HomeMy WebLinkAboutContract 44581T'�riff for Retail Delivery Serv9ce �"'
Oncor Electric Delivery Company LLC ���
6.3 Agreements and Forms C�� �C�� �;
Applicable: Entire Certified Service Area CDo��� �' of 2
Effective Date: September 21, 2009
6.3.1 Facilities Extension Agreement
WR Number: 3084304
Transaction ID: 29200
This Agreement is made between City of Fort Worth , hereinafter called "Customer" and
Oncor Electric Delivery Company LLC, a Delaware limited liability company, hereinafter called "Company" for the extension of Company
Delivery System facilities, as hereinafter described, to the following location of Customer's Eastside Pump Station at 2511 Avenue B,
Fort Worth, Texas
The Company has received a request for the extension of: (check all that apply)
✓❑ STANDARD DELIVERY SYSTEM FACILITIES TO NON-RESIDENTIAL DEVELOPMENT
Company shall extend standard Delivery System facilities necessary to serve Customer's estimated maximum demand
requirement of 900 kW ("Contract kW"). The Delivery System facilities installed hereunder will be of the
character commonly described as 3010 - 2400 volts at 60 hertz, with reasonable variation to be allowed.
❑ STANDARD DELIVERY SYSTEM FACILITIES TO RESIDENTIAL DEVELOPMENT
Company shall extend standard Delivery System facilities necessary to serve:
All-electric residential lot(s)/apartment units, or
(Number of lots/unds)
Electric and gas residential lot(s)/apartment units.
(Number of lots/units)
The Delivery System facilities installed hereunder will be of the character commonly described as
volt, phase, at 60 hertz, with reasonable variation to be allowed.
❑ NON-STANDARD DELIVERY SYSTEM FACILITIES
Company shall extend/install the following non-standard facilities:
ARTICLE I- PAYMENT BY CUSTOMER
At the time of acceptance of this Agreement by Customer, Customer will pay to Company $69,764.09 as payment for the
Customer's portion of the cost of the extension of Company facilities, in accordance with Company's Facilities Extension Policy, such
payment to be and remain the property of the Company. Subject to provisions in Article V.
ARTICLE II - NON-UTILIZATION CLAUSE FOR STANDARD DELIVERY SYSTEM FACILITIES
This article, Article II, applies only to the installation of standard Delivery System facilities.
a.The amount of Contribution in Aid of Construction ("CIAC") to be paid by Customer underArticle I above is calculated based on the
estimated data (i.e., Contract kW or number and type of lots/units) supplied by Customer and specified above. Company will
conduct a review of the actual load or number and type of lots/units at the designated location to determine the accuracy of the
estimated data supplied by Customer. If, within four (4) years after Company completes the extension of Delivery System
facilities, the estimated load as measured by actual maximum kW billing demand at said location has not materialized or the
estimated number and type of dwelling units/lots at said location have not been substantially completed, Company will re-
calculate the CIAC based on actual maximum kW billing demand realized or the number and type of substantially completed
dwelling units/lots. For purposes of this Agreement, a dwelling uniUlot shall be deemed substantially completed upon the
installation of Company's meter. The installation of a Company meter in connection with Temporary Delivery Service does not
constitute substantial completion.
b.Customer will pay to Company a"non-utilization charge" in an amount equal to the difference between the re-calculated CIAC
amount and the amount paid by Customer under Article I, above. Company's invoice to Customer for such "non-utilization
charge" is due and payable within fifteen (15) days after the date of the invoice.
t��FFICIAL RECORD
R E C E I V E D JUN 2 a� 20iS ��9iY SECR�%ARY
�'�'. VUi1R'�'H, �'X
Tariff for Retail Delivery Service
Oncor Electric Delivery Company LLC, a Delaware limited liability company
6.3 Agreements and Forms
Applicabfe: Entire Certified Service Area Page 2 of 2
Effective Date: September 21, 2009
ARTICLE 111 - TITLE AND OWNERSHIP
Company at all times shall have title to and complete ownership and control over the Delivery System facilities extended
under this Agreement.
ARTICLE IV - GENERAL CONDITIONS
Delivery service is not provided under this Agreement. However, Customer understands that, as a result of the
installation provided for in this Agreement, the Delivery of Electric Power and Energy by Company to the specified location
will be provided in accordance with Rate Schedule 6.1.1.1.3 Secondary Service Greater Than 10 kW , which
may from time to time be amended or succeeded.
This Agreement supersedes all previous agreements or representations, either written or oral, between Company and
Customer made with respect to the matters herein contained, and when duly executed constitutes the agreement between
the parties hereto and is not binding upon Company unless and until signed by one of its duly authorized representatives.
ARTICLE V— OTHER SPECIAL CONDITIONS
(i) Customer has disclosed to Company all underground facilities owned by Customer or any other party that is not a
public utility or governmental entity, that are located within real property owned by Customer. In the event that Customer
has failed to do so, or in the event of the existence of such facilities of which Customer has no knowledge, Company, its
agents and contractors, shall have no liability, of any nature whatsoever, to Customer, or Customer's agents or assignees,
for any actual or consequential damages resulting from damage to such undisclosed or unknown facilities.
(��)
Customer agrees to provide and install the necessary electrical conduits and equipment pads according to Company specifications and
construction guideiines for the provision of this service.
�i
ACCEPTED BY COMPANY:
Oncor Electric Delivery Company LLC
Oncor Representative - Signature
Oncor Representative — Printed Name
Oncor Representative - Title
Date
ACCEPTED BY CUSTOMER:
City of Fort Worth
Customer / Company Name
Customer Representative Signature
Customer Representative — Printed Name
Customer Representative - Title
Date
,..r � � � � �
`f' "` ' � CITY ATTORN�Y
�
This Agreement is effective as of the last date signed by the Parties ("Effective Date")
Company: City of Fort Worth
��.c� �/� r.��� �r/�v�.•�y �i�---
By:
(Signature)
(Printed Name)
Title:
Address:
City/State/Zip:
Date
By:
(Fe��nai�do Costa )
Assistant City Manager
Date 6/.Z�/�.3 �
�%1 n .> _ ,� -- ��u.u.� ..
Attest: � L�
Mary . I ay er,
City Secretaiy
(Seal)
M&C #k4 � � ZC;S�;'�
Date: �' y. �'3
� Q�'� �.
°° �1Op
o �,9
o ,�
a
o�
0
— aQ
��Ud !
000 "� �
��
�.��
Ap roved'"as to orm and Legality:
Do glas W. Black
Assistant City Attorney
APPROVAL RECOMMENDED:
� � C��i7�Y�
S. Frank Crrnnb, P.E.
DIRECTOR,
(Wuter Depa1•tn�e��t)
OFFICIAL RECORD
61T1( SECRfE'�'ARY
(�'e �4l��2�'�9 ��
CITY OF FORT WORTH F.'astsrde Purnp Stu —. c i��ice Agreemenf
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised June 4, 2012
New Construction Management
Ralph Schroeder
7860 Winbrook Drive
Benbrook,TX 76126
Phone #: 817 - 988 - 8904
City of Fort Worth
Mr. Chris Harder
1511 11th Avenue
Fort Worth, TX 76102
April 29, 2013
WR # 3084304
Tracking # 29200
Services provided at:
Eastside Pump Station
2511 Avenue B
DESCRIPTION AMOUNT
Upgrade service at Customer's Eastside Pump Station to a three phase 1000 kVA pad mounted transformer $69,764.09
dually rated at 2400 V detta or 4160Y/2400 V and to a 2400 V pad mounted metering unit. Customer will
provide and install conduits and equipment pads according to Oncor specifications.
Total Amount Due Upon Receipt
$69,764.09
o Remit this Statement of Charges and Payment to the address below with attention to Vickie Coe.
� Project will be scheduled after payment and any required easements have been received.
� Price quoted is valid for sixty days (60) from date of this invoice.
� If you should have any questions, please contact Ralph Schroeder.
r�
� �_,�..,. ����
Please make all check(s) payable to Ot1COt" E�@Ctt'1C D@�IV@i"y
Remit to:
' Attn: Ms. Vickie Coe 3M-005
n.,...... c1e..�.:.. nei�..d...,
T/�r.�:;'i; �: �?.�;.���1.(',W
� � � � - �-
Page 1 of 1
O�tici<F; sii:e ef iiie <;i�y c,; s o; i tv'o; i�', l"er:s
�(3 ft�i' �$'(l �'l I I
COUNCIL ACTION: Approved on 6/4/2013
DATE: 6/4/2013 REFERENCE NO.: G26302 LOG NAME:
CODE: C TYPE: NON- PUBLIC
CONSENT HEARING:
600NCOR PAYMENT
EASTSIDE PS
NO
SUBJECT: Authorize Payment to Oncor Electric Delivery Company, LLC, in the Amount of
$69,764.09 for Replacement and Upgrade to the Electrical Service at the Eastside Pump
Station Located at 2511 Avenue B(COUNCIL DISTRICT 8)
RECOMMENDATION:
It is recommended that the City Council authorize a payment to Oncor Electric Delivery Company,
LLC, in the amount of $69,764.09 for replacement and upgrade to the electrical service at the
Eastside Pump Station located at 2511 Avenue B.
DISCUSSION:
The Eastside Pump Station was constructed in 1947 and expanded in 1954 and 1959. It is a critical
pump station, providing backup and peak water supply capacity to east Fort Worth.
The electrical service and equipment is old and outdated, consisting of overhead transformers and
outdated switchgear. The Water Department plans on replacing the switchgear and upgrading the
pump starters and controls as part of a pump station improvement project. The replacement and
upgrade of the electrical service is also recommended.
As part of the work under this Agreement, Oncor Electric Delivery Company, LLC, will be required to
remove the existing overhead electrical transformers and install a new pad mounted transformer of
increased capacity, as well as the primary metering unit.
This project is located in COUNCIL DISTRICT 8.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current operating
budget, as appropriated, of the Water and Sewer Fund.
TO Fund/Account/Centers
FROM Fund/Account/Centers
PE45 541200 0605004 $69,764.09
Submitted for Citv Manaqer's Office bv:
Oriqinatinq Department Head:
Additional Information Contact:
ATTACHMENTS
600ncor Pavment Eastside PS map.pdf
Fernando Costa (6122)
S. Frank Crumb (8207)
Chris Harder (8293)
http://apps.cfwnet.org/council�acket/mc_review.asp?ID=18429&councildate=6/4/2013 6/6/2013