HomeMy WebLinkAboutContract 43501-CO1 I cffy e I I 4�0 J�--(() i F" Wc>a-F*4 City of Fort Worth =Sqrr e t aq 0 P Y Change Order Request Project Name. Medical District Part 8 City Sec No. [:4:3�5011 Project No.(s)-EP2615-609170168787 DOE No, City Proji.No.- Project Description: Water Distribution System Improvements on Braldner Street',Broadway Street, Henderson Street, Mag:nolia Avenue, St. Louis Avenue and South Main Street Contractor:[ William J.Schultz,lnic,,,dba Circle"C"Construction:Co. Change Order# 1 Date. 5/17 1/2 City Project Mgr,F John Kasavich, City Inspector: Mike Myers Ph�one Number] 817-392-8480 Phone Numberl 817-480-4451 Delpt. WATER Totals Contract Time (Calendar d'a S) M L �M$43/1 5 A Original Contract Arnount $1$,441,842.00 1:80 "M/1"Alk/1111IN Mwv/11111 1, Extras to Date Credits to Date Pending Change Orders(in M&C Process) -"I Contract Cost to Date 11/1011 NINE JAmount of Pr22osedl Cha e Orde, /11/32 020 Mw',111'n pygg NO Orl MMIVIR71�' 11A Revised:Contract Amount Noll- Original'Funds Available for Change,Orders $25,000.00 ...........­//­,g ­1 71, x 11/1'�,/�,���'ll"�",,//�l/",� OWN` Remaining Funds Available for this CO Additional Fu�nding(if necessary) CHANGE ORDERS to,DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT MAXALLOWAB,LE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) The change order will provide for the followin.g.- The installation of a 12-inch casing pipe by box tu,nnel instead of by bore and jack method due to limited job space at the job site to install a bore bit. 0 'Fhe removal and replacement of a conflicting 18-inch storm drain pipe., 0 The removal of trolley ties and concrete basethat were encountered during construction., 0 No&. Staff concurs with the contractor's request for, ar days on this change order. M Abided M, 0 OFFICIAL RECORD "0 o" CITY�SECRETARY Am y mary se Se F'Tn WORTH, TX CA2 It is understood and agreed'that the acceptance of this,Change(1�%fV&iWktor constitutes,an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Oil Willliam J.Schultz,lnc,,dba Circle"C"Const.,Co. Terri Skelly �4 6 ji't ;—A�3 A3 J-11 K" , 46 M&C Number N= M,&C Date Approved N/A City of Fo�rt Worth Change Order Additions Project Name M edical District Part 8 City S,ec No.: Project No.(s): __P265­6091 701168787 DOE No.[_16786, Proj.No. City Project Water Distribubon,System Im�pro!vemen�ts on Brad'n�er Street, Broadway Street, Hendiers,on,Street,, Miagniolia Avenue,,St,, Description Louils Avenue and South Main Street Contractor ['william J, Schultz, Inc.,dba Circle"C"Construction,Col., Chane Order# Date. 5/117'/ City Project Mgr. L—John Kasavich City inspector Mike Myeers AUDITIUNS ............... 73 48"'Wood Box Tunnel WATER 80.00 LF 50�010 $36,000-001 74 18"RCP w/CSS Backfill-Remove and Replace �WATER 16,�O�O LF $160,010 $2,560-010 75 1 moval Trolley Ties and Concrete Base WATER 1,00 LS $,21,850.00 $�2)850.00 �w--o i wwo wimm w- Ni NOW WON_,"'ON.M. m Wil N�hli MINIM...... 41 01110 1 IN I",I OWN,I I ''I WATER $41)4101,00 Plage 2,of 4 l�Ad�ditilon�s Sulb To�tall $41$ "9 Fco n 0-r Wc>P,-r m City of Fort Worth Change Order Deletions Project Name Medical District Part 8 City Sec No,,: 4�3�501 Project No.(s): P265-60:9170168787 DOE No. 6786 City Proj.Nom: Project Description Water Distribution System Improvements on Bradner Street, B:r a way Street, Henderson Street, Magnollia Avenue, St.Louis Avenue and South MainamStreet Contractor W'illiam J.Schultz, Inc.,dba Circle"C"Construction Co!. Chiane Order# Date' 5/17/2013 City Project Mglr. John Kasavich City Inspector Em:ikeMyers DELETIONS 8 12"Casin!g By Other Than Open!Cut WATER 80.00 LF $350.00 $281010!0,�0!01 0100— -am 0 mom imi�pi WON ma WATER $28,000-00 Page 3 of 4 Deletions Sub,Total, $28�000.00 MIWBE Breakdown for thi's Change Order I RONNIE lllil' .............. Total Previous, Change Orders, ............ VE Total Page 4 of 4 .......................