HomeMy WebLinkAboutContract 44606-CO1 (2)��ry s�c�°��� �, � , , �� a � � . �i'f �. `� �� � �,� �� � i.� � � � .: � � >f � �' 1 �;� . _ �", 'o t FORT wORTH City of Fort Worth '' _J��-� Change Order Request Project Name Northside IV Elevatetl Storage Tank (EST) and Pipeline City Sec # 44606 Client Project #(s) Fort Worth Water Dept (00370); CDM Smith (63234); Landmark Strurctures I(1395) Project A new tank in Northside IV Pressure and asoociated 30-inch pipeline with Tunnel Under US 287. Design M&C C-22296; Description Construction M&C C-26301 Contractor Landmark Structures I, LP Change Order #� Date 413I2014 City Project Mgr. Farida S Goderya, PhD, PE City Inspector Mike Hill Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Original Funtls Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Water 230.00 Select Day Totals T e '40,000.00 480 90 '40,000.00 570 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTR,4CT 17.81 % MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,675,000.00 � P�'1 n m � m 0 � � ►� � � � -� �Y' iA � This Change Order # 1 covers the following: Note, Time Extension is also a part of this Change Order. � � ��°�� � . The additional details may be found n the subseque � a�s�q,b°° °Oo�� � °� , �° ° 0 0 � o� A� � �� o�� 0o a 1 ��-' �' /' / �° � ��,o°`���.,;3 �. S � �������� ,��F1�9��. ���Oft[� �ITX SECR,Ei'Ait� GS-�� "�'��7E���"I; �l� ..�, �� ,� ��g_ It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidentai to, the above Change Order. � � � � 0 � � � �..1 Q L � 0 � � � � O � �� �+ ai U� � t U �j :L � j �� :L � � 0 cD v � � U N � � U N � � U � � � co E a c � J � C � (6 � � W � � � U � ._ N � co ai � W � � - L a � L � Z L� (D � N N N U U � � c � .� a> 0 0 m (O N U U � � c 0 U � N � O U °� � o � � �Q z � U � � � �o c � � � U U � �o � v 0 N M �' a> io � � � L � � � Q� m C m � U � J � � � U � � (LS � � c J � 0 U (O C O U � Q N a ao � a C O � � Q L � � � N t]A C !D t U The revised proposal, along with additional contract time, is detailed below: Additional Cost: $666,230.00 Includes subcontractor cost, bond & insurance, job direct Landmark operational management, and overhead. Work under this proposal is significant additional risk and cost to Landmark which is not covered under the original contract amount. Additional Contract Time: Additional time for Substantial Completion Additional time for Final Completion Revised Substantial Completion Date Revised Final Completion Date: 60 Calendar Days 30 Calendar Days December 24, 2014 February 22, 2015 A change order summary detailing the additional cost associated with this proposal along with a copy of the proposal as provided by our tunnel subcontractor (SJ Louis) has been attached for your reference. The scope of this work includes grouting of the 265 linear feet of 54" liner plate previously installed to mitigate future settlement. After existing 54" (iner plate tunnel is grouted in place the tunnel launch shaft will be excavated to an additional depth shown for the installation of the new 54" liner plate tunnel. The new 54" liner plate tunnel will then be installed to approximate station 1+05 per the "Option 2" sketch. Included in this price is: - Additional 54" liner plate material and installation - Additional trench safety - Tunneling through competent rock - Spoils removal - Additional waterline piping and fittings - Additional precast required at blow off vault - Installation of cellular grout for existing tunnel - Additional excavation at the receiving tunnel pit - Remobilization/Demobilization Acceptance of this proposal will constitute acceptance with the means and methods described above and will also take the place of any submittals requested for this additional work. No additional submittals will be provided for this work or installation. Please do not hesitate to call my office should you have any questions. Best Regards, �ANDMARK STRUCTURES I, L.P. ' i�` � � � � %,,'%<'" ` lf,' -.`-o. t � ���Ct �'/ /f �f t' . _- � � � � Marshall Peterson Project Manager Attachments: - SJ Louis Proposal Dated 2/14/14 - Landmark Change Order Summary Owner Change Order No. 2B Job Name: Northside IV EST & Pipeline Job Number: 1395 Internal CO Number: Description: Tunne� conetct �option z� � �a����r��to�°s l��cfi�ccat���a ��r����� - f'�����cal i�o�ihside� N i;ievated Storage ian: [���ST� atid pipelinc � Harley Ave., Moni�om�ry St. and Kip ,iphns�n Rd. i2espnnse Xequired Bv Niarshail Pc�torson Landn�ark Struc€ures 166� Harmon Road Porf Vdorth, TX 7b 1'77 �%I8 �T't181� �. - 1(nption 7_) � rchruary 14, 2�1a 7�nnsnrined Hv Sam E(�nna Project Manager 1.� � �- � -:=� r ����- � � �� _...r,_._._, t ��scriptrnn nf ti'nrk This proposai is toprovide material and installation for "Option 2" as provided in sketch by CDM Smith on November22, 2033. The scape bf this work would indude grouting th� 265 ii�ear fest af S4° (iner p(ate previoiasly installed in piace ta mitigate future setYlement. After the existing S4" liner plate tunne) is grouted in place the tunnel iaunch shzft will be excavated to an additiqnai depth shown for instailation of the new 54" liner plate tunnel. The new 5A" liner piate tunnef will then be i�stalied to appro.ximate statipn 1+05 per the "Optian 2" plans. Included in this p�ice is: * additianai 5�" pner plate material and instailation �' additionai trench safefy " tur�ne(ing "` spoiis remoya( * additional veRical waterline pipe and fittings * additional precast required at the hlow aff vauit * ceilui�r gro�t for existing,tunnel * ad4itiona( �xcavation at the receiving tunnel pit *' demcbilfzatiort/rembbilizatipn Acc2ptance of this proposafwiil constitute acceptance �vith the means and methods described above and will also take place of any �ubmittais requested for this additianal wor!t. No additiqnal submittals wilf be {��ovided for!his work c insialiaticn: Please �eview and fet us knaw if you have any questions and/or requi�e any ac+ditional information. Please confirm this proposal is acceptabie so w� can proc. eed with the tivork. lt�em vC�v:l �1Ctv-a pf t'rnpn,ru( �Iorthsic3cl'V �ier�ated Sttir�ge "�ank (ESTJ anci z i�atinc �ffsite Pipe anci 7'unnet Ins#atlation _. DescripNo�t Unit.c �3uafrlity t;nit Price temaic 7ut�nCl - Opti�n 2- Sundaace Pricc f.,F 36S 5 987.�4 �t>uii�g Tunnel L}� 2G� S 172.50 ai�ri�ls (Additionai Lincr t'(atc:. t)IP, Ptecasi; Spo;ls„ Trench Safei;�, �ic;) l.S 1 $ I;<,(W2.H0 �@� �ti2i1��: �Ze�uested Add€�:���t Caie�¢�a� ����s: e, ja)ea.se prtiv��3c aa auahori�adon sigs�at�rc hels3w �nd return nnc (1} cnpy to nur o�ce, LGJ(IS CpIESfYf1C1f!)1t ,�Cll012 � C��st 5363; �Ai. i 2 x4$:7i2.So S I:si,t)y2 �ahra��� ��.�2 G3 �9a�s �fiJ, d auis Go�esiruction ��j�'c��ius Ltrf. 520-st .S. b1li t�VE'311dQ .fT�latrsfreld, %'�us 7GlIt3 (877j 477-tI3?0 Offter� (817) 477 F)Si2 1''�zx �v City of Fort Worfh, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 4/8/2014 ' DATE: Tuesday, April 08, 2014 LOG NAME: 60NORTHSIDE IV EST & PIPELINE TUNNEL C01 REFERENCE NO.: **C-26757 SUBJECT: Authorize Execution of Change Order No. 1 to City Secretary Contract No. 44606 with Landmark Structures I, LP, in the Amount of $666,230.00 for the Construction of a New Tunnel Under US Highway 287 for the Northside IV Elevated Storage Tank and Pipeline, Thereby Increasing the Total Contract Amount to $4,406,230.00 (COUNCIL DISTRICT 7) RECOMMENDATION: it is recommended that the City Council authorize the execution of Change Order No. 1 to City Secretary Contract No. 44606 with Landmark Structures I, LP, in the amount of $666,230.00 for the construction of a new tunnei under US Highway 287, for the Northside IV Elevated Storage Tank and Pipeline project, thereby increasing the total contract amount to $4,406,230.00. DISCUSSION: On June 4, 2013, (M&C C-26301) the City Council authorized the construction of a one million gallon Elevated Storage Tank (EST) and 30-inch pipeline that crosses underneath US Highway 287, which requires tunneling. During the tunnel construction under US Hwy 287, the contractor encountered a conflicting 42-inch Texas Department of Transportation (TXDOT) storm drain. At that point the tunnel construction was stopped. The City's consultant and Staff reviewed many options with TXDOT personnel and the contractor, and it was decided that re-tunneling will be the best and least expensive option. The net effect of this proposed Change Order No. 1 is as follows: AMOUNT CONTRACT TIME (CALENDAR DAYS) Original Contract $3,740,000.00 480 Proposed Change Order No. 1 Revised Contract Amount $ 666,230.00 $4,406,230.00 .� 570 M/WBE Office - Landmark Structures I, LP, is in compliance with the City's BDE Ordinance by committing to an overall four percent MBE participation on this contract inclusive of this Change Order No. 1. Staff has reviewed this change order and considers it to be fair and reasonable. Logname: 60NORTHSIDE IV EST PIPELINE TUNNEL COl Page 1 of 2 This project is located in COUNCIL DISTRICT 7, Mapsco 202-B8. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers P265 541200 607140037080 Fernando Costa (6122) S. Frank Crumb (8246) Farida Goderya (8214) ATTACHMENTS 1. CO no1- Northside IV - MBE Compliance.pdf (CFW Internal) 2. FAR-005 CIP#00370 P265.pdf (CFW Internal) 3. Fund Verification P265.pdf (CFW Internal) 4. NS IV EST Exhibit for MnC.pdf (Public) �666,230.00 T,�srnamP• F,(1NCIRTNCTT�R TV F.�T PTPF.T,TNR TTINNRT, (1:(11 Pa�e 2 nf 2