Change Order Request
Project Name Norlhsitle IV Elevated Storage Tank (EST) and Pipeline City Sec # 44606
Client Project #(s) Fort Worih Water Dept (00370); CDM Smith (63234); Landmark Strurclures I(1395)
Project A new tank in Norlhside IV Pressure antl asoociated 30-inch pipeline wilh Tunnel Untler US 287. Design M&C C-22296;
Description Construclion M&C C-26301
Contractor Lantlmark Slructures I, LP Change Order #�3 Daie 7/7/2015
Cily Project Mgr. Farida S Goderya, PhD, PE City Inspector Mike Hill
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Conlract Cost to Date
Water
799.00
$0.00
799.00
Original Funds Available for Change Orders $0.00
Remaining Funds Available (or this CO $0.00
Additional Funding (if necessary) $2,092.67 $2,092,67
CHANGE ORDERS fo DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 a,53%
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,675,000.00
This Change Ortler # 3 covers the following:
PCM-03 Work includes provision antl installation of a Rosemount pressurellevel lransmifler in lieu of the specifietl Foxboro brand as
requested by the City.
PCM-04 Additional cost for provision of a 20'x3'x4" reinforced concrete cap for protection of an existing Enervest natural gas line, which
crosses lhe drainage swale associated wilh ihe NS4 EST site.
PCM-05 Conlract time extension request for 28-days due to weather which caused tlamage to the steel ��j�'�� � rage tank.
See lhe attached lefter reqeust (rom Landmark, �"
6gaaoeo� r�
PCM-06 Contract time extension re uest for 15-da s due t additional ' e(or Cit dm irn rative of C n e`�� �,
q Y �a .�.�..a,,.,��..o %���� � p�� 9 0���-
Atltlitional delails may be fountl in the attached pages.
_;,
It is understood and agreed that the acceptance of this Change Order by the contractor constilules an accord a
paymenf in full (both lime and money) for all costs arising oul of, or incidenfal to, lhe above Chan e Ortler.
ConUactor's Com an Name = Contractor Name ontr t.S' f
Lantlmark Slructures I, LP Marshall Pelerson ,,. , �- ;'�
Consultant En ineer- CDM Slnith",�:: �:�
Chad Bariruff, PE •" � ,j t_;
Water Director , -•
,
John Carman �/,� �;',O/«��%%�
Assistant Ci Attorfie
Qoug Black -' -'�%� � '
�—
— � �.__...��.__`_'_.—."__."____.___'1
� i y
M&C Number NIA ,
"� a
'� ���'�1t ;� �� � � ,
� �i'. tdIP��TH, Y('� j
,23=
���
�
J.
Sefect Day
Totals T e
3,740,000.00 480
$690,799.00 90
$0.00 0
9,430J99.00 570
�n ��
B�-� ° �
�, o�
a
r.,k.�,o. ,-:j`��.�
Date
Farida S, Gode a, PE � �� '' ' ° 5`
Assistant Director, En i1ee 'n Date
And Cronber , PE ' 3 fi
Assistanl Ci Mana er � Dat
Few�e�e�?osta �. ,.�-.,... 7 �S.
required)
M&C Date Approvetl NIA
� E�
SCAN��� fl
�
O
�
V'
V
�
O
e
� � �
U �
� N
� N
T N
U �
U U �6
otf �
�
m
.�
� � _
�
M
1� _
W
N �
� Y
� � �
� �
'D "D
M � O �
c � a"i
- c ca o-
� L C
H U
N � � �
� � � � c�
�
� +_ cn =_ cn
O -a � .�- Z
� -a � � O
a -� � �
'� L c�6 C ❑
� � C J O Q
L � � "D
`� O �- N °'
o � n, �
�p U
� � O
� � � t �
�
V � c~i� cn �
S.' w C
U � `°
Y Q N
c U �
N
F-- v�i
N O �
� ti �
0 0 � O a. �
� Q '�O N J �
�
N � � U � d
� � C� � (6
N � z °� U �
w (6 � 7 N
� � Y O � �
� � C U `1
:O p � � N (n
� � � � � �
� � �
C
� C C �
z �i Q U � u�.
�"i � �$ C .
0 0 `o�
� z � � � �
O U � �
�.., a`�i a a`ni U 'o
a �o c � a
O°- '� � .._�",
w �' -o �
a
0
� � o 0
N � � �
� �
O
O� O O
N � � �
E/) �
J I J I J I J
p I O I O I O
O O O O
N I � I N I N
� � � �
"0 � Y T
� � � N
y > � (n (6 "CS
O �
7 L N z �N � �
6 �p C N p. "n
N U W � a� � m
c� N� L �' J cp
p (6 � � ' � `s � :-.
� � � � �
aEi � �.x.� `a o U�
� ca o a> a� E.c Q
� 9 U (O �U � U C a-
� �
p� O C N � �� � Z
c O c.� � � O p m�
�� N U @ O� N O'O
� � � p N j � � _ �
(6 .0 O Q � � � 7 � �
C Q � � � fn �� fn m
� � .� j W m � -c
� � � X � � � :p � C>
� � � o
p � X � N U N
'N � O O .L-� � O � � �
U N � - `7 �. '�
.� � � � tn .0 (6 � .0 N
a C C y (B d N (6 V
O � p_ O
"D � � N U Cp -p � p fl-
��� � � t U d � U p
U
c� C N L O 7 p O�
,Y N � � p� � cn p� �
� Qj C m C '+�
� � O w �C � � � '� � �
�� o� fn U E'° U�ia a`"i
c ca -p �
o � U `n � � o -o � o .a' a`�i
t/� � x m � � (Q C
� �n � � � F � c� � "
d Q� '� � W d N� d c�a 3
c-I N M �
�
O
N
N
h�
ro
o..
C
O
�
�
¢
v
�
`o
�
��
�
N
�
U
PROPOSED CONTRACT MODIFICATION (PCM
OWNER: City of Fort Worth
PROJECT: Northside Elevated Storage Tank IV
CONTRACTOR: Landmark Structures I, LP
ENGINEER: CDM Smith
ENGINEER'S CONTACT: Chad Bartruff. PE
PROJECT NO. 63234
OWNER: 00370
CONTRACTOR: 1395
ENGINEER:
PCM NO. 003
NOTIFICATION TO CONTRACTOR:
WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED
MATERIALS AND REQUEST THAT YOU TAKE THE FOLLOWING ACTION:
❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT
TIME OR AMOUNT. A FIELD ORDER WILL BE ISSUED.
� SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR
PERFORMING THE DESCRIBED CHANGE.
❑ A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID
❑ PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT.
BY: Chad Bartruff, PE DATE: June 1, 2014
DESCRIPTION OF PROPOSED CHANGE: ❑ DESCRIBED HEREIN � SEE ATTACHED
Refer to attached letter from Landmark:
Landmark proposes to furnish and install a Rosemount transmitter in place of the specified Foxboro transmitter as
requested by the City.
�
CONTRACTOR'S RESPONSE:
WE RESPOND TO YOUR REQUEST AS FOLLOWS:
❑ WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE, ISSUE FIELD ORDER.
� WE SUBMIT THE ATTACHED PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED
SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE.
❑ WE ARE PROCEEDING WITH THE CHANGE AT THE UNIT PRICE BID
❑ WE ARE PROCEEDING WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE
CONTRACT.
BY: Marshall Peterson (See attached letter proposal) DATE: June 1, 2014
ACTION TAKEN:
❑ PROPOSED CONTRACT MODIFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED.
BY: DATE:
❑ FIELD ORDER ISSUED: NO. DATE: BY:
� CHANGE ORDER ISSUED: NO. 3 DATE: Julv 7, 2015 BY: Chad Bartruff, PE
Khole, Sagar
From: Goderya, Farida <Farida.Goderya@fortworthtexas.gov>
Sent: Monday, August 25, 2014 10:25 AM �
To: Khole, Sagar � v S �
Cc: Bartruff, Chad � 1�� L-
Subject: RE: NS IV EST and Pipeline: PCM #3 Rosemount Transmitter** �`
Follow Up Flag: Follow up
Flag Status: Flagged
Hi Sagar/Chad,
I have reviewed the PCM 03 for furnishing and installing Rosemount Transmitter Model 3051. The need for this was
identified by city staff during the construction and submittal review. Also, refer to the emails correspondences during
6/7/14, 6/17/14 and 6/18/14 regarding Electrical & SCADA Submittal review.
I understand, this proposal includes all costs associated with furnishing the transmitter and will not require contract
time extension. I am in agreement with this PCM 003 and it will be included in the next change order (CO #3)
paperwork.
Call or email with questions. Regards. Farida
Farida S. GodeNya, PhD, PE
Sr. Prof Engineer � Facilities Project Manager
Fort Worth Water Department
Office: 817-392-8214
Cell: 817-851-4910
Farida. Goder�a(a�fortworthtexas. gov
City of Fort Wortle — Wor/ring togetlie�• to brrild n strong corrrmuirit��
FORT V�V�IRTH�
From: Khole, Sagar [mailto:KholeSH@cdmsmith.com]
Sent: Friday, August 22, 2014 6:40 PM
To: Goderya, Farida
Cc: Bartruff, Chad
Subject: RE: NS IV EST and Pipeline: PCM #3 Rosemount Transmitter
Hi Farida,
Please find attached paperwork for PCM #3 — Rosemount Transmitter with our cover letter for your review. This is
assuming that the PCM will be processed as a part of a future change order (i.e. #3).
� ,-- _ ��
��
.� v �
Q �'
Please see my responses to your instructions below.
Thanks,
Sagar H. Khole, P.E. � CDM Smith (TX F-3043) � 100 Throckmorton Street, Suite 600 � Fort Worth, TX 76102 � Phone:
(817) 332-8727 � Fax: (817) 820-0450 � KholeSH@cdmsmith.com � cdmsmith.com
From: Goderya, Farida [mailto:Farida.Goderya@fortworthtexas. ov
Sent: Thursday, August 21, 2014 4:01 PM
To: Khole, Sagar
Cc: Bartruff, Chad
Subject: RE: NS IV EST and Pipeline: PCM #? Rosemount Transmitter
Hi Sagar,
As we discussed, please
- check on the Correct PCM no. (3 or 4?) for this Rosemount Transmitter.
The #4 referenced in earlier emails was Landmark's internal numbering system which will be different than
ours. This is PCM #3.
- also send me the PCM/CMR and RFI log and/or you can put it on Buzzsaw.
We have had only 2 PCMs (not counting above), 2 COs, and 10 RFIs so far. I can create a log sheet similar to
that of our submittal and RFI logs (most regularly updated) and update buzzsaw as needed. Will have to go
through the previous PCMs to fill in the necessary fields. Will post when updated.
- Since you have already prepared the recommendation letter for this PCM, you can send me. However for
future PCMs/CMRs, an email would be just fine too. I am big fan of the KISS (Keep it simple & short)
Principle. BTW, I will give you my approval for a given PCM/CMR as an email.
Per your instructions we will send you emails approving PCMs here on in.
- I have also attached CO2; including the paper work for the PCM 01- Tri County Electric power extension
charge. This will give you an idea of a complete paperwork for the CO.
Acknowledged
- Notice the name in the subject header and all the email chain attached below.
Updated subject header
Call or email with questions. Regards. Farida
Farida S. GodeNya, PhD, PE
Sr. Prof Engineer � Facilities Project Manager
Fort Worth Water Department
Office: 817-392-8214
Cell: 817-851-4910
Farida.Goder�(�a,fortworthtexas. o�v
Ciiy of Fort Wortlr — Wor/iiitg togetlrer to Guild n stro�tg commu�2ity
�o�T �'VoRTH�
CDM
Sm�th
100 Throckmorton Street, Suite 100
Fort Worth, TX 76102
tel: 817 332-8727
fax: 817 820-0450
August aa, aoi4
Ms. Farida Godeiya, Ph.D., P.E.
Project Manager
City of Fort Worth
i000 Throcicmorton
Fort Worth, TX �6ioa
Subject: Northside IV Elevated Storage Tanlc and Pipeline
Landmarlc Proposed Contract Modification No. 3
Dear Ms. Godeiya:
�_-.
��� �3
We have reviewed the attached Proposed Contract Modification No. 3 from Landmarlc for the
above referenced project. Worlc includes providing and installing a Rosemount pressure/level
transmitter in lieu of the specified Foxboro brand. Landmarlc has requested $i,a97.00 for
performing this worlc. We find the estimate fair and equitable for the worlc to be performed.
Based on our review, we recommend the City accept the proposal and execute as a part of a
future change order to the construction contract.
Please let us Icnow if you have any comments/questions regarding this item.
Very truly yours
/ =! //
� .�.---,
�
Chad Bartruff, PE
Project Manager
CDM Sinith Inc.
File: 63�34-os.o6.�0
i�'0
WATER + ENVIRONMENT +TRANSPORTATION + ENERGY + FACIUTIES �
� l./�N f�M/�RlC
June 1, 2014
CDM Smith
100 Throcl<morton Street
Suite 600
Fort Worth, TX 76102
Att n
Re
Chad Bartruff, PE
Transmitter Change Proposal
Northside IV EST and Pipeline
City of Forth Worth, TX, Project No. 00370
Dear Mr. Bartruff:
� `�
� V S
p�
Landmark Structures
1665 Harmon Road
Fort Worlh, Texas 76177
817.439.8Fl88 Phone
817.439.9001 Fax
vrv✓w.teamlandmark.com
As requested, Landmarl< proposes to furnish and install a Rosemount transmitter in place of the
specified Foxboro transmitter as detailed below. Attached is the transmittal product info for your review
and approval.
Additional Cost: $1,297.00
Includes change from a Foxboro to Rosemount transmitter only.
Additional Contract Time: 0 Days
No impact to the project schedule is anticipated if response to this proposal is received
no later than July 9, 2014.
Exclusions:
- No additional submittals will be provided for this worl< or installation.
Please do not hesitate to call my office should you have any questions.
Best Regards,
LANDMARK STRUCTURES I, L.P.
I � ' � ,� '
. � � - '-
Marshall Peterson
Project Manager
Attachments:
- Landmarl< Change Order Summary
- Circle A Electric Quote
- Rosemount Transmitter Product Infomation
Owner Change Order No. 4
Job Name: Northside IV EST 8 Pi
Job Number: 1395
Internal CO Number:
D@SCflptl011: Pressure Transmitter Change
� �-� � 1 �
AMOUNT DETAIL
ITEM DESCRIPTION �TY UNIT UNIT RATE EXTENDED TOTAL Notes
AMOUNT AMOUNT
i ENGINEERING ;0.00
z Perform Design Including Modi(ying Ihe lollowing Drawings
3 I
4
5
6
]
8
5 Principal Engineer
to Delail Engineer
ti CADOperator
tz Document Contral Clerk
13
14
�s PROCUREMENT 50.00
i6
1]
18
19
20
21
n
. 23 _ . . . . _ . . — _ . _ . _ _ _ _ . . _
24
�5
26
2]
2B
29
�
31
32
� CONSTRUCTION 50.00
aa
as Installation Labor
J5
3]
�
39
ao Equipment
ai
az
43 _
— _ . . _ _.___. __ _ . — _ .._—_ _ .. . . _ ._ . ___
44
as SUBCONTRACT §1,178.59
es Circle A Electric
m Pwvide and ins�all Rosemount transmifter 1.00 LS 1.00 52,36123 2,361 23
ae CreditforFozborotransmitter 1.00 LS 1.00 �1,182.64 (1,182.64)
49
50
_51. _ . . .. _ _
52
�
SC
55
56
n CHANGE ORDER AMOUNT SUMMARY §0.00
� -. _- --- —_ .. . - - ---- -
�
� ENGINEERING $0.00
e, PROCUREMENT $0.00
�z CONSTRUCTION $0.00
� SUBCONTRACT $1,179.00
� Sub-Total $1,179.00
ss OVERHEAD 8 FEE � 10% $118.00
� TOTAL VALUE OF THIS CHANGE ORDER $1,297.00
6]
fi8
�
]0
» JOB COMPLETION TIME IMPACT DUE TO THIS CHANGE ORDER
�z Current Substantial Completion Dale 24-Dec-14
�a Currenl Final Completion Date 22-Feb-15
]4
�5 Days Added with this Change 0 Days
]6
» Revised Substanlial Completion Date (with lhis CO) 24-DeC-14
�e Revised Final Completion Dale (with this CO) 22-Feb-15
�s
� CHANGE ORDER SUMMARY
e� Total Amount of this change $1,297.00
az Amount of Increase of Time To Complete 0 Da s
�, Revised Substantial Completion Date Due to This Change 24-Dec-14
�, Revised Final Completion Date Due to This Change 22-Feb-15
�s
e�
87
�
99
CIRCLE
A
ELECTRIC
Quoted to:
1051 KENNEDY LANE
SAGI NAW, TEXAS 76131
OFFICE: (817) 625-0880
FAX: (817) 577-2197
License #17781
LANDMARK STRUCTURES 1, LP
1665 HARMON RD
FT WORTH, TX 76177
Phone 817-230-8898
E-m ai I
NORTHSIDE IV TANK
QUOTE
Quote Number:
5418-R EV 1
Quote Date:
Jul 18, 2014
Page:
1
j �� `' S
\
Customer ID Good Thru Payment Terms Sales Rep
100 LAN-2 8/17/14 001
--- _
Description
JORTHSIDE IV ELEVATED STORAGE TANK
�HANGE FOXBORO IGP10-A22D1 F-M2 TRANSMITTER TO ROSEMOUNT 3015CG4A02A1AM5D4BAH2
�RANSMITTER FOR THE SCADA SYSTEM
�REDIT FOXBORO TRANSMITTER
NSTALL ROSEMOUNT TRANSMITTER
Regulated by the Texas Dept of Licensing and Regulation, PO Box 12157,
Austin, TX 78711, 1-800-803-9202, 512-463-6599-
Subtotal
Sales Tax
Total
Amo unt
-1,182
2,361
1,178 .59
1,178.59
PROPOSED
OWNER: City of Fort Worth
PROJECT: Northside Elevated Storage Tank IV
CONTRACTOR: Landmark Structures I, LP
ENGINEER: CDM Smith
ENGINEER'S CONTACT: Chad Bartruff. PE
CONTRACT MODIFICATION
PROJECT NO. 63234
OWNER: 00370
CONTRACTOR: 1395
ENGINEER:
PCM NO. 004
PCM
NOTIFICATION TO CONTRACTOR:
WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED
MATERIALS AND REQUEST THAT YOU TAKE THE FOLLOWING ACTION:
❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT
TIME OR AMOUNT. A FIELD ORDER WILL BE ISSUED.
� SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR
PERFORMING THE DESCRIBED CHANGE.
❑ A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID
❑ PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT.
BY: Chad Bartruff, PE DATE: Oct 29, 2014
DESCRIPTION OF PROPOSED CHANGE: ❑ DESCR�BED HEREIN � SEE ATTACHED
Refer to attached letter from Landmark:
Furnish and install one 20' L x 3' W x 4" thick concrete caps where the Enervest gas line and cathodic
protection line cross the drainage swale
CONTRACTOR'S RESPONSE:
WE RESPOND TO YOUR REQUEST AS FOLLOWS:
❑ WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE, ISSUE FIELD ORDER.
� WE SUBMIT THE ATTACHED PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED
SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE.
❑ WE ARE PROCEEDING WITH THE CHANGE AT THE UNIT PRICE BID
❑ WE ARE PROCEEDING WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE
CONTRACT.
BY: Marshall Peterson (See attached letter proposal) DATE: Oct 29, 2014
ACTION TAKEN:
❑ PROPOSED CONTRACT MODIFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED.
BY: DATE:
❑ FIELD ORDER ISSUED: NO. DATE: BY:
� CHANGE ORDER ISSUED: NO. 3 DATE: Julv 7, 2015 BY: Chad Bartruff PE
Khole, Sagar
�— -�
From: Bartruff, Chad � ��,,� --
Sent: Tuesday, November 04, 2014 3:50 PM 1 �`' �
To: Goderya, Farida ��
Cc: Byrd, Gerald; Hill, Mike; 'Peterson, Marshall'; Khole, Sagar --
Subject: RE: 1395 - Northside EST - Concrete Caps for Gas Line Crossing
Attachments: 2014.10.29 - 1395 - Gas Line Concrete Cap Letter.pdf
Farida — The attached proposal from Landmark for the additional work associated with installation of a concrete cap
over the EnerVest gas pipeline has been reviewed, and we concur with your approval. We will process this as a PCM for
inclusion as part of a future change order to the construction contract.
Please let us know if you have any questions and we will post the documentation to Buzzsaw for record.
Regards —Chad
Chad D. Bartruff, P.E.
CDM Smith (TX #F-3043)
100 Throckmorton Street, Suite 600
Fort Worth, TX 76102
Tel: (817) 332-8727 Fax: (817) 820-0450
bartruffcd(u�cdmsmith.com
cdmsmith.com
`' ` Please consider the environment before printing this email.
From: Goderya, Farida [mailto:Farida.Goderya@fortworthtexas.gov]
Sent: Tuesday, November 04, 2014 2:55 PM
To: 'Peterson, Marshall'; Khole, Sagar
Cc: Byrd, Gerald; Bartruff, Chad; Hill, Mike
Subject: RE: 1395 - Northside EST - Concrete Caps for Gas Line Crossing
Hi Chad/Sagar,
Please document this as PCM ??, attach the complete paperwork and upload on Buzzsaw.
FYI, I am ok with this PCM for an addition of concrete cap on EnerVest Gas line crossing.
Regards. Farida
Farida Goderya, PhD, PE
Sr. Prof Engineer � Facilities Project Manager
Fort Worth Water Department
Office: 817-392-8214
Cell: 817-851-4910
Farida. Goderva(�a,fortworthtexas. gov
City of Forl Woi•tla — Wor/ri�rg togetlter to Guild a stratg conanrrr�tit��
� IJ�N I�M/�R I�
October 29, 2014
CDM Smith
100 Throcl<morton Street
Suite 600
Fort Worth, TX 76102
Attn
Re
Chad Bartruff, PE
Concrete Caps for Gas Line Crossing
Northside IV EST and Pipeline
City of Forth Worth, TX, Project No. 00370
Dear Mr. Bartruff:
�.
��'� U� �
/
Landmark Structures
1665 Harmon Road
Fort Worth, Texas 76177
817.439.8F388 Phone
817.439.9001 Fax
www.teamlandmark.com
As requested, Landmarlc proposes to furnish and install one 20' L x 3' W x 4" thicl< concrete caps where
the gas line and cathodic protection line cross the drainage swale. The additional cost and contract time
is detailed below.
Additional Cost: $795.67
Includes material, labor, and Landmari<overhead & fee.
Additional Contract Time:
No impact to the project schedule is anticipated.
Exclusions:
- Density Testing
- Concrete Cylinders & Inspection
Acceptance of this proposal will constitute acceptance with the means and methods described above
and will also tal<e the place of any submittals requested for this additional work. No additional
submittals will be provided for this work or installation.
Please do not hesitate to call my office should you have any questions.
Best Regards,
LANDMARK STRUCTURES I, L.P.
l� �� , _
,.r / �-
Marshall Peterson
Project Manager
PROPOSED CONTRACT MODIFICATION (PCM
OWNER: City of Fort Worth
PROJECT: Northside Elevated Storage Tank IV
CONTRACTOR: Landmark Structures I, LP
ENGINEER: CDM Smith
ENGINEER'S CONTACT: Chad Bartruff, PE
PROJECT NO. 63234
OWNER: 00370
CONTRACTOR: 1395
ENGINEER:
PCM NO. 005
NOTIFICATION TO CONTRACTOR:
WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED
MATERIALS AND REQUEST THAT YOU TAKE THE FOLLOWING ACTION:
❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT
TIME OR AMOUNT. A FIELD ORDER WILL BE ISSUED.
� SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR
PERFORMING THE DESCRIBED CHANGE.
❑ A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID
❑ PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT.
BY: Chad Bartruff, PE DATE: Sept 3, 2014
DESCRIPTION OF PROPOSED CHANGE: ❑ DESCRIBED HEREIN � SEE ATTACHED
Refer to attached letter from Landmark — Time extension request due to storm damage to tank bowl.
28-day (calendar) extension requested based on time that was required to repair the tank bowl.
CONTRACTOR'S RESPONSE:
WE RESPOND TO YOUR REQUEST AS FOLLOWS:
❑ WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE, ISSUE FIELD ORDER.
� WE SUBMIT THE ATTACHED PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED
SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE.
❑ WE ARE PROCEEDING WITH THE CHANGE AT THE UNIT PRICE BID
❑ WE ARE PROCEEDING WITH THE CHANGE UNDER THE TIME AND MATERIALS PROV�SIONS OF THE
CONTRACT.
BY: Marshall Peterson (See attached letter proposal) DATE: Sept 3, 2014
ACTION TAKEN:
❑ PROPOSED CONTRACT MODiFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED.
BY: DATE:
❑ FIELD ORDER ISSUED: NO. DATE: BY:
� CHANGE ORDER ISSUED: NO. 3 DATE: Julv 7, 2015 BY: Chad Bartruff, PE
� I.J�NI�MARK
September 3, 2014
CDM Smith
100 Throcicmorton Street
Suite 600
Fort Worth, TX 76102
Attn: Chad Bartruff, P.E.
Re: Project Delay - Storm Damage Repair
Northside IV EST and Pipeline
City of Forth Worth, TX, Project No. 00370
Dear Mr. Bartruff:
,
r ��
���1 � >
Landmark Structures
1665 Harmon Road
Fort Worth, Texas 76177
817.439.888II Phone
817.439.9001 Fax
www.teamlandmark.com
As discussed in previous correspondence, the adverse weather conditions damaged the tank the
morning of June 16, 2014. In accordance with specification section 00 72 00 12.03.A, Landmark notified
the owner of the potential delay on June 17, 2014 and traciced specific impacts to the progress of the
project associated with this repair. Landmark requests the extension of 28 Calendar Days, between June
16, 2014 and July 14, 2014 (excluding July 4, 2014) be added to the above referenced contract in
accordance with the specifications. I appreciate your consideration and let me Icnow if you have any
questions.
Best Regards,
LANDMARK STRUCTURES I, L.P.
j� , ��
Marshall Peterson
Project Manager
PROPOSED CONTRACT MODIFICATION (PCM
OWNER: City of Fort Worth
PROJECT: Northside Elevated Storage Tank IV
CONTRACTOR: Landmark Structures I, LP
ENGINEER: CDM Smith
ENGINEER'S CONTACT: Chad Bartruff, PE
PROJECT NO. 63234
OWNER: 00370
CONTRACTOR: 1395
ENGINEER:
PCM NO. 006
NOTIFICATION TO CONTRACTOR:
WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED
MATERIALS AND REQUEST THAT YOU TAKE THE FOLLOWING ACTION:
❑ NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT
TIME OR AMOUNT. A FIELD ORDER WILL BE ISSUED.
� SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR
PERFORMING THE DESCRIBED CHANGE.
❑ A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID
❑ PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE CONTRACT.
BY: Chad Bartruff, PE DATE: March 28, 2015
DESCRIPTION OF PROPOSED CHANGE: ❑ DESCRIBED HEREIN � SEE ATTACHED
Refer to attached letter from Landmark — Time extension request due additional City administrative time
required for processing of Change Order No. 1. 15 days (calendar) extension requested.
CONTRACTOR'S RESPONSE:
WE RESPOND TO YOUR REQUEST AS FOLLOWS:
❑ WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE, ISSUE FIELD ORDER.
� WE SUBMIT THE ATTACHED PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED
SCHEDULE FOR PERFORMING THE DESCRIBED CHANGE.
❑ WE ARE PROCEEDING WITH THE CHANGE AT THE UNIT PRICE BID
❑ WE ARE PROCEEDING WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISIONS OF THE
CONTRACT.
BY: Marshall Peterson (See attached letter proposal) DATE: March 28, 2015
ACTION TAKEN:
❑ PROPOSED CONTRACT MODIFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED.
BY: DATE:
❑ FIELD ORDER ISSUED: NO. DATE: BY:
� CHANGE ORDER ISSUED: NO. 3 DATE: Julv 7, 2015 BY: Chad Bartruff, PE
�_ ---�
�
� �y'l u �
�_-
� IJ�N I�M/�R K
March 28, 2014
CDM Smith
100 Throckmorton Street
Suite 600
Fort Worth, TX 76102
Attn: Brian Williams, PE
Re: Tunnel Conflict Option #2 Proposal
Northside IV EST and Pipeline
City of Forth Worth, TX, Project No. 00370
Dear Mr. Williams:
Landmark Structures
1665 Harmon Road
Fort Worlh, Texas 76177
II17.439.8f3E38 Phone
817.439.9001 Fax
www.teamlandmark.com
Per previous correspondence, Landmarlc was notified that the Tunnel Conflict Option #2 Proposal for
Northside IV EST and Pipeline was not executed for approval during the most recent City of Fort Worth
council meeting held on March 18, 2014. Landmarl< submitted this proposal on February 19, 2014 with
the intentions of council consideration during the next session.
The duration on the proposal submitted on February 19, 2014 was based off the communicated
intention that this worlc would be available to begin following the next council meeting. As we discussed
during the negotiation portions of the proposal, the timeline of this work is going to directly affect the
critical path of this project. Due to the monetary and risk magnitude of this worl< in relation to the
contract, Landmarlc does not feel comfortable in proceeding until final approval is submitted. With the
assumption that this proposal will be introduced and approved during the next City of Fort Worth
Council Meeting on April 1, 2014, Landmarlc formally requests the addition of 15 Calendar Days added to
both the Substantial and Final Completion dates submitted on the proposal. If approval is not released
by April 3, 2014, Landmark reserves the right to again re-evaluate the impacted construction duration.
I appreciate your consideration and feel free to call me if you have any questions.
Best Regards,
LANDMARK STRUCTURES I, L.P.
� � � � --
,r. _
Marshall Peterson
Project Manager
Bartruff, Chad
From: Goderya, Farida <Farida.Goderya@fortworthtexas.gov>
Sent: Friday, June 19, 2015 1:09 PM
To: Bartruff, Chad
`�� � �
P
_y_-
Cc: Hill, Mike; Khole, Sagar; 'Peterson, Marshall (mpeterson@teamlandmark.com)'
Subject: RE: 1395 - Northside EST - Storm Damage CMR ?? & CO3
I am ok with additional 15-days extension to Landmark for the tunnel change order.
Regards. Farida
Farida Gode�ya, PhD, PE
Sr. Prof Engineer � Facilities Project Manager
Fort Worth Water Department
Office: 817-392-8214
Cell: 817-851-4910
Farida.Goder,ya(a�fortworthtexas. o�v
From: BartrufF, Chad [mailto:BartruffCD@cdmsmith.com]
Sent: Thursday, June 18, 2015 5:41 PM
To: Goderya, Farida
Cc: Hill, Mike; Khole, Sagar; 'Peterson, Marshall (mpeterson@teamlandmark.com)'
Subject: RE: 1395 - Northside EST - Storm Damage CMR ?? & CO3
Farida — I believe that there is an outstanding question pertaining to an additional 15-day extension requested by
Landmark related to the original tunnel change and the time it took for internal City processing of the original tunnel
change order. You had forwarded the Landmark letter request to me, but I did not recall confirmation that it was
formally accepted? You probably had notified me but I could not find it in my notes. Please confirm and I will get the
final CO-3 out for signature following updates.
I will update the document signatures as noted.
Thanks -Chad
From: Goderya, Farida [mailto:Farida.Goderva@fortworthtexas.�ov]
Sent: Thursday, June 18, 2015 5:28 PM
To: Bartruff, Chad
Cc: Hill, Mil<e; Khole, Sagar;'Peterson, Marshall (mpeterson@teamlandmark.com)'
Subject: RE: 1395 - Northside EST - Storm Damage CMR ?? & CO3
Hi Chad,
What happened to this CO3? My files still show an incomplete/unsigned documents.
I also notice that now the front page needs to be revised to include the new Director (Carman) and Andy back as
Assistant Director. See attached excel file.
Regards. Farida
Farida Goderya, PhD, PE
Sr. Prof Engineer � Facilities Project Manager
Fort Worth Water Department
Office: 817-392-8214
Cell: 8l 7-851-4910
Farida.Goder�a(a�,fortworthtexas.�
From: Goderya, Farida
Sent: Tuesday, November 04, 2014 3:21 PM
To: 'Bartruff, Chad'
Cc: Hill, Mike; Khole, Sagar; Peterson, Marshall (mpeterson@teamlandmark.com)
Subject: RE: 1395 - Northside EST - Storm Damage CMR ?? & CO3
���� _
�C� U j \
� �
Chad,
I am ok with giving Landmark 28 days extension for the wind/storm damage. Please document this as CMR ??, complete
the paperwork and upload on Buzzsaw.
We can roll this into the Change Order 3(CO3), hence at this point the CO3 will include
- CMR 01?, Wind/Storm Damage Time Extension
- PCM 03, Rosemount Transmitter and
- PCM 04?, Gas line Concrete cap
Any other if necessary
FYI, Currently, we have only given one 90 day time extension, as part of the C01 for the tunnel rework.
Call or email with questions. Regards. Farida
Fa�ida Goderya, PhD, PE
Sr. Prof Engineer � Facilities Project Manager
Fort Worth Water Department
Office: 817-392-8214
Cell: 817-851-4910
Farida.Goder�a(�a,fortworthtexas.gov
City of Fort Wortlt — Worlring togetlrer to build n sli•oitg communitJ�
Fo�T�aRTH�
From: Bartruff, Chad [mailto:BartruffCDCa�cdmsmith.com]
Sent: Tuesday, November 04, 2014 10:01 AM
To: Goderya, Farida
Cc: Hill, Mike; Khole, Sagar
Subject: FW: 1395 - Northside EST - Storm Damage