Loading...
HomeMy WebLinkAboutContract 44606-CO 3�iTY ����TA(�°� ifl�!i�7� �1 t14A'611�^ �j' !l�.l�o �� _. _ _ _ �ORT�ORTH,> City of Fort Worth Change Order Request Project Name Norlhsitle IV Elevated Storage Tank (EST) and Pipeline City Sec # 44606 Client Project #(s) Fort Worih Water Dept (00370); CDM Smith (63234); Landmark Strurclures I(1395) Project A new tank in Norlhside IV Pressure antl asoociated 30-inch pipeline wilh Tunnel Untler US 287. Design M&C C-22296; Description Construclion M&C C-26301 Contractor Lantlmark Slructures I, LP Change Order #�3 Daie 7/7/2015 Cily Project Mgr. Farida S Goderya, PhD, PE City Inspector Mike Hill Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Conlract Cost to Date Water 799.00 $0.00 799.00 Original Funds Available for Change Orders $0.00 Remaining Funds Available (or this CO $0.00 Additional Funding (if necessary) $2,092.67 $2,092,67 CHANGE ORDERS fo DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 a,53% MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,675,000.00 This Change Ortler # 3 covers the following: PCM-03 Work includes provision antl installation of a Rosemount pressurellevel lransmifler in lieu of the specifietl Foxboro brand as requested by the City. PCM-04 Additional cost for provision of a 20'x3'x4" reinforced concrete cap for protection of an existing Enervest natural gas line, which crosses lhe drainage swale associated wilh ihe NS4 EST site. PCM-05 Conlract time extension request for 28-days due to weather which caused tlamage to the steel ��j�'�� � rage tank. See lhe attached lefter reqeust (rom Landmark, �" 6gaaoeo� r� PCM-06 Contract time extension re uest for 15-da s due t additional ' e(or Cit dm irn rative of C n e`�� �, q Y �a .�.�..a,,.,��..o %���� � p�� 9 0���- Atltlitional delails may be fountl in the attached pages. _;, It is understood and agreed that the acceptance of this Change Order by the contractor constilules an accord a paymenf in full (both lime and money) for all costs arising oul of, or incidenfal to, lhe above Chan e Ortler. ConUactor's Com an Name = Contractor Name ontr t.S' f Lantlmark Slructures I, LP Marshall Pelerson ,,. , �- ;'� Consultant En ineer- CDM Slnith",�:: �:� Chad Bariruff, PE •" � ,j t_; Water Director , -• , John Carman �/,� �;',O/«��%%� Assistant Ci Attorfie Qoug Black -' -'�%� � ' �— — � �.__...��.__`_'_.—."__."____.___'1 � i y M&C Number NIA , "� a '� ���'�1t ;� �� � � , � �i'. tdIP��TH, Y('� j ,23= ��� � J. Sefect Day Totals T e 3,740,000.00 480 $690,799.00 90 $0.00 0 9,430J99.00 570 �n �� B�-� ° � �, o� a r.,k.�,o. ,-:j`��.� Date Farida S, Gode a, PE � �� '' ' ° 5` Assistant Director, En i1ee 'n Date And Cronber , PE ' 3 fi Assistanl Ci Mana er � Dat Few�e�e�?osta �. ,.�-.,... 7 �S. required) M&C Date Approvetl NIA � E� SCAN��� fl � O � V' V � O e � � � U � � N � N T N U � U U �6 otf � � m .� � � _ � M 1� _ W N � � Y � � � � � 'D "D M � O � c � a"i - c ca o- � L C H U N � � � � � � � c� � � +_ cn =_ cn O -a � .�- Z � -a � � O a -� � � '� L c�6 C ❑ � � C J O Q L � � "D `� O �- N °' o � n, � �p U � � O � � � t � � V � c~i� cn � S.' w C U � `° Y Q N c U � N F-- v�i N O � � ti � 0 0 � O a. � � Q '�O N J � � N � � U � d � � C� � (6 N � z °� U � w (6 � 7 N � � Y O � � � � C U `1 :O p � � N (n � � � � � � � � � C � C C � z �i Q U � u�. �"i � �$ C . 0 0 `o� � z � � � � O U � � �.., a`�i a a`ni U 'o a �o c � a O°- '� � .._�", w �' -o � a 0 � � o 0 N � � � � � O O� O O N � � � E/) � J I J I J I J p I O I O I O O O O O N I � I N I N � � � � "0 � Y T � � � N y > � (n (6 "CS O � 7 L N z �N � � 6 �p C N p. "n N U W � a� � m c� N� L �' J cp p (6 � � ' � `s � :-. � � � � � aEi � �.x.� `a o U� � ca o a> a� E.c Q � 9 U (O �U � U C a- � � p� O C N � �� � Z c O c.� � � O p m� �� N U @ O� N O'O � � � p N j � � _ � (6 .0 O Q � � � 7 � � C Q � � � fn �� fn m � � .� j W m � -c � � � X � � � :p � C> � � � o p � X � N U N 'N � O O .L-� � O � � � U N � - `7 �. '� .� � � � tn .0 (6 � .0 N a C C y (B d N (6 V O � p_ O "D � � N U Cp -p � p fl- ��� � � t U d � U p U c� C N L O 7 p O� ,Y N � � p� � cn p� � � Qj C m C '+� � � O w �C � � � '� � � �� o� fn U E'° U�ia a`"i c ca -p � o � U `n � � o -o � o .a' a`�i t/� � x m � � (Q C � �n � � � F � c� � " d Q� '� � W d N� d c�a 3 c-I N M � � O N N h� ro o.. C O � � ¢ v � `o � �� � N � U PROPOSED CONTRACT MODIFICATION (PCM OWNER: City of Fort Worth PROJECT: Northside Elevated Storage Tank IV CONTRACTOR: Landmark Structures I, LP ENGINEER: CDM Smith ENGINEER'S CONTACT: Chad Bartruff. PE PROJECT NO. 63234 OWNER: 00370 CONTRACTOR: 1395 ENGINEER: PCM NO. 003 NOTIFICATION TO CONTRACTOR: WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED MATERIALS AND REQUEST THAT YOU TAKE THE FOLLOWING ACTION: ❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT TIME OR AMOUNT. A FIELD ORDER WILL BE ISSUED. � SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE. ❑ A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID ❑ PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT. BY: Chad Bartruff, PE DATE: June 1, 2014 DESCRIPTION OF PROPOSED CHANGE: ❑ DESCRIBED HEREIN � SEE ATTACHED Refer to attached letter from Landmark: Landmark proposes to furnish and install a Rosemount transmitter in place of the specified Foxboro transmitter as requested by the City. � CONTRACTOR'S RESPONSE: WE RESPOND TO YOUR REQUEST AS FOLLOWS: ❑ WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE, ISSUE FIELD ORDER. � WE SUBMIT THE ATTACHED PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE. ❑ WE ARE PROCEEDING WITH THE CHANGE AT THE UNIT PRICE BID ❑ WE ARE PROCEEDING WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT. BY: Marshall Peterson (See attached letter proposal) DATE: June 1, 2014 ACTION TAKEN: ❑ PROPOSED CONTRACT MODIFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED. BY: DATE: ❑ FIELD ORDER ISSUED: NO. DATE: BY: � CHANGE ORDER ISSUED: NO. 3 DATE: Julv 7, 2015 BY: Chad Bartruff, PE Khole, Sagar From: Goderya, Farida <Farida.Goderya@fortworthtexas.gov> Sent: Monday, August 25, 2014 10:25 AM � To: Khole, Sagar � v S � Cc: Bartruff, Chad � 1�� L- Subject: RE: NS IV EST and Pipeline: PCM #3 Rosemount Transmitter** �` Follow Up Flag: Follow up Flag Status: Flagged Hi Sagar/Chad, I have reviewed the PCM 03 for furnishing and installing Rosemount Transmitter Model 3051. The need for this was identified by city staff during the construction and submittal review. Also, refer to the emails correspondences during 6/7/14, 6/17/14 and 6/18/14 regarding Electrical & SCADA Submittal review. I understand, this proposal includes all costs associated with furnishing the transmitter and will not require contract time extension. I am in agreement with this PCM 003 and it will be included in the next change order (CO #3) paperwork. Call or email with questions. Regards. Farida Farida S. GodeNya, PhD, PE Sr. Prof Engineer � Facilities Project Manager Fort Worth Water Department Office: 817-392-8214 Cell: 817-851-4910 Farida. Goder�a(a�fortworthtexas. gov City of Fort Wortle — Wor/ring togetlie�• to brrild n strong corrrmuirit�� FORT V�V�IRTH� From: Khole, Sagar [mailto:KholeSH@cdmsmith.com] Sent: Friday, August 22, 2014 6:40 PM To: Goderya, Farida Cc: Bartruff, Chad Subject: RE: NS IV EST and Pipeline: PCM #3 Rosemount Transmitter Hi Farida, Please find attached paperwork for PCM #3 — Rosemount Transmitter with our cover letter for your review. This is assuming that the PCM will be processed as a part of a future change order (i.e. #3). � ,-- _ �� �� .� v � Q �' Please see my responses to your instructions below. Thanks, Sagar H. Khole, P.E. � CDM Smith (TX F-3043) � 100 Throckmorton Street, Suite 600 � Fort Worth, TX 76102 � Phone: (817) 332-8727 � Fax: (817) 820-0450 � KholeSH@cdmsmith.com � cdmsmith.com From: Goderya, Farida [mailto:Farida.Goderya@fortworthtexas. ov Sent: Thursday, August 21, 2014 4:01 PM To: Khole, Sagar Cc: Bartruff, Chad Subject: RE: NS IV EST and Pipeline: PCM #? Rosemount Transmitter Hi Sagar, As we discussed, please - check on the Correct PCM no. (3 or 4?) for this Rosemount Transmitter. The #4 referenced in earlier emails was Landmark's internal numbering system which will be different than ours. This is PCM #3. - also send me the PCM/CMR and RFI log and/or you can put it on Buzzsaw. We have had only 2 PCMs (not counting above), 2 COs, and 10 RFIs so far. I can create a log sheet similar to that of our submittal and RFI logs (most regularly updated) and update buzzsaw as needed. Will have to go through the previous PCMs to fill in the necessary fields. Will post when updated. - Since you have already prepared the recommendation letter for this PCM, you can send me. However for future PCMs/CMRs, an email would be just fine too. I am big fan of the KISS (Keep it simple & short) Principle. BTW, I will give you my approval for a given PCM/CMR as an email. Per your instructions we will send you emails approving PCMs here on in. - I have also attached CO2; including the paper work for the PCM 01- Tri County Electric power extension charge. This will give you an idea of a complete paperwork for the CO. Acknowledged - Notice the name in the subject header and all the email chain attached below. Updated subject header Call or email with questions. Regards. Farida Farida S. GodeNya, PhD, PE Sr. Prof Engineer � Facilities Project Manager Fort Worth Water Department Office: 817-392-8214 Cell: 817-851-4910 Farida.Goder�(�a,fortworthtexas. o�v Ciiy of Fort Wortlr — Wor/iiitg togetlrer to Guild n stro�tg commu�2ity �o�T �'VoRTH� CDM Sm�th 100 Throckmorton Street, Suite 100 Fort Worth, TX 76102 tel: 817 332-8727 fax: 817 820-0450 August aa, aoi4 Ms. Farida Godeiya, Ph.D., P.E. Project Manager City of Fort Worth i000 Throcicmorton Fort Worth, TX �6ioa Subject: Northside IV Elevated Storage Tanlc and Pipeline Landmarlc Proposed Contract Modification No. 3 Dear Ms. Godeiya: �_-. ��� �3 We have reviewed the attached Proposed Contract Modification No. 3 from Landmarlc for the above referenced project. Worlc includes providing and installing a Rosemount pressure/level transmitter in lieu of the specified Foxboro brand. Landmarlc has requested $i,a97.00 for performing this worlc. We find the estimate fair and equitable for the worlc to be performed. Based on our review, we recommend the City accept the proposal and execute as a part of a future change order to the construction contract. Please let us Icnow if you have any comments/questions regarding this item. Very truly yours / =! // � .�.---, � Chad Bartruff, PE Project Manager CDM Sinith Inc. File: 63�34-os.o6.�0 i�'0 WATER + ENVIRONMENT +TRANSPORTATION + ENERGY + FACIUTIES � � l./�N f�M/�RlC June 1, 2014 CDM Smith 100 Throcl<morton Street Suite 600 Fort Worth, TX 76102 Att n Re Chad Bartruff, PE Transmitter Change Proposal Northside IV EST and Pipeline City of Forth Worth, TX, Project No. 00370 Dear Mr. Bartruff: � `� � V S p� Landmark Structures 1665 Harmon Road Fort Worlh, Texas 76177 817.439.8Fl88 Phone 817.439.9001 Fax vrv✓w.teamlandmark.com As requested, Landmarl< proposes to furnish and install a Rosemount transmitter in place of the specified Foxboro transmitter as detailed below. Attached is the transmittal product info for your review and approval. Additional Cost: $1,297.00 Includes change from a Foxboro to Rosemount transmitter only. Additional Contract Time: 0 Days No impact to the project schedule is anticipated if response to this proposal is received no later than July 9, 2014. Exclusions: - No additional submittals will be provided for this worl< or installation. Please do not hesitate to call my office should you have any questions. Best Regards, LANDMARK STRUCTURES I, L.P. I � ' � ,� ' . � � - '- Marshall Peterson Project Manager Attachments: - Landmarl< Change Order Summary - Circle A Electric Quote - Rosemount Transmitter Product Infomation Owner Change Order No. 4 Job Name: Northside IV EST 8 Pi Job Number: 1395 Internal CO Number: D@SCflptl011: Pressure Transmitter Change � �-� � 1 � AMOUNT DETAIL ITEM DESCRIPTION �TY UNIT UNIT RATE EXTENDED TOTAL Notes AMOUNT AMOUNT i ENGINEERING ;0.00 z Perform Design Including Modi(ying Ihe lollowing Drawings 3 I 4 5 6 ] 8 5 Principal Engineer to Delail Engineer ti CADOperator tz Document Contral Clerk 13 14 �s PROCUREMENT 50.00 i6 1] 18 19 20 21 n . 23 _ . . . . _ . . — _ . _ . _ _ _ _ . . _ 24 �5 26 2] 2B 29 � 31 32 � CONSTRUCTION 50.00 aa as Installation Labor J5 3] � 39 ao Equipment ai az 43 _ — _ . . _ _.___. __ _ . — _ .._—_ _ .. . . _ ._ . ___ 44 as SUBCONTRACT §1,178.59 es Circle A Electric m Pwvide and ins�all Rosemount transmifter 1.00 LS 1.00 52,36123 2,361 23 ae CreditforFozborotransmitter 1.00 LS 1.00 �1,182.64 (1,182.64) 49 50 _51. _ . . .. _ _ 52 � SC 55 56 n CHANGE ORDER AMOUNT SUMMARY §0.00 � -. _- --- —_ .. . - - ---- - � � ENGINEERING $0.00 e, PROCUREMENT $0.00 �z CONSTRUCTION $0.00 � SUBCONTRACT $1,179.00 � Sub-Total $1,179.00 ss OVERHEAD 8 FEE � 10% $118.00 � TOTAL VALUE OF THIS CHANGE ORDER $1,297.00 6] fi8 � ]0 » JOB COMPLETION TIME IMPACT DUE TO THIS CHANGE ORDER �z Current Substantial Completion Dale 24-Dec-14 �a Currenl Final Completion Date 22-Feb-15 ]4 �5 Days Added with this Change 0 Days ]6 » Revised Substanlial Completion Date (with lhis CO) 24-DeC-14 �e Revised Final Completion Dale (with this CO) 22-Feb-15 �s � CHANGE ORDER SUMMARY e� Total Amount of this change $1,297.00 az Amount of Increase of Time To Complete 0 Da s �, Revised Substantial Completion Date Due to This Change 24-Dec-14 �, Revised Final Completion Date Due to This Change 22-Feb-15 �s e� 87 � 99 CIRCLE A ELECTRIC Quoted to: 1051 KENNEDY LANE SAGI NAW, TEXAS 76131 OFFICE: (817) 625-0880 FAX: (817) 577-2197 License #17781 LANDMARK STRUCTURES 1, LP 1665 HARMON RD FT WORTH, TX 76177 Phone 817-230-8898 E-m ai I NORTHSIDE IV TANK QUOTE Quote Number: 5418-R EV 1 Quote Date: Jul 18, 2014 Page: 1 j �� `' S \ Customer ID Good Thru Payment Terms Sales Rep 100 LAN-2 8/17/14 001 --- _ Description JORTHSIDE IV ELEVATED STORAGE TANK �HANGE FOXBORO IGP10-A22D1 F-M2 TRANSMITTER TO ROSEMOUNT 3015CG4A02A1AM5D4BAH2 �RANSMITTER FOR THE SCADA SYSTEM �REDIT FOXBORO TRANSMITTER NSTALL ROSEMOUNT TRANSMITTER Regulated by the Texas Dept of Licensing and Regulation, PO Box 12157, Austin, TX 78711, 1-800-803-9202, 512-463-6599- Subtotal Sales Tax Total Amo unt -1,182 2,361 1,178 .59 1,178.59 PROPOSED OWNER: City of Fort Worth PROJECT: Northside Elevated Storage Tank IV CONTRACTOR: Landmark Structures I, LP ENGINEER: CDM Smith ENGINEER'S CONTACT: Chad Bartruff. PE CONTRACT MODIFICATION PROJECT NO. 63234 OWNER: 00370 CONTRACTOR: 1395 ENGINEER: PCM NO. 004 PCM NOTIFICATION TO CONTRACTOR: WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED MATERIALS AND REQUEST THAT YOU TAKE THE FOLLOWING ACTION: ❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT TIME OR AMOUNT. A FIELD ORDER WILL BE ISSUED. � SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE. ❑ A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID ❑ PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT. BY: Chad Bartruff, PE DATE: Oct 29, 2014 DESCRIPTION OF PROPOSED CHANGE: ❑ DESCR�BED HEREIN � SEE ATTACHED Refer to attached letter from Landmark: Furnish and install one 20' L x 3' W x 4" thick concrete caps where the Enervest gas line and cathodic protection line cross the drainage swale CONTRACTOR'S RESPONSE: WE RESPOND TO YOUR REQUEST AS FOLLOWS: ❑ WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE, ISSUE FIELD ORDER. � WE SUBMIT THE ATTACHED PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE. ❑ WE ARE PROCEEDING WITH THE CHANGE AT THE UNIT PRICE BID ❑ WE ARE PROCEEDING WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT. BY: Marshall Peterson (See attached letter proposal) DATE: Oct 29, 2014 ACTION TAKEN: ❑ PROPOSED CONTRACT MODIFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED. BY: DATE: ❑ FIELD ORDER ISSUED: NO. DATE: BY: � CHANGE ORDER ISSUED: NO. 3 DATE: Julv 7, 2015 BY: Chad Bartruff PE Khole, Sagar �— -� From: Bartruff, Chad � ��,,� -- Sent: Tuesday, November 04, 2014 3:50 PM 1 �`' � To: Goderya, Farida �� Cc: Byrd, Gerald; Hill, Mike; 'Peterson, Marshall'; Khole, Sagar -- Subject: RE: 1395 - Northside EST - Concrete Caps for Gas Line Crossing Attachments: 2014.10.29 - 1395 - Gas Line Concrete Cap Letter.pdf Farida — The attached proposal from Landmark for the additional work associated with installation of a concrete cap over the EnerVest gas pipeline has been reviewed, and we concur with your approval. We will process this as a PCM for inclusion as part of a future change order to the construction contract. Please let us know if you have any questions and we will post the documentation to Buzzsaw for record. Regards —Chad Chad D. Bartruff, P.E. CDM Smith (TX #F-3043) 100 Throckmorton Street, Suite 600 Fort Worth, TX 76102 Tel: (817) 332-8727 Fax: (817) 820-0450 bartruffcd(u�cdmsmith.com cdmsmith.com `' ` Please consider the environment before printing this email. From: Goderya, Farida [mailto:Farida.Goderya@fortworthtexas.gov] Sent: Tuesday, November 04, 2014 2:55 PM To: 'Peterson, Marshall'; Khole, Sagar Cc: Byrd, Gerald; Bartruff, Chad; Hill, Mike Subject: RE: 1395 - Northside EST - Concrete Caps for Gas Line Crossing Hi Chad/Sagar, Please document this as PCM ??, attach the complete paperwork and upload on Buzzsaw. FYI, I am ok with this PCM for an addition of concrete cap on EnerVest Gas line crossing. Regards. Farida Farida Goderya, PhD, PE Sr. Prof Engineer � Facilities Project Manager Fort Worth Water Department Office: 817-392-8214 Cell: 817-851-4910 Farida. Goderva(�a,fortworthtexas. gov City of Forl Woi•tla — Wor/ri�rg togetlter to Guild a stratg conanrrr�tit�� � IJ�N I�M/�R I� October 29, 2014 CDM Smith 100 Throcl<morton Street Suite 600 Fort Worth, TX 76102 Attn Re Chad Bartruff, PE Concrete Caps for Gas Line Crossing Northside IV EST and Pipeline City of Forth Worth, TX, Project No. 00370 Dear Mr. Bartruff: �. ��'� U� � / Landmark Structures 1665 Harmon Road Fort Worth, Texas 76177 817.439.8F388 Phone 817.439.9001 Fax www.teamlandmark.com As requested, Landmarlc proposes to furnish and install one 20' L x 3' W x 4" thicl< concrete caps where the gas line and cathodic protection line cross the drainage swale. The additional cost and contract time is detailed below. Additional Cost: $795.67 Includes material, labor, and Landmari<overhead & fee. Additional Contract Time: No impact to the project schedule is anticipated. Exclusions: - Density Testing - Concrete Cylinders & Inspection Acceptance of this proposal will constitute acceptance with the means and methods described above and will also tal<e the place of any submittals requested for this additional work. No additional submittals will be provided for this work or installation. Please do not hesitate to call my office should you have any questions. Best Regards, LANDMARK STRUCTURES I, L.P. l� �� , _ ,.r / �- Marshall Peterson Project Manager PROPOSED CONTRACT MODIFICATION (PCM OWNER: City of Fort Worth PROJECT: Northside Elevated Storage Tank IV CONTRACTOR: Landmark Structures I, LP ENGINEER: CDM Smith ENGINEER'S CONTACT: Chad Bartruff, PE PROJECT NO. 63234 OWNER: 00370 CONTRACTOR: 1395 ENGINEER: PCM NO. 005 NOTIFICATION TO CONTRACTOR: WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED MATERIALS AND REQUEST THAT YOU TAKE THE FOLLOWING ACTION: ❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT TIME OR AMOUNT. A FIELD ORDER WILL BE ISSUED. � SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE. ❑ A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID ❑ PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT. BY: Chad Bartruff, PE DATE: Sept 3, 2014 DESCRIPTION OF PROPOSED CHANGE: ❑ DESCRIBED HEREIN � SEE ATTACHED Refer to attached letter from Landmark — Time extension request due to storm damage to tank bowl. 28-day (calendar) extension requested based on time that was required to repair the tank bowl. CONTRACTOR'S RESPONSE: WE RESPOND TO YOUR REQUEST AS FOLLOWS: ❑ WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE, ISSUE FIELD ORDER. � WE SUBMIT THE ATTACHED PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE. ❑ WE ARE PROCEEDING WITH THE CHANGE AT THE UNIT PRICE BID ❑ WE ARE PROCEEDING WITH THE CHANGE UNDER THE TIME AND MATERIALS PROV�SIONS OF THE CONTRACT. BY: Marshall Peterson (See attached letter proposal) DATE: Sept 3, 2014 ACTION TAKEN: ❑ PROPOSED CONTRACT MODiFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED. BY: DATE: ❑ FIELD ORDER ISSUED: NO. DATE: BY: � CHANGE ORDER ISSUED: NO. 3 DATE: Julv 7, 2015 BY: Chad Bartruff, PE � I.J�NI�MARK September 3, 2014 CDM Smith 100 Throcicmorton Street Suite 600 Fort Worth, TX 76102 Attn: Chad Bartruff, P.E. Re: Project Delay - Storm Damage Repair Northside IV EST and Pipeline City of Forth Worth, TX, Project No. 00370 Dear Mr. Bartruff: , r �� ���1 � > Landmark Structures 1665 Harmon Road Fort Worth, Texas 76177 817.439.888II Phone 817.439.9001 Fax www.teamlandmark.com As discussed in previous correspondence, the adverse weather conditions damaged the tank the morning of June 16, 2014. In accordance with specification section 00 72 00 12.03.A, Landmark notified the owner of the potential delay on June 17, 2014 and traciced specific impacts to the progress of the project associated with this repair. Landmark requests the extension of 28 Calendar Days, between June 16, 2014 and July 14, 2014 (excluding July 4, 2014) be added to the above referenced contract in accordance with the specifications. I appreciate your consideration and let me Icnow if you have any questions. Best Regards, LANDMARK STRUCTURES I, L.P. j� , �� Marshall Peterson Project Manager PROPOSED CONTRACT MODIFICATION (PCM OWNER: City of Fort Worth PROJECT: Northside Elevated Storage Tank IV CONTRACTOR: Landmark Structures I, LP ENGINEER: CDM Smith ENGINEER'S CONTACT: Chad Bartruff, PE PROJECT NO. 63234 OWNER: 00370 CONTRACTOR: 1395 ENGINEER: PCM NO. 006 NOTIFICATION TO CONTRACTOR: WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED MATERIALS AND REQUEST THAT YOU TAKE THE FOLLOWING ACTION: ❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT TIME OR AMOUNT. A FIELD ORDER WILL BE ISSUED. � SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE. ❑ A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID ❑ PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT. BY: Chad Bartruff, PE DATE: March 28, 2015 DESCRIPTION OF PROPOSED CHANGE: ❑ DESCRIBED HEREIN � SEE ATTACHED Refer to attached letter from Landmark — Time extension request due additional City administrative time required for processing of Change Order No. 1. 15 days (calendar) extension requested. CONTRACTOR'S RESPONSE: WE RESPOND TO YOUR REQUEST AS FOLLOWS: ❑ WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE, ISSUE FIELD ORDER. � WE SUBMIT THE ATTACHED PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE. ❑ WE ARE PROCEEDING WITH THE CHANGE AT THE UNIT PRICE BID ❑ WE ARE PROCEEDING WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT. BY: Marshall Peterson (See attached letter proposal) DATE: March 28, 2015 ACTION TAKEN: ❑ PROPOSED CONTRACT MODIFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED. BY: DATE: ❑ FIELD ORDER ISSUED: NO. DATE: BY: � CHANGE ORDER ISSUED: NO. 3 DATE: Julv 7, 2015 BY: Chad Bartruff, PE �_ ---� � � �y'l u � �_- � IJ�N I�M/�R K March 28, 2014 CDM Smith 100 Throckmorton Street Suite 600 Fort Worth, TX 76102 Attn: Brian Williams, PE Re: Tunnel Conflict Option #2 Proposal Northside IV EST and Pipeline City of Forth Worth, TX, Project No. 00370 Dear Mr. Williams: Landmark Structures 1665 Harmon Road Fort Worlh, Texas 76177 II17.439.8f3E38 Phone 817.439.9001 Fax www.teamlandmark.com Per previous correspondence, Landmarlc was notified that the Tunnel Conflict Option #2 Proposal for Northside IV EST and Pipeline was not executed for approval during the most recent City of Fort Worth council meeting held on March 18, 2014. Landmarl< submitted this proposal on February 19, 2014 with the intentions of council consideration during the next session. The duration on the proposal submitted on February 19, 2014 was based off the communicated intention that this worlc would be available to begin following the next council meeting. As we discussed during the negotiation portions of the proposal, the timeline of this work is going to directly affect the critical path of this project. Due to the monetary and risk magnitude of this worl< in relation to the contract, Landmarlc does not feel comfortable in proceeding until final approval is submitted. With the assumption that this proposal will be introduced and approved during the next City of Fort Worth Council Meeting on April 1, 2014, Landmarlc formally requests the addition of 15 Calendar Days added to both the Substantial and Final Completion dates submitted on the proposal. If approval is not released by April 3, 2014, Landmark reserves the right to again re-evaluate the impacted construction duration. I appreciate your consideration and feel free to call me if you have any questions. Best Regards, LANDMARK STRUCTURES I, L.P. � � � � -- ,r. _ Marshall Peterson Project Manager Bartruff, Chad From: Goderya, Farida <Farida.Goderya@fortworthtexas.gov> Sent: Friday, June 19, 2015 1:09 PM To: Bartruff, Chad `�� � � P _y_- Cc: Hill, Mike; Khole, Sagar; 'Peterson, Marshall (mpeterson@teamlandmark.com)' Subject: RE: 1395 - Northside EST - Storm Damage CMR ?? & CO3 I am ok with additional 15-days extension to Landmark for the tunnel change order. Regards. Farida Farida Gode�ya, PhD, PE Sr. Prof Engineer � Facilities Project Manager Fort Worth Water Department Office: 817-392-8214 Cell: 817-851-4910 Farida.Goder,ya(a�fortworthtexas. o�v From: BartrufF, Chad [mailto:BartruffCD@cdmsmith.com] Sent: Thursday, June 18, 2015 5:41 PM To: Goderya, Farida Cc: Hill, Mike; Khole, Sagar; 'Peterson, Marshall (mpeterson@teamlandmark.com)' Subject: RE: 1395 - Northside EST - Storm Damage CMR ?? & CO3 Farida — I believe that there is an outstanding question pertaining to an additional 15-day extension requested by Landmark related to the original tunnel change and the time it took for internal City processing of the original tunnel change order. You had forwarded the Landmark letter request to me, but I did not recall confirmation that it was formally accepted? You probably had notified me but I could not find it in my notes. Please confirm and I will get the final CO-3 out for signature following updates. I will update the document signatures as noted. Thanks -Chad From: Goderya, Farida [mailto:Farida.Goderva@fortworthtexas.�ov] Sent: Thursday, June 18, 2015 5:28 PM To: Bartruff, Chad Cc: Hill, Mil<e; Khole, Sagar;'Peterson, Marshall (mpeterson@teamlandmark.com)' Subject: RE: 1395 - Northside EST - Storm Damage CMR ?? & CO3 Hi Chad, What happened to this CO3? My files still show an incomplete/unsigned documents. I also notice that now the front page needs to be revised to include the new Director (Carman) and Andy back as Assistant Director. See attached excel file. Regards. Farida Farida Goderya, PhD, PE Sr. Prof Engineer � Facilities Project Manager Fort Worth Water Department Office: 817-392-8214 Cell: 8l 7-851-4910 Farida.Goder�a(a�,fortworthtexas.� From: Goderya, Farida Sent: Tuesday, November 04, 2014 3:21 PM To: 'Bartruff, Chad' Cc: Hill, Mike; Khole, Sagar; Peterson, Marshall (mpeterson@teamlandmark.com) Subject: RE: 1395 - Northside EST - Storm Damage CMR ?? & CO3 ���� _ �C� U j \ � � Chad, I am ok with giving Landmark 28 days extension for the wind/storm damage. Please document this as CMR ??, complete the paperwork and upload on Buzzsaw. We can roll this into the Change Order 3(CO3), hence at this point the CO3 will include - CMR 01?, Wind/Storm Damage Time Extension - PCM 03, Rosemount Transmitter and - PCM 04?, Gas line Concrete cap Any other if necessary FYI, Currently, we have only given one 90 day time extension, as part of the C01 for the tunnel rework. Call or email with questions. Regards. Farida Fa�ida Goderya, PhD, PE Sr. Prof Engineer � Facilities Project Manager Fort Worth Water Department Office: 817-392-8214 Cell: 817-851-4910 Farida.Goder�a(�a,fortworthtexas.gov City of Fort Wortlt — Worlring togetlrer to build n sli•oitg communitJ� Fo�T�aRTH� From: Bartruff, Chad [mailto:BartruffCDCa�cdmsmith.com] Sent: Tuesday, November 04, 2014 10:01 AM To: Goderya, Farida Cc: Hill, Mike; Khole, Sagar Subject: FW: 1395 - Northside EST - Storm Damage