HomeMy WebLinkAboutContract 46462-CO7 (2)�ORT�ORTH� City of Fort Worth �� Change Order Request Breakdown CITY SECRETARI( G �� CONTRACT N0. �,��� Project Name South Main Street Improvements City Sec # 46462 Client Project #(s) City Proj #02113, Water #265-608140211383, Sewer #275-708130211383, DOE 7158, K-2294, X-22529 Contractor JLB Contracting, LLC PM Patrick Buckley Inspector Joe Rogers Change Order Submittal #�7 Date 6/13I2017 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW Water Sewer 30,599.11 $1,497,009.31 $1,170,739.14 $84,700.79 $21,949.72 30,599.11 $1.581.710.10 $1.192.688.86 Contract Time Totals CD 48,347.56 540 06,650.51 �54,998.07 540 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 5.54% MAXALLOWABLE CONTR.4CT AMOUNT (ORIGINAL CONTRACT COST+ 25%J $9,810,434.45 JUSTIPICATION (REASONS) FOR CHANGE ORDER The following items were requested JLB to modify on this project: 1. To make the 30" connecfion af Vickery 423 LF of 18" DIP Sewer Pipe was required to be reconstructed due to all of the Franchise Utilities to clear the utilities. Additionally, JLB was requestetl to mill and overlay the intersection of South Main and Vickery Bivd, after it was determined that the water and sewer lines work in this intersection matle the pavement very rough to drive (this was not in existing drawings). This C07 retluces some of the bid items that were proposed to be a temporary patch and makes the new item permanent repair. 2. New sewer line down South Main from Rosedale to Magnolia needed to have South Main repaved. This C07 reduces some of the bid items that were patch related antl goes to make this paving permanent repair. 3. At the Vandervort Site private sewer utilities were encounterwithin the South Main parkway. Additional MHs, new services, antl sampling wells were required. Also exploratory excavations to locate all the private utilities to determine the best solution to address the conflicts found. 4. At the intersection of South Main and Pennsylvania the tleveloper at the Southwest corner had a different design elevation that JLB was asked to tie to, which required some adjustments in the field. This included some adjustment of existing curb inlets. 5. Near Southside requestetl several changes to the streetlights and some site furniture. Based on a previous project in Near Southside, they wanted to retluce the streetlights from 4K to 3K. Our streetlights had already been ordered, which required a adjustment to each fixture. Near Southside changed to a different bench that was specified. We also coortlinated with Public Arf with a simple electrical tie-in to their art structures, versus running parallel electrical lines to power sources. New electrical meters were identifed as being required for the street lights. Several foundations were found to interfere with utilities, so a new foundation was specifietl for several of the lights. 6. Several field revisions were requested to adjust plant bulb-outs or driveway locations. They occurred at 105 South Main, 215 South Main, and at the Northwest corner of South Main and Pennsylvania. At Amphibian Theater there were parking lot revisions due to grades to match existing conditions and repair of roof drains that were encounter at the front of the building. Ramps and stairs were added to the Chambers Brick building. 7. Due to utility conflicts a Type 2 Inlet was atlded at Daggett and South Main. 8. JLB hatl installed 318 SF of a brick they believed to be approved. It was determined it tlid not meet the requirements of CFW and Near Southside, JLB has reordered the specified brick and requests to be paitl for the reinstallation of the brick as they felt it was not their fault. 9. The payment of the water impact fees for three irrigation meters and the payment of the water was not addressed in the construction Plans and Specifications. Time extensions requested: 1. Installation of revised 30" connection of water line in the intersection of South Main and Vickery. The tlelay of the water connection delayed progressing with the water line extensions. Days Requested -130 Days 2. Franchise Utilities conflicts along South Main — Days Requested - 60 Days � E''� 3. ONCOR providing power to requestetl sites. �p�q' �`'+ Days Requested — 60 Days � ' ' ' ��" �' 4. How to pay for3 Irrigation Meters has delayed the beginning of landscaping until June 2017. Day,s Requested — 30 Days '`�, Total fxtra Tim� Requestetl —�L80' D,�ys �_ . REc��v�u � �., � 25 �p1� C11V�F�OP�wORTH 4 cro s�ca�A��t .ei � ` -.�1) �! � 1� r 1 � � � I � • �•� ( � : �, .. � ����__�_-�-- � . . OFFICIAL� IRECORD � : �_ CITY $EGRf�TARY o� �', W�I�H, "�� M�y J. r, ity SecretarY F�a__�'� H City of Fort Worth Change Order Additions Project Name South Main Street Improvements City Sec # 46462 Client ProJect # City Proj #02113, Water #265-608140211363, Sewer #275-708130211383, DOE 7158, K-2294, X-22529 ConUactor JLB Contracting, LLC PM Patrick Buckley � Inspector Joe Rogers Change Order Submittai # �7 Date 6/13/2017 ADDITIONS Cha�ge Order Additio�s Page 1 ot 1 r�oft__�,t,�,� ciry ot Fort wortn Change Order Deletions Project Name South Main Street Improvements City Sec # 46462 Client Project # City Proj #02113, Water #265-608140211383, Sewer #275-708130211383, DOE 7158, K-2294, X-22529 Contracior JLB Contracting, LLC PM Patrick Buckley Inspeclor Joe Rogers Change Order Submittal #�7 Date 6I13I2017 DELETIONS Change Order Deletions Page 1 of 1 Previous Change Orders 5/8/2015 6/17/2015 7/16/2015 $38,366.51 $32,401.00 $9,705.00 4 � 8/14/2015 � $14,958.00 5/17/2016 $10,415.00 6 � 8/30/2016 � $4,400.00 Total MISBE Breakdown for this Change Order CFW Change Order Approval St-COApp01 FORTWORTHoCity of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) Cost($) Fund Account Center: $ 318,662.23 C291 541200 208230211383 For Change Order Submittal No.: 7 Change Order No.: St-COApp01 Date Started: 2017-06-27 City Sec. No.: 46462 Date Due: 2017-08-16 Project Name: 02113 - South Main Street 02113 DOE Numbers: Project Numbers: 7158 Project South Main Street - Vickery to Magnolia Description: use of contigent funds for C07 Project Manager: Patrick Buckley City Inspector: Joe Rogers Contractor: JLB Contracting, LLC COUNCIL ACTION (If Required): M&C Log Name: 20SOUTH MAIN CO FUNDS AND C07 M&C Number: M&C Date: 2017-08-01 COST AND DAYS SUMMARY: Department: TPW � I _ i , Approval Status: �i _ II � �I_ _ i .li- � Il _ , ; Page 2 of 4 Requested Days: 280 . I! _ ;� � Total Cost: $ 318,662.23 Total Requested Days: 280 https://projectpoint.buzzsaw.coin/ bz_web/Foi•ms/FormPrint.aspx?SiteId=51500&Pi•ocessI... 8/24/2017 CFW Change Order Approval St-COApp01 Approved: Yes Comments: User: Aaron Perez Date: 2017-06-28 10:14 AM Approved: Yes 'Comments: User: Patrick Buckley Date: 2017-06-29 4:56 PM ,Approved: Yes Comments: User: Mike Domenech Date: 2017-06-29 5:58 PM Approved: Yes Comments: User: Aaron Perez Date: 2017-07-07 4:05 PM Approved: Yes Comments: User: Patrick Buckley Date: 2017-07-07 4:09 PM Approved: Yes Comments: User: Mike Domenech Date: 2017-07-07 5:28 PM Approved: Yes Comments: User: Kim Arnold Date: 2017-07-10 2:37 PM Approved: Yes Comments: User: Doug Wiersig Date: 2017-07-12 2:53 PM Approved: Yes Comments: User: Doug Black Date: 2017-08-21 11:31 AM Approved: Yes Comments: Page 3 of 4 https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 8/24/2017 CFW Change Order Approval St-COApp01 User: Jay Chapa Date: 2017-08-21 1:50 PM Action Required: Approve of C07 Page 4 of 4 littps://projectpoint.buzzsaw.com/ bz_web/Forins/FormPrint.aspa?SiteId=51500&ProcessI... 8/24/2017 CFW Change Order Approval St-COApp01 Page 1 of 4 Routinq Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthaov/Infrastructure Proiects/02113 - South Main Street Vickery to Maqnolia/Contractor/Chanqe Orders/C07/CO 7 Breakdown South Main ]�B.XLS Attachments (0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz_web/Forms/ForrnPrint.aspx?SiteId=51500&ProcessI... 8/24/2017 CFW Change Order Appi•oval Wa-COApp08 ORTWORTHoc�ay of Fo�two�tn g Order Request Approval (Change Order Breakdown Available in Links) Date Started: 2017-06-26 Date Due: 2017-08-15 For Change Order Submittal No.: 7 Change Order No.: Wa-COApp08 City Sec. No.: 46462 Project Name: 02113 - South Main Street 02113 Project Numbers: 7158 PI'ojeCt South Main Description: Project Manager: Patrick Buckley Contractor: JLB Contracting, LLC DOE Numbers: City Inspector: Joe Rogers Page 2 of 3 COUNCIL ACTION (If Required): M&C Log Name: 20SOUTH MAIN CO FUNDS AND C07 M&C Number: M&C Date: 2017-08-01 COST AND DAYS SUMMARY: Department: Cost($) Fund Account Center: Water $ 4,705.97 P253 541200 608140211383 Sewer $ 4,622.65 P258 541200 708130211383 I 1 ; Approval Status: Total Cost: � 9,328.62 �� �l Requested Days: � � I _ � i' � Total Requested Days: � https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 8/24/2017 CFW Change Order Approval Wa-COApp08 Approved: Yes Comments: User: Aaron Perez Date: 2017-06-28 10:15 AM Approved: Yes Comments: User: Patrick Buckley Date: 2017-06-29 4:55 PM Approved: Yes Comments: User: John Kasavich Date: 2017-07-03 8:31 AM Approved: Yes Comments: User: Chris Harder Date: 2017-08-21 9:51 AM Approved: Yes Comments: User: Doug Black Date: 2017-08-23 5:21 PM Approved : Yes Comments: User: Jay Chapa Date: 2017-08-24 10:26 AM Action Required: Approve Water and Sewer Funds for C07 Page 3 of 3 https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 8/24/2017 CFW Change Or•der Approval Wa-COApp08 Routinq Assigned To: Assigned By: Page 1 of 3 Due Date: Due Time: Links 1 fortworthqov/Infrastructure Proiects/02113 - South Main Street Vickery to Maqnolia/Contractor/Chanqe Orders/C07/CO 7 Breakdown South Main JLB.X�S Attachments (0) ' No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 8/24/2017 City of Fort Worfh, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 8/15/2017 - Ordinance Nos. 22819-08-20�7 & 22820-08- 2017 DATE: Tuesday, August 15, 2017 REFERENCE NO.: **G-19061 LOG NAME: 20SOUTH MAIN FUNDS AND CHANGE ORDER 7 SUBJECT: Adopt Ordinances Increasing Estimated Receipts and Appropriations in the Water Capital Fund in the Amount of $17,416.00 and the Sewer Capital Fund Legacy in the Amount of $7,317.00 and Authorize Execution of Change Order No. 7, in the Amount of $327,990.85, to City Secretary Contract No. 46462 with JLB Contracting, LLC for Streetscape and Infrastructure Improvements along South Main Street from Vickery Boulevard to Magnolia Avenue and Adopt Appropriation Ordinances (COUNCIL DISTRICTS 8 and 9). RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinances increasing estimated receipts and appropriations in the Water Capital Fund in the amount of $17,416.00 and the Sewer Capital Fund Legacy in the amount of $7,317.00; and 2. Authorize execution of Change Order No. 7, in the amount of $327,990.85, to City Secretary Contract No. 46462 with JLB Contracting, �LC for additional streetscape and infrastructure improvements along South Main Street from Vickery Boulevard to Magnolia Avenue (CO2113). DISCUSSION: The South Main Urban Village Complete Streets Project, which encompasses the South Main Urban Village, will construct streetscape and infrastructure improvements along South Main Street from Vickery Boulevard to Magnolia Avenue. The streetscape improvements include wide sidewalks, tree wells, pedestrian lighting, recessed on-street parking with bulb-outs to define pedestrian crossings and replacement of existing bike lanes. Infrastructure improvements include full roadway reconstruction, water and sewer upgrades (to replace aging facilities and provide additional capacity to accommodate anticipated development) and upgraded storm drainage facilities. Once construction started several property owners along South Main Street approached the City of Fort Worth to have their existing services upgraded to a larger size. An agreement was made with six of the property owners whereby they would pay for the cost difference in their water and sewer services upgrades. A portion of those receipts were previously appropriated (M&C C-27184) with the balance being appropriated with this M&C. Change Order No. 7 adds to the Contract with JLB for the required quantities not previously included. The items provided for in this change order include water pipe, sewer pipe, sewer sampling well, asphalt paving, concrete paving, brick pavers, landscaping items and street light metering. M/WBE Office - JLB Contracting, LLC. agrees to maintain its initial MBE commitment of 15 percent that it Logname: 20SOUTH MAIN FLTNDS AND CHANGE ORD�R 7 Page 1 of 2 made on the original contract and extend and maintain that same MBE commitment of 15 percent to all prior change orders up to and inclusive of this Change Order No. 7. Therefore JLB Contracting, LLC. remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MBE Commitment form executed by an authorized representative of its company. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the Water Capital Fund, Sewer Capital Fund- Legacy and Special Funded Projects Fund, as appropriated. The Fiscal Year 2017 Water Operating Budget includes appropriation of $21,060,000.00 for the purpose of providing Pay-As-You-Go funding for Water Capital Projects. After this transfer for Fiscal Year 2017, the balance will be $2,538,573.00. The Fiscal Year 2017 Water Operating Budget includes appropriations of $31,636,073.00 for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects. After this transfer for Fiscal Year 2017, the balance will be $3,865,401.00. FUND IDENTIFIERS (FIDs): TO Fund Department Acc ID FROM un�Project IProgra ID ctivity Budget Reference # moun Year (Chartfield 2) Activity Budget Reference # moun Year (Chartfield 2) Jay Chapa (5804) Douglas Wiersig (7801) Patrick Buckley (2443) und Department Accoun Project Progra ID ID CERTIFICATIONS: Submitted for Citv Manaqer's Office bv: Oriqinating Department Head: Additional Information Contact: ATTACHMENTS 1. 1295 Form for JLB.pdf (Public) 2. 20SOUTH MAIN FUNDS AND CHANGE ORDER 7 59601 A017.docx (Public) 3. 20SOUTH MAIN FUNDS AND CHANGE ORDER 7 59607 A017.docx (Public) 4. APCF C07.pdf (CFW Internal) 5. CO 7 SouthMain.pdf (CFW Internal) 6. FID Table for South Main St C07 (004).pdf (CFW Internal) 7. MBE Committment South Main C07.pdf (CFW Internal) 8. South Main Loction Map.pdf (Public) Lognarne: 20SOUTH MAIN FtTNDS AND CHANGE ORDER 7 Page 2 of 2 CO2113 — South Main Change Or•der #7 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting