HomeMy WebLinkAboutContract 53640-CO1 CSC No. 53640-001 FORT WORTH. City of Fort Worth Change Order Request Project Name W Felix St Bridge Deck and Pavement Rehabilitation City Sec# 53640 Client Project#(s) 101385 Project Description Bridge Deck replacement and approach roadway rehabilitation Contracto Rebcon,Inc. Change Order# 1 Date 6/15/2022 City Project Mgr. Tariqul Islam City Inspector Contract Time Dept. Ti Contract (CD) Original Contract Amount $3,989,272.40 $3,989,272.40 548 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $3,989,272.40 $3,989,272.40 548 Amount of Proposed Change Order $632,495.57 $632,495.57 Revised Contract Amount $4,621,767.97 $4,621,767.97 548 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $632,495.57 $632,495.57 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 15.85% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,986,590.50 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order is to add$632,495.57 to City Secretary Contract#53640 with revised contract amount$4,621,767.97. After awarding the contract Union Pacific Railroad(UPRR)had a long delay to issue permit to start construction.As a result contractor requested adjusted bid price for increased material cost,labor and operating expenses. The M&C approval(22-0428,dated 6/14/2022)for this change order and contractor's quote are attached herewith. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor(Name) Contract Signature Date Rebcon,Inc Danny Krieg DK Jun 20,2022 Inspector/Inspection Supervisor Project and Contract Compliance Manager Date Jun 21,2022 Program Manager Date Senior Capital Project Officer Date Jun 21,2022 anezQ�Ae Jun 21,2022 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date Lce�621a.'- Jun 22,2022 Jun 23,2022 Date Assistant City Manager Date Jun 24,2022 .4rl g'A°"d°� Jun 27,2022 � ion Council Action(if required) �d4wUpn ^"&C Number 22-0428 M&C Date Approved 6/14/2022 ATTEST: oA�FOR)'Quad ,7ahhPttP C Gaa�'all y 0 o0o T 0 0 0 Jannette Goodall,City Secretary 0. . 0. OFFICIAL RECORD o ooz o *d CITY SECRETARY 000 o cY aaatlTE000000 FT.WORTH, TX nbanvoo. FORTWORTH City of Fort Worth v---- Change Order Additions Project Name W Felix St Bridge Deck and Pavement Rehabilitation City Sec# 53640 Client Project# 101385 Contractor Rebcon,Inc. PM Tanqul Islam Inspector Change Order Submittal# O1 Date 6/15/2022 ADDITIONS ITEM DESCRIPTION DEPT City Unit Unit Cost Total Construction Staking 3 0241.0100 Remove Sidewalk TPW 2,318.00000000 SF $4.00 Remove Conc Pvmt TPW 3,960.00000000 SY 5 0241.1100 Remove Asphalt Pvmt TPW 3,627.00000000 SY $5.50 "Surface Milling TPW 265.00000000 SY 7 3110.0101 Site Clearing TPW 1.00000000 LS $153,910.00 77 Unclassified Excavation by Plan TPW 162.00000000 CY 9 3124.0101 Embankment by Plan TPW 123.00000000 CY $38.00 3125.0101 SWPPP>!1 acre TPW 1.00000000 LS 11 3211.0400 Hydrated Lime TPW 74.00000000 TN $212.00 "Lime Treatment TPW 4,454.00000000 SY 13 3212.0302 2"Asphalt Pvmt Type D TPW 82.00000000 SY $260.00 "Conc Pvmt TPW 3,968.00000000 SY 15 3213.0301 4"Conc Sidewalk TPW 158.00000000 SF $11.00 3213.0311 "Conc Sidewalk,Adjacent to Curb TPW SF 17 3217.0002 4"SLID Pvmt Marking HAS(Y) TPW 9,464.00000000 LF $1.50 "BRK Pvmt Marking HAS(W) TPW 1,6b8.00000000 LF 19 3217.0201 8"SLID Pvmt Marking HAS(W) TPW 450.00000000 LF $3.20 "SLD Pvmt Marking HAE(W) TPW 60.00000000 LF 21 3217.1002 Lane Legend Arrow TPW 4.00000000 EA $170.00 REFL Raised MarkerTY I-C TPW 176.00000000 EA 23 3217.2103 REFL Raised Marker TY II-A-A TPW 151.00000000 EA $6.00 A Raised Marker,Work Zone TPW 9,240.00000000 EA 26 3217.4306 Remove 24"Pvmt Marking TPW 60.00000000 LF $3.30 777707 Remove Raised Marker TPW l,b44.UUUUUUUU EA 28 3291.0100 Topsoil TPW 68.00000000 CY $101.00 3292.0100 Block Sod Placement TPW SY 30 3441.1409 NO8 Insulated ElecCondr TPW 3,820.00000000 LF $2.50 NO 8 Bare ElecCondr TPW 1,910.00000000 LF 32 3441.3002 Rdwy Ilium AssmblyTY 8,11,D-25,and D-30 TPW 4.00000000 EA $4,300.00 Rdwy Ilium Foundation TY 1,2,and 4 TPW 4.00000000 EA 34 3441.3501 Salvage Street Light Pale TPW 8.00000000 EA $1,450.00 Traffic Control TPW 18.0oilooiloo MO 36 3471.0002 Portable Message Sign TPW 104.00000000 WK $350.00 Construction Allowance TPW 1.00000000 EA 39 9999.0002 Misc.Utility Relocation/Adjustments TPW 1.00000000 EA $20,000.05 A Railroad Coordination Relocation/Adjustments TPW 1.00000000 LS 39B 9999.0003 Railroad Flagman Allowance TPW 1.00000000 LS $186,000.00 REMOVING CONC(RIPRAP) TPW 2t.uuuuuuuu SY 41 REMOVING CONC(APPR SLAB) TPW 124.00000000 SY $80.00 CEM STABIL BKFL TPW 150.00000000 CY 43 REIN CONC SLAB(HPC) TPW 22,908.00000000 SF $46.50 BRIDGE SIDEWALK(HPC) TPW 3,093.00000000 SF TTM 45 APPROACH SLAB(HPC) TPW 152.00000000 CY $1,325.00 CONC STIR REPR(REMOV AND REPL BACKWALL) TPW 4.00000000 CY 47 RIPRAP(CONC)(CL B)(RR8&RR9) TPW 10.00000000 CY $1,350.00 STIR STEEL(SHEAR CONNECTOR) TPW 13,434.00000000 LB 49 CLEAN&PAINT EXIST STIR(SYSTEM 11) TPW 1.00000000 LS $450,000.00 50 RAIL(TY C )(HPC) TPW 71 LF 51 SEALED EXPANSION JOINT(41N)(SEJ-A) TPW 183.00000000 LF $262.00 REMOV STIR(BRIDGE SLAB) TPW 1.00000000 EA 52A PORT CTB(FUR&INST)(F-SHAPE)(TY 1) TPW 2,220.00000000 LF $45.00 B PORT CTB(MOVE)(F-SHAPE)(TY ) TPW LF 52C PORT CTB(REMOVE)(F-SHAPE)(TY 1) TPW 2,220.00000000 LF $20.00 =- -757[l CRASH CUSH ATTEN(INSTL)(L)(N)(TL) TPW 4.00000000 EA 52E CRASH CUSH ATTEN(MOVE&RESET) TPW 4.00000000 EA $2,400.00 F CRASH CUSH ATTEN(REMOVE) TPW EA 53 CHAIN LINK FENCE(INSTALL)(8') TPW 106.00000000 LF $230.05 REPAIR/REPLACE STL BRIDGE MEMBERS TPW tu.1010101010101010 LF 54A CHAIN LINK FENCE(REMOVE) TPW 200.00000000 LF $4.00 B CHAIN LINK FENCE(INSTALL) TPW 200.00000000 LF TPW S4,621,767.97 Sub Total Additions S4.621.767.97 Change Order Additions Page 2 of4 FORH City of Fort Worth Change Order Deletions Project Name W Felix St Bridge Deck and Pavement Rehabilitation City Sec# 53640 Client Project# 101385 Contractor Reboon,Inc. PM Tani Islam Inspector Change Order Submittal# O1 Date 6/15/2022 DELETIONS y Unit Unit Cost I ota onstruction Staking Remove Sidewalk TPW SF Remove Conic Pvmt TPW SY Remove Asphalt Pvmt TPW SY "Surface Milling TPW SY Site Clearing TPW LS Uncassirfied Excavation by Plan TPW 162.00000000 CY Embankment by Plan TPW TTJ7=—Cy 3125.0101 SWPPP>!1 acre TPW LS Hydrated Lime TPW TN "Lime Treatment TPW SY "Asphalt Pvmt Type D TPW 82.00000000 SY "Conc Pvmt TPW SY "Conic Sidewalk TPW 158.00000000 SF "Conc Sidewalk,Adjacent to Curb TPW SF "SLD Pvmt Marking HAS(Y) TPW 9,464.00000000 LF "BRK Pvmt Marking HAS(W) TPW LF 3217.0201 "SLID Pvmt Marking HAS(W) TPW LF 777577277113 1 Marking HAE(W) TPW LF Lane Legend Arrow TPW 4.00000000 EA REFL Raised Marker TY I-C TPW 176.00000000 EA REFL Raised Marker TY II-A-A TPW EA A 3217.3001 Raised Marker,Work Zone TPW EA 3217.4306 Remove "Pvmt Marking TPW TnM= LF Remove Raised Marker TPW EA 3291.0100 Topsoil TPW —Cy 3292.0100 Block Sod Placement TPW Turz= SY NO 8 Insulated Elec Condr TPW 3,820.00000000 LF NO 8 Bare ElecCondr TPW LF Rdwy Ilium Assmbly TY 8,1 1,D-25,and D-30 TPW EA Rdwy Ilium Foundation TY 1,2,and 4 TPW 7TT= EA Salvage Street Light Pole TPW 8.0iloil0000 EA Traffic Control TPW 18.00000000 MO 3471.0002 Portable Message Sign TPW TUTU= WK Construction Allowance TPW 1.00000000 EA Misc.Utility Relocation/Adjustments TPW EA A Railroad Coordination Relocation/Adjustments TPW 1.00000000—ES B 79997TRailroad Flagman Allowance TPW Toomiloo—Ls REMOVING CONC(RIPRAP) TPW SY REMOVING CONC(APPR SLAB) TPW SY CEM STABIL BKFL TPW —Cy 43 REIN CONC SLAB(HPC) TPW 22,908.00000000 SF BRIDGE SIDEWALK(HPC) TPW SF APPROACH SLAB(HPC) TPW TnTM= CY 47—CONC STIR REPR(REMOV AND REPL BAXNALL) TPW —Cy RIPRAP(CONC)(CL B)(RR&RR) TPW CY 48 STIR STEEL(SHEAR CONNECTOR) TPW LB CLEAN&PAINT EXIST STIR(SYSTEM II) TPW LS RAIL(TY C )(HPC) TPW 765.00000000 LF SEALED EXPANSION JOINT(4 IN)(SEJ-A) TPW 7717= LF REMOV STIR(BRIDGE SLAB) TPW EA A PORT CTB(FUR&INST)(F-SHAPE)(TY ) TPW LF B PORT CTB(MOVE)(F-SHAPE)(TY ) TPW LF C PORT CTB(REMOVE)(F-SHAPE)(TY ) TPW LF D CRASH CUSH ATTEN(INSTL)(L)(N)(TL) TPW EA E CRASH CUSH ATTEN(MOVE&RESET) TPW 4.00000000 EA F CRASH CUSH ATTEN(REMOVE) TPW EA CHAIN LINK FENCE(INSTALL)(') TPW TIMM= LF REPAIR/REPLACE STL BRIDGE MEMBERS TPW == LF A CHAIN LINK FENCE(REMOVE) TPW 7TT= LF B CHAIN LINK FENCE(INSTALL) TPW LF TPW $3,989,272.40 Sub Total Deletions S . Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total 1 $0.00 Official site of the City of Fort worth,Texas CITY COUNCIL AGENDA FORTH Create New From This M&C DATE: 6/14/2022 REFERENCE**M&C 22-LOG NAME: 20W.FELIX ST BRIDGE AND NO.: 0428 PAVEMENT REHAB C01 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 9)Authorize Execution of Change Order No. 1 in the Amount of$632,495.57 to the Contract with Rebcon Inc.,for West Felix Street Bridge Deck and Pavement Rehabilitation for a Revised Contract Amount of$4,621,767.97,Adopt Appropriation Ordinance,and Amend the Fiscal Years 2022-2026 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Change Order No. 1 in the amount of$632,495.57 to City Secretary Contract No. 53640 with Rebcon Inc.,for West Felix Street Bridge deck and pavement rehabilitation for a revised contract amount of$4,621,767.97; 2. Adopt the attached appropriation ordinance adjusting estimated appropriations in the 2014 Bond Program Fund in the amount of $700,000.00 by increasing appropriations in the West Felix Street Bridge Improvement Project(City Project No. 101385) and decreasing estimated appropriations in the 34014 Appropriation Only project(City Project No. U34014) by the same amount,, and 3. Amend the Fiscal Years 2022-2026 Capital Improvement Program. DISCUSSION: On January 14,2020, Mayor and Council Communication(M&C)20-0020 awarded City Secretary Contract No.53640 in the amount of $3,989,272.40 to Rebcon, Inc.,for West Felix Street Bridge Deck and Pavement Rehabilitation Project(City Project No. 101385).The project is performing bridge maintenance over an existing railroad.After award and for at least 18 months the UPRR would not honor the city's rights under its construction and maintenance agreement which prevented the contractor from getting started. In February 2022 UPRR relented and allowed work to begin. Since the project was on hold,the market has seen unprecedented increases in the cost of materials, labor and operating expenses.As a result,the contractor has requested adjusted bid prices reflected in the proposed change order.As a general rule,staff denies price increase requests, however,this is a unique situation not created by the contractor.This M&C is to authorize execution of Change Order No. 1 with Rebcon, Inc.in the amount of$632,495.57 for a revised contract amount of$4,621,767.97. In addition$67,504.00 will be needed for additional contingencies.Residual 2014 Bond Program funding from the completed Chapel Creek Bridge Project is being used to fund the change order for the West Felix Street Bridge Improvement Project. Funding for the West Felix Street Bridge Deck and Pavement Rehabilitation is summarized in the table below: F Fund Existing Funding Additional Funding Project Total 34014-2014 Bond Program Fund $392,000.00 $700,000.00 $1,092.000.00 34018-2018 Bond Program Fund $4,508,000.001 $0 F $4,508,000.00 Project Toital $4,900,000.00 $700,000.00 $5,600,000.00 Funding is available for appropriation in the 34014 Appropriation Only project in the 2014 Bond Program Fund for the purpose of funding the West Felix Street Bridge Improvement project?.?Approximately$1,116,902.00 is available and the?adoption of this$700,000.00 appropriation ordinance will reduce the available amount to$416,902.00. Funding for this project was not included in the Fiscal Years 2022-2026 Capital Improvement Program(CIP)due to charges being incurred after the CIP was adopted.This action in this M&C will amend the Fiscal Years 2022-2026 Capital Improvement Program as approved in connection with Ordinance 25073-09-2021. M/WBE OFFICE:Rebcon, Inc.agrees to maintain its initial M/WBE commitment of 11\%made on the original agreement and extends and maintains that same M/WBE commitment of 11\%to this amendment. Therefore,Rebcon, Inc. remains in compliance with the City's MMBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of the company. The project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are currently available in the FUND 34014 APPROP ONLY project within the 2014 Bond Program Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance,funds will be available in the 2014 Bond Program Fund for the?W. Felix St Bridge Improvement project to support the approval of the above recommendations and execution of the change order. Prior to an expenditure being incurred,the Transportation and Public Works department has the responsibility of verifying the availability of funds. TO Fund Department Account Project Program Activity Budget I Reference# I Amount ID I I ID I I I Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget I Reference# Amount ID ID Year Chartfield 2 Submitted for City Manager's Office by_ Dana Burghdoff(8018) Originating Department Head: William Johnson(7801) Additional Information Contact: Monty Hall(8662) ATTACHMENTS 101385 Project Budget.GlF (CFW Intemal) 20W.FELIX ST BRIDGE AND PAVEMENT REHAB C01.docx (CFW Intemal) 20W.FELIX ST BRIDGE AND PAVEMENT REHAB C01 34014 AO22(r4).docx (Public) Form 1295 C01 (1).pdf (CFW Intemal) Map W.Felix St Bridge and Pavement Rehab.pdf (Public) MWBE Commitment Form Revised CPN101385 Signed GV 5.9.22.pdf (CFW Intemal) Project Budget Summarypdf (CFW Intemal) SAM 101385 Rebcon,Inc..pdf (CFW Intemal) W FELIX FID TABLEALSX (CFW Intemal) REBICON, INC. 6-15-2022 Mr.Tariqul Islam TPW/Street Services 5001 James Avenue Fort Worth,Texas 76115 RE:W Felix Street Bridge Deck and Pavement Rehabilitation City Project No. 101385 Mr. Islam, Major cost increases for the Felix Bridge Repair Project are below: REBCON BID CHANGE LOG 4/28/2022 Oeerhead Original Qty Unit Original Bid Cost Total Reused Qty Unit Reused Cost Total Total Cost Increase PM Months 10.00 MO $8,460.00 $84,600.00 13.00 MO $10,150.00 $131,950.00 $47,350.00 Superintendent 3.32 MO $7,160.00 $23,771.20 4.32 MO $8,850.00 $38,232.00 $14,460.80 Van Cost Increase 1.00 LS $10,000.00 $10,000.00 1.00 LS $15,374.33 $15,374.33 $5,374.33 Tolls 1.00 LS $6,649.00 $6,649.00 1.00 LS $9,973.00 $9,973.00 $3,324.00 Bond 1.00 LS $38,832.75 $38,832.75 1.00 LS $43,221.00 $43,221.00 $4,388.25 Fuel 1.00 LS $66,486.49 $66,486.49 1.00 LS $73.135.14 $73,135.14 $6,648.65 Staging Area 18.00 MO $1,500.00 $27,000.00 18.00 MO $2,000.00 $36,000.00 $9,000.00 Staking 1.00 LS $60,000.00 $60,000.00 1.00 LS $68,400.00 $68,400.00 $8,400.00 Total $98,946.03 Cost Matrix Labor 1.00 LS $826,784.93 $826,784.93 1.00 LS $920,246.20 $920,246.20 $93,461.27 Trucking/Hauling 1.00 LS $71,677.06 $71,677.06 1.00 LS $83,266.85 $83,266.85 $11,589.79 Equipment Rent 1.00 LS $173,087.92 $173,087.92 1.00 LS $200,730.00 $200,730.00 $27,642.08 Total $132,693.14 Misc.Material Increases Lumber for Forms/Deck Remo%e 1.00 LS $51,116.65 $51,116.65 1.00 LS $81,386.67 $81,386.67 $30,270.02 Temp Special Shoring 400.00 SF $10.00 $4,000.00 400.00 SF $14.50 $5,800.00 $1,800.00 CTB Rent 2220.00 LF $15.00 $33,300.00 2220.00 LF $20.00 $44,400.00 $11,100.00 Total $43,170.02 Subcontractor Increase Bean Electric 1,00 LS $36,900.00 $36,900.00 1.00 LS $45,412.95 $45,412.95 $8,512.95 American Striping 1.00 LS $57,548.70 $57,548.70 1.00 LS $84,764.13 $84,764.13 $27,215.43 Bluebird Construction 1.00 LS $20,328.00 $20,328.00 1.00 LS $29,928.78 $29,928.78 $9,600.78 THM 1.00 LS $31,900.00 $31,900.00 1.00 LS $44,808.81 $44,808.81 $12,908.81 Total $58,237.97 Supplier Increase D-Mac Industries 13500.00 SF $3.00 $40,500.00 13500.00 SF $5.63 $76,032.00 $35,532.00 Bridge Studs 14504.13 EA $1.04 $15,084.29 14504.13 EA $2.09 $30,313.63 $15,229.34 Lime Slurry 74.00 TON $170.50 $12,617.00 74.00 TON $211.20 $15,628.80 $3,011.80 Bridge Steel Repair(Misc) 70.00 LF $400.00 $28,000.00 70.00 LF $457.74 $32,041.88 $4,041.88 Bridge Railing 765.00 LF $55.57 $42,511.05 765.00 LF $85.42 $65,346.30 $22,835.25 Reber 1.00 LS $196,934.00 $196,934.00 1.00 LS $298,211.50 $298,211.50 $101,277.50 Concrete 1.00 LS $272,755.22 $272,755.22 1.00 LS $390,275.88 $390,275.88 $117,520.66 Total $299,448.42 Total Increase $632,495.57 Ong Contract $3,989,272.40 %Change 15.85% Sinc rely, f Danny Kr' esident 1868 W. NORTHWEST HWY. GALLAS, TEXAS 75220 972/444-8230