AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 44578
WHEREAS, the City of Fort Worth (CITY) and Gary P. Kutilek d/b/a The
Landscape Alliance, (ENGINEER) made and entered into City Secretary Contract No.
44578, (the CONTRACT) which was City Council authorized on the 4 day of June,
2013 in the amount of $ 77,800.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in
the amount of $138,759.50 which was authorized by M&C #C-26715 on March 18tn
2014 for the following project:
Sandy Lane Park Improvements; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional engineering
services specified in a proposal dated September 29, 2014, a copy of which is
attached hereto and incorporated herein. The cost to City for the additional
design services to be performed by Engineer totals $20,370.00. (See Attached
Funding Breakdown Sheet, Page -3-)
2.
�
m
n
rn
�
m
v
0
�
�-a
i�
�
r�a
0
�
.�.
Article II of the CONTRACT is amended to provide for an increase in the
fee to be �aid to Engineer for all work and services performed under the
Contract, as amended, so that the total fee paid by the City for all work and
services shall be an amount of $236,929.50.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory, below.
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 1 of 3
�FFICI�� �ECORD
� �CI'i°lf SfEC�ETARY
� ��. ��RT�� ��
APPROVED:
City of Fort Worth
1 � �� -� ---_.,
Sus n lanis
Assistant City Manager
DATE : ( p �}p �p
ENGINEER
Gary P. Kutilek d/b/a
The Landscape Alliance
Gar P. Kutilek
Principal
DATE : � 0 ��
APPROVAL RECOMMENDED:
Richa Zavala
Direct r, Parks and Community Services Department
APPROVED AS TO FORM AND LEGALITY:
M&C:
N/A
�
Douglas W. Black
Assistant City Attorney
Date:
ATTEST:
.
LS�,
Mary J. Kayser
City Secretary
Ciry of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 2 of 3
� �� `a�°���� �''�,
0
�� � °�
�o
� � /i � -� � S�-'�
4i L� U Y
OG
` � U> O
t;Y�.f��°o�,c0000v''°,A. a•
������ '� � .a,Ar r
(�FFICIAL REC�ORD
�IT'Y S�CRETARI°
� t�e ������ �� I
FUNDING BREAKDOWN SHEET
City Secretary No. 44578
Amendment No. 2
Department E'und-Account-Center Amount
80 C282-531200-805480173630 $20,370.00
Total: $20,370.00
City of Fort Worth
Professional Services Agreement Amendment Template
PMO OfFicial Release 8/1/2012
Page 3 of 3
The Landscape Alliance
.r�r.� site planning landscape architecture irrigation
September 29, 2014
Eric Seebocic
Parks and Community Services Department
City of Fort Worth
4200 South Freeway, Suite 2200
Fort Worth, Texas 76115-1499
Re: Sandy Lane Park Additional Services
Dear Eric:
I appreciate the opportunity to submit The Landscape Alliance's (TLA) proposal to provide additional
services related to the design and development of improvements at Sandy Lane Parlc. These services are
based on additional requirements of the project as discussed in recent meetings with you, the current TLA
team, T&PW Storm Water personnel and Stephanie Coffinan of Freese and Nichols, who will be under
contract to Storm Water for Cottonwood Creek studies.
The project scope will include the following additional or expanded work elements:
Site Surve.y
It was requested that our surveyor, Spooner and Associates, accompany Ms. Coffinan to physicallly locate
and tie down features along the creek to the current survey base. It has been represented that this will
require one day of field time and one day of survey office time to prepare a base which will accurately
represent collected �ield data.
Geotechnical Investi�ations
Investigations will be expanded to conform with recent requests which will add two borings south of the
creek in recently cleared areas and one additional boring north of the creek. This service will be provided
by CMJ Engineering, our original geotechnical consultant. They will provide three borings to a depth of
30' below existing grade in the areas approved by you and Ms. Coffman. These services will be utilized to
guide design and engineering of proposed channel improvements.
HEC-RAS Modelin� and Desi�n Coordination
Based on added inputs to the expanded project, our civil consultants, CP&Y will:
• Review the FNI HEC-RAS Model (for the longer stream segment) and subsequent
coordination with FNI.
• Coordinate and discuss options with FNI for minimizing erosion in Sandy Lane Park and
the channel segment immediately downstream.
• Attend one additional meeting to present and discuss options with city staff and other
consultants. For this meeting, Dr. Michael Harvey and Stu Trabant, geomorphic experts,
951 W. Pipeline Rd., Suite 410, Hurst, Texas 76053 Metro: (817) 589-8909
will travel from Fort Collins, Colorado to participate in person. They were brought in during
our prior site visit with Storm Water and FNI to provide an initial review and assessment of
the project.
Fees
The proposed additional fees for the services defined above is outlined below.
SiteSurvey ............................................................... .
Geotechnical Investi ations
g.........................................................................
HEC-RAS Modeling and Design Coordination ...........................................
Total Additional Fee .................................
Current Revised Contract Fee ......,
Proposed Additional Services Fee.
..............................................
Total Revised Fee
$ 1,980.00
$ 4,950.00
$ 13,440.00
$ 20,370.00
$216,559.50
$ 20,370.00
$236,929.50
These fees includes all primary services described in the phase outline to be provided by TLA and its
consultants. Fees will be billed on an hourly basis, based on services actually rendered. The City of Fort
Worth will be advised in advance of any anticipated changes in services which will impact the fee. Included
in the proposed fee are costs associated with reproduction and travel related to the production of the contract
products. Items not specifically included in the estimated fee include:
1. Permit application and review fees other than TDLR.
2. Additional services or other items not referenced or inferred herein will be charged as an additional
service cost if required and approved by the City.
The Texas Board of Architectural Examiner's has jurisdiction over a professional's practice and may be
contacted at P.O. Box 12337, Austin, Texas 78701-2337, (512) 305-9000.
If this agreement meets with your approval, please initiate preparation of a contract amendment at your
convenience. Please call if you have any questions concerning any of the items herein or speci�cally
omitted.
Sincerely,
The Landscape Alliance
i. i tr ;n�,
Gary P. Kutilek, RLA
GPK/cb
951 W. Pipeline Rd., Suite 410, Hurst, Texas 76053 Metro: (817) 589-8909
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 6/4/2013
DATE: Tuesday, June 04, 2013 REFERENCE NO.: C-26303
LOG NAME: 80SANDY LANE PARK TLA AGREEMENT
SUBJECT:
Authorize Execution of an Engineering Agreement with Gary P. Kutilek d/b/a The Landscape Alliance in the
Amount of $77,800.00 for Design and Engineering Services for Sandy Lane Park Improvements
(COUNCIL DISTRICT 5)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of an Engineering Agreement with Gary
P. Kutilek d/b/a The Landscape Alliance in the amount of $77,800.00 for design and engineering services
for Sandy Lane Park improvements.
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to provide authorization for the execution
of an engineering Agreement with Gary P. Kutilek d/b/a The Landscape Alliance in the amount of
$77,800.00 to develop a park master plan, design and prepare construction documents for Sandy Lane
Park.
Project funding currently available is as follows:
_. _ . _ ___ __. _ ,--__ __ _,...__ ,. „ . ._ __ _ _ _ _ ____ _ _ ___ __. .,. . .. . _ ._ . . . _ ___ .. _ ____--- __ .,_
AMOUNT M&C � DATE �COMMENT
$590,646.00 16786
---._ .. - _
� $57,400.00 �G g17
.._ ____....
�$648,046.00
December 8, Parks and Community Services Department Fiscal Year
2009 2010 Gas Well Expenditure Plan - Gas bonus funds
__ ... .. .. . ..... . . .. _ . ______. _._._ _ _. . . .. ._._.... __._ _ __ ______.
February 19, Parks and Community Services Department Fiscal Year
2013 2013 Gas Well Expenditure Plan - Gas bonus funds
_....._ ..... _...._ _.._ _ _ -- -
_ ____ .,_. ._... _ .._.__ _. .. . . _ ___
Total
It is anticipated that an additional $90,000.00 will be recommended for appropriation to the project upon
the award of the actual construction contract. These funds are available for use in Sandy Lane Park as
the result of the execution of a license Agreement between the City and T- Mobile on December 15, 2009,
(M&C L-14904) for the installation of a communication tower at the park. Upon this additional
appropriation, the total project funding will amount to $738,046.00.
Project elements to be provided in the conceptual master plan as site conditions allow include an
accessible loop trail, a new playground, new group shelter, multi-use slab and drinking fountain, a
pedestrian bridge, security lighting, the repaving of the existing asphalt park road and parking lot, and
drainage improvements along a portion of the creek area.
Staff considers this fee to be fair and reasonable for the scope of services proposed.
Logname: 80SANDY LANE PARK_TLA AGREEMENT Page 1 of 2
M/WBE Office: Gary P. Kutilek d/b/a The Landscape Alliance is in compliance with the City's BDE
Ordinance by committing to 20 percent MBE participation on this project. The City's MBE goal on this
project is 15 percent.
In addition to the contract amount, $5,000.00 is required for design phase project administration, for a total
design budget in the amount of $82,800.00.
Sandy Lane Park is located in COUNCIL DISTRICT 5.
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Park Gas Lease Project Fund.
_ _ _ _ _ ___ .__ _ __ - _--_ . _ __._ _ _ _ __ . __ _ _ ___ _ _ , _ _ _ _ ___ __ __ _ ___ _
FUND CENTERS:
TO Fund/Account/Centers FROM Fund/Account/Centers
C282 531200 805480173630 $77,800.00
_ ___ __ - _ _ _._ ___. __ __ _ __ .___ __ __. __. _ _ _.__ ._ _ _._.
CERTIFICATIONS:
Submitted for City Manager's Office b� Susan Alanis (8180)
Originating Department Head: Richard Zavala (5704)
Additional Information Contact: David Creek (5744)
ATTACHMENTS
1. C282 01736.doc (CFW Internal)
2. MWBE Compliance Memo.pdf (CFW Internal)
Logname: 80SANDY LANE PARK TLA AGREEMENT Page 2 of 2
City of Fort Worth, Texas
Mayor and Council Communication
r� . � . �. � � � _ x � � � _ _ � � _.
GOUNCIL ACTION: Approved on 3/18/2014
..,. � ,F , � . . � .
, �._ � � . � ,
� � � �. ._ , �
r, .. . �- -� . � .
DATE: Tuesday, March 18, 2014
LOG NAME: 80SANDY �ANE PARK TLA CONTRACT AMENDMENT 1
REFERENCE NO.: **C-26715
SUBJECT:
Authorize Execution of Amendment No. 1 to City Secretary Contract No. 44578 in the Amount of
$138,759.50, an Engineering Agreement with Gary P. Kutilek d/b/a The Landscape Alliance for Additional
Engineering Services for Sandy Lane Park, Thereby Revising the Total Contract Amount to $216,559.50
(COUNCIL DISTRICT 5)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Amendment No. 1 to City Secretary
Contract No. 44578 in the amount of $138,759.50, an Engineering Agreement with Gary P. Kutilek d/b/a
The Landscape Alliance for additional engineering services for Sandy Lane Park, thereby revising the
total contract amount to $216,559.50.
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to authorize the execution of
Amendment No. 1 to City Secretary Contract No. 44578 in the amount of $138,759.50 to an Engineering
Agreement with Gary P. Kutilek d/b/a The Landscape Alliance for additional engineering services for
Sandy Lane Park, thereby revising the total contract amount to $216,559.50.
Gary P. Kutilek d/b/a The Landscape Alliance proposes to perform the additional design and engineering
services for this amendment for a lump-sum fee amount of $138,759.50. Staff considers it to be fair and
reasonable for the scope of services proposed.
On June 4, 2013, (M&C C-26303) the City Council authorized the execution of an Engineering Agreement
with Gary P. Kutilek d/b/a The Landscape Alliance in the amount of $77,800.00 to develop a park
improvement conceptual master plan and prepare construction documents for park improvements at the
site. Project funding includes the amount of $648,046.00 from gas bonus funds and the amount of
$90,000.00 received from a License Agreement between the City and T-Mobile West Corporation (M&C L-
14904) for the installation of a communication tower at the park, together totaling $738,046.00.
Ongoing creek bank erosion has occurred at the site causing further impact on the existing park drive,
storm drain and site utitilities.
M/WBE Office - Based on the cost savings of the original contract inclusive of this amendment No. 1, Gary
P. Kutilek d/b/a The Landscape Alliance is in compliance with the City's M/WBE Ordinance by committing
to an overall 74 percent M/WBE participation.
An additional amount of $8,000.00 allocation is required for design phase project administration, which
when added to the revised contract amount of $216,559.50 will result in a total design phase budget
amount of $224,559.50.
Logname: 80SANDY LANE PARK TLA CONTRACT AMENDMENT 1 Page 1 of 2
The project is located in COUNCIL DISTRICT 5.
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Park Gas Well Leases Fund.
_ _ _ _ _ . _ . ____ _ __ ___ __ _ __ _ _ _ _ _ .
FUND CENTERS:
TO Fund/AccountlCenters FROM Fund/AccountlCenters
C282 531200 805480173630 $138,759.50
_ _ . .__ _ _ _ _ _ . . __.._ _ _ __._ ___ . ..__.__ _ .___ _ _ _ _ _ _ ._._ . ._ _ _ _ __._ . _ _ __ _ __ _ _ __
CERTIFICATIONS:
Submitted for City Manager's Office by: Susan Alanis (8180)
Ori�nating Department Head: Richard Zavala (5704)
Additional Information Contact: Mike Ficke (5746)
ATTACHMENTS
1. Amend # 1 Gary P. Kutilek dba TLA Compliance Memo Revised.pdf (CFW Internal)
2. C282 01736.docx (CFW Internal)
3. FAR-00004.pdf (CFW Internal)
Logname: 80SANDY LANE PARK_TLA CONTRACT AMENDMENT 1 Page 2 of 2