HomeMy WebLinkAboutContract 55586-FP2 City Secretary 55586 -FP2 Contract No. FORTWORTH, Date Received Jun23,2022 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Copper Creek Phase 4.2 City Project No.: 102886 Improvement Type(s): Water X Sewer ❑X Original Contract Price; $369,177.50 ;Amount of Approved Change Order(s); Revised Contract Amount; Total Cost of Work Complete; $369,177.50 76e��i r OD(Jun 21,202213:53 CDT) Jun 21, 2022 Contractor Date PROJECT MANAGER Title CONATSER CONSTRUCTION TX, L.P. Company Name Jun 21, 2022 Project Inspector Date ';;trick tey(hn 2,2022 09:16 CDT) Jun 22, 2022 Project Manager Date �79/1ie Sa 9Ze 1 OM10t Jun 22 2022 e 5carlett Morales Jun 22 202217:39 CDC CFA Manager Date 'Dana Burghdof 22,20 19:19 CDT) Jun 22, 2022 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Copper Creek Phase 4.2 City Project No.: 102886 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑ Yes ❑x N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 100 WD Days Charged: 225 Work Start Date: 6/3/2021 Work Complete Date: 6/16/2022 Completed number of Soil Lab Test: 231 Completed number of Water Test: 18 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name COPPER CREEK PHASE 4.2 Contract Limits Project Type WATER&SEWER City Project Numbers 102886 DOE Number 2886 Estimate Number I Payment Number I For Period Ending 6/30/2022 WD City Secretary Contract Number Contract Time IOWD Contract Date 1/26/2021 Days Charged to Date 225 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors CORDOVA,R / JACKSON,K Tuesday,June 21,2022 Page 1 of 4 City Project Numbers 102886 DOE Number 2886 Contract Name COPPER CREEK PHASE 4.2 Estimate Number l Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 6/30/2022 Project Funding WATER FACILITEIS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------- -------- ------------ 1 8"PVC WATER PIPE 2035 LF $36.00 $73,260.00 2035 $73,260.00 2 6"PVC WATER PIPE 19 LF $33.50 $636.50 19 $636.50 3 8"GATE VALVE&VALVE BOX 2 EA $1,300.00 $2,600.00 2 $2,600.00 4 STD.FIRE HYDRANT ASSEMBLY W/6"GATE 2 EA $4,500.00 $9,000.00 2 $9,000.00 VALVE&VALVE BOX 5 DUCTILE IRON WATER FITTINGS 0.5 TN $5,000.00 $2,500.00 0.5 $2,500.00 W/RESTRAINT 6 TRENCH SAFETY 2054 LF $1.00 $2,054.00 2054 $2,054.00 7 1"DOMESTIC WATER SERVICES 63 EA $1,000.00 $63,000.00 63 $63,000.00 8 CONNECT TO EXISTING 8"W.L.STUB-OUT 5 EA $1,000.00 $5,000.00 5 $5,000.00 9 WATER TEST 2054 LF $1.00 $2,054.00 2054 $2,054.00 -------------------------------------- Sub-Total of Previous Unit $160,104.50 $160,104.50 SEWER FACILITIES Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ---------------------------------- 10 8"SDR-28 PVC SEWER PIPE 1792 LF $45.00 $80,640.00 1792 $80,640.00 11 CONNECT TO EXISTING 8"S.S.STUB-OUT 4 EA $1,000.00 $4,000.00 4 $4,000.00 12 SDR-26 4"SEWER SERVICES 50 EA $675.00 $33,750.00 50 $33,750.00 13 4'STD DIA.S.S.MANHOLE 17 EA $4,200.00 $71,400.00 17 $71,400.00 14 EXTRA DEPTH FOR 4'STD.DIA.MANHOLE 29 VF $185.00 $5,365.00 29 $5,365.00 15 8"PVC SEWER PIPE W/CSS BACKFILLL 100 LF $55.00 $5,500.00 100 $5,500.00 16 TRENCH WATER STOP 5 EA $250.00 $1,250.00 5 $1,250.00 17 TRENCH SAFETY 1792 LF $1.00 $1,792.00 1792 $1,792.00 18 POST-CCTV INSPECTION 1792 LF $3.00 $5,376.00 1792 $5,376.00 -------------------------------------- Sub-Total of Previous Unit $209,073.00 $209,073.00 -------------------------------------- Tuesday,June 21,2022 Page 2 of 4 City Project Numbers 102886 DOG Number 2886 Contract Name COPPER CREEK PHASE 4.2 Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 6/30/2022 Project Funding Contract Information Summary Original Contract Amount $369,177.50 Change Orders Total Contract Price $369,177.50 Total Cost of Work Completed $369,177.50 Less %Retained $0.00 Net Earned $369,177.50 Earned This Period $369,177.50 Retainage This Period $0.00 Less Liquidated Damages Days @ /Day $0.00 LessPavenient Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $369,177.50 Tuesday,June 21,2022 Page 3 of City Project Numbers 102886 DOE Number 2886 Contract Name COPPER CREEK PHASE 4.2 Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 6/30/2022 Project Funding Project Manager NA City Secretary Contract Number Inspectors CORDOVA,R / JACKSON,K Contract Date 1/26/2021 Contractor CONATSER CONSTRUCTION T•_LP Contract Time 100 WD 5327 WICHITA ST Days Charged to Date 225 WD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $369,177.50 Less %Retained $0.00 Net Earned $369,177.50 Earned This Period $369,177.50 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $369,177.50 Tuesday,June 21,2022 Page 4 of 4 FORTWORTH TRANSPORTATION AND PUBLIC WORDS PIPE REPORT FOR: PROJECT NAME: Copper Creek phase 4.2 CITY PROJECT NUMBER: 102886 WATER PIPE LAID SIZE TYPE OF PIPE LF 8" C-900 8" PVC 2035 FIRE HYDRANTS: 2 VALVES(16" OR LARGER) N/A PIPE ABANDONED SIZE TYPE OF PIPE LF NONE DENSITIES: YES NEW SERVICES: 1" Copper 63 EA SEWER PIPE LAID SIZE TYPE OF PIPE LF 8" SDR-26 8" PVC 1792 PIPE ABANDONED SIZE TYPE OF PIPE LF NONE DENSITIES: YES NEW SERVICES: 4" SDR-26 PVC 50 EA TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throck morton Street•Fort Worth,T176012-6311 (817)392-7941 •Fax:(817)392-7845 FORT WORTH. TRANSPORTATION AND PUBLIC WORKS June 16, 2022 Conatser Construction 5327 Wichita St. Forest Hill TX.76119 RE: Acceptance Letter Project Name:Copper Creek 4.2 Project Type: Water,Sewer City Project No.: 102886 To Whom It May Concern: On June 16, 2022 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on June 16, 2022, which is the date of the final inspection and will extend of two (2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at: 817-392-2443. SinnceLrelly,, _l ,A,�� Patrick Buckley, Project Manager Cc: Kevin Jackson, Inspector Ron Cordova, Inspection Supervisor Gary Deyon,Senior Inspector Victor Tornero, Program Manager Goodwin & Marshall Inc., Consultant Conatser Construction, Contractor Copper Creek 232 Holdings LP, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev.08/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority,a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX. LP,known to me to be a credible person,who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth,has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: COPPER CREEK PH. 4.2 WATER, SANITARY SEWER, STORM DRAIN, & PAVING IMPROVEMENTS DOE#: N/A CFA PRJ#: 20-0132 CITY PROJCT #: 102886 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP d4"J&A-- Brock Huggins Subscribed and sworn to before me this 261h day of May, 2022 '�'-` NotaryPublic in Tarrant County, Texas vy'Ka. - i,,RINEROSE inn; N�3'IHRY PUBLIC s*e k: ION 133467933 q' Py. CommEif11302025 YYW ,CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT SURETY CONTRACTOR Conforms with the American Institute of OTHER Architects, AIA Document G707 Bond No 0235125 PROJECT: (name, address)Copper Creek Phase 4.2 Fort Worth,TX TO (Owner) COPPER CREEK PARTNERS, LP AND CITY OF FT -I ARCHITECT'S PROJECT NO: CFA No.20-0132 WORTH CONTRACT FOR: 5055 Keller Springs Rd.,Suite 500 Water,Sanitary Sewer,and Paving Improvements for Copper Creek Phase 4.2 Addison TX 75001 J CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 476 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P, 5327 Wichita St. Fort Worth TX 76119-6035 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here Insert name and address of Owner) COPPER CREEK PARTNERS, LP AND CITY OF FT.WORTH 5055 Keller Springs Rd., Suite 500 Addison TX 75001 , OWNER, as set forth in the said Surety Company's bond. IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 24th day of May,2022 BERKLEY INSURANCE COMPANY Surety Company Attest: (Seal):`-lze_ �C — Signature of Authorized Representative Robbi Morales Attorney-in-Fact Title NOTE: This form Is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No.BI-7280k POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE:- The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. v KNOW ALL MEN BY THESE PRESENTS,that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and.existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made;:constituted a • and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna;Don.E Cornell,Sophinie Hunter; Robbi Morales; Kelly A. Westbrook; Thus MCEwalt; Joshua Saundees; Tonie Petvnek; or Mikaela Peppers of Aon Risk Services Southwest, Inc. of Dallas; TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds 'and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/1.00 U.S. Dollars(U.S.S50,000,000.00),to the Ln = same.extent as if such bonds had been duly executed and.acknowledged by the regularly elected officers.of the Company at its a � principal office in.their own proper-persons.. c W � H o > This Power of Attorney shall be construed and enforced in accordance with,and governed by, the laws of the State of Delaware, > without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following o resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January.25,2010: a� C RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief .Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant o Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney in-fact named therein to execute bonds, undertakings,recognizances, or other suretyship obligations on behalf of the Company, and to affix the o� c corporate seal of the Company to powers of attorney executed pursuant hereto, and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED, that such power of attorney limits the acts of.those named therein to the bonds,undertakings, recognizances, b or other suretyship obligations specifically narned therein, and they have no authority to bind the Company except in the Q b manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and O bo further RESOLVED, that the signature of any authorized officer and the seal of the Company-may be affixed by facsimile to any 3 power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking,recognizance, or other suretyship obligation of the Company;and such signature and seal when so used shall have the,same force and effect as •G though.manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any n E person or person's who shall have been such officer or officers of the Company,notwithstanding the fact that they may have b ceased to be such at the time when such instruments shall be issued. � a o IN WITNTFSS ATIEREOF; the Company has caused these presents to,be signed and'attested lay its appropriate officers ditd its o corporate seal hereunto affixed this r�day of a0 . -fl Attest .• Bcrkl Insurance Company a� (Seat)0 )3y By U.. n, •✓ o IraK Kede6an. J-e after• o Executive Vice President&Secretary. 4.:Se i �ce: resideatt o WARNING:TI US POWER IN'VALYD 71rNOT FMTED ON 10LUE Y"SECURITY PAPEI.i. sz STATE OF CONNECTICUT) o ) ss: COUNTY OF-FAIRM.T,ri ) 0 Swom to before nee, a Notary Public:in the State-of Connecticut;this 1t+"%day of MCL, . .10a,�L,by Im S. Lederman and Jaffrey M. Haftex who are swom to me to`be the.Executive Vice President a Secretary,. and Scuior Vice.President, respectively,-ofBerkleylnsurance:Compapy. t�NaTRIAnra Nini'I cu t;ONNEbylcur. C wC0Mk9SSi0N EXPIRES o nt�utao,zna4 titer}­:I'iiblic,State ofConnechetrt z CERTMI.CATE z ' T,the undersi?ned;:AssisMtlt S;ecretnry'of BE1t1CLEY INSURANCE COMi'ANY,DD:EEIfEBY CERTIFY that the foregoing is a a trot,correct and complete copy of the.ongmal:Power of Attorney,that said Power of Attorney has not t en revoked.or rescinded 3 and that the authority of the Attorney in T'act:set forth therein, w)kbaeaecuted the bond or u�ertaldng to whiel.this'Power of Attorney is attached is.in fillfordt;and effect as of this date. Given under my band and seal of the Gompait};this 2 4 th day of Ma 2022 (Seal) _ 'VincentF.Forte AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority,a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX. LP,known to me to be a credible person,who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth,has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: COPPER CREEK PH. 4.2 WATER, SANITARY SEWER, STORM DRAIN, & PAVING IMPROVEMENTS DOE#: N/A CFA PRJ#: 20-0132 CITY PROJCT #: 102886 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP Brock Huggins Subscribed and sworn to before me this 26th day of May, 2022 RtW--.-j u- Notary Public in Tarrant County, Texas 1�P;'Pfi�•, +ri1 i,AWINE ROSE inn'; N:31fiRY PUBLIC +' *: ION 133467933 ''•'?.......P� [AM EV State f 11 30 2025 tYvv CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 0235125 PROJECT: (name, addreSS)Copper Creek Phase 4.2 Fort Worth,TX TO (Owner) COPPER CREEK PARTNERS,LP AND CITY OF FT ARCHITECT'S PROJECT NO: CFA No.20-0132 WORTH CONTRACT FOR: 5056 Keller Springs Rd.,Suite 500 Water,Sanitary Sewer,and Paving Improvements for Copper Creek Phase 4.2 Addison Tx 75001 J CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here Insert name and address of Owner) COPPER CREEK PARTNERS, LP AND CITY OF FT.WORTH 5055 Keller Springs Rd., Suite 500 Addison TX 75001 , OWNER, as set forth in the said Surety Company's bond. IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 24th day of May,2022 BERKLEY INSURANCE COMPANY Surety Company Attest: (Seal): Signature of Authorized Representative Robbi Morales Attorney-in-Fact Title NOTE; This form Is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No.BI-7280k POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE:- The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. v Cd KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly x organized and.existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made;:constituted a and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna,Don E Cornell,Sophinie Hunter; Robbi Morales, Kelly A. Westbrook, Tura McEwan; Joshua Saunders; Tonle Pettdnek; or Mikaela Peppers of Aou Risk ;? Services Southwest, Inc. of Dallas; TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds 'and undertakings, with the exception of Financial Guaranty " Insurance, providing that no single obligation shall exceed Fifty Million and 00/1.00 U.S. Dollars (U.S.$50,000,000.00),to the Z same extent as if such bonds had been duly executed and.acknowledged by the regularly elected officers.of the Company at its principal office in their own proper•persons., a a, oThis Power of Attorney shall be construed and enforced in accordance with,and governed by, the laws of the State of Delaware, > without giving effect to the principles of conflicts of laws thereof. This Power of.Attorney is granted pursuant to the following 0 resolutions which were dilly and validly adopted at a rneeting of the Board of Directors of the Company held on January.25,20I0: a RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief a Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant o b Secretary' are hereby authorized to execute powers of attorney authorizing and qualifying.the attorney-in-fact named therein 3 .a to execute bonds, undertakings,recognizance.s, or other suretyship obligations on behalf of the Company, and to affix the o� c corporate seal of the Company to powers of attorney executed pursuant hereto.; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds,undertakings,recognizances, -6 IVor other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated;and further b 9 RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and o b further a ' RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any 3 power of attorney or certification thereof authorizing the execution and delivery of any bond, undettaking,recognizance, or other suretyship obligation of the Company;and such signature and seal when so used shall have the,same force and effect as C though.manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any n E person or persons who shall have been such officer or officers of the Company; notwithstanding the fact that they may have b ceased to be such at the time when such instruments shall be issued. o0 IN WITNTI✓SS VLR RIA1~; the Company has caused these presents to,be signed and'attested by its appropriate officers vhd its o° corporate seal hereunto.af>"ixed-this��'day of Attest: .• Bcrkl rnsurarice Company o b (Seal) Ey By �,�. .✓ !; o N edeit»aa. Je after o E+tecutivo Vice President&Secretary `.:Se i ` 1�lce: resident WARNING;TIUS-PO VER NVALYD SNOT F1WgTED ONtLUE g Y"SECURITY PAPE..1t. 2 STATE OF CONNECTICUT) o COUNTY OF VAT1i. tl) ) o � s Sworn,to before me, a Notary Public.in the State-of Connecticut; this lit day of Mr a0a.Zt-,by Ira.S. Lederman and lefticy M. Hafter who are worn to aie to'be fhe.Executive Vice President Secretary, and $cuior Vice-President, N respectively;-of'Berldeyfnsurance.cbm aany. 61na1acaunlnagx NaTAHY.-PUN IG CONHECTICUT r~ MYCCMhVSSfON EXPIRES I o ntauta0,am lotary Publici State of Connecticut Z CERTMI<CATE z J,the undersigned,:Assistant Secretary'ofBL1tKALEY 30SURANCE COW.ANY,DD:HEREBYCE3z;TIFY that the foregoing is a e� true, correct and complete copy of the.ongmal.Power of Attorney;that said Power of Attorney has not beenrevoked or rescinded and that the authority ol=the Attorney in F6ct;set.,forth therein, wlio%exeeuted the bond or undertaking to which.this Power of Attorney is attached,is,iin full force:and-ef ect as of this-date. Given under zny hand and seal of Cite Cornpany,this 2 4 th day of Ma / 2022 (Seal) 'Vincent F.Torte