Loading...
HomeMy WebLinkAboutContract 52394-CO5 ATTEST: �pF°Fonr $ °° ° od CSC No. 52394-005 ° ° s. a�o °9d �a��em s.eooaan)���u,zozz n: CDT) IJ o�� Jun 21,2022 �—oo o=� FORT VVDRTH:. °°°°°°°°o°°°° aa��EXpS•oQ� City Of Fort Worth Change Order Request Facility and Project Rockwood Clubhouse and Maintenance Facility City Sec No. 52394 Description: Funding(FID)34018-0800450-5330201-101656-004980-9999-18020130 City Proj.No. 101656 No.(s) Contractor: RJMContractors,Inc. Change Order#F5 Date: 5/26/2022 City Project Mgr.I Ronnie Clements City Inspector: I Mitch Kiowski Phone Number:(817)392-8014 Phone Number: (817)392-2297 Contract Time (CD) Original Contract Amount $6,751,000.00 400 Extras to Date $165,051.37 47 Credits to Date $0.00 0 Pending Change Orders(in M&C Process) $0.00 0 Contract Cost to Date $6,916,051.37 0 Amount of Proposed Change Order $585.00 0 Revised Contract Amount $6,916,636.37 447 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $0.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.45 MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $8,438,750.00 JUSTIFICATION(REASONS)FOR CHANGE ORDER The purpose of Change Order#5 is to repair damage to the storefront brake metal and replace the L angle.This is due to a cart hitting the building.Change Orders No.1,2,3,4,&5 increases the original contract($6,751,000.00)by$165,636.37 for a revised contract amount of $6.916,636.37.A 2.45 percent increase to the original contract price.Change Order#3 was approved through M&C 21-0906. It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order. RJM Contractors Inc. I May 31,2022 Contractor's Company Name Contractor Name Contra'ctto/or Signature Date ku May 31,2022 • (,ra�� Jun 3,2022 PMD Inspector Date Architecural Services Manager Date a_td Jun 1,2022 Jun 8,2022 o ke June 202209 PMD Superintendent Date Director Property Management Department Date -1-XCA-t Jun 1,2022 s Jun 17,2022 PMD Project Manager Date Assistant City Attorney Date Jun 1,2022 Jun 17,2022 Project Architect Date Assistant City Manager Date M&C Number N/A M&C Date Approved I N/A Contras Compliance Manager: • �� OFFICIAL RECORD By signing I acknowledge that I am the person responsible /W�. for the monitoring and administration of this contract,including Brian R.Glass,AIA CITY SECRETARY ensuring all performance and reporting requirements. Architectural Services Manager June 201F FT.WORTH, TX Rockwood - Maintenance Yard 5/25/22 PCO #45 — Repair Damaged Storefront @ Main Entry Clubhouse Amax Glass $585.00 (Repair & replace damaged storefront break metal & L angle at corner of RJ M Clubhouse main entry includes new gasketing, caulk, & seal.) RJM Contractors, Inc. Subtotal $585.00 7616 Benbrook Parkway Benbrook,TX 76126 Total............................................................................................................$ 5.0 80 www.rj-mitter.com Mitch McLeod RJM Contractors, Inc. W�5' PROPOSAL 6200 Southwest Blvd., Fort Worth, TX. 76109 Office(817)732-3359 5/20/2022 JOB: ROCKWOOD GOLF COURSE PRODUCT: Break Metal&L Angle GLASS: N/A MIRRORS: N/A FRAME: N/A Ajax Glass&Mirror proposes to furnish and install (unless otherwise noted)the following: 1. Remove existing Damaged Break Metal& L Angle, Replace. 2. Run Rubber caulk and or seal. 3. Verify Installed Properly We propose hereby to furnish material and labor, complete in accordance with above specifications, for the sum of: $ 585.00 All material is guaranteed to be as specked.All work to be completed in a workmanlike manner according practices.Any alteration or deviation from the above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate.All agreements are contingent upon strikes,accidents or delays beyond our control.Owner is to carry fire,tornado and other necessary insurance.Our workers are fully covered by workman's compensation insurance. PREPARED BY: NOTE:THIS PROPOSAL MAY BE WITHDRAWN BY US IF NOT ACCEPTED WITHIN 60 DAYS. EXCLUSIONS:ENGINEERING,CALCULATIONS,SHOP DRAWINGS BY STOREFRONT MFG.,MASONRY,STEEL, WOOD BLOCKING,BREAK METAL NOT LISTED ABOVE,FLASHING OTHER THAN STD.UNLESS LISTED ABOVE. PROTECTION OF STOREFRONT,FINAL CLEANING.