Change Order Request
Project Name HMAC Surface Overlay 2013-4 City Sec # 44574
Client Project #(s) DOE 7024, City Project No. 02092
Dept.
Original Contract Amount
Extras to Date
Cretlits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
80
:00
Change Order Submittal # �2
Date 6/26/2015
Contract Time
Totals CD
i87,340.80 150
$7,940.00
80
00
150
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0:50%
MAXALLOWABLECONTR,4CTAMOUNT(ORIGINALCONTR,4CTCOST+25%) $1,984,176:00
.�� ��, � ; ;'- �JUSTIPI�A�TI� R� �,� , �G�H�., �� � ',� � �- ._.,"���+_
This Change Order is required to add two new project items, pavement markings and traffic loop detectors, for Vickery Blvd. and Jennings Ave.
Aiso, additional time is requested to compensate for construction delays from franchise utilities and for the addition of Llano Ave. and Willis
Ave. to the Contract. Additionally, it was agreed that due to the residents in the Tandy Hills Park / Meadowbrook neighborhood that we would
wait to work on Meadowbrook Dr.,west of Oakland Blvd., until we could mobilize onto Medowbrook Dr., Stratford Dr., Stratford Ct,, Stratford
Park Dr, and Belford Ave. on the 2014-3 contract, minimizing the inconvenience to the residents. These streets weren't released on the 2014-3
Contract until the middle of January, 2015, after 500 days were charged on the contract.
�
� r�r�-
SCA������
OFFICIAL RECORD
CITY SECRETARY
�r. woRr�, Tx
>}� 5���
F�R� ►� c�ty of Fort wortn
Change Order Additions
Project Name HMAC Surface Oveday 2013-4 City Sec # 44574
Client Project # DOE 7024, City Project No. 02092
Change Order Submittal # �2 Date 6/26f2015
ADDITIONS
iy nit nit ost ota
ou e e ow
40 4" Yellow - Double left turn TPW 630.00 LF 4.75
41 4" White Edge TPW 6,427.00 LF 1.00
42 8" White Edge TPW 605.00 LF 2.35
43 4" White x 2' Dots TPW 298.00 EA 3.50
44 4" White Parking Spot Markers TPW 92.00 EA 1.75
45 24" White Stop Bar TPW 148.00 LF 7.00
46 RightArrow-prefabtape TPW 2.00 EA 425.00
47 LeftArrow-prefabtape TPW 3.00 EA 425.00
48 RightandStraightArrow-prefabtape TPW 7.00 EA 700.00
49 Only - prefab tape TPW 4.00 EA 600.00
50 Bike w/ Arrow - prefab tape TPW 21.00 EA 700.00
51 Bike wl Chevron - prefab tape TPW 5.00 EA 675.00
52 Raised Pavement Markers TPW 14.00 EA 5.75
53 Loop Detectors TPW 1,350.00 LF 12.50
TPW $58,400.25
Sub Total Additions 58,400.25
Change OrderAdditions Page 1 of 1
F�R_ T� H city of Fort wortn
Change Order Deletions
Project Name HMAC Suriace Overlay 2013-4 City Sec # 44574
Client Project # DOE 7024, City Project No. 02092
Change Order Submiflal # 02 Date 612612015
DELETIONS
�I�f� 1 • � � � 1 1 � �
� � � • � , r • � ������
1rii1��'������� ��r�
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
� �����
s �����■
� �������
� �������
� ������
� �������
� ������
� ������
�� ��■���■
� ������
� ������
� ������
� ���■���
� ������
� ����■�■�
� ������
� �����
� �������
� ������
� �����
� ������
� ������
� ������
� ������
� ������
� ������
� �������
� ������
� ■�����
� ������
� ������
� ������
� ��������
• . : .,,
�■��
���
� �.��•, ,:�ii
Change Order Deletions Page 1 of 1
CFW Change Order Approval St-COApp03 Page 1 of 3
Routina
Assigned To: Due Date:
Assigned By: Due Time:
Links 1
fortworthaov/Infrastructure Proiects/02092 - HMAC Surface Overlav (2013-4) 50 50/Contractor/ChanQe Orders/chanQe
order 2 breakdown revised.xisx
Attachments (0)
No Attachments have been added to this form.
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId.,. 7/9/2015
CFW Change Order Approval St-COApp03
O�T �VaRTHa c�ty of Fo�t wo�tn
--r � Change Order Request Approval
(Change Order Breakdown Available in Links)
Page 2 of 3
For Change Order Submittal No.: 2
Change Order No.: St-COApp03 Date Started: 2015-06-30
City Sec. No.: Date Due: 2015-08-19
Project Name: 02092 - HMAC Surface Overlay (2013-4) 50_50
02092 DOE Numbers:
Project Numbers:
7024
PrOjeCt Remove and replace broken, nonfunctional curbs & gutters and
Description: driveways; pulverization and stabilization of the existing
pavement, to be followed with and overlay of 2�� of virgin HMAC
surface course.
Project Manager: Kristian Sugrim
Contractor: JLB Contracting, LLC.
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number:
City Inspector: Mike Glover
M&C Date:
COST AND DAYS SUMMARY:
Department: Cost($)
Transportation & Public WOrk
Fund Account Center:
Requested
Days:
422
Total Cost: � 0.00
Approval Status:
Total Requested Days: 422
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 7/9/2015
CFW Change Order Approval St-COApp03
Approved: Yes
Comments:
User: Tara Fishback
Date: 2015-07-02 4:30 PM
Approved: Yes
Comments:
User: Sam Davis
Date: 2015-07-03 8:33 AM
Approved: Yes
Comments:
User: Kristian Sugrim
Date: 2015-07-06 10:15 AM
Approved: Yes
Comments:
User: Najib Fares
Date: 2015-07-06 10:29 AM
Approved: Yes
Comments: Additional time to minimize impact to neighborhood and due to utility
adjustments after project start.
User: Andy Anderson
Date: 2015-07-06 4:04 PM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2015-07-09 9:52 AM
Approved: Yes
Comments:
User: Grant Jordan
Date: 2015-07-09 9:58 AM
Approved: Yes
Comments:
User: Fernando Costa
Date: 2015-07-09 3:08 PM
Page 3 of 3
�� �I�� ���UAR�D
. __ ._ ,� �,�
��.0 �� 1
A��a by:
J.
Action Required: