Change Order Request
Project Name Northside IV Elevaled Storage Tank (EST) and Pipeline City Sec # 44606
Client Project #(s) Fort Worth Water Dept (00370); CDM Smilh (63234); Landmark Strurctures I(1395)
Project A new tank in Northside IV Pressure and asoociated 30-inch pipeline with Tunnel Under US 287, Design M&C C-22296;
Descriplion Construcfion M&C C-26301
Contractor Landmark Structures I, LP Change Order #� Dale 2118/2016
City Projecl Mgr. Farida S Goderya, PhD, PE Cily Inspector Mike Hill
Dept,
Original Contract Amount
Extras to Dale
Credits fo Date
Pending Change Orders (in M&C Process)
Contract Cost to Dale
Amount of Proposed Chanqe Order
Originai Funds Available for Change Orders
Remaining Funds Available for ihis CO
Additional Funding (if necessary)
Water
.67
.67
CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%J
This Change Order No, 4(CO-04) covers the following;
(REASONS) FOR
Contract Time
Totals CD
'40,000.00 480
i92,891.67 133
$0.00 0
19.10%
$4,675,000.00
CMR-01 - Installation of a CLSM low-permiability barrier in the pipeline trench to inhibit groundwater migration per
recommendation.
CMR-02 - Supply, installation, and testing of additional cathodic proteclion anodes at two pipeline stations due to
and the installed pipeline.
. .. _ _,._ � Lea.. , �
Additional details may be found in the aftached pages.
l�u�i�l �o
� SCAN��fl
��
��
��'
�,
x���
v�� ��
$�
o�
�� t�8����. ���i��%') ��I
Cd�'�l ��CRC'CA��1� ji�
�1'. UIIf0iti6i, 4� i;
It is understood and agreed that ihe acceptance of this Change Order by the contractor conslilutes an accord and salisfaction and represents
payment in full (both time and money) for ail costs arising out of, or incidenlal to, lhe above Change Order.
Contractor's Com an Name Contractor Name ct " Date
Landmark Structures I, LP Marshall Peterson ,t�.;s/".; /�� /''�--� �;'�� /i,_
�
C
� O
� �
� �
� �
.�.+ Q
L �
0 �
�.�.. �
� O
�
��\ �
V �
�
�
U
x
F
a
3
F
CG
w
�
a
�
�
�
�
U
N
�
�
U
`ai
�
U
�
Y
(6
E
�
(O
J
d. �.j
a �
c
(Q L
� �
� �
W �
Y Q
� U
F- ' '
� S
N �
:o 0
N �
O p
Z LL
�
�
N
N
N
U
U
c2S
�
c
rn
.N
a�
0
N
�
�
a`�
�
c
�
c
F=-
L
.�
.�
d
U
C
O
�
N
N
�U
�
�
(6
�
�
�
a"�
a`
> o
— M
N co
� N
N U
�
o U
Z �
�
C C
Y O
C U
c�,a =
� N
C C
Q U
°' � o
� U 'Q
Z �
� ��
� a �
'o c �
a °' �
U �
'o
a
�
0
N
�
N
a�
iu
�
�
� I
�
-o
O
m
m
U
d
J
N
�
U
�
�
�
E
cc6
J
`o
U
�
U
�
w
O
c-I
v
bA
t0
a
�
c
O
U
�
Q
L
N
v
O
�
OD
C
t
� �
(D
�
CDM
Sm�th
Memorandum
To: Marshall Peterson
Byron Williams
Landmark
From: Chad Bartruff, PE
CDM Smith (TX F-3043)
Date: February 18, 2016
Subject: City of Fort Worth
NS-4 EST and Pipeline
CMR-01 Pipeline Groundwater Barrier
Attached for reference is documentation related to the above referenced item identified as CMR-01.
• CDM Smith `Pipeline Groundwater Barrier' memorandum (dated December 2, 2014)
• Landmarlc'Pipeline Groundwater Barrier' proposal (dated December 12, 2014)
• SJ Louis `Concrete Cut-off Wall' proposal (received October 5, 2015)
The origin of the CMR is described in the CDM Smith memorandum. The original proposal from
Landmark was received, and at that time, additional information was requested by CDM Smith.
Additional information, in the form of the SJ Louis proposal, was received and reviewed by CDM
Smith and subsequently discussed with Landmark.
As noted in our previous discussion, the quantities in the proposal from SJ Louis were well in excess
of what would be expected based on the original installation detail provided in the CDM Smith
memorandum, including allowances for construction excavation tolerances. It was understood that
Landmark agreed with this, and upon review of the probable construction requirements,
subsequently suggested that the proposal be refined to reflect the construction and provision of the
barrier at one-third of the original excavation, materials, and labor. CDM Smith discussed the
revised proposal with the City and it was determined to be acceptable. As such, it is understood
that the CMR-01 proposal is for a total value of $ 3,960.00.
C M R-01
CMR-01PlpelineGroundwater0arrier20160217.doa Page 1/14
Byron Williams
Marshall Peterson
February 18, 2016
Page 2
The original Landmarlc proposal included a request for additional contract time. As the requested
proposal brealcdown information was not provided as requested, the completion of the worlc did
not iinpact substantial completion, and Landmarlc did not otherwise complete unrelated punchlist
items in advance of the CMR-01 worlc, the additional time is considered not applicable and is not
approved, It should be noted, that the substantial and final completion dates for operational
availability of the tanlc and project completion, respectively, are considered acceptable and the
application of liquidated damages is not being considered at this time.
cc: Farida Goderya (FWWD)
Milce Hill (FWWD)
File: 63234-05.06.40
CMR-01
CMR-01PIpeIlneGroundwaterBarr1er20160217.docx Page 2/14
CDM
sm�th
Memorandum
To: Marshall Peterson
Landmark
From: Chad Bartruff, PE (TX-91688)
CDM Smith (TX F-3043J
Date: December 2, 2014
Subject: Northside IV Elevated Storage Tank and Pipeline Project
Pipeline Groundwater Barrier
In follow-up to the November 17, 2014 meeting involving City of Fort Worth, SJ Louis, Landmark,
and CDM Smith regarding discussion of the identified groundwater concerns related to the NS-4
pipeline tunnel, this memorandum is to address an action item assigned to CDM Smith.
As discussed in the meeting, Landmark advised migration of groundwater within and along the
pipeline trench towards the elevated storage tanlc foundation is a potential concern. Landmarlc was
to confirm with their structural engineer regarding this potential situation and advise the City and
CDM Smith of his/her comments. However, in effort to inhibit the potential groundwater
movement along the pipeline trench, the City requested that CDM Smith provide a detail for a
controlled low-strength material (CLSM) pipeline collar. Accordingly, the attached Detail BE, as
shown on page 2 of this memo, is proposed for installation at approximately Station 5+60. The
collar shall be at minimum of the dimensions shown and shall be placed in undisturbed earth. For
installation and placement, Groundwater flow shall be managed as required for placement and
curing of the CLSM.
cc: Mike Hill (FWWD)
Farida Goderya (FWWD)
File: 63234-05.02.10
CM R-01 63239_PlpelineGroundwaterCallar_20141202.doa
Page 3/14
Marshall Peterson
December 2, 2014
Page 2
i
[�II►1
18�� y ���
MIN �RENCH NJIDTH MIN
(EtEYC7�lCl�
���h���
FILL
,�''�
NOTES:
3" WIC7E, �—MIL ��'C�L�'ETH'r`LENE
CACJTIU�lAF2Y WATERLIhlE MAF�i�ER
TAI�E, �—�EET AE��VE TCiI' t�F F�IF'E.
TC}P OF GRAf�ULAR PII�E
������c� ������a��
BARRIEk� TO BE K�YED INTO
UNDISTUR��D �ARTH 1 �" MIN ALI�
AROUND TRENCH P�RIM�T�R AND
1 S� MIN 7WIGKN�SS
UNC315TUR8ECi EARTH
�... .
� . � • : !-• � �
. . � �. �.
. ' � ! � � � . � ... �
� �
1 TOP ��VEL f7F CLSN9 SFiALL. BE PLACED TO ELEVATION TO PROVIDE
MINIMUM 1-�T FR�E��ARD TC? D�S�RV�D GROUN�WAT�R STATIC
LEVEL, �tJT NO L�S� TFIAN 24" �EL.QW FINISMED CaRADE
• ' ' �: ' '� � ► . ��.. .
_�� '� �. �i i :i r �
, • '�
�
;
CM R-01 63234_PlpellneGroundWalerCollar_20141202.docx
Page 4/14
Bartruff, Chad
From: Bartruff, Chad
Sent: Sunday, December 14, 2014 3:42 PM
To: Peterson, Marshall; Khole, Sagar
Cc: Goderya, Farida
Subject: RE: 1395 - Northside EST - Tunnel Meeting Follow-Up
Marshall — Please provide complete breakdown of proposal costs. As submitted, allocation of costs associated with the
proposed work cannot be evaluated.
Thanks — Chad
Chad D. Bartruff, P.E.
CDM Smith (TX #F-3043)
100 Throckmorton Street, Suite 600
Fort Worth, TX 76102
Tel: (817) 332-8727 Fax: (817) 820-0450
bartruffcdnn,cdmsmith.com
cdmsmith.com
� Please consider the environment before printing this email.
From: Peterson, Marshall [mailto:mpeterson@teamlandmark.com]
Sent: Sunday, December 14, 2014 3:36 PM
To: Bartruff, Chad; Khole, Sagar
Cc: Goderya, Farida
Subject: RE: 1395 - Northside EST-Tunnel Meeting Follow-Up
Chad,
Please see the attached proposal.
Thanks,
Marshall
From: Bartruff, Chad [mailto:BartruffCDCa�cdmsmith.com]
Sent: Wednesday, December 03, 2014 2;05 PM
To: Peterson, Marshall
Cc: Williams, Byron; Hernandez-Sevier, Esther; Goderya, Farida; Sanders, Gregory; Mike Hill
(Mike. Hill @fortworthtexas.clov)
Subject: RE: 1395 - Northside EST - Tunnel Meeting Follow-Up
Byron — Please see the attached memo/detail that was at the November 17t'' meeting. We are reviewing the
documentation provided by SJ Louis and will advise of questions/comments as soon as possible.
Thanks — Chad
Chad D. BartrufF, P.E.
1 CM R-01
Page 5/14
CDM Smith (TX #F-3043)
100 Throckmorton Street, Suite 600
Fort Worth, TX 76102
Tel: (817) 332-8727 Fax: (817) 820-0450
bartruffcd(r�,cdmsm ith.co m
cdmsmith.com
� Please consider the environment before printing this email.
From: Williams, Byron [mailto:bwilliams@teamlandmark.com]
Sent: Tuesday, December 02, 2014 1:26 PM
To: Goderya, Farida; Bartruff, Chad
Cc: Peterson, Marshali; Hernandez-Sevier, Esther
Subject: FW: 1395 - Northside EST-Tunnel Meeting Follow-Up
Farida / Chad,
My apologies on the delayed delivery on these tickets. Little miscommunication on my end internally. See attached
backup based on previous request from our meeting.
Thanks,
Byron Williams
Landmark Structures
Office 817.230.8815 x 1215
Mobile 817.602.9103
bwilliams@teamlandmark.com
www.teamlandmarl<.com
� �� .,;�',ai � A`y9 i�i 9M{4IVi`A.�.�� �i`R
EI�.:�,�;�IJ•ic� Ex��E;cliiliun�
From: Sam Hanna [mailto:SamH@S]Louis.Coml
Sent: Tuesday, November 18, 2014 8:47 AM
To: Williams, Byron; Pete Stahl
Cc: Peterson, Marshall; Dina Wilson; Justin Clifton; Bryce Kohler
Subject: RE: 1395 - Northside EST - Tunnel Meeting Follow-Up
Byron,
We appreciate you setting up this meeting and assisting in this resolution.
As a follow up to our meeting, see attached concrete tickets to submit to CDM. We also need to find out what is holding
up our August Pay Estimate. All of the pipe installation and connections have been completed. The remaining work is
subsidiary to our contract and will be done once the engineer provides a solution and we are paid to date.
Our office is filing a lien on this invoice as of today. Please let me know how soon we can expect payment.
Thanks,
Sam Hanna, PE, SIT
Project Manager
C M R-01
Page 6/14
S. J. Louis Construction of Texas LTD.
520 S. 6th. Ave
Mansfield, Texas 76063
817-477-0320 Office
817-975-1907 Celi
"EXCELLENCE /N UNDERGROUND CONSTRUCT/ON"
From: Williams, Byron [mailto:bwilliamsCa�teamlandmark.com]
Sent: Tuesday, November 18, 2014 8:18 AM
To: Sam Hanna; Pete Stahl
Cc: Peterson, Marshall
Subject: 1395 - Northside EST - Tunnel Meeting Follow-Up
Sa m,
Just to follow up on our meeting yesterday afternoon, please forward the batch tickets as requested by the City of Fort
Worth for the CLSM worlc depicted on Contract Drawing CZ-11:Detail EB for both the North and South side of the tunnel
within the next couple of days. This will mitigate the underlying concern I noticed that these were installed per plans
and specifications. I will keep in touch with CDM Smith throughout this weelc in regard to the additional detail to the
Vault and the their intentions. Once I receive the revised detail I will forward it on. As discussed, I want to maintain the
sense of urgency to finish up this project as soon as feasible and maintain both of our firms continued relationship with
the City of Fort Worth. It is our intent to have this tanl< ready to fill prior to the end of the year and finish up all site
work during the month of January 2015. Feel free to give me a call if you have any questions or concerns.
Thanks,
Byron Williams
Landmark Structures
Office 817.230.8815 x 1215
Mobile 817.602.9103
bwilliams@teamlandmark.com
www.teamlandmark.com
� �IVC)M/�RK
Elevating Expectatians
C M R-01
Page 7/14
� �,,, � � � � �
December 12, 2014
CDM Smith
100 Throcicmorton Street
Suite 600
Fort Worth, TX 76102
Attn: Chad Bartruff, PE
Re: Pipeline Groundwater Barrier
Northside IV EST and Pipeline
City of Forth Worth, TX, Project No. 00370
Dear Mr. Bartruff:
Landmark Structures
1665 Harmon Road
Fort Worth, Texas 76177
£317.439.£3886 Phone
817.439.9001 Fax
www.teamlandmark.com
As requested, the following proposal is for the installation of a controlled low-strength material (CLSM)
pipeline collar at Station 5+60 per your memo dated December 2, 2014. The additional cost and contract
time is detailed below.
Additional Cost: $11,880.00
Includes material, labor, equipment, and Landmarlc overhead & fee.
Additional Contract Time:
Additional time for execution of worlc 10 Calendar Days
Additional time for delay 32 Calendar Days*
Total Additional Time 42 Calendar Days
*To match actual delay from 11/17/14 to approval of change order. Estimated
additional time shown.
Attached is a proposal and description of worl<from SJ Louis for your reference.
Acceptance of this proposal will constitute acceptance with the means and methods described above
and will also tal<e the place of any submittals requested for this additional work. No additional
submittals will be provided for this worl< or installation.
Please do not hesitate to call my office should you have any questions.
Best Regards,
LANDMARI<STRUCTURES I, L.P.
��� ,
, r." t ( �_
Marshall Peterson
Project Manager
Attachments:
- SJ Louis Proposal, Dated 12/12/14
CM R-01
Page 8/14
Contrr�ctor's Modification Request - Proposal
Northside IV Elevated Storage Tank [EST] and Pipeline
Harley Ave., Montgomery St. and Rip Johnson Rd.
Resparse Required By
Marshall Peterson
Landmark Structures
1665 Harmon Road
Fort Worth, TX 76177
Via Email
of Work
C.M.R. -Proposa!
2 � December 12, 2014
Transmitled By
Sam Hanna
Project Manager
SJ louis Construction of 7exas is submitting the following pricing in regards to the letter sent by CDM Smith on 12/2/2014
requesting placement of a CLSM cut off wall at approximate station 5+60.
This pricing indudes the excavation, shoring and trench safety around the live 30" ductile iron pipe at station 5+60 per detail "BE"'
provided in the letter. Pricing also inciudes the maintenance and dewatering of the current groundwater for placement and '
curing of the CLSM trench in addition to the labor, equipment, fuel and CLSM material required to perform this additional work. '',
treakdowu of Proposal
Northside IV Elevated Storage Tank [EST] and Pipeline
Joint Bond Installation to Separate Contractors Pipe
Item Description UniJs Quanlity Ueit Price
New-1 CLSM Cut Off Wall at Station 5+60 EA 1 $ 10,800.00
Net Change:
Requested Additional Calendar Days:
f acceptable, please provide an authorization signature belo�v and return one (1) copy to our ofCce.
:J. Louis Co�islructio�t Acliou
:c'r.. S.J. Louis Proiect No. 21332 Proiect File
.`
S J. Louis Conslruction of Texas Ltd.
520 A S. 61/t Avenue
Mansf%ltl, Texas 76063
�8r�� 4�� o3zo off�e �sr�� 4�� oss2 F�X
Cos!
$10,80�
$10,800.00
10 Days
CM R-01
Page 9/14
Bartruff, Chad
From:
Sent:
To:
Cc:
Subject:
Attachments:
Chad,
Williams, Byron <bwilliams@teamlandmark.com>
Monday, October 05, 2015 5:04 PM
Bartruff, Chad
Hernandez-Sevier, Esther
1395 - Northside CLSM CO Information
2014.12.12 - 1395 - Pipeline Groundwater Barrier.pdf; SJ Louis Backup.pdf
I am digging through some of the information outstanding for the Northside Tanl< and I see that we still have the Change
Order for the CLSM install out there pending. I understand there has been a substantial amount of time since this worl<
was installed and it appears that the ball was left in our court to provide you some additional brealcdown
information. When I met with Pete Stahl on site to finish up the punch list he mentioned this to me and has since
provided some more information fairly quicl<ly as if it was provided, but I cannot tell that it had. The attached letter was
the original proposal sent in December 2014. You responded on 5/6/15 requested additional information and a
breal<down of these costs for evaluation. The second attachment provides this to include the invoice from Cow Town
Redi-Mix (referencing a ship date of 2/11/15), the original proposal provided in our December letter, a specific time
sheet to the worlc performed that day by SJ Louis, and a thorough breal<down of how the original number was
generated.
Lil<e I mentioned, I am somewhat lool<ing at this from the outside-in at this point but understand that the worl< was
completed per the change order due to the ground water concern we met about previously. Give me a shout to discuss
at your convenience and let me Icnow what else is necessary to continue this one for final approval before we close this
project out.
13yron Williams
Sr. Project Manager
Landmark Structures
Office 817.230.8815 x 1215
Mobile 817.602.9103
bwilliams(cilteamlandmark.com
www.teamlandmark.com
� ���iY1����.
El�velinc� Expe�:talions
CMR-01
Page 10/14
�
` � �o�' `�'''o�r� ��c����� .
REMIT TO:
- CowTown Redi 1VIIx, inc. '
. � ��� � 6 �Q9� p.o.Box 1G2327
� Fort Worth, 'TX 7G 161
W�ixcoNce�rE ,,;� .; .• �,;.••�' �(817� 759-1919 Fax: (817) 759-171G
D►�patc�i _ ,
' (81�) 759-2599 � Invoice # � 1 Q8�76
BII.L. TO: ' • SHIP TO:
SJ.Louis Construciion of Texas . • ,
520 South 6th Avenue N 287 AT AVONDAL.E-HASLET RD
Mansfteld, 7X 76063 ' • , .
CMR-01
Page 11 /14
� �1 i � ��il�'���o• �1��
j�'�.c.d �_..�e.Q.� E..�' t'o�l ,ri �'au.�..e . G; c
.i
�i�ic� �7v�ii,�����, -�_ _n_ � �.._ .��
, tti � , . .
' 'Sales Tax
Total Due
Contr•ac%�'s .Modific�ction Request - Proposal
Cut - off Wall near Sta 5+60
Respo�rse Reryr�ired By
Byron Williams
Landmark Structures � .
1665 Harmon Road
Fort Worth, TX 76177
Email : bwilliams@teamlandmark.com
of FYork
2 originaily submitted
12/12/2014
Trnns�eifled By
Peter J. Stahl
North Texas Area Manager
Signah�re
� �,
SJ Louis Construction of Texas is submitting the following pricing in regards to the letter sent by CDM Smith on 12/2/2014
requesting piacement of a CLSM cut off wall at approximaee station 5+60.
7his pricing inciudes the excavation, shoring and trench safety around the live 30" ductile iron pipe at station 5+6� per detail "BE"
provided in the lekter. Pricing aiso includes the maintenance and dewatering of the current groundwater for ptacement and
curing of the CLSM trench in addition to the labor, equipment, fuel and CLSM material required to perform this additional work.
�renkdown ojProposn!
Northside IV �levated Storage Tank [�ST] and Pipeline
Joant Bond Installation to Separate Contractors Pipe
Ifenr Descriptio�r Unifs Quanlily Unif Prlce
New-1 CLSM Cut Oli' Wall at Station 5+60 EA 1 $ 10,800.00
Net Change:
Requested Additio�nal Cale�dax Days:
f acceptablc, plcasc providc an authorizntion sign�ture below an� return onc (�) copy to our officc.
i.J. Lottis Coustrr�clion AcJlo��
S J. Louis Co��sti�uction of Texas Lttl.
520 A S. 6lh Ave�tue
Mnnsfielcl, Texas 76063
(817) q77 0320 Offrce (8I7) 477•0552 Fnx
Cos1
$
10
CMR-01
Page 12/14
TINIE SHEET
—ll--�S �oB� .,� 13 3�_
I �DAY �I ��N�S%I!¢/ WEATHER
��. i„�.�, �� � � n ��-- �� � � �.�-. �-�
't"R D
:;:�
�
REVISED 419ft4
C M R-01
Page 13/14
PLEASEFtLL IN EQUIPM�NT HOUF2S ON LASTDAY OF WEEK
, , ' - i•
��
r �
ro o
o �
ry N
M O
0 '
H
OI
�
�
lU
N
N
�
O
O
G
� �'� �ji1• N N N N N N fA N m � Z
'{� L itt': S� � C�
Q L" I'; o � �
a ;; ` ;u a .3"
4 tA
ij �,ImpJI � Op P Qp Q a � V/
� O , O S O O O � O 1/���
• 41 fn N N IA N N N '\y
n
� t � �. m
. a �c
:�
i � M
� -. � � � � 3 , �
a O p!.
��
� � �
rs � �
��
„-`,000'oo'000 L: '.-'z-;'? �0000:' o C
0
Si
�noward�ar�-ara��cr�wo�o
N
n � r O
n� o y;7 Y� m td
NN �� "'� �iA -� �00 7'
� � � � � o��� 4u �� � � i nm�� Q
o��I' I' (, I' (,
0��
��[
N
�nnoon�r.�wr.i�Flz:uw�r�+aw�oovwwaMa���wr.�uwwaru��
C M R-01
Page 14/14
CDM
Smith
Memorandum
To: Marshall Peterson
Byron Williams
Landmark
From: Chad Bartruff, PE
CDM Smith (TX F-3043)
Date: February 18, 2016
Subject: City of Fort Worth
NS-4 EST and Pipeline
CMR-02 Cathodic Protection Supplement
Based on review of the submitted Landmarlc 0&M manual documentation, it was previously noted
that when tested, the cathodic protection system did not meet performance requirements. From on
further review of this information by CorrPro, it was their conclusion that a`short' in the cathodic
protection was occurring. Potential reasons for the short included metal-to-metal contact between
the pipe and tunnel liner plates and/or the presence of groundwater within the tunnel. CorrPro
advised that due to the `short' additional sacrificial anodes were required to protect the tunnel and
pipe system as a whole.
To provide a cathodic protection system that will be in compliance with the specifications due to
the new conditions, a revised CorrPro design was requested. Attached to this memo are CorrPro's
proposal and notes regarding CorrPro's evaluation commentary. CorrPro's proposal includes
provision of the labor, materials, shipping, testing and final report associated with the supplemental
cathodic protection elements.
It was requested that the installation of the CorrPro provided system be performed by Landmarlc.
Attached to this memo is the Landmarlc proposal for execution of this work. The cathodic
protection system shall be installed in accordance with CorrPro requirements so that the system is
fully protecting the installed piping/tunnel system in accordance with the specifications. If testing
determines that the system is not functioning to protect the entire system, remedial activities by
Landmark and CorrPro will be required.
CMR-02
CMR-02Cathodc Protection Supplement 20160217.doa Page 1/10
Marshall Peterson
Byron Willialns
February 18, 2016
Page 2
Landmarlc shall provide and otherwise adhere to the following requirements for fulfillment of this
CMR.
• Extension of the cathodic protection system shall occur wholly within the limits of
the temporary and permanent construction easements associated with the project,
• Implementation of all applicable site safety measures including, as required, trench
safety measure
• All excavation spoils shall be removed from the worlc areas and grading repaired to
pre-construction conditions,
• Prior to initiation of the worlc associated with these proposals, Landmark shall
provide the City with 72 hour notice.
• Landinark shall also appropriately coordinate all utility locates within the area of
excavation and construction in accordance with State of Texas and contract
document requirements.
• Following installation, Landmarlc shall scarify and apply seed to the disturbed areas.
Further Inaintenance of the areas will not be required.
• Landmarlc shall provide marlc-ups to the previously submitted record documents
for review and update by CDM Smith.
Completion of worlc defined in the Landmark proposal shall be amended to include the additional
items and notifications identified above.
cc: Farida Goderya [FWWD)
Mike Hill (FWWD)
Sagar Khole (CDM Smith)
File: 63234-
C M R-02
CMR-02CathodcProtectlonSupplement201602ll.doa Page 2/10
� � �� ���A�� �
January 27, 2016
CDM Smith
100 Throckmorton Street
Suite 600
Fort Worth, TX 76102
Attn: Chad Bartruff, PE
Re: Additional CP Anode Installation Proposal
Northside IV EST and Pipeline
City of Forth Worth, TX, Project No. 00370
Dear Mr. Bartruff:
Landmark Structures
1665 Harmon Road
Fort Worth, Texas 76177
£317.439.8f3II8 Phone
817.439.9001 Fax
www.teainlandmark.com
As requested, below is the pricing to furnish and install 20 additional anodes for the waterline/tunnel
cathodic protection system. Anodes will be installed per Corrpro Change Order dated December 21,
2015. 10 anodes will be installed at Station 1+00 and 10 anodes at Station 4+78, Anodes will be installed
at a depth of 5 feet and at 3 foot spacing. The new anodes will be connected to the existing system at
the respective test stations. Corrpro will issue a report after completion and testing. Please issue a
change order so we can proceed with this worlc.
Additional Cost:
Corrpro (Re-design, Materials, Testing) $5,990.00
Dowager (Anode Installation) $10,000.00
Landmark Fee (10%) $1,599.00
Total Additional Cost $17,589.00
Additional Contract Time:
Contract duration will need to be adjusted accordingly to match actual delay through
completion of worlc.
Exclusions:
- We assume full access to both sides for anode installation
- No backfill density testing
- No greenery restoration
- No additional submittals will be provided for this work or installation.
Please do not hesitate to call my office should you have any questions.
Best Regards,
LANDMARI<STRUCTURES I, L.P.
f� '
. i f � � -
Marshall Peterson
Project Manager
CMR-02
Page 3/10
corrpro�
an AEG � 0%l�comnany
Houston Office
70006 Holliste� Houston, TX 77040
713.460.6000� www.corrpro.com
CHANGEORDER
CUSTOMER NAME: SJ LOUIS CONSTRUCTION
PROJECT NAME: NORTHSIDE IV ELEVATED STORAGETANK
CLIENT CONTACT: PETE STAHL / CHAD BARTRUFF
PURCHASE ORDER N0: 21332-10
CORRPRO JOB NUMBER: 340301696
DATE: 12/21/2015
CONTRACT ADIUSTMENT:
PREVIOUS CONTRACT VALUE: $4,342.00
CHANGE ORDER N0: 2
REQUESTED CHANGE: S5,990.00
NEW CONTRACT AMOUNT: 510,332.00
REFERENCE NUMBER: BID q14170
THIS CHANGE ORDER NUMBER IS ISSUED TO DO THE FOLLOWING:
RE-DESIGN TO ADDRESS SHORTED CASING. LUMP SUM PRICE INCLUDES LABOR, MATERIAIS, SHIPPING, TESTING AND REPORT.
ITEMIZED LIST OF CHANGE ORDER ITEMS:
Signature (Corrpro)
MARITA GRIMBLE
Print Name
PROJECT MANAGER - 1:
Position & Date
Signature (Customer)
Print Name
Position & Date
CMR-02
Page 4/10
� • �
r
�'' � �' " �' '_� "� `' "� �
� ., � �;, y ;� �,o°�, q �
"�' ;� ��a � Y�;a�� 1� M Z =� s
�`s:.;�; �' :;°�''�a� ° � � - �
Y � r�
I 4 i V
d
I � I
� � I
i �
I � � '
I i � tl �_tce_
� o—�
- �----�--- �--
__ 3 � ��
&� � k � a
� ` �� z
a I ai� 3_6CB_o
�y � N �� ��
g � �
� �m �
$q
j � �.o,a s� a
� � �— t �� s�
� 3 � � �" IJ .
�
�€
�8
' - > �
�
:�3 ,�-s�
�e ,��,� � $ia� � ,3,�,�
�_��
�
—L�Z i.VMH9� f o
o �
o �
a �
�((iAYd LTMd�
w5
� x � L4f13AVd 1T'HdStl
;w�
.�,Z? L9Z AVMHJI 'S'fl ONf100H1f105
_s�sre= � �
3 � r�e He—o—
O �
� o � [YB M �f68—W—
I �
0 �� � � CYB�m Bx-F—_�
� o� $ ,>a
,re
�4 i ; �-s�e
'� E m € s`e
ri� � — llf3RY�tld 1TMd5tl
1 � LBZ AVhIH`JI � 'fl ONf108H12JON
�b �s �
�€ 4 r
q� 3
U� GU a hYB 8�— btB�
�€ �� 9YB g�
t z � �tl
LYB GOB
Sz B10 HYB
�� �� �n� N OSB—p OSB
{e l58 — + ISB
_ �F m� � L59—N f e
�rc oi Z fSB— K8�—
� �� �� �� � �58�
� a3un� �e een� �a� �
� �a �g �s Ll3tt31Vd 313e�No�
��sz����� ' �
�
- w n + ri L9Z AVMHJIH 'S'fl OVO �1�2135 OBHINON
e— ie — le — o� ed� ��,�� ie — ie — -
�o� �o� �o �o� �o�� -bm �
— n- (�.�..��
� .--,.--.��
�_ ysg �f � 3 3" !3f 3L�HHW9 �
��
� 65H �
t�� 31 3 NB ,
0
F
n`
O
�
� U
g � �
O
O
b
wW
Z �
J �
Q> a
> �
U ¢
Z Z
o a
c�
0
N
� �
� >i
� w`
o �9 p=
e S �/J •
� � F
� O C
o Z�
� c
U �
0
0
M =
� � �
ir �" �
�'E se�;
���e
-I
py ��o;
/\ BE:E
v "
g� o=u
S �� ��o
L o� I oEYq
��3
� �o ���
� ~ � �
O
+ �
N � � �
B � � �
�
�
0
�
� v + zWd �I / I �ry NOIL�3N J i0 LAOd ' _, u
ai ��� gl �' I �i � �ll �r�1mo�} I l'0619 vl5 I . I �
z� �� � � 86_as �
� w�a��d a
� F�W��� m m � � � m � m m
a=
��uns nw �a uouniuowm ��wesx w i�wx �aroxd mwo ury eo� •urva uo noHx w•a3sn 3e oi iw 3av or,v �wns nro io uu3eoea 3�u 3sv rmmu wwoauroui 3YAH35 MKK553fONd AB U30MOtld SIA630 W/ SW3�Iq00 3S31LL :SII(LII1J00 f0 35rt3tl
'mws3u vw�.a m wms na� o
, ,
i
i
�
� �
L�
I
TXDOT R.O.W.
,� I STA 5+98.09 SEE SHEEf C-7 FOR I
N 7036367.54 CONTINUATION I
I E 2301682.01 �
� INOTES: � I M _ —
1. SEE NOTES ON SHEET G-2. RA EL ROqD —'n — ny �
I W ,.yl��dG
m 2. CONTRACTOR SHALL HAVE CHOICE OF SELECTING THE SIZE OF SHAFf AND THE DIRECTION OF � 12" GATE VA�VE SEE DEfAIL � I OF
TUNNELING. CONTRACTOR SHALL SUBMIT THE PLAN TO THE ENGINEER FOR APPROVAL. 'O_� cz-1 � ��PSE�T�
CJ .
O 3. THE CONTRACTOR SHALL NOTIFY TxDOT INSPECTOR J.D. GREENHILL AT 817-370-6588 AT LEAST a GRqVEL ROqD .*;' ......................':i`:
I 48 HOURS PRIOR TO CONSTRUCTION IN TxDOT RIGHT-OF-WAY. � — — _ _ _ — — — — — — —
� � caEcorn w, snwo�rss:
I m 4. USE CONVENTIONAL DRY BORE, IN TxDOT RIGHT-OF-WAY, UNIESS OTHERWISE APPROVED BY w � 108377
� 12" PLUG SEE DETAIL cz-s l o•`/�
TxDOT ENGINEER OR INSPECTOR.. � ��ENSE:`�2'
� � � I I ���� �
v� I O I 5. SEE BORING LOGS ON SHEEf C-12. 12"x12�� TEE WITH A� Z Z �3
TUNNEUNG SHAFT � 30" BUITERFLY VALVE PLUG SEE DEfAIL cz-s
(SEE NOTE 2) � � I
I � �
STA 1+15.11 � N � -
N 7036729.96 � '� }' �� 3a�� WATER LINE IN 12' � 30Ax30 z�12" TEE I
u� Q TUNNEL 54" DIA OF T
E 2301800.73 � m � '�E•••••-•��.
C� � � u (MINIMUM) I I I y�P� � �
(TXDOT R.O.W.) � p � = w �;� •
r � � � �n �n STA 4+68.20 `* * .: ................. `•*.
MPORARY EASEMENT � _ � I� y � M M � r N 7036447.41 ••:•• •• • •••�••
� M N � O O� 00 h��� 00 a a � 30-Ff PERMANENT WATER EASEMENT C. P. NAWAL
� .� v� �n �n u� � a� �+ a� d' < N m� ro m m � E 2301589.32 � o � 103675
z(n romaocommmoomao N p I �
o � Q (TXDOT R.O.W.) .+ ro � ���ENSE�'�'
u � > > >- u� m I �/a�n� �
s8 30' O o W � I � STA 4+78.41 � �. Q��[� 3 p6 201
= 30"-90' BEND TEMPORARY EASEMENT �
L� Q u� � � 2 �
� � °�s " 2+00' B-Z 3+00 � 4+0 � m
--F- � � � . I
h�yo � M .r � . Z � (� � 3 � � STA 4+75.00 �E �
� m �� w N� SM-1 � � SM-2 � F SM-3 8' Q I 6" BLOW-OFF SEE DETAIL �Z_�p � � N
100' 30 � W j � � � Q w w �� — —
I � f � �
TEASEMEN Y � � w � � � � > j `� w � TUNNELING SHAFT
a a qy ♦ > SCALE IN FEEf
TEMPOR4RY EASEMENT � w � � i. <o �n a� � m a a M M a� Cn � i- � m �
-- 0� � � MN�apia0aa�� � _ �n v a d� a �
TIE IN POINT � � � m � �`P a�a m°°'° `O °0 a0 m� o � ¢ � � I I ? N N � M 1 HORIZONTAL SCALE (
N 7036742.22 �
E 2301809.91 W m � _ � O a Q �°
�� STA 0.90.11 m m � Z SEE DETAILI CZC" � � �
�, 30�� DIA WL Q I g � I I I � I 2 SVERTOICAL SCALE 5
'� �` FL EL = 840.00 . •. I I I I
' o
F. . .. - _ . n . .._. _. . -� - -- -__--- �. _ . .-- -� �-� ---- - _�..------_ .. .._.. . .. .. -� - --. . . __ .._ ..._ _ _ _ .__ - . . . _ . .. . . _.
'�i . _- . .. . ..... . . . . . . _ . . . . .. _ ... _. . _ _.._._ .. .
W V1 W � N N N N N
� 860 Z in o '�°. a u� n = n m � W� 7 �� >- >- > > r f
� o t� . N N w o vi z �'� oi a �o �� N ' Z r�i �� N � x x x x x a a Z o
. rn�' O I m � �- 7 W M � N N O M p a0 O li (7 (7 C7 � V' O Z � �
� } � } • � t Jd� -F �I- i� WmQ t p= �h UmQ� S 2 2 2 Q 2 K d' U . _ ' � _ m m_ _ ..W' __ _... ._.. ¢ . .. Z
� . . _ O V) . . _ "" . . .. _. _ _ _ _ _ _. . . _ � _ .
.•- �- - �_ .�_ _._. .. .... .... . . .... ....._._._. "__
.- W W - V
. __ . . _ _.._ . _ ' _ ._. � . __ . — ___'__ _...._ . J . ._ . . J. m �� O
; Q O Q.^]_..w QWZ OeOWJ FQ Q O Q WO�. Q jlW�i Q wp�a. . _.. j = _ '. . ._. . � 7 > � V WN W Q J J J I Q
855 `�' d. � v� � �li HMI� f/1 � li � fnZ= � mF- �(nZ2m O � O 0 M �� N �� M � d 10 M O w O O Z� �(7� F-�.Ub � a� � W � V�N £
I — d: � d� N 7 Il] � d' � 00 m W O I� O [O Z M7 F7- OMO I- R' 00 N�`F N c0 N f� N F � M
: M O M O .- Oli If7 O t�. r O 01 N N li i(1 � b � 7 h h W a0 O W pNp � r U' O� Z W Op
� +m +m +mo +mo +m + rn +o +o +� + +�� oog +a�> +> + + +w +=o
! . - . . _. _. " _ . _ �� _ . _ _ � . . . . _ . _ . _ N � . . _ . . _ .. _ . _ . . N . F . _ _ _ M � W _ _ . _. _ _ _ . _. M F. W IM F . _ _ M . M) . d'. W - . _ . d' W . 'J' � _ < . U . � � w m � � U - � = Q N W � � d � . 1n � . . 1n � . . N w � W
__ . . . . (n 2 � Z � fn W � fn W � f/1 � W (n W ¢� Q j Q Z Q Z O � O Q O O N J a N J Q Q J Q Q W O
�
850 �'n w �n o �'n f,�" �ii w � io.. � �n rn � N �,. �ii a � %n i�n c� �ii � �ii �n � �' j
i
1 _ _ _ _ _ _. \ . _ _
� 845 �
� ��, � sM_2 �
� _ _ _ - ___ _ ___._ _ _ ----- __ --
; _ . . ._ . _ _ ---- -sM-t--_ . _ - - -- --_ _ _ �•� __ - - - -- ---- -- - - -- __ _ _. ._ __
_ _ _ _ - - _ _
_- - -
� 840 y \ � �
,
� SM-3
i TUN EL 54" DIA EB FA I SEE DEfAIL �DE SEE DEfAIL �ZB
-- - --. _ _._.. _. _ _ . _ . _.. _ - .. -� - -- � -
� (MINMUM) SEE D AIL �Z-�� Z-� �
6 Fif I I �
' 835
- " CCP I 0��° `c
� ( Y ANOTHER CONTR4CTOR �B ��� _ _,�
i � 7YPROJECTN0.01414 - ��-- - . ._. . _ ..._.._. . _ ._ . . _ __ .3��-. . -. -. . _..----- ._ _ . -_._ _ I I C�F' - _. . _. _.
-' OE N0. 630 H'ATER LINE � �,56q, J w
? 830 LE N0. X-2 558. 5-21 4) —� e,NpSF'� >�n �" �n i
0
1 �O �� M 0 N M
� W � o W
� '____'..... __. ___ __ ._ .._.. __.... ._.. .._.. . .___ .._.._._."_ _ ..__._. .. .. __.._. ............ .__._.._ ._.._ _ ._._._..__. '__. _......._... _'_..._._. ._ .__'. _.. __._." ""_'____ '_'-'..." ""____-___-__._ __. _'_ .. ._ _ _ .. _.__.. _�.m.J'_ • J _ ._. ... _ ... .
_ _ u .
, W � xW
' 825 TXD T R.O.W. aF` aF`
N M� N M� I
(
l
J. . . . . . . _ _ _ _ . _ ._. . _. . . _ . . _ . .... .. . . _ _ _ ". . _.
; . _ . . . _ . . . . . . . . .
i S'ZO �
i 1+00 2+00 3+00 4+00 5+00 6+00
� I No I DATE I DRWN I CHKD
REMARKS
Neo ev CP NAWAL VERIFY SCALES CDM
J BY B TAL PLACIDO ��S ONE INCH ON
ORIGINAL DRAWING gmith
� CHKD 6Y D. VARNER
7VEp gy D. VARNER IF NOT ONE INCH ON 100 Throckmortan So-eet, suite 6a0
rr�is sHeer, nwusr FortWatlh,TX76102
NOVEMBER 2012 SCALES ACCOtt01NGLY Tel: (817) 332-8727
TBPE Firm RegisUation No. F-3043
CITY OF FORT WORTH, TEXAS
NORTHSIDE IV
ELEVATED STORAGE TANK (EST) AND PIPELINE
30-INCH WATER LINE
PLAN AND PROFILE
PROJECT No
FIIE NAAIE CI
SHEET No
C-11
Bartruff, Chad
From:
Sent:
To:
Cc:
Subject:
Attachments:
Chad/Pete:
Marita Grimble <mgrimble@corrpro.com>
Monday, December 21, 2015 2:37 PM
Bartruff, Chad; Pete Stahl (PeteS@SJLouis.Com)
Matthew Matlas
RE: RE: Fort Worth - NS4 Elevated Storage Tank and Pipeline
CHANGE ORDER - Re-deisgn 12.21.15.pdf
To address the shorted casing, SJ Louis will need to install 10 anodes at 1+00 and 10 anodes at 4+78 per
drawing C-2. The anodes will need to be installed at a depth of 5 feet and at 3 feet spacing. The attached
change order includes materials, shipping, and a site visit for testing as well as a report. Once the signed
change order is received we can ship the materials to SJ Louis.
Please review and let us know if you have questions.
Best regards,
Marita Grimble � Project Manager � Corrpro Companies, Inc.
70006 Hollister � Houston, TX 77040
Direct: 713.351.0262 � Ce11: 713.253.8704
marimble@corrpro.com
From: Marita Grimble
Sent: Monday, December 21, 2015 8:58 AM
To: 'Bartruff, Chad'
Cc: Matthew Matlas
Subject: RE: RE: Fort Worth - NS4 Elevated Storage Tanl< and Pipeline
Chad,
The re-design is complete. I'll work up a change order and get it to you today.
Marita Grimble � Project Manager � Corrpro Companies, Inc.
7000B Hollister � Houston, TX 77040
Direct: 713.351.0262 � Ce11: 713.253.8704
marimble@corrpro.com
1 C M R-02
Page 6/10
From: Bartruff, Chad [mailto:BartruffCD@cdmsmith.com]
Sent: Monday, December 14, 2015 7:50 AM
To: Marita Grimble
Cc: Matthew Matlas
Subject: RE: RE: Fort Worth - NS4 Elevated Storage Tank and Pipeline
Marita — We had discussed in the phone call that the revision of calcs could get worked into the queue for at latest the
week after Thanksgiving. We are trying to close out this project and without resolution of this item we are on hold. If
there is any way for you to check on this it would be appreciated.
Thanks — Chad
Chad D. Bartruff, P.E.
CDM Smith (TX #F-3043)
100 Throckmorton Street, Suite 600
Fort Worth, TX 76102
Tel: (817) 332-8727 Fax: (817) 820-0450
bartruffcd@cdmsmith.com
cdmsmith.com
� Please consider the environment before printing this email.
From: Marita Grimble fmailto:m�rimble@corrpro.com]
Sent: Monday, December 14, 2015 6:18 AM
To: Bartruff, Chad <BartruffCD@cdmsmith.com>
Cc: Matthew Matlas <mmatlas@corrpro.com>
Subject: RE: RE: Fort Worth - NS4 Elevated Storage Tanlc and Pipeline
Chad,
Unfortunately I don't have an update for you. Matt was handling this one and he is out of the office
until the 215t. Could we follow up with you then?
Marita Grimble � Project Manager � Corrpro Companies, Inc.
7000B Hollister � Houston, TX 77040
Direct: 713.351.0262 � Ce11: 713.253.8704
marimble@corrpro.com
From: Bartruff, Chad fmailto:BartruffCD@cdmsmith.com]
Sent: Sunday, December 13, 2015 12:51 PM
To: Marita Grimble; Matthew Matlas
Cc: Farida. Goderya (Farida.Goderva@fortworthtexas.�ov); Mil<e Hill (Mike.Hill@fortworthtexas.�ov); Williams,
Byron;'Peterson, Marshall; Pete Stahl
Subject: RE: RE: Fort Worth - NS4 Elevated Storage Tanlc and Pipeline
Matt / Marita — I plan to call tomorrow AM, at approx. 9AM for an update regarding status of the items
below. Please let me know if an alternative time is preferred.
CMR-02
Page 7/10
Thanks — Chad
From: Bartruff, Chad
Sent: Thursday, December 03, 2015 2:16 PM
To:'Marita Grimble' <m�rimble@corrpro.com>;'Matthew Matlas' <mmatlas@corrpro.com>; Farida.
Goderya (Farida.Goderva@fortworthtexas.�ov) <Farida.Goderva@fortworthtexas.�ov>; Mil<e Hill
(Mike.Hill@fortworthtexas.�ov) <Mike.Hill@fortworthtexas.�ov>;'Williams, Byron'
<bwilliams@teamlandmark.com>; "Peterson, Marshall' <mpeterson@teamlandmark.com>;'Pete Stahl'
<PeteS@SJLouis.Com>
Subject: RE: RE: Fort Worth - NS4 Elevated Storage Tanl< and Pipeline
Matt — Can you please advise as to status of CorrPro's review of required additional anodes ?
Thanks — Chad
Chad D. Bartruff, P.E.
CDM Smith (TX #F-3043)
100 Throckmorton Street, Suite 600
Fort Worth, TX 76102
Tel: (817) 332-8727 Fax: (817) 820-0450
bartruffcdCa�cdmsmith.com
cdmsmith.com
� Please consider the environment before printing this email.
From: Bartruff, Chad
Sent: Friday, November 20, 2015 1:37 PM
To:'Marita Grimble' <m�rimble@corrpro.com>;'Matthew Matlas' <mmatlas@corrpro.com>;
Farida. Goderya (Farida.Goderva@fortworthtexas.�ov) <Farida.Goderva@fortworthtexas.�ov>;
Mil<e Hill (Mike.Hill@fortworthtexas.�ov) <Mike.Hill@fortworthtexas.�ov>;'Williams, Byron'
<bwilliams@teamlandmark.com>; "Peterson, Marshall' <mpeterson@teamlandmark.com>;
'Pete Stahl' <PeteS@SJLouis.Com>
Subject: RE: Fort Worth - NS4 Elevated Storage Tank and Pipeline
Conference Call occurred Thursday 11/19 at 1 pm as scheduled.
Call participants: City — Mike Hill, Farida Goderya; Landmark — Marshall Peterson; SJ Louis —
Pete Stahl; CorrPro — Matt Matlas; CDM Smith — Chad Bartruff
Call Summary Notes:
➢ CDM Smith to forward as-built documents by Landmark to CorrPro (partial set attached)
for CorrPro review of cathodic protection installation and development of additional
anode installation requirements. Recommend CorrPro refer to their submittal drawings
also. Encasement at the south bulkhead of the tunnel is not clearly
shown. Landmark/SJ Louis will need to provide additional information if requested by
CorrPro
C M R-02
Page 8/10
➢ CorrPro clarified the following:
o See call notes below from previous discussion between CDM Smith and
CorrPro. CorrPro reiterated items noted below.
o Test readings less negative than -850 mV indicates lack of proper protection and
readings slightly more negative indicate that the designed 20-year protective life
of the cathodic protection system will not be provided.
o Comparative test readings from tunnel and pipe indicate short is present as test
readings at Station 1 were the same, Station 2 were within 10 mV.
o Remediation of the system in-place can be accomplished with additional
anodes, due to the `short', for protection of the combined tunnel/pipe system.
o CorrPro will update calculations to determine what amount of additional
protective anodes are needed. Expected next week once CDM Smith provides
Landmark as-built information.
o Installation of additional anodes will require vacuum excavation and trenching
for proper placement. Anodes would not need to be placed at pipe depth due
to issues with rock at lower profile. Installation can be approx 10-ft deep and 3-
ft apart.
➢ Landmark raised question as to who will pay for the additional installation. All parties
agreed to table discussion until CorrPro can provide summary of remediation
requirements.
Proposed that we reschedule as noted due to conflict - 11:00 to 12:00
General Notes:
• CDM Smith (Chad Bartruff) spoke with CorrPro (Matt Matlas and Marita Grimble) at
11 AM.
• CorrPro advised that test information indicates there is a short between the liner plate
casing and the pipe. (upon check of project documents, spacers were to be installed
with 1/2" rubber pad). CorrPro advised that groundwater could impact system
isolation.
• CorrPro advised that likely remediation method for a`short' condition could possibly
be additional anode protection for the combined pipe and liner plate system.
• Secondary conference call to be scheduled with City, Landmark, CorrPro and CDM
Smith. Invitation of others to be coordinated by the individual invitees.
Conference call regarding cathodic protection system for the NS4 pipeline and tanlc.
CONF CALL•
Dial-In —1-719-457-1414
Participant Code — 950791
Submitted with the last 0&M Manual version was cathodic protection test report for the
pipeline and casing. Based on the report, CorrPro stated that inadequate protection is in place
CMR-02
Page 9/10
for the pipeline/casing. Discussion of current status of system and testing results is needed and,
as possible, development of plan forward.
Please advise as to your availability.
Thanks - Chad
Chad D. Bartruff, P.E.
CDM Smith (TX #F-3043)
100 Throckmorton Street, Suite 600
Fort Worth, TX 76102
Tel: (817) 332-8727 Fax: (817) 820-0450
bartruffcd@cdmsmith.com
cdmsmith.com
� Please consider the environment before printing this email.
Aegion Disclaimer
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If
you are not the named addressee you should not disseminate, distribute, retain, or copy this e-mail or any attachments. [f you have received this
email in error please delete and notify the sender.
Ae�ion
CMR-02